[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN204646207U - A kind of integrated acidification to dispel block application system that offshore oilfield is provided - Google Patents

A kind of integrated acidification to dispel block application system that offshore oilfield is provided Download PDF

Info

Publication number
CN204646207U
CN204646207U CN201520325150.XU CN201520325150U CN204646207U CN 204646207 U CN204646207 U CN 204646207U CN 201520325150 U CN201520325150 U CN 201520325150U CN 204646207 U CN204646207 U CN 204646207U
Authority
CN
China
Prior art keywords
online wireless
online
metering device
flow meter
well head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520325150.XU
Other languages
Chinese (zh)
Inventor
桂钦民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING DONGSHENG CENTURY SCIENCE AND TECHNOLOGY Co Ltd
Original Assignee
BEIJING DONGSHENG CENTURY SCIENCE AND TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING DONGSHENG CENTURY SCIENCE AND TECHNOLOGY Co Ltd filed Critical BEIJING DONGSHENG CENTURY SCIENCE AND TECHNOLOGY Co Ltd
Priority to CN201520325150.XU priority Critical patent/CN204646207U/en
Application granted granted Critical
Publication of CN204646207U publication Critical patent/CN204646207U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to one provides offshore oilfield integrated acidification to dispel block application system, belongs to offshore oil exploitation field, and this system comprises and forms acid solution injected system by surge tank, acidifying high-pressure pump, online wireless transmission flow meter, well head high pressure mixer; Acid dilution system is formed by high-pressure injected water pump, online wireless receiving control metering device, well head high pressure mixer; By online wireless transmission flow meter, online wireless receiving controls metering device and forms online dilution proportion system; Wherein, surge tank, acidifying high-pressure pump, online wireless transmission flow meter, well head high pressure mixer are connected successively; High-pressure injected water pump controls metering device by online wireless receiving and is connected with well head high pressure mixer, and online wireless transmission flow meter and online wireless receiving control metering device and be connected.Native system realizes a discharging 6 mouthfuls of above acidification to dispel block of well; Do not conflict with offshore production platform water filling flow process; There is not any security risk; Efficiency of construction is high, the simple advantage of operation.

Description

A kind of integrated acidification to dispel block application system that offshore oilfield is provided
Technical field
The utility model belongs to offshore oil exploitation technical field, and particularly one provides offshore oilfield integrated acidification to dispel block application system.
Background technology
Offshore oilfield is different with onshore oil field, and its platform space is narrow.If platform beats new well or pump detection and workover, other work measure can not be implemented.Cause injection pressure to raise because well injects sewage quality defective (oil-containing, machine are mixed and particle diameter exceeds standard), when close to formation fracture pressure, must injection rate be reduced, thus affect waterflooding development effect.Adopt acidification to dispel block measure for this reason, reduce note pressure, reach injection allocation amount.Because of platform restriction, acidification to dispel block is constructed on general tugboat ship and is constructed, and tugboat (400T) conventional acidulation technique is: tugboat is stopped near operation platform, and institute's with medicament is extracted into different surge tank (30-40m 3), then be diluted to design concentration with injection water, clamp-on construction well with acidifying high-pressure pump.Tugboat (400T) discharging only can be constructed a bite well, and its cost is quite large, and efficiency of construction is low.In order to reduce costs, improve and execute speed, need develop a kind of integrated acidifying and supporting corresponding construction skill, each tugboat (400T) discharging only can be constructed more than 6 mouthfuls of wells, greatly improves efficiency of construction, and after its construction, effect does not subtract.
Utility model content
The utility model object is the weak point for overcoming prior art, proposes the integrated acidification to dispel block application system of a kind of offshore oilfield.Current tugboat (400T) acidizing unit can be utilized, once go out the material of more than 6 mouthfuls of wells.During construction, need not dilute after medicament is extracted into different surge tank, directly well head high pressure mixer clamp-oned by acidifying high-pressure pump on the one hand, and another aspect platform high-pressure injected water also enters well head high pressure mixer and evenly dilutes, and evenly dilution acid solution enters de-plugging target zone.
The one that the utility model proposes provides offshore oilfield integrated acidification to dispel block application system, it is characterized in that, this system comprises and forms acid solution injected system by surge tank, acidifying high-pressure pump, online wireless transmission flow meter, well head high pressure mixer; Acid dilution system is formed by high-pressure injected water pump, online wireless receiving control metering device, well head high pressure mixer; By online wireless transmission flow meter, online wireless receiving controls metering device and forms online dilution proportion system; Wherein, surge tank, acidifying high-pressure pump, online wireless transmission flow meter, well head high pressure mixer are connected successively; High-pressure injected water pump controls metering device by online wireless receiving and is connected with well head high pressure mixer, and online wireless transmission flow meter and online wireless receiving control metering device and be connected.
The utility model proposes one provides integrated its advantage of acidification to dispel block application system of offshore oilfield to be:
Utilize current tugboat (400T) conventional acidulation equipment, realize a discharging 6 mouthfuls of above acidification to dispel block of well;
Inject water at the scene to mix with acid solution, do not conflict with offshore production platform water filling flow process;
The high pressure mixer of this cover system is arranged in well head, without any safety factor;
This cover system efficiency of construction is high, and effect is not second to conventional acidulation de-plugging;
This system cloud gray model is simple to operate.
Accompanying drawing explanation
Fig. 1 is the new composition schematic diagram of this practicality.
Wherein: 1-surge tank, 2-acidifying high-pressure pump, 3-online wireless transmission flow meter, 4-well head high pressure mixer, 5-mix acid liquor, 6-high-pressure injected water, 7-online wireless receiving controls metering device,
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model flow process is described further:
The one that the utility model proposes provides the integrated acidification to dispel block application system of offshore oilfield as shown in Figure 1, and this system comprises and forms acid solution injected system by surge tank 1, acidifying high-pressure pump, online wireless transmission flow meter 3, well head high pressure mixer 4; Acid dilution system is formed by high-pressure injected water pump 6, online wireless receiving control metering device 7, well head high pressure mixer 4; By online wireless transmission flow meter 3, online wireless receiving controls metering device 7 and forms online dilution proportion system; Wherein, surge tank 1, acidifying high-pressure pump, online wireless transmission flow meter 3, well head high pressure mixer 4 are connected successively; High-pressure injected water pump 6 controls metering device 7 by online wireless receiving and is connected with well head high pressure mixer 4, and online wireless transmission flow meter 3 and online wireless receiving control metering device 7 and be connected.
Concrete enforcement and the annexation of the equipment of above-mentioned each subsystem are respectively described below:
Surge tank (30m 3) and acidifying high-pressure pump (AP3D-25/40) between adopt low pressure (D100) pipeline to be connected, adopt high pressure line (D50) to be connected between acidifying high-pressure pump (AP3D-25/40) and online wireless transmission flow meter (WQED100/25), between online wireless transmission flow meter (WQED100/25) and well head high pressure mixer (YLW-350), adopt high pressure line (D50) to be connected; High-pressure injected water (platform injection water) and online wireless receiving control to adopt high pressure line (D50) to be connected between metering device (WRQEK100/25), and online wireless receiving controls metering device (WRQEK100/25) and controls to adopt wireless signal to connect between metering device (WRQEK100/25) with adopting high pressure line (D50) phase on line wireless transmission flow meter (WQED100/25) and online wireless receiving between well head high pressure mixer (YLW-350).
Adopt the Specific construction mode of the utility model system:
One is that construction acid solution is extracted into surge tank 1; Two is mix up online wireless receiving to control metering device 7 dilution ratio, and is connected with online wireless transmission flow meter 3 signal; Three is start acidifying high-pressure pump 2, acid solution is to well head high pressure mixer 4, online wireless transmission flow meter 3 controls metering device 7 number of delivering a letter to online wireless receiving, online wireless receiving controls metering device 7 and automatically regulates the high pressure water yield to well head high pressure mixer 4, after both Homogeneous phase mixing, inject construction shaft bottom.

Claims (1)

1. provide offshore oilfield an integrated acidification to dispel block application system, this system comprises and forms acid solution injected system by surge tank, acidifying high-pressure pump, online wireless transmission flow meter, well head high pressure mixer; Acid dilution system is formed by high-pressure injected water pump, online wireless receiving control metering device, well head high pressure mixer; By online wireless transmission flow meter, online wireless receiving controls metering device and forms online dilution proportion system; Wherein, surge tank, acidifying high-pressure pump, online wireless transmission flow meter, well head high pressure mixer are connected successively; High-pressure injected water pump controls metering device by online wireless receiving and is connected with well head high pressure mixer, and online wireless transmission flow meter and online wireless receiving control metering device and be connected.
CN201520325150.XU 2015-05-19 2015-05-19 A kind of integrated acidification to dispel block application system that offshore oilfield is provided Active CN204646207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520325150.XU CN204646207U (en) 2015-05-19 2015-05-19 A kind of integrated acidification to dispel block application system that offshore oilfield is provided

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520325150.XU CN204646207U (en) 2015-05-19 2015-05-19 A kind of integrated acidification to dispel block application system that offshore oilfield is provided

Publications (1)

Publication Number Publication Date
CN204646207U true CN204646207U (en) 2015-09-16

Family

ID=54098971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520325150.XU Active CN204646207U (en) 2015-05-19 2015-05-19 A kind of integrated acidification to dispel block application system that offshore oilfield is provided

Country Status (1)

Country Link
CN (1) CN204646207U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060719A (en) * 2017-01-01 2017-08-18 陕西海山能源发展有限公司 A kind of oil well work-in-progress control treatment process system
CN112943193A (en) * 2021-03-19 2021-06-11 大庆油田有限责任公司 Preparation and injection integrated acidizing plug removal process
CN113107453A (en) * 2021-03-22 2021-07-13 长江大学 Pulse type acidizing fluid generating device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060719A (en) * 2017-01-01 2017-08-18 陕西海山能源发展有限公司 A kind of oil well work-in-progress control treatment process system
CN112943193A (en) * 2021-03-19 2021-06-11 大庆油田有限责任公司 Preparation and injection integrated acidizing plug removal process
CN113107453A (en) * 2021-03-22 2021-07-13 长江大学 Pulse type acidizing fluid generating device

Similar Documents

Publication Publication Date Title
CN204252982U (en) Offshore oilfield polymer displacement of reservoir oil polymer solution preparation and injected system
CN203971841U (en) A kind of of the fracturing fluid mixing system
CN102423655B (en) Large-flow fracturing fluid preparation system and method
CN103321606B (en) Water plugging shielding method for low-permeability fractured reservoir oil well
CN204646207U (en) A kind of integrated acidification to dispel block application system that offshore oilfield is provided
CN204419151U (en) A kind of proppant loops back conveying device
CN202398329U (en) Large-traffic sled dress formula of fracturing fluid joins in marriage liquid device
CN105756638A (en) System for rapidly dispersing and diluting powder polymer in offshore or alpine or fault-block oil field
CN201843595U (en) Polymer gel microsphere online injection device
CN101435317A (en) Lost-return leakage cross-linked gel plugging process
CN104449642A (en) Plugging agent for oil field gas driving
CN107023284A (en) A kind of static expanding agent injected system and method for implanting
CN205577966U (en) Likepowder polymer instant dispersed , dilution system in marine or high and cold or fault block oil field
CN204186364U (en) A kind of Fractured low permeability oil field skid-mounted type transfer drive device
CN203356010U (en) Mixing dispensing gun
CN205577965U (en) Oil well acidizing complex acid ware
CN202937239U (en) Integrated device for jell dispersoid continuous online production and injection
CN203448043U (en) Underground synthetic gel profile control matching device
CN106634921B (en) The continuous online production of viscous oil emulsion particle diverting agent and injection integral method
CN106493859A (en) A kind of concrete mixer
CN204977114U (en) Isolating agent pond system with cooling device
CN204865565U (en) Device is added in dispersion of polyacrylamide dry powder
CN203979888U (en) Acid solution feeding mechanism during a kind of PCB produces
CN204609856U (en) The online acidizing device of portable water injection well
CN204352834U (en) Double pump proportion adjustable Automatic Mixing System of Emulsion

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant