CN110175705B - 一种负荷预测方法及包含该方法的存储器、系统 - Google Patents
一种负荷预测方法及包含该方法的存储器、系统 Download PDFInfo
- Publication number
- CN110175705B CN110175705B CN201910373982.1A CN201910373982A CN110175705B CN 110175705 B CN110175705 B CN 110175705B CN 201910373982 A CN201910373982 A CN 201910373982A CN 110175705 B CN110175705 B CN 110175705B
- Authority
- CN
- China
- Prior art keywords
- historical
- classification
- data
- cluster
- historical data
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 39
- 230000006870 function Effects 0.000 claims abstract description 70
- 238000004364 calculation method Methods 0.000 claims description 18
- 238000007781 pre-processing Methods 0.000 claims description 11
- 238000013507 mapping Methods 0.000 claims description 6
- 238000012545 processing Methods 0.000 claims description 2
- 238000001514 detection method Methods 0.000 description 5
- 238000005314 correlation function Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 238000004836 empirical method Methods 0.000 description 3
- 238000013528 artificial neural network Methods 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 201000004569 Blindness Diseases 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000002068 genetic effect Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000003064 k means clustering Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 235000015277 pork Nutrition 0.000 description 1
- 238000012847 principal component analysis method Methods 0.000 description 1
- 238000002922 simulated annealing Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F18/00—Pattern recognition
- G06F18/20—Analysing
- G06F18/23—Clustering techniques
- G06F18/232—Non-hierarchical techniques
- G06F18/2321—Non-hierarchical techniques using statistics or function optimisation, e.g. modelling of probability density functions
- G06F18/23211—Non-hierarchical techniques using statistics or function optimisation, e.g. modelling of probability density functions with adaptive number of clusters
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F18/00—Pattern recognition
- G06F18/20—Analysing
- G06F18/24—Classification techniques
- G06F18/241—Classification techniques relating to the classification model, e.g. parametric or non-parametric approaches
- G06F18/2415—Classification techniques relating to the classification model, e.g. parametric or non-parametric approaches based on parametric or probabilistic models, e.g. based on likelihood ratio or false acceptance rate versus a false rejection rate
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Data Mining & Analysis (AREA)
- General Physics & Mathematics (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Tourism & Hospitality (AREA)
- General Engineering & Computer Science (AREA)
- Evolutionary Biology (AREA)
- Bioinformatics & Computational Biology (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Evolutionary Computation (AREA)
- Artificial Intelligence (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Probability & Statistics with Applications (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Entrepreneurship & Innovation (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (11)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910373982.1A CN110175705B (zh) | 2019-05-07 | 2019-05-07 | 一种负荷预测方法及包含该方法的存储器、系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910373982.1A CN110175705B (zh) | 2019-05-07 | 2019-05-07 | 一种负荷预测方法及包含该方法的存储器、系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110175705A CN110175705A (zh) | 2019-08-27 |
CN110175705B true CN110175705B (zh) | 2021-11-09 |
Family
ID=67691361
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910373982.1A Active CN110175705B (zh) | 2019-05-07 | 2019-05-07 | 一种负荷预测方法及包含该方法的存储器、系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110175705B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114219144A (zh) * | 2021-12-13 | 2022-03-22 | 广西电网有限责任公司北海供电局 | 一种主变负荷预测方法及系统 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102722642A (zh) * | 2012-05-25 | 2012-10-10 | 重庆市电力公司长寿供电局 | 大波动电网负荷短期预测方法 |
CN103123665A (zh) * | 2012-07-31 | 2013-05-29 | 上海交通大学 | 基于模糊聚类相似日的短期电力负荷预测方法 |
WO2015077754A1 (en) * | 2013-11-25 | 2015-05-28 | Siemens Corporation | A statistical approach to modeling and forecast of cchp energy and cooling demand and optimization cchp control setpoints |
CN109242189A (zh) * | 2018-09-12 | 2019-01-18 | 国网安徽省电力有限公司合肥供电公司 | 一种基于气象因素的电力负荷短期预测方法 |
CN109583503A (zh) * | 2018-12-03 | 2019-04-05 | 国网江苏省电力有限公司扬州供电分公司 | 一种可中断负荷预测方法 |
-
2019
- 2019-05-07 CN CN201910373982.1A patent/CN110175705B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102722642A (zh) * | 2012-05-25 | 2012-10-10 | 重庆市电力公司长寿供电局 | 大波动电网负荷短期预测方法 |
CN103123665A (zh) * | 2012-07-31 | 2013-05-29 | 上海交通大学 | 基于模糊聚类相似日的短期电力负荷预测方法 |
WO2015077754A1 (en) * | 2013-11-25 | 2015-05-28 | Siemens Corporation | A statistical approach to modeling and forecast of cchp energy and cooling demand and optimization cchp control setpoints |
CN109242189A (zh) * | 2018-09-12 | 2019-01-18 | 国网安徽省电力有限公司合肥供电公司 | 一种基于气象因素的电力负荷短期预测方法 |
CN109583503A (zh) * | 2018-12-03 | 2019-04-05 | 国网江苏省电力有限公司扬州供电分公司 | 一种可中断负荷预测方法 |
Non-Patent Citations (1)
Title |
---|
基于族群进化计算的多项式回归电力负荷预测;陈皓等;《软件》;20110909;第34-37页 * |
Also Published As
Publication number | Publication date |
---|---|
CN110175705A (zh) | 2019-08-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110503256B (zh) | 基于大数据技术的短期负荷预测方法及系统 | |
CN106779223B (zh) | 一种光伏系统发电功率实时预测方法及装置 | |
CN111369070B (zh) | 一种基于包络线聚类的多模融合光伏功率预测方法 | |
CN108846527A (zh) | 一种光伏发电功率预测方法 | |
CN105117810A (zh) | 一种阶梯电价机制下居民用电中期负载预测方法 | |
CN112801388B (zh) | 一种基于非线性时间序列算法的电力负荷预测方法及系统 | |
CN109670676A (zh) | 基于支持向量数据描述的配网台区风险预警方法及系统 | |
CN111488896B (zh) | 一种基于多源数据挖掘的配电线路时变故障概率计算方法 | |
CN107730031A (zh) | 一种超短期高峰负荷预测方法及其系统 | |
CN106682763B (zh) | 一种用于大量样本数据的电力负荷优化预测方法 | |
CN110264107B (zh) | 一种基于大数据技术的台区线损率异常诊断方法 | |
CN110503570A (zh) | 一种异常用电数据检测方法、系统、设备、存储介质 | |
CN111008726B (zh) | 一种电力负荷预测中类图片转换方法 | |
CN111915083B (zh) | 一种基于时间分层组合的风电功率预测方法及预测系统 | |
CN113515512A (zh) | 一种工业互联网平台数据的质量治理及提升方法 | |
CN116227637A (zh) | 一种面向有源配电网的精细化负荷预测方法和系统 | |
CN110909958A (zh) | 一种计及光伏并网功率的短期负荷预测方法 | |
CN104850612B (zh) | 一种基于增强凝聚层次聚类的配网用户负荷特征分类方法 | |
CN115860797A (zh) | 一种适应新电价改革形势的电量需求预测方法 | |
CN116454875A (zh) | 基于集群划分的区域风电场中期功率概率预测方法及系统 | |
CN112949207A (zh) | 一种基于改进最小二乘支持向量机的短期负荷预测方法 | |
CN118095704A (zh) | 基于大数据的乡村典型能源供需平衡方法及系统 | |
CN109523077A (zh) | 一种风电功率预测方法 | |
CN115545333A (zh) | 一种多负荷日类型配电网负荷曲线预测方法 | |
CN110175705B (zh) | 一种负荷预测方法及包含该方法的存储器、系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: Room 509, building D, 39 Ruihe Road, Huangpu District, Guangzhou City, Guangdong Province Applicant after: Guangzhou Shuimu Qinghua Technology Co.,Ltd. Address before: Room 936, Room 333 Jiufojian Road, Zhongxin Guangzhou Knowledge City, Huangpu District, Guangzhou City, Guangdong Province Applicant before: Guangzhou Shuimu Qinghua Technology Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: Room 604, Building 2, No. 5 Yunkai Road, Huangpu District, Guangzhou City, Guangdong Province, 510535 Patentee after: Guangzhou Shuimu Qinghua Technology Co.,Ltd. Address before: 510700 room 509, building D, 39 Ruihe Road, Huangpu District, Guangzhou City, Guangdong Province Patentee before: Guangzhou Shuimu Qinghua Technology Co.,Ltd. |
|
CP02 | Change in the address of a patent holder |