CN1198242A - Method for building nuclear power plant and layout thereof - Google Patents
Method for building nuclear power plant and layout thereof Download PDFInfo
- Publication number
- CN1198242A CN1198242A CN95197961A CN95197961A CN1198242A CN 1198242 A CN1198242 A CN 1198242A CN 95197961 A CN95197961 A CN 95197961A CN 95197961 A CN95197961 A CN 95197961A CN 1198242 A CN1198242 A CN 1198242A
- Authority
- CN
- China
- Prior art keywords
- unit
- crane
- nuclear power
- packaged type
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
A nuclear power plant building method is employed in building a plurality of nuclear power plant units in which while an earlier building unit out of the plurality of units which is started to be built earlier is being built, a later building unit that is to be started to be built later than the earlier building unit is started to be built, and in which a common mobile crane is adapted to move between a crane operating area for the earlier building unit and a crane operating area for the later building unit so that the common mobile crane can be used in building the plurality of units.
Description
The present invention relates to a kind of method of building nuclear power station.
Recently, in the Nuclear Power Station field, pack into and installation effectiveness, use the method for construction of a kind of being called " large-sized module structure " more and more for the object that improves on-site.In this method, before the buildings of packing into, earlier a plurality of articles are dressed up a module, and then with the large scale crane at the buildings of sometime this module being packed into.Along with the increase of nuclear power station output, also should enlarge the weight of unit object, thus, be necessary to effectively utilize crane.
The object that a large amount of sizes and weight are all bigger will be loaded in the nuclear power station, therefore, for these objects are put in the power-house, is necessary to use the large-sized crane with high load-carrying capacity.As this crane with high elevating capacity that achieves the above object, known have a kind of large scale tower crane and an a kind of large scale packaged type crane.Specifically, in building the nuclear power station process, use effectively a kind ofly to have the large scale packaged type crane of high elevating capacity as a main crane.
The method of building nuclear power station by a large scale packaged type of known use crane, can use this crane like this, it can be installed near the ground of a reinforcement the reaction chamber for operating this crane, and operate this crane serially up to the packing into of the large scale object of finishing same nuclear power station unit, then this crane is removed.In this method, in order to build a plurality of nuclear power stations unit (in this standard method, be checked through the beginning commercial operation and need 48 months) according to (individual unit) index formation method from rock in same place, when finishing about 1/4 construction duration of a beginning unit, begin to build Unit one second, therefore, for object being installed into this Unit second, need give this Unit second additional install one with the identical large scale crane of hoisting power in the start element.For example, in order in the interval in 1 year, to build a dimorphism (twin type) nuclear power station unit, need two large-sized cranes to be installed simultaneously about 2 years at same construction site.Herein, the radius of clean-up of a large-sized packaged type crane is that 45m and bearing capacity are 800 tons or more.
The investment that an object of the present invention is to be used in the removable crane of large scale of building a plurality of nuclear power stations unit minimizes.
Above-mentioned purpose is by providing a method by construction nuclear power station of the present invention to realize, this method is characterized in that building a plurality of nuclear power stations unit by this way: at first begin to build one in the unit of building on the zero-time formerly of construction formerly, begin to build a zero-time in the middle of this process of formerly building the unit this formerly builds the follow-up construction unit that the unit falls behind relatively building; Shared packaged type crane moves back and forth between the workspace of formerly building a workspace of unit and being used for follow-up construction unit being used for, and this shared packaged type crane can be used to build a plurality of unit thus.In addition, above-mentioned purpose also can reach by the configuration by a nuclear power station provided by the invention, this configuration is characterised in that: first group of a plurality of nuclear power stations unit is provided with like this, make the waste disposal chamber be common to a plurality of unit, a pulpit and a maintenance room be located between each reaction chambers of a plurality of unit and between each steamer unit room; The buildings configuration of one second group of a plurality of nuclear power stations unit is identical with first group of unit, and adjacent with these first group of a plurality of unit; All there is a crane workspace first and second groups of each unit, and those crane workspaces between first and second groups of unit are unified into a public crane workspace, to be common to first and second groups of unit; Between the crane workspace, be provided with a motion path that is used for the packaged type crane.
By above-mentioned method of construction, use one to build one at a large scale packaged type crane that is used for the crane perform region of this unit and formerly build the unit.Finishing before this formerly builds the unit, begin to build a follow-up construction unit.When large scale packaged type crane was used to build follow-up construction unit, it moved on to the workspace that is used for follow-up construction unit from the workspace that is used for formerly building the unit and is used to build this follow-up construction unit.
Equally, when this large scale packaged type crane is used to build when formerly building the unit, it promptly moves on to from the workspace that is used for follow-up construction unit and is used for formerly building the workspace of unit and is used for once more building and formerly builds the unit.
Like this, use this shared large scale packaged type crane to build a plurality of construction unit, therefore, can reach the minimized effect of investment that is used in the crane of building a plurality of unit.
According to the configuration of above-mentioned nuclear power station, a large scale packaged type crane moves along the motion path between the crane workspace of unit, and thereby when using crane to build a unit, it can move on to the perform region of unit along motion path.Therefore, the configuration of a nuclear power station has realized above-mentioned method of construction.In addition, if during the crane perform region of large scale packaged type crane between two groups (every group comprises two unit respectively), can use large scale packaged type crane to build those unit near the crane perform regions.
Therefore,, the minimized effect of investment of the crane that is used in a plurality of unit can be reached, the amount of exercise of crane can be reduced simultaneously by adopting above-mentioned configuration.
Fig. 1 is a plan view, shows the building configuration by a nuclear power station unit of the present invention, and the configuration of the workspace of a large scale packaged type crane.
Fig. 2 is the flow chart of a signal, wherein shows a duration of building a nuclear power station unit; Install and utilize the time of a large scale packaged type crane; With use this large scale packaged type crane main object put into time in the unit;
Fig. 3 is a flow chart, show and do not adopt the application examples of building the large scale packaged type crane of two groups of dimorphism nuclear power station unit (totally four unit) by method of the present invention, wherein differed from 1 year between the construction start time of Unit first and second, the construction start time of Unit the second and the 3rd differed from 2 years, and the difference of the construction start time of Unit third and fourth is 1 year;
Fig. 4 is a process flow diagram, show the use order of large scale packaged type crane in each unit when building two groups of dimorphism nuclear power station unit (totally four) by the method for large scale packaged type crane of the present invention according to use, wherein the construction zero-time difference of Unit first and second is 1 year, the construction zero-time difference of Unit the second and the 3rd is 2 years, and the construction zero-time difference of Unit third and fourth is 1 year;
Fig. 5 is a planimetric map, shows a requirement and improves the interval (motion path of large scale packaged type crane) of ground to allow large scale packaged type crane to move between the construction unit along material institute path (yard road);
Fig. 6 is a planimetric map, it shows an example that is used for the mobile route of large scale packaged type crane, wherein crane along a part that is used for one of various objectives material institute (yard) move-discord work is relevant, and described part is carried out ground and is handled simultaneously;
Fig. 7 is the planimetric map of basis by the installation position of another auxiliary crane of one embodiment of the present of invention; With
Fig. 8 is the example schematic diagram of a large scale packaged type crane of the present invention.
The present invention is intended to the construction period characteristic based on a nuclear power station, by using a suitable crane equipment, makes the investment of used crane equipment minimize.
The construction period of a nuclear power station had a construction scheme usually, is built within the interval in 1 year comprising the unit, dimorphism power station of one group of two unit, built unit, next dimorphism power station then later in two or three years.The invention provides the method for the large scale packaged type crane of such construction period that is used for a nuclear power station effectively.
Afterwards, by means of following construction example embodiments of the invention are described with reference to the accompanying drawings.Be used for the construction example of embodiment, building two groups of nuclear power station unit of the same type and promptly have four unit (to call unit, dimorphism power station in the following text) altogether, 4, one maintenance rooms in 3, one pulpit of one of them waste disposal chamber are by two units shareds.In addition, build in the example at this, the construction zero-time difference of the first module 61 and second unit 62 is 1 year, and the construction zero-time difference of second unit 62 and the 3rd unit 63 is 2 years, and the construction zero-time difference of the 3rd unit 63 and the 4th unit 64 is 1 year.
Fig. 1 shows the configuration of nuclear power station unit building, wherein has large scale packaged type crane workspace (41,41 and 43) in this embodiment.
In dimorphism nuclear power station unit, accompany the reactor block 1 middle shared pulpit 4 that accompanies of 3, two unit of shared waste disposal chamber between the steamer unit room 2 of two unit.
Consider use one with the large scale packaged type crane 91 of big load-carrying capacity will be the heaviest reactor pressure vessel and other main large scale object be set in reactor block 1 and the steamer unit room 2, therefore each large scale mobile crane car workspace (41,42 and 43) can be located at reactor block 1 place of each unit.More particularly, the radius of clean-up of crane 91 is 50m, and load-bearing capacity is 500 tons or more.Should be noted that in this embodiment having used a radius of action is 800 tons or more crane as 45m and load-bearing capacity.
If will build the 3rd unit 63 and follow-up nuclear power station unit in abutting connection with the construction position of second unit 62, the perform region 42 that is used for the large scale packaged type crane of second unit 62 is configured to can be shared with the perform region 42 of the large scale packaged type crane that is used for the 3rd unit 63.
Compare in the perform region 42 that a large scale packaged type crane all is set with each unit, the present invention program is advantageous, this advantage is, can reduce the quantity of employed large scale packaged type crane perform region, thereby reduces the investment cost of crane facility.
The method embodiment that uses a large scale packaged type crane progressively to build a nuclear power station below will be described.
Fig. 2 is a process flow diagram, and it schematically shows a standard method process of building a single unit of a nuclear power station.In the method, be used for rock inspection (rockinspection), the hydraulic pressure test 32 of reactor pressure vessel, a construction period 71 of the commercial operation 34 of refuelling and beginning (finish and build after the unit) needs 48 months.Fig. 2 has also schematically illustrated the use step of a large scale packaged type crane 91, and promptly it comprises 51, one work periods 52 an of installation period and a dismounting cycle 53; Also showing one in addition uses large scale packaged type crane 91 that main object is installed into packing into the cycle of unit, for example, packing into the cycle 35 of a RCCV lining (RCCVliner), one big locking condenser (blocked condenser) packs into the cycle 36, pack into cycle 37 and reactor pressure vessel of carbonated drink separating heater packed into the cycle 38.
In the process flow diagram of Fig. 2 of the standard method of having represented to build nuclear power station, begin to build nuclear power station from rock inspection 31, pass through some key steps then, for example hydraulic pressure test 32 and fuel filling 33 reach the commercial operation 34 of beginning at last.
In this embodiment, for the purpose of simplifying the description, need to suppose 4 years to build a nuclear power station (checking 31 to the commercial operation 34 of beginning) from rock, and all be put into the power station and will spend triennium from beginning to be built into main object, no longer need large scale packaged type crane to build this moment.
In the process flow diagram that shows the standard method of building a nuclear power station of Fig. 2, large scale packaged type crane before beginning, is installed in the rock inspection, to carry out the assembling of object, pack into and start working, described object comprises the concrete reinforcement of the enhancing of the bottom substrate that is used for anabolic reaction pile room 1 (reactor block 1 being mounted to cancellated rod-type (bar) module as prefabricated component at building-site), the lining (liner) that is used for containment vessel, and other need be installed into other object in the unit period in the beginning of building.
Use large scale packaged type crane 91 to be installed into specifically being exemplified as of main machine/electric object in the unit: a RCCV lining module, the concrete model of an inwall that is used to form a containment vessel and the piping system that penetrates this reactor safety housing become one therein; A RPV pedestal (RPV pedestal), it is the basis of setting up reactor pressure vessel, and it can be discharged into high pressure steam in the pressure suppression pool when major accident takes place; A RCCV dry-well (dry well) module, pipe system therein, valve member, a syndeton, fender wall and similarly object mutually combine in aggregates; With the lower case of a vapour condenser, a carbonated drink separating heater, the main body of a generator unit stator and a reactor pressure vessel.
In addition, for the method for construction of building nuclear power station is further rationalized, a cancellated bar module, a RCCV top board (top slab) module, a layout bar module and an analog of forming film bottom (diaphragm floor) is also put in the nuclear power station buildings with large scale packaged type crane 91.
Use large scale packaged type crane 91 that the large scale object is installed in the buildings carries out always, up to the hydraulic pressure test 32 that has carried out being used for reactor pressure vessel, large scale packaged type crane 91 oneself moves to a position then, thinks to pack object in the next unit and get ready.
If next unit not in same place, is then dismantled this large scale packaged type crane 91 so that it is moved.
Fig. 3 shows a reference example, does not wherein use the method for large scale packaged type crane of the present invention to build two groups of dimorphism nuclear power station unit (totally four unit).In this embodiment, the difference of the construction zero-time of Unit first and second is 1 year, and the difference of the construction zero-time of Unit the second and the 3rd is 2 years, and the difference of the construction zero-time of Unit third and fourth is 1 year.
It should be noted that the configuration in configuration of buildings this moment and large scale packaged type crane groundwork zone 11 identical with shown in Fig. 1.
Under this kind situation, need two large scale packaged type cranes (crane #1 and #2) to build Unit first and second respectively.More particularly, the large scale packaged type crane (crane #1) that is used to build first module to build first module up to time point 32, carries out the hydraulic pressure test of the reactor pressure vessel of first module in 41 work of the perform region of large scale packaged type crane this moment.Because press construction plan, Unit second was built than first module in late 1 year, therefore just used #2 large scale packaged type crane to build Unit second after #1 large scale packaged type crane uses 1 year.
Like this, the work period overlaid of the work period of a #1 large scale packaged type crane and #2 large scale packaged type crane.
More particularly, after #2 large scale packaged type crane is used to build Unit second, #1 large scale packaged type crane still in large scale packaged type crane workspace 41 continuous workings that are used for first module 2 years.
Also can this thing happens when building Unit third and fourth.
Therefore, do not using under the situation of the inventive method, needing two large scale packaged type cranes 91.
In addition, available identical large scale mobile crane is built Unit the second and the 3rd of sharing the large scale packaged type crane workspace 42 be used to build Unit the second and the 3rd.
In other words, after using large scale packaged type crane construction first module,, there is one to leave unused in the middle of two large scale packaged type cranes to bringing into use large scale packaged type crane to build between Unit the 4th.
Below, the use order of large scale packaged type crane when building each nuclear power station unit will be described by means of the construction example of reference Fig. 4.In this example, use uses the method for large scale packaged type crane to build two groups of dimorphism nuclear power station unit (totally four) by the present invention.In addition, the construction start time of Unit first and second differed 1 year, and the construction start time of Unit the second and the 3rd differs 2 years, and the construction start time of Unit third and fourth differed 1 year.
The large scale packaged type crane 91 that is used to build first module was used to build before Unit second after 1 year, and this large scale packaged type crane 91 just is used for object is put into first module in large scale packaged type crane workspace 41.
Then, for object being put into Unit second, with large scale packaged type crane 91 move to build Unit the second and the 3rd in the shared large scale packaged type crane perform region 42, so can use large scale packaged type crane 91 that the large scale object is put into Unit second.
Beginning to build Unit second to no longer needing large scale packaged type crane to build this section of first module in period, when needs are put into Unit second with the large scale object, large scale packaged type crane 91 can move between large scale packaged type crane perform region 41 and 42, thereby object is put into Unit second.
Equally, in order to build Unit third and fourth, large scale packaged type crane 91 moves so that object is put into corresponding units in large scale packaged type crane perform region (42,43).
Large scale packaged type crane 91 can oneself move between each unit.
Large scale packaged type crane 91 has a counterweight to keep its stability when mentioning an object.
When crane 91 when (or zone) is mobile, can remove counterweight 95 along a path that strengthens for moving in the perform region from large scale packaged type crane 91.
With reference to Fig. 5, the influence that every mobile route 92 (being used for the motion at large scale packaged type crane 91 between Unit first and second) and mobile route 93 (being used for the motion of large scale packaged type crane 91 between Unit the second and the 3rd) are improved by ground like this, make crane under the state that counterweight 95 unloads from crane 91 on motion path when mobile, (ground) should bear the weight of a large scale packaged type crane 91.
In this case, by preparing motion path 92 and 93 along motion path 92 and 93 feeds institute path (yardroad) foundation pressure greater than general road of reinforcement, the weight of the crane of operation thereon can be born in this sample institute path.
Be used for each motion path 92 of large scale packaged type crane 91 and 93 width slightly greater than the width of the motion parts (crawler belt) of large scale packaged type crane 91.
Use a truck to be carried between the perform region, and once more this counterweight is installed on the large scale packaged type crane 91 from the counterweight 95 that large scale packaged type crane 91 disassembles.
For large scale packaged type crane can be moved, can consider that the special path of a ground with a reinforcement of preparation (for example material institute path of Zeng Qianging) in a material institute can be moved large scale packaged type crane 91 along it between the perform region; Also can consider to use large scale packaged type crane to continue to use in the material part of various objectives and move, but not relevant with work, this part is subjected to ground processing effect, for example layer overlay steel plate simultaneously.
An example of the mobile route 96 of large scale packaged type crane 91 in this case has been shown among Fig. 6.
Fig. 6 show when beginning to build Unit the 3rd material user mode.As shown in FIG., be provided with a material institute 21 so that a RCCV lining to be installed, the large-sized module at a scene and analog, the prefabricated object material institute 22 of a reinforcement, one is transmitted material institute 23, a light oil case generates district 24 (light oil tank creation area), a zone that is used to assemble an on-the-spot pond (pool in-situ).
Large scale packaged type crane 91 is motion between workspace 41 that is used for first module and the workspace 42 that is used for Unit the second or the 3rd, and mobile with the part (utilizing) of the material institute that allows the crane process along the ground with reinforcement simultaneously.
In addition, for the material that changes along with the time user mode adapt, can consider in advance to the multi-usage material around the builder's yard ground carry out some enhancings.
In order to make after large scale packaged type crane 91 has moved on to another construction unit, one object is put in the previous construction unit, can consider another whipline to be set in the build area of the construction unit that does not have large scale packaged type crane 91, its load-carrying capacity is used for the auxiliary object of installing less than large scale packaged type crane.
The installation position example of another selectable whipline is seen Fig. 7.
The same with large scale packaged type crane, from the angle of economy, also require to reduce the quantity of selectable whipline.
In example shown in Figure 7, suppose when large scale packaged type crane has moved on to the construction unit area of odd number and packed work into, in the construction unit area of even number then by the work of packing into of selectable whipline.
After finishing the work of packing in Unit second, this selectable whipline is moved to Unit the 4th side.This whipline can be a tower crane or a packaged type crane.
As mentioned above, according to the present invention, can only use a large scale packaged type crane 91 in the above-mentioned construction time interval, to build dimorphism nuclear power station unit (comprising a plurality of unit), though can in two identical construction time intervals, use two large scale packaged type cranes to build this dimorphism nuclear power station unit routinely.
Fig. 8 shows an example that is used for large scale packaged type crane 91 of the present invention.
Near large scale packaged type crane perform region 41 work of this large scale packaged type crane 91 reactor block 1 is with buildings 1 that large-sized module and analog are packed into.
The above embodiments can reduce the purchase cost of crane, the maintenance management expense, and also can be reduced to the expense that large scale packaged type crane is prepared ground.
Claims (5)
1. method of building nuclear power station is characterized in that:
Build a plurality of nuclear power stations unit like this, promptly begin to build the unit of construction formerly formerly on the zero-time earlier, on zero-time, be later than the follow-up construction unit that this formerly builds the unit in described one of the middle construction of process of formerly building the unit of construction then; With
Describedly formerly build the crane perform region of unit and be used for moving repeatedly between the crane perform region of follow-up construction unit a shared packaged type crane is arranged being used for, this shared packaged type crane is used to build described a plurality of unit.
2. press the method for construction of the described a kind of nuclear power station of claim 1, it is characterized in that, after described mobile route was reinforced processing, described packaged type crane was formerly built the crane perform region of unit and is used for moving back and forth between the crane perform region of described follow-up construction unit described.
3. press the method for construction of claim 1 or the described a kind of nuclear power station of claim 2, it is characterized in that, first group of described nuclear power station unit disposes like this, a feasible waste disposal chamber that is common to a plurality of unit, one pulpit, and a maintenance room places the reaction of a plurality of unit to push away between the chamber respectively and the steamer unit room between a zone line;
One with near second group of a plurality of nuclear power stations unit that above-mentioned first group of unit has an identical configuration is arranged on above-mentioned first group of nuclear power station unit; With
The one crane perform region that is common to above-mentioned first and second groups of unit is arranged between first and second groups of unit, uses described packaged type crane in described shared crane perform region to build the unit of the described shared crane of the vicinity perform region in described first and second groups of unit thus.
4. by the method for construction of one of claim 1 to 3 described a kind of nuclear power station, it is characterized in that, use elevating capacity to build and be close to the unit that does not have the described crane of crane workspace less than another selectable whipline of described packaged type crane.
5. the configuration of a nuclear power station is characterized in that,
One first group of a plurality of nuclear power stations unit carries out its building configuration like this, be common to a waste disposal chamber of described a plurality of unit, a pulpit, and maintenance room is separately positioned between each reactor blocks of described a plurality of unit and between each steamer unit room;
The configuration of one second group of a plurality of nuclear power stations unit is identical with the configuration of first group of a plurality of unit, and is arranged near described first group of a plurality of unit;
Each described unit all has a crane perform region in described first and second groups;
In described crane perform region, those crane perform regions between described first and second groups are unified into a shared crane perform region to be common to described first and second groups; With
Between described crane perform region, be provided with a mobile route that is used for the packaged type crane.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN95197961A CN1198242A (en) | 1995-09-18 | 1995-09-18 | Method for building nuclear power plant and layout thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN95197961A CN1198242A (en) | 1995-09-18 | 1995-09-18 | Method for building nuclear power plant and layout thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1198242A true CN1198242A (en) | 1998-11-04 |
Family
ID=5083463
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN95197961A Pending CN1198242A (en) | 1995-09-18 | 1995-09-18 | Method for building nuclear power plant and layout thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1198242A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101967886A (en) * | 2010-11-16 | 2011-02-09 | 中国核工业第五建设有限公司 | Assembly and installation methods of steel containment vessel of nuclear power station |
CN101752017B (en) * | 2007-09-27 | 2012-07-18 | 中国核工业二三建设有限公司 | Modularization construction method for nuclear power station nuclear island |
CN103953210A (en) * | 2014-03-31 | 2014-07-30 | 中国核电工程有限公司 | Nuclear island arrangement structure of small-size pressurized water reactor nuclear power plant |
-
1995
- 1995-09-18 CN CN95197961A patent/CN1198242A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101752017B (en) * | 2007-09-27 | 2012-07-18 | 中国核工业二三建设有限公司 | Modularization construction method for nuclear power station nuclear island |
CN101967886A (en) * | 2010-11-16 | 2011-02-09 | 中国核工业第五建设有限公司 | Assembly and installation methods of steel containment vessel of nuclear power station |
CN101967886B (en) * | 2010-11-16 | 2013-06-05 | 中国核工业第五建设有限公司 | Assembly and installation methods of steel containment vessel of nuclear power station |
CN103953210A (en) * | 2014-03-31 | 2014-07-30 | 中国核电工程有限公司 | Nuclear island arrangement structure of small-size pressurized water reactor nuclear power plant |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1080801C (en) | Top-lifting building method of building from upper to lower | |
CN103243934B (en) | The Housing system of single single footing institute construction and building method thereof | |
CN113833309A (en) | Construction method for mechanically dismantling building group and application | |
CN115324366A (en) | Hoisting method for overlong and overweight truss of framed bent structure system | |
CN1198242A (en) | Method for building nuclear power plant and layout thereof | |
CN109025365A (en) | A kind of dismounting system and method for skyscraper | |
CN109296082A (en) | A kind of frame or half inverted construction structure of cylinder load-bearing high level modular architectural and construction method | |
CN106480826B (en) | The cast-in-place traversing construction engineering method of single line box beam pier top | |
CN1165914C (en) | Hydraulic control device and its mounting method | |
CN214062485U (en) | Modularization pipe gallery applied to industrial water treatment industry | |
CN1152783A (en) | Construction method for upper dry well of nuclear reactor shell and assembly unit used for it | |
CN2546426Y (en) | Combined base for tower crane | |
CN208267114U (en) | A kind of frame or half inverted construction structure of cylinder load-bearing high level modular architectural | |
CN108951430A (en) | A kind of road and bridge in-site installation structure, method and loop wheel machine | |
CN103738480A (en) | Skid-mounted offshore platform module | |
CN113578913B (en) | Ground type double-layer overhead rigid landfill | |
JP3523223B2 (en) | Demolition equipment for high-rise buildings | |
JP3078805B1 (en) | Construction method of nuclear power facilities | |
JP3608796B2 (en) | Nuclear power plant construction method and nuclear power plant | |
CN1182940A (en) | Method for building base of nuclear reactor pressure container and used composite object | |
CN220845350U (en) | Be applicable to narrow and small space heavy object transport vechicle | |
CN1337498A (en) | In-situ support system and its construction method | |
CN105926632B (en) | Detachable unearthed platform | |
CN219526372U (en) | Mud discharging device for filling heavy filler into composite biological filter bed system | |
CN110130232A (en) | A kind of method of bridge pier overall stiffness enhancing and pile foundation reinforcement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
REG | Reference to a national code |
Ref country code: HK Ref legal event code: GR Ref document number: 1051919 Country of ref document: HK |