CN114154890A - Power grid planning system form generation method - Google Patents
Power grid planning system form generation method Download PDFInfo
- Publication number
- CN114154890A CN114154890A CN202111493855.9A CN202111493855A CN114154890A CN 114154890 A CN114154890 A CN 114154890A CN 202111493855 A CN202111493855 A CN 202111493855A CN 114154890 A CN114154890 A CN 114154890A
- Authority
- CN
- China
- Prior art keywords
- current situation
- power supply
- planning system
- data
- power grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 31
- 238000011160 research Methods 0.000 claims abstract description 30
- 238000012423 maintenance Methods 0.000 abstract description 2
- 230000005540 biological transmission Effects 0.000 description 8
- 238000012550 audit Methods 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 1
- 239000004020 conductor Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000012552 review Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/101—Collaborative creation, e.g. joint development of products or services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- Health & Medical Sciences (AREA)
- Data Mining & Analysis (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Public Health (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention provides a form generation method of a power grid planning system, and belongs to the technical field of power grid operation and maintenance. The method comprises the steps that a power supply branch side obtains a problem bank from a power grid planning system, then a corresponding current situation analysis table is built based on the problem bank, data of the current situation analysis table are filled by using the corresponding relation between the problem current situation table and the current situation analysis table in the problem bank, and finally the content of the current situation analysis table is used for generating a feasibility research report or feasibility research summary. The feasibility research report or feasibility research summary is compiled in a mode that the problem bank data is obtained by the power supply branch office end, and the problems that compiling personnel of each power supply branch office query data from a power grid planning system by themselves, the data volume is large, repeated work is carried out, data checking is difficult, the error rate is high and the like are solved.
Description
Technical Field
The invention belongs to the technical field of power grid operation and maintenance, and particularly relates to a form generation method of a power grid planning system.
Background
Power grid planning, also known as transmission system planning, is based on load prediction and power supply planning. The power grid planning determines when and where to put in what type of transmission line and the number of loops thereof so as to achieve the transmission capacity required in the planning period, and the cost of the transmission system is minimized on the premise of meeting various technical indexes.
In the field of power grid planning, in each feasibility research stage of medium and low voltage distribution network infrastructure projects, basic units (power supply substations) need to write feasibility research reports. The compilation of the feasibility research report needs to inquire a plurality of data from the power grid planning system, and because the data exist in different forms and the formats of the forms are inconsistent, the data can only be manually filled by workers at present, so that the problems of large filled data quantity, repeated work, difficult data check, high error rate and the like exist, and the feasibility research work quality of the infrastructure engineering is greatly influenced.
Disclosure of Invention
In view of the above, the invention aims to solve the problems that the data is automatically inquired when the feasibility study report is manually compiled at the existing power supply branch end, the data is manually filled and reported, the data volume is large, the repeated work is realized, the data is difficult to check, the error rate is high, and the like.
In order to solve the technical problems, the invention provides the following technical scheme:
the invention provides a method for generating a form of a power grid planning system, which comprises the following steps:
the power supply branch side acquires a problem library from a power grid planning system, wherein the problem library comprises a plurality of different problem current situation tables;
a power supply substation end creates a current situation analysis table with a theme corresponding to the problem current situation table, and captures column labels of the problem current situation table as column labels of the current situation analysis table;
the power supply branch end fills the data corresponding to the problem current situation list label into the table corresponding to the current situation analysis list label;
and the power supply branch terminal generates a feasibility research report or feasibility research summary according to the content of the current situation analysis table.
Further, the problem current situation table is established by professional responsible persons, and the establishment of the problem current situation table by the professional responsible persons is specifically as follows:
and a professional responsible person cleans the current situation data of all the lines and transformers of the distribution network from the distribution network planning system, analyzes the problems of the lines and the transformer area of the distribution network, and establishes a corresponding problem current situation table according to the problems of the lines and the transformer area of the distribution network.
Further, before creating a present analysis table with a theme corresponding to the problem present table at the power distribution substation, the method further includes:
and the power supply branch office end checks the data of the problem bank and modifies the data with problems in the problem bank.
Further, the data of the problem existing in the power supply substation modifying problem library specifically comprises:
and the power supply branch office end modifies the data with problems in the problem database and reports the modified data to the corresponding professional responsible person, so that the professional responsible person modifies the problem database according to the modified data.
Further, the problem status table specifically includes:
the current situation and the existing problems of the medium-voltage public distribution line, the current situation and the existing problems of the public distribution transformer and the infrastructure project library of the medium-voltage and low-voltage distribution network.
Further, the presence analysis table specifically includes:
the method comprises the following steps of medium-voltage power supply line current situation analysis and public distribution transformer current situation analysis.
Further, after generating the feasibility study report or the feasibility study summary according to the content of the status analysis table, the power supply distribution side further includes:
and the power supply branch terminal uploads the feasibility research report or feasibility research summary to the power grid planning system.
In summary, the present invention provides a method for generating a form of a power grid planning system, which includes that a power distribution end acquires a problem base from a power grid planning system, then a corresponding current situation analysis table is newly built based on the problem base, data of the current situation analysis table is filled by using a corresponding relationship between the problem current situation table and the current situation analysis table in the problem base, and finally, a feasibility study report or feasibility study summary can be generated by using the content of the current situation analysis table. The feasibility research report or feasibility research summary is compiled in a mode that the problem bank data is obtained by the power supply branch office end, and the problems that compiling personnel of each power supply branch office query data from a power grid planning system by themselves, the data volume is large, repeated work is carried out, data checking is difficult, the error rate is high and the like are solved.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
Fig. 1 is a schematic flow chart of a method for generating a form of a power grid planning system according to an embodiment of the present invention;
fig. 2 is a full flow chart of feasibility study approval of a conventional power distribution network infrastructure project scheme provided by an embodiment of the invention;
fig. 3 is a full flowchart of feasibility study approval of the power distribution network infrastructure project scheme provided by the embodiment of the invention.
Detailed Description
In order to make the objects, features and advantages of the present invention more obvious and understandable, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the embodiments described below are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Power grid planning, also known as transmission system planning, is based on load prediction and power supply planning. The power grid planning determines when and where to put in what type of transmission line and the number of loops thereof so as to achieve the transmission capacity required in the planning period, and the cost of the transmission system is minimized on the premise of meeting various technical indexes.
In the field of power grid planning, in each feasibility research stage of medium and low voltage distribution network infrastructure projects, basic units (power supply substations) need to write feasibility research reports. The compilation of the feasibility research report needs to inquire a plurality of data from the power grid planning system, and because the data exist in different forms and the formats of the forms are inconsistent, the data can only be manually filled by workers at present, so that the problems of large filled data quantity, repeated work, difficult data check, high error rate and the like exist, and the feasibility research work quality of the infrastructure engineering is greatly influenced.
Specifically, please refer to fig. 2. In the conventional feasibility study approval process, the process is divided into four stages, and the content and time requirements of each stage are shown in fig. 2. Each stage is described in detail below.
First stage (power supply branch): the content completed by the corresponding professional responsible person or the main responsible person comprises content one: collecting a question bank, compiling and reporting a project research plan, a research adjustment plan and a content II: and editing and reporting the project researched scheme according to the review opinions.
Second stage (grid planning center): the content completed by its professional responsible person includes content three: issuing project plan (i.e. project workable plan, workable adjustment plan) to the third stage and content four: collecting the expert evaluation opinions, evaluating the project plan and issuing the evaluation opinions. And if the technical examination is not passed, the power supply branch office is led to complete the corresponding work content II. If so, the process proceeds to the third stage. Other tasks that need to be performed include checking the amount and archiving, etc.
Stage three (expert library): the project examination is completed by an expert group, and specifically comprises project scheme readiness examination, project scheme compliance examination, project scheme technical examination and project scheme implementation effect examination. And when the second-stage technology examination conclusion passes, project plan examination is required, and the second-stage verification amount is continued after the project plan examination passes.
Fourth stage (grid planning center): the central responsible person verifies that the amount is correct and then passes the project plan. If the audit is passed, filing processing is carried out; if the audit is not passed, the corresponding responsible person of the power supply branch office in the other first stage is responsible for revising the project scheme.
As can be seen from the above, the project research schemes and the research adjustment schemes are mainly compiled by the corresponding professional responsible persons or main responsible persons of each power supply branch office, and they need to perform data query from the power grid planning system to collect a problem library, which requires a large amount of data to be filled in. And the power grid planning system is mainly responsible for a power grid planning center, if data errors can cause errors of data filled by a power supply substation end but the errors are not found, the compiled project scheme can not pass examination, and the waste of manpower work is caused.
Based on the method, the invention provides a form generation method of a power grid planning system.
The following is a detailed description of an embodiment of a form generation method of a power grid planning system according to the present invention.
Referring to fig. 1, the present embodiment provides a method for generating a form of a power grid planning system, including the following steps:
s100: and the power supply branch side acquires a problem library from the power grid planning system, wherein the problem library comprises a plurality of different problem current situation tables.
It should be noted that, because of the traditional programming method, the amount of data filled by the programmer at the power distribution side is large, the work is repeated, the data check is difficult, and the error rate is high. Therefore, the existing problem bank can be directly obtained from the power grid planning system by each branch office. The project plan compilation is carried out by directly utilizing the established question bank data, so that the workload of filling and reporting the data can be greatly reduced, and the data error probability is reduced.
The problem status table in the problem bank is established by professional responsible persons. As shown in fig. 3, a specific process of establishing the problem current situation table by the professional responsible person is that the professional responsible person cleans current situation data of all lines and transformers of the distribution network from the distribution network planning system, analyzes problems of the lines and the transformer area of the distribution network, and establishes a corresponding problem current situation table according to the problems of the lines and the transformer area of the distribution network. The problem status table specifically includes: the current situation and the existing problems of the medium-voltage public distribution line, the current situation and the existing problems of the public distribution transformer and the infrastructure project library of the medium-voltage and low-voltage distribution network.
The problem of possible errors also exists in directly obtaining the problem bank from the power grid planning system. Therefore, after acquiring the problem bank, the power supply branch needs to verify the quality of the data in the problem bank and check whether the data is wrong. If there is a mistake, the data with a problem in the question bank needs to be modified. Specifically, the data with problems in the problem database is modified by the power supply branch office and reported to the relevant professional responsible person (referring to the professional responsible person in the power grid planning center), so that the professional responsible person modifies the database (namely, the problem database) according to the modified data.
S200: and a power supply substation end creates a current situation analysis table with a theme corresponding to the problem current situation table, and captures column labels of the problem current situation table as column labels of the current situation analysis table.
For example, a "medium-voltage power supply line current status analysis" table corresponding to "medium-voltage utility distribution line current status and existence of problem" and a "utility distribution line current status analysis" table corresponding to "utility distribution line current status and existence of problem" are newly created. Column labels of the problem presence table need to be captured as column labels of the presence analysis table.
For example, the column labels of the "area and county", the "substation name" and the "feeder name" of the column label are extracted from the "current situation and problem existing medium-voltage public distribution line" table as the column labels of the "current situation analysis of medium-voltage power supply line" table.
And (3) capturing the 'the region and county', the 'transformer substation name', the 'feeder line name' and the 'distribution transformer name' of the column labels from the 'public distribution transformer current situation and problem existing' table as the column labels of the 'public distribution transformer current situation analysis' table.
S300: and the power supply branch terminal fills the data corresponding to the problem current situation list label into the table corresponding to the current situation analysis list label.
It should be noted that, from "current state of medium-voltage public distribution line and problem," grab column label "safe current (a)", "substation name", "fault indicator (set) with communication function", "two remote terminals (set)", "power supply radius (km)", "power supply section classification", "connection mode", "feeder name", "end voltage (kV)", "annual power supply amount (kWh)", "annual maximum current (a)", "annual maximum load rate (%)", "three remote terminals (set)", "whether or not optical fiber coverage is achieved", "area country", commissioning date "," line property "," main cable model "," main cable length (km) "," main overhead line length (km) "," main insulated overhead model "," power supply voltage (km) "," power supply section classification "," line mode ", and" state of the power supply section ", and" line quality ", respectively, The current situation analysis of the medium-voltage power supply line of the corresponding line is filled in 33 data corresponding to the model number of the bare trunk conductor, the number of automatic sections of the trunk line, the total trunk length (km), the attached public variable capacity (kVA), the attached public variable transformer number, the attached public transformer total number, the attached capacity (kVA), the attached special variable capacity (kVA), the attached special transformer number and the like.
The method comprises the steps of filling 19 data corresponding to the public distribution transformer current situation and the existing problems, such as 'the district and county belonging to a public distribution transformer' from a grabbing column label ',' the power supply partition classification ',' the distribution transformer name ',' the distribution transformer model ',' the rated capacity (kVA), 'the commissioning date', 'the substation name', 'the feeder name', 'the number of outgoing lines and loops (loops) of a transformer district', 'the main line path of a transformer district low-voltage main line', 'the power supply radius (m),' the load property ',' the number of users (users) realizing one meter, the number of smart meters (blocks), 'the number of users (users) realizing low-voltage meter reading', and the like, into 'the public distribution transformer current situation analysis' of the corresponding public transformer.
S400: and the power supply branch terminal generates a feasibility research report or feasibility research summary according to the content of the current situation analysis table.
It should be noted that the generated feasibility study report or the feasibility study summary also needs to be uploaded to the power grid planning system.
The embodiment provides a method for generating a form of a power grid planning system, which comprises the steps that a power supply branch end obtains a problem base from a power grid planning system, then a corresponding current situation analysis table is built on the basis of the problem base, data of the current situation analysis table are filled by using the corresponding relation between the problem current situation table and the current situation analysis table in the problem base, and finally a feasibility research report or feasibility research summary can be generated by using the content of the current situation analysis table. Compared with the traditional process, the problem situation table is generated at the power grid planning system end, so that the problem base is formed for the power supply substation end to compile the project scheme, and the problems that compiling personnel of each power supply substation inquire data from the power grid planning system, the data volume is large, repeated work is difficult, the data checking is difficult, the error rate is high and the like in manual data filling are avoided.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.
Claims (7)
1. A method for generating a form of a power grid planning system is characterized by comprising the following steps:
the power supply branch side acquires a problem library from a power grid planning system, wherein the problem library comprises a plurality of different problem current situation tables;
the power supply branch side creates a current situation analysis table with a theme corresponding to the problem current situation table, and captures column labels of the problem current situation table as column labels of the current situation analysis table;
the power supply branch terminal fills the data corresponding to the problem current situation list label into the table corresponding to the current situation analysis list label;
and the power supply branch terminal generates a feasibility research report or feasibility research summary according to the content of the status analysis table.
2. The power grid planning system form generation method according to claim 1, wherein the problem status table is established by the professional responsible person, and the establishment of the problem status table by the professional responsible person specifically includes:
and the professional responsible person cleans the current situation data of all lines and transformers of the distribution network from the distribution network planning system, analyzes the problems of the lines and the transformer area of the distribution network, and establishes a corresponding problem current situation table according to the problems of the lines and the transformer area of the distribution network.
3. The method for generating a form of a power grid planning system according to claim 1, wherein before creating a presence analysis table with a new theme corresponding to the problem presence table at the power supply branch side, the method further comprises:
and the power supply branch office end checks the data of the problem bank and modifies the data with problems in the problem bank.
4. The method for generating a grid planning system form according to claim 3, wherein the modifying of the data with problems in the problem library by the power supply branch side specifically includes:
and the power supply branch office terminal modifies the data with problems in the problem library and reports the modified data to the corresponding professional responsible person, so that the professional responsible person modifies the problem library according to the modified data.
5. The power grid planning system form generation method according to claim 1, wherein the problem status table specifically includes:
the current situation and the existing problems of the medium-voltage public distribution line, the current situation and the existing problems of the public distribution transformer and the infrastructure project library of the medium-voltage and low-voltage distribution network.
6. The grid planning system form generation method according to claim 1, wherein the presence analysis table specifically includes:
the method comprises the following steps of medium-voltage power supply line current situation analysis and public distribution transformer current situation analysis.
7. The method for generating a form of a power grid planning system according to claim 1, wherein the step of generating a feasibility study report or a feasibility study summary by the power distribution side according to the content of the status analysis table further includes:
and the power supply branch terminal uploads the feasibility research report or feasibility research to the power grid planning system in a gathering manner.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111493855.9A CN114154890A (en) | 2021-12-08 | 2021-12-08 | Power grid planning system form generation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111493855.9A CN114154890A (en) | 2021-12-08 | 2021-12-08 | Power grid planning system form generation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114154890A true CN114154890A (en) | 2022-03-08 |
Family
ID=80453940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111493855.9A Pending CN114154890A (en) | 2021-12-08 | 2021-12-08 | Power grid planning system form generation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114154890A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114677112A (en) * | 2022-03-25 | 2022-06-28 | 国网江西省电力有限公司电力科学研究院 | Power distribution network project large-scale evaluation method and system based on big data |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050251433A1 (en) * | 2004-04-16 | 2005-11-10 | Orifici Joseph M | Method and system to assess, track and implement capital projects by municipalities |
CN107146002A (en) * | 2017-04-13 | 2017-09-08 | 天津天大求实电力新技术股份有限公司 | One kind builds area's distribution network planning method and system |
CN108345991A (en) * | 2018-01-31 | 2018-07-31 | 国网山东省电力公司经济技术研究院 | A kind of the feasibility study review system and reviewing method of fusion power grid multi-source information |
CN112200458A (en) * | 2020-10-12 | 2021-01-08 | 贵州电网有限责任公司 | Power distribution network planning data application method and system |
-
2021
- 2021-12-08 CN CN202111493855.9A patent/CN114154890A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050251433A1 (en) * | 2004-04-16 | 2005-11-10 | Orifici Joseph M | Method and system to assess, track and implement capital projects by municipalities |
CN107146002A (en) * | 2017-04-13 | 2017-09-08 | 天津天大求实电力新技术股份有限公司 | One kind builds area's distribution network planning method and system |
CN108345991A (en) * | 2018-01-31 | 2018-07-31 | 国网山东省电力公司经济技术研究院 | A kind of the feasibility study review system and reviewing method of fusion power grid multi-source information |
CN112200458A (en) * | 2020-10-12 | 2021-01-08 | 贵州电网有限责任公司 | Power distribution network planning data application method and system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114677112A (en) * | 2022-03-25 | 2022-06-28 | 国网江西省电力有限公司电力科学研究院 | Power distribution network project large-scale evaluation method and system based on big data |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101272051B (en) | Information system integration method of electric network production control region and management information region | |
CN102567859B (en) | Data integrated management system of intelligentized power supply system | |
CN102567603B (en) | Method for automatically generating BPA calculation file based on actual measurement topology and measured data | |
CN112765258A (en) | Power distribution network graph model checking management system and method thereof | |
CN105022874A (en) | Digital simulation automatic modeling method and system for power distribution network | |
CN104992382B (en) | A kind of data fusion method towards power distribution network As-Is Assessment | |
CN102545204B (en) | Automatic generation method and device of power grid fault set | |
CN202600765U (en) | Data comprehensive management system for intelligent power supply system | |
CN108764750A (en) | Main distribution network model modeling and topology analyzing method and system | |
CN103065269A (en) | Marketing and distribution main data management system | |
CN112134277B (en) | Power grid topology optimization checking method and system based on full-grid marketing and distribution multi-source data | |
CN113283619A (en) | Power failure maintenance planning auxiliary method and system based on knowledge graph | |
CN106970999A (en) | A kind of BPA Database Modelings and maintaining method | |
CN106910143A (en) | Power distribution network artwork multi-edition control method and system | |
CN104881739B (en) | Data consistency verification method is matched somebody with somebody by a kind of battalion based on IEC61970/61968 CIM standards | |
CN114154890A (en) | Power grid planning system form generation method | |
CN114841627B (en) | Maintenance plan checking method, device, equipment and storage medium | |
CN112541671A (en) | Primary and secondary fusion power distribution network construction evaluation system based on multi-stage fuzzy comprehensive evaluation | |
CN112366690A (en) | Low-voltage transformer area transverse node relation identification method based on strong synchronous voltage feature matching | |
CN104112183B (en) | The intelligent scheduling model management system and management method of intelligent substation plug and play | |
CN110489729B (en) | Automatic conversion method and system for D5000-matpower grid multi-disaster coupling cascading failure model | |
CN110492488B (en) | Automatic generation method for low-frequency low-voltage load reduction sequence of regional power grid | |
CN109840646A (en) | Voltage monitoring method based on big data processing | |
CN112149897A (en) | Power distribution network planning visual management method and device and storage medium | |
CN111985794A (en) | Line loss management method based on marketing and distribution information integration platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |