CN1039290C - 制造钢带的方法和设备 - Google Patents
制造钢带的方法和设备 Download PDFInfo
- Publication number
- CN1039290C CN1039290C CN92111079A CN92111079A CN1039290C CN 1039290 C CN1039290 C CN 1039290C CN 92111079 A CN92111079 A CN 92111079A CN 92111079 A CN92111079 A CN 92111079A CN 1039290 C CN1039290 C CN 1039290C
- Authority
- CN
- China
- Prior art keywords
- steel band
- equipment
- distortion
- roll
- thickness
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 44
- 239000010959 steel Substances 0.000 title claims abstract description 44
- 238000000034 method Methods 0.000 title claims description 17
- 239000007788 liquid Substances 0.000 claims abstract description 5
- 238000005096 rolling process Methods 0.000 claims abstract description 4
- 238000007711 solidification Methods 0.000 claims description 4
- 230000008023 solidification Effects 0.000 claims description 4
- 230000011218 segmentation Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 claims description 2
- 229910001208 Crucible steel Inorganic materials 0.000 abstract description 6
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000001816 cooling Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000003466 welding Methods 0.000 description 3
- 238000005266 casting Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/466—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a non-continuous process, i.e. the cast being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/463—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/1206—Accessories for subsequent treating or working cast stock in situ for plastic shaping of strands
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2201/00—Special rolling modes
- B21B2201/14—Soft reduction
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Continuous Casting (AREA)
- Metal Rolling (AREA)
Abstract
在制造钢带的方法中,由固化钢带壳3和液芯4构成的连续浇注的钢带2的厚度,在变形辊中变薄,然后进行轧制。为了避免不希望的厚度偏差改善接合及简化辊压变形部件,将钢带浇注成厚度为40~80mm,并经最多为三级的辊压实形,使钢带厚度压薄到15~40mm,并且其剩余液芯为2~15mm厚,于是通过穿行固化装置。
Description
本发明涉及一种制造钢带的方法,它由已固化的钢带壳和液芯构成的连续浇注的钢带,在其辊压变形中使其厚度不断地变薄,然后进行轧制。
在专利EP-A1-0286862所公开的方法中,通过固定模浇注出的厚度为40~50mm的钢带,该钢带从固定模出来后经过轧制件压挤,使得在固定模中所形成的钢带壳的隔离的内壁互相熔接。
在通过设有一定长度的固定模的钢带浇注过程中,实际上所形成的钢带壳的厚度,取决于浇注的速度。为了保持恒定的轧辊间隙,其轧制力必须与当时的钢带壳厚度相匹配。在浇注速度较慢时,不再能达到有效的轧制力,使得所生产的钢带厚度便会超过规定的厚度,反之,在浇注速度太快时,由于所产生的钢带厚度小于规定厚度,于是,可能使得钢带出现钢带壳熔接。
本发明的目的是提供一种实施该过程的方法和设备,从而避免产生钢带的不希望的厚度偏差及不良的熔接。由此,简化了变形部件以及降低能源消耗。
本发明的目的是这样达到的,钢带铸坯被浇注成厚度为40~80mm,最多经过三级辊压变形,使钢带厚度变薄到15~40mm,并且其中部具有厚度为2~15mm的剩余液芯,然后,使该钢带在不变形情况下通过固化装置。
通过该方法,可使浇注速度和钢带厚度互相自由得到补偿而达到较高的生产率,并获得钢带内部结构密实、熔析自由的接合。由于减小了变化部件的调整力,使设备结构简单,同时也节约了能源。
在进行辊压变形前,钢带壳厚度最好为6~19mm。
本发明的进一步特征,是辊压变形率为10~60%,该变形率在浇注时可以进行调整。
在浇注速度为2~10米/分时,钢带直线前进导入长度为1~5米的辊压变形带。
经过固化装置后的钢带,被调整到其轧制温度后,才进行轧制。
在本发明的设备结构中,用于实施固定模浇注钢带方法的设备中,在最多有三对变形辊之后,设置由支承辊构成的固化区和一驱动装置。
其中的变形辊和/或支承辊装有一机构定位装置和液压压紧装置。
本发明进一步实施方案在权利要求9~14中加以说明。
参照附图,描述具有本发明的特征和优点的实施例,其中:
图1是制造钢带设备的原理图;
图2是该设备的第一部分,即从固定模到驱动装置图;
图3是图2具有两对变形辊的变形图;
图4是设置在变形辊对前面的支承辊对的进一步变形图;
图5是变形辊对的局部视图,它具有支承横梁和调整定位装置;
图6是支承辊对的局部视图,它具有支承框架和调整定位装置。
如图1的设备,包括固定模1,一对变形辊5,一些导向支承辊7和一对驱动辊8。所述固定模1浇注的钢带2,其厚度为40~80mm。为了使钢带在传送过程中转向,设置一个转向轮9。钢带2’接着进入驱动调整装置10处,并借助剪切装置11而分段。为了调整钢带温度,一段钢带再通过一加热炉12,而在该炉后面设有另一剪切装置13和把钢带上氧化皮去掉的除氧化皮装置14。
在钢带传送流程中所设置的斯蒂克轧机,它包括一轧机机座15,它具有一前置的卷盘炉16或后置的转盘炉17。离开斯蒂克轧机的钢带2”,通过叶片或冷却装置区18,最后进入卷取机19中。
图2~图4,带有浇注设备中的钢带2,2’的制造步骤。由注入到固定模中的钢水,在固定模1中冷却凝固成一钢带壳3,该钢带壳3具有形成一液芯4的铸钢带2。
在固定模1下面的钢带壳3的钢带的宽侧之间的相对距离,借助具有内冷却装置35的变形辊5、6而变小。此时,以该方式形成的钢带厚度为15~40mm,其剩余液芯4厚度为2~15mm。于是,经辊压变形后的浇注钢带2在不变形情况下通过导向辊7所构成的辊子导轨之间,并由此逐渐被固化。所述钢带的向前推进是由驱动辊8来完成的。
如图2所示的实施例,对于处在变形辊对5之间的浇注钢带的辊压变形是一级的。如图3所示的实施例,它选择了变形辊5和6,这是二级辊压变形。两级或三级辊压变形对不允许高速度变形,而多级变形的对钢带是有益的。为了冷却浇注钢带2,在导向辊7之间设有喷水咀20。
图4所示的替换方案,在固定模1之下的浇注钢带,首先被导入支承辊21之间,从而首先调节其特性温度。支承辊21和导向辊7分别具有内冷却装置22和23。
图5所示的结构中,其变形辊5被多段地支承在其间,其中轴承24,25固定在横梁27,28上,其横梁相对两测由支架26来导向。轴传动装置29固定在支架26上,它作为横梁27,28和变形辊5的定位装置。所述的与电机30连接的轴传动装置,朝着横梁27,28的方向各有一丝杆31。拧入丝杆31上的每一个调节距离的螺母32,通过一键33的作用,可防止其转动。每一个调节距离的螺母32顶在模梁27,28上的止挡板34上。通过具有拉杆36a的调整缸36,可使械梁27,28互相向内拉紧,而它们之间拉紧后的距离和变形辊5之们的距离,通过由轴传动装置29定位的调节距离螺母32来确定。用该方法,经距离调节后使得变形辊对5保持在固定模1成型空间的中心位置。对于另一变形辊对6(图3),也可设置如此的相应的支承和调节装置。
图6所示的结构,导向辊7同样被多段地支承在其间,其中的轴承37,38装在框架39,40上,框架39,40的两侧由支架41来导向。轴传动装置42固定在支架41上,它作为框架39,40和导向辊7的定位装置。与电机43连接的轴传动装置42朝着框架39,40的方向各具有一丝杆44。每一在丝杆44上的距离螺母45 通过一键46防止旋转。每一距离螺母45顶在框架39、40上的止档板47上,通过各具有拉杆48a的调整缸48使框架39、40互相拉紧,其中其框架的相对距离和导向辊7的相对中距离通过由轴传动装置42定位的距离螺母45而确定。通过该方法便得导向辊7经调节距离后对准相应的变形辊5。
Claims (14)
1.制造钢带的方法,其中由固化钢带壳和液芯构成的连续浇注成40~80mm厚的钢带(2),在钢带随后穿过不带辊压的导引段以前最多经三级辊压变形后,使钢带(2)的厚度变为15~40mm,而其剩余液芯(4)厚度为2~15mm,然后,使钢带(2)导入并通过固化装置。
2.如权利要求1所述的方法,其特征是在经辊压变形之前的钢带壳(3)的厚度为6~19mm。
3.如权利要求1所述的方法,其特征是辊压变形率在10~60%之间。
4.如权利要求1所述的方法,其特征是所述的辊压变形率可在浇注时进行调节。
5.如权利要求1所述的方法,其特征是在浇注速度为2~10米/分钟时,钢带以直线前进导入长度为1~5米的辊压变形带。
6.如权利要求1所述的方法,其特征是在通过固化装置后的钢带(2'),被调节到轧制温度而进行轧制。
7.实施权利要求1~6之一的设备,它由一钢带浇注用的固定模,及其后置的变形辊组成,其特征是在最多为三个变形辊对(5,6)的后面,设有单由并不对钢带施加变形影响的导向辊(7)组成的固化区和一驱动装置(8)。
8.如权利要求7所述的设备,其特征是所述变形辊(5,6)装有机械定位装置(29~34)和液压压紧装置(36,36a)。
9.如权利要求7所述的设备,其特征是所述的导向辊(7)装有机械定位装置(42~47),和液压压紧装置(48,48a)。
10.如权利要求7所述的设备,其特征是所述的变形辊(5,6)根据钢带宽度而分段,并且它是在中间被支承着。
11.如权利要求7所述的设备,其特征是在钢带宽度上分段的而且由中间支承的导向辊(7)形成的所述的穿行固化区。
12.如权利要求7所述的设备,其特征是在所述穿行固化区之后,设置转向装置(9)和驱动装置(10)。
13.如权利要求14所述的设备,其特征是在驱动装置(10)之后,设置温度调节区(12)和轧制装置(15)。
14.如权利要求7所述的设备,其特征是在固定模(1)和变形辊对(5)之间,设有支承辊(21)。
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEP4131116.7 | 1991-09-19 | ||
DE4131116 | 1991-09-19 | ||
DEP4135214.9 | 1991-10-25 | ||
DE4135214A DE4135214C2 (de) | 1991-09-19 | 1991-10-25 | Verfahren und Anlage zur Herstellung von Stahlband |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1071868A CN1071868A (zh) | 1993-05-12 |
CN1039290C true CN1039290C (zh) | 1998-07-29 |
Family
ID=25907454
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN92111079A Expired - Fee Related CN1039290C (zh) | 1991-09-19 | 1992-09-19 | 制造钢带的方法和设备 |
Country Status (8)
Country | Link |
---|---|
US (2) | US5339887A (zh) |
EP (1) | EP0535368B1 (zh) |
JP (1) | JP3113410B2 (zh) |
CN (1) | CN1039290C (zh) |
AT (1) | ATE138835T1 (zh) |
CA (1) | CA2078582C (zh) |
ES (1) | ES2089317T3 (zh) |
RU (1) | RU2053859C1 (zh) |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4338805C2 (de) * | 1993-11-12 | 1995-10-26 | Schloemann Siemag Ag | Verfahren und Vorrichtung zum Betreiben einer Stranggießanlage |
DE19515937C2 (de) * | 1994-05-02 | 2001-07-19 | Siemens Ag | Bandgieß-Walzanlage |
DE19849603C2 (de) * | 1997-11-21 | 2002-11-07 | Sms Demag Ag | Verfahren und Stranggießanlage zum Gießen von Brammen mit einer Durchlaufkokille und einer Strangführung aus Rollen |
EP0917922B1 (de) * | 1997-11-21 | 2003-06-25 | SMS Demag AG | Verfahren und Anlage zum Stranggiessen von Brammen |
DE50012252D1 (de) * | 1999-12-15 | 2006-04-27 | Sms Demag Ag | Verfahren zur Formatdickenänderung des Gussstranges unterhalb der Kokille einer Stranggiessanlage |
AT410522B (de) * | 2001-05-07 | 2003-05-26 | Hulek Anton | Verfahren und stranggiessanlage zum vertikalen stranggiessen eines stahlbandes |
DE10302265A1 (de) * | 2003-01-22 | 2004-07-29 | Sms Demag Ag | Verfahren und Vorrichtung zur Erzeugung von stranggegossenen Stahlbrammen |
US7137434B1 (en) * | 2004-01-14 | 2006-11-21 | Savariego Samuel F | Continuous roll casting of ferrous and non-ferrous metals |
DE102007005778A1 (de) * | 2006-03-09 | 2007-09-13 | Sms Demag Ag | Stranggießanlage und Verfahren zum Betreiben einer Stranggießanlage |
ITRM20070150A1 (it) * | 2007-03-21 | 2008-09-22 | Danieli Off Mecc | Processo e impianto per la produzione di nastro metallico |
IT1405344B1 (it) * | 2010-06-14 | 2014-01-03 | Danieli Off Mecc | Linea di laminazione e relativo procedimento |
CN102554169B (zh) * | 2012-03-15 | 2013-12-18 | 中冶连铸技术工程股份有限公司 | 一种板坯轻压下系统安全控制方法和装置 |
JP5742867B2 (ja) * | 2013-04-10 | 2015-07-01 | トヨタ自動車株式会社 | 引上式連続鋳造装置及び引上式連続鋳造方法 |
DE102013214939A1 (de) | 2013-07-30 | 2015-02-05 | Sms Siemag Ag | Gießwalzanlage zum Herstellen von Metallbändern |
CN104415973B (zh) * | 2013-08-28 | 2016-03-30 | 中冶东方工程技术有限公司秦皇岛研究设计院 | 一种铸轧一体化轧制速度控制方法 |
RU2643003C1 (ru) * | 2013-12-26 | 2018-01-29 | Поско | Устройство и способ непрерывного литья и прокатки стального листа |
CN104084429B (zh) * | 2014-07-11 | 2015-09-23 | 中冶东方工程技术有限公司 | 一种液芯大压下轧制压下量控制方法 |
CN104148387B (zh) * | 2014-07-11 | 2016-05-04 | 中冶东方工程技术有限公司 | 一种连铸热芯轧制方法 |
DE102015210863A1 (de) | 2015-04-15 | 2016-10-20 | Sms Group Gmbh | Gieß-Walz-Anlage und Verfahren zu deren Betrieb |
DE102015210865A1 (de) | 2015-05-06 | 2016-11-10 | Sms Group Gmbh | Gieß-Walz-Anlage und Verfahren zu deren Betrieb |
KR101736574B1 (ko) | 2015-06-04 | 2017-05-17 | 주식회사 포스코 | 응고 장치 |
EP3338914A1 (de) * | 2016-12-22 | 2018-06-27 | Primetals Technologies Austria GmbH | Verfahren zur endlosen herstellung eines aufgewickelten warmbands in einer giess-walz-verbundanlage, verfahren zum anfahren einer giess-walz-verbundanlage und giess-walz-verbundanlage |
IT201800006563A1 (it) * | 2018-06-21 | 2019-12-21 | Impianto e procedimento per la produzione di un nastro metallico laminato a caldo |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0286862A1 (de) * | 1987-04-13 | 1988-10-19 | Thyssen Stahl Aktiengesellschaft | Verfahren zum Herstellen eines Stahlbandes |
EP0344095A2 (de) * | 1988-05-25 | 1989-11-29 | MANNESMANN Aktiengesellschaft | Verfahren zum kontinuierlichen Giesswalzen |
CN1039370A (zh) * | 1988-07-04 | 1990-02-07 | 曼内斯曼股份公司 | 生产比铸造状态更薄的板坯的连续浇铸方法 |
EP0450391A1 (de) * | 1990-04-05 | 1991-10-09 | Sms Schloemann-Siemag Aktiengesellschaft | Vorrichtung zur Stützung eines Metallgiessstranges, insbesondere zur Weichreduktion bei einer Vorband-Giessanlage |
Family Cites Families (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1087154A (en) * | 1964-07-27 | 1967-10-11 | British Iron Steel Research | Improvements in and relating to the production of metal strip |
AT266362B (de) * | 1966-04-22 | 1968-11-11 | Boehler & Co Ag Geb | Verfahren und Vorrichtung zur Herstellung von streckverformten Erzeugnissen aus hochschmelzenden Metallen, insbesondere aus unlegierten oder legierten Stählen mit verbesserten Qualitätseigenschaften |
AT284043B (de) * | 1966-12-06 | 1970-08-25 | Boehler & Co Ag Geb | Verfahren zur Regelung der Arbeitsbedingungen bei der Herstellung von Walzprodukten aus Stranggußerzeugnissen aus hochschmelzenden Metallen, insbesondere aus unlegierten und legierten Stählen |
AT298714B (de) * | 1970-09-04 | 1972-05-25 | Voest Ag | Verfahren zur Behandlung von Gußsträngen in Stranggießanlagen |
US4519439A (en) * | 1977-07-26 | 1985-05-28 | Jernjontoret | Method of preventing formation of segregations during continuous casting |
US4815520A (en) * | 1980-10-27 | 1989-03-28 | Wuetig Fred H | Method and apparatus for continuously casting metal |
US4540037A (en) * | 1982-09-27 | 1985-09-10 | Concast Ag | Method and apparatus for bidirectional horizontal continuous casing |
JPS5997747A (ja) * | 1982-11-25 | 1984-06-05 | Nippon Steel Corp | 連続鋳造法による超薄手スラブの製造方法 |
JPS61132247A (ja) * | 1984-11-30 | 1986-06-19 | Kawasaki Steel Corp | 連続鋳造方法 |
JPS62252647A (ja) * | 1986-04-24 | 1987-11-04 | Ishikawajima Harima Heavy Ind Co Ltd | 金属片連続製造方法及び装置 |
DE3627991A1 (de) * | 1986-08-18 | 1988-02-25 | Mannesmann Ag | Verfahren zum stranggiessen von brammen und einrichtung zur durchfuehrung des verfahrens |
JPS63286260A (ja) * | 1987-05-19 | 1988-11-22 | Nkk Corp | 軽圧下鋳造方法 |
JPH01271047A (ja) * | 1988-04-20 | 1989-10-30 | Sumitomo Metal Ind Ltd | 連続鋳造機における軽圧下方法 |
DE3823861A1 (de) * | 1988-07-14 | 1990-01-18 | Thyssen Stahl Ag | Verfahren und anlage zum herstellen eines stahlbandes mit einer dicke von weniger als 10 mm |
JPH02263551A (ja) * | 1989-04-04 | 1990-10-26 | Sumitomo Metal Ind Ltd | 薄鋳片の連続鋳造方法及びその装置 |
FR2647377B1 (fr) * | 1989-04-06 | 1993-04-30 | Techmetal Promotion | Procede et installation de coulee de produits metalliques minces a reduction d'epaisseur sous la lingotiere |
FR2645463B1 (fr) * | 1989-04-06 | 1991-05-31 | Techmetal Promotion | Procede et installation de coulee de produits metalliques minces |
JPH03124352A (ja) * | 1989-10-09 | 1991-05-27 | Kobe Steel Ltd | 内部品質に優れた連続鋳造鋳片の製造方法 |
-
1992
- 1992-08-27 ES ES92114594T patent/ES2089317T3/es not_active Expired - Lifetime
- 1992-08-27 AT AT92114594T patent/ATE138835T1/de not_active IP Right Cessation
- 1992-08-27 EP EP92114594A patent/EP0535368B1/de not_active Expired - Lifetime
- 1992-09-16 JP JP04246604A patent/JP3113410B2/ja not_active Expired - Fee Related
- 1992-09-18 CA CA002078582A patent/CA2078582C/en not_active Expired - Fee Related
- 1992-09-18 US US07/947,708 patent/US5339887A/en not_active Expired - Lifetime
- 1992-09-18 RU SU925052482A patent/RU2053859C1/ru active
- 1992-09-19 CN CN92111079A patent/CN1039290C/zh not_active Expired - Fee Related
-
1994
- 1994-06-24 US US08/265,333 patent/US5400850A/en not_active Expired - Lifetime
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0286862A1 (de) * | 1987-04-13 | 1988-10-19 | Thyssen Stahl Aktiengesellschaft | Verfahren zum Herstellen eines Stahlbandes |
EP0344095A2 (de) * | 1988-05-25 | 1989-11-29 | MANNESMANN Aktiengesellschaft | Verfahren zum kontinuierlichen Giesswalzen |
CN1039370A (zh) * | 1988-07-04 | 1990-02-07 | 曼内斯曼股份公司 | 生产比铸造状态更薄的板坯的连续浇铸方法 |
EP0450391A1 (de) * | 1990-04-05 | 1991-10-09 | Sms Schloemann-Siemag Aktiengesellschaft | Vorrichtung zur Stützung eines Metallgiessstranges, insbesondere zur Weichreduktion bei einer Vorband-Giessanlage |
Also Published As
Publication number | Publication date |
---|---|
US5400850A (en) | 1995-03-28 |
EP0535368B1 (de) | 1996-06-05 |
ATE138835T1 (de) | 1996-06-15 |
US5339887A (en) | 1994-08-23 |
JPH05277682A (ja) | 1993-10-26 |
CN1071868A (zh) | 1993-05-12 |
ES2089317T3 (es) | 1996-10-01 |
JP3113410B2 (ja) | 2000-11-27 |
CA2078582C (en) | 1999-11-16 |
EP0535368A1 (de) | 1993-04-07 |
RU2053859C1 (ru) | 1996-02-10 |
CA2078582A1 (en) | 1993-03-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1039290C (zh) | 制造钢带的方法和设备 | |
EP0853987B1 (de) | Anlage zum Herstellen eines Bandes, Vorstreifens oder einer Bramme | |
RU2163934C2 (ru) | Способ изготовления горячекатаной стальной ленты и устройство для его осуществления | |
DE19529049C1 (de) | Hochgeschwindigkeits-Dünnbrammenanlage | |
EP0326190A2 (de) | Anlage zum Herstellen eines Stahlbandes mit einer Dicke von 2 bis 25 mm | |
EP3535076B1 (de) | Giess-walz-verbundanlage und verfahren zur endlosen herstellung eines warmgewalzten fertigbandes | |
EP2441540A1 (de) | Verfahren und Anlage zur energieeffizienten Erzeugung von Stahlwarmband | |
AT410767B (de) | Verfahren und vorrichtung zur kontinuierlichen herstellung eines gewalzten metallbandes aus einermetallschmelze | |
US3710841A (en) | Method for casting and rolling of metal stands from the casting heat | |
WO2016165933A1 (de) | GIEß-WALZ-ANLAGE UND VERFAHREN ZU DEREN BETRIEB | |
US7025118B2 (en) | Method and device for continuously casting ingots, slabs or thin slabs | |
KR100218643B1 (ko) | 강대의 제조를 위한 방법 및 설비 | |
EP4297918A1 (de) | Giess-walz-verbundanlage und verfahren zur herstellung von warmband mit einer enddicke <1,2 mm auf der giess-walz-verbundanlage | |
EP2869945A2 (de) | Kontinuierlich arbeitende bandgiess- und walzanlage | |
EP1412110B1 (de) | Verfahren und anlage zum vertikalen stranggiessen eines stahlbandes | |
EP1059125A2 (de) | Verfahren zum Herstellen von Metallband | |
EP1441871B1 (de) | Verfahren und giessmaschine zur produktion von gusssträngen im knüppel- oder blockformat | |
CN100396391C (zh) | 薄带钢铸轧生产工艺 | |
DE10025080A1 (de) | Verfahren zum Herstellen von Metallband | |
EP1381482A1 (de) | Verfahren und vorrichtung zum herstellen von strangguss-vormaterial | |
CN1039371A (zh) | 厚度小于10毫米的钢带的生产方法 | |
WO1998034754A1 (de) | Induktionsschweisseinrichtung und arbeitsverfahren zum verbinden mehrerer vorbänder in einer anlage zur endlosherstellung von warmgewalztem stahlband |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C15 | Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993) | ||
OR01 | Other related matters | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 19980729 Termination date: 20110919 |