CN103736569A - Beneficiation method of sulphide ore - Google Patents

Beneficiation method of sulphide ore Download PDF

Info

Publication number
CN103736569A
CN103736569A CN201310677274.XA CN201310677274A CN103736569A CN 103736569 A CN103736569 A CN 103736569A CN 201310677274 A CN201310677274 A CN 201310677274A CN 103736569 A CN103736569 A CN 103736569A
Authority
CN
China
Prior art keywords
ore
flotation
product
concentrate
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310677274.XA
Other languages
Chinese (zh)
Other versions
CN103736569B (en
Inventor
赵寿红
谢杰
江敏
王玛斗
崔忠远
马忠鑫
秦磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Nickel Cobalt Co ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN201310677274.XA priority Critical patent/CN103736569B/en
Publication of CN103736569A publication Critical patent/CN103736569A/en
Application granted granted Critical
Publication of CN103736569B publication Critical patent/CN103736569B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacture And Refinement Of Metals (AREA)
  • Separation Of Solids By Using Liquids Or Pneumatic Power (AREA)

Abstract

A beneficiation method of sulphide ore relates to improvement of a beneficiation method of sulphide ore, and especially adopts a combined flotation method with a cylindrical grinder. The beneficiation process comprises the steps of performing first-stage screening of sulphide ore to obtain a first-stage coarse particle concentrate A1 and a first-stage tailing product A2; and the beneficiation process is characterized in that the first-stage tailing product A2 is subjected to a combined screening process by a cylindrical grinder. The method of the invention can effectively overcome the problem that sulphide ore with a small disseminated grain size and complex material composition cannot be recovered effectively with routine flotation methods in a flotation process, adopts a combined screening process of first-stage tailings by using a cylindrical grinder, and achieves satisfied metal recovery effect on ultrafine particle fractions in the ore by beneficiation with a cylindrical grinder.

Description

A kind of beneficiation method of sulphide ore
Technical field
A beneficiation method for sulphide ore, the beneficiation method that relates to a kind of sulphide ore is improved, and particularly adopts the method for grinding column machine associating flotation.
Background technology
In Mineral Processing Industry, the dressing method that metal sulfide rock is most widely used is floating separation, is called for short flotation.Floatation is applied to mining industry and produces the history of existing more than 150 year, and floatation process and theory also have a great development, and have formed the floatation process of various unique technology contents and various uses.
Along with the continuous exploitation utilization of mineral resources, it is more and more poorer that mineral resources become, poor, thin, assorted, the difficult future development of mineral resources trend, and difficulty selects the yield proportion of grandidierite increasing, and the disseminated grain size of valuable mineral is thin.The technological process that floatation is processed sulfide mineral is traditionally arranged to be that two stage grinding, two sections are roughly selected, repeatedly selected and coarse scan choosing, the outstanding feature of this class flow process is to access thinner product, can roughly grind and fine grinding at different grinding sections, and be 80%-200 order when requiring mog to be less than 0.15mm(), adopt stage grinding less expensive, and product granularity forms evenly, and it is few that hardness is crossed crushing phenomenon compared with large gangue mineral.But having fatefulue weakness, is also the common problem that current floatation exists, and is specially:
1, regrind after in fine fraction valuable metal can not well be recycled.Because fine-grained dissemination characteristic between the mineral of one section of thick, selected mine tailing has determined to carry out Ultrafine Grinding to ore, monomer whose is dissociated, can realize effective sorting of mineral.
2, valuable metal disseminated grain size is thinner, the normal technology enriching and recovering of regrinding and sorting that adopts.Valuable metal sulfide is generally tiny granular or irregular granular aggregate embedding and is distributed in gangue mineral, even part is closely connected with oxide ore and with it, form relict texture, network and particulate disseminated structure, multi-metal sulfide or mutually form a kind of special " microcrystal is fit ".This part mineral enters conventional flotation, on the one hand, ultra-fine grain specific area is large, surface can be high, beneficiation reagent weakens the solid hydrophobic effect of the parent of object mineral in this case, the character of swimming of object mineral and gangue mineral is very approaching, be difficult to effectively separation, it is very outstanding that the contradictory relation of concentrate grade and the rate of recovery at this time seems, makes the recovery utilization rate of superfine granule metal sulfide mineral lower.The effectively sorting because object mineral and associated mineral disseminated grain size are too thin such as domestic existing a large amount of gold mines, weakly magnetic iron ore, manganese ore, phosphorus ore, bauxite at present.
3, in flotation, the processing of chats is problem comparatively complicated in floatation process always, does not have new theory and process application in industrial practice, to obtain the example of achievement in research.In general, during application floatation process, according to the mineral composition of chats, mainly contain two kinds of disposal options, a kind of is directly to return to last flow process, and another kind is independent regrinding and reconcentration, thereby obtains the second qualified concentrate containing.These two kinds of modes are processed chats and can be improved comprehensive recovery to a certain extent, but simultaneously a large amount of chats in flotation flowsheet, circulate also can worsen each section of operation sort environment and total quality flow process, the room for promotion of restriction recovery rate in ore-dressing, chats metal rate is about 35-40%, and operation recovery is low is the principal element that affects sorting operation comprehensive recovery.
Summary of the invention
Object of the present invention is exactly the deficiency existing for above-mentioned prior art, provides a kind of and can effectively overcome that disseminated grain size is thin, material forms the beneficiation method that complicated sulphide ore adopts the sulphide ore of the problem that conventional flotation method can not effectively reclaim in floatation process.
The object of the invention is to be achieved through the following technical solutions.
A beneficiation method for sulphide ore, the step of its ore dressing process comprises sulfide mineral is sorted through one section, obtains one section of coarse granule concentrate A1 and one section of product from failing A2; It is characterized in that one section of mine tailing A2 to adopt grinding column machine to combine the process of sorting.
The beneficiation method of a kind of sulphide ore of the present invention, is characterized in that grinding column machine combines the step of the process of sorting and comprise:
(1) one section of mine tailing A2 sorting is cleaned and control classification, obtain-400 order content and reach 95~98% the material B1 that flotation column sorts requirement that meets, control classification sand setting and enter vertical mixing mill fine grinding, obtain P 80the ore milling product B2 of=38 μ m, enters control classification; B1 is as flotation column raw material;
(2) the qualified products B1 vertical mixing mill of step (1) being prepared feeds tank diameter, and lime solution is added 500~1000g/t; Add water the concentration of ore pulp is adjusted to 25~30%, add adjusting agent vulcanized sodium 30-100g/t, waterglass 100-200g/t, collecting agent butyl xanthate 10 g/t+aerofloat 226 50 g/t, foaming agent 2# oil 10 g/t, then stir 5minute, obtain flotation column to ore deposit B3;
(3) two sections of ore pulp B1 that step (2) obtained, feed flotation column and carry out concentrate enrichment and sort, and in ore pulp, pour air, and aeration quantity remains on 26-28m 3/ min, implements foam spray, leaching quantity 1-1.5m 3/ h, froth bed THICKNESS CONTROL, at 150-200mm, sorts time 10-12 minute, obtains a selected copper concentrate products C 1 and flotation column product from failing C2;
(4) a selected copper concentrate product D1 who step (3) is obtained, feeds essence and sweeps two flotation columns and carry out concentrate enrichment, in ore pulp, pours air, and aeration quantity remains on 32-35m 3/ min, implements foam spray, leaching quantity 1.5-1.8m 3/ h, froth bed THICKNESS CONTROL, at 350-400mm, sorts time 8-10 minute, obtains the copper concentrate products C 3 of selected two product from failing C4 and particulate, and C4 product returns in order and feeds a selected flotation column;
(5) flotation column product from failing C2 step 3 being obtained, feeds the once purging selection that flotation device carries out flotation column cleaner tailings, adds water pulp density is adjusted to 15-18%, in ore pulp, is filled with air 0.45-0.5m 3/ m 2min, flotation 13 minutes, obtains flotation device and scans a concentrate products C 5 and scan a product from failing C6, scans a concentrate products C 5 and returns to vertical mixing mill and regrind;
(6) product from failing C6 step (5) being obtained, feeds and scans two flotation devices and sort, and adds water pulp density is adjusted to 13-15%, in ore pulp, is filled with air 0.35m 3/ m 2min, flotation 10-11 minute, obtains scanning two concentrate products C 7 and scans product from failing C8, and C7 product returns to feed in order scans a flotation device.
The beneficiation method of a kind of sulphide ore of the present invention, is characterized in that the C8 product of its output is as system true tailings.Through sorting of this technological process, flotation column concentrate C3 product send smelting together with A1 as qualified concentrate containing, and C8 is system true tailings, after concentrated, delivers to tailings reservoir for piling.
The beneficiation method of a kind of sulphide ore of the present invention, the granularity that it is characterized in that stirring mill is 20~30 times of feeding granularity F80; When sulphide ore ore grinding, solid weight concentration is 55%~65%; Vertical stirring mill medium volume useful load in the situation that of not overflow is 80%.
The beneficiation method of a kind of sulphide ore of the present invention, is characterized in that it is 25%-38% that flotation column feed ore concentration is controlled, aeration quantity 26-35 m 3/ min, the blowing pressure remains between 0.8-1.2 MPa, and froth bed thickness is 50-300mm.
The beneficiation method of a kind of sulphide ore of the present invention, is characterized in that flotation device feed ore concentration is at 18%-25%, and depth of foam remains on 60-120mm.
The beneficiation method of a kind of sulphide ore of the present invention, its beneficial effect is:
1, give full play in flow process key equipment vertical mixing mill, flotation column and flotation device characteristic advantage separately, mutually form supporting technical conditions, can effectively solve sulfide mineral and associated mineral disseminated grain size too thin, be easy to overground and adopt the conventional flotation cannot the low problem of the efficiency of separation.
2,, in the fine grinding of object mineral or Ultrafine Grinding operation, when adopting conventional ore grinding technology (as ball mill) to realize the monomer dissociation of valuable metal, power consume and production cost are quite high.Even if mog can make mineral obtain monomer dissociation, but the overground phenomenon of product is serious, many valuable minerals are lost in sludge.And vertical mixing mill production efficiency is high, be the more than ten times of ball mill, energy resource consumption is 1/4 of ball mill, when realizing Ultrafine Grinding, overground rate can be reduced to below 2%, shockproof operating type more can meet the requirement that environmental protection is produced.
3, in this technique, flotation column is simple in structure, and space availability ratio is high, there is no moving component noiselessness, and operating environment is good, can be described as safe low energy consumption operation; Sufficient because of its bubble-particle flotation interface, concentration ratio is large, the rate of recovery is high, flotation speed is fast, and flotation flowsheet is simplified more, effectively reduces flotation operation number of times.
4,, in the mine tailing after this separating method sorts, the valuable metal that general sulphide ore form exists, containing quantity not sufficient 3%, illustrates that this flow process has almost reclaimed ultra-fine grade object mineral completely; The following recovery rate of valuable metals of-10 μ m is brought up to more than 50% by 30% of general grading process, and grinding column machine combines that to sort flow process effect remarkable.This dressing method is applied to sorting of copper sulfide gold mine, compares with the dressing method of ball mill+common flotation device, and Cu Concentrate Grade has improved 2%, and copper, gold recovery improve 0.1%, 1.8%.
Accompanying drawing explanation
Fig. 1 is principle process chart of the present invention.
The specific embodiment
Below in conjunction with specific embodiment and accompanying drawing thereof, the present invention is described in further detail, but because the scope of application of grinding column machine technique is wider, so two examples that embodiments of the present invention are not limited to lift in the present invention.
A beneficiation method for sulphide ore, the step of its ore dressing process comprises sulfide mineral is sorted through one section, obtains one section of coarse granule concentrate A1 and one section of product from failing A2; Adopt grinding column machine to combine the process of sorting one section of mine tailing A2, in mineral, after ultra-fine grade object mineral application grinding column machine beneficiation method, reached satisfied metal recovery effect.
Specifically comprise the following steps:
1, material is prepared
Mineral, after one section sorts, obtain one section of coarse granule concentrate A1 and one section of product from failing A2; A1 metal content, 10.66% ~ 16.85%, send smelting procedure together with the concentrate after sorting with grinding column machine technique, and one section of mine tailing A2 raw material enters grinding column machine and combines and sort flow process.
2 grinding column machines are combined and are sorted
2.1 stock grading
One section of mine tailing A2 sorting is cleaned and controls classification, obtain-400 order content and reach 95~98% the material B1 that flotation column sorts requirement that meets, control classification sand setting and enter vertical mixing mill fine grinding, obtain P 80the ore milling product B2 of=38 μ m, enters control classification; B1 is as flotation column raw material.
2.2 dosings, size mixing and stir
The qualified products B1 that step 2.1 vertical mixing mill is prepared feeds tank diameter, and lime solution is added 500~1000g/t; Add water the concentration of ore pulp is adjusted to 25~30%, add adjusting agent vulcanized sodium 30-100g/t, waterglass 100-200g/t, collecting agent butyl xanthate 10 g/t+aerofloat 226 50 g/t, foaming agent 2# oil 10 g/t, then stir 5minute, obtain flotation column to ore deposit B3;
2.3 sort
2.3.1 flotation column selected one: two sections of ore pulp B1 that step 2.2 is obtained, and feed flotation column and carry out concentrate enrichment and sort, in ore pulp, pour air, aeration quantity remains on 26-28m 3/ min, implements foam spray, leaching quantity 1-1.5m 3/ h, froth bed THICKNESS CONTROL, at 150-200mm, sorts time 10-12 minute, obtains a selected copper concentrate products C 1 and flotation column product from failing C2;
2.3.2 flotation column selected two: the selected copper concentrate product D1 that step 2.3.1 is obtained, and feed essence and sweep two flotation columns and carry out concentrate enrichment, in ore pulp, pour air, aeration quantity remains on 32-35m 3/ min, implements foam spray, leaching quantity 1.5-1.8m 3/ h, froth bed THICKNESS CONTROL, at 350-400mm, sorts time 8-10 minute, obtains the copper concentrate products C 3 of selected two product from failing C4 and particulate, and C4 product returns in order and feeds a selected flotation column;
2.3.3 flotation device scans one: the flotation column product from failing C2 that step 2.3.1 is obtained, feed the once purging selection that flotation device carries out flotation column cleaner tailings, and add water pulp density is adjusted to 15-18%, in ore pulp, be filled with air 0.45-0.5m 3/ m 2min, flotation 13 minutes, obtains flotation device and scans a concentrate products C 5 and scan a product from failing C6, scans a concentrate products C 5 and returns to vertical mixing mill and regrind;
2.3.4 flotation device is scanned: the product from failing C6 that step 2.3.3 is obtained, and feed and scan two flotation devices and sort, add water pulp density is adjusted to 13-15%, in ore pulp, be filled with air 0.35m 3/ m 2min, flotation 10-11 minute, obtains scanning two concentrate products C 7 and scans product from failing C8, and C7 product returns to feed in order scans a flotation device.
The C8 product of output is as system true tailings.Through sorting of this technological process, flotation column concentrate C3 product send smelting together with A1 as qualified concentrate containing, and C8 is system true tailings, after concentrated, delivers to tailings reservoir for piling.
The beneficiation method of a kind of sulphide ore of the present invention, its innovation point:
1, adopt post machine combined recovery mode by ultra-fine, microfine valuable metal, analyze foam more stable from floatation kinetics, object mineral contact more abundant with bubble, can improve the operation recovery 5-10 percentage point of chats.
2, the vertical mixing mill of grinding column machine combined process flow take mill peel off as main, weaken the effect of impacting and shearing, make to greatest extent material keep original lattice shape, avoiding in overground guaranteeing that the fineness of object mineral can provide best ore grinding grade for flotation column again; Flotation column is brought into play its high sorting result characteristic to fine mineral and is sub-elected high-quality concentrate; Meanwhile, the micro-size fraction mineral that dissociate bad enter flotation device and scan, and then after regrinding, reenter flotation column, realize and throw tail, guarantee that whole operation has the higher sorting rate of recovery.
3, flotation device-flotation column New process combining has been broken through and with hydrometallurgy or degree of depth flotation, has been obtained the traditional mode of the high-quality molybdenum concntrate of part both at home and abroad, flotation column is good to micro-size fraction recovering effect, flotation device supplements recovery to coarse fraction or intergrowth, thereby obtain the concentrate of high-grade, high-recovery, realize the sorting of flotation column one flotation device and have complementary advantages.Reclaim the thin and inhomogeneous mineral of embedding cloth of object mineral and have absolute predominance.
4, when object mineral are fully realized fineness requirement, mineral surfaces is cleaned, innovate a grinding machine and produced multiple effect, especially the little medium ball adopting, grind fast flotation concentrate, chats or mine tailing, wash the impurity of valuable mineral surface adhesion by rubbing with the hands, for flotation provides the good environment that sorts, significantly improve concentrate grade and the rate of recovery.
5, control the technical parameter of each setting, in the situation that adaptation to end mineral sort requirement, determine the technical parameter of each operation, be more conducive to valuable metal recovery.Can control according to different grade demands the ore grinding time of vertical mixing mill.The general granularity that stirs mill should be 20~30 times of feeding granularity F80; When sulphide ore ore grinding, this best solid weight concentration is between 55%~65%; Vertical stirring mill medium volume useful load in the situation that of not overflow is 80% time, and the larger kinetic energy consumption of useful load is lower.Flotation column feed ore concentration is controlled at 25% ~ 38%, aeration quantity 26 ~ 35 m 3/ min, the blowing pressure remains between 0.8 ~ 1.2 MPa, and froth bed thickness is 50-300mm.Flotation device feed ore concentration is at 18%-25%, and depth of foam remains on 60-120mm.Medicament adds and mog is determined according to concrete ore deposit property.
Embodiment 1---in difficulty, select the application of copper-sulphide ores
Raw ore is 0.80% containing copper grade, and copper is respectively oxide and sulphided form is present in ore, and wherein copper sulfide accounts for 74.48% of metal rate, and cupric oxide accounts for 25.52%, therefore this ore deposit belongs to copper-sulphide ores.The gangue mineral symbiosis such as chalcopyrite is the highest copper mineral of content in this ore, is xenomorphic granular more, normal and calcite, parcel partly wraps up calcite, is veiny, the distribution of veiny disseminated; Part and tetrahedrite symbiosis, the phenomenon of visible tetrahedrite explanation chalcopyrite; Part edge alteration becomes vitreous copper.In coarse grain chalcopyrite, normal embedding is furnished with the gangue mineral of particulate and pyrite, zincblende, particulate chalcopyrite normal with the tight symbiosis of gangue mineral, that border is given birth in embedding is very complicated.In ore, chalcopyrite disseminated grain size is extremely inhomogeneous, and the disseminated grain size of most chalcopyrites is 0.02~0.5mm, and minimum is 0.001 mm, and maximum particle size can reach 1.8 mm.In ore, bornite is containing 0.11%, bornite is secondary sulphide ore, is also the symbiosis such as xenomorphic granular and normal and dolomite more, and filling is asked in idiomorphic granular dolomite, often be veiny disseminated, the distribution of sparse disseminated, visible part bornite edge alteration becomes covellite.Bornite granularity is generally in 0.03~0.3 mm left and right, and minimum is 0.001mm, maximum 1.0 mm.Pyrite, marcasite are of paramount importance pyrites in this ore, the two normal closely symbiosis.In ore, pyritous disseminated grain size is inhomogeneous, and pyritous disseminated grain size is generally thicker, be often irregular embedding cloth in gangue mineral, and marcasite euhedral degree is poor, and disseminated grain size is thinner.The relation of these two kinds of mineral and other sulfide is also quite close.
1, material is prepared
Above copper-bearing mineral, after one section sorts, obtains one section of coarse granule concentrate A1 and one section of product from failing A2; A1 metal content, 10.66% ~ 16.85%, send smelting procedure together with the concentrate after sorting with grinding column machine technique, and one section of mine tailing A2 raw material enters grinding column machine and combines and sort flow process.
2 grinding column machines are combined and are sorted
2.1 stock grading
One section of mine tailing A2 sorting is cleaned and controls classification, obtain-400 order content and reach 95~98% the material B1 that flotation column sorts requirement that meets, control classification sand setting and enter vertical mixing mill fine grinding, obtain P 80the ore milling product B2 of=38 μ m, enters control classification; B1 is as flotation column raw material.
2.2 dosings, size mixing and stir
The qualified products B1 that step 2.1 vertical mixing mill is prepared feeds tank diameter, and lime solution is added 500~1000g/t; Add water the concentration of ore pulp is adjusted to 25~30%, add adjusting agent vulcanized sodium 100g/t, waterglass 200g/t, collecting agent butyl xanthate 10 g/t+aerofloat 226 50 g/t, foaming agent 2# oil 10 g/t, then stir 5minute, obtain flotation column to ore deposit B3;
2.3 sort
2.3.1 flotation column selected one: two sections of ore pulp B1 that step 2.2 is obtained, and feed flotation column and carry out concentrate enrichment and sort, in ore pulp, pour air, aeration quantity remains on 26m 3/ min, implements foam spray, leaching quantity 1m 3/ h, froth bed THICKNESS CONTROL, at 150mm, sorts 10 minutes time, obtains a selected copper concentrate products C 1 and flotation column product from failing C2;
2.3.2 flotation column selected two: the selected copper concentrate product D1 that step 2.3.1 is obtained, and feed essence and sweep two flotation columns and carry out concentrate enrichment, in ore pulp, pour air, aeration quantity remains on 35m 3/ min, implements foam spray, leaching quantity 1.5m 3/ h, froth bed THICKNESS CONTROL, at 400mm, sorts 8 minutes time, obtains the copper concentrate products C 3 of selected two product from failing C4 and particulate, and C4 product returns in order and feeds a selected flotation column;
2.3.3 flotation device scans one: the flotation column product from failing C2 that step 2.3.1 is obtained, feed the once purging selection that flotation device carries out flotation column cleaner tailings, and add water pulp density is adjusted to 18%, in ore pulp, be filled with air 0.5m 3/ m 2min, flotation 13 minutes, obtains flotation device and scans a concentrate products C 5 and scan a product from failing C6, scans a concentrate products C 5 and returns to vertical mixing mill and regrind;
2.3.4 flotation device is scanned: the product from failing C6 that step 2.3.3 is obtained, and feed and scan two flotation devices and sort, add water pulp density is adjusted to 15%, in ore pulp, be filled with air 0.35m 3/ m 2min, flotation 10 minutes, obtains scanning two concentrate products C 7 and scans product from failing C8, and C7 product returns to feed in order scans a flotation device.
The C8 product of output is as system true tailings.Through sorting of this technological process, flotation column concentrate C3 product, copper grade more than 8.2% is sending smelting together with A1 as qualified concentrate containing, and C8 is system true tailings, copper grade, lower than 0.17%, is delivered to tailings reservoir for piling after concentrated.
This example is compared with common flow process, mog is brought up to-400 heights of eye in 95% time by original-200 orders, concentrate grade and the rate of recovery are all relatively more satisfactory, this is complicated with ore symbiosis, the disseminated grain size of copper is really very thin ore feature and ore technology mineralogical study result are consistent, have also proved advance and the economic worth of grinding column machine associating flotation flowsheet.
In the present embodiment, through the inventive method, sorting the copper concentrate product copper grade obtaining is 8.2%; Through grinding column machine associating Floatation Concentrate Grade, be 8.2%, tailings grade is 0.17%, and selected mine slurry grade is 0.35%.The rate of recovery of grinding column machine operation copper is 52.52%.Computational process is:
The explanation that the rate of recovery is calculated: the percentage that refers to this substance weight in the weight of metal in concentrate product or other useful constituent and raw ore.The rate of recovery is important mineral processing index, and it has reflected the recovery degree of metal in ore dressing process, nonmetal or other useful component and technique of preparing level, management work quality.The rate of recovery is calculated (all applicable to whole ore dressing process and any stage, an operation)
Figure 709144DEST_PATH_IMAGE002
In formula: α ... head grade (%) β ... concentrate grade (%)
θ ... tailings grade (%) ε ... the rate of recovery (%)
Q kconcentrate output (t) Q 0raw ore amount (t)
In actual production, conventionally use head grade, concentrate grade, tailings grade to calculate recovery rate in ore-dressing.
Embodiment 2---the application in molybdenum ore sorts
Raw ore is 0.43% containing molybdenum grade, and the molybdenum distributive law in sulfide is up to 94.85%.Through mineral, connect grain size analysis, from determining degree of dissociation result, + 74 μ m grade material molybdenite liberation degree of minerals only have 70.7%, only at one 32 μ m grade molybdenites, just can reach completely dissociate (+32 μ m grade molybdenite liberation degree of minerals amount to 98.O%), illustrate if go for high-quality molybdenum concntrate, need higher mog.In these mineral, after ultra-fine grade object mineral application grinding column machine beneficiation method, reached satisfied metal recovery effect.Application process comprises the following steps:
1 material is prepared
Through one section of concentrate products A 1 of one section of sorting operation output and one section of product from failing A2; To be 0.11% A2 enter grinding column machine as raw material to molybdenum grade combines and sort flow process.
2 grinding column machines are combined and are sorted
2.1 materials are prepared
One section of mine tailing A2 sorting is controlled to classification scouring, classification, obtain-350 order content and reach 90~95% the material B1 that flotation column sorts requirement that meets, control classification sand setting and enter vertical mixing mill fine grinding, obtain P 80the ore milling product B2 of=32 μ m, enters control classification; B1 is as flotation column raw material.
2.2 dosings, size mixing and stir
The qualified products B1 that step 2.1 vertical mixing mill is prepared feeds tank diameter, and the amount of sodium sulfide of prefabricated dilution is added according to 32kg/t; Add water the concentration of ore pulp is adjusted to 25%, add adjusting agent waterglass 1.2Kg/t, foaming agent kerosene 2g/t, then stir 6minute, obtain flotation column to ore deposit B3;
2.3 sort
2.3.1 flotation column selected one: two sections of ore pulp B3 that step 2.2 is obtained, and feed flotation column and carry out concentrate enrichment and sort, in ore pulp, pour air, aeration quantity remains on 28m 3/ min, implements foam spray, leaching quantity 1.5m 3/ h, froth bed THICKNESS CONTROL, at 200mm, sorts 12 minutes time, obtains a selected molybdenum concntrate products C 1 and flotation column product from failing C2;
2.3.2 flotation column selected two: the selected molybdenum concntrate products C 1 that step 2.3.1 is obtained, and feed essence and sweep two flotation columns and carry out concentrate enrichment, in ore pulp, pour air, aeration quantity remains on 32m 3/ min, implements foam spray, leaching quantity 1.8m 3/ h, froth bed THICKNESS CONTROL, at 400mm, sorts 8 minutes time, obtains the molybdenum concntrate products C 3 of selected two product from failing C4 and particulate, and C4 product returns in order and feeds a selected flotation column;
2.3.3 flotation device scans one: the flotation column product from failing C2 that step 2.3.1 is obtained, feed the once purging selection that flotation device carries out flotation column cleaner tailings, and add water pulp density is adjusted to 15%, in ore pulp, be filled with air 0.45m 3/ m 2min, flotation 13 minutes, obtains flotation device and scans a concentrate products C 5 and scan a product from failing C6, scans a concentrate products C 5 and returns to vertical mixing mill and regrind;
2.3.4 flotation device is scanned: the product from failing C6 that step 2.3.3 is obtained, and feed and scan two flotation devices and sort, add water pulp density is adjusted to 13%, in ore pulp, be filled with air 0.35m 3/ m 2min, flotation 11 minutes, obtains scanning two concentrate product D7 and scans product from failing C8, and C7 product returns to feed in order scans a flotation device.
The C8 product of output is as system true tailings.Through sorting of this technological process, flotation column concentrate C3 product, molybdenum grade more than 16.9% is being sent smelting together with B6 as qualified concentrate containing, and C8 is system true tailings, molybdenum grade, lower than 0.04%, is delivered to tailings reservoir for piling after concentrated.
This example is compared with common flow process, mog is brought up to-350 heights of eye in 90% time by original-200 orders, concentrate grade and the rate of recovery are all relatively more satisfactory, this is complicated with ore symbiosis, the disseminated grain size of molybdenum is really very thin ore feature and ore technology mineralogical study result are consistent, have also proved advance and the economic worth of grinding column machine associating flotation flowsheet.
In the present embodiment, selected molybdenum grade is 0.11%, and through the inventive method, sorting the Floatation Concentrate Grade obtaining is 16.9%, and tailings grade is 0.04%, and as calculated, operation recovery is 63.78%.Computational process is:
Figure 479970DEST_PATH_IMAGE004
Rate of recovery explanation: the percentage that refers to this substance weight in the weight of metal in concentrate product or other useful constituent and raw ore.The rate of recovery is important mineral processing index, and it has reflected the recovery degree of metal in ore dressing process, nonmetal or other useful component and technique of preparing level, management work quality.The rate of recovery is calculated (all applicable to whole ore dressing process and any stage, an operation)
Figure 832454DEST_PATH_IMAGE005
In formula: α ... head grade (%) β ... concentrate grade (%)
θ ... tailings grade (%) ε ... the rate of recovery (%)
Q kconcentrate output (t) Q 0raw ore amount (t)
In actual production, conventionally use head grade, concentrate grade, tailings grade to calculate recovery rate in ore-dressing.

Claims (7)

1. a beneficiation method for sulphide ore, the step of its ore dressing process comprises sulfide mineral is sorted through one section, obtains one section of coarse granule concentrate A1 and one section of product from failing A2; It is characterized in that one section of mine tailing A2 to adopt grinding column machine to combine the process of sorting.
2. the beneficiation method of a kind of sulphide ore according to claim 1, is characterized in that grinding column machine combines the step of the process of sorting and comprise:
(1) one section of mine tailing A2 sorting is cleaned and control classification, obtain-400 order content and reach 95~98% the material B1 that flotation column sorts requirement that meets, control classification sand setting and enter vertical mixing mill fine grinding, obtain P 80the ore milling product B2 of=38 μ m, enters control classification; B1 is as flotation column raw material;
(2) the qualified products B1 vertical mixing mill of step (1) being prepared feeds tank diameter, and lime solution is added 500~1000g/t; Add water the concentration of ore pulp is adjusted to 25~30%, add adjusting agent vulcanized sodium 30-100g/t, waterglass 100-200g/t, collecting agent butyl xanthate 10 g/t+aerofloat 226 50 g/t, foaming agent 2# oil 10 g/t, then stir 5minute, obtain flotation column to ore deposit B3;
(3) two sections of ore pulp B1 that step (2) obtained, feed flotation column and carry out concentrate enrichment and sort, and in ore pulp, pour air, and aeration quantity remains on 26-28m 3/ min, implements foam spray, leaching quantity 1-1.5m 3/ h, froth bed THICKNESS CONTROL, at 150-200mm, sorts time 10-12 minute, obtains a selected copper concentrate products C 1 and flotation column product from failing C2;
(4) a selected copper concentrate product D1 who step (3) is obtained, feeds essence and sweeps two flotation columns and carry out concentrate enrichment, in ore pulp, pours air, and aeration quantity remains on 32-35m 3/ min, implements foam spray, leaching quantity 1.5-1.8m 3/ h, froth bed THICKNESS CONTROL, at 350-400mm, sorts time 8-10 minute, obtains the copper concentrate products C 3 of selected two product from failing C4 and particulate, and C4 product returns in order and feeds a selected flotation column;
(5) flotation column product from failing C2 step 3 being obtained, feeds the once purging selection that flotation device carries out flotation column cleaner tailings, adds water pulp density is adjusted to 15-18%, in ore pulp, is filled with air 0.45-0.5m 3/ m 2min, flotation 13 minutes, obtains flotation device and scans a concentrate products C 5 and scan a product from failing C6, scans a concentrate products C 5 and returns to vertical mixing mill and regrind;
(6) product from failing C6 step (5) being obtained, feeds and scans two flotation devices and sort, and adds water pulp density is adjusted to 13-15%, in ore pulp, is filled with air 0.35m 3/ m 2min, flotation 10-11 minute, obtains scanning two concentrate products C 7 and scans product from failing C8, and C7 product returns to feed in order scans a flotation device.
3. the beneficiation method of a kind of sulphide ore according to claim 2, is characterized in that the C8 product of its output is as system true tailings.
4. pass through sorting of this technological process, flotation column concentrate C3 product send smelting together with A1 as qualified concentrate containing, and C8 is system true tailings, after concentrated, delivers to tailings reservoir for piling.
5. the beneficiation method of a kind of sulphide ore according to claim 2, the granularity that it is characterized in that stirring mill is 20~30 times of feeding granularity F80; When sulphide ore ore grinding, solid weight concentration is 55%~65%; Vertical stirring mill medium volume useful load in the situation that of not overflow is 80%.
6. the beneficiation method of a kind of sulphide ore according to claim 5, is characterized in that it is 25%-38% that flotation column feed ore concentration is controlled, aeration quantity 26-35 m 3/ min, the blowing pressure remains between 0.8-1.2 MPa, and froth bed thickness is 50-300mm.
7. the beneficiation method of a kind of sulphide ore according to claim 2, is characterized in that flotation device feed ore concentration is at 18%-25%, and depth of foam remains on 60-120mm.
CN201310677274.XA 2013-12-13 2013-12-13 A kind of beneficiation method of sulphide ore Active CN103736569B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310677274.XA CN103736569B (en) 2013-12-13 2013-12-13 A kind of beneficiation method of sulphide ore

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310677274.XA CN103736569B (en) 2013-12-13 2013-12-13 A kind of beneficiation method of sulphide ore

Publications (2)

Publication Number Publication Date
CN103736569A true CN103736569A (en) 2014-04-23
CN103736569B CN103736569B (en) 2015-12-09

Family

ID=50493677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310677274.XA Active CN103736569B (en) 2013-12-13 2013-12-13 A kind of beneficiation method of sulphide ore

Country Status (1)

Country Link
CN (1) CN103736569B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104148162A (en) * 2014-08-12 2014-11-19 昆明理工大学 Copper sulphide ore flotation separation method
CN104399573A (en) * 2014-10-17 2015-03-11 金川集团股份有限公司 Copper furnace slag mineral processing process
CN104858066A (en) * 2015-06-04 2015-08-26 中蓝连海设计研究院 Direct-reverse flotation process for preparing high-purity sulfur concentrate
CN106824551A (en) * 2017-03-24 2017-06-13 中南大学 A kind of combined modifier of flotation magnesium skarn type copper sulfide ore and its application
CN107115974A (en) * 2017-05-09 2017-09-01 江西理工大学 A kind of beneficiation method for improving microfine copper-sulphide ores floatation indicators
RU2648400C1 (en) * 2017-03-22 2018-03-26 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Extracting ultrafine gold particles from steering carbon ore method
CN108940578A (en) * 2018-05-15 2018-12-07 昆明理工大学 It is a kind of using flotation device-flotation column combined recovery Fine cassiterite beneficiation method
CN109647615A (en) * 2018-12-29 2019-04-19 南京银茂铅锌矿业有限公司 Efficiently improve beneficiation method and ore-sorting system that hardly possible selects the zinc concentrate rate of recovery
CN111841895A (en) * 2020-06-24 2020-10-30 紫金矿业集团股份有限公司 Method for recovering valuable metal minerals from sulfide ore mine beneficiation sludge
CN114653471A (en) * 2022-04-11 2022-06-24 甘肃酒钢集团宏兴钢铁股份有限公司 Method for improving beneficiation efficiency of copper sulfide ore
CN115025884A (en) * 2022-05-07 2022-09-09 金川集团股份有限公司 Machine-column combined separation process suitable for fine-grain copper-nickel sulfide ore separation
RU2799219C1 (en) * 2022-12-19 2023-07-04 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Method for extraction of low-dimensional structures of noble metals from carbon feedstock

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6170669B1 (en) * 1998-06-30 2001-01-09 The Commonwealth Of Australia Commonwealth Scientific And Industrial Research Organization Separation of minerals
JP2007222800A (en) * 2006-02-24 2007-09-06 Taiheiyo Cement Corp Apparatus and method for removing unburnt carbon in fly ash
CN102698875A (en) * 2012-06-15 2012-10-03 紫金矿业集团股份有限公司 Ore dressing technology for complex copper-zinc-sulfur multi-metal ore
CN102974451A (en) * 2012-10-12 2013-03-20 金川集团股份有限公司 Method for improving recovery rate of copper nickel associated precious metals
CN103084274A (en) * 2013-01-25 2013-05-08 湖南有色金属研究院 Preparation method of high grade copper oxide concentrate
CN103170409A (en) * 2013-03-25 2013-06-26 江西铜业股份有限公司 Selection method for copper sulfide copper minerals and associated elements thereof
CN103433149A (en) * 2013-09-12 2013-12-11 广西华锡集团股份有限公司车河选矿厂 Polymetallic sulphide ore flotation process capable of increasing zinc index

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6170669B1 (en) * 1998-06-30 2001-01-09 The Commonwealth Of Australia Commonwealth Scientific And Industrial Research Organization Separation of minerals
JP2007222800A (en) * 2006-02-24 2007-09-06 Taiheiyo Cement Corp Apparatus and method for removing unburnt carbon in fly ash
CN102698875A (en) * 2012-06-15 2012-10-03 紫金矿业集团股份有限公司 Ore dressing technology for complex copper-zinc-sulfur multi-metal ore
CN102974451A (en) * 2012-10-12 2013-03-20 金川集团股份有限公司 Method for improving recovery rate of copper nickel associated precious metals
CN103084274A (en) * 2013-01-25 2013-05-08 湖南有色金属研究院 Preparation method of high grade copper oxide concentrate
CN103170409A (en) * 2013-03-25 2013-06-26 江西铜业股份有限公司 Selection method for copper sulfide copper minerals and associated elements thereof
CN103433149A (en) * 2013-09-12 2013-12-11 广西华锡集团股份有限公司车河选矿厂 Polymetallic sulphide ore flotation process capable of increasing zinc index

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104148162A (en) * 2014-08-12 2014-11-19 昆明理工大学 Copper sulphide ore flotation separation method
CN104399573A (en) * 2014-10-17 2015-03-11 金川集团股份有限公司 Copper furnace slag mineral processing process
CN104399573B (en) * 2014-10-17 2016-06-29 金川集团股份有限公司 A kind of Cu-S ore ore-dressing technique
CN104858066A (en) * 2015-06-04 2015-08-26 中蓝连海设计研究院 Direct-reverse flotation process for preparing high-purity sulfur concentrate
RU2648400C1 (en) * 2017-03-22 2018-03-26 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Extracting ultrafine gold particles from steering carbon ore method
CN106824551A (en) * 2017-03-24 2017-06-13 中南大学 A kind of combined modifier of flotation magnesium skarn type copper sulfide ore and its application
CN107115974B (en) * 2017-05-09 2019-03-19 江西理工大学 A kind of beneficiation method improving microfine copper-sulphide ores floatation indicators
CN107115974A (en) * 2017-05-09 2017-09-01 江西理工大学 A kind of beneficiation method for improving microfine copper-sulphide ores floatation indicators
CN108940578A (en) * 2018-05-15 2018-12-07 昆明理工大学 It is a kind of using flotation device-flotation column combined recovery Fine cassiterite beneficiation method
CN108940578B (en) * 2018-05-15 2020-07-31 昆明理工大学 Beneficiation method for recovering fine-grained cassiterite by adopting flotation machine-flotation column
CN109647615A (en) * 2018-12-29 2019-04-19 南京银茂铅锌矿业有限公司 Efficiently improve beneficiation method and ore-sorting system that hardly possible selects the zinc concentrate rate of recovery
CN109647615B (en) * 2018-12-29 2020-03-20 南京银茂铅锌矿业有限公司 Beneficiation method and beneficiation system for improving recovery rate of refractory zinc concentrate
CN111841895A (en) * 2020-06-24 2020-10-30 紫金矿业集团股份有限公司 Method for recovering valuable metal minerals from sulfide ore mine beneficiation sludge
CN114653471A (en) * 2022-04-11 2022-06-24 甘肃酒钢集团宏兴钢铁股份有限公司 Method for improving beneficiation efficiency of copper sulfide ore
CN115025884A (en) * 2022-05-07 2022-09-09 金川集团股份有限公司 Machine-column combined separation process suitable for fine-grain copper-nickel sulfide ore separation
CN115025884B (en) * 2022-05-07 2024-04-09 金川集团股份有限公司 Machine-column joint selection process suitable for sorting fine-grained copper-nickel sulfide ores
RU2799219C1 (en) * 2022-12-19 2023-07-04 федеральное государственное бюджетное образовательное учреждение высшего образования "Санкт-Петербургский горный университет" Method for extraction of low-dimensional structures of noble metals from carbon feedstock

Also Published As

Publication number Publication date
CN103736569B (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN103736569B (en) A kind of beneficiation method of sulphide ore
CN105268559B (en) The beneficiation method of low-grade copper sulfide ores
CN102698875B (en) Ore dressing technology for complex copper-zinc-sulfur multi-metal ore
CN104258963B (en) A kind of cupric, cobalt and magnetic iron ore sorting process
CN102284369B (en) Method for improving flotation recovery rate
CN103495492B (en) Beneficiation method for copper nickel
CN105381868B (en) Physical beneficiation phosphorus reduction method for skarn type high-phosphorus molybdenum ore
CN103990549A (en) Beneficiation method for complex multi-metal sulfide electrum comprehensive recovery
CN103639059A (en) Beneficiation method for carbonic mud barite ore
CN104148163B (en) A kind of beneficiation method processing low-grade tin-lead-zinc multi-metal oxygen ore deposit
CN104060108B (en) A kind of method extracting vanadium from high calcium siliceous shale containing vanadium
CN107234006B (en) A kind of method for floating of high cupro-nickel than mineral
CN105435957A (en) Mineral separation technology for recovering low-grade marmatite and cassiterite minerals from copper separation tailings
CN110292983A (en) Beneficiation method containing golden secondary copper sulfide mineral
CN105880032B (en) A kind of mid-low grade collophanite ore floats combined sorting method again
CN104841569A (en) Flotation technology of middle-low-grade silica-calcia bearing phosphate rock
CN109092563A (en) A kind of method of high sulfur-lead-zinc ore efficient flotation separation
CN109607527A (en) A kind of purification by mineral method of low-grade micro crystal graphite
CN102824956B (en) Poor hematite grading level and narrow level sorting process
CN107812617A (en) One kind improves the difficult copper sulfide ore beneficiation of microfine and refers to calibration method
CN102773150A (en) Polymetallic (iron, tin and zinc) ore comprehensive recovery beneficiation method
CN106622641B (en) The method that rich indium marmatite is recycled in association polymetallic ore is total under low alkali from copper zinc indium
CN103433144B (en) Flotation agent for flotation of kustelite and flotation method
CN105750090A (en) Silica-calcia bearing phosphate rock separation method
CN105772215A (en) Mineral processing method of separating sulfur concentrates from selected pyrite tailings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240219

Address after: 737100 No. 2 Lanzhou Road, Beijing Road Street, Jinchuan District, Jinchang City, Gansu Province

Patentee after: Jinchuan Group Nickel Cobalt Co.,Ltd.

Country or region after: China

Address before: 737103 No. 98, Jinchuan Road, Jinchang, Gansu

Patentee before: JINCHUAN GROUP Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right