CN102495327A - 一种变电站接地网设计检测方法及装置 - Google Patents
一种变电站接地网设计检测方法及装置 Download PDFInfo
- Publication number
- CN102495327A CN102495327A CN2011104168794A CN201110416879A CN102495327A CN 102495327 A CN102495327 A CN 102495327A CN 2011104168794 A CN2011104168794 A CN 2011104168794A CN 201110416879 A CN201110416879 A CN 201110416879A CN 102495327 A CN102495327 A CN 102495327A
- Authority
- CN
- China
- Prior art keywords
- grounding grid
- grounding
- msub
- grid
- mrow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000001514 detection method Methods 0.000 title claims abstract description 17
- 239000004020 conductor Substances 0.000 claims abstract description 33
- 238000000034 method Methods 0.000 claims description 24
- 238000004364 calculation method Methods 0.000 claims description 23
- 239000011159 matrix material Substances 0.000 claims description 13
- 238000000354 decomposition reaction Methods 0.000 claims description 7
- 238000010998 test method Methods 0.000 claims 1
- 230000005540 biological transmission Effects 0.000 abstract description 10
- 239000000243 solution Substances 0.000 description 5
- 230000001788 irregular Effects 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000001939 inductive effect Effects 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000003044 adaptive effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Measurement Of Resistance Or Impedance (AREA)
Abstract
本发明提出一种变电站接地网设计的检测方法,包括步骤:建立接地网的边界元模型;获取接地网导体的阻抗特性;根据所述接地网导体的阻抗特性和建立的边界元模型,计算接地网的接地电阻;获取接地网的总故障电流和分流系数;根据所述接地网的总故障电流、所述分流系数和所述接地电阻,确定接地网引起的电位升高量;根据所述接地网引起的电位升高量调节接地网对应的设备参数。本发明还提出一种变电站接地网设计的检测装置,可以提高变电站接地网的接地电阻的正确率,提高接地网引起的电位升高量的正确率,保证工作人员的安全和正常的输电。
Description
技术领域
本发明涉及电力系统的变电站,具体涉及一种变电站接地网设计的检测方法及装置。
背景技术
接地网在变电站安全运行中起着极为重要的作用,不仅为站内各种电气设备提供一个公共的参考地,还可以在系统发生故障时排泄故障电流并降低变电站的地电位升,从而确保站内工作人员的人身安全及各种电气设备的正常运行。
接地网设计的一个重要目标是控制接地网的最大电位升高。其中,接地网引起的电位升高:V=RI;R表示接地电阻,I表示入地故障电流,而I=Ie×(1-Ke),Ie为总故障电流,Ke为分流系数。国内采用钢材接地网,钢的电阻率和磁导率较高,接地网不等电位问题较为严重。过往未有相应地质地貌状况的接地网设计计算工具,在工频故障电流下,变电站的地网设计直接套用过往的等电位模型,计算得到的接地电阻误差较大;当电力系统发生接地故障时,入地的交流电流在接地系统上产生的电位,不仅有与电流同相的分量,还有与入地电流正交的分量,即接地参数中的感性部分。等电位接地设计中,忽略了感性分量,可能使计算的接地网最大电位升高偏低较多,威胁工作人员的人生安全、电气设备工作不正常,影响正常的输电。
发明内容
本发明的目的是提出一种变电站接地网设计的检测方法,可以提高变电站接地网的接地电阻的正确率,提高接地网引起的电位升高量的正确率,保证工作人员的安全和正常的输电。
基于上述目的,采用的方案:
一种变电站接地网设计的检测方法,包括步骤:
建立接地网的边界元模型;
获取接地网导体的阻抗特性;
根据所述接地网导体的阻抗特性和建立的边界元模型,计算接地网的接地电阻;
获取接地网的总故障电流和分流系数;
根据所述接地网的总故障电流、所述分流系数和所述接地电阻,确定接地网引起的电位升高量;
根据所述接地网引起的电位升高量调节接地网对应的设备参数。
本发明先建立接地网的边界元模型,然后获取接地网导体的阻抗特性,利用其阻抗特性和边界元模型进行联立求解,实现接地网不等电位情况下的接地网接地电阻的正确计算;再获取接地网的总故障电流和分流系数,结合计算得到的接地电阻计算得到准确率较高的接地网引起的电位升高量,根据该电位升高量调节接地网对应的设备参数,保障工作人员人生安全,保障正常输电。
本发明的目的还在于提出一种变电站接地网设计的检测装置,可以提高变电站接地网的接地电阻的正确率,提高接地网引起的电位升高量的正确率,保证工作人员的安全和正常的输电。
基于上述目的,采用的方案:
一种变电站接地网设计的检测装置,包括:
模型建立单元,用于建立接地网的边界元模型;
第一获取单元,用于获取接地网导体的阻抗特性;
第一计算单元,用于根据所述接地网导体的阻抗特性和建立的边界元模型,计算接地网的接地电阻;
第二获取单元,用于获取接地网的总故障电流和分流系数;
第二计算单元,用于根据所述接地网的总故障电流、所述分流系数和所述接地电阻,确定接地网引起的电位升高量;
调节单元,用于根据所述接地网引起的电位升高量调节接地网对应的设备参数。
本发明装置通过模型建立单元建立接地网的边界元模型,然后通过第一获取单元获取接地网导体的阻抗特性;第一计算单元利用其阻抗特性和边界元模型进行联立求解,实现接地网不等电位情况下的接地网接地电阻的正确计算;再通过第二获取单元获取接地网的总故障电流和分流系数;第二计算单元结合计算得到的接地电阻计算得到准确率较高的接地网引起的电位升高量,调节单元根据该电位升高量调节接地网对应的设备参数,保障工作人员人生安全,保障正常输电。
附图说明
图1是本发明方法的一个流程图;
图2是尺度系数迭代剖分法原理示意图;
图3是本发明装置的一个结构示意图。
具体实施方式
为便于理解本发明,下面将结合附图进行阐述。
请参考图1,本发明提出一种变电站接地网设计的检测方法,包括步骤:
101、建立接地网边界模型;
102、获取接地网导体阻抗特性;
103、根据边界模型和阻抗特性计算接地电阻;
根据接地网导体的阻抗特性和建立的边界元模型,计算接地网的接地电阻。
具体的:边界元电荷密度ηi满足如下条件:
其中, Ii为第i段导体的入地电流,r为电阻,ρ为电阻率,L为导体长度,s为导体横截面积,η为边界元电荷密度,ε为介电常数,n为边界元数目;
公式(2)写成矩阵形式:
Aη′+BI=0 (3)
其中,
导体电位Ui满足如下条件:
公式(4)写成矩阵形式:
U=Cη′+DI (5)
其中:
由接地理论有:
U=KV (6)
F=KtI+AtGAV (7)
解有:
F=[Kt(D-CA-1B)-1K+AtGA]V (8)
其中,U代表导体电位矩阵;V代表节点电位矩阵;K代表关联矩阵;F代表节点注入电流列向量;
由上述公式可获得接地电阻值;接地电阻计算值等于最大节点电压除以节点注入电流。
104、获取总故障电流和分流系数;
获取接地网的总故障电流和分流系数。
105、根据总故障电流、分流系数和接地电阻计算电位升高量;
根据接地网的总故障电流、分流系数和接地电阻,计算接地网引起的电位升高量。
106、根据电位升高量调节接地网设备参数。
根据接地网引起的电位升高量调节接地网对应的设备参数。
本发明先建立接地网的边界元模型,然后获取接地网导体的阻抗特性,利用其阻抗特性和边界元模型进行联立求解,实现接地网不等电位情况下的接地网接地电阻的正确计算;再获取接地网的总故障电流和分流系数,结合计算得到的接地电阻计算得到准确率较高的接地网引起的电位升高量,根据该电位升高量调节接地网对应的设备参数,保障工作人员人生安全,保障正常输电。
由于输电线路的覆盖的地区,地形复杂,例如沿海丘陵地区;其变电站接地导体数目众多且覆盖区域大,空间分布不规则,加上地质情况十分复杂,造成了边界元剖分十分困难。目前通常采用手动指定边界剖分形式的方法进行,即手动输入每一个具体边界的剖分数和剖分比例以满足导体附近的边界足够稠密的要求。此法缺点十分明显:一方面,通过手动指定边界剖分形式往往依据本人经验进行,通常需要多次调整剖分参数才能得到正确计算结果,因而缺乏理论依据;另外沿海丘陵地区变电站边界众多,手动方法效率低下。为此可对上述实施例作如下改进:
在建立接地网的边界元模型时,利用接地网导体和边界的空间关系实现接地导体的自适应剖分,根据剖分后的导体(边界元)建立超大规模的接地网地的边界元模型。其具体步骤如下:
请参考图2,存在一四边形原始边界S和点源P,e1和e2为S的两个尺度,取尺度系数k,d为P与S的垂直距离,并作以下约定:
1.若d≥ke1,d≥ke2全为否,则S在两个尺度方向上均细分2份,此时S分成4份;
2.若d≥ke1,d≥ke2有一者为否,为否者在尺度方向上细分2份,此时S 分成2份;
3.若d≥ke1,d≥ke2均为真,则S无需进一步剖分;
4.若出现S经细分的情况,细分后的S代替原S作迭代,直至所有边界满足d≥ke1,d≥ke2。
采用上述建立的超大规模的边界元模型,大大提升了接地计算中使用的边界元数目。目前应用最广泛的国外软件CDEGS边界元的上限为7500个,而本发明计算软件的上限可达40000个,因而可以考虑复杂的地质情况,求解不规则土壤接地问题,适用于沿海丘陵地区变电站接地计算。
由于边界元的个数众多,模型求解的速度缓慢,计算模型以矩阵算法的形式求解。
为了提高速度可以用并行三角(LU)分解法求解;并行LU分解法采用并行杜里特尔分解将满秩方程的系数矩阵A分解为上三角阵U和下三角阵L的乘积,并以紧凑形式存入在原矩阵A中,解方程时以回代的方式进行,具有节约内存,计算速度快,数值稳定性好等优点。
在变电站分流系数是分析接地系统安全时必须考虑的一个重要参数。我国在以往的设计中,分流系数往往采用简化计算或估算的方法,这样忽略了很多因素的影响,往往造成较大的误差。为了解决此问题,可对分流系数的获取作如下改进:
在获取接地网的分流系数时,先确定电网中线路的结构参数、变压器的结构参数、变电站接地网的接地参数;
根据电网的运行方式,把线路、变压器、变电站接地网的结构参数进行相分量的建模;
根据回路电流法和建立的线路、变压器、变电站接地网的相分量模型,求解电网的故障电流分布,从而由定义得到分流系数。
下面介绍本发明装置,请参参考图3,一种变电站接地网设计的检测装置:
模型建立单元T1,用于建立接地网的边界元模型;
第一获取单元T2,用于获取接地网导体的阻抗特性;
第一计算单元T3,用于根据接地网导体的阻抗特性和建立的边界元模型,计算接地网的接地电阻;
第二获取单元T4,用于获取接地网的总故障电流和分流系数;
第二计算单元T5,用于根据接地网的总故障电流、分流系数和接地电阻,确定接地网引起的电位升高量;
调节单元T6,用于根据接地网引起的电位升高量调节接地网对应的设备参数。
本发明装置通过模型建立单元建立接地网的边界元模型,然后通过第一获取单元获取接地网导体的阻抗特性;第一计算单元利用其阻抗特性和边界元模型进行联立求解,实现接地网不等电位情况下的接地网接地电阻的正确计算;再通过第二获取单元获取接地网的总故障电流和分流系数;第二计算单元结合计算得到的接地电阻计算得到准确率较高的接地网引起的电位升高量,调节单元根据该电位升高量调节接地网对应的设备参数,保障工作人员人生安全,保障正常输电。
由于输电线路的覆盖的地区地形复杂,例如沿海丘陵地区;其变电站接地导体数目众多且覆盖区域大,空间分布不规则,加上地质情况十分复杂,造成了边界元剖分十分困难。目前通常采用手动指定边界剖分形式的方法进行,缺乏理论依据,得到的分流系数不准确,并且手动方法效率低下。为此可对上述实施例作如下改进:
模型建立单元T1在建立接地网的边界元模型时,利用接地网导体和边界的空间关系实现接地导体的自适应剖分,根据剖分后的边界元建立超大规模的接地网地的边界元模型。
为了提高运算速度,第一计算单元T3,采用矩阵算法计算接地网的接地电阻;采用并行LU分解算法计算接地电阻。
在变电站分流系数是分析接地系统安全时必须考虑的一个重要参数。我国在以往的设计中,分流系数往往采用简化计算或估算的方法,这样忽略了很多因素的影响,往往造成较大的误差。为了解决此问题,可对分流系数的获取作如下改进:
第二获取单元T4在获取接地网的分流系数时,建立接地网的电力元件的结构参数;
根据电网的运行方式,把线路、变压器、变电站接地网的结构参数进行相分量的建模;根据回路电流法和建立的线路、变压器、变电站接地网的相分量模型,求解电网的故障电流分布,从而由定义得到分流系数。
利用本发明的方法,还可以检测接地网设计中其他接地参数的检测,例如:地网自身电位分布、地表电位分布、接触电势、跨步电势等。
以上本发明实施方式,并不构成对本发明保护范围的限定。任何在本发明的精神和原则之内所作的修改、等同替换和改进等,均应包含在本发明的权利要求保护范围之内。
Claims (10)
1.一种变电站接地网设计的检测方法,其特征是,包括步骤:
建立接地网的边界元模型;
获取接地网导体的阻抗特性;
根据所述接地网导体的阻抗特性和建立的边界元模型,计算接地网的接地电阻;
获取接地网的总故障电流和分流系数;
根据所述接地网的总故障电流、所述分流系数和所述接地电阻,确定接地网引起的电位升高量;
根据所述接地网引起的电位升高量调节接地网对应的设备参数。
2.根据权利要求1所述的变电站接地网设计的检测方法,其特征是,
在建立接地网的边界元模型时,利用接地网导体和边界的空间关系对接地网边界元进行自适应剖分,根据剖分后的边界元建立超大规模的接地网地的边界元模型。
3.根据权利要求1所述的变电站接地网设计的检测方法,其特征是,
采用矩阵算法计算所述接地网的接地电阻。
4.根据权利要求1所述的变电站接地网设计的检测方法,其特征是,
采用并行LU分解算法计算所述接地电阻。
5.根据权利要求1至4任一项所述的变电站接地网设计的检测方法,其特征是,
在所述获取接地网的分流系数时,先确定电网中线路的结构参数、变压器的结构参数、变电站接地网的接地参数;
根据电网的运行方式,把线路、变压器、变电站接地网的结构参数进行相分量的建模;
根据回路电流法和建立的线路、变压器、变电站接地网的相分量模型,求解电网的故障电流分布,从而得到分流系数。
6.一种变电站接地网设计的检测装置,其特征是,包括:
模型建立单元,用于建立接地网的边界元模型;
第一获取单元,用于获取接地网导体的阻抗特性;
第一计算单元,用于根据所述接地网导体的阻抗特性和建立的边界元模型,计算接地网的接地电阻;
第二获取单元,用于获取接地网的总故障电流和分流系数;
第二计算单元,用于根据所述接地网的总故障电流、所述分流系数和所述接地电阻,确定接地网引起的电位升高量;
调节单元,用于根据所述接地网引起的电位升高量调节接地网对应的设备参数。
7.根据权利要求6所述的变电站接地网设计的检测装置,其特征是,
所述模型建立单元在建立接地网的边界元模型时,利用接地网导体和边界的空间关系对接地网边界元进行自适应剖分,根据剖分后的边界元建立超大规模的接地网地的边界元模型。
8.根据权利要求6所述的变电站接地网设计的检测装置,其特征是,
所述第一计算单元,采用矩阵算法计算所述接地网的接地电阻。
9.根据权利要求6所述的变电站接地网设计的检测装置,其特征是,
所述第一计算单元采用并行LU分解算法计算所述接地电阻。
10.根据权利要求6至9任一项所述的变电站接地网设计的检测装置,其特征是,
所述第二获取单元在所述获取接地网的分流系数时,先确定电网中线路的结构参数、变压器的结构参数、变电站接地网的接地参数;
根据电网的运行方式,把线路、变压器、变电站接地网的结构参数进行相分量的建模;
根据回路电流法和建立的线路、变压器、变电站接地网的相分量模型,求解电网的故障电流分布,从而得到分流系数。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110416879 CN102495327B (zh) | 2011-12-13 | 2011-12-13 | 一种变电站接地网设计检测方法及装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110416879 CN102495327B (zh) | 2011-12-13 | 2011-12-13 | 一种变电站接地网设计检测方法及装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102495327A true CN102495327A (zh) | 2012-06-13 |
CN102495327B CN102495327B (zh) | 2013-10-30 |
Family
ID=46187168
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110416879 Active CN102495327B (zh) | 2011-12-13 | 2011-12-13 | 一种变电站接地网设计检测方法及装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102495327B (zh) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103197133A (zh) * | 2013-03-26 | 2013-07-10 | 广东电网公司电力科学研究院 | 一种基于无线传输的大型地网分流向量测量方法 |
CN103427354A (zh) * | 2013-08-15 | 2013-12-04 | 国家电网公司 | 一种变电站接地网结构的早期确定方法 |
CN104111376A (zh) * | 2014-07-28 | 2014-10-22 | 王涵宇 | 一种变电站接地网特性参数的数值计算与分析方法 |
CN104569671A (zh) * | 2014-12-30 | 2015-04-29 | 云南电网公司电力科学研究院 | 一种换流站接地网直流分流系数测试方法 |
CN104678147A (zh) * | 2015-02-05 | 2015-06-03 | 河南平高电气股份有限公司 | 一种用于气体绝缘变电站内最大接触电压的计算方法 |
CN104833835A (zh) * | 2015-02-05 | 2015-08-12 | 河南平高电气股份有限公司 | 一种用于气体绝缘变电站的跨步电压的计算方法 |
CN105021943A (zh) * | 2015-07-15 | 2015-11-04 | 南方电网科学研究院有限责任公司 | Mmc-hvdc交流侧故障的过电流检测方法和系统 |
CN105069202A (zh) * | 2015-07-22 | 2015-11-18 | 国网天津市电力公司 | 一种变电站接地网的智能敷设设计方法 |
WO2016124014A1 (zh) * | 2015-02-05 | 2016-08-11 | 国家电网公司 | 用于气体绝缘变电站的跨步电压和最大接触电压计算方法 |
CN106950456A (zh) * | 2017-05-26 | 2017-07-14 | 云南电网有限责任公司电力科学研究院 | 一种基于人工短路实验的变电站接地网性能评估方法 |
CN107132455A (zh) * | 2017-05-26 | 2017-09-05 | 云南电网有限责任公司电力科学研究院 | 一种基于地线电流注入的变电站接地网性能评估方法 |
CN107219420A (zh) * | 2017-05-26 | 2017-09-29 | 云南电网有限责任公司电力科学研究院 | 一种换流站短路电流分流系数仿真方法及系统 |
CN107505536A (zh) * | 2017-08-07 | 2017-12-22 | 国网上海市电力公司 | 计及多根金属管道的变电站接地网地表电位分布计算方法 |
CN107766622A (zh) * | 2017-09-27 | 2018-03-06 | 国网上海市电力公司 | 一种地下变电站接地系统设计优化方法 |
CN112684273A (zh) * | 2021-01-06 | 2021-04-20 | 国核电力规划设计研究院重庆有限公司 | 一种110kV全电缆出线变电站接地短路故障入地电流分流方法 |
CN113504411A (zh) * | 2021-06-29 | 2021-10-15 | 合肥工业大学 | 一种大型接地网接地电阻多要素评价方法 |
CN118112466A (zh) * | 2024-04-30 | 2024-05-31 | 元工电力技术有限公司 | 一种接地网故障诊断方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1560645A (zh) * | 2004-03-03 | 2005-01-05 | 西安交通大学 | 基于模型参数识别的小电流接地选线方法 |
CN101034129A (zh) * | 2007-02-12 | 2007-09-12 | 湖南大学 | 发变电站接地网在线监测方法及其装置 |
CN101159376A (zh) * | 2007-09-26 | 2008-04-09 | 东北大学 | 一种小电流接地故障检测与定位的装置及方法 |
-
2011
- 2011-12-13 CN CN 201110416879 patent/CN102495327B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1560645A (zh) * | 2004-03-03 | 2005-01-05 | 西安交通大学 | 基于模型参数识别的小电流接地选线方法 |
CN101034129A (zh) * | 2007-02-12 | 2007-09-12 | 湖南大学 | 发变电站接地网在线监测方法及其装置 |
CN101159376A (zh) * | 2007-09-26 | 2008-04-09 | 东北大学 | 一种小电流接地故障检测与定位的装置及方法 |
Non-Patent Citations (2)
Title |
---|
F. NAVARRINA ETAL: "ANALYTICAL INTEGRATION TECHNIQUES FOR EARTHING GRID COMPUTATION BY BOUNDARY ELEMENT METHODS", 《NUMERICAL METHODS IN ENGINEERING AND APPLIED SCIENCIES》 * |
孟奇 等: "边界元法在接地网数值计算中的应用", 《东北电力学院学报》 * |
Cited By (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103197133B (zh) * | 2013-03-26 | 2015-09-16 | 广东电网公司电力科学研究院 | 一种基于无线传输的大型地网分流向量测量方法 |
CN103197133A (zh) * | 2013-03-26 | 2013-07-10 | 广东电网公司电力科学研究院 | 一种基于无线传输的大型地网分流向量测量方法 |
CN103427354A (zh) * | 2013-08-15 | 2013-12-04 | 国家电网公司 | 一种变电站接地网结构的早期确定方法 |
CN104111376A (zh) * | 2014-07-28 | 2014-10-22 | 王涵宇 | 一种变电站接地网特性参数的数值计算与分析方法 |
CN104569671B (zh) * | 2014-12-30 | 2017-08-11 | 云南电网公司电力科学研究院 | 一种换流站接地网直流分流系数测试方法 |
CN104569671A (zh) * | 2014-12-30 | 2015-04-29 | 云南电网公司电力科学研究院 | 一种换流站接地网直流分流系数测试方法 |
CN104678147A (zh) * | 2015-02-05 | 2015-06-03 | 河南平高电气股份有限公司 | 一种用于气体绝缘变电站内最大接触电压的计算方法 |
CN104833835A (zh) * | 2015-02-05 | 2015-08-12 | 河南平高电气股份有限公司 | 一种用于气体绝缘变电站的跨步电压的计算方法 |
CN104833835B (zh) * | 2015-02-05 | 2018-03-23 | 河南平高电气股份有限公司 | 一种用于气体绝缘变电站的跨步电压的计算方法 |
WO2016124014A1 (zh) * | 2015-02-05 | 2016-08-11 | 国家电网公司 | 用于气体绝缘变电站的跨步电压和最大接触电压计算方法 |
CN105021943B (zh) * | 2015-07-15 | 2017-11-03 | 南方电网科学研究院有限责任公司 | Mmc‑hvdc交流侧故障的过电流检测方法和系统 |
CN105021943A (zh) * | 2015-07-15 | 2015-11-04 | 南方电网科学研究院有限责任公司 | Mmc-hvdc交流侧故障的过电流检测方法和系统 |
CN105069202A (zh) * | 2015-07-22 | 2015-11-18 | 国网天津市电力公司 | 一种变电站接地网的智能敷设设计方法 |
CN105069202B (zh) * | 2015-07-22 | 2018-06-12 | 国网天津市电力公司 | 一种变电站接地网的智能敷设设计方法 |
CN106950456B (zh) * | 2017-05-26 | 2019-07-26 | 云南电网有限责任公司电力科学研究院 | 一种基于人工短路实验的变电站接地网性能评估方法 |
CN107132455A (zh) * | 2017-05-26 | 2017-09-05 | 云南电网有限责任公司电力科学研究院 | 一种基于地线电流注入的变电站接地网性能评估方法 |
CN107219420A (zh) * | 2017-05-26 | 2017-09-29 | 云南电网有限责任公司电力科学研究院 | 一种换流站短路电流分流系数仿真方法及系统 |
CN106950456A (zh) * | 2017-05-26 | 2017-07-14 | 云南电网有限责任公司电力科学研究院 | 一种基于人工短路实验的变电站接地网性能评估方法 |
CN107219420B (zh) * | 2017-05-26 | 2020-05-01 | 云南电网有限责任公司电力科学研究院 | 一种换流站短路电流分流系数仿真方法及系统 |
CN107132455B (zh) * | 2017-05-26 | 2019-07-05 | 云南电网有限责任公司电力科学研究院 | 一种基于地线电流注入的变电站接地网性能评估方法 |
CN107505536A (zh) * | 2017-08-07 | 2017-12-22 | 国网上海市电力公司 | 计及多根金属管道的变电站接地网地表电位分布计算方法 |
CN107505536B (zh) * | 2017-08-07 | 2020-03-31 | 国网上海市电力公司 | 计及多根金属管道的变电站接地网地表电位分布计算方法 |
CN107766622A (zh) * | 2017-09-27 | 2018-03-06 | 国网上海市电力公司 | 一种地下变电站接地系统设计优化方法 |
CN112684273A (zh) * | 2021-01-06 | 2021-04-20 | 国核电力规划设计研究院重庆有限公司 | 一种110kV全电缆出线变电站接地短路故障入地电流分流方法 |
CN112684273B (zh) * | 2021-01-06 | 2023-08-29 | 国核电力规划设计研究院重庆有限公司 | 一种110kV全电缆出线变电站接地短路故障入地电流分流方法 |
CN113504411A (zh) * | 2021-06-29 | 2021-10-15 | 合肥工业大学 | 一种大型接地网接地电阻多要素评价方法 |
CN118112466A (zh) * | 2024-04-30 | 2024-05-31 | 元工电力技术有限公司 | 一种接地网故障诊断方法 |
CN118112466B (zh) * | 2024-04-30 | 2024-07-09 | 元工电力技术有限公司 | 一种接地网故障诊断方法 |
Also Published As
Publication number | Publication date |
---|---|
CN102495327B (zh) | 2013-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102495327A (zh) | 一种变电站接地网设计检测方法及装置 | |
CN103412242B (zh) | 一种基于快速独立分量分析和互信息的谐波源定位方法 | |
Li et al. | Influence of deep earth resistivity on HVDC ground-return currents distribution | |
CN105182184B (zh) | 一种基于沿线方向行波分解的配网线缆混合直配线路故障测距方法 | |
CN109711088B (zh) | 一种场路结合的配电线路感应雷过电压计算方法 | |
CN103869173A (zh) | 一种测量地表到地深数十公里土壤电阻率分布的方法 | |
CN103675565B (zh) | 超/特高压交流输电线路工频参数测量方法 | |
Sun et al. | Comparison between 1-D and 3-D geoelectric field methods to calculate geomagnetically induced currents: A case study | |
CN104698313A (zh) | 多直流接地极不同运行方式下直流偏磁电流影响站点的预测方法 | |
CN104007308B (zh) | 一种基于微分法的接地网支路电流检测方法 | |
CN107179430A (zh) | 一种中低纬局域电网中地磁感应电流的风险评估方法 | |
CN104318003A (zh) | 基于tdcm模型的变电站地表电位计算及选址检测方法 | |
CN102590686A (zh) | 一种双极直流输电线路无线电干扰确定方法 | |
CN106208050A (zh) | 一种基于pmu的电网支路静态参数检测辨识方法 | |
CN104122452A (zh) | 基于多次同步异频法的大型地网工频接地阻抗测量方法 | |
CN105375470B (zh) | 一种利用磁场数据逆推架空输电线路三相电流的方法 | |
CN106771616A (zh) | 一种确定深层土壤等效土壤电阻率的方法 | |
CN102608462B (zh) | 输电线路无线电干扰测量方法 | |
Li et al. | Airborne transient electromagnetic simulation: detecting geoelectric structures for HVdc monopole operation | |
CN113297526B (zh) | 一种基于Wenner四极和大地电磁数据的水平分层土壤结构联合反演方法 | |
CN114221327B (zh) | 基于变电站偏磁的互联直流通路等值建模方法 | |
Dehghanian et al. | An Integrated Assessment of a G3 GMD Event on Large-Scale Power Grids: From Magnetometer Data To Geomagnetically Induced Current Analysis | |
CN105092469B (zh) | 基于在线监测技术获得绝缘子盐密饱和系数的方法及系统 | |
Burstinghaus et al. | The importance of non-uniform geoelectric fields in calculating GIC distributions | |
CN102590633B (zh) | 一种地下接地装置间自、互阻抗测量方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |