CN102040165B - Temporary supporting piece for installation of ropeway of cabling machine - Google Patents

Temporary supporting piece for installation of ropeway of cabling machine Download PDF

Info

Publication number
CN102040165B
CN102040165B CN201110022945A CN201110022945A CN102040165B CN 102040165 B CN102040165 B CN 102040165B CN 201110022945 A CN201110022945 A CN 201110022945A CN 201110022945 A CN201110022945 A CN 201110022945A CN 102040165 B CN102040165 B CN 102040165B
Authority
CN
China
Prior art keywords
side plate
bearing
lower side
plate
epipleural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110022945A
Other languages
Chinese (zh)
Other versions
CN102040165A (en
Inventor
罗陈
周建平
刘新华
黄家奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 7 Co Ltd
Original Assignee
Sinohydro Bureau 7 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 7 Co Ltd filed Critical Sinohydro Bureau 7 Co Ltd
Priority to CN201110022945A priority Critical patent/CN102040165B/en
Publication of CN102040165A publication Critical patent/CN102040165A/en
Application granted granted Critical
Publication of CN102040165B publication Critical patent/CN102040165B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

The invention discloses a temporary supporting piece for installation of a ropeway of a cabling machine, belonging to the technical field of installation of a ropeway system, comprising a traveling wheel, a bearing and a pin shaft and further comprising a main side plate, an upper side plate and a lower side plate, wherein the bearing and the pin shaft are embedded in the traveling wheel; the pin shaft penetrates through the main side plate, the bearing and the upper side plate in sequence and is clamped by a beta pin; the upper side plate is connected with the lower side plate by a hinge; the lower side plate is fixedly connected with the main side plate by a bottom plate; the lower end of the bottom plate is welded with a bearing hook; a partitioning plate is welded between the middle of the lower side plate and the main side plate, and is provided with a connecting hole which is sheathed with a U-shaped clamping ring fixed by a bolt; and gaskets are arranged among the traveling wheel, the main side plate and the upper side plate. By utilizing the temporary supporting piece, the rope-bearing force for installing auxiliary systems (ground anchors, winch pulley blocks and the like) of a cable-rope type crane can be greatly reduced, the safety of erecting the ropeway system can be improved and the efficiency of installing the cable-rope type crane can be improved.

Description

Cable machine cableway is installed and is held horse temporarily
Affiliated technical field
The present invention relates to cableway system and install, hold horse (having another name called the guy device) during especially the cable crane cableway system is installed, belong to cableway system field engineering field.
Background technology
At present, adopt large-tonnage, large span cable crane (cable machine) as main preparation of construction during big-and-middle-sized Hydraulic and Hydro-Power Engineering is built, the installation of its cableway system is that the cable machine is installed the maximum critical process of security risk, and is aloft work.For this reason, it is then extremely important how to improve safety and installation effectiveness that cable machine cableway system installs.The existing directly dilatory cableway of winch that adopts mostly, the shortcoming of existence is: winch, earth anchor also need the tension force of track rope except that the deadweight of track rope in the cableway erection process, and for this reason, winch, earth anchor bearing capacity are bigger.
Summary of the invention
To the above-mentioned deficiency that cableway system is installed, the present invention provides a kind of horse of temporarily holding.
The technical solution adopted for the present invention to solve the technical problems is: cable machine cableway is installed and is held horse temporarily, comprises road wheel, setting-in bearing and bearing pin wherein, also comprises master plate, epipleural and lower side panel; Bearing pin runs through master plate, bearing, epipleural successively, and by the screens of β pin; Epipleural is connected with lower side panel through hinge; Lower side panel is captiveed joint through base plate with the master plate; The base plate lower end is welded with the carrying hook; Be welded with dividing plate between lower side panel middle part and the master plate; Dividing plate is provided with connecting bore, wherein is set with the U-shaped snap ring, and by bolt; Between road wheel and master plate, the epipleural packing ring is installed.
The invention has the beneficial effects as follows, reduce the Suo Li that holds that cable crane is installed ancillary system (earth anchor, winch assembly pulley etc.) greatly, improve the safety that cableway system sets up, and can improve the efficient that cable crane is installed.
Description of drawings
Fig. 1 is an overall structure scheme drawing of the present invention;
Fig. 2 is the left view of Fig. 1.
Parts and numbering among the figure:
The 1-road wheel, the 2-bearing pin, 3-master plate, the 4-epipleural, the 5-lower side panel, the 6-dividing plate,
The 7-base plate, 8-carries hook, the 9-bearing, the 10-packing ring, the interim cableway of 11-, the 12-snap ring,
The 13-hauling rope, 14-ropeway carrying-rope, 15-hinge, 16-β pin.
The specific embodiment
Below in conjunction with embodiment the present invention is further specified.
Referring to Fig. 1,2, cable machine cableway is installed and is held horse temporarily, comprises road wheel 1, setting-in bearing 9 and bearing pin 2 wherein, also comprises master plate 3, epipleural 4 and lower side panel 5; Bearing pin 2 runs through master plate 3, bearing 9, epipleural 4 successively, and sells 16 screens by β; Epipleural 4 is connected with lower side panel 5 through hinge 15; Lower side panel 5 is captiveed joint through base plate 7 with master plate 3; Base plate 7 lower ends are welded with carries hook 8; Be welded with dividing plate 6 between lower side panel 5 middle parts and the master plate 3; Dividing plate 6 is provided with connecting bore, wherein is set with U-shaped snap ring 12, and by bolt; Between road wheel 1 and master plate 3, the epipleural 4 packing ring 10 is installed.
The flank radius of road wheel 1 directly matches with the rope of interim cableway 11.
Road wheel 1 is installed on the interim cableway 11 that has set up, and hauling rope 13 is connected on the snap ring 12, ropeway carrying-rope 14 is put into carried hook 8.
Setting-in bearing 9 in the road wheel 2; Road wheel 1 is installed on the interim cableway 11 that has set up; Bearing pin 2 penetrates from master plate 3 outsides earlier, puts a packing ring 10, passes bearing 9, puts a packing ring 10 again, and the inboard from epipleural 4 wears out again; Sell 16 screens with β again, according to the gap fitting gasket 10 between road wheel 1 and master plate 3, the epipleural 4; Road wheel 1 adopts aluminum material, and the flank radius of road wheel 1 needs directly to process according to the rope that sets up interim cableway 11, and master plate 3 need guarantee that with the spacing of epipleural 4 road wheel 1 does not take off groove in the course of the work.
Epipleural 4 is connected through hinge 15 with lower side panel 5; Master plate 3 becomes whole with lower side panel 5 with dividing plate 6, base plate 7 assembly weldings; Dividing plate 6 is provided with two connecting bores, so that U-shaped snap ring 12 to be installed; Base plate 7 bottoms are welded with carries hook 8.
Installation is held Ma Shixu temporarily the pin of the β on the bearing pin 2 16 is extracted; Raise epipleural 4; Mount to the interim cableway 11 that has set up hold horse temporarily, because of epipleural 4 has been raised, then hauling rope 13 can be positioned on the dividing plate 6; And hauling rope 13 and dividing plate 6 are carried out clamping with snap ring 12, to be convenient to hold horse dilatory temporarily; Epipleural 4 is connected through hinge 15 with lower side panel 5, be convenient to epipleural 4 and open, close, epipleural 4 open, close installation and hauling rope 13 clampings of being convenient to hold horse temporarily; Ropeway carrying-rope 14 put into carry hook 8, promptly one is held the horse installation temporarily, treats to hold horse temporarily and walks to certain distance and the next one promptly is installed is held horse temporarily, crosses rivers until ropeway carrying-rope 14 and accomplishes.

Claims (2)

1. a cable machine cableway is installed and is held horse temporarily, comprises road wheel (1), setting-in bearing (9) and bearing pin (2) wherein, it is characterized in that, also comprises master plate (3), epipleural (4) and lower side panel (5); Bearing pin (2) runs through master plate (3), bearing (9), epipleural (4) successively, and by (16) screens of β pin; Epipleural (4) is connected with lower side panel (5) through hinge (15); Lower side panel (5) is captiveed joint through base plate (7) with master plate (3); Base plate (7) lower end is welded with carries hook (8); Be welded with dividing plate (6) between lower side panel (5) middle part and the master plate (3); Dividing plate (6) is provided with connecting bore, wherein is set with U-shaped snap ring (12), and by bolt; Between road wheel (1) and master plate (3), the epipleural (4) packing ring (10) is installed.
2. cable machine cableway according to claim 1 is installed and is held horse temporarily, it is characterized in that, the flank radius of described road wheel (1) directly matches with the rope of interim cableway (11).
CN201110022945A 2011-01-20 2011-01-20 Temporary supporting piece for installation of ropeway of cabling machine Active CN102040165B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110022945A CN102040165B (en) 2011-01-20 2011-01-20 Temporary supporting piece for installation of ropeway of cabling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110022945A CN102040165B (en) 2011-01-20 2011-01-20 Temporary supporting piece for installation of ropeway of cabling machine

Publications (2)

Publication Number Publication Date
CN102040165A CN102040165A (en) 2011-05-04
CN102040165B true CN102040165B (en) 2012-10-10

Family

ID=43906763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110022945A Active CN102040165B (en) 2011-01-20 2011-01-20 Temporary supporting piece for installation of ropeway of cabling machine

Country Status (1)

Country Link
CN (1) CN102040165B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102756987B (en) * 2012-07-06 2014-12-24 葛洲坝集团第一工程有限公司 Cable machine main rope river-passing balance safety device
AT513309B1 (en) * 2012-09-13 2014-09-15 Innova Patent Gmbh Notlauflagerung
CN103231995B (en) * 2013-04-28 2015-07-08 杭州国电大力机电工程有限公司 Double-wheel self-propelled rope carrier
CN112938775A (en) * 2021-03-19 2021-06-11 徐灵根 Fixed bearing for cable crane
CN113845043B (en) * 2021-09-10 2023-08-29 山东水总有限公司 Cable crane and installation method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2626964Y (en) * 2003-05-21 2004-07-21 四川路桥建设股份有限公司 Rope bearing equipment
CN2723412Y (en) * 2004-09-08 2005-09-07 杭州国电大力机电工程有限公司 Self walking bearing
JP2005239354A (en) * 2004-02-26 2005-09-08 Iwafuji Kogyo Kk Loading and unloading device
CN101323419A (en) * 2008-04-23 2008-12-17 中铁十三局集团有限公司 Non-tower cable crane
CN201473221U (en) * 2009-08-28 2010-05-19 中国第一冶金建设有限责任公司 Light cable crane for suspension bridge
CN201530683U (en) * 2009-05-15 2010-07-21 中国十七冶建设有限公司 Movable saddle for temporary aerial ropeway
CN201923793U (en) * 2011-01-20 2011-08-10 中国水利水电第七工程局有限公司 Temporary support for mounting cable crane ropeway

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07172765A (en) * 1993-12-15 1995-07-11 Seirei Ind Co Ltd Roller frame structure of rope type carrier

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2626964Y (en) * 2003-05-21 2004-07-21 四川路桥建设股份有限公司 Rope bearing equipment
JP2005239354A (en) * 2004-02-26 2005-09-08 Iwafuji Kogyo Kk Loading and unloading device
CN2723412Y (en) * 2004-09-08 2005-09-07 杭州国电大力机电工程有限公司 Self walking bearing
CN101323419A (en) * 2008-04-23 2008-12-17 中铁十三局集团有限公司 Non-tower cable crane
CN201530683U (en) * 2009-05-15 2010-07-21 中国十七冶建设有限公司 Movable saddle for temporary aerial ropeway
CN201473221U (en) * 2009-08-28 2010-05-19 中国第一冶金建设有限责任公司 Light cable crane for suspension bridge
CN201923793U (en) * 2011-01-20 2011-08-10 中国水利水电第七工程局有限公司 Temporary support for mounting cable crane ropeway

Also Published As

Publication number Publication date
CN102040165A (en) 2011-05-04

Similar Documents

Publication Publication Date Title
CN102040165B (en) Temporary supporting piece for installation of ropeway of cabling machine
CN101548100B (en) Suspension device for wind wheel blade, method of mounting wind wheel blade, and method of constructing wind-driven generator
CN108660946B (en) Method for replacing main cable of suspension bridge
CN106758767B (en) A kind of suspension bridge segmented cat road and its construction method
CN108661667A (en) It is a kind of that shield ventilating shaft is facilitated to bear the device and application method that endless tube piece is removed
CN211500721U (en) Cable bearing and moving device of roadheader
CN101708812B (en) Self-lifting hoister and using method thereof
CN106099757A (en) A kind of transmission line insulator crosses over crane span structure and construction technology thereof
CN204434116U (en) A kind of hanging device for interior courtyard lifting pipeline
CN201923793U (en) Temporary support for mounting cable crane ropeway
CN215060111U (en) Large-diameter vertical pipe mounting and fixing structure
CN102849622B (en) Mast-based section-by-section vertical lifting assembling method of tower
CN212503680U (en) Hoisting system for large-scale bridge crane heavy workpiece
CN208564567U (en) A kind of device for facilitating the negative endless tube piece of shield ventilating shaft to remove
CN103194974B (en) Pre-deviation device for structural bearings
CN202245861U (en) Device capable of integrally elevating ultrahigh large-span heavy-duty steel vestibule
CN214660350U (en) Split initial tunneling pipeline extension supporting device of shield tunneling machine
CN211645930U (en) Tunnel inverted arch construction trestle
CN202864784U (en) Endless rope holding rope wheel set and endless rope winch
CN206667058U (en) A kind of across cable walking cord clip handling erecting device
CN202358822U (en) Hoisting structure for oil field skid block
CN205973541U (en) Tower crane is with electronic introduction device that hangs, breaks off relations certainly
CN218754750U (en) Make things convenient for installation loop wheel machine of dismouting
CN108729362B (en) Large-span pipe bridge vertical face circulating cable replacement system and use method thereof
CN215154601U (en) Inclined shaft transportation track mounting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant