CN109936127B - Power distribution method, device, equipment and system of data center - Google Patents

Power distribution method, device, equipment and system of data center Download PDF

Info

Publication number
CN109936127B
CN109936127B CN201910329823.1A CN201910329823A CN109936127B CN 109936127 B CN109936127 B CN 109936127B CN 201910329823 A CN201910329823 A CN 201910329823A CN 109936127 B CN109936127 B CN 109936127B
Authority
CN
China
Prior art keywords
battery
power supply
load
voltage direct
direct current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910329823.1A
Other languages
Chinese (zh)
Other versions
CN109936127A (en
Inventor
吴双鹤
王鹏冲
王永平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Baidu Netcom Science and Technology Co Ltd
Original Assignee
Beijing Baidu Netcom Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Baidu Netcom Science and Technology Co Ltd filed Critical Beijing Baidu Netcom Science and Technology Co Ltd
Priority to CN201910329823.1A priority Critical patent/CN109936127B/en
Publication of CN109936127A publication Critical patent/CN109936127A/en
Application granted granted Critical
Publication of CN109936127B publication Critical patent/CN109936127B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The embodiment of the application discloses a power distribution method, a power distribution device, power distribution equipment, a power distribution system and a computer readable medium of a data center. One embodiment of the method comprises: acquiring power supply state information of high-voltage direct-current equipment and a battery in a power distribution system and energy demand information of load equipment of a data center; performing load distribution based on the power supply state information of the high-voltage direct-current equipment and the battery and the energy demand information of the load equipment of the data center and generating a load distribution signal, wherein the load distribution signal is used for indicating the power supply amount of the high-voltage direct-current power supply and the power supply amount of the battery; and respectively sending load distribution signals to the high-voltage direct current equipment and the battery so as to control the high-voltage direct current equipment and the battery to respectively provide power for the load equipment of the data center according to the load distribution signals. This implementation has realized the energy distribution of data center distribution system, can effectively utilize the charge-discharge performance of battery to promote distribution system's energy utilization.

Description

Power distribution method, device, equipment and system of data center
Technical Field
The embodiment of the application relates to the technical field of computers, in particular to the technical field of data center power supply, and particularly relates to a data center power distribution method, device, equipment, system and computer readable medium.
Background
The power supply system of the data center is a system for converting electric energy and then transmitting the converted electric energy to a load. In general, a power supply system is provided with a battery as a backup power source to ensure power supply to a load in an abnormal situation such as a mains power failure.
In general, a battery in a power supply system is used only as a backup power source, and the battery is in a standby state for a long time because of few abnormal situations such as a mains power failure.
Disclosure of Invention
The embodiment of the disclosure provides a power distribution method, a power distribution device, power distribution equipment, a power distribution system and a computer readable medium of a data center.
In a first aspect, an embodiment of the present disclosure provides a power distribution method for a data center, including: acquiring power supply state information of high-voltage direct-current equipment and a battery in a power distribution system and energy demand information of load equipment of a data center; performing load distribution based on the power supply state information of the high-voltage direct-current equipment and the battery and the energy demand information of the load equipment of the data center and generating a load distribution signal, wherein the load distribution signal is used for indicating the power supply amount of the high-voltage direct-current power supply and the power supply amount of the battery; and respectively sending load distribution signals to the high-voltage direct current equipment and the battery so as to control the high-voltage direct current equipment and the battery to respectively provide power for the load equipment of the data center according to the load distribution signals.
In some embodiments, the load distribution and generating the load distribution signal based on the power supply state information of the high voltage dc device and the battery and the energy demand information of the load device of the data center includes: and in response to determining that the high-voltage direct current equipment and the battery are both available according to the power supply state information of the high-voltage direct current equipment and the battery, generating a load distribution signal according to a preset load distribution proportion and energy demand information of load equipment of the data center.
In some embodiments, the load distribution and generating the load distribution signal based on the power supply state information of the high voltage dc device and the battery and the energy demand information of the load device of the data center includes: in response to determining that the power supply state information of the battery meets a preset charging condition, generating a load distribution signal indicating that energy requirements of the load device are met by the high-voltage direct current device; the method further comprises the following steps: and generating a battery charging signal and transmitting the battery charging signal to the high-voltage direct-current device in response to the fact that the power supply state information of the battery meets the preset charging condition, so as to control the high-voltage direct-current device to charge the battery.
In some embodiments, the power supply status information of the battery includes a current working time, and the preset charging condition includes that the current working time is within a preset power consumption valley period.
In some embodiments, the load distribution and generating the load distribution signal based on the power supply state information of the high voltage dc device and the battery and the energy demand information of the load device of the data center includes: in response to determining a fault in the high voltage dc device based on the power supply status information for the high voltage dc device, a load sharing signal is generated indicating that the energy demand of the load device is met by the battery supply.
In some embodiments, the load distribution and generating the load distribution signal based on the power supply state information of the high voltage dc device and the battery and the energy demand information of the load device of the data center includes: and generating a load distribution signal indicating that the energy demand of the load equipment is met by the high-voltage direct-current equipment in response to the fact that the power supply state of the battery is switched within the preset time period according to the power supply state information of the battery.
In a second aspect, an embodiment of the present disclosure provides a power distribution apparatus of a data center, including: the system comprises an acquisition unit, a storage unit and a control unit, wherein the acquisition unit is configured to acquire power supply state information of a high-voltage direct current device and a battery in a power distribution system and energy demand information of load devices of a data center; a generating unit configured to perform load distribution based on power supply state information of the high voltage direct current device and the battery and energy demand information of a load device of the data center and generate a load distribution signal indicating a power supply amount of the high voltage direct current power supply and a power supply amount of the battery; and the transmitting unit is configured to transmit the load distribution signals to the high-voltage direct current device and the battery respectively so as to control the high-voltage direct current device and the battery to provide power to the load devices of the data center according to the load distribution signals.
In some embodiments, the generating unit is further configured to perform load distribution and generate the load distribution signal based on the power supply state information of the high voltage dc device and the battery and the energy demand information of the load device of the data center as follows: and in response to determining that the high-voltage direct current equipment and the battery are both available according to the power supply state information of the high-voltage direct current equipment and the battery, generating a load distribution signal according to a preset load distribution proportion and energy demand information of load equipment of the data center.
In some embodiments, the generating unit is further configured to perform load distribution and generate the load distribution signal based on the power supply state information of the high voltage dc device and the battery and the energy demand information of the load device of the data center as follows: in response to determining that the power supply state information of the battery meets a preset charging condition, generating a load distribution signal indicating that energy requirements of the load device are met by the high-voltage direct current device; the above-mentioned device still includes: and the charging unit is configured to generate a battery charging signal and transmit the battery charging signal to the high-voltage direct current device in response to the fact that the power supply state information of the battery meets the preset charging condition so as to control the high-voltage direct current device to charge the battery.
In some embodiments, the power supply status information of the battery includes a current working time, and the preset charging condition includes that the current working time is within a preset power consumption valley period.
In some embodiments, the generating unit is further configured to perform load distribution and generate the load distribution signal based on the power supply state information of the high voltage dc device and the battery and the energy demand information of the load device of the data center as follows: in response to determining a fault in the high voltage dc device based on the power supply status information for the high voltage dc device, a load sharing signal is generated indicating that the energy demand of the load device is met by the battery supply.
In some embodiments, the generating unit is further configured to perform load distribution and generate the load distribution signal based on the power supply state information of the high voltage dc device and the battery and the energy demand information of the load device of the data center as follows: and generating a load distribution signal indicating that the energy demand of the load equipment is met by the high-voltage direct-current equipment in response to the fact that the power supply state of the battery is switched within the preset time period according to the power supply state information of the battery.
In a third aspect, an embodiment of the present disclosure provides a power distribution apparatus of a data center, including: one or more processors; a storage device having one or more programs stored thereon; when the one or more programs are executed by the one or more processors, the one or more processors implement the power distribution method of the data center as provided in the first aspect
In a fourth aspect, an embodiment of the present disclosure provides a power distribution system of a data center, including: the power distribution apparatus as provided in the third aspect; high voltage direct current devices, and batteries.
In a fifth aspect, an embodiment of the present disclosure provides a computer readable medium, on which a computer program is stored, wherein the program, when executed by a processor, implements the power distribution method of the data center provided in the first aspect.
The power distribution method, device, equipment, system and computer readable medium of the data center of the above embodiments of the present application, by acquiring power supply state information of high-voltage direct current equipment and a battery in a power distribution system and energy demand information of load equipment of a data center, performing load distribution based on the power supply state information of the high-voltage direct current equipment and the battery and the energy demand information of the load equipment of the data center and generating load distribution signals, wherein the load distribution signals are used for indicating the power supply amount of the high-voltage direct current power supply and the power supply amount of the battery and respectively sending the load distribution signals to the high-voltage direct current equipment and the battery, the high-voltage direct-current equipment and the battery are controlled to respectively provide power for the load equipment of the data center according to the load distribution signal, so that the energy distribution of the power distribution system of the data center is realized, and the energy utilization rate of the power distribution system can be improved by effectively utilizing the charge and discharge performance of the battery.
Drawings
Other features, objects and advantages of the present application will become more apparent upon reading of the following detailed description of non-limiting embodiments thereof, made with reference to the accompanying drawings in which:
FIG. 1 is an exemplary system architecture diagram to which embodiments of the present application may be applied;
FIG. 2 is a flow diagram of one embodiment of a method of power distribution in a data center according to the present disclosure;
FIG. 3 is a flow diagram of another embodiment of a method of power distribution in a data center according to the present disclosure;
FIG. 4 is a schematic block diagram of one embodiment of a power distribution apparatus of a data center of the present disclosure;
FIG. 5 is a hardware architecture diagram of power distribution equipment of a data center according to the present disclosure;
fig. 6 is a schematic structural diagram of a power distribution system of a data center according to the present disclosure.
Detailed Description
The present application will be described in further detail with reference to the following drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the relevant invention and not restrictive of the invention. It should be noted that, for convenience of description, only the portions related to the related invention are shown in the drawings.
It should be noted that the embodiments and features of the embodiments in the present application may be combined with each other without conflict. The present application will be described in detail below with reference to the embodiments with reference to the attached drawings.
Fig. 1 illustrates an exemplary system architecture to which a power distribution method of a data center or a power distribution apparatus of the data center of the present application may be applied.
As shown in fig. 1, the system architecture 100 may include a utility 110, a power supply system 120, and a load device 130. The utility power 110 is an ac power source, and the power supply system 120 converts the electrical energy provided by the utility power 110 and transmits the converted electrical energy to the load device 130.
The load device 130 may be an electronic device such as a server, a monitoring device, a control device, and the like of a data center. The energy source for operation of the load device 130 is provided by the power supply system 120.
The power supply system 120 may include a power conversion device 121, and the power conversion device 121 is a device for converting the commercial power 110, such as a high-voltage direct current (HVDC) power supply. The power conversion device 121 may convert the mains 110 into a power supply adapted to the load device 130, for example, converting an alternating current into a direct current.
In applications of the present disclosure, the power supply system 120 may also include a backup power source 122, such as a battery. The battery may be connected to the load device 130 and may provide power to the load device 130 in case of a mains or HVDC failure. Here, the battery may be rechargeable, and may be embodied as a battery or a battery pack.
The power supply system 120 may also include an energy storage management system 123. The energy storage management system 123 may manage the power conversion device 121 and the battery. The energy storage management system 123 may control the power conversion device 121 and the battery to supply power to the load device 130, and the energy storage management system 123 may control the power conversion device 121 to charge the battery.
The energy storage management system 123 may be implemented as software or hardware, and when the energy storage management system 123 is hardware, it may be implemented as a distributed server cluster formed by a plurality of servers, or may be implemented as a single server. When the energy storage management system 123 is software, it may be implemented as a plurality of software or software modules, or may be implemented as a single software or software module. And is not particularly limited herein.
It should be noted that the power distribution method of the data center provided by the embodiment of the present disclosure may be executed by the energy storage management system 123, and accordingly, the power distribution device of the data center may be disposed in the energy storage management system 123.
It should be understood that the number of power supply systems, load devices, power conversion devices, backup power sources, and energy storage management systems in fig. 1 are merely illustrative. Any number of power supply systems, load devices, power conversion devices, backup power sources, and energy storage management systems may be present, as desired for implementation.
With continued reference to fig. 2, a flow 200 of one embodiment of a method of power distribution in a data center according to the present application is shown. The power distribution method of the data center comprises the following steps:
step 201, acquiring power supply state information of high-voltage direct-current equipment and a battery in a power distribution system and energy demand information of load equipment of a data center.
In this embodiment, the power distribution system of the data center may include high voltage dc devices and batteries. The high-voltage direct-current equipment is connected with a mains supply, converts a mains supply into a high-voltage direct-current power supply and then transmits the high-voltage direct-current power supply to load equipment of the data center. The battery is also connected to load devices of the data center, and the battery may also provide power to the load devices.
The execution main body of the power distribution method of the data center can be connected with the high-voltage direct current equipment and the battery, monitor the states of the high-voltage direct current equipment and the battery and acquire power supply state information of the high-voltage direct current equipment and the battery. Wherein the power supply status information may include at least one of: status information of normal or abnormal power supply, power supply efficiency, power supply time, power supply amount per unit time, power supply cost, and the like. The power state of the battery may also include, but is not limited to, at least one of: the residual capacity, the charge-discharge state and the switching time of the battery and the total using time of the battery. The power supply state information of the battery can be obtained based on monitoring parameters such as internal resistance, voltage, temperature and the like of the battery.
The energy demand information of the load devices of the data center may be power consumption demand amounts of the load devices. And the calculation can be carried out according to the working power and the number of various types of load equipment. The load devices may be lighting devices, servers, cooling devices, and the like. The execution main body of the power distribution method of the data center can acquire information such as types, working power and quantity of load equipment of the data center, calculate electric quantity capable of meeting normal work of the load equipment, and increase estimated loss electric quantity on the basis of meeting the electric quantity of the normal work of the load equipment to obtain energy demand information of the load equipment.
And 202, performing load distribution and generating a load distribution signal based on the power supply state information of the high-voltage direct-current equipment and the battery and the energy demand information of the load equipment of the data center.
In this embodiment, load distribution may be performed according to the amount of power that can be provided by the high-voltage dc power supply and the battery and the amount of power required by the load device, for example, a portion of the amount of power required by the load device may be distributed and provided by the high-voltage dc power supply, and another portion of the amount of power required by the load device may be distributed and provided by the battery, so as to generate a load distribution signal. The load distribution signal is used for indicating the power supply amount of the high-voltage direct-current power supply and the power supply amount of the battery, namely the high-voltage direct-current power supply and the battery respectively provide corresponding electric quantity according to the indication of the load distribution signal.
The power supply state information of the high voltage direct current power supply and the battery may further include power supply costs of the high voltage direct current power supply and the battery, such as a unit electricity price of the high voltage direct current power supply and the battery. Load distribution can be performed according to the power supply cost and the power amount available by the battery, for example, the total power supply cost under various load distribution strategies can be calculated, a load distribution mode with lower power supply cost is selected, and a corresponding load distribution signal is generated.
And step 203, respectively sending load distribution signals to the high-voltage direct current equipment and the battery to control the high-voltage direct current equipment and the battery to respectively provide power for the load equipment of the data center according to the load distribution signals.
The load sharing signal may be sent to the high voltage dc device and the battery, respectively. And after receiving the load distribution signal, the high-voltage direct current equipment and the battery respectively provide power for the load equipment according to the indication of the load distribution signal.
In this embodiment, the hvdc device and the battery are both connected to the load devices of the data center, and both the hvdc device and the battery can independently provide power to the load devices, for example, when the load distribution signal indicates that the hvdc device independently provides power, the battery can be in a quiescent state and does not provide power. The high-voltage direct-current equipment and the battery can also provide power for the load equipment at the same time, when the energy demand of the load equipment of the data center is large, the load of a power supply system is possibly overlarge due to the fact that the high-voltage direct-current equipment is singly used for supplying power, and the power supply of partial load equipment can be achieved through battery discharge. For example, the load sharing signal may indicate that the high voltage dc power source provides 80% of the energy demand and the battery provides 20% of the energy demand.
According to the power distribution method of the data center, power supply state information of high-voltage direct-current equipment and a battery in a power distribution system and energy demand information of load equipment of the data center are obtained; performing load distribution based on the power supply state information of the high-voltage direct-current equipment and the battery and the energy demand information of the load equipment of the data center and generating a load distribution signal, wherein the load distribution signal is used for indicating the power supply amount of the high-voltage direct-current power supply and the power supply amount of the battery; the load distribution signals are respectively sent to the high-voltage direct-current equipment and the battery so as to control the high-voltage direct-current equipment and the battery to respectively provide power for the load equipment of the data center according to the load distribution signals, energy distribution of a power distribution system of the data center is achieved, and the energy utilization rate of the power distribution system can be improved by effectively utilizing the charging and discharging performance of the battery.
Referring to fig. 3, a flow diagram of another embodiment of a method of power distribution in a data center according to the present disclosure is shown. As shown in fig. 3, a flow 300 of a power distribution method of a data center of the present embodiment includes the following steps:
step 301, acquiring power supply state information of a high-voltage direct-current device and a battery in a power distribution system and energy demand information of load devices of a data center.
In this embodiment, the power distribution system of the data center may include high voltage dc devices and batteries. The high-voltage direct-current equipment is connected with a mains supply, converts a mains supply into a high-voltage direct-current power supply and then transmits the high-voltage direct-current power supply to load equipment of the data center. The battery is also connected to load devices of the data center, and the battery may also provide power to the load devices.
The power supply state information of the high voltage dc device and the battery may include, but is not limited to, at least one of: the state information of normal or abnormal power supply, power supply efficiency, power supply time, power supply amount per unit time, power supply cost, residual electric quantity of the battery, charge-discharge state and switching time of the battery, and total use duration of the battery. The execution main body can monitor the states of the high-voltage direct-current device and the battery to acquire power supply state information. For example, parameters such as voltage, current, resistance of the battery, voltage, temperature and the like output by the high-voltage direct-current device can be detected through the monitoring circuit. The power supply state information can be obtained in various modes such as calculating the power supply efficiency of the high-voltage direct-current equipment and recording the charging and discharging time of the battery.
The energy demand information of the load equipment of the data center is the electricity consumption demand of the load equipment. And the calculation can be carried out according to the working power and the number of various types of load equipment.
And 302, in response to the fact that the high-voltage direct current equipment and the battery are available according to the power supply state information of the high-voltage direct current equipment and the battery, generating a load distribution signal according to a preset load distribution proportion and energy demand information of load equipment of the data center.
Wherein the load distribution signal is used for indicating the power supply amount of the high-voltage direct-current power supply and the power supply amount of the battery.
In this embodiment, whether the high voltage dc device and the battery can normally supply power may be determined according to the power supply state information of the high voltage dc device and the battery. Specifically, whether the power supply state parameters such as the temperature, the voltage and the internal resistance of the battery are within the preset value range under the normal discharge condition can be judged according to the power supply state parameters such as the power supply voltage, the power supply current and the power supply efficiency of the high-voltage direct-current equipment. If the power supply state parameter of the high-voltage direct-current equipment is in the numerical range under the preset normal power supply condition, the high-voltage direct-current equipment can be determined to be available; if the power supply state parameter of the battery is within the value range under the preset normal discharge condition, the battery can be determined to be available.
The specific weight of the load distribution of the high voltage dc power supply and the battery may be set in advance, for example, 80% and 20% for the high voltage dc device and the battery, respectively. Optionally, load distribution specific gravities of the high-voltage direct-current power supply and the battery in different time periods can be set, and particularly, different load distribution specific gravities can be set according to peak-valley time-of-use prices. Particularly, in the peak time period of electricity price, the electric energy stored by the battery can be fully utilized to provide a power supply required by load operation; during the time period of low price of electricity, the high-voltage direct-current equipment can be utilized to provide power as much as possible. The load distribution specific gravity of the battery during the peak electricity price period may be set higher than that during the valley electricity price period, for example, 80% or 100% may be set for the peak electricity price period and 20% or 0 may be set for the valley electricity price period.
The execution main body of the power distribution method of the data center can calculate the electric quantity which needs to be provided by the high-voltage direct-current equipment and the battery respectively according to the preset load distribution proportion and the energy demand information of the load equipment of the data center, and generate load distribution signals which indicate the high-voltage direct-current equipment and the battery to provide corresponding electric quantity respectively.
Therefore, when both the high-voltage direct-current equipment and the battery are available, the load distribution signal is generated according to the preset load distribution proportion, the discharge performance of the battery can be fully utilized to share the load of the high-voltage direct-current equipment, and the stable operation of a power supply system is ensured.
Step 303, in response to determining that the power supply state information of the battery meets the preset charging condition, generating a load distribution signal indicating that the energy demand of the load device is met by the high voltage direct current device.
In this embodiment, the battery is a rechargeable battery. The preset charging condition may be a condition that a preset power supply state that the battery needs to be charged satisfies. When the electric quantity of the battery reaches the lowest early warning value or the voltage of the battery end is lower than the preset voltage value, the battery can be stopped from being used for supplying power to the load equipment. At this point, the high voltage dc power supply is required to power all of the load devices, and a load distribution signal may be generated that indicates that the energy demand of the load devices is being met by the high voltage dc power supply.
At this time, the power distribution method of the data center may further include: and generating a battery charging signal and transmitting the battery charging signal to the high-voltage direct-current device in response to the fact that the power supply state information of the battery meets the preset charging condition, so as to control the high-voltage direct-current device to charge the battery.
The battery can be connected with high-voltage direct-current equipment, and the high-voltage direct-current equipment can charge the battery after converting commercial power into a direct-current power supply under the control of a battery charging signal. When the power supply state information of the battery meets the preset charging condition, the load equipment can be supplied with power and the battery can be charged through the high-voltage direct-current equipment.
Optionally, the power supply status information of the battery includes a current working time, and the preset charging condition includes that the current working time is within a preset power consumption valley time period. The peak-valley electricity rate is generally an electricity rate divided according to the peak and valley of the used amount of electricity in order to improve the efficiency of the use of electric energy and reduce the load of the electricity generation, and the period of the valley of the used amount of electricity, i.e. the period of the low valley of the electricity rate, is, for example, 23: 00 to 7 am earlier. Therefore, the high-voltage direct-current equipment is controlled to charge the battery and provide power required by all load equipment in the electricity price off-peak time period, and the battery can be charged in the electricity consumption off-peak time period to realize low-cost and high-efficiency energy storage, so that the energy stored by the battery is utilized to supply power to the load in the electricity consumption peak time period.
By combining step 302 and step 303, the charge and discharge performance of the battery can be effectively utilized, and the battery can be recycled.
In response to determining a fault in the high voltage dc device from the power supply status information of the high voltage dc device, a load distribution signal is generated indicating that the energy demand of the load device is met by the battery supply, step 304.
In this embodiment, whether the high-voltage direct-current device fails or not may be monitored based on the power supply state information, for example, the voltage and the current output by the high-voltage direct-current device are monitored, and whether the voltage and the current are within a normal range or not is determined. If the high-voltage direct current equipment is monitored to have a fault, the battery can be controlled to provide electric quantity meeting the energy requirements of all load equipment so as to ensure the normal operation of the load equipment.
Optionally, if a fault of the high-voltage direct-current equipment is monitored, the time length during which the electric quantity of the battery can maintain the normal operation of the data center can be estimated, and prompt information is generated to prompt that the high-voltage direct-current equipment needs to be repaired within the time length.
And 305, generating a load distribution signal indicating that the energy requirement of the load equipment is met by the high-voltage direct-current equipment in response to the fact that the power supply state of the battery is switched within the preset time period according to the power supply state information of the battery.
The power supply state information of the battery may further include time information of switching of the power supply state of the battery, and the power supply state of the battery may include: the charging state comprises a floating charging state and a uniform charging state. If the power supply state of the battery is monitored to be switched over in a preset time period, for example, the battery is monitored to be switched from a floating charge state to a static state in the preset time period, or the battery is switched from a discharge state to a fault state in the preset time period, a load distribution signal for controlling the high-voltage direct-current equipment to provide electric quantity meeting the energy demand of all load equipment can be generated. The preset time period may be a short time period before the current time, for example, within 10 seconds before the current time.
Therefore, the high-voltage direct-current equipment is controlled to supply power within a period of time after the power supply state of the battery is switched, the battery does not supply power, and the loss of the battery caused by frequent switching within a short time of the battery state can be avoided. And the fault state of the battery can be detected in time, so that the abnormity of the battery can be judged.
And step 306, respectively sending load distribution signals to the high-voltage direct current equipment and the battery to control the high-voltage direct current equipment and the battery to respectively provide power for the load equipment of the data center according to the load distribution signals.
The load sharing signal may be sent to the high voltage dc device and the battery, respectively. And after receiving the load distribution signal, the high-voltage direct current equipment and the battery respectively provide power for the load equipment according to the indication of the load distribution signal.
According to the power supply method of the data center, the process 300 determines the power supply quantity distribution strategy of the high-voltage direct current equipment and the battery according to the power supply state information of the high-voltage direct current equipment and the battery, so that reasonable distribution of electric energy is realized, and the use efficiency of the electric energy can be improved.
With further reference to fig. 4, as an implementation of the methods shown in the above figures, the present application provides an embodiment of a power distribution apparatus of a data center, which corresponds to the method embodiments shown in fig. 2 and fig. 3, and which can be applied to various electronic devices.
As shown in fig. 4, the power distribution apparatus 400 of the data center of the present embodiment includes: acquisition section 401, generation section 402, and transmission section 403. The acquiring unit 401 is configured to acquire power supply state information of the high-voltage direct-current devices and the batteries in the power distribution system and energy demand information of load devices of the data center; the generating unit 402 is configured to perform load distribution based on the power supply state information of the high voltage dc device and the battery and the energy demand information of the load device of the data center and generate a load distribution signal indicating the power supply amount of the high voltage dc power supply and the power supply amount of the battery; the transmitting unit 403 is configured to transmit load distribution signals to the high voltage dc device and the battery, respectively, to control the high voltage dc device and the battery to supply power to the load devices of the data center according to the load distribution signals, respectively.
In some embodiments, the generating unit 402 may be further configured to perform load distribution and generate the load distribution signal based on the power supply status information of the high voltage dc device and the battery and the energy demand information of the load devices of the data center as follows: and in response to determining that the high-voltage direct current equipment and the battery are both available according to the power supply state information of the high-voltage direct current equipment and the battery, generating a load distribution signal according to a preset load distribution proportion and energy demand information of load equipment of the data center.
In some embodiments, the generating unit 402 may be further configured to perform load distribution and generate the load distribution signal based on the power supply status information of the high voltage dc device and the battery and the energy demand information of the load devices of the data center as follows: in response to determining that the power supply state information of the battery meets a preset charging condition, generating a load distribution signal indicating that energy requirements of the load device are met by the high-voltage direct current device; the apparatus 400 may further include: and the charging unit is configured to generate a battery charging signal and transmit the battery charging signal to the high-voltage direct current device in response to the fact that the power supply state information of the battery meets the preset charging condition so as to control the high-voltage direct current device to charge the battery.
In some embodiments, the power supply status information of the battery includes a current working time, and the preset charging condition includes that the current working time is within a preset power consumption valley period.
In some embodiments, the generating unit 402 may be further configured to perform load distribution and generate the load distribution signal based on the power supply status information of the high voltage dc device and the battery and the energy demand information of the load devices of the data center as follows: in response to determining a fault in the high voltage dc device based on the power supply status information for the high voltage dc device, a load sharing signal is generated indicating that the energy demand of the load device is met by the battery supply.
In some embodiments, the generating unit 402 may be further configured to perform load distribution and generate the load distribution signal based on the power supply status information of the high voltage dc device and the battery and the energy demand information of the load devices of the data center as follows: and generating a load distribution signal indicating that the energy demand of the load equipment is met by the high-voltage direct-current equipment in response to the fact that the power supply state of the battery is switched within the preset time period according to the power supply state information of the battery.
It should be understood that the elements recited in apparatus 400 correspond to various steps in the methods described with reference to fig. 2 and 3. Thus, the operations and features described above for the method are equally applicable to the apparatus 400 and the units included therein, and are not described in detail here.
The power distribution apparatus 400 of the data center according to the above-mentioned embodiment of the present disclosure obtains the power supply state information of the high-voltage dc device and the battery in the power distribution system and the energy demand information of the load device of the data center by the obtaining unit, the generating unit performs load distribution based on the power supply state information of the high-voltage dc device and the battery and the energy demand information of the load device of the data center and generates a load distribution signal indicating the power supply amount of the high-voltage dc power supply and the power supply amount of the battery, the transmitting unit transmits the load distribution signal to the high-voltage dc device and the battery respectively, the high-voltage direct-current equipment and the battery are controlled to respectively provide power for the load equipment of the data center according to the load distribution signal, so that the energy distribution of the power distribution system of the data center is realized, and the energy utilization rate of the power distribution system can be improved by effectively utilizing the charge and discharge performance of the battery.
Referring now to FIG. 5, a hardware architecture diagram of power distribution equipment of a data center suitable for use in implementing embodiments of the present disclosure is shown. The power distribution apparatus shown in fig. 5 is only an example, and should not bring any limitation to the function and the range of use of the embodiments of the present disclosure.
As shown in fig. 5, the power distribution apparatus 500 includes a processor (e.g., a central processing unit, a graphic processor) 501, a storage device 502, an input unit 503, and an output unit 504, wherein the processor 501, the storage device 502, the input unit 503, and the output unit 504 are connected to each other through a bus 505. Here, the method according to an embodiment of the present disclosure may be implemented as a computer program and stored in the storage 502. The processing device 501 in the power distribution apparatus 500 specifically implements the power distribution function defined in the method of the embodiment of the present disclosure by calling the above-described computer program stored in the storage device 502. In some implementations, the input unit 503 may be a unit that can be used to acquire status information of the high voltage dc device and the battery, and energy demand information of the load device, and the output unit 504 may be a unit that outputs a load distribution signal. Thus, when the computer program is called to execute the power distribution function, the processor 501 may control the input unit 503 to acquire the state information of the high voltage dc device and the battery and the energy demand information of the load device, and control the output unit 504 to output the load distribution signal.
The embodiment of the disclosure also provides a power distribution system of the data center. Referring to fig. 6, a power distribution system 600 includes a power distribution device 601, a high voltage dc device 602, and a battery 603. The power distribution device 601 may be the power distribution device described in connection with fig. 5, connected to the high voltage dc device 602 and the battery 603. The high voltage dc device 602 may be connected between the utility power and load devices of the data center and the battery may be connected between the output of the high voltage dc device 602 and load devices of the data center. The power distribution system may provide operating power to load devices.
In particular, according to an embodiment of the present disclosure, the processes described above with reference to the flowcharts may be implemented as computer software programs. For example, embodiments of the present disclosure include a computer program product comprising a computer program embodied on a computer readable medium, the computer program comprising program code for performing the method illustrated in the flow chart. The computer program, when executed by a processing device, performs the above-described functions defined in the methods of embodiments of the present disclosure. It should be noted that the computer readable medium described in the embodiments of the present disclosure may be a computer readable signal medium or a computer readable storage medium or any combination of the two. A computer readable storage medium may be, for example, but not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination of the foregoing. More specific examples of the computer readable storage medium may include, but are not limited to: an electrical connection having one or more wires, a portable computer diskette, a hard disk, a Random Access Memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disc read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing. In embodiments of the disclosure, a computer readable storage medium may be any tangible medium that can contain, or store a program for use by or in connection with an instruction execution system, apparatus, or device. In embodiments of the present disclosure, however, a computer readable signal medium may comprise a propagated data signal with computer readable program code embodied therein, for example, in baseband or as part of a carrier wave. Such a propagated data signal may take many forms, including, but not limited to, electro-magnetic, optical, or any suitable combination thereof. A computer readable signal medium may also be any computer readable medium that is not a computer readable storage medium and that can communicate, propagate, or transport a program for use by or in connection with an instruction execution system, apparatus, or device. Program code embodied on a computer readable medium may be transmitted using any appropriate medium, including but not limited to: electrical wires, optical cables, RF (radio frequency), etc., or any suitable combination of the foregoing.
The computer readable medium may be embodied in the electronic device; or may exist separately without being assembled into the electronic device. The computer readable medium carries one or more programs which, when executed by the electronic device, cause the electronic device to: acquiring power supply state information of high-voltage direct-current equipment and a battery in a power distribution system and energy demand information of load equipment of a data center; performing load distribution based on the power supply state information of the high-voltage direct-current equipment and the battery and the energy demand information of the load equipment of the data center and generating a load distribution signal, wherein the load distribution signal is used for indicating the power supply amount of the high-voltage direct-current power supply and the power supply amount of the battery; respectively sending load distribution signals to the high-voltage direct current equipment and the battery to control the high-voltage direct current equipment and the battery to respectively provide power for the load equipment of the data center according to the load distribution signals
Computer program code for carrying out operations for embodiments of the present disclosure may be written in any combination of one or more programming languages, including an object oriented programming language such as Java, Smalltalk, C + +, and conventional procedural programming languages, such as the "C" programming language or similar programming languages. The program code may execute entirely on the user's computer, partly on the user's computer, as a stand-alone software package, partly on the user's computer and partly on a remote computer or entirely on the remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer through any type of network, including a Local Area Network (LAN) or a Wide Area Network (WAN), or the connection may be made to an external computer (for example, through the Internet using an Internet service provider).
The flowchart and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of systems, methods and computer program products according to various embodiments of the present application. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
The units described in the embodiments of the present application may be implemented by software or hardware. The described units may also be provided in a processor, and may be described as: a processor includes a write acquisition unit, a generation unit, and a transmission unit. The names of the units do not limit the units themselves in some cases, and for example, the acquiring unit may also be described as a unit that acquires power supply state information of the high-voltage direct-current devices and the batteries in the power distribution system and energy demand information of the load devices of the data center.
The above description is only a preferred embodiment of the application and is illustrative of the principles of the technology employed. It will be appreciated by those skilled in the art that the scope of the invention herein disclosed is not limited to the particular combination of features described above, but also encompasses other arrangements formed by any combination of the above features or their equivalents without departing from the spirit of the invention. For example, the above features may be replaced with (but not limited to) features having similar functions disclosed in the present application.

Claims (15)

1. A method of power distribution in a data center, comprising:
acquiring power supply state information of high-voltage direct-current equipment and a battery in a power distribution system and energy demand information of load equipment of a data center, wherein the high-voltage direct-current equipment and the battery simultaneously provide power for the load equipment of the data center;
performing load distribution based on the power supply state information of the high-voltage direct current equipment and the battery and the energy demand information of the load equipment of the data center and generating a load distribution signal, wherein the high-voltage direct current equipment is used for converting a commercial power supply into a high-voltage direct current power supply, and the load distribution signal is used for indicating the power supply quantity of the high-voltage direct current power supply and the power supply quantity of the battery;
the power supply state information of the high-voltage direct current power supply and the battery comprises the following information: the power supply cost of the high-voltage direct current power supply and the battery, and the load distribution based on the power supply state information of the high-voltage direct current equipment and the battery and the energy demand information of the load equipment of the data center comprises the following steps: load distribution is carried out according to the power supply cost and the power quantity which can be provided by the battery;
and respectively sending load distribution signals to the high-voltage direct current equipment and the battery so as to control the high-voltage direct current equipment and the battery to respectively provide power for the load equipment of the data center according to the load distribution signals.
2. The method of claim 1, wherein the load distributing and generating load distribution signals based on the power supply status information of the high voltage direct current devices and the battery and the energy demand information of the load devices of the data center comprises:
and in response to determining that the high-voltage direct current equipment and the battery are available according to the power supply state information of the high-voltage direct current equipment and the battery, generating a load distribution signal according to a preset load distribution proportion and energy demand information of load equipment of the data center.
3. The method of claim 1, wherein the load distributing and generating load distribution signals based on the power supply status information of the high voltage direct current devices and the battery and the energy demand information of the load devices of the data center comprises:
in response to determining that the power supply state information of the battery meets a preset charging condition, generating a load distribution signal indicating that energy requirements of the load device are met by the high-voltage direct current device;
the method further comprises the following steps:
and in response to the fact that the power supply state information of the battery meets the preset charging condition, generating a battery charging signal and sending the battery charging signal to the high-voltage direct current equipment so as to control the high-voltage direct current equipment to charge the battery.
4. The method of claim 3, wherein the power supply status information of the battery includes a current operating time, and the preset charging condition includes the current operating time being within a preset power usage trough time period.
5. The method of claim 1, wherein the load distributing and generating load distribution signals based on the power supply status information of the high voltage direct current devices and the battery and the energy demand information of the load devices of the data center comprises:
generating a load distribution signal indicative of an energy demand of the load device being met by the battery supply in response to determining that the high voltage direct current device is malfunctioning in accordance with the power supply status information of the high voltage direct current device.
6. The method of claim 1, wherein the load distributing and generating load distribution signals based on the power supply status information of the high voltage direct current devices and the battery and the energy demand information of the load devices of the data center comprises:
and generating a load distribution signal indicating that the energy demand of the load equipment is met by the high-voltage direct-current equipment in response to the fact that the power supply state of the battery is switched within a preset time period according to the power supply state information of the battery.
7. A power distribution apparatus of a data center, comprising:
the system comprises an acquisition unit, a processing unit and a control unit, wherein the acquisition unit is configured to acquire power supply state information of a high-voltage direct current device and a battery in a power distribution system and energy demand information of load equipment of a data center, and the high-voltage direct current device and the battery simultaneously supply power to the load equipment of the data center;
a generating unit configured to perform load distribution based on the power supply state information of the high voltage direct current device and the battery and the energy demand information of the load device of the data center and generate a load distribution signal indicating a power supply amount of the high voltage direct current power supply and a power supply amount of the battery;
the power supply state information of the high-voltage direct current power supply and the battery comprises the following information: the power supply cost of the high-voltage direct current power supply and the battery, and the load distribution based on the power supply state information of the high-voltage direct current equipment and the battery and the energy demand information of the load equipment of the data center comprises the following steps: load distribution is carried out according to power supply cost and the power quantity which can be provided by the battery;
a transmitting unit configured to transmit load distribution signals to the high voltage direct current device and the battery, respectively, to control the high voltage direct current device and the battery to supply power to load devices of the data center, respectively, according to the load distribution signals.
8. The apparatus of claim 7, wherein the generating unit is further configured to perform load distribution and generate the load distribution signal based on the power supply state information of the high voltage direct current device and the battery and the energy demand information of the load devices of the data center as follows:
and in response to determining that the high-voltage direct current equipment and the battery are available according to the power supply state information of the high-voltage direct current equipment and the battery, generating a load distribution signal according to a preset load distribution proportion and energy demand information of load equipment of the data center.
9. The apparatus of claim 7, wherein the generating unit is further configured to perform load distribution and generate the load distribution signal based on the power supply state information of the high voltage direct current device and the battery and the energy demand information of the load devices of the data center as follows:
in response to determining that the power supply state information of the battery meets a preset charging condition, generating a load distribution signal indicating that energy requirements of the load device are met by the high-voltage direct current device;
the device further comprises:
a charging unit configured to generate and transmit a battery charging signal to the high voltage direct current device to control the high voltage direct current device to charge the battery in response to determining that the power supply state information of the battery satisfies a preset charging condition.
10. The apparatus of claim 9, wherein the power supply status information of the battery includes a current operating time, and the preset charging condition includes the current operating time being within a preset power usage trough time period.
11. The apparatus of claim 7, wherein the generating unit is further configured to perform load distribution and generate the load distribution signal based on the power supply state information of the high voltage direct current device and the battery and the energy demand information of the load devices of the data center as follows:
generating a load distribution signal indicative of an energy demand of the load device being met by the battery supply in response to determining that the high voltage direct current device is malfunctioning in accordance with the power supply status information of the high voltage direct current device.
12. The apparatus of claim 7, wherein the generating unit is further configured to perform load distribution and generate the load distribution signal based on the power supply state information of the high voltage direct current device and the battery and the energy demand information of the load devices of the data center as follows:
and generating a load distribution signal indicating that the energy demand of the load equipment is met by the high-voltage direct-current equipment in response to the fact that the power supply state of the battery is switched within a preset time period according to the power supply state information of the battery.
13. A power distribution apparatus of a data center, comprising:
one or more processors;
a storage device having one or more programs stored thereon;
when executed by the one or more processors, cause the one or more processors to implement the method of any one of claims 1-6.
14. A power distribution system for a data center, comprising:
the power distribution device of claim 13;
high voltage direct current devices, and batteries.
15. A computer-readable medium, on which a computer program is stored, wherein the program, when executed by a processor, implements the method of any one of claims 1-6.
CN201910329823.1A 2019-04-23 2019-04-23 Power distribution method, device, equipment and system of data center Active CN109936127B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910329823.1A CN109936127B (en) 2019-04-23 2019-04-23 Power distribution method, device, equipment and system of data center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910329823.1A CN109936127B (en) 2019-04-23 2019-04-23 Power distribution method, device, equipment and system of data center

Publications (2)

Publication Number Publication Date
CN109936127A CN109936127A (en) 2019-06-25
CN109936127B true CN109936127B (en) 2021-08-13

Family

ID=66990790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910329823.1A Active CN109936127B (en) 2019-04-23 2019-04-23 Power distribution method, device, equipment and system of data center

Country Status (1)

Country Link
CN (1) CN109936127B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111047153A (en) * 2019-11-22 2020-04-21 佛山电建集团有限公司 Energy distribution method, device, equipment and storage medium
CN113867618A (en) * 2020-06-30 2021-12-31 华为技术有限公司 Resource scheduling method, device, equipment, system and medium for energy storage equipment pool
CN112803452B (en) * 2021-03-12 2023-12-22 珠海格力电器股份有限公司 Power utilization control method of electric equipment and power utilization control system of data center

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102394510A (en) * 2011-09-30 2012-03-28 百度在线网络技术(北京)有限公司 Efficient and reliable power supply architecture of data center information technology (IT) equipment
CN103023131A (en) * 2012-11-14 2013-04-03 北京百度网讯科技有限公司 Direct-current power supply system of data center
CN104620469A (en) * 2013-03-15 2015-05-13 富士电机株式会社 Uninterruptible power supply apparatus
CN106300325A (en) * 2016-09-27 2017-01-04 天津大学 A kind of DC power-supply system for data center
CN106684995A (en) * 2017-01-04 2017-05-17 北京百度网讯科技有限公司 Power supply system and control method

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202353297U (en) * 2011-09-30 2012-07-25 百度在线网络技术(北京)有限公司 Data center IT device power supply system and standby high voltage DC power supply
CN204243874U (en) * 2014-07-29 2015-04-01 九州方圆实业控股(集团)有限公司 A kind of data center high-voltage direct current (DC) power system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102394510A (en) * 2011-09-30 2012-03-28 百度在线网络技术(北京)有限公司 Efficient and reliable power supply architecture of data center information technology (IT) equipment
CN103023131A (en) * 2012-11-14 2013-04-03 北京百度网讯科技有限公司 Direct-current power supply system of data center
CN104620469A (en) * 2013-03-15 2015-05-13 富士电机株式会社 Uninterruptible power supply apparatus
CN106300325A (en) * 2016-09-27 2017-01-04 天津大学 A kind of DC power-supply system for data center
CN106684995A (en) * 2017-01-04 2017-05-17 北京百度网讯科技有限公司 Power supply system and control method

Also Published As

Publication number Publication date
CN109936127A (en) 2019-06-25

Similar Documents

Publication Publication Date Title
US9071083B2 (en) Super capacitor supplemented server power
KR101206362B1 (en) Battery Energy Storage System
US8946929B2 (en) Method and apparatus for effective utilization of energy storage components within a microgid
US9948119B2 (en) Control of parallel battery utilization
US9184601B2 (en) Charge-discharge control device, charge-discharge monitoring device, charge-discharge control system, and computer program product
US9209629B2 (en) Charge-discharge control device, charge-discharge control system, and computer program product
CN109936127B (en) Power distribution method, device, equipment and system of data center
JP6590762B2 (en) Power supply system
EP3207615B1 (en) Power path information generation device, method for generating power path information, and computer program
US20130113294A1 (en) Modular energy storage system
JP5165042B2 (en) System power stabilization system, system power stabilization method, and charger / discharger
US10326270B2 (en) DC power transmission device, DC power reception device, and DC power transmission system
WO2024041383A1 (en) Energy storage system and power supply control method for battery management system
KR20130098079A (en) Apparatus and method for controlling power supply at substation
CN103576633A (en) Method and system for conducting power supply control on intelligent home systems in community micro grid
KR102198040B1 (en) Power management device and energy storage system including the same
US9853474B2 (en) Battery pack and driving method thereof
US20220006133A1 (en) Power storage control system and power storage control method
US11451085B2 (en) Fuel cell and battery backup power sources within power systems
CN113595173A (en) Charging equipment, power configuration method and device thereof and electronic equipment
JP5573258B2 (en) Power control apparatus, power control system, storage battery control method, and program
WO2017163747A1 (en) Power storage system, charge/discharge control device, control method therefor, and program
CN107171433A (en) A kind of power supply device, method of supplying power to and a kind of server
CN116632803A (en) Architecture of renewable energy ecological system
KR20160032315A (en) Battery management system and method for variable capacity dividing of battery pack using thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant