CN109858807A - Enterprise operation monitoring method and system - Google Patents
Enterprise operation monitoring method and system Download PDFInfo
- Publication number
- CN109858807A CN109858807A CN201910093416.5A CN201910093416A CN109858807A CN 109858807 A CN109858807 A CN 109858807A CN 201910093416 A CN201910093416 A CN 201910093416A CN 109858807 A CN109858807 A CN 109858807A
- Authority
- CN
- China
- Prior art keywords
- data
- monthly
- annual
- index data
- setting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 111
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000004458 analytical method Methods 0.000 claims description 24
- 238000009826 distribution Methods 0.000 claims description 18
- 230000002860 competitive effect Effects 0.000 claims description 14
- 238000007405 data analysis Methods 0.000 claims description 7
- 230000010354 integration Effects 0.000 claims description 6
- 230000001131 transforming effect Effects 0.000 claims description 5
- 230000005611 electricity Effects 0.000 claims 1
- 238000007726 management method Methods 0.000 description 9
- 230000000694 effects Effects 0.000 description 4
- 238000012550 audit Methods 0.000 description 2
- 238000013475 authorization Methods 0.000 description 2
- 238000013480 data collection Methods 0.000 description 2
- 238000013523 data management Methods 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 239000000284 extract Substances 0.000 description 2
- 238000000605 extraction Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000013079 data visualisation Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000004141 dimensional analysis Methods 0.000 description 1
- 201000010099 disease Diseases 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000002085 persistent effect Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000009877 rendering Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Alarm Systems (AREA)
Abstract
The invention provides a method and a system for enterprise operation monitoring, wherein the method comprises the following steps: integrating a plurality of business systems of an enterprise into a unified platform; setting a monitoring period, a monthly index data target value, a monthly early warning mode and a monthly early warning range, and setting an annual index data target value, an annual early warning mode and an annual early warning range; acquiring monthly core index data and annual core index data in a plurality of service systems from a unified platform; and calculating a difference value between the monthly core index data and a monthly index data target value as a first difference value, and a difference value between the annual core index data and an annual index data target value as a second difference value, judging whether the monthly core index data corresponds to a normal index, an index needing attention or an alarm index, and judging whether the annual core index data corresponds to a normal index, an index needing attention or an alarm index. The invention can realize the unified monitoring and management of enterprise operation work, and greatly improves the working efficiency of enterprise operation monitoring.
Description
Technical field
The present invention relates to the method and system that enterprise's monitoring technical field more particularly to a kind of enterprise operation monitor.
Background technique
Existing enterprise supervision scheme is that the index of correlation in the system that corporate departments are responsible for this department is monitored,
By manually carrying out data collection, finally report these data to company leader by the personnel of each department, it is artificial to carry out data receipts
Collection leads to calculate cumbersome easy error, inefficiency, there is also the data reported between department are inconsistent, between different departments
Warning level disunity, data report not in time, inter-sectional to link up the defects of at high cost.Though existing kernel business system system
Can so monitor the related data of enterprise, but there are poor in timeliness, monitoring classification is few, it is not prominent to show effect, alerts range not
Unified, monitoring content appearance alarm cannot notify in time related personnel, related personnel to learn announcement after cannot alerting, alerting in time
Subsequent feedback after the police persistent ailments such as not in time.It can unite to the operation of enterprises difference department therefore, it is necessary to a kind of
One monitoring and the scheme of management improve working efficiency.
Summary of the invention
In order to solve the above technical problems, the present invention provides a kind of method and system of enterprise operation monitoring, may be implemented to look forward to
The unified monitoring and management of industry operation greatly provide the working efficiency of enterprise operation monitoring.
A kind of method of enterprise operation monitoring provided by the invention, includes the following steps:
Multiple operation systems of enterprise are integrated into the unified platform, the multiple operation system include: dispatching service system,
Marketing system, customer information system, distribution scheduling system, enterprise assets system, metering system, financial system;
Setting monitoring period, monthly achievement data target value, monthly alarm mode and monthly early warning range, and setting year
Spend achievement data target value, annual alarm mode and annual early warning range;
According to the monitoring period of setting, the monthly core for needing to monitor in multiple operation systems is obtained from the unified platform
Achievement data and annual core index data;
The difference calculated between the monthly core index data and the monthly achievement data target value is poor as first
It is worth and the difference between the annual core index data and the annual achievement data target value is as the second difference, and
By the monthly alarm mode of first difference and setting and monthly early warning range corresponding with the monthly alarm mode into
Row compares, and judges that the monthly core index data correspond to normal index, need to pay close attention to index and still alert index, also by described the
The annual alarm mode and annual early warning range corresponding with the year alarm mode of two differences and setting are compared, and are sentenced
The annual core index data of breaking, which correspond to normal index, need to pay close attention to index still alerts index.
Preferably, further include following step:
It, will be described monthly according to the address related personnel ID of setting when the monthly core index data are alarm indexs
Core index data real-time informing relevant staff, when the annual core index data are alarm indexs, according to setting
The address related personnel ID by the annual core index data real-time informing relevant staff.
Preferably, further include following step:
The monthly core index data and the annual core index data are summarized, are supervised according to the operation of setting
The address control personnel ID, the monthly core index data and the annual core index data after summarizing are sent to operation prison
Control personnel, and monitoring operation personnel are obtained to the analysis report of the monthly core index data and the annual core index data
It accuses, after obtaining the analysis report, the address ID is led according to the decision of setting, the analysis report is sent to decision neck
It leads.
Preferably, further include following step:
According to the monitoring period of setting, is obtained in real time from the unified platform and need to monitor daily in multiple operation systems
Business datum, and the business datum is daily counted and shown, and the address ID is led according to the decision of setting, it will be described
Business datum is sent to decision leader, wherein the business datum includes: network load data, electric network operation data, distribution transforming
Heavy-overload situation data, distribution line tripping and telegram in reply situation data.
Preferably, further include following step:
According to the business datum criteria for classifying of setting, the business datum is divided as emphasis business datum, competitive industry
Data of being engaged in and core index data, by the emphasis business datum, the competitive business datum and the core index
Data carry out classification real time monitoring and statistics.
The present invention also provides a kind of systems of enterprise operation monitoring, comprising:
Integration module, for multiple operation systems of enterprise to be integrated into the unified platform, the multiple operation system includes:
Dispatching service system, marketing system, customer information system, distribution scheduling system, enterprise assets system, metering system, finance system
System;
Setting module, for setting monitoring period, monthly achievement data target value, monthly alarm mode and monthly early warning model
It encloses, and sets annual achievement data target value, annual alarm mode and annual early warning range;
Data acquisition module obtains in multiple operation systems for the monitoring period according to setting from the unified platform
The monthly core index data and annual core index data for needing to monitor;
Data analysis module, for calculating between the monthly core index data and the monthly achievement data target value
Difference as the difference between the first difference and the annual core index data and the annual achievement data target value
As the second difference, and by the monthly alarm mode of first difference and setting and corresponding with the monthly alarm mode
Monthly early warning range is compared, and judges that the monthly core index data correspond to normal index, need to pay close attention to index and still alert
Index, also by the annual alarm mode and annual early warning corresponding with the year alarm mode of second difference and setting
Range is compared, and judges that the annual core index data correspond to normal index, need to pay close attention to index and still alert index.
Preferably, further includes:
Pre-alert notification module, for when the monthly core index data be alarm index when, according to the relevant people of setting
The member address ID is by the monthly core index data real-time informing relevant staff, when the annual core index data are to accuse
When alert index, according to the address related personnel ID of setting by the annual core index data real-time informing relevant staff.
Preferably, further includes:
Monitoring analysis module, for converging the monthly core index data and the annual core index data
Always, the monthly core index data and the annual core according to the address monitoring operation personnel ID of setting, after summarizing
Achievement data is sent to monitoring operation personnel, and obtains monitoring operation personnel to the monthly core index data and the year
The analysis report of core index data leads the address ID according to the decision of setting after obtaining the analysis report, will be described point
Analysis report is sent to decision leader.
Preferably, further includes:
Daily concern module obtains multiple business systems from the unified platform for the monitoring period according to setting in real time
The business datum for needing to monitor daily in system, and the business datum is daily counted and shown, and determining according to setting
Plan leads the address ID, the business datum is sent to decision leader, wherein the business datum includes: network load number
According to, electric network operation data, distribution transforming heavy-overload situation data, distribution line tripping and telegram in reply situation data.
Preferably, further includes:
Data categorization module attaches most importance to business datum division for the business datum criteria for classifying according to setting
Business datum, competitive business datum and core index data, by the emphasis business datum, the competitive business datum
And the core index data carry out classification real time monitoring and statistics.
The invention has the following beneficial effects: to enterprises, other operation systems are integrated into the unified platform, convenient
It is unified data are carried out to multiple operation systems directly to adopt extractions, Data Integration is carried out, the target value of setting, alarm mode, in advance are passed through
Alert range analyzes the data of acquisition, separates normal index, need to pay close attention to index and alarm index, the prominent weight of data analysis
Point facilitates administrative staff and understands enterprise operation situation in time, carries out concentrated collection, right to the achievement datas of multiple operation systems
The achievement data of different business systems is analyzed using unified alarm mode and early warning range, realizes enterprise operation work
Unified monitoring and management, and data collection and analysis does not need manual operation and calculating, greatly provides enterprise operation monitoring
Working efficiency.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is the flow chart of the method for enterprise operation monitoring provided by the invention.
Fig. 2 is provided by the invention multiple operation systems to be carried out to integrated schematic diagram.
Specific embodiment
The present invention provides a kind of method of enterprise operation monitoring, as shown in Figure 1, this method includes the following steps:
Multiple operation systems of enterprise are integrated into the unified platform, can refer to Fig. 2, multiple operation systems include: scheduling clothes
Business system, marketing system, customer information system, distribution scheduling system, enterprise assets system, metering system, financial system;It is multiple
Operation system distinguishes the achievement data of multiple departments, enterprise, can also include other operation systems in multiple operation systems, such as:
Enterprise Integrated data platform, EIP system (Enterprise Information Portal, Enterprise Information Portal), 4A (certification
Authentication, authorization Authorization, book keeping operation Accounting, audit Audit) system, enterprise's letter plateform system
Deng;Multiple operation systems are integrated into the unified platform, specification, efficiently and comprehensively;
Setting monitoring period, monthly achievement data target value, monthly alarm mode and monthly early warning range, and setting year
Spend achievement data target value, annual alarm mode and annual early warning range;
According to the monitoring period of setting, the monthly core index for needing to monitor in multiple operation systems is obtained from the unified platform
Data and annual core index data;
The difference between monthly core index data and monthly achievement data target value is calculated as the first difference, Yi Jinian
The difference between core index data and annual achievement data target value is spent as the second difference, and by the first difference and setting
Monthly alarm mode and monthly early warning range corresponding with monthly alarm mode are compared, and judge monthly core index data
Corresponding normal index need to pay close attention to index and still alert index, also by the annual alarm mode of the second difference and setting and with year
The corresponding annual early warning range of degree alarm mode is compared, and judges that annual core index data correspond to normal index, need to pay close attention to
Index still alerts index.For example, there are three sections for setting for early warning range (monthly early warning range or annual early warning range), in advance
Police's formula (monthly alarm mode or annual alarm mode) includes normally, need to pay close attention to and alert, and three sections are corresponding normally, need
Three alarm modes of concern and alarm, when the alarm mode that the section correspondence where the first difference need to be paid close attention to, then the first difference
Corresponding monthly core index data are that need to pay close attention to index.
Specifically, at work, the personnel at monitoring operation center need in company operation 27 core index and
It is associated with nearly 100 indexs being related to and is monitored tracking, these indexs can be divided into monthly index and annual index.
Monthly index (including monthly core index data) refers to one data of a generation in month, that is to say that the monitoring period is
It is monthly.The data source of monthly index is divided into two kinds: one is every month by program timer automatically from other operation systems
In extracted.Another kind is by artificial mode to carry out typing every month.At the beginning of the year of each year, monitoring operation center
Personnel can be to the target value of all monthly index allocation every months.And the alarm mode of the monthly index, early warning range.It is of that month
After the monthly completion of degree index is worth out, system can be according to the target value of index, completion value, alarm mode, early warning range
Come judge the index it is monthly at this be normal index, index need to be paid close attention to and still alert index.
Annual index (including annual core index data) refers to one data of generation in 1 year, that is, the monitoring period is year
Degree.The data source of annual index is divided into two kinds: one is every year by program timer automatically from other operation systems into
Row extracts.Another kind is to carry out typing by artificial mode every year.At the annual beginning of the year, the personnel at monitoring operation center can be right
The target value of all this years of index allocation in year.And the alarm mode of year index, early warning range.The year of current year index
Completion be worth out after, system can be according to the target value of index, completion value, alarm mode, and early warning range judges the index
It is normal index in the year, index need to be paid close attention to and still alert index.
Further, the method for enterprise operation monitoring further includes following step:
When monthly core index data are alarm indexs, according to the address related personnel ID of setting by monthly core index
Data real-time informing relevant staff, when current year core index data are alarm indexs, according to the related personnel ID of setting
Address is by annual core index data real-time informing relevant staff.
Further, the method for enterprise operation monitoring further includes following step:
Monthly core index data and annual core index data are summarized, according to the monitoring operation personnel ID of setting
Address, monthly core index data and annual core index data after summarizing are sent to monitoring operation personnel, and obtain fortune
Monitoring personnel is sought to the analysis report of monthly core index data and annual core index data, after obtaining analysis report, root
The address ID is led according to the decision of setting, analysis report is sent to decision leader.
Further, the method for enterprise operation monitoring further includes following step:
According to the monitoring period of setting, the business for needing to monitor daily in multiple operation systems is obtained in real time from the unified platform
Data, and business datum is daily counted and shown, and the address ID is led according to the decision of setting, business datum is sent
Give decision leader, wherein business datum includes: network load data, electric network operation data, distribution transforming heavy-overload situation data,
Distribution line tripping and telegram in reply situation data.
Further, the method for enterprise operation monitoring further includes following step:
According to the business datum criteria for classifying of setting, business datum is divided as emphasis business datum, competitive business number
Accordingly and core index data, emphasis business datum, competitive business datum and core index data classify in real time
Monitoring and statistics.
The present invention also provides a kind of enterprise operation monitoring system, the system include: integration module, data acquisition module,
Setting module, data analysis module.
Integration module is used to for multiple operation systems of enterprise being integrated into the unified platform, and multiple operation systems include: scheduling
Service system, marketing system, customer information system, distribution scheduling system, enterprise assets system, metering system, financial system.
Setting module is for setting monitoring period, monthly achievement data target value, monthly alarm mode and monthly early warning model
It encloses, and sets annual achievement data target value, annual alarm mode and annual early warning range.
Data acquisition module is used for the monitoring period according to setting, obtains in multiple operation systems from the unified platform and needs to supervise
The monthly core index data of control and annual core index data.
The difference that data analysis module is used to calculate between monthly core index data and monthly achievement data target value is made
Difference for the first difference, and between annual core index data and annual achievement data target value as the second difference, and
The monthly alarm mode and monthly early warning range corresponding with monthly alarm mode of first difference and setting are compared, sentenced
Monthly core index data of breaking, which correspond to normal index, need to pay close attention to index still alerts index, also by the year of the second difference and setting
Degree alarm mode and annual early warning range corresponding with annual alarm mode are compared, and judge annual core index data pair
Normal index is answered, index need to be paid close attention to still alerts index.
Further, the system of enterprise operation monitoring further include: pre-alert notification module.
Pre-alert notification module is used for when monthly core index data are alarm indexs, according to the related personnel ID of setting
Location is by monthly core index data real-time informing relevant staff, when current year core index data are alarm indexs, according to
The address related personnel ID of setting is by annual core index data real-time informing relevant staff.
In enterprise operation monitoring, certain alarms are found, serious index or other the case where not conforming to convention, operation
The personnel of monitoring center can notify related personnel by the process function of walking of pre-alert notification module, allow the relevant departments being related to
Or personnel know pre-warning content, and make the corresponding measure explained and plan is taken, and the effect finally obtained.
Further, the system of enterprise operation monitoring further include: monitoring analysis module.
Monitoring analysis module is used to summarize monthly core index data and annual core index data, according to setting
The address monitoring operation personnel ID, monthly core index data after summarizing and annual core index data are sent to operation prison
Control personnel, and monitoring operation personnel are obtained to the analysis report of monthly core index data and annual core index data, it is obtaining
After taking analysis report, the address ID is led according to the decision of setting, analysis report is sent to decision leader.
To the overall situation of the content of monitoring every month, the personnel in monitoring operation can do detailed report, and special special
Topic analysis is led by the decision that system is sent to company, so that company leader can control the traffic-operating period of company comprehensively.
Further, the system of enterprise operation monitoring further include: pay close attention to module daily.
Daily concern module is used for the monitoring period according to setting, and obtaining in real time from the unified platform needs in multiple operation systems
The business datum to monitor daily, and business datum is daily counted and shown, and with leading ID according to the decision of setting
Business datum is sent to decision leader, wherein business datum includes: network load data, are matched at electric network operation data by location
Become heavy-overload situation data, distribution line tripping and telegram in reply situation data.Business datum also may include having customer complaint situation number
According to (12398 complain situation, 95598 to complain situation), Business Process System situation data, high pressure Business Process System timeout case data.
Further, the system of enterprise operation monitoring further include: data categorization module.
Data categorization module is used for the business datum criteria for classifying according to setting, and business datum is divided as emphasis business number
According to, competitive business datum and core index data, by emphasis business datum, competitive business datum and core index number
According to carrying out classification real time monitoring and statistics.
Preferably, the system of enterprise operation monitoring further include: key task module.Key task module obtains enterprise and shows rank
The data of the business tine of Duan Chongdian follow-up.Content mainly includes: reconstruction of village-in-city, four all standings, distributions do not have a power failure work
Industry etc..
It can also include that PC (personal computer, personal computer) holds work in the system of enterprise operation monitoring
Daily concern module, key task module, the function mould for monitoring competitive business can be set in platform, the end PC workbench
Block, and the functional module of setting monitoring critical workflow.
It can also include INDEX MANAGEMENT module in the system of enterprise operation monitoring, INDEX MANAGEMENT module is used to carry out index
Definition, planning index system, the monitoring of specified index annual plan, be also used to achievement data and make a report on index relationship safeguard etc..
It can also include data management module in the system of enterprise operation monitoring, data management module is used for abnormal finger
Mark data are monitored, and the achievement data that processing changes extremely.
It can also include mobile terminal and the display screen for monitoring in the system of enterprise operation monitoring.Wherein, mobile terminal is wrapped
Daily concern module, key task module are included, further includes the functional module for monitoring competitive business, refers to for monitoring core
The functional module and early warning for marking data supervise and manage functional module.Display screen can carry out panorama displaying.
The invention belongs to data pick-up, data analysis and data visualizations to show application, to other business systems of enterprises
System carries out data and directly adopts extraction, carries out Data Integration, and can be visualized on more locking terminals, and needs in interaction
The dynamic effect of upper prominent system.The present invention provides strong data supporting for real-time, the accurate and efficient monitoring of enterprise operation and relaxes
Suitable visual effect.
In order to better meet the needs of traffic-operating period monitoring of the monitoring operation center to entire enterprise, the present invention is based on enterprises
The basic data of the existing numerous operation systems of industry, extracts it in real time, counts, and analyzes, and excavates, and carry out in effect
Give top priority to what is the most important, it is readily appreciated that processing rendering.To reach efficient, accurate, battalion's monitoring in real time.Facilitate administrative staff to understand in time
Enterprise operation situation, auxiliary realize more scientific, more timely business administration, research and realization improvement plan.
(1) the unitized management and monitoring of index
The index of correlation in system being responsible for since original monitoring scheme is corporate departments this department is monitored,
Finally report these data to company leader by the personnel of each department, there are inconsistent between inter-sectional report, warning level is not
It is unified, it reports not in time, it is inter-sectional to link up the defects of at high cost.It can be solved at one stroke by unitized monitoring and management above-mentioned stupid
Disease, it is effective to carry out enterprise supervision management, greatly provide the working efficiency of user.
(2) timely pre-alert notification
Since original pre-alert notification uses flash report, and carried out by way of mail.Poor in the presence of failing, mail reception is not
Determine performance reason.The above problem can solve using the pre-alert notification of system.Pre-warning content can be timely conveyed, and receives early warning
Feedback.
The present invention is by establishing monitoring operation system, and using scientific specified alarm mode, intelligent data is extracted, point
Analysis, statistics etc. realize the unified monitoring of monitoring operation work, and intelligence is isolated, whole process supervision, multi dimensional analysis, are enterprise
It realizes that lean management provides support, escorts for the health operation of enterprise.
The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be said that
Specific implementation of the invention is only limited to these instructions.For those of ordinary skill in the art to which the present invention belongs, exist
Under the premise of not departing from present inventive concept, a number of simple deductions or replacements can also be made, all shall be regarded as belonging to of the invention
Protection scope.
Claims (10)
1. a kind of method of enterprise operation monitoring, which is characterized in that include the following steps:
Multiple operation systems of enterprise are integrated into the unified platform, the multiple operation system includes: dispatching service system, marketing
System, customer information system, distribution scheduling system, enterprise assets system, metering system, financial system;
Setting monitoring period, monthly achievement data target value, monthly alarm mode and monthly early warning range, and setting refer in year
Mark datum target value, annual alarm mode and annual early warning range;
According to the monitoring period of setting, the monthly core index for needing to monitor in multiple operation systems is obtained from the unified platform
Data and annual core index data;
Difference between the monthly core index data and the monthly achievement data target value is calculated as the first difference, with
And the difference between the annual core index data and the annual achievement data target value is as the second difference, and will be described
The monthly alarm mode of first difference and setting and monthly early warning range corresponding with the monthly alarm mode are compared,
Judge that the monthly core index data correspond to normal index, need to pay close attention to index and still alert index, also by second difference
And the annual alarm mode of setting and annual early warning range corresponding with the year alarm mode are compared, described in judgement
Annual core index data, which correspond to normal index, need to pay close attention to index still alerts index.
2. the method for enterprise operation monitoring according to claim 1, which is characterized in that further include following step:
When the monthly core index data are alarm indexs, according to the address related personnel ID of setting by the monthly core
Achievement data real-time informing relevant staff, when the annual core index data are alarm indexs, according to the phase of setting
The pass address personnel ID is by the annual core index data real-time informing relevant staff.
3. the method for enterprise operation monitoring according to claim 1, which is characterized in that further include following step:
The monthly core index data and the annual core index data are summarized, according to the monitoring operation people of setting
The address member ID, the monthly core index data and the annual core index data after summarizing are sent to monitoring operation people
Member, and obtain monitoring operation personnel to the analysis report of the monthly core index data and the annual core index data,
After obtaining the analysis report, the address ID is led according to the decision of setting, the analysis report is sent to decision leader.
4. the method for enterprise operation monitoring according to claim 1, which is characterized in that further include following step:
According to the monitoring period of setting, the business for needing to monitor daily in multiple operation systems is obtained in real time from the unified platform
Data, and the business datum is daily counted and shown, and the address ID is led according to the decision of setting, by the business
Data are sent to decision leader, wherein the business datum includes: network load data, electric network operation data, distribution transforming mistake again
Carry situation data, distribution line tripping and telegram in reply situation data.
5. the method for enterprise operation monitoring according to claim 4, which is characterized in that further include following step:
According to the business datum criteria for classifying of setting, the business datum is divided as emphasis business datum, competitive business number
Accordingly and core index data, by the emphasis business datum, the competitive business datum and the core index data
Carry out classification real time monitoring and statistics.
6. a kind of system of enterprise operation monitoring characterized by comprising
Integration module, for multiple operation systems of enterprise to be integrated into the unified platform, the multiple operation system includes: scheduling
Service system, marketing system, customer information system, distribution scheduling system, enterprise assets system, metering system, financial system;
Setting module, for setting monitoring period, monthly achievement data target value, monthly alarm mode and monthly early warning range,
And set annual achievement data target value, annual alarm mode and annual early warning range;
Data acquisition module was obtained in multiple operation systems from the unified platform and is needed for the monitoring period according to setting
The monthly core index data of monitoring and annual core index data;
Data analysis module, for calculating the difference between the monthly core index data and the monthly achievement data target value
Value is as the difference conduct between the first difference and the annual core index data and the annual achievement data target value
Second difference, and by the monthly alarm mode of first difference and setting and corresponding monthly with the monthly alarm mode
Early warning range is compared, and judges that the monthly core index data correspond to normal index, need to pay close attention to index and still alert index,
Also by the annual alarm mode and annual early warning range corresponding with the year alarm mode of second difference and setting
It is compared, judges that the annual core index data correspond to normal index, need to pay close attention to index and still alert index.
7. the system of enterprise operation monitoring according to claim 1, which is characterized in that further include:
Pre-alert notification module, for when the monthly core index data be alarm index when, according to the related personnel ID of setting
Address is by the monthly core index data real-time informing relevant staff, when the annual core index data are that alarm refers to
When mark, according to the address related personnel ID of setting by the annual core index data real-time informing relevant staff.
8. the system of enterprise operation monitoring according to claim 1, which is characterized in that further include:
Monitoring analysis module, for the monthly core index data and the annual core index data to be summarized, root
The monthly core index data and the annual core index number according to the address monitoring operation personnel ID of setting, after summarizing
According to being sent to monitoring operation personnel, and obtains monitoring operation personnel and the monthly core index data and the annual core are referred to
The analysis report for marking data leads the address ID according to the decision of setting, by the analysis report after obtaining the analysis report
It is sent to decision leader.
9. the system of enterprise operation monitoring according to claim 1, which is characterized in that further include:
Daily concern module obtains in multiple operation systems for the monitoring period according to setting from the unified platform in real time
The business datum for needing to monitor daily, and the business datum is daily counted and shown, and is led according to the decision of setting
The address ID is led, the business datum is sent to decision leader, wherein the business datum includes: network load data, electricity
Net work data, distribution transforming heavy-overload situation data, distribution line tripping and telegram in reply situation data.
10. the system of enterprise operation monitoring according to claim 9, which is characterized in that further include:
Data categorization module divides the business datum for emphasis business for the business datum criteria for classifying according to setting
Data, competitive business datum and core index data, by the emphasis business datum, the competitive business datum and
The core index data carry out classification real time monitoring and statistics.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910093416.5A CN109858807B (en) | 2019-01-30 | 2019-01-30 | Enterprise operation monitoring method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910093416.5A CN109858807B (en) | 2019-01-30 | 2019-01-30 | Enterprise operation monitoring method and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109858807A true CN109858807A (en) | 2019-06-07 |
CN109858807B CN109858807B (en) | 2022-11-25 |
Family
ID=66897136
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910093416.5A Active CN109858807B (en) | 2019-01-30 | 2019-01-30 | Enterprise operation monitoring method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109858807B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112215514A (en) * | 2020-10-22 | 2021-01-12 | 星云海数字科技股份有限公司 | Operation analysis report generation method and system |
CN112633660A (en) * | 2020-12-17 | 2021-04-09 | 山大地纬软件股份有限公司 | Multi-angle unemployment risk early warning device and method |
CN117172609A (en) * | 2023-09-18 | 2023-12-05 | 北汽蓝谷信息技术有限公司 | Management method and system based on value chain management and business management fusion |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002269311A (en) * | 2001-03-07 | 2002-09-20 | Ricoh Co Ltd | Management condition estimating method |
US20040260588A1 (en) * | 2003-06-23 | 2004-12-23 | Katherin Bowen | Method and system for business planning and improved business performance |
US20070195944A1 (en) * | 2006-02-22 | 2007-08-23 | Shmuel Korenblit | Systems and methods for context drilling in workforce optimization |
US20100030596A1 (en) * | 2008-07-30 | 2010-02-04 | Gaurav Johari | Business Process Intelligence |
US8204809B1 (en) * | 2008-08-27 | 2012-06-19 | Accenture Global Services Limited | Finance function high performance capability assessment |
US8311863B1 (en) * | 2009-02-24 | 2012-11-13 | Accenture Global Services Limited | Utility high performance capability assessment |
CN104123590A (en) * | 2014-06-27 | 2014-10-29 | 国家电网公司 | 95598 customer service center operation monitoring system and method |
CN104156822A (en) * | 2014-08-11 | 2014-11-19 | 国家电网公司 | SOA-based comprehensive enterprise level information system operation and maintenance management method |
CN107169894A (en) * | 2017-05-16 | 2017-09-15 | 上海斐晟企业管理有限公司 | Real estate operation management system based on SAP |
-
2019
- 2019-01-30 CN CN201910093416.5A patent/CN109858807B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002269311A (en) * | 2001-03-07 | 2002-09-20 | Ricoh Co Ltd | Management condition estimating method |
US20040260588A1 (en) * | 2003-06-23 | 2004-12-23 | Katherin Bowen | Method and system for business planning and improved business performance |
US20070195944A1 (en) * | 2006-02-22 | 2007-08-23 | Shmuel Korenblit | Systems and methods for context drilling in workforce optimization |
US20100030596A1 (en) * | 2008-07-30 | 2010-02-04 | Gaurav Johari | Business Process Intelligence |
US8204809B1 (en) * | 2008-08-27 | 2012-06-19 | Accenture Global Services Limited | Finance function high performance capability assessment |
US8311863B1 (en) * | 2009-02-24 | 2012-11-13 | Accenture Global Services Limited | Utility high performance capability assessment |
CN104123590A (en) * | 2014-06-27 | 2014-10-29 | 国家电网公司 | 95598 customer service center operation monitoring system and method |
CN104156822A (en) * | 2014-08-11 | 2014-11-19 | 国家电网公司 | SOA-based comprehensive enterprise level information system operation and maintenance management method |
CN107169894A (en) * | 2017-05-16 | 2017-09-15 | 上海斐晟企业管理有限公司 | Real estate operation management system based on SAP |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112215514A (en) * | 2020-10-22 | 2021-01-12 | 星云海数字科技股份有限公司 | Operation analysis report generation method and system |
CN112633660A (en) * | 2020-12-17 | 2021-04-09 | 山大地纬软件股份有限公司 | Multi-angle unemployment risk early warning device and method |
CN117172609A (en) * | 2023-09-18 | 2023-12-05 | 北汽蓝谷信息技术有限公司 | Management method and system based on value chain management and business management fusion |
Also Published As
Publication number | Publication date |
---|---|
CN109858807B (en) | 2022-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104407964B (en) | A kind of centralized monitoring system and method based on data center | |
CN105871605A (en) | Operation and maintenance monitoring platform based on big power marketing data | |
CN109800250B (en) | System architecture for no longer configuring enterprise central server | |
CN107810500A (en) | Data quality analysis | |
CN104881352A (en) | System resource monitoring device based on mobile terminal | |
CN100573375C (en) | Electrostatic real-time monitoring system and data acquisition thereof and analytical approach | |
CN110618911B (en) | Data monitoring method and device, storage medium and server | |
CN108846691A (en) | Regional grain and oil market price monitoring analysing and predicting system and monitoring method | |
CN108964269A (en) | Power distribution network O&M and total management system | |
CN103218743A (en) | Enterprise tax risk assessment platform | |
CN102609537A (en) | Data quality audit method based on database schema | |
CN114021971A (en) | Comprehensive evaluation system, method and storage medium for expressway operation and maintenance management | |
CN109858807A (en) | Enterprise operation monitoring method and system | |
CN110855012A (en) | Real-time line loss intelligent analysis system for transformer area | |
CN114648393A (en) | Data mining method, system and equipment applied to bidding | |
CN113434575B (en) | Data attribution processing method, device and storage medium based on data warehouse | |
CN117992304A (en) | Integrated intelligent operation and maintenance platform | |
CN110677271B (en) | Big data alarm method, device, equipment and storage medium based on ELK | |
CN106355489A (en) | Data center system and data processing method for management | |
CN115730909A (en) | Enterprise client information management system | |
CN112633639A (en) | Food and drug safety supervision-oriented targeted risk early warning platform and method | |
CN106843656A (en) | A kind of data display and the method for interaction | |
US20130041712A1 (en) | Emerging risk identification process and tool | |
CN116821106A (en) | Enterprise data digital management system and method | |
CN110827172A (en) | Wisdom water affairs cloud service platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |