CN109680829A - Girder steel, steel column and the fabrication and installation method for filling wall integrated component - Google Patents
Girder steel, steel column and the fabrication and installation method for filling wall integrated component Download PDFInfo
- Publication number
- CN109680829A CN109680829A CN201811520899.4A CN201811520899A CN109680829A CN 109680829 A CN109680829 A CN 109680829A CN 201811520899 A CN201811520899 A CN 201811520899A CN 109680829 A CN109680829 A CN 109680829A
- Authority
- CN
- China
- Prior art keywords
- steel
- filling wall
- steel column
- column
- integrated component
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 72
- 239000010959 steel Substances 0.000 title claims abstract description 72
- 238000000034 method Methods 0.000 title claims abstract description 9
- 238000009434 installation Methods 0.000 title claims abstract description 8
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 8
- 238000010276 construction Methods 0.000 claims abstract description 19
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 10
- 239000004567 concrete Substances 0.000 claims abstract description 8
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 4
- 238000005266 casting Methods 0.000 claims abstract description 3
- 238000003466 welding Methods 0.000 claims description 4
- 230000010354 integration Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/02—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls built-up from layers of building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/562—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with fillings between the load-bearing elongated members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
- E04B2/58—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of girder steel, steel column and the fabrication and installation methods for filling wall integrated component.It is included in factory for girder steel, the mode that steel column is bolted and welds is assembled, binding filling wall framework reinforcing bar, three layers of filling wall are built up and down, pour filling wall framework concrete, realize girder steel, steel column and filling wall form entirety, component is transported to construction site, construction lower layer's girder steel, steel column and floor lift the first Pin integrated component, its supporting leg is supported on reinforced concrete floor, connection upper and lower level steel column simultaneously welds, lifting standard Pin integrated component, its supporting leg is supported on reinforced concrete floor, connection upper and lower level steel column simultaneously welds, steel beam web plate bolt is installed, the welded steel beam edge of a wing, casting concrete floor.Steel beam, column of the present invention and filling wall are fabricated to integral module in factory, and high-quality precision is high, and one module of every up of three-layer, beam column wall is once completed, and lift by crane primary three layers of completion, greatly improve construction efficiency and construction quality.
Description
Technical field
The present invention relates to steel building technical field of construction, specifically a kind of girder steel, steel column and filling wall integration structure
The fabrication and installation method of part.
Background technique
Steel building is fast-developing in recent years, and the mounting means of steel construction is the pass for influencing construction quality and speed of application
Key factor first installs steel column in conventional practice, then installs girder steel, finally installs or build filling wall, industrialization degree is low, applies
Work speed is slow.
Summary of the invention
Present invention seek to address that the above problem, thus provide a kind of girder steel that can be improved construction efficiency and construction quality,
The fabrication and installation method of steel column and filling wall integrated component.
The present invention solves described problem, the technical solution adopted is that:
A kind of girder steel, steel column and the fabrication and installation method for filling wall integrated component, include the following steps:
(1) mode that girder steel, steel column are bolted and weld is assembled in factory;
(2) filling wall framework reinforcing bar is bound, builds three layers of filling wall up and down, pours and fills wall framework concrete, realization girder steel,
Steel column and filling wall form entirety;
(3) component is transported to construction site;
(4) construction lower layer's girder steel, steel column and floor;
(5) the first Pin integrated component is lifted, its supporting leg is supported on reinforced concrete floor, connection upper and lower level steel column is simultaneously
Welding;
(6) standard Pin integrated component is lifted, its supporting leg is supported on reinforced concrete floor, connection upper and lower level steel column is simultaneously
Steel beam web plate bolt, the welded steel beam edge of a wing are installed in welding;
(7) casting concrete floor.
The present invention by adopting the above technical scheme, compared with prior art, the feature protruded is:
Steel beam, column and filling wall are fabricated to integral module in factory, and high-quality precision is high, one module of every up of three-layer, beam column
Wall is once completed, and is lifted by crane primary three layers of completion, is greatly improved construction efficiency and construction quality.
Detailed description of the invention
Fig. 1 is the first Pin component schematic view of facade structure of the embodiment of the present invention;
Fig. 2 is mark Pin component schematic view of facade structure of the embodiment of the present invention;
Fig. 3 is girder steel of the embodiment of the present invention, steel column and filling wall integrated component assembling schematic view of facade structure;
In figure: filling wall 1;Reinforced concrete floor 2;Girder steel 3;Steel column 4;Lifting lug 5;Peg 6;Light block 7;Supporting leg 8.
Specific embodiment:
Below with reference to embodiment, the invention will be further described, and purpose, which is only that, more fully understands the content of present invention, therefore, institute
The example of act is not intended to limit protection scope of the present invention.
Referring to Fig. 1, Fig. 2, Fig. 3, a kind of girder steel, steel column and the fabrication and installation method for filling wall integrated component, including such as
Lower step:
(1) mode that girder steel 3, steel column 4 are bolted and weld is assembled in factory, welds lifting lug on girder steel 3
5。
(2) by peg 6, wall framework reinforcing bar is filled in binding respectively on girder steel 3 and steel column 4, builds three layers of lightweight up and down
Building block 7 forms filling wall, pours filling wall framework concrete, and girder steel 3, steel column 4 and filling wall shape are realized in every layer of wall bottom box out
It is integral.
(3) component is transported to construction site.
(4) construction lower layer's girder steel 3, steel column 4 and reinforced concrete floor 2.
(5) the first Pin integrated component is lifted, its supporting leg 8 is supported on reinforced concrete floor 2, connects upper and lower level
Steel column 4 simultaneously welds.
(6) standard Pin integrated component is lifted, its supporting leg 8 is supported on reinforced concrete floor 2, connects upper and lower level
Steel column 4 simultaneously welds, and installs 3 web bolt of girder steel, 3 edge of a wing of welded steel beam.
(7) pouring reinforcement concrete floor 2.
Girder steel 3, steel column 4 and filling wall are fabricated to integral module in factory by the present invention, and high-quality precision is high, every three layers of group
At a module, beam column wall is once completed, and is lifted by crane primary three layers of completion, is greatly improved construction efficiency and construction quality.
The foregoing is merely preferably feasible embodiment of the invention, not thereby limiting the scope of the invention,
It is all to use equivalence changes made by description of the invention and its accompanying drawing content, it is intended to be included within the scope of the present invention.
Claims (1)
1. a kind of girder steel, steel column and the fabrication and installation method for filling wall integrated component, which comprises the steps of:
(1) mode that girder steel, steel column are bolted and weld is assembled in factory;
(2) filling wall framework reinforcing bar is bound, builds three layers of filling wall up and down, pours and fills wall framework concrete, realization girder steel,
Steel column and filling wall form entirety;
(3) component is transported to construction site;
(4) construction lower layer's girder steel, steel column and floor;
(5) the first Pin integrated component is lifted, its supporting leg is supported on reinforced concrete floor, connection upper and lower level steel column is simultaneously
Welding;
(6) standard Pin integrated component is lifted, its supporting leg is supported on reinforced concrete floor, connection upper and lower level steel column is simultaneously
Steel beam web plate bolt, the welded steel beam edge of a wing are installed in welding;
(7) casting concrete floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811520899.4A CN109680829A (en) | 2018-12-12 | 2018-12-12 | Girder steel, steel column and the fabrication and installation method for filling wall integrated component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811520899.4A CN109680829A (en) | 2018-12-12 | 2018-12-12 | Girder steel, steel column and the fabrication and installation method for filling wall integrated component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109680829A true CN109680829A (en) | 2019-04-26 |
Family
ID=66186710
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811520899.4A Pending CN109680829A (en) | 2018-12-12 | 2018-12-12 | Girder steel, steel column and the fabrication and installation method for filling wall integrated component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109680829A (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1760486A (en) * | 2004-10-15 | 2006-04-19 | 罗进南 | Slot opening building blocks or bricks as well as light shear wall and related building, and construction method |
EP2365145B1 (en) * | 2010-03-05 | 2013-05-08 | Mariotti Prefabbricati snc Di Mariotti Alviero & C. | A prefabricated modular building |
CN103541463A (en) * | 2013-11-01 | 2014-01-29 | 王睿敏 | Wallboard and shear wall allowing floor location provided with post-pouring belt comprising same and construction method for shear wall |
CN105649236A (en) * | 2016-02-02 | 2016-06-08 | 长沙理工大学 | Gravity type damping filling wall |
CN105839813A (en) * | 2016-05-24 | 2016-08-10 | 北京工业大学 | Assembly type thermal insulation energy saving wall board with groovechannel steel connection piece, and manufacture method thereof |
CN107989227A (en) * | 2017-12-20 | 2018-05-04 | 中冶建筑研究总院有限公司 | A kind of assembled steel reinforced concrete shear walls structure and its preparation and installation method |
CN207739437U (en) * | 2017-12-20 | 2018-08-17 | 中冶建筑研究总院有限公司 | A kind of prefabricated steel reinforced concrete shear wall structure |
CN108457469A (en) * | 2017-02-21 | 2018-08-28 | 黄靓 | A kind of concrete structure construction method with assembled masonry filler wall |
-
2018
- 2018-12-12 CN CN201811520899.4A patent/CN109680829A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1760486A (en) * | 2004-10-15 | 2006-04-19 | 罗进南 | Slot opening building blocks or bricks as well as light shear wall and related building, and construction method |
EP2365145B1 (en) * | 2010-03-05 | 2013-05-08 | Mariotti Prefabbricati snc Di Mariotti Alviero & C. | A prefabricated modular building |
CN103541463A (en) * | 2013-11-01 | 2014-01-29 | 王睿敏 | Wallboard and shear wall allowing floor location provided with post-pouring belt comprising same and construction method for shear wall |
CN105649236A (en) * | 2016-02-02 | 2016-06-08 | 长沙理工大学 | Gravity type damping filling wall |
CN105839813A (en) * | 2016-05-24 | 2016-08-10 | 北京工业大学 | Assembly type thermal insulation energy saving wall board with groovechannel steel connection piece, and manufacture method thereof |
CN108457469A (en) * | 2017-02-21 | 2018-08-28 | 黄靓 | A kind of concrete structure construction method with assembled masonry filler wall |
CN107989227A (en) * | 2017-12-20 | 2018-05-04 | 中冶建筑研究总院有限公司 | A kind of assembled steel reinforced concrete shear walls structure and its preparation and installation method |
CN207739437U (en) * | 2017-12-20 | 2018-08-17 | 中冶建筑研究总院有限公司 | A kind of prefabricated steel reinforced concrete shear wall structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100507150C (en) | Corrugated steel web box girder with steel-concrete combined board lower wing edges | |
CN104532953B (en) | 3D printing based assembly type special-shaped column framework structure and construction method thereof | |
CN105133791A (en) | Construction method for prefabricated thick plate steel rib concrete column variable cross-section transformation node structure | |
CN106012864A (en) | Method for lifting and installing whole bridge arch rib | |
CN102839601A (en) | Fixed connection structure for steel pier column and cushion cap of portal rigid frame overbridge and construction method of fixed connection structure | |
JP2008274586A (en) | Pillar head construction method | |
CN105908902A (en) | Positioning frame for prefabricated pier column reinforcing bar cages and construction method of pier column reinforcing bar cages | |
CN206873730U (en) | A kind of steel bar truss floor structure | |
CN103981803A (en) | Prefabricated assembled combination type door-shaped pillar and construction method thereof | |
US20150292168A1 (en) | Deck | |
CN104532730A (en) | Full-breadth variable-cross-section steel box girder and construction method thereof | |
CN211006356U (en) | Corrugated steel web cantilever assembling structure | |
CN103321153B (en) | A kind of construction method of Mid and minor spans channel girder | |
CN102777050B (en) | Assembly type jig frame for longspan pipe truss roof girder | |
CN104294752A (en) | Hollow slab bridge structure with end floor beams and construction method thereof | |
CN109267489B (en) | Construction method for cable-stayed bridge cable tower anchoring area | |
CN109680829A (en) | Girder steel, steel column and the fabrication and installation method for filling wall integrated component | |
CN209584813U (en) | Frame bridge system | |
CN204356896U (en) | Based on the assembling Framed Structure with Special-Shaped Columns that 3D prints | |
CN208430715U (en) | A kind of prefabricated assembled concrete-steel stair of jack welding | |
CN111186780A (en) | Movable arm type tower crane underframe weight type foundation and construction method | |
CN215858257U (en) | Connecting structure of prefabricated bay window and floor slab | |
CN106032705A (en) | Integrated casting molding construction method of reinforced concrete floor system | |
CN110512728B (en) | Assembly type building superposed lotus root beam column node structure and construction method thereof | |
CN210288825U (en) | Assembled and cast-in-situ combined beam plate structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190426 |