[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

CN107147065B - A kind of tool-free sliding dismounting sealing plate package assembly of bus bridge - Google Patents

A kind of tool-free sliding dismounting sealing plate package assembly of bus bridge Download PDF

Info

Publication number
CN107147065B
CN107147065B CN201710549823.3A CN201710549823A CN107147065B CN 107147065 B CN107147065 B CN 107147065B CN 201710549823 A CN201710549823 A CN 201710549823A CN 107147065 B CN107147065 B CN 107147065B
Authority
CN
China
Prior art keywords
pontic
sealing plate
frame
bridge pier
socket bore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710549823.3A
Other languages
Chinese (zh)
Other versions
CN107147065A (en
Inventor
宋海鹏
盛利东
唐敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Zhengtai Electric Technology Co.,Ltd.
Original Assignee
Chint Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chint Electric Co Ltd filed Critical Chint Electric Co Ltd
Priority to CN201710549823.3A priority Critical patent/CN107147065B/en
Publication of CN107147065A publication Critical patent/CN107147065A/en
Application granted granted Critical
Publication of CN107147065B publication Critical patent/CN107147065B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G5/00Installations of bus-bars
    • H02G5/06Totally-enclosed installations, e.g. in metal casings

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Insulating Bodies (AREA)

Abstract

The invention discloses a kind of tool-free slidings of bus bridge to dismount sealing plate package assembly, it is characterized in that, the pontic sealing plate or bridge pier sealing plate are fixed by clamping structure, the two sides up and down of the left and right ends of the pontic sealing plate are respectively provided at least one lateral Pear-Shaped notch, the side of each Pear-Shaped notch is equipped with socket bore one, frame corresponding with the pontic sealing plate is equipped with positioning clamping pin and socket bore two, and positioning clamping pin is matched with Pear-Shaped notch, and two socket bore match;When assembly, the bared end of positioning clamping pin exposes from the relatively big end of Pear-Shaped notch, and socket bore one and socket bore two it is tangent or mutually from;When assembly is completed, the bared end of positioning clamping pin limits at the small end of Pear-Shaped notch, and socket bore one is overlapped with socket bore two.For the present invention using the profile material assembling of steel plate bending at frame structure, surrounding uses sealing plate, can tool-free manual teardown, while solving difficult high altitude operation and side installation copper bar and insulation subproblem.

Description

A kind of tool-free sliding dismounting sealing plate package assembly of bus bridge
Technical field
The present invention relates to a kind of tool-free slidings of bus bridge to dismount sealing plate package assembly, belongs to equipment for power transmission and distribution field.
Background technique
In power transmission and transformation system, switchgear is its important component part, for realizing the conveying and distribution of electric energy, and Bus bridge frame conduct, the important ring that switchgear is connect with switchgear and with transformer, is installed in place in switchgear, scene Production is measured size, delivery date is generally more urgent, therefore the convenience and property easy to install of gantry design, directly influences system Punctual reliably put into operation.
Since the bridge pier frame and pontic frame of existing bus bridge frame mostly use welded structure, upper and lower cover plates (pontic), Front and back sealing plate (bridge pier) is spirally connected using screw with associated frame members, and gantry is bulky, and erecting bed generally lacks lifting appliance, peace Dress personal height operation is careless slightly to will result in the generation of disequilibrium fallen accident, to cause to client or supply of material producer Unnecessary loss.
In addition, gantry generally uses bridge pier sealing plate formula welding structure, in horizontal pontic, installing copper bar and insulator can only be from It installs above, in pontic width and larger height, arm can't reach installation, needs to enter in pontic and install, very inconvenient Also dangerous.
Summary of the invention
Problem to be solved by this invention is existing bus bridge frame using welded type bridge pier frame and pontic frame structure, envelope Plate is connect using screw with associated frame members, and gantry is bulky, and erecting bed high altitude operation is inconvenient and dangerous.
To solve the above-mentioned problems, the present invention provides a kind of tool-free slidings of bus bridge to dismount sealing plate package assembly, institute Stating bus bridge includes bridge pier frame and pontic frame, and pontic sealing plate, the bridge pier frame outside are equipped on the outside of the pontic frame Equipped with bridge pier sealing plate, which is characterized in that the pontic sealing plate or bridge pier sealing plate are fixed by least one set of clamping structure, the card Binding structure specifically: the two sides up and down of the left and right ends of the pontic sealing plate are respectively provided at least one lateral Pear-Shaped notch, The upper and lower ends of the bridge pier sealing plate are each side provided at least one vertical Pear-Shaped notch, each Pear-Shaped notch Side be equipped with socket bore one, frame corresponding with the pontic sealing plate or bridge pier sealing plate be equipped with positioning clamping pin and socket bore two, Positioning clamping pin is matched with Pear-Shaped notch, and socket bore two is matched with socket bore one;When assembly, the bared end of positioning clamping pin is from cucurbit Expose in the relatively big end of shape notch, and socket bore one and socket bore two it is tangent or mutually from;When assembly is completed, the bared end of positioning clamping pin in It is limited at the small end of Pear-Shaped notch, and socket bore one is overlapped with socket bore two.
Preferably, the pontic frame includes four pontic crossbeams and four pontic curb girders, the pontic on same vertical plane The rear and front end of curb girder respectively passes through the connection of pontic column, is equipped with pontic crossbeam between the beam of adjacent bridge side, in pontic crossbeam Equipped with multiple insulator beams being arranged successively, 9 top of insulator is connected and fixed with copper bar;Four surfaces in pontic frame outside are successively Pontic sealing plate one, pontic sealing plate two, pontic sealing plate three, pontic sealing plate four are installed.
It is highly preferred that the upper surface of the pontic column is provided with circular hole, it is equipped in circular hole for the lifting of pontic frame Hanging ring.
Preferably, each socket bore one on the pontic frame is located at Pear-Shaped notch relative to the another of bridge pier frame Side.
Preferably, the bridge pier frame is vertically sequentially connected top of bridge pier by parallel two blocks of opposite bridge pier side plates from top to bottom Cover board, bridge pier crossbeam, insulator beam, two bridge pier bottom beams.
Using the profile material assembling of steel plate bending at frame structure, surrounding uses sealing plate, tool-free can tear open manually the present invention It unloads, while solving difficult high altitude operation and side installation copper bar and insulation subproblem.
Interior bridge is made of the bridge pier of two sides and the several segments pontic of centre in the present invention;Outer bridge (inlet wire bridge) by bridge pier, lean on Wall hole end pontic and the several segments pontic of centre composition;Bus bridge pontic therein requires to determine according to detailed programs.
The present invention has many advantages, such as that easy to operate, easy to install, just transport, suitable high altitude operation and side dress are arranged.It is especially suitable Conjunction wall hole is higher, and pontic size is larger, and scene does not need lifting appliance.
Compared with prior art, the beneficial effects of the present invention are:
1, using steel plate bending forming material assembled frame structure, using the tool-free sliding detachable sealing plate of screwless, side Just site operation personnel install especially high altitude operation, improve working efficiency and user experience;
2, sealing plate can be installed using sliding detaching structure, copper bar and insulator from side, facilitate user's high altitude operation;
3, clout processing can be used in the accessory (by steel plate bending forming material) used, greatly improves the plate benefit of manufacturing enterprise With rate;
4, it is designed using standard bridge pier and standard pontic, standardization level is high, greatly shortens the delivery date of gantry product;
5, using no-welding structure, meet the environmentally protective requirement of national energy conservation and emission reduction.
Detailed description of the invention
Fig. 1 is the main view using the bus bridge of package assembly provided by the invention;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the left view of Fig. 1;
Fig. 4 is the top view of Fig. 1;
Fig. 5 is the partial enlarged view of the part I in Fig. 1;
Fig. 6 is the cross-sectional view in the face A-A in Fig. 1;
Fig. 7 is the partial enlarged view of the part II in Fig. 6;
Fig. 8 is the partial enlarged view of the part III in Fig. 4;
Fig. 9 is the main view of pontic sealing plate after the assembly is completed;
Figure 10 is the partial enlarged view of the part IV in Fig. 9;
Figure 11 is the cross-sectional view in the face B-B in Figure 10;
Figure 12 corresponds to sealing plate for Fig. 9 and is in removed position schematic diagram;
In figure:
1- bridge pier side plate one;2- pontic column;3- hanging ring;4- pontic crossbeam;5- positioning clamping pin;6- pontic curb girder;7- is exhausted Edge beam;8- copper bar;9- insulator;10- coach screw;11- bridge pier bottom beam;12- bridge pier crossbeam;13- bridge pier lamina tecti;14- Bridge pier side plate two;15- handle;16- pontic sealing plate one;17- pontic sealing plate two;18- bridge pier sealing plate one;19- bridge pier sealing plate two;m- Pear-Shaped notch;N- socket bore one;N '-socket bore two.
Specific embodiment
In order to make the present invention more obvious and understandable, hereby with preferred embodiment, and attached drawing is cooperated to be described in detail below.
Embodiment
A kind of bus bridge for sealing off board assembling structure using the tool-free sliding disassembly of bus bridge is present embodiments provided, is such as schemed Shown in 1-8 comprising bridge pier frame and pontic frame.
The assembling of pontic frame:
Pontic frame includes four pontic crossbeams 4, and the rear and front end of the pontic curb girder 6 on same vertical plane respectively passes through one Pontic column 2 connects, and is spirally connected fixation with coach screw 10, and pontic crossbeam 4, pontic crossbeam 4 are equipped between adjacent bridge side beam 6 Interior to be equipped with multiple insulator beams 7 being arranged successively, 9 top of insulator is connected and fixed with copper bar 8.Four surfaces on the outside of pontic frame Pontic sealing plate 1, pontic sealing plate 2 17, bridge pier sealing plate 1, bridge pier sealing plate 2 19 are successively installed.
Pontic crossbeam 4 is that high-strength steel sheet bending and molding is section similar to G type, and left and right ends bending is provided with circular hole, is led to Coach screw 10 is crossed to be spirally connected with pontic column 2.In the small vertical mating surface of class G type on the top surface of (as shown in Figure 1) and G type (as shown in Figure 5), riveting has positioning clamping pin 5 (being provided with groove in positioning clamping pin 5), and punching press two n ' of socket bore used for positioning.Absolutely Edge beam 7 is vertically bolted in pontic crossbeam 4 (only installing bottom position, as shown in Figure 1).
Pontic curb girder 6 be high-strength steel sheet be bent into c-type, rear and front end face is provided with circular hole, by coach screw 10 with Pontic column 2 connects.A side of pontic curb girder 6 is opened there are five circular hole.Bridge pier crossbeam 12 and bridge pier lamina tecti 13 pass through screw Connection.
Hinge of the pontic column 2 as pontic frame is bent into class G profile for high-strength steel sheet, and two of them are vertically big Face is provided with square hole, and two square holes pass through coach screw 10 respectively and are spirally connected with pontic crossbeam 4, pontic curb girder 6.Pontic column 2 Upper surface center be provided with circular hole, for being spirally connected with hanging ring 3, as pontic frame lift by crane use.
The assembling of bridge pier frame:
Bridge pier frame is matched by parallel opposite two blocks of bridge pier sealing plates (bridge pier side plate 1, bridge pier side plate 2 14) as core Part vertically passes sequentially through coach screw 10 from top to bottom and is spirally connected following accessory: (only one, bridge pier lamina tecti 13, bridge pier crossbeam 12 For with pontic frame connecting pin use), 7, two bridge pier bottom beams 11 of insulator beam.
Bridge pier side plate 1, bridge pier side plate 2 14 are bent into section into c-type, bridge pier side plate 1, bridge pier by high-strength steel sheet The bottom surface of side plate 2 14 is uniformly provided with circular hole, is spirally connected by screw and switch cabinet bracket bridge floor.Bridge pier side plate 1, bridge pier side plate two 14 opposite face direction, corresponding bridge pier lamina tecti 13,7 direction of bridge pier crossbeam 12, bridge pier bottom beam 11 and insulator beam, open position phase Corresponding square hole, for being spirally connected with these parts.
The two c-type top surface of vertical direction of bridge pier side plate 1, bridge pier side plate 2 14, riveting has positioning clamping pin 5, and punching press is used In two n ' of socket bore of positioning.
Bridge pier side plate 1, bridge pier side plate 2 14 top corresponding position be provided with circular hole, for being spirally connected with hanging ring 3, as bridge The lifting of pier frame is used.
Bridge pier lamina tecti 13 is steel plate bending into c-type, and rear and front end face corresponding position is provided with circular hole, is used for and two pieces of bridges Pier sealing plate is spirally connected.13 one side of bridge pier lamina tecti is provided with 5 circular holes, for being spirally connected with pontic frame.
By assembled bridge pier frame loaded on switchgear bridge formation mounting surface on, and with screw be spirally connected securely after.Use suspender By assembled pontic frame, hang in bridge pier horizontal alignment position, then locking lifting appliance nut.By bridge pier frame and pontic frame Frame is spirally connected securely with screw.Then dress insulator 9 insulate corresponding be loaded on of the copper bar 8 for being cased with heat-shrinkable T bush on insulator beam 7 On son 9.So far bridge pier frame and pontic frame are installed, and finally start to install the pontic sealing plate and bridge pier frame on pontic frame Bridge pier sealing plate on frame.
Consolidate since two blocks of bridge pier sealing plates of bridge pier frame and four blocks of pontic sealing plates of pontic frame are all made of the package assembly It is fixed, it is described in detail by taking pontic sealing plate 1 as an example, other pontic sealing plate/bridge pier sealing plates are without repeating.
The pontic sealing plate 1 is fixed by being located at four clamping structures at four angles with pontic frame, the clamping knot Structure specifically: the two sides up and down of one 16 left and right ends of pontic sealing plate respectively open that there are two lateral Pear-Shaped notch m (bridge pier sealing plates one 18 upper and lower ends are each side opened there are two vertical Pear-Shaped notch), the left and right ends corresponding position of pontic crossbeam 4 is set There is one n of socket bore, the pontic crossbeam 4 is equipped with two n ' of positioning clamping pin 5 and socket bore, and positioning clamping pin 5 and Pear-Shaped notch m match It closes, two n ' of socket bore is matched with one n of socket bore;When the pontic sealing plate 1 assembles, the bared end of positioning clamping pin 5 is from Pear-Shaped slot Expose in the relatively big end of mouthful m, and one n of socket bore and two n ' of socket bore is tangent or phase from;When assembly is completed, positioning clamping pin 5, positioning are positioned The bared end of bayonet lock 5 limits at the small end of Pear-Shaped notch m, and one n of socket bore is overlapped with two n ' of socket bore.
When assembly, the plane in one direction n of socket bore is bonded pontic crossbeam 4 first, makes the Pear-Shaped slot of pontic sealing plate 1 The great circle of mouth m is directed at (as shown in figure 12) positioning clamping pin 5, then touches pontic sealing plate 1 (it is equipped with handle 15) to the left, makes The small end of Pear-Shaped notch m and the groove of positioning clamping pin 5 match (as shown in figs. 9-11), and pontic sealing plate 1 is in work Positioning is completed at this point, two n ' of socket bore of one n of socket bore of pontic sealing plate 1 and pontic crossbeam 4 is overlapped in position.
When disassembly, upper right side oblique first pushes away pontic sealing plate 1, makes one n of socket bore and pontic crossbeam of pontic sealing plate 1 4 two n ' of socket bore is detached from cooperation, so that the relatively big end of Pear-Shaped notch m is directed at positioning clamping pin 5 (as shown in figure 12), pontic seals at this time Plate 1 is in removed position, and then both hands lift the handle 15 of pontic sealing plate 1, will in the direction perpendicular to positioning clamping pin 5 Pontic sealing plate 1 is removed, and the disassembly of pontic sealing plate 1 is so far completed.Pontic sealing plate 2 17, bridge pier sealing plate 1, bridge pier envelope The assembly of plate 2 19, disassembly process are identical.

Claims (5)

1. a kind of tool-free sliding of bus bridge dismounts sealing plate package assembly, the bus bridge includes bridge pier frame and pontic frame, It is equipped with pontic sealing plate on the outside of the pontic frame, is equipped with bridge pier sealing plate on the outside of the bridge pier frame, which is characterized in that the pontic Sealing plate or bridge pier sealing plate are fixed by least one set of clamping structure, the clamping structure specifically: the left and right of the pontic sealing plate The two sides up and down at both ends are respectively provided at least one lateral Pear-Shaped notch (m), the left and right of the upper and lower ends of the bridge pier sealing plate Two sides are respectively provided at least one vertical Pear-Shaped notch (m), and the side of each Pear-Shaped notch (m) is equipped with socket bore one (n), with The pontic sealing plate or the corresponding frame of bridge pier sealing plate are equipped with positioning clamping pin (5) and socket bore two (n '), positioning clamping pin (5) with Pear-Shaped notch (m) matches, and socket bore two (n ') is matched with socket bore one (n);When assembly, the bared end of positioning clamping pin (5) from Expose in the relatively big end of Pear-Shaped notch (m), and socket bore one (n) and socket bore two (n ') it is tangent or mutually from;When assembly is completed, positioning The bared end of bayonet lock (5) limits at the small end of Pear-Shaped notch (m), and socket bore one (n) is overlapped with socket bore two (n ').
2. the tool-free sliding of bus bridge as described in claim 1 dismounts sealing plate package assembly, which is characterized in that the pontic frame Frame includes four pontic crossbeams (4) and four pontic curb girders (6), and the rear and front end of the pontic curb girder (6) on same vertical plane is each It is connected by a pontic column (2), is equipped with pontic crossbeam (4) between adjacent bridge side beam (6), be equipped in pontic crossbeam (4) Multiple insulator beams (7) being arranged successively, 9 top of insulator is connected and fixed with copper bar (8);On the outside of pontic frame four surfaces according to Secondary installation pontic sealing plate one (16), pontic sealing plate two (17), pontic sealing plate three, pontic sealing plate four.
3. the tool-free sliding of bus bridge as claimed in claim 2 dismounts sealing plate package assembly, which is characterized in that the pontic is vertical The upper surface of column (2) is provided with circular hole, and the hanging ring (3) for the lifting of pontic frame is equipped in circular hole.
4. the tool-free sliding of bus bridge as claimed in any one of claims 1-3 dismounts sealing plate package assembly, which is characterized in that Each socket bore one (n) on the pontic frame is located at the other side of the Pear-Shaped notch (m) relative to bridge pier frame.
5. the tool-free sliding of bus bridge as described in claim 1 dismounts sealing plate package assembly, which is characterized in that the bridge pier frame Frame is vertically sequentially connected bridge pier lamina tecti (13), bridge pier crossbeam (12), absolutely by parallel two blocks of opposite bridge pier side plates from top to bottom Edge beam (7), two bridge pier bottom beams (11).
CN201710549823.3A 2017-07-06 2017-07-06 A kind of tool-free sliding dismounting sealing plate package assembly of bus bridge Active CN107147065B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710549823.3A CN107147065B (en) 2017-07-06 2017-07-06 A kind of tool-free sliding dismounting sealing plate package assembly of bus bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710549823.3A CN107147065B (en) 2017-07-06 2017-07-06 A kind of tool-free sliding dismounting sealing plate package assembly of bus bridge

Publications (2)

Publication Number Publication Date
CN107147065A CN107147065A (en) 2017-09-08
CN107147065B true CN107147065B (en) 2019-01-25

Family

ID=59786170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710549823.3A Active CN107147065B (en) 2017-07-06 2017-07-06 A kind of tool-free sliding dismounting sealing plate package assembly of bus bridge

Country Status (1)

Country Link
CN (1) CN107147065B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107528269A (en) * 2017-10-23 2017-12-29 镇江华驰电器有限公司 A kind of bus bridge frame
CN111478255B (en) * 2020-05-11 2024-10-18 华翔翔能科技股份有限公司 Detachable bus bridge
CN111613978B (en) * 2020-05-20 2024-10-18 华翔翔能科技股份有限公司 Bus bridge for a switchgear cabinet

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1893213A (en) * 2005-07-20 2007-01-10 王强 Plastic cable bridge-carriage jointing structure
JP2010233388A (en) * 2009-03-27 2010-10-14 Kyodo Ky Tec Corp Bus duct vibration stopper and installation structure of bus duct vibration stopper
CN203103875U (en) * 2012-12-27 2013-07-31 正泰电气股份有限公司 Telescopic bus bridge of switch equipment
CN203911397U (en) * 2014-06-27 2014-10-29 丁启荣 Alloy plastic bridge stand
CN204068137U (en) * 2014-08-29 2014-12-31 中国西电集团公司 A kind of aluminum section bar frame bolted bus bridge
CN205595612U (en) * 2016-04-20 2016-09-21 江苏扬开电力设备股份有限公司 High pressure bus duct
CN205901234U (en) * 2016-08-16 2017-01-18 山东捷远电气股份有限公司 Assembled generating line bridge of steel sheet spraying plastics
CN207082804U (en) * 2017-07-06 2018-03-09 正泰电气股份有限公司 Bus bridge is tool-free to slide dismounting shrouding package assembly

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1893213A (en) * 2005-07-20 2007-01-10 王强 Plastic cable bridge-carriage jointing structure
JP2010233388A (en) * 2009-03-27 2010-10-14 Kyodo Ky Tec Corp Bus duct vibration stopper and installation structure of bus duct vibration stopper
CN203103875U (en) * 2012-12-27 2013-07-31 正泰电气股份有限公司 Telescopic bus bridge of switch equipment
CN203911397U (en) * 2014-06-27 2014-10-29 丁启荣 Alloy plastic bridge stand
CN204068137U (en) * 2014-08-29 2014-12-31 中国西电集团公司 A kind of aluminum section bar frame bolted bus bridge
CN205595612U (en) * 2016-04-20 2016-09-21 江苏扬开电力设备股份有限公司 High pressure bus duct
CN205901234U (en) * 2016-08-16 2017-01-18 山东捷远电气股份有限公司 Assembled generating line bridge of steel sheet spraying plastics
CN207082804U (en) * 2017-07-06 2018-03-09 正泰电气股份有限公司 Bus bridge is tool-free to slide dismounting shrouding package assembly

Also Published As

Publication number Publication date
CN107147065A (en) 2017-09-08

Similar Documents

Publication Publication Date Title
CN107147065B (en) A kind of tool-free sliding dismounting sealing plate package assembly of bus bridge
CN207082804U (en) Bus bridge is tool-free to slide dismounting shrouding package assembly
CN102723675B (en) Instrument box wiring fixture
CN206673191U (en) A kind of PDU intelligent cabinets serial socket structure
CN205791238U (en) A kind of 10kV distribution line charged lifter of straightway three-phase conducting wire
CN104235505A (en) Solderless folding cable support frame
CN103384047B (en) A kind of distributing cabinet frame
CN208046025U (en) New Low Voltage comprehensive distribution box body structure
CN208390902U (en) A kind of Portable conducting wire cutting tool that can quickly adjust
CN205426995U (en) Novel electric energy meter of terminal box supports fixedly device
CN206036398U (en) Cable rack
CN206041258U (en) Equipment distribution box
CN203961417U (en) A kind of electric pole cross-arm and thread-laying device thereof
CN200992805Y (en) Knife inspection scaffold
CN209277526U (en) Aluminum alloy pattern plate for building
CN205817174U (en) Conducting rod installing plate positioning auxiliary device
CN102064483A (en) Safety device for examining and repairing tower
CN105781058A (en) Arc-surface modeling decorative plate installation structure
CN204315932U (en) The heterogeneous busbar connected system that confluxes
CN204258104U (en) A kind of one pole insurance support being easy to install and use
CN204927010U (en) Mutual -inductor suitable for guide rail watch shell
CN209217605U (en) A kind of ladder type abnormal shape is without copper aluminium four-way
CN209389506U (en) A kind of fully assembled box-type substation
CN216371850U (en) Connecting rod group is to frock
CN207719693U (en) A kind of device of distribution box convenient for assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210527

Address after: 314006 workshop 6, 379 Ziyu Road, Daqiao Town, Nanhu District, Jiaxing City, Zhejiang Province

Patentee after: Zhejiang Zhengtai Electric Technology Co.,Ltd.

Address before: 3555 Sixian Road, Songjiang District, Shanghai 201600

Patentee before: Chint Electric Co.,Ltd.