CN105971023A - Basement tower crane - Google Patents

Basement tower crane Download PDF

Info

Publication number
CN105971023A
CN105971023A CN201610418281.1A CN201610418281A CN105971023A CN 105971023 A CN105971023 A CN 105971023A CN 201610418281 A CN201610418281 A CN 201610418281A CN 105971023 A CN105971023 A CN 105971023A
Authority
CN
China
Prior art keywords
tower crane
basement
vertical rod
standard section
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610418281.1A
Other languages
Chinese (zh)
Inventor
张勋来
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201610418281.1A priority Critical patent/CN105971023A/en
Publication of CN105971023A publication Critical patent/CN105971023A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/44Foundations for machines, engines or ordnance

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Barrages (AREA)

Abstract

The invention discloses a basement tower crane. The basement tower crane is characterized in that the basement tower crane comprises tower crane standard knot vertical rods, waterstop steel plates and upper-lower layer steel bars. Tower crane standard knots are arranged in all four corners of a basement floor. The basement floor is provided with the upper-lower layer steel bars. Waterstop steel plates are welded around all the tower crane standard knots. The upper-lower layer steel bars of the basement floor and the tower crane standard knots are welded firmly through the waterstop steel plates. The basement tower crane has the beneficial effects that provided basement tower crane foundation burying method blocking antiseep control technology changes traditional construction processes, construction is simple and convenient, and operation is easy; project quality of a basement floor concrete structure in the position of the tower crane is ensured effectively, and no leakage phenomenon occurs in tower crane foundations; the construction level is improved, the project quality is ensured, a construction method is simplified, man hours are saved, and the construction cost is reduced.

Description

A kind of basement tower crane
Technical field
The invention belongs to work China Democratic National Construction Association Basement Concrete Structures engineering, be specially a kind of basement tower crane.
Background technology
Building is when construction, and its vertical transport the most all utilizes tower crane to carry out, and has building of basement Building thing, the tower crane of its vertical transport must fall on basement, after this most just removes to later stage tower crane, and basement Closure brings certain technical difficulty, it is common practice that after being removed by tower crane, first carry out waterproof construction, underground Being welded to connect of room baseplate reinforcing bar, then carry out microdilatancy water-tight concrete closure, but, due to construction technology The most rigorous, often cause the architecture quality at closure it cannot be guaranteed that and the generation of Seepage.
In Basement Concrete Structures holes blocking Construction practices, continuous summing up experience, for guaranteeing to fall in underground Tower crane on room, the underplate concrete architecture quality after dismounting and the generation of ne-leakage phenomenon, take effectively Preventive measure, the construction technology blocked by change, take implantation to block, in practice it has proved that, can reach reason Think effect.In i.e.: just the standard knot of tower crane is directly cast in concrete of basement base plate, when tower crane is removed, Standard section of tower crane is directly cut off at bottom plate surface layer, both can guarantee that the construction quality quality of basement structure, again Can ensure that the generation of ne-leakage phenomenon herein.
Summary of the invention
It is an object of the invention to effectively to ensure the construction quality of Basement Concrete Structures, at tower crane without The generation of Seepage, the most simple and practical, easy to operate, moreover it is possible to improve construction level, save man-hour, fall Low construction cost, it is to avoid after formulating processing scheme when generation mass defect and seepage, when taking to process, one is The generation of row expense.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
One basement tower crane of the present invention, including standard section of tower crane vertical rod, steel plate for sealing water and levels reinforcing bar, Four turnings of basement bottom board are provided with described standard section of tower crane vertical rod, and described basement bottom board is provided with Lower floor's reinforcing bar, the surrounding of described standard section of tower crane vertical rod is all welded with steel plate for sealing water, described basement bottom board upper Lower floor's reinforcing bar and standard section of tower crane vertical rod are by steel plate for sealing water firm welding.
As a preferred technical solution of the present invention, described steel plate for sealing water is 150 wide steel plate for sealing water.
Present invention also offers a kind of basement tower crane implantation closure antiseep control method, control method As follows:
A, weld 150 wide steel plate for sealing water in the vertical rod surrounding of standard section of tower crane vertical rod;
B, by the levels reinforcing bar of basement bottom board and standard section of tower crane vertical rod firm welding;
When c, basement bottom board concreting, directly standard section of tower crane vertical rod is buried people wherein, treat later stage tower When being hung in dismounting, standard section of tower crane vertical rod more than basement bottom board face is cut off.
The present invention is reached to provide the benefit that: the basement tower crane implantation closure antiseep control proposed Technology processed, changes traditional construction technology, easy construction, processing ease, is effectively guaranteed underground at tower crane The construction quality of room underplate concrete structure, the generation of ne-leakage phenomenon at tower crane, improve construction level, Guarantee construction quality, simplify construction method, save man-hour, reduce construction cost.
Accompanying drawing explanation
Accompanying drawing is for providing a further understanding of the present invention, and constitutes a part for description, with the present invention Embodiment be used for together explaining the present invention, be not intended that limitation of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of the present invention a kind of basement tower crane;
In figure: 1, standard section of tower crane vertical rod;2, steel plate for sealing water;3, basement bottom board levels reinforcing bar.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that described herein excellent Select embodiment to be merely to illustrate and explain the present invention, being not intended to limit the present invention.
Embodiment 1
As it is shown in figure 1, a kind of basement tower crane, including standard section of tower crane vertical rod 1, steel plate for sealing water 2 and up and down Layer reinforcing bar 3, is provided with described standard section of tower crane vertical rod 1, described basement at four turnings of basement bottom board Being provided with levels reinforcing bar 3 on base plate, the surrounding of described standard section of tower crane vertical rod 1 is all welded with steel plate for sealing water 2, Prevent subsoil water along standard section of tower crane vertical rod 1 seepage in basement;The levels steel of described basement bottom board Muscle 3 and standard section of tower crane vertical rod 1, by steel plate for sealing water 2 firm welding, prevent because tower crane in use produces Raw dynamic load, has disturbing phenomenon to basement concrete floor.
As a preferred technical solution of the present invention, described steel plate for sealing water 2 is 150 wide steel plate for sealing water 2.
Present invention also offers a kind of basement tower crane implantation closure antiseep control method, control method As follows:
A, weld 150 wide steel plate for sealing water 2 in the vertical rod surrounding of standard section of tower crane vertical rod 1;
B, by the levels reinforcing bar 3 of basement bottom board and standard section of tower crane vertical rod 1 firm welding;
When c, basement bottom board concreting, directly standard section of tower crane vertical rod 1 is buried people wherein, treat the later stage Standard section of tower crane vertical rod 1 more than basement bottom board face, when removing, is cut off by tower crane, it is possible to ensure tower crane The construction quality of place's basement bottom board xoncrete structure, the generation of ne-leakage phenomenon at tower crane, and construct Effect easy, cost-effective is notable.
The present invention is reached to provide the benefit that: the basement tower crane implantation closure antiseep control proposed Technology processed, changes traditional construction technology, easy construction, processing ease, is effectively guaranteed underground at tower crane The construction quality of room underplate concrete structure, the generation of ne-leakage phenomenon at tower crane, improve construction level, Guarantee construction quality, simplify construction method, save man-hour, reduce construction cost.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, it is not limited to this Bright, although the present invention being described in detail with reference to previous embodiment, those skilled in the art is come Saying, the technical scheme described in foregoing embodiments still can be modified by it, or to wherein part skill Art feature carries out equivalent.All within the spirit and principles in the present invention, any amendment of being made, equivalent are replaced Change, improvement etc., should be included within the scope of the present invention.

Claims (3)

1. a basement tower crane, it is characterised in that include standard section of tower crane vertical rod (1), steel plate for sealing water (2) With levels reinforcing bar (3), it is provided with described standard section of tower crane vertical rod (1) at four turnings of basement bottom board, Being provided with levels reinforcing bar (3) on described basement bottom board, the surrounding of described standard section of tower crane vertical rod (1) is equal It is welded with steel plate for sealing water (2), the levels reinforcing bar (3) of described basement bottom board and standard section of tower crane vertical rod (1) By steel plate for sealing water (2) firm welding.
A kind of basement tower crane the most according to claim 1, it is characterised in that described steel plate for sealing water (2) It is 150 wide steel plate for sealing water (2).
3. a basement tower crane implantation closure antiseep control method, it is characterised in that controlling party Method is as follows:
A, weld 150 wide steel plate for sealing water (2) in the surrounding of standard section of tower crane vertical rod (1);
B, by the levels reinforcing bar (3) of basement bottom board and standard section of tower crane vertical rod (1) firm welding;
When c, basement bottom board concreting, directly standard section of tower crane vertical rod (1) is buried people wherein, treat the later stage Standard section of tower crane vertical rod (1) more than basement bottom board face, when removing, is cut off by tower crane.
CN201610418281.1A 2016-06-08 2016-06-08 Basement tower crane Pending CN105971023A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610418281.1A CN105971023A (en) 2016-06-08 2016-06-08 Basement tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610418281.1A CN105971023A (en) 2016-06-08 2016-06-08 Basement tower crane

Publications (1)

Publication Number Publication Date
CN105971023A true CN105971023A (en) 2016-09-28

Family

ID=57021107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610418281.1A Pending CN105971023A (en) 2016-06-08 2016-06-08 Basement tower crane

Country Status (1)

Country Link
CN (1) CN105971023A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55152225A (en) * 1980-04-04 1980-11-27 Chubu Electric Power Co Inc Hollow cylinder for fundation floor plate of steel tower foundation
CN202038822U (en) * 2010-12-29 2011-11-16 广东金辉华集团有限公司 Tower crane installation connecting device
CN105002923A (en) * 2015-08-03 2015-10-28 上海建工五建集团有限公司 Embedded tower crane foundation and construction mode thereof
KR20150121461A (en) * 2014-04-21 2015-10-29 대우조선해양 주식회사 Drill ship for polar region
CN105129636A (en) * 2015-07-03 2015-12-09 中国十七冶集团有限公司 Large-basement baseboard tower-crane installation apparatus
CN205046568U (en) * 2015-09-17 2016-02-24 浙江中成建工集团有限公司 Three pile platform tower crane base apparatuses

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55152225A (en) * 1980-04-04 1980-11-27 Chubu Electric Power Co Inc Hollow cylinder for fundation floor plate of steel tower foundation
CN202038822U (en) * 2010-12-29 2011-11-16 广东金辉华集团有限公司 Tower crane installation connecting device
KR20150121461A (en) * 2014-04-21 2015-10-29 대우조선해양 주식회사 Drill ship for polar region
CN105129636A (en) * 2015-07-03 2015-12-09 中国十七冶集团有限公司 Large-basement baseboard tower-crane installation apparatus
CN105002923A (en) * 2015-08-03 2015-10-28 上海建工五建集团有限公司 Embedded tower crane foundation and construction mode thereof
CN205046568U (en) * 2015-09-17 2016-02-24 浙江中成建工集团有限公司 Three pile platform tower crane base apparatuses

Similar Documents

Publication Publication Date Title
CN104612160B (en) A kind of next-door neighbour's existing building pit maintenance soil structure and construction method
CN102587663A (en) Concrete construction process of steel tube columns of super-high-rise building
CN108035354A (en) A kind of construction method of GRC cement plates brick mold
CN103103988A (en) Foundation ditch construction method of horizontal bracing structure of central island floor slaps
CN102839672A (en) Foundation pit supporting method for preventing displacement limit exceeding of soft base cement mixing pile
CN112343091A (en) Subside post-cast strip structure sealed in advance
CN210127485U (en) Concrete suction type caisson foundation and thin-wall pier stud connecting structure
CN110055947A (en) A kind of mud and soft soil foundation in-situ solidifying and discharge structure
CN207392209U (en) Lattice column batten plate with grid
CN203755296U (en) Underground diaphragm wall construction building envelope
CN105971023A (en) Basement tower crane
CN105672443A (en) Structure integrating anchoring of anti-seepage film, flood interception and passing
CN104131570A (en) Steel box enclosure device for foundation pit construction and construction method thereof
CN204326080U (en) A kind of next-door neighbour's existing building pit maintenance soil structure
CN102660965A (en) Construction method for post-pouring settlement belt with simply supported fully-enclosed plate retainer structure
CN111155543A (en) Open caisson isolation bottom die wet type bottom sealing structure and construction method thereof
CN213358679U (en) Water buoyancy balance system of subway upper cover structure
CN212506224U (en) Shear wall structural member of underground continuous wall
CN106567415A (en) Drain sleeve for preventing basement floating upward and use method
CN105129636A (en) Large-basement baseboard tower-crane installation apparatus
CN109555129A (en) Rapid emergency diagonal bracing for foundation pit emergency and construction method
CN210194691U (en) Protective structure for post-cast strip of settlement of basic raft
CN207512723U (en) A kind of structure construction for promoting diaphram wall surface concrete quality
CN112095665A (en) Water buoyancy balance construction method applied to subway upper cover
CN206128101U (en) Compound back cover structure of shaped steel concrete

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928

RJ01 Rejection of invention patent application after publication