CN104120519B - 一种相互配套的锭子与筒管 - Google Patents
一种相互配套的锭子与筒管 Download PDFInfo
- Publication number
- CN104120519B CN104120519B CN201410389027.4A CN201410389027A CN104120519B CN 104120519 B CN104120519 B CN 104120519B CN 201410389027 A CN201410389027 A CN 201410389027A CN 104120519 B CN104120519 B CN 104120519B
- Authority
- CN
- China
- Prior art keywords
- bobbin
- spindle
- spindle blade
- concave groove
- inverted concave
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Spinning Or Twisting Of Yarns (AREA)
Abstract
本发明公开了一种纺织锭子及配套的筒管,包括中空的锭杆(10)、锭盘(20)、定位轴(30)、锭座(40)、筒管(50),筒管(50)的底部侧壁上开设有倒凹形槽(51),倒凹形槽(51)仅一端开口,锭杆(10)底部侧面上安装有突出的杆(11),杆(11)和锭盘(20)顶面之间安装有伸缩装置(60)。操作人员旋动套在锭杆上的筒管,使锭杆上的杆卡入倒凹形槽的开口端,再沿倒凹形槽的槽走向旋转筒管,松开筒管,在伸缩装置的张力下,杆卡入倒凹形槽未开口的一端,完成了筒管的固定。反向操作上述步骤即可从锭杆上取走筒管。通过上述方案,固定和取走筒管均很方便,提高了生产效率。
Description
技术领域:
本发明涉及纺织机械设计领域,具体而言,涉及一种相互配套的锭子与筒管。
背景技术:
在纺织生产中,锭子是必不可少的纺织机械的零部件之一,如图1所示,现有的锭子包括锭杆10、锭盘20、定位轴30和锭座40,锭杆10与锭盘20固定连接,锭盘20与定位轴30活动连接,定位轴30固定在锭座40上,工作时,锭杆10上套有纺织筒管,锭杆10和锭盘20围绕定位轴30旋转。
按上述的锭子结构,筒管需紧紧地插在锭子的锭杆上,以防止筒管松动。在工作时,锭杆和插在锭杆上的筒管围绕定位轴旋转以缠绕纱线。如此,纱线卷绕完成后筒管很难被拔下,导致工作效率的降低。
发明内容:
本发明所解决的技术问题:现有技术中的锭子需筒管紧紧地插在锭子的锭杆上,筒管上纱线卷绕完成后筒管很难被拔下,导致工作效率的降低。
本发明提供如下技术方案:一种相互配套的锭子与筒管,包括锭杆、与锭杆固定连接的锭盘、与锭盘活动连接的定位轴、与定位轴固定连接的锭座、套在锭杆上的筒管,所述筒管的底部侧壁上开设有倒凹形槽,所述倒凹形槽仅一端开口,所述锭杆底部侧面上安装有突出的杆,所述杆可在倒凹形槽内移动,所述杆和锭盘顶面之间安装有伸缩装置,所述伸缩装置可被套在锭杆上的筒管的下端面压缩。
纺织生产中,操作人员将与锭杆间隙配合的筒管套在锭杆上,旋动筒管,使筒管侧壁上的倒凹形槽的开口端套在锭杆侧面上的杆上,即锭杆侧面上的杆卡入倒凹形槽的开口端。操作人员下压筒管,筒管的下端面压缩伸缩装置,伸缩装置给筒管下端面一定的压力。当锭杆侧面上的杆到达倒凹形槽的顶部时,操作人员旋动筒管,在伸缩装置压力的作用下,杆卡入倒凹形槽的另一端,即未开口的一端。至此,筒管已被固定在锭杆上。当操作人员需从锭杆上取走筒管时,操作人员只要下压筒管,再反方向旋转筒管,最后松开筒管,筒管在压缩装置的作用下沿锭杆被弹起,此时,操作人员即可方便地取走筒管。通过上述技术方案,在纺织生产中,操作人员无需将筒管紧紧地插在锭子的锭杆上,即可将筒管固定在锭杆上,不仅固定筒管方便,而且取走筒管也很方便,提升了纺织生产的工作效率。
作为本发明的限定,所述伸缩装置包括开有中心孔的圆盘、安装在圆盘底面上的伸缩弹簧,所述圆盘套在锭杆上,所述圆盘可沿锭杆上下移动。优选的,所述的伸缩弹簧至少为三个,所述的伸缩弹簧沿圆周均匀分布。
作为本发明的进一步改进,所述筒管外圆周设有突出环,所述突出环位于倒凹形槽的上方。如此改进可将筒管的绕线区限制在突出环的上方,不影响突出环下方的倒凹形槽的功能。
作为本发明的进一步改进,所述锭杆上杆的数量为沿圆周均匀分布的三个,所述筒管上开设有三个与所述杆相配套的倒凹形槽。如此改进可提高筒管固定在锭杆上的稳定性。
附图说明:
下面结合附图对本发明做进一步的说明:
图1为现有技术中纺织锭子的结构示意图;
图2为本发明一种相互配套的锭子与筒管中的筒管的结构示意图;
图3为本发明一种相互配套的锭子与筒管中的锭子的结构示意图。
图中符号说明:
10-锭杆;11-杆;
20-锭盘;
30-定位轴;
40-锭座;
50-筒管;51-倒凹形槽;52-突出环;
60-伸缩装置;61-圆盘;62-伸缩弹簧。
具体实施方式:
如图2、图3所示,一种相互配套的锭子与筒管,包括锭杆10、与锭杆10固定连接的锭盘20、与锭盘20活动连接的定位轴30、与定位轴30固定连接的锭座40、套在锭杆10上的筒管50。
如图2所示,所述筒管50的底部侧壁上开设有倒凹形槽51,所述倒凹形槽51仅一端开口。所述筒管50外圆周设有突出环52,所述突出环52位于倒凹形槽51的上方。
如图3所示,所述锭杆10底部侧面上安装有突出的杆11,所述杆11可在倒凹形槽51内移动,所述杆11和锭盘20顶面之间安装有伸缩装置60。所述伸缩装置60包括开有中心孔的圆盘61、安装在圆盘61底面上的伸缩弹簧62,所述圆盘61套在锭杆10上,所述圆盘61可沿锭杆10上下移动。所述伸缩弹簧62为沿圆周均匀分布的四个。
具体操作时,操作人员将筒管50的倒凹形槽51的开口端套在锭杆10的杆11上,按压筒管50,再沿倒凹形槽51的槽走向旋转筒管50,松开筒管50,在伸缩装置60的张力下,杆11卡入倒凹形槽51未开口的一端,如此,即完成了筒管50固定在锭杆10上的动作。当需从锭杆10上取走筒管50时,操作人员按压筒管50,再沿倒凹形槽51的槽走向反向旋转筒管50,松开筒管50,在伸缩装置60的张力下,杆11从倒凹形槽51开口的一端脱离倒凹形槽51,如此,即完成了筒管50从锭杆10上取走的动作。
Claims (5)
1.一种相互配套的锭子与筒管,包括锭杆(10)、与锭杆(10)固定连接的锭盘(20)、与锭盘(20)活动连接的定位轴(30)、与定位轴(30)固定连接的锭座(40)、套在锭杆(10)上的筒管(50),其特征在于:所述筒管(50)的底部侧壁上开设有倒凹形槽(51),所述倒凹形槽(51)仅一端开口,所述锭杆(10)底部侧面上安装有突出的杆(11),所述杆(11)可在倒凹形槽(51)内移动,所述杆(11)和锭盘(20)顶面之间安装有伸缩装置(60),所述伸缩装置(60)可被套在锭杆(10)上的筒管(50)的下端面压缩。
2.如权利要求1所述的相互配套的锭子与筒管,其特征在于:所述伸缩装置(60)包括开有中心孔的圆盘(61)、安装在圆盘(61)底面上的伸缩弹簧(62),所述圆盘(61)套在锭杆(10)上,所述圆盘(61)可沿锭杆(10)上下移动。
3.如权利要求2所述的相互配套的锭子与筒管,其特征在于:所述伸缩弹簧(62)至少为三个,所述伸缩弹簧(62)沿圆周均匀分布。
4.如权利要求1所述的相互配套的锭子与筒管,其特征在于:所述筒管(50)外圆周设有突出环(52),所述突出环(52)位于倒凹形槽(51)的上方。
5.如权利要求1所述的相互配套的锭子与筒管,其特征在于:所述锭杆(10)上杆(11)的数量为沿圆周均匀分布的三个,所述筒管(50)上开设有三个与所述杆(11)相配套的倒凹形槽(51)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410389027.4A CN104120519B (zh) | 2014-08-08 | 2014-08-08 | 一种相互配套的锭子与筒管 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410389027.4A CN104120519B (zh) | 2014-08-08 | 2014-08-08 | 一种相互配套的锭子与筒管 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104120519A CN104120519A (zh) | 2014-10-29 |
CN104120519B true CN104120519B (zh) | 2016-07-13 |
Family
ID=51766139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410389027.4A Active CN104120519B (zh) | 2014-08-08 | 2014-08-08 | 一种相互配套的锭子与筒管 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104120519B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111560669B (zh) * | 2020-05-18 | 2022-10-28 | 高淳县驿达金属结构厂 | 一种易分离式锭子与筒管的装配方法 |
CN112404951B (zh) * | 2020-11-06 | 2023-01-13 | 浙江沃棆特毛绒制品有限公司 | 一种纺纱锭的锭脚与上支承压装机 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4736579A (en) * | 1985-10-19 | 1988-04-12 | Palitex Project Company Gmbh | Variable length bobbin holder for a textile machine |
US4739941A (en) * | 1985-05-14 | 1988-04-26 | Carlo Menegatto | Centrifugal spool-clamping device |
CN1113382A (zh) * | 1993-07-14 | 1995-12-13 | 东丽株式会社 | 筒管夹持器及带有该筒管夹持器的卷绕装置 |
DE10154654A1 (de) * | 2001-10-31 | 2003-05-15 | Stahlecker Gmbh Wilhelm | Spulenhülsenaufnahme an einer Spinn- oder Zwirnspindel |
CN1490447A (zh) * | 2002-10-15 | 2004-04-21 | 诺维布拉有限责任公司 | 用于纺纱锭子或捻丝锭子上的筒管联接器 |
CN2743381Y (zh) * | 2004-09-10 | 2005-11-30 | 杨阜生 | 环锭纺纱铝套管锭子用双锥体筒管 |
CN100430540C (zh) * | 2002-10-15 | 2008-11-05 | 诺维布拉有限责任公司 | 落纱装置 |
CN201793840U (zh) * | 2010-09-16 | 2011-04-13 | 常熟长城轴承有限公司 | 新型纺纱锭子 |
CN204000021U (zh) * | 2014-08-08 | 2014-12-10 | 湖州市菱湖石淙永盛丝织厂 | 一种相互配套的锭子与筒管 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002160868A (ja) * | 2000-11-28 | 2002-06-04 | Scalar High Touch Kk | 被覆糸用ボビン及びスピンドル装置 |
-
2014
- 2014-08-08 CN CN201410389027.4A patent/CN104120519B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4739941A (en) * | 1985-05-14 | 1988-04-26 | Carlo Menegatto | Centrifugal spool-clamping device |
US4736579A (en) * | 1985-10-19 | 1988-04-12 | Palitex Project Company Gmbh | Variable length bobbin holder for a textile machine |
CN1113382A (zh) * | 1993-07-14 | 1995-12-13 | 东丽株式会社 | 筒管夹持器及带有该筒管夹持器的卷绕装置 |
DE10154654A1 (de) * | 2001-10-31 | 2003-05-15 | Stahlecker Gmbh Wilhelm | Spulenhülsenaufnahme an einer Spinn- oder Zwirnspindel |
CN1490447A (zh) * | 2002-10-15 | 2004-04-21 | 诺维布拉有限责任公司 | 用于纺纱锭子或捻丝锭子上的筒管联接器 |
CN100430540C (zh) * | 2002-10-15 | 2008-11-05 | 诺维布拉有限责任公司 | 落纱装置 |
CN100464013C (zh) * | 2002-10-15 | 2009-02-25 | 诺维布拉有限责任公司 | 用于纺纱锭子或捻丝锭子上的筒管联接器 |
CN2743381Y (zh) * | 2004-09-10 | 2005-11-30 | 杨阜生 | 环锭纺纱铝套管锭子用双锥体筒管 |
CN201793840U (zh) * | 2010-09-16 | 2011-04-13 | 常熟长城轴承有限公司 | 新型纺纱锭子 |
CN204000021U (zh) * | 2014-08-08 | 2014-12-10 | 湖州市菱湖石淙永盛丝织厂 | 一种相互配套的锭子与筒管 |
Also Published As
Publication number | Publication date |
---|---|
CN104120519A (zh) | 2014-10-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202542572U (zh) | 一种旋转放线装置 | |
CN103449254A (zh) | 一种络筒机摇架 | |
CN104120519B (zh) | 一种相互配套的锭子与筒管 | |
CN104555576A (zh) | 一种减震的纺织用绕盘装置 | |
CN203474089U (zh) | 一种络筒机摇架 | |
CN203333884U (zh) | 一种锭子 | |
CN204000023U (zh) | 一种可固定不同内径筒管的纺织锭子 | |
CN104131374B (zh) | 一种纺织锭子及配套的筒管 | |
CN204727345U (zh) | 一种耐磨损的新型纺织纱管 | |
CN104153064B (zh) | 一种无锭杆的锭子与配套的筒管 | |
CN204000021U (zh) | 一种相互配套的锭子与筒管 | |
CN204079087U (zh) | 绕线器 | |
CN103910234A (zh) | 一种紧固型纺织用纱线架 | |
CN204000018U (zh) | 一种纺织锭子及配套的筒管 | |
CN204000024U (zh) | 一种锭杆长度可变的纺织锭子 | |
CN205501511U (zh) | 一种可保持纱线与蜡块之间具有足够压力的上蜡装置 | |
CN216471528U (zh) | 络筒机纱线上蜡装置 | |
CN104495526A (zh) | 一种用于纺织机的筒管 | |
CN204000019U (zh) | 一种无锭杆的锭子与配套的筒管 | |
CN205170045U (zh) | 纺织筒管松拔装置 | |
CN206256227U (zh) | 光杆集体落纱棉纺锭子 | |
CN201924127U (zh) | 倒筒机的筒管夹紧装置 | |
CN103469501A (zh) | 一种光控绕线器 | |
CN204676218U (zh) | 一种并纱机纱管座 | |
CN205711343U (zh) | 独立针杆驱动绗绣机一体机用的收料机构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Tian Shugao Inventor before: Gu Zian |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160608 Address after: The five group of 402681 Chongqing city Tongnan County town of Shou village Diaolou Applicant after: CHONGQING HEINGJINYUAN SILK CO., LTD. Address before: 313014 Zhejiang Province, Huzhou city Nanxun District Xu Shuiqiao Shicong town Applicant before: HUZHOU LINGHU SHICONG YONGSHENG SILK WEAVING FACTORY |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |