AT523062A4 - Production plant and method for operating such a production plant - Google Patents
Production plant and method for operating such a production plant Download PDFInfo
- Publication number
- AT523062A4 AT523062A4 ATA50100/2020A AT501002020A AT523062A4 AT 523062 A4 AT523062 A4 AT 523062A4 AT 501002020 A AT501002020 A AT 501002020A AT 523062 A4 AT523062 A4 AT 523062A4
- Authority
- AT
- Austria
- Prior art keywords
- slab
- strip
- production line
- train
- roughing
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/1206—Accessories for subsequent treating or working cast stock in situ for plastic shaping of strands
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H9/00—Details of switching devices, not covered by groups H01H1/00 - H01H7/00
- H01H9/02—Bases, casings, or covers
- H01H9/0207—Adjustable mounting of casings
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/463—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a continuous process, i.e. the cast not being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/46—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting
- B21B1/466—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling metal immediately subsequent to continuous casting in a non-continuous process, i.e. the cast being cut before rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/12—Accessories for subsequent treating or working cast stock in situ
- B22D11/128—Accessories for subsequent treating or working cast stock in situ for removing
- B22D11/1282—Vertical casting and curving the cast stock to the horizontal
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/14—Plants for continuous casting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/14—Plants for continuous casting
- B22D11/142—Plants for continuous casting for curved casting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D11/00—Continuous casting of metals, i.e. casting in indefinite lengths
- B22D11/14—Plants for continuous casting
- B22D11/147—Multi-strand plants
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H13/00—Switches having rectilinearly-movable operating part or parts adapted for pushing or pulling in one direction only, e.g. push-button switch
- H01H13/02—Details
- H01H13/04—Cases; Covers
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01H—ELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
- H01H23/00—Tumbler or rocker switches, i.e. switches characterised by being operated by rocking an operating member in the form of a rocker button
- H01H23/02—Details
- H01H23/04—Cases; Covers
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/015—Boards, panels, desks; Parts thereof or accessories therefor
- H02B1/04—Mounting thereon of switches or of other devices in general, the switch or device having, or being without, casing
- H02B1/044—Mounting through openings
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Power Engineering (AREA)
- Metal Rolling (AREA)
- Switch Cases, Indication, And Locking (AREA)
Abstract
Die Erfindung betrifft eine Produktionsanlage und ein Verfahren zum Betrieb solch einer Produktionsanlage, wobei eine Stranggießanlage (55) einer ersten Produktionslinie aus der metallischen Schmelze (105) eine erste Bramme (110) gießt, wobei die erste Bramme (110) aus der Stranggießanlage (55) einer Vorwalzstraße (60) der ersten Produktionslinie (15) zugeführt wird und die Vorwalzstraße (60) aus der ersten Bramme (110) ein erstes Vorband (116) walzt, wobei das erste Vorband (116) der Fertigwalzstraße (80) zugeführt wird und die Fertigwalzstraße (80) das erste Vorband zu dem ersten Fertigband (145) walzt, wobei eine zweite Bramme (130) einer Brammenheizung (95) der zweiten Produktionslinie (25) zugeführt wird und die Brammenheizung (95) die zweite Bramme (130) auf eine Vorwalztemperatur erwärmt, wobei eine Brammenwalzstraße (100) der zweiten Produktionslinie (25) die zweite Bramme (130) zu dem zweiten Vorband (155) walzt, wobei eine Transporteinrichtung (20) das zweite Vorband (155) von der zweiten Produktionslinie (25) zu der ersten Produktionslinie (15) transportiert und der Fertigwalzstraße (80) das zweite Vorband (155) statt dem ersten Vorband (116) zugeführt wird, wobei die Fertigwalzstraße (80) das zweite Vorband (155) zu dem zweiten Fertigband (170) walzt.The invention relates to a production plant and a method for operating such a production plant, wherein a continuous casting plant (55) of a first production line casts a first slab (110) from the metallic melt (105), the first slab (110) from the continuous casting plant (55 ) is fed to a roughing train (60) of the first production line (15) and the roughing train (60) rolls a first roughing strip (116) from the first slab (110), the first roughing strip (116) being fed to the finishing rolling train (80) and the finishing train (80) rolls the first pre-strip into the first finished strip (145), a second slab (130) being fed to a slab heater (95) of the second production line (25) and the slab heater (95) on the second slab (130) heated a roughing temperature, wherein a slab rolling train (100) of the second production line (25) rolls the second slab (130) to the second preliminary strip (155), wherein a transport device (20) the second preliminary strip (155) vo n the second production line (25) is transported to the first production line (15) and the finishing rolling train (80) is supplied with the second preliminary strip (155) instead of the first preliminary strip (116), the finishing rolling train (80) adding the second preliminary strip (155) the second finished strip (170) rolls.
Description
15 15th
20 20th
25 25th
30 30th
35 35
201900302 201900302
Produktionsanlage und Verfahren zum Betrieb solch einer Pro-Production plant and process for operating such a pro-
duktionsanlage production plant
Die Erfindung betrifft eine Produktionsanlage gemäß Patentanspruch 1 und ein Verfahren zum Betrieb solch einer The invention relates to a production plant according to claim 1 and a method for operating such a plant
Produktionsanlage gemäß Patentanspruch 9. Production plant according to claim 9.
Aus EP 1 657 004 Al ist eine Produktionsanlage mit zwei Stranggießanlagen bekannt, wobei eine der beiden Stranggießanlagen in Linie zu einer Fertigwalzstraße der Produktionsanlage A production plant with two continuous casting plants is known from EP 1 657 004 A1, one of the two continuous casting plants in line with a finishing mill of the production plant
ausgerichtet ist. is aligned.
Es ist Aufgabe der Erfindung, eine verbesserte Produktionsanlage und ein verbessertes Verfahren zum Betrieb solch einer Pro-It is the object of the invention to provide an improved production plant and an improved method for operating such a pro-
duktionsanlage bereitzustellen. production plant to provide.
Diese Aufgabe wird mittels einer Produktionsanlage gemäß Patentanspruch 1 und mittels eines Verfahrens gemäß Patentanspruch 9 gelöst. Vorteilhafte Ausführungsformen sind in den abhängigen This object is achieved by means of a production plant according to patent claim 1 and by means of a method according to patent claim 9. Advantageous embodiments are in the dependent
Ansprüchen angegeben. Claims stated.
Es wurde erkannt, dass eine verbesserte Produktionsanlage dadurch bereitgestellt werden kann, dass die Produktionsanlage eine erste Produktionslinie, eine zweite Produktionslinie und eine Transporteinrichtung aufweist. Die erste Produktionslinie weist eine Stranggießanlage, eine Vorwalzstraße und eine Fertigwalzstraße auf. Die zweite Produktionslinie weist eine Brammenwalzstraße auf. Die Transporteinrichtung ist zwischen der ersten Produktionslinie und der zweiten Produktionslinie ausgebildet. Die Stranggießanlage ist ausgebildet, aus einer metallischen Schmelze eine erste Bramme zu gießen. Vorzugsweise wird die erste Bramme in einem sogenannten Endlosstrangguss (auch ESP - Endless Strip Production) gegossen. Die Vorwalzstraße ist der Stranggießanlage bezogen auf eine erste Förderrichtung der ersten Bramme nachgeordnet. Vorzugsweise befindet sich die It was recognized that an improved production system can be provided in that the production system has a first production line, a second production line and a transport device. The first production line has a continuous caster, a roughing mill and a finishing mill. The second production line has a slab rolling train. The transport device is formed between the first production line and the second production line. The continuous caster is designed to cast a first slab from a metallic melt. The first slab is preferably cast in what is known as an endless continuous casting (also ESP - Endless Strip Production). The roughing train is arranged downstream of the continuous caster in relation to a first conveying direction of the first slab. Preferably the
Vorwalzstraße direkt im Anschluss an die Stranggießanlage. Der Pre-rolling train directly following the continuous caster. The
15 15th
20 20th
25 25th
30 30th
35 35
201900302 201900302
Vorwalzstraße ist die erste Bramme zuführbar und die Vorwalzstraße ist ausgebildet, die erste Bramme zu einem ersten Vorband zu walzen. Die Fertigwalzstraße ist der Vorwalzstraße bezogen auf die erste Förderrichtung der ersten Bramme in der Vorwalzstraße nachgeordnet und das erste Vorband ist aus der Vorwalzstraße in die Fertigwalzstraße zuführbar. Die zweite Produktionslinie weist eine Brammenheizeinrichtung auf, und eine zweite Bramme ist der Brammenheizung zuführbar. Die Brammenwalzstraße der Brammenheizung bezogen auf eine zweite Förderrichtung der zweiten Bramme nachgeordnet. Die Brammenheizung ist ausgebildet, die zweite Bramme auf eine vordefinierte Vorwalztemperatur zu erwärmen. Die Brammenwalzstraße ist ausgebildet, die zweite Bramme zu einem zweiten Vorband zu walzen. Die Transporteinrichtung ist ausgebildet, das zweite Vorband von der Brammenwalzstraße zu der ersten Produktionslinie zu transportieren und das zweite Vorband der ersten Produktionslinie zuzuführen. Die Fertigwalzstraße ist ausgebildet, das erste Vorband zu einem ersten Fertigband oder das zweite Vorband The first slab can be fed to the roughing train and the roughing train is designed to roll the first slab into a first roughing strip. The finishing train is downstream of the roughing train in relation to the first conveying direction of the first slab in the roughing train and the first roughing strip can be fed from the roughing train into the finishing train. The second production line has a slab heater, and a second slab can be fed to the slab heater. The slab rolling train is arranged downstream of the slab heating in relation to a second conveying direction of the second slab. The slab heater is designed to heat the second slab to a predefined roughing temperature. The slab rolling train is designed to roll the second slab into a second slab. The transport device is designed to transport the second sliver from the slab rolling train to the first production line and to feed the second sliver to the first production line. The finishing train is designed, the first pre-strip to a first finished strip or the second pre-strip
zu einem zweiten Fertigband zu walzen. to roll into a second finished strip.
Diese Ausgestaltung hat den Vorteil, dass durch die Erweiterung der Produktionsanlage mit der zweiten Produktionslinie auch bei einem Stillstand der Stranggießanlage die Fertigwalzstraße der ersten Produktionslinie betrieben werden kann und dadurch eine hohe Auslastung der Produktionsanlage sichergestellt ist. Ferner kann eine Produktionskapazität der Produktionsanlage zur Herstellung von Fertigband erhöht werden, ohne dass dafür eine zusätzliche weitere Stranggießanlage und gegebenenfalls, falls nicht ausreichend flüssige metallische Schmelze mit einem bestehenden Konverter herstellbar ist, eine weitere Stranggießanlage und ein weiterer Konverter installiert werden müssen, um die Auslastung der Fertigwalzstraße zu erhöhen. Ferner ist der Bauraumbedarf zum Erweitern der Produktionsanlage deutlich reduziert. Insbesondere kann die Brammenwalzstraße mit einem reversierenden Walzgerüst ausgestattet sein, sodass die This refinement has the advantage that, by expanding the production plant with the second production line, the finishing rolling train of the first production line can be operated even when the continuous casting plant is at a standstill, thereby ensuring high capacity utilization of the production plant. Furthermore, the production capacity of the production plant for the production of finished strip can be increased without the need to install an additional continuous caster and, if necessary, if an existing converter cannot produce sufficient liquid metal melt, a further continuous caster and a further converter have to be installed in order to achieve full capacity utilization the finishing mill to increase. Furthermore, the installation space required to expand the production plant is significantly reduced. In particular, the slab rolling mill can be equipped with a reversing roll stand, so that the
Brammenwalzstraße besonders einfach ausgebildet ist. Slab rolling train is particularly simple.
15 15th
20 20th
25 25th
30 30th
35 35
201900302 201900302
Von besonderem Vorteil ist, wenn die Produktionsanlage ein Brammenlager zur Lagerung wenigstens einer zweiten Bramme, vorzugsweise mehrerer zweiter Brammen, und eine Brammenfördereinrichtung aufweist. Das Brammenlager ist ausgebildet, die zweite Bramme bei einer Temperatur von -30°C bis +60°C für wenigstens einen Zeitraum von 12, vorzugsweise von wenigstens 24 Stunden, zu lagern. Die Brammenfördereinrichtung ist zumindest abschnittsweise zwischen der zweiten Produktionslinie und dem Brammenlager ausgebildet. Die Brammenfördereinrichtung ist ausgebildet, die zweite Bramme von dem Brammenlager zu der zweiten Produktionslinie zu transportieren und der zweiten Produktionslinie zuzuführen. Diese Ausgestaltung hat den Vorteil, dass zahlreiche zweite Brammen im zweiten Brammenlager gelagert werden können und durch die lange Lagerungszeit dort die Umgebungstemperatur des zweiten Brammenlagers annehmen. Dadurch kann auch bei einem kurzfristigen Ausfall, beispielsweise bei einer Störung der Stranggießanlage und/oder der Vorwalzstraße und/oder des Konverters das zweite Fertigband mit der Produktionsanlage hergestellt werden. Von besonderem Vorteil ist hierbei, wenn die erste Bramme einen ersten Werkstoff, beispielsweise eine erste Legierungszusammensetzung, aufweist. Die zweite Bramme kann einen zweiten Werkstoff mit einer zweiten Legierungszusammensetzung aufweisen. Der erste Werkstoff kann unterschiedlich zu dem zweiten Werkstoff sein. So kann beispielsweise der zweite Werkstoff eine nicht im installierten Stahlwerk herstellbare Sonderlegierung sein und der erste Werkstoff eine im angeschlossenen Stahlwerk herstellbare It is particularly advantageous if the production plant has a slab store for storing at least one second slab, preferably several second slabs, and a slab conveying device. The slab store is designed to store the second slab at a temperature of -30 ° C. to + 60 ° C. for at least a period of 12, preferably at least 24 hours. The slab conveying device is formed at least in sections between the second production line and the slab store. The slab conveying device is designed to transport the second slab from the slab store to the second production line and to supply it to the second production line. This configuration has the advantage that numerous second slabs can be stored in the second slab store and, due to the long storage time, assume the ambient temperature of the second slab store there. As a result, the second finished strip can be produced with the production system even in the event of a short-term failure, for example in the event of a malfunction in the continuous caster and / or the roughing mill and / or the converter. It is particularly advantageous here if the first slab has a first material, for example a first alloy composition. The second slab can comprise a second material with a second alloy composition. The first material can be different from the second material. For example, the second material can be a special alloy that cannot be produced in the installed steelworks and the first material one that can be produced in the connected steelworks
Standardlegierung sein. Be standard alloy.
In einer weiteren Ausführungsform weist die zweite Produktionslinie wenigstens eine Wickeleinrichtung auf, wobei die Wickeleinrichtung ausgebildet ist, das zweite Vorband zu einer Coil aufzuwickeln. Die Transporteinrichtung ist ausgebildet, die Coil mit dem aufgewickelten zweiten Vorband zu der ersten Produktionslinie zu transportieren, wobei zwischen der Vorwalzstraße und der Fertigwalzstraße ein Abwickler angeordnet ist, der ausgebildet ist, die Coil abzuwickeln. Das zweite In a further embodiment, the second production line has at least one winding device, the winding device being designed to wind the second pre-strip into a coil. The transport device is designed to transport the coil with the wound up second pre-strip to the first production line, with an unwinder being arranged between the roughing train and the finishing train, which is designed to unwind the coil. The second
Vorband ist abgewickelt der Fertigwalzstraße zuführbar. Ist das The pre-strip is unwound and can be fed to the finishing train. Is this
15 15th
20 20th
25 25th
30 30th
35 35
201900302 201900302
zweite Vorband als Coil gewickelt, kann es besonders gut in heißem Zustand transportiert werden. Ferner ist ein Wärmeverlust der gewickelten Coil gering. Auch kann die Coil mit dem zweiten Vorband thermisch isoliert werden, sodass ein Wärmeverlust der Coil beim Transport von der zweiten Produktionslinie zu der ersten Produktionslinie gering ist. Durch das Warmwalzen der zweiten Bramme zu dem zweiten Vorband kann ferner das zweite Second pre-strip wound as a coil, it can be transported particularly well when it is hot. Furthermore, there is little heat loss from the wound coil. The coil can also be thermally insulated with the second pre-strip so that there is little heat loss from the coil during transport from the second production line to the first production line. By hot rolling the second slab to form the second pre-strip, the second
Vorband besonders gut zu der Coil gewickelt werden. The opening strip can be wound particularly well to the coil.
In einer weiteren Ausführungsform weist die Produktionsanlage ein erstes Gebäude auf, wobei in dem ersten Gebäude die erste Produktionslinie, die zweite Produktionslinie und die Transporteinrichtung angeordnet sind. Das Brammenlager kann außerhalb des ersten Gebäudes angeordnet sein. Zum Schutz der zweiten Brammen kann das Brammenlager eingehaust sein. Diese Ausgestaltung hat den Vorteil, dass das erste Gebäude besonders klein gehalten werden kann und nicht zusätzlich noch das Brammenlager aufnehmen muss. In einer alternativen Ausgestaltung der Produktionsanlage weist die Produktionsanlage ein erstes Gebäude und ein räumlich zu dem ersten Gebäude benachbart angeordnetes zweites Gebäude auf, wobei in dem ersten Gebäude die erste Produktionslinie und in dem zweiten Gebäude die zweite Produktionslinie angeordnet sind. Die Transporteinrichtung ist zumindest abschnittsweise zwischen dem ersten Gebäude und dem zweiten Gebäude angeordnet. Die Transporteinrichtung ist ausgebildet, das zweite Vorband von der im zweiten Gebäude angeordneten zweiten Produktionslinie zu der im ersten Gebäude angeordneten ersten Produktionslinie zu transportieren. Diese Ausgestaltung hat den Vorteil, dass das erste Gebäude und das zweite Gebäude in Summe ein reduziertes umbautes Volumen aufweisen können gegenüber der ersten Ausgestaltung, wenn die erste Produktionslinie und die zweite Produktionslinie gemeinsam im ersten Gebäude angeordnet sind. Auch in der alternativen Ausgestaltung ist es von Vorteil, wenn das Brammenlager außerhalb des ersten und des zweiten Gebäudes angeordnet ist. Sollte das Brammenlager eingehaust werden, beispielsweise aufgrund von Umwelteinflüssen, beispielsweise aufgrund von Sandflug, so In a further embodiment, the production plant has a first building, the first production line, the second production line and the transport device being arranged in the first building. The slab store can be arranged outside the first building. The slab store can be enclosed to protect the second slab. This configuration has the advantage that the first building can be kept particularly small and does not have to additionally accommodate the slab store. In an alternative embodiment of the production plant, the production plant has a first building and a second building arranged spatially adjacent to the first building, the first production line being arranged in the first building and the second production line being arranged in the second building. The transport device is arranged at least in sections between the first building and the second building. The transport device is designed to transport the second sliver from the second production line arranged in the second building to the first production line arranged in the first building. This embodiment has the advantage that the first building and the second building in total can have a reduced enclosed volume compared to the first embodiment if the first production line and the second production line are arranged together in the first building. In the alternative embodiment, too, it is advantageous if the slab store is arranged outside the first and the second building. If the slab store is to be enclosed, for example due to environmental influences, for example due to sand drift, so
bietet sich an, das Brammenlager in dem zweiten Gebäude un-it makes sense to move the slab store in the second building
15 15th
20 20th
25 25th
30 30th
35 35
201900302 201900302
terzubringen. Von Vorteil ist hierbei, wenn ein Abstand der beiden Gebäude kleiner als 150 m, insbesondere kleiner 100 m, bring up. It is advantageous here if the distance between the two buildings is less than 150 m, in particular less than 100 m,
insbesondere kleiner 50 m und zumindest größer 10 m ist. is in particular less than 50 m and at least greater than 10 m.
In einer weiteren Ausführungsform weist die Transporteinrichtung einen Kran und eine Kranbahn auf, wobei die Kranbahn zumindest abschnittsweise zwischen der zweiten Produktionslinie und der ersten Produktionslinie ausgebildet ist. Der Kran ist auf der Kranbahn verfahrbar angeordnet. Der Kran ist ausgebildet, zumindest abschnittsweise das zweite Vorband von der zweiten Produktionslinie zu der ersten Produktionslinie zu transportieren. Diese Ausgestaltung hat den Vorteil, dass kein spezifisches Mittel vorgesehen sein muss, um das Vorband zwischen den beiden Produktionslinien zu transportieren. Auch kann mittels des Krans, beispielsweise bei einer Wartung der ersten und/oder zweiten Produktionslinie das zweite Vorband angehoben In a further embodiment, the transport device has a crane and a crane runway, the crane runway being formed at least in sections between the second production line and the first production line. The crane is arranged to be movable on the crane runway. The crane is designed to transport the second pre-strip from the second production line to the first production line, at least in sections. This embodiment has the advantage that no specific means have to be provided in order to transport the pre-strip between the two production lines. The second pre-strip can also be raised by means of the crane, for example during maintenance of the first and / or second production line
und transportiert werden. and be transported.
In einer weiteren Ausführungsform weist die Brammenfördereinrichtung einen Rollengang auf, wobei der Rollengang bezogen auf die zweite Förderrichtung der zweiten Bramme vor der Brammenheizung angeordnet ist. Der Rollengang ist ausgebildet, die Bramme zumindest abschnittsweise zwischen dem Brammenlager und der Brammenheizung zu transportieren. Diese Ausgestaltung hat den Vorteil, dass auch mehrere zweite Brammen mit dem Rollengang zeitgleich transportiert werden können. Der Transport kann dabei sequentiell erfolgen, sodass eine hohe Taktrate für die zweite Produktionslinie möglich ist und ein Nachschub von In a further embodiment, the slab conveying device has a roller conveyor, the roller conveyor being arranged in front of the slab heating in relation to the second conveying direction of the second slab. The roller conveyor is designed to transport the slab at least in sections between the slab store and the slab heater. This configuration has the advantage that several second slabs can also be transported with the roller conveyor at the same time. The transport can take place sequentially, so that a high cycle rate is possible for the second production line and a replenishment of
zweiten Brammen nicht unterbrochen ist. second slab is not interrupted.
In einer weiteren Ausführungsform ist die Stranggießanlage als Endlosstranggießanlage ausbildet, wobei das erste Vorband an In a further embodiment, the continuous caster is designed as an endless continuous caster, with the first sliver on
einer ersten Seite mit der ersten Bramme und das erste Vorband an einer zur ersten Seite gegenüberliegenden zweiten Seite mit a first side with the first slab and the first sliver on a second side opposite to the first side
dem ersten Fertigband verbunden ist. connected to the first finished tape.
In einer weiteren Ausführungsform ist zwischen der Vorwalzstraße In a further embodiment is between the roughing train
und der Fertigwalzstraße eine Zwischenheizung angeordnet, wobei and an intermediate heater is arranged on the finishing rolling train, wherein
15 15th
20 20th
25 25th
30 30th
35 35
201900302 201900302
die Zwischenheizung ausgebildet ist, das erste Vorband auf eine vordefinierte erste Fertigwalztemperatur zu erwärmen, wobei das zweite Vorband der Fertigwalzstraße zwischen der Zwischenheizung und der Vorwalzstraße zugeführt wird. Bei Zuführung des zweiten Vorbands ist die Zwischenheizung ausgebildet, das zweite Vorband auf eine vordefinierte zweite Fertigwalztemperatur zu erwärmen, wobei die erste vordefinierte Fertigwalztemperatur unterschiedlich oder identisch zu der ersten vordefinierten Fer-the intermediate heater is designed to heat the first pre-strip to a predefined first finishing-rolling temperature, the second pre-strip being fed to the finishing-rolling train between the intermediate heating and the roughing-rolling train. When the second pre-strip is supplied, the intermediate heater is designed to heat the second pre-strip to a predefined second finishing rolling temperature, the first predefined finishing rolling temperature being different or identical to the first predefined finishing
tigwalztemperatur ist. rolling temperature is.
Besonders gut kann die oben beschriebene Produktionsanlage dadurch betrieben werden, dass die Stranggießanlage aus der metallischen Schmelze die erste Bramme gießt, wobei die erste Bramme aus der Stranggießanlage der Vorwalzstraße zugeführt wird. Die Vorwalzstraße walzt aus der ersten Bramme das erste Vorband. Das erste Vorband wird der Fertigwalzstraße zugeführt. Die Fertigwalzstraße walzt das erste Vorband zu dem ersten Fertigband. Die zweite Bramme wird der Brammenheizung zugeführt und die Brammenheizung erwärmt die zweite Bramme auf die Vorwalztemperatur. Die Brammenwalzstraße walzt die zweite Bramme zu dem zweiten Vorband. Die Transporteinrichtung transportiert das zweite Vorband von zweiten Produktionslinie zu der ersten Produktionslinie. Der Fertigwalzstraße wird das zweite Vorband statt dem ersten Vorband zugeführt, wobei die Fertigwalzstraße The production plant described above can be operated particularly well in that the continuous casting plant casts the first slab from the metallic melt, the first slab being fed from the continuous casting plant to the roughing mill. The roughing mill rolls the first slab from the first slab. The first sliver is fed to the finishing train. The finishing train rolls the first pre-strip into the first finished strip. The second slab is fed to the slab heater and the slab heater heats the second slab to the roughing temperature. The slab rolling train rolls the second slab into the second sliver. The transport device transports the second sliver from the second production line to the first production line. The second pre-strip instead of the first pre-strip is fed to the finishing train, with the finishing train
das zweite Vorband zu dem zweiten Fertigband walzt. rolls the second pre-strip into the second finished strip.
Diese Ausgestaltung hat den Vorteil, dass auch bei einer Störung der Stranggießanlage mit der Fertigwalzstraße das zweite Vorband zum zweiten Fertigband gewalzt werden kann und dadurch die erste Produktionslinie nicht komplett stillsteht. Ferner bietet sich an, dass die erste Bramme und die zweite Bramme jeweils unterschiedliche Werkstoffe aufweisen, sodass während des Ausfalls der Stranggießanlage das zweite Fertigband mit dem zweiten Werkstoff gewalzt wird. So können mittels einer Produktionsanlage zwei verschiedene Fertigbänder mit unterschiedlichen This refinement has the advantage that even if the continuous caster with the finishing rolling train malfunctions, the second preliminary strip can be rolled into the second finished strip and the first production line does not come to a complete standstill. It is also advisable that the first slab and the second slab each have different materials, so that the second finished strip is rolled with the second material during the failure of the continuous caster. In this way, two different finished strips with different
Werkstoffen kostengünstig hergestellt werden. Materials can be produced inexpensively.
15 15th
20 20th
25 25th
30 30th
35 35
201900302 201900302
In einer weiteren Ausführungsform wird das zweite Vorband zu einer Coil gewickelt, wobei die Coil von der zweiten Produktionslinie zu der ersten Produktionslinie transportiert wird. Die Coil wird abgewickelt und das zweite Vorband wird der In a further embodiment, the second pre-strip is wound into a coil, the coil being transported from the second production line to the first production line. The coil is unwound and the second sliver becomes the
Fertigwalzstraße abgewickelt zugeführt. Finishing mill fed unwound.
In einer weiteren Ausführungsform wird die zweite Bramme mit einer Temperatur von -30°C bis +60°C der Brammenheizung zugeführt, wobei die Brammenheizung die zweite Bramme auf die In a further embodiment, the second slab is fed to the slab heater at a temperature of -30 ° C. to + 60 ° C., the slab heater being applied to the second slab
Vorwalztemperatur, vorzugsweise von 1100°C bis 1200°C, erwärmt. In einer weiteren Ausführungsform wird die zweite Bramme mit einem vollständig erstarrten metallischen Gefüge der Bram-Pre-rolling temperature, preferably from 1100 ° C to 1200 ° C, heated. In a further embodiment, the second slab with a completely solidified metallic structure of the slab
menheizung zugeführt. heating supplied.
Nachfolgend wird die Erfindung anhand von Figuren näher er-The invention is explained in more detail below with the aid of figures
läutert. Dabei zeigen: purifies. Show:
FIG 1 eine schematische Darstellung einer Produktionsanlage 1 shows a schematic representation of a production plant
gemäß einer ersten Ausführungsform; according to a first embodiment;
FIG 2 eine in FIG 1 gezeigte erste Produktionslinie der 2 shows a first production line shown in FIG
Produktionsanlage. Production facility.
FIG 3 eine zweite Produktionslinie der in FIG 1 gezeigten 3 shows a second production line of the one shown in FIG
Produktionsanlage; Production plant;
FIG 4 ein Ablaufdiagramm eines Verfahrens zum Betrieb der in 4 shows a flow chart of a method for operating the in
den Figuren 1 bis 3 gezeigten Produktionsanlage; und the production plant shown in Figures 1 to 3; and
FIG 5 eine schematische Darstellung einer Produktionsanlage 5 shows a schematic representation of a production plant
gemäß einer zweiten Ausführungsform. according to a second embodiment.
FIG 1 zeigt eine schematische Darstellung einer Produktions-1 shows a schematic representation of a production
anlage 10 gemäß einer ersten Ausführungsform. plant 10 according to a first embodiment.
15 15th
20 20th
25 25th
30 30th
35 35
201900302 201900302
Die Produktionsanlage 10 weist ein erste Produktionslinie 15, eine Transporteinrichtung 20, eine zweite Produktionslinie 25, The production plant 10 has a first production line 15, a transport device 20, a second production line 25,
ein Fertiglager 30 und ein Brammenlager 35 auf. a finished store 30 and a slab store 35.
Die Produktionsanlage 10 befindet sich auf einem Gelände 40 einer Herstellungsfirma. Auf dem Gelände 40 befindet sich wenigstens ein erstes Gebäude 45, vorzugsweise eine Fertigungshalle, wobei in dem ersten Gebäude 45 zumindest die erste Produktionslinie 15 und die zweite Produktionslinie 25 untergebracht sind. Zusätzlich kann sich in dem Gebäude 45 auch das Fertiglager 30 The production plant 10 is located on a site 40 of a manufacturing company. At least one first building 45, preferably a production hall, is located on the site 40, with at least the first production line 15 and the second production line 25 being housed in the first building 45. In addition, the prefabricated warehouse 30 can also be located in the building 45
befinden. are located.
Die Transporteinrichtung 20 ist in dem ersten Gebäude 45 zumindest zwischen der ersten Produktionslinie 15 und der zweiten Produktionslinie 20 ausgebildet. Die Transporteinrichtung 20 kann beispielsweise einen ersten Kran 21 und eine erste Kranbahn 22 aufweisen. Der erste Kran 21 kann als Portalkran in dem ersten Gebäude 45 ausgebildet sein. Der erste Kran 21 ist entlang der ersten Kranbahn 22 verfahrbar. Die erste Kranbahn 22 wird durch zwei um 90° versetzt ausgebildete Verfahrwege des ersten Krans 21 ausgebildet. Die erste Kranbahn 22 verläuft zwischen der ersten Produktionslinie 15 und der zweiten Produktionslinie 25. Auch könnte die Transporteinrichtung 20 einen Coil-Transporter, der beispielsweise als Schienenfahrzeug ausgebildet ist, aufweisen. Auch könnte die Transporteinrichtung 20 einen ersten The transport device 20 is formed in the first building 45 at least between the first production line 15 and the second production line 20. The transport device 20 can, for example, have a first crane 21 and a first crane runway 22. The first crane 21 can be designed as a gantry crane in the first building 45. The first crane 21 can be moved along the first crane runway 22. The first crane runway 22 is formed by two traverse paths of the first crane 21 that are offset by 90 °. The first crane runway 22 runs between the first production line 15 and the second production line 25. The transport device 20 could also have a coil transporter, which is designed, for example, as a rail vehicle. The transport device 20 could also have a first
Rollengang aufweisen. Have roller conveyor.
In der Ausführungsform kann die zweite Produktionslinie 25 versetzt und beabstandet zu der ersten Produktionslinie 15 in dem Gebäude 45 angeordnet sein. Dabei ist ein minimaler Abstand a der ersten Produktionslinie 15 zu der zweiten Produktionslinie kleiner oder gleich 150 m, vorzugsweise kleiner oder gleich 100 m, insbesondere kleiner oder gleich 50 m, insbesondere kleiner oder gleich 30 m. Der minimale Abstand a der zweiten Produktionslinie 25 zu der ersten Produktionslinie 15 beträgt In the embodiment, the second production line 25 can be arranged offset and at a distance from the first production line 15 in the building 45. A minimum distance a from the first production line 15 to the second production line is less than or equal to 150 m, preferably less than or equal to 100 m, in particular less than or equal to 50 m, in particular less than or equal to 30 m the first production line is 15
wenigstens 10 m. at least 10 m.
15 15th
20 20th
25 25th
30 30th
35 35
201900302 201900302
Das Brammenlager 35 befindet sich auf dem Gelände 40 und kann als Außenlager beispielsweise außerhalb des ersten Gebäudes 45 beispielhaft räumlich neben dem ersten Gebäude 45 angeordnet sein. Auch kann das Brammenlager 35 in dem Gebäude 45, in dem die erste und zweite Produktionslinie 15, 25 sich befinden, untergebracht sein. Auch kann das Brammenlager 35 in einem weiteren, in FIG 1 nicht dargestellten, Gebäude untergebracht The slab store 35 is located on the site 40 and can be arranged as an external store, for example outside the first building 45, for example spatially next to the first building 45. The slab store 35 can also be accommodated in the building 45 in which the first and second production lines 15, 25 are located. The slab store 35 can also be accommodated in a further building, not shown in FIG
sein. be.
Ferner kann die Produktionsanlage 10 eine Brammenfördereinrichtung 50 aufweisen, wobei die Brammenfördereinrichtung 50 zwischen dem Brammenlager 35 und der zweiten Produktionslinie 25 ausgebildet ist. Die Brammenfördereinrichtung 50 kann beispielsweise einen zweiten Kran 51, insbesondere einen Portalkran, und eine zweite Kranbahn 53 aufweisen. Der zweite Kran 51 ist entlang der zweiten Kranbahn 53 verfahrbar. Ferner kann die Brammenfördereinrichtung 50 einen zweiten Rollengang 52 (gemäß BZL erster Rollengang 52, bitte im gesamten Dokument ersten und zweiten Rollengang und BZ mit suchen/ersetzen prüfen, ist nicht extra markiert) aufweisen, wobei der zweite Rollengang 52 beispielsweise zwischen dem Brammenlager 35 und der zweiten Furthermore, the production plant 10 can have a slab conveying device 50, the slab conveying device 50 being formed between the slab store 35 and the second production line 25. The slab conveyor device 50 can have, for example, a second crane 51, in particular a gantry crane, and a second crane runway 53. The second crane 51 can be moved along the second crane runway 53. Furthermore, the slab conveyor device 50 can have a second roller conveyor 52 (according to BZL first roller conveyor 52, please check first and second roller conveyor and BZ with search / replace in the entire document, is not specially marked), the second roller conveyor 52, for example, between the slab store 35 and The second
Produktionslinie 25 ausgebildet ist. Production line 25 is formed.
Die erste Produktionslinie 15 weist beispielsweise eine Stranggießanlage 55, eine Vorwalzstraße 60, eine erste Trenneinrichtung 65, einen Abwickler 66, eine zweite Trenneinrichtung 70, eine Zwischenheizung 75, einen Entzunderer 76, eine Fertigwalzstraße 80, eine Kühleinrichtung 85, eine dritte Trenneinrichtung 90 und eine erste Wickeleinrichtung 125 The first production line 15 has, for example, a continuous caster 55, a roughing train 60, a first separating device 65, an unwinder 66, a second separating device 70, an intermediate heater 75, a descaler 76, a finishing rolling train 80, a cooling device 85, a third separating device 90 and a first winding device 125
auf. on.
Die zweite Produktionslinie 25 weist zumindest eine Brammenheizung 95 und eine Brammenwalzstraße 100 auf. Zusätzlich kann die zweite Produktionslinie 25 eine Reinigungseinrichtung 106 und/oder eine zweite Coil 160 und/oder eine vierte Trennein-The second production line 25 has at least one slab heater 95 and one slab rolling train 100. In addition, the second production line 25 can have a cleaning device 106 and / or a second coil 160 and / or a fourth separation unit
richtung 161 aufweisen. direction 161.
15 15th
20 20th
25 25th
30 30th
35 35
201900302 10 201900302 10
FIG 2 zeigt die erste Produktionslinie 15 der in FIG 1 gezeigten FIG. 2 shows the first production line 15 of the one shown in FIG
Produktionsanlage 10. Production plant 10.
Die Stranggießanlage 55 ist beispielhaft als Bogenstranggießanlage ausgebildet. Auch eine andere Ausgestaltung der Stranggießanlage 55 ist möglich. Im Betrieb der ersten Produktionslinie 15 wird die Stranggießanlage 55 mittels einer Pfanne 144 mit einer metallischen Schmelze 105 befüllt. Die metallische Schmelze 105 kann beispielsweise mittels eines Konverters, beispielsweise eines Lichtbogenofens, oder in einem The continuous caster 55 is designed, for example, as a curved continuous caster. Another embodiment of the continuous casting installation 55 is also possible. During operation of the first production line 15, the continuous casting installation 55 is filled with a metallic melt 105 by means of a pan 144. The metallic melt 105 can for example by means of a converter, for example an electric arc furnace, or in a
Linz-Donawitz-Verfahren hergestellt werden. Linz-Donawitz process.
Die metallische Schmelze 105 kann als ersten Werkstoff beispielsweise Stahl, beispielsweise in einer ersten Zusammensetzung, aufweisen. Die im Folgenden angegebenen Temperaturen beziehen sich jeweils darauf, dass die Produktionsanlage 10 mit Stahl als ersten Werkstoff und/oder zweiten Werkstoff beschickt wird. Auch kann die metallische Schmelze 105 überwiegend einen Nichteisenwerkstoff aufweisen. In der Stranggießanlage 55 wird die metallische Schmelze 105 zumindest teilweise zu einer ersten Bramme 110 erstarrt. Die erste Bramme 110 kann in der Stranggießanlage 55 beispielsweise im Dünnbrammenformat oder im Mittelbrammenformat gegossen werden. Vorzugsweise ist die Stranggießanlage 55 ausgebildet, die erste Bramme 110 im The metallic melt 105 can have steel, for example in a first composition, as the first material. The temperatures specified below each relate to the fact that the production plant 10 is charged with steel as the first material and / or the second material. The metallic melt 105 can also predominantly comprise a non-ferrous material. In the continuous caster 55, the metallic melt 105 is at least partially solidified to form a first slab 110. The first slab 110 can be cast in the continuous caster 55, for example in the thin slab format or in the medium slab format. The continuous caster 55 is preferably formed, the first slab 110 in the
Endlosstrangguss zu gießen. Continuous continuous casting to be poured.
In einer ersten Förderrichtung der ersten Bramme 110 ist die Vorwalzstraße 60 der Stranggießanlage 55 nachgeordnet und folgt in der Ausführungsform direkt der Stranggießanlage 55. Die Vorwalzstraße 60 kann ein oder mehrere Vorwalzgerüste 115 aufweisen, die in der ersten Förderrichtung der ersten Bramme 110 hintereinander angeordnet sind. Die Anzahl der Vorwalzgerüste 115 ist im Wesentlichen frei wählbar und im Wesentlichen abhängig In a first conveying direction of the first slab 110, the pre-rolling train 60 is arranged downstream of the continuous caster 55 and in the embodiment directly follows the continuous caster 55. The pre-rolling train 60 can have one or more pre-rolling stands 115, which are arranged one behind the other in the first conveying direction of the first slab 110. The number of roughing stands 115 is essentially freely selectable and essentially dependent
von einem Format der ersten Bramme 110. Die Vorwalzstraße 60 ist ausgebildet, die bei Zuführung in die of a format of the first slab 110. The roughing train 60 is formed, which when fed into the
Vorwalzstraße 60 heiße erste Bramme 110, wobei die heiße erste Pre-rolling train 60 hot first slab 110, with the hot first
Bramme 110 beispielsweise eine Temperatur von 1100°C bis 1200°C Slab 110, for example, has a temperature of 1100 ° C to 1200 ° C
15 15th
20 20th
25 25th
30 30th
35 35
201900302 11 201900302 11
aufweist, zu einem ersten Vorband 116 in einem Durchgang durch die Vorwalzstraße 60 zu walzen. Das erste Vorband 116 weist bei Verlassen der Vorwalzstraße 60 vorzugsweise eine Dicke von 15 bis 45 mm auf. Das erste Vorband 116 verlässt die Vorwalzstraße 60 in der ersten Förderrichtung der ersten Bramme 110 auf einer zur has to roll to a first sliver 116 in one pass through the roughing train 60. The first sliver 116 preferably has a thickness of 15 to 45 mm when it leaves the roughing train 60. The first sliver 116 leaves the roughing train 60 in the first conveying direction of the first slab 110 on one side
Stranggießanlage 55 abgewandten Seite der Vorwalzstraße 60. Continuous caster 55 facing away from the rough rolling train 60.
Die erste und zweite Trenneinrichtung 65, 70 sind der Vorwalzstraße 60, bezogen auf die erste Förderrichtung des ersten Vorbands 116 bzw. der zum ersten Vorband 116 gewalzten ersten Bramme 110, nachgeordnet. Dabei kann die erste Trenneinrichtung 65 direkt der Vorwalzstraße 60 nachgeordnet sein, während hingegen die zweite Trenneinrichtung 70 beabstandet zu der ersten Trenneinrichtung 65 und der Vorwalzstraße 60, bezogen auf die erste Förderrichtung des ersten Vorbands 116, nachgeordnet ist. Auf die erste und/oder zweite Trenneinrichtung 65, 70 kann auch verzichtet werden. Die erste und/oder zweite Trenneinrichtung 65, 70 kann beispielsweise als Trommelschere oder Kurbelschere ausgebildet sein. Nach der ersten Trenneinrichtung 65 kann das erste Vorband 116 aus der ersten Produktionslinie 15 genommen werden, beispielsweise wenn eine Störung der Fertigwalzstraße 80 auftritt. Der Abwickler 66 ist zwischen der ersten Trennein-The first and second separating devices 65, 70 are arranged downstream of the roughing train 60, based on the first conveying direction of the first preliminary strip 116 or the first slab 110 rolled to form the first preliminary strip 116. The first separating device 65 can be arranged directly downstream of the roughing train 60, whereas the second separating device 70 is arranged at a distance from the first separating device 65 and the roughing train 60, based on the first conveying direction of the first roughing strip 116. The first and / or second separating device 65, 70 can also be dispensed with. The first and / or second separating device 65, 70 can be designed, for example, as drum shears or crank shears. After the first cutting device 65, the first sliver 116 can be removed from the first production line 15, for example if a malfunction occurs in the finishing train 80. The unwinder 66 is between the first separator
richtung 65 und der zweiten Trenneinrichtung 70 angeordnet. direction 65 and the second separating device 70 arranged.
Zwischen der zweiten Trenneinrichtung 70 und der Fertigwalzstraße 80 kann die Zwischenheizung 75 angeordnet sein. Die Zwischenheizung 75 kann beispielhaft als Induktionsofen ausgebildet sein. Auch eine andere Ausgestaltung der Zwischenheizung 75 wäre denkbar. Die Zwischenheizung 75 ist bezogen auf die erste Förderrichtung des ersten Vorbands 116 der Fertigwalzstraße 80 und dem Ent zunderer 76 vorgeordnet. Der Ent zunderer 76 ist der Fertigwalzstraße 80 direkt vorgeordnet und der The intermediate heater 75 can be arranged between the second separating device 70 and the finishing rolling train 80. The intermediate heater 75 can be designed, for example, as an induction furnace. Another embodiment of the intermediate heater 75 would also be conceivable. The intermediate heater 75 is arranged upstream of the finishing rolling train 80 and the descaler 76 in relation to the first conveying direction of the first pre-strip 116. The descaler 76 is arranged directly upstream of the finishing train 80 and the
Zwischenheizung 75 direkt nachgeordnet. Intermediate heating 75 directly downstream.
Die Fertigwalzstraße 80 kann ein oder mehrere Fertigwalzgerüste 120 aufweisen. In der Ausführungsform sind beispielhaft fünf Fertigwalzgerüste 120 vorgesehen, die hintereinander, bezogen The finishing mill train 80 can have one or more finishing stands 120. In the embodiment, five finishing stands 120 are provided, for example, which are related one behind the other
auf die Fördereinrichtung des ersten Vorbands 116, angeordnet on the conveyor of the first sliver 116 arranged
15 15th
20 20th
25 25th
30 30th
35 35
201900302 12 201900302 12
sind. Bezogen auf die erste Förderrichtung des ersten Vorbands 116 schließt sich an die Fertigwalzstraße 80 die Kühleinrichtung 85 an. Auf einer zur Fertigwalzstraße 80 abgewandten Seite der Kühleinrichtung 85 ist die dritte Trenneinrichtung 90 angeordnet. Der dritten Trenneinrichtung 90 kann die erste WiCkeleinrichtung 125 der ersten Produktionslinie 15 nachgeordnet sein. Die dritte Trenneinrichtung 90 kann beispielsweise als are. In relation to the first conveying direction of the first pre-strip 116, the finishing rolling train 80 is followed by the cooling device 85. The third separating device 90 is arranged on a side of the cooling device 85 facing away from the finishing rolling train 80. The first winding device 125 of the first production line 15 can be arranged downstream of the third separating device 90. The third separating device 90 can, for example, as
Trommelschere oder Kurbelschere ausgebildet sein. Drum shears or crank shears can be designed.
FIG 3 zeigt die zweite Produktionslinie 25 der in FIG 1 gezeigten FIG. 3 shows the second production line 25 of the one shown in FIG
Produktionsanlage 10. Production plant 10.
Die zweite Produktionslinie 25 weist keine Stranggießanlage 55 auf. Dadurch kann die zweite Produktionslinie 25 besonders kurzgehalten werden und weist beispielsweise eine maximale The second production line 25 does not have a continuous caster 55. As a result, the second production line 25 can be kept particularly short and has, for example, a maximum
Baulänge kleiner 100 m auf. Overall length less than 100 m.
Eingangsseitig der zweiten Produktionslinie 25 endet beispielsweise der zweite Rollengang 52. Mittels des zweiten Rollengangs 52 kann eine zweite Bramme 130 aus dem Brammenlager At the entrance to the second production line 25, for example, the second roller conveyor 52 ends. A second slab 130 can be removed from the slab store by means of the second roller conveyor 52
35 der zweiten Produktionslinie 25 zugeführt werden. 35 of the second production line 25 are fed.
Ist die Reinigungseinrichtung 106 vorgesehen, so endet der zweite Rollengang 52 an der Reinigungseinrichtung 106. Die Brammenheizung 95 ist bezogen auf eine zweite Förderrichtung der zweiten Bramme 130 zwischen der Brammenwalzstraße 100 und der Reinigungseinrichtung 106 angeordnet und somit der Brammenwalzstraße If the cleaning device 106 is provided, the second roller conveyor 52 ends at the cleaning device 106. The slab heater 95 is arranged between the slab rolling train 100 and the cleaning device 106 and thus the slab rolling train with respect to a second conveying direction of the second slab 130
100 vorgeordnet. 100 upstream.
Die Brammenheizung 95 kann beispielsweise als gasbetriebener Wärmeofen ausgebildet sein. Auch kann die Brammenheizung 95 andersartig ausgebildet sein. Die Brammenheizung 95 dient dazu, die zweite Bramme 130 von einer Umgebungstemperatur auf eine vordefinierte Vorwalztemperatur zu erwärmen. Die Vorwalztemperatur kann bei Stahl als zweitem Werkstoff 1100°C bis 1200°C The slab heater 95 can be designed, for example, as a gas-operated heating furnace. The slab heater 95 can also be designed differently. The slab heater 95 is used to heat the second slab 130 from an ambient temperature to a predefined roughing temperature. The roughing temperature for steel as the second material can be 1100 ° C to 1200 ° C
betragen. be.
15 15th
20 20th
25 25th
30 30th
35 35
201900302 13 201900302 13
In den FIGN sind beispielweise die erste Produktionslinie 15 und die zweite Produktionslinie 25 bezüglich der ersten Förderrichtung des ersten Vorbands 116 und der zweiten Förderrichtung des zweiten Vorbands 155 parallel zueinander ausgerichtet. Auch kann die zweite Produktionslinie 25 zu der ersten Produkti-In the figures, for example, the first production line 15 and the second production line 25 are aligned parallel to one another with respect to the first conveying direction of the first pre-strip 116 and the second conveying direction of the second pre-strip 155. The second production line 25 can also be connected to the first
onslinie 15 geneigt, vorzugsweise senkrecht angeordnet sein. onslinie 15 inclined, preferably arranged vertically.
Die Brammenwalzstraße 100 weist ein Brammenwalzgerüst auf. Auch kann die Brammenwalzstraße 100 mehrere Brammenwalzgerüste 135 The slab rolling mill 100 has a slab rolling stand. The slab rolling mill 100 can also have several slab rolling stands 135
aufweisen, die hintereinander angeordnet sein können. have, which can be arranged one behind the other.
Die zweite Wickeleinrichtung 140 ist der Brammenwalzstraße 100, bezogen auf die zweite Förderrichtung der zweiten Bramme 130, nachgeordnet. Zusätzlich kann zwischen der zweiten WiCkeleinrichtung 140 und der Brammenwalzstraße die vierte Trenneinrichtung 161 angeordnet sein, die beispielsweise als The second winding device 140 is arranged downstream of the slab rolling train 100 in relation to the second conveying direction of the second slab 130. In addition, the fourth separating device 161 can be arranged between the second winding device 140 and the slab rolling train, which, for example, can be used as a
Trommelschere oder als Kurbelschere ausgebildet ist. Drum shears or designed as crank shears.
FIG 4 zeigt ein Ablaufdiagramm eines Verfahrens zum Betrieb der FIG. 4 shows a flow chart of a method for operating the
in den FIGN 1 bis 3 gezeigten Produktionsanlage 10. Production plant 10 shown in FIGS. 1 to 3.
Die Produktionsanlage 10 kann in zwei Betriebszuständen 200, 201 betrieben werden. In einem ersten Betriebszustand 201 wird in einem ersten Verfahrensschritt 205 die Stranggießanlage 55 mit der metallischen Schmelze 105 befüllt und die metallische The production plant 10 can be operated in two operating states 200, 201. In a first operating state 201, in a first method step 205, the continuous casting plant 55 is filled with the metallic melt 105 and the metallic melt
Schmelze 105 wird in der Stranggießanlage 55 zu der ersten Bramme 110 erstarrt. Die erste Bramme 110 weist vorzugsweise am Ende der Stranggießanlage 55 eine Dicke von 100 bis 600 mm auf, mit der Melt 105 is solidified in the continuous caster 55 to form the first slab 110. The first slab 110 preferably has a thickness of 100 to 600 mm at the end of the continuous caster 55, with the
die erste Bramme 110 direkt der Vorwalzstraße 60 zugeführt wird. the first slab 110 is fed directly to the roughing train 60.
In einem zweiten Verfahrensschritt 210 wird in der Vorwalzstraße 60 der ersten Produktionslinie 15 die erste Bramme 110 durch die Vorwalzgerüste 115 zu dem ersten Vorband 116 heißgewalzt. Bei Verlassen der Vorwalzstraße 60 kann das erste Vorband 116 eine In a second method step 210, in the roughing train 60 of the first production line 15, the first slab 110 is hot-rolled through the roughing stands 115 to form the first roughing strip 116. When leaving the roughing train 60, the first sliver 116 can be a
Dicke von 15 bis 45 mm aufweisen. Have a thickness of 15 to 45 mm.
Das erste Vorband 116 wird durch die erste und zweite The first sliver 116 is through the first and second
Trenneinrichtung 65, 70 geführt. Die erste Trenneinrichtung 65 Separating device 65, 70 out. The first separator 65
15 15th
20 20th
25 25th
30 30th
35 35
201900302 14 201900302 14
dient dazu, beispielsweise bei einem Stillstand der Fertigwalzstraße 80, das zu dem ersten Vorband 116 gewalzte Material in einem dritten Verfahrensschritt 215 in Streifen zu trennen, die beispielsweise aufgewickelt und eingelagert werden, um einen kontinuierlichen Betrieb der Stranggießanlage 55 und der Vorwalzstraße 60 bei einem gleichzeitigen Stillstand der serves to separate the material rolled to the first pre-strip 116 into strips in a third process step 215, for example when the finishing rolling train 80 is at a standstill, which, for example, are wound up and stored in order to ensure continuous operation of the continuous caster 55 and the pre-rolling train 60 with simultaneous Standstill of
Fertigwalzstraße 80 sicherzustellen. Ensure finishing mill 80.
In dem ersten Betriebszustand 201 der ersten Produktionslinie 15 passiert jedoch das erste Vorband 116 die erste und zweite Trenneinrichtung 65, 70 und wird in einem vierten Verfahrensschritt 220 kontinuierlich durch die Zwischenheizung 75 zugeführt. Die Zwischenheizung 75 erwärmt in einem fünften Verfahrensschritt 225 das erste Vorband 116 von einer Temperatur von etwa 900°C, wenn die metallische Schmelze 105 im Wesentlichen Stahl aufweist, auf eine vordefinierte Fertigwalztemperatur von beispielsweise 1100°C bis 1200°C, In the first operating state 201 of the first production line 15, however, the first sliver 116 passes the first and second separating devices 65, 70 and is fed continuously through the intermediate heater 75 in a fourth method step 220. In a fifth method step 225, the intermediate heater 75 heats the first pre-strip 116 from a temperature of approximately 900 ° C., if the metallic melt 105 essentially comprises steel, to a predefined final rolling temperature of, for example, 1100 ° C. to 1200 ° C.,
In dem der Zwischenheizung 75 nachgeschalteten Entzunderer 76 kann Zunder in einem sechsten Verfahrensschritt 230 von einer Oberfläche des ersten Vorbands 116 entfernt, insbesondere In the descaler 76 connected downstream of the intermediate heater 75, scale can be removed, in particular, from a surface of the first pre-strip 116 in a sixth method step 230
abgewaschen, werden. washed off.
Die Fertigwalzstraße 80 walzt das erste Vorband 116 in einem siebten Verfahrensschritt 235 in einem Warmumformprozess von der Dicke von beispielsweise 15 bis 45 mm zu einem ersten Fertigband 145, das beispielsweise eine Dicke von 0,5 bis 12,5 mm bei The finishing rolling train 80 rolls the first pre-strip 116 in a seventh method step 235 in a hot forming process from a thickness of, for example, 15 to 45 mm to a first finished strip 145, which, for example, has a thickness of 0.5 to 12.5 mm
Verlassen der Fertigwalzstraße 80 aufweist. Having left the finishing train 80.
In einem achten Verfahrensschritt 240 wird nach Verlassen der Fertigwalzstraße 80 das erste Fertigband 145 durch die Küh-In an eighth method step 240, after leaving the finishing rolling train 80, the first finished strip 145 is passed through the cooling
leinrichtung 85 geführt, wobei die Kühleinrichtung 85 das erste Fertigband 145 von einer Temperatur von 800 bis 950°C auf eine Temperatur von über 170°C mit einer Kühlrate von mehr als 10 K/s abkühlt. Das erste Fertigband ist mit dem ersten Vorband 116 und L device 85 out, wherein the cooling device 85 cools the first finished strip 145 from a temperature of 800 to 950 ° C to a temperature of more than 170 ° C with a cooling rate of more than 10 K / s. The first finished strip is with the first pre-strip 116 and
mit der ersten Bramme 110 verbunden. connected to the first slab 110.
15 15th
20 20th
25 25th
30 30th
35 35
201900302 15 201900302 15
Am Ende der ersten Produktionslinie 15 wickelt die erste WiCkeleinrichtung 125 das erste Fertigband 145 in einem neunten Verfahrensschritt 245 zu einer ersten Coil 150 auf. Das Aufwickeln zu der ersten Coil 150 kann auf einer ersten Haspel oder einem ersten Dorn erfolgen. Auch ein dornloses Aufwickeln ist denkbar. At the end of the first production line 15, the first winding device 125 winds the first finished strip 145 in a ninth method step 245 into a first coil 150. The winding to form the first coil 150 can take place on a first reel or a first mandrel. A mandrel-free winding is also conceivable.
Wenn die erste Coil 150 fertig gewickelt ist, trennt die dritte Trenneinrichtung 90 in einem zehnten Verfahrensschritt 250 das aufgewickelte erste Fertigband 145 von dem durch die Kühleinrichtung 85 laufenden ersten Fertigband 145 ab. Das erste Fertigband 145 kann als erste Coil 150 mittels der Transporteinrichtung 20 in das Fertiglager 30 transportiert werden und When the first coil 150 has been completely wound, the third separating device 90 separates the wound first finished strip 145 from the first finished strip 145 running through the cooling device 85 in a tenth method step 250. The first finished strip 145 can be transported as the first coil 150 by means of the transport device 20 into the finished storage 30 and
dort weiter auf Umgebungstemperatur abgekühlt werden. there to be further cooled to ambient temperature.
Parallel zu dem ersten bis zehnten Verfahrensschritt 205 bis 250 werden im Brammenlager 35 eine Vielzahl von zweiten Brammen 130 gelagert. Die zweiten Brammen 130 können dabei eine Dicke von 100 bis 600 mm aufweisen. Vorzugsweise sind die zweiten Brammen 130 im Dünnbrammenformat oder im Mittelbrammenformat gegossen. Die zweiten Brammen 130 können beispielsweise auf einer nicht dargestellten weiteren Stranggießanlage gegossen worden sein. Von besonderem Vorteil ist, wenn die zweiten Brammen 130 beispielsweise zugekauft werden und mittels einer weiteren Stranggießanlage hergestellt worden sind, die sich außerhalb des Geländes 40 befindet. In parallel with the first to tenth method steps 205 to 250, a multiplicity of second slabs 130 are stored in the slab store 35. The second slabs 130 can have a thickness of 100 to 600 mm. The second slabs 130 are preferably cast in the thin slab format or in the medium slab format. The second slabs 130 can, for example, have been cast on a further continuous caster (not shown). It is particularly advantageous if the second slabs 130 are purchased, for example, and have been produced by means of a further continuous caster that is located outside the site 40.
Die zweiten Brammen 130 weisen den zweiten Werkstoff auf, wobei der zweite Werkstoff unterschiedlich zu dem ersten Werkstoff der ersten Bramme 110 sein kann. Auch kann der zweite Werkstoff der zweiten Bramme 130 im Wesentlichen identisch zu dem Werkstoff der ersten Bramme 110 sein. Insbesondere ist von Vorteil, wenn der zweite Werkstoff im Wesentlichen die gleiche Legierungszusammensetzung aufweist wie der erste Werkstoff. Ach kann der zweite Werkstoff eine Sonderlegierung sein und der erste The second slabs 130 have the second material, it being possible for the second material to be different from the first material of the first slab 110. The second material of the second slab 130 can also be essentially identical to the material of the first slab 110. It is particularly advantageous if the second material has essentially the same alloy composition as the first material. The second material can be a special alloy and the first
Werkstoff eine Standardlegierung. Material is a standard alloy.
15 15th
20 20th
25 25th
30 30th
35 35
201900302 16 201900302 16
Im Brammenlager 35 (vgl. FIG 1) werden die zweiten Brammen 130 bei der Umgebungstemperatur gelagert. Das Brammenlager 35 kann gegenüber der Umgebung hin offen oder als separates Gebäude ausgebildet sein. Je nach globaler Aufstellung der Produktionsanlage 10 weisen die zweiten Brammen 130 eine Temperatur von -30°C bis +60°C auf. Die zweiten Brammen 130 liegen beispielsweise wenigstens 12 Stunden, vorzugsweise wenigstens 24 Stunden, im Brammenlager 35 und nehmen die Umgebungstemperatur, In the slab store 35 (see FIG. 1), the second slabs 130 are stored at the ambient temperature. The slab store 35 can be open to the environment or designed as a separate building. Depending on the global setup of the production plant 10, the second slabs 130 have a temperature of -30 ° C to + 60 ° C. The second slabs 130 are, for example, at least 12 hours, preferably at least 24 hours, in the slab store 35 and take the ambient temperature,
die im Brammenlager 35 herrscht, an. which prevails in the slab store 35.
Die Produktionsanlage 10 wird vorzugsweise zum Umstellen vom ersten Betriebszustand 201 in den zweiten Betriebszustand 202 The production system 10 is preferably used to switch from the first operating state 201 to the second operating state 202
zeitweise in beiden Betriebszuständen 201, 202 betrieben. operated temporarily in both operating states 201, 202.
Im zweiten Betriebszustand 202 transportiert in einem elften Verfahrensschritt 255, der zeitgleich zu dem ersten bis zehnten Verfahrensschritt 205 bis 250 durchgeführt werden kann, die Brammenfördereinrichtung 50 die zweite Bramme 130 zu der Brammenheizung 95. Dazu kann der zweite Kran 51 eine oder mehrere zweite Brammen 130 aus dem Brammenlager 35 heben und zu dem zweiten Rollengang 52 transportieren. Der zweite Kran 51 kann die zweite Bramme 130 auf dem zweiten Rollengang 52 ablegen, wobei der zweite Rollengang 52 die zweite Bramme 130 zu der Brammenheizung 95 oder, falls vorgesehen, zu der Reinigungsein-In the second operating state 202, in an eleventh method step 255, which can be carried out at the same time as the first to tenth method steps 205 to 250, the slab conveying device 50 transports the second slab 130 to the slab heater 95 Lift it out of the slab store 35 and transport it to the second roller conveyor 52. The second crane 51 can place the second slab 130 on the second roller conveyor 52, the second roller conveyor 52 transferring the second slab 130 to the slab heater 95 or, if provided, to the cleaning unit.
richtung 106 fördert. direction 106 promotes.
In einem zwölften Verfahrensschritt 260, der auch zeitlich vor dem elften Verfahrensschritt erfolgen kann, wird die Brammenheizung 95 auf eine vordefinierte Betriebstemperatur vorgewärmt. Auf den zwölften Verfahrensschritt 260 kann auch In a twelfth method step 260, which can also take place before the eleventh method step, the slab heater 95 is preheated to a predefined operating temperature. The twelfth method step 260 can also
verzichtet werden. be waived.
In einem auf den zwölften Verfahrensschritt 260 folgenden dreizehnten Verfahrensschritt 265 wird die zweite Bramme 130 in der Reinigungseinrichtung 106 von Verschmutzungen, wie beispielsweise Staub und/oder Sand, beispielsweise durch einen Waschvorgang gereinigt. Überschüssige Reinigungsflüssigkeit In a thirteenth method step 265 following the twelfth method step 260, the second slab 130 in the cleaning device 106 is cleaned of dirt such as dust and / or sand, for example by a washing process. Excess cleaning fluid
kann beispielsweise in der Reinigungseinrichtung 106 abgeblasen can for example be blown off in the cleaning device 106
15 15th
20 20th
25 25th
30 30th
35 35
201900302 17 201900302 17
werden. Auch kann beispielsweise die zweite Bramme 130 mittels Druckluft gereinigt werden, um Anlagerungen von beispielsweise Sand und/oder Staub zu entfernen. Auf den dreizehnten Ver-become. For example, the second slab 130 can also be cleaned by means of compressed air in order to remove deposits of, for example, sand and / or dust. On the thirteenth
fahrensschritt 265 kann auch verzichtet werden. Step 265 can also be dispensed with.
In einem auf den dreizehnten Verfahrensschritt 265 folgenden vierzehnten Verfahrensschritt 270 wird die, gegebenenfalls gereinigte, zweite Bramme 130 der Brammenheizung 95 zugeführt. Von besonderem Vorteil ist, wenn der zwölfte und/oder dreizehnte Verfahrensschritt 260, 265 begonnen werden, wenn sich abzeichnet, dass die Stranggießanlage 55 außer Betrieb gesetzt wird und eine Herstellung der ersten Bramme 110 bzw. des ersten Vorbands 116 unterbrochen wird. Dies kann beispielsweise dann erfolgen, wenn der Konverter und/oder die Stranggießanlage 55 und/oder die Vorwalzstraße 60 gewartet werden muss, wobei die durchzuführende Wartung nicht im Laufenden Betrieb durchgeführt In a fourteenth method step 270 following the thirteenth method step 265, the possibly cleaned second slab 130 is fed to the slab heater 95. It is particularly advantageous if the twelfth and / or thirteenth method step 260, 265 is started when it becomes apparent that the continuous caster 55 will be put out of operation and production of the first slab 110 or the first pre-strip 116 will be interrupted. This can take place, for example, when the converter and / or the continuous caster 55 and / or the roughing train 60 have to be serviced, the servicing to be carried out not being carried out during operation
werden kann. can be.
Im vierzehnten Verfahrensschritt 270 erwärmt die Brammenheizung 95 die zweite Bramme 130 von der Umgebungstemperatur, beispielsweise -30°C bis +60°C, auf die vordefinierte Vorwalztemperatur, die abhängig von dem zweiten Werkstoff ist. So kann beispielsweise bei Stahl die vordefinierte Vorwalztemperatur beispielsweise 1100°C bis 1200°C betragen. Die Brammenheizung 95 erwärmt die zweite Bramme 130 derart auf die vordefinierte Vorwalztemperatur, dass die zweite Bramme 130 im Wesentlichen durchgewärmt ist und im Kern die vordefinierte Vorwalztemperatur In the fourteenth method step 270, the slab heater 95 heats the second slab 130 from the ambient temperature, for example -30 ° C. to + 60 ° C., to the predefined roughing temperature, which is dependent on the second material. For example, in the case of steel, the predefined roughing temperature can be 1100 ° C to 1200 ° C, for example. The slab heater 95 heats the second slab 130 to the predefined roughing temperature in such a way that the second slab 130 is substantially heated through and is essentially at the predefined roughing temperature
aufweist. having.
Auf die vordefinierte Vorwalztemperatur erwärmt wird die zweite Bramme 130 in einem auf den vierzehnten Verfahrensschritt 270 folgenden fünfzehnten Verfahrensschritt 275 der Brammenwalz-The second slab 130 is heated to the predefined roughing temperature in a fifteenth method step 275 of the slab rolling that follows the fourteenth method step 270.
straße 100 zugeführt. street 100 fed.
Die Brammenwalzstraße 100 kann reversierend betrieben werden, sodass die zu einem zweiten Vorband 155 zu walzende zweite Bramme 130 mehrfach in der zweiten Fördereinrichtung und entgegen-The slab rolling train 100 can be operated in a reversing manner, so that the second slab 130 to be rolled into a second pre-strip 155 multiple times in the second conveying device and in opposite directions.
gesetzt zur zweiten Fördereinrichtung durch die Brammenwalz-set to the second conveyor by the slab rolling
15 15th
20 20th
25 25th
30 30th
35 35
201900302 18 201900302 18
straße 100 geführt wird. Dadurch kann die Anzahl von Walzgerüsten der Brammenwalzstraße 100 gegenüber der Vorwalzstraße 60 reduziert sein. Auch kann die zweite Bramme 130 nur einmal durch die Brammenwalzstraße 100 geführt werden, sodass die zweite Bramme 130 zu dem zweiten Vorband 155 fertiggewalzt die street 100 is led. As a result, the number of rolling stands of the slab rolling train 100 can be reduced compared to the roughing rolling train 60. The second slab 130 can also be guided through the slab rolling train 100 only once, so that the second slab 130 is finish-rolled to form the second pre-strip 155
Brammenwalzstraße 100 verlässt. Exits slab rolling mill 100.
Beim Verlassen der Brammenwalzstraße 100 kann das zweite Vorband 155 eine Temperatur von etwa 900°C aufweisen. Das zweite Vorband 155 weist nach dem (Heiß-)Walzen in der Brammenwalzstraße 100 eine Dicke zwischen 15 und 45 mm auf. Das zweite Vorband 155 kann mittels der zweiten Wickeleinrichtung 140 zu einer zweiten Coil 160 in einem sechzehnten Verfahrensschritt 280 aufgewickelt When leaving the slab rolling train 100, the second sliver 155 can have a temperature of approximately 900 ° C. After the (hot) rolling in the slab rolling train 100, the second pre-strip 155 has a thickness between 15 and 45 mm. The second pre-strip 155 can be wound up by means of the second winding device 140 to form a second coil 160 in a sixteenth method step 280
werden. Das Wickeln des zweiten Vorbands 155 mittels der zweiten Wickeleinrichtung 140 kann dornlos erfolgen. Auch kann das zweite Vorband 155 auf einem zweiten Dorn oder einer zweiten Haspel become. The winding of the second pre-strip 155 by means of the second winding device 140 can take place without a mandrel. The second sliver 155 can also be on a second mandrel or a second reel
aufgewickelt werden. be wound up.
Bei einem Stillstand der Stranggießanlage 55 und/oder der Vorwalzstraße 60, beispielsweise wenn nicht genügend metallische Schmelze 105 vorhanden ist oder die Stranggießanlage 55 und/oder die Vorwalzstraße 60 und/oder der Konverter gewartet werden, transportiert in einem siebzehnten Verfahrensschritt 285 die Transporteinrichtung 20 das zur zweiten Coil 160 gewickelte zweite Vorband 155 von der zweiten Produktionslinie 25 zu der ersten Produktionslinie 15. Von Vorteil ist, wenn bei dem Transport der zweiten Coil 160 thermisch isoliert transportiert wird, um ein Auskühlen der zweiten Coil 160 zu vermeiden. Der Transport kann beispielsweise mittels des ersten Krans 21 und/oder des ersten Rollengangs und/oder des Coil-Transporters If the continuous caster 55 and / or the pre-rolling train 60 is at a standstill, for example if there is not enough metallic melt 105 or the continuous caster 55 and / or the pre-rolling train 60 and / or the converter are being serviced, the transport device 20 transports the in a seventeenth method step 285 Second pre-strip 155 wound to the second coil 160 from the second production line 25 to the first production line 15. It is advantageous if the second coil 160 is transported in a thermally insulated manner during transport in order to prevent the second coil 160 from cooling down. The transport can, for example, by means of the first crane 21 and / or the first roller conveyor and / or the coil transporter
erfolgen. respectively.
In einem achtzehnten Verfahrensschritt 290 wird die zweite Coil 160 an der ersten Produktionslinie 15 mittels des Abwicklers 66 abgewickelt und das zweite Vorband 155 vor der zweiten In an eighteenth method step 290, the second coil 160 is unwound on the first production line 15 by means of the unwinder 66 and the second pre-strip 155 is unwound before the second
Trenneinrichtung 70 in eine Transportebene des ersten Vorbands Separating device 70 in a transport plane of the first pre-strip
116 eingeführt. Das zweite Vorband 155 wird durch die zweite 116 introduced. The second sliver 155 is through the second
15 15th
20 20th
25 25th
30 30th
35 35
201900302 19 201900302 19
Trenneinrichtung 70 anstelle des ersten Vorbands 116 der Separating device 70 instead of the first sliver 116 of
Zwischenheizung 75 zugeführt. Intermediate heater 75 supplied.
Im Folgenden werden die oben beschriebenen fünften bis zehnten Verfahrensschritte 225 bis 250 für das zweite Vorband 155 zur In the following, the fifth to tenth method steps 225 to 250 described above for the second sliver 155 are used
Herstellung eines zweiten Fertigbands 170 ebenso durchgeführt. Production of a second finished strip 170 also carried out.
Im fünften Verfahrensschritt 225 erwärmt die Zwischenheizung 75 das zweite Vorband 155 auf eine weitere vordefinierte Fertigwalztemperatur. Die erste Fertigwalztemperatur und die weitere Fertigwalztemperatur können unterschiedlich oder identisch sein. Zusätzlich entfernt der Entzunderer 76 in dem sechsten Verfahrensschritt 230 Zunder von dem zweiten Vorband 155. Das zweite Vorband 155 wird in der Fertigwalzstraße 80 zu dem zweiten Fertigband 170 in dem siebten Verfahrensschritt 235 gewalzt, wobei das zweite Vorband 155 durch die mehreren zweiten Fertigwalzgerüste 120 fertiggewalzt wird. Dabei wird die Fertigwalzstraße 80 sowohl beim ersten Vorband 116 als auch beim zweiten Vorband 155 beispielhaft nicht reversierend, sondern mit der ersten Förderrichtung, nämlich von der Stranggießanlage 55 In the fifth method step 225, the intermediate heater 75 heats the second sliver 155 to a further predefined finishing rolling temperature. The first finishing rolling temperature and the further finishing rolling temperature can be different or identical. In addition, the descaler 76 removes scale from the second roughing strip 155 in the sixth method step 230. The second roughing strip 155 is rolled in the finishing train 80 to the second finishing strip 170 in the seventh method step 235, the second roughing strip 155 being finish-rolled by the multiple second finishing stands 120 becomes. In this case, the finishing rolling train 80 is not reversing, for example, both in the case of the first pre-strip 116 and in the second pre-strip 155, but with the first conveying direction, namely from the continuous caster 55
in Richtung der ersten Wickeleinrichtung 125, gewalzt. in the direction of the first winding device 125, rolled.
Nach Durchlaufen der Fertigwalzstraße 80 wird das zweite Fertigband 170 in der Kühleinrichtung 85 in dem achten Verfahrensschritt 240 abgekühlt und mittels der ersten WiCkeleinrichtung 125 zu einer dritten Coil 175 in dem neunten Verfahrensschritt 245 aufgewickelt. Wenn die dritte Coil 175 fertig gewickelt ist, trennt die dritte Trenneinrichtung 90 das aufgewickelte zweite Fertigband 170 in dem zehnten Verfahrensschritt 250 von dem in der Transportebene laufenden zweiten Fertigband 170 ab. After passing through the finishing rolling train 80, the second finished strip 170 is cooled in the cooling device 85 in the eighth method step 240 and wound up using the first winding device 125 to form a third coil 175 in the ninth method step 245. When the third coil 175 has been completely wound, the third separating device 90 separates the wound, second finished strip 170 in the tenth method step 250 from the second finished strip 170 running in the transport plane.
Der zweite Betriebszustand 202 der Produktionsanlage 10 wird solange aufrechterhalten bzw. der fünfte bis achtzehnte Verfahrensschritt 225 bis 290 werden so lange durchgeführt bzw. wiederholt, bis die Produktionsanlage 10 wieder im ersten Betriebszustand 201 betreibbar ist und der erste bis vierte Verfahrensschritt 205 bis 220 durchführbar ist. Dies kann The second operating state 202 of the production plant 10 is maintained or the fifth to eighteenth method steps 225 to 290 are carried out or repeated until the production plant 10 can be operated again in the first operating state 201 and the first to fourth method steps 205 to 220 can be carried out . This can
15 15th
20 20th
25 25th
30 30th
35 35
201900302 20 201900302 20
beispielsweise nach Abschluss der Wartungsarbeiten der Stranggießanlage 55 und/oder der Vorwalzstraße 60 und/oder des for example after completion of the maintenance work on the continuous caster 55 and / or the roughing mill 60 and / or the
Konverters sein. Be converter.
Diese Ausgestaltung und das Betriebsverfahren der oben beschriebenen Produktionsanlage 10 haben den Vorteil, dass auf eine zweite Stranggießanlage verzichtet werden kann, sodass die Produktionsanlage 10 besonders kostengünstig und effektiv This embodiment and the operating method of the production plant 10 described above have the advantage that a second continuous casting plant can be dispensed with, so that the production plant 10 is particularly cost-effective and effective
betrieben werden kann. can be operated.
Ferner kann zur Auslastung der Fertigwalzstraße 80 auf bereits hergestellte zweite Brammen 130 zurückgegriffen werden, Dadurch steht bei einer Wartung der Stranggießanlage 55 und/oder der Vorwalzstraße 60 und/oder des Konverters nur ein Teil der ersten Produktionslinie 15 still, während hingegen die zweite Produktionslinie 25 und der der zweiten Trenneinrichtung 70 nachgeordnete weitere Teil der ersten Produktionslinie 15 in Betrieb gehalten werden können. Dadurch kann ein Abkühlen, insbesondere der Zwischenheizung 75 und der Fertigwalzstraße 80, vermieden werden. Ferner eignet sich die in den FIGN 1 bis 3 gezeigte Produktionsanlage 10 insbesondere auch für Produktionsstätten, bei denen für den Betrieb einer weiteren Stranggießanlage nicht genügend Flüssigmetallkapazität vor-In addition, second slabs 130 that have already been produced can be used to utilize the finishing rolling train 80. As a result, during maintenance of the continuous caster 55 and / or the pre-rolling train 60 and / or the converter, only part of the first production line 15 is idle, while the second production line 25 and the further part of the first production line 15 downstream of the second separating device 70 can be kept in operation. As a result, cooling, in particular the intermediate heater 75 and the finishing train 80, can be avoided. Furthermore, the production plant 10 shown in FIGS. 1 to 3 is also particularly suitable for production plants in which there is not enough liquid metal capacity available for the operation of a further continuous casting plant.
handen ist. hand is.
FIG 5 zeigt eine schematische Darstellung einer Produktions-FIG 5 shows a schematic representation of a production
anlage 10 gemäß einer zweiten Ausführungsform. plant 10 according to a second embodiment.
Die Produktionsanlage 10 ist im Wesentlichen identisch zu der in den FIGN 1 bis 3 gezeigten Produktionsanlage 10 ausgebildet. Im Folgenden wird ausschließlich auf die Unterschiede der in FIG 5 gezeigten Produktionsanlage 10 gegenüber der in den FIGN 1 bis The production plant 10 is designed essentially identical to the production plant 10 shown in FIGS. 1 to 3. In the following, only the differences between the production plant 10 shown in FIG. 5 and that in FIGS
3 gezeigten Produktionsanlage 10 eingegangen. 3 shown production plant 10 received.
Auf dem Gelände 40 ist die erste Produktionslinie 15 in dem ersten Gebäude 45 untergebracht. Räumlich benachbart neben dem ersten Gebäude 45 ist ein zweites Gebäude 180 auf dem Gelände 40 The first production line 15 is housed in the first building 45 on the site 40. Spatially adjacent to the first building 45 is a second building 180 on the site 40
angeordnet. Unter räumlich benachbart wird verstanden, dass das arranged. Spatially adjacent is understood to mean that the
15 15th
20 20th
201900302 21 201900302 21
zweite Gebäude 180 sich auf dem Gelände 40 befindet und/oder ein weiterer minimaler Abstand a2 der Gebäude 40, 180 zueinander kleiner oder gleich 150 m, vorzugsweise kleiner oder gleich 100 m, insbesondere kleiner oder gleich 50 m, insbesondere kleiner oder gleich 30 m ist. Der weitere minimale Abstand a second building 180 is located on site 40 and / or another minimum distance a2 between buildings 40, 180 is less than or equal to 150 m, preferably less than or equal to 100 m, in particular less than or equal to 50 m, in particular less than or equal to 30 m . The further minimum distance a
beträgt wenigstens 10 m. is at least 10 m.
In dem weiteren Gebäude 180 ist die zweite Produktionslinie 25 untergebracht. Die Transporteinrichtung 20 verläuft zwischen der im ersten Gebäude 45 angeordneten ersten Produktionslinie 15 und der im zweiten Gebäude 180 angeordneten zweiten Produktionslinie 25. The second production line 25 is housed in the further building 180. The transport device 20 runs between the first production line 15 arranged in the first building 45 and the second production line 25 arranged in the second building 180.
Die in FIG 5 gezeigte Produktionsanlage 10 kann mit dem in FIG 4 beschriebenen Verfahren betrieben werden. Diese Ausgestaltung hat den Vorteil, dass das umbaute Volumen der Gebäude 45, 180 besonders gering ist und dadurch die Produktionsanlage 10 The production plant 10 shown in FIG. 5 can be operated with the method described in FIG. This refinement has the advantage that the enclosed volume of the buildings 45, 180 is particularly small and, as a result, the production plant 10
besonders kostengünstig ist. is particularly inexpensive.
15 15th
20 20th
25 25th
30 30th
35 35
201900302 201900302
22 22nd
Bezugszeichenliste List of reference symbols
10 Produktionsanlage 10 production plant
15 erste Produktionslinie 15 first production line
20 Transporteinrichtung 20 Transport device
21 erster Kran 21 first crane
22 erste Kranbahn 22 first crane runway
25 zweite Produktionslinie 25 second production line
30 Fertiglager 30 prefabricated stores
35 Brammenlager 35 slab store
40 Gelände 40 terrain
45 erstes Gebäude 45 first building
50 Brammenfördereinrichtung 50 slab conveyor
51 zweiter Kran 51 second crane
52 zweiter Rollengang 52 second roller conveyor
53 zweite Kranbahn 53 second crane runway
55 Stranggießanlage 55 continuous caster
60 Vorwalzstraße 60 roughing mill
65 erste Trenneinrichtung 65 first separator
66 Abwickler 66 unwinder
70 zweite Trenneinrichtung 70 second separator
75 Zwischenheizung 75 intermediate heating
76 Entzunderer 76 Descalers
80 Fertigwalzstraße 80 finishing mill
85 Kühleinrichtung 85 cooling device
90 dritte Trenneinrichtung 90 third separator
95 Brammenheizung 95 Slab heating
100 Brammenwalzstraße 100 slab rolling mill
105 metallische Schmelze 105 metallic melt
106 Reinigungseinrichtung 106 cleaning device
110 erste Bramme 110 first slab
115 Vorwalzgerüst 115 roughing mill
116 erstes Vorband 116 first opening act
120 Fertigwalzgerüst 120 finishing mill stands
125 erste Wickeleinrichtung 125 first winding device
130 zweite Bramme 130 second slab
135 Brammenwalzgerüst 135 Slab Mill
140 zweite Wickeleinrichtung 140 second winding device
15 15th
20 20th
25 25th
30 30th
201900302 201900302
144 145 150 155 160 161 165 170 175 180 201 202 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 144 145 150 155 160 161 165 170 175 180 201 202 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290
Pfanne pan
23 23
erstes Fertigband first finished tape
erste Coil first coil
zweites Vorband second opening act
zweite Coil second coil
vierte Trenneinrichtung fourth separator
Zwischenlager Interim storage
zweites Fertigband second finished tape
dritte Coil third coil
zweites Gebäude second building
erster Betriebszustand first operating status
zweiter Betriebszustand second operating state
erster Verfahrensschritt first procedural step
zweiter Verfahrensschritt second procedural step
dritter Verfahrensschritt third process step
vierter Verfahrensschritt fourth procedural step
fünfter Verfahrensschritt fifth procedural step
sechster Verfahrensschritt sixth procedural step
siebter Verfahrensschritt seventh procedural step
achter Verfahrensschritt eighth procedural step
neunter Verfahrensschritt ninth process step
zehnter Verfahrensschritt tenth procedural step
elfter Verfahrensschritt eleventh procedural step
zwölfter Verfahrensschritt twelfth process step
dreizehnter vierzehnter fünfzehnter sechzehnter siebzehnter thirteenth, fourteenth, fifteenth, sixteenth, seventeenth
achtzehnter eighteenth
Verfahrensschritt Verfahrensschritt Verfahrensschritt Verfahrensschritt Verfahrensschritt Process step Process step Process step Process step Process step
Verfahrensschritt Process step
24 / 34 24/34
Claims (12)
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ATA50100/2020A AT523062B1 (en) | 2020-02-11 | 2020-02-11 | Production plant and method for operating such a production plant |
ATA8003/2021A AT523790B1 (en) | 2020-02-11 | 2020-05-12 | switch arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ATA50100/2020A AT523062B1 (en) | 2020-02-11 | 2020-02-11 | Production plant and method for operating such a production plant |
Publications (2)
Publication Number | Publication Date |
---|---|
AT523062A4 true AT523062A4 (en) | 2021-05-15 |
AT523062B1 AT523062B1 (en) | 2021-05-15 |
Family
ID=74556865
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ATA50100/2020A AT523062B1 (en) | 2020-02-11 | 2020-02-11 | Production plant and method for operating such a production plant |
ATA8003/2021A AT523790B1 (en) | 2020-02-11 | 2020-05-12 | switch arrangement |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
ATA8003/2021A AT523790B1 (en) | 2020-02-11 | 2020-05-12 | switch arrangement |
Country Status (1)
Country | Link |
---|---|
AT (2) | AT523062B1 (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000051755A1 (en) * | 1999-03-04 | 2000-09-08 | Pohang Iron & Steel Co., Ltd. | Method of manufacturing hot rolled steel sheet using mini mill process |
DE10045085A1 (en) * | 2000-09-12 | 2002-04-04 | Siemens Ag | continuous casting and rolling |
WO2013046348A1 (en) * | 2011-09-28 | 2013-04-04 | 三菱日立製鉄機械株式会社 | Hot rolling facility |
WO2013046347A1 (en) * | 2011-09-28 | 2013-04-04 | 三菱日立製鉄機械株式会社 | Hot rolling equipment |
WO2013046345A1 (en) * | 2011-09-28 | 2013-04-04 | 三菱日立製鉄機械株式会社 | Hot rolling facility |
DE112011105560T5 (en) * | 2011-09-28 | 2014-05-15 | Mitsubishi-Hitachi Metals Machinery, Inc. | Hot rolling mill |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102015109579A1 (en) * | 2015-06-16 | 2016-12-22 | Abb Ag | Installation device for home or building installation technology with extended functionality |
WO2019012459A1 (en) * | 2017-07-13 | 2019-01-17 | Schneider Electric Industries Sas | A universal switch assembly with push and hold mechanism in multiple zones in pcba to facilitate switch function |
-
2020
- 2020-02-11 AT ATA50100/2020A patent/AT523062B1/en active
- 2020-05-12 AT ATA8003/2021A patent/AT523790B1/en active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2000051755A1 (en) * | 1999-03-04 | 2000-09-08 | Pohang Iron & Steel Co., Ltd. | Method of manufacturing hot rolled steel sheet using mini mill process |
DE10045085A1 (en) * | 2000-09-12 | 2002-04-04 | Siemens Ag | continuous casting and rolling |
WO2013046348A1 (en) * | 2011-09-28 | 2013-04-04 | 三菱日立製鉄機械株式会社 | Hot rolling facility |
WO2013046347A1 (en) * | 2011-09-28 | 2013-04-04 | 三菱日立製鉄機械株式会社 | Hot rolling equipment |
WO2013046345A1 (en) * | 2011-09-28 | 2013-04-04 | 三菱日立製鉄機械株式会社 | Hot rolling facility |
DE112011105560T5 (en) * | 2011-09-28 | 2014-05-15 | Mitsubishi-Hitachi Metals Machinery, Inc. | Hot rolling mill |
Also Published As
Publication number | Publication date |
---|---|
AT523790B1 (en) | 2022-07-15 |
AT523790A1 (en) | 2021-11-15 |
AT523062B1 (en) | 2021-05-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE3241745C2 (en) | Process for the production of hot-rolled steel strip from continuously cast raw material in directly successive work steps | |
EP0876856B1 (en) | High performance wire rolling mill | |
DE202011110779U1 (en) | Plant for the production of flat rolled products | |
EP0264459A1 (en) | Production of hot-rolled steel strip from continuously cast slabs | |
WO2007090455A1 (en) | Roller hearth furnace for heating and/or temperature equalisation of steel or steel alloy continuous cast products and arrangement thereof before a hot strip final rolling mill | |
WO2003039775A1 (en) | Method and casting/rolling mill for producing steel strips | |
WO2004004938A1 (en) | Method and casting roller plant for the semi-endless or endless rolling by casting of a metal in particular a steel strip which may be transversely separated as required after solidification | |
DE10304318B4 (en) | Process for rolling thin and / or thick slabs of steel materials to hot strip | |
DE4234454A1 (en) | Process and plant for the production of hot-rolled strips or profiles from continuously cast primary material | |
EP0595282B2 (en) | Method and installation for manufacturing hot-rolled steel strip, in particular from a continuously cast material | |
DE3743057C1 (en) | Process and plant for producing hot-rolled strip from continuously cast starting material | |
DE10109223C1 (en) | Process for operating a casting and rolling plant | |
DE102019207459A1 (en) | Casting mill for batch and continuous operation | |
EP3016762B1 (en) | Cast-rolling installation and method for producing metallic rolled stock | |
WO2016165933A1 (en) | Casting/rolling system and method for operating same | |
EP1641573B1 (en) | Device for producing a hot-rolled thermal strip, especially made of strip-type continuous casting material | |
AT523062B1 (en) | Production plant and method for operating such a production plant | |
WO2003068425A1 (en) | Method for the continuous rolling of a metal bar, particularly a steel bar, which is produced at a casting speed and the cross section of which is configured as a thin slab, and corresponding continuous casting machine | |
EP4351812A1 (en) | Method for producing a microalloyed steel, a microalloyed steel produced using the method, and a combined casting/rolling installation | |
EP2667983B1 (en) | Transporting system and method for transporting stock to be rolled between at least two processing lines | |
WO2000012235A1 (en) | Method and device for producing hot-rolled wide strip, notably from thin slabs | |
WO2023186471A1 (en) | Roll casting installation and method for operating same | |
DE202011050449U1 (en) | Hot Rolling Mill | |
EP4423303A1 (en) | Method for producing a dual-phase steel strip in a combined casting and rolling system, a dual-phase steel strip produced by means of the method, and a combined casting and rolling system | |
DE102009060828A1 (en) | Rolling mill for continuous rolling of strip-shaped rolling stock |