OA09004A - Process for producing hydrocarbon deposits with reinjection of effluents into the deposit or into the well (s) and installation for implementing said process. - Google Patents
Process for producing hydrocarbon deposits with reinjection of effluents into the deposit or into the well (s) and installation for implementing said process.Info
- Publication number
- OA09004A OA09004A OA58020A OA58020A OA09004A OA 09004 A OA09004 A OA 09004A OA 58020 A OA58020 A OA 58020A OA 58020 A OA58020 A OA 58020A OA 09004 A OA09004 A OA 09004A
- Authority
- OA
- OAPI
- Prior art keywords
- reinjection
- effluents
- deposit
- implementing
- installation
- Prior art date
Links
- 238000000034 method Methods 0.000 title 2
- 239000004215 Carbon black (E152) Substances 0.000 title 1
- 229930195733 hydrocarbon Natural products 0.000 title 1
- 150000002430 hydrocarbons Chemical class 0.000 title 1
- 238000009434 installation Methods 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/34—Arrangements for separating materials produced by the well
- E21B43/40—Separation associated with re-injection of separated materials
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Production Of Liquid Hydrocarbon Mixture For Refining Petroleum (AREA)
- Extraction Or Liquid Replacement (AREA)
- Sampling And Sample Adjustment (AREA)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR8118797A FR2514071B1 (en) | 1981-10-06 | 1981-10-06 | PROCESS FOR PRODUCING HYDROCARBON DEPOSITS WITH INJECTION OF EFFLUENTS INTO THE DEPOSIT OR IN THE WELL (S) AND INSTALLATION FOR CARRYING OUT SAID METHOD |
Publications (1)
Publication Number | Publication Date |
---|---|
OA09004A true OA09004A (en) | 1991-03-31 |
Family
ID=9262794
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
OA58020A OA09004A (en) | 1981-10-06 | 1983-06-06 | Process for producing hydrocarbon deposits with reinjection of effluents into the deposit or into the well (s) and installation for implementing said process. |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP0089986B1 (en) |
BR (1) | BR8207912A (en) |
DE (1) | DE3268173D1 (en) |
FR (1) | FR2514071B1 (en) |
NO (1) | NO832008L (en) |
OA (1) | OA09004A (en) |
WO (1) | WO1983001273A1 (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2545533B2 (en) * | 1983-05-06 | 1986-12-26 | Chaudot Gerard | INSTALLATION FOR THE PRODUCTION OF HYDROCARBON DEPOSITS WITH INJECTION OF EFFLUENTS INTO THE DEPOSIT OR IN THE WELL (S) AND METHOD FOR THE IMPLEMENTATION OF THIS INSTALLATION |
GB8326964D0 (en) * | 1983-10-08 | 1983-11-09 | Miller D P J | Downhole tool |
GB2235696A (en) * | 1989-09-06 | 1991-03-13 | Shell Int Research | Method of inhibiting asphalt precipitation in an oil production well |
WO1999031198A2 (en) * | 1997-12-18 | 1999-06-24 | Dogadin Oleg V | Plant for removing carbon dioxide from gases and method for the exploitation of said plant |
NO311103B1 (en) * | 2000-02-08 | 2001-10-08 | Jon Grepstad | Process for facilitating the separation of a crude oil stream and aqueous phase |
GB2371817A (en) * | 2000-05-31 | 2002-08-07 | Ingen Process Ltd | Method of providing artificial lift in a well |
NO315990B1 (en) * | 2000-08-31 | 2003-11-24 | Abb Research Ltd | Method and system for injecting gas into a reservoir |
GB2377711A (en) * | 2001-07-20 | 2003-01-22 | Ingen Process Ltd | Thinning of crude oil in a bore well |
US10323495B2 (en) | 2016-03-30 | 2019-06-18 | Exxonmobil Upstream Research Company | Self-sourced reservoir fluid for enhanced oil recovery |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH180358A (en) * | 1935-01-09 | 1935-10-31 | Embru Werke Ag | Table with a height-adjustable table top. |
US2412765A (en) * | 1941-07-25 | 1946-12-17 | Phillips Petroleum Co | Recovery of hydrocarbons |
US2368748A (en) * | 1943-02-19 | 1945-02-06 | Hard Mfg Company | Over-bed table |
US3223157A (en) * | 1963-04-09 | 1965-12-14 | Exxon Production Research Co | Oil recovery process |
US3352355A (en) * | 1965-06-23 | 1967-11-14 | Dow Chemical Co | Method of recovery of hydrocarbons from solid hydrocarbonaceous formations |
US3780805A (en) * | 1971-09-07 | 1973-12-25 | W Green | Viscous oil recovery system |
US4008764A (en) * | 1974-03-07 | 1977-02-22 | Texaco Inc. | Carrier gas vaporized solvent oil recovery method |
DE2926759A1 (en) * | 1979-07-03 | 1981-01-22 | Peter Heckmann | Table leg height adjustment system - consists of one toothed rack section with cog wheel, accommodated inside second leg section |
-
1981
- 1981-10-06 FR FR8118797A patent/FR2514071B1/en not_active Expired
-
1982
- 1982-10-05 WO PCT/FR1982/000161 patent/WO1983001273A1/en active IP Right Grant
- 1982-10-05 BR BR8207912A patent/BR8207912A/en unknown
- 1982-10-05 EP EP82902906A patent/EP0089986B1/en not_active Expired
- 1982-10-05 DE DE8282902906T patent/DE3268173D1/en not_active Expired
-
1983
- 1983-06-03 NO NO832008A patent/NO832008L/en unknown
- 1983-06-06 OA OA58020A patent/OA09004A/en unknown
Also Published As
Publication number | Publication date |
---|---|
BR8207912A (en) | 1983-09-13 |
EP0089986A1 (en) | 1983-10-05 |
DE3268173D1 (en) | 1986-02-06 |
FR2514071B1 (en) | 1986-09-26 |
EP0089986B1 (en) | 1985-12-27 |
NO832008L (en) | 1983-06-03 |
FR2514071A1 (en) | 1983-04-08 |
WO1983001273A1 (en) | 1983-04-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FR2596320B1 (en) | PROCESS FOR FORMING A PROTECTIVE COATING ON THE INTERIOR SURFACE OF A PIPE, DEVICE FOR IMPLEMENTING SAME AND TREATED PIPE ACCORDING TO SAID METHOD | |
BE888359A (en) | METHOD AND INSTALLATION FOR INTERNAL TRIM OF A PIPE, | |
FR2498676B1 (en) | LOCKING CHUCK FOR WELL DRAIN PIPE | |
FR2630196B1 (en) | INSULATED FLUID ACCUMULATION UNIT, ESPECIALLY A WATER HEATER, AND METHOD FOR THE PRODUCTION THEREOF | |
OA07239A (en) | Novel zirconium crosslinking agents, aqueous fracturing fluid containing them, and corresponding process for the fracturing of subterranean formations. | |
FR2557195B1 (en) | METHOD FOR FORMING A FLUID BARRIER USING INCLINED DRAINS, ESPECIALLY IN AN OIL DEPOSIT | |
FR2505345B1 (en) | WATER-REPELLENT AND OIL-REFUSING COATINGS AND PROCESS FOR PREPARING THE SAME | |
OA09004A (en) | Process for producing hydrocarbon deposits with reinjection of effluents into the deposit or into the well (s) and installation for implementing said process. | |
DZ1402A1 (en) | Process for the removal of mercury and possibly arsenic from hydrocarbons. | |
DZ983A1 (en) | Method for preventing the entry of water into an oil and / or gas producing well. | |
FR2500147B1 (en) | DEVICE FOR LOCKING THE CYLINDER HEAD OF A FIREARMS, SUCH AS A SHOTGUN, AND METHOD FOR THE PRODUCTION THEREOF | |
FR2615523B1 (en) | PROCESS FOR HYDROCRACKING A HYDROCARBON CHARGE AND HYDROCRACKING INSTALLATION FOR CARRYING OUT SAID METHOD | |
FR2611803B1 (en) | PROCESS FOR THE SELECTIVE REDUCTION OF VENUES OF WATER IN WELLS PRODUCING OIL OR GAS | |
OA07104A (en) | Process for placing a zone of consolidated particles in a well and composition used for this process. | |
FR2511698B1 (en) | TUBE FOR THE THERMAL CRACKING OR REFORMING OF HYDROCARBONS AND ITS MANUFACTURING METHOD | |
FR2513732B1 (en) | PROCESS FOR THE PRODUCTION OF A SEALED INTERIOR COATING ON PIPES OF A PIPE AND CRACK FILLER FOR APPLYING THIS PROCESS | |
MA21468A1 (en) | PROCESS FOR THE RECOVERY OF SEWAGE SLUDGE. | |
FR2601999B1 (en) | PROCESS FOR PRODUCING A COATING WALL ON THE PERIPHERAL SURFACE OF A TUNNEL AND FORMWORK STRUCTURE FOR IMPLEMENTING THIS PROCESS | |
FR2545533B2 (en) | INSTALLATION FOR THE PRODUCTION OF HYDROCARBON DEPOSITS WITH INJECTION OF EFFLUENTS INTO THE DEPOSIT OR IN THE WELL (S) AND METHOD FOR THE IMPLEMENTATION OF THIS INSTALLATION | |
OA07957A (en) | A method of constructing a drilled well, mainly a well for producing water, and well equipment for carrying out this method. | |
FR2611151B1 (en) | DEVICE FOR PREHEATING AND / OR SEALING AND UNCOUPLING A CASTING ORIFICE AND METHOD FOR ITS IMPLEMENTATION | |
BE893869A (en) | PROCESS OF OPERATING A DRYER-IRONER WITH HEATED BOWL (S) AND DRYER-IRONER FOR IMPLEMENTING IT | |
OA07818A (en) | Installation for bringing hydrocarbon deposits into production with reinjection of effluents into the deposit or into the well or wells and method for using this installation. | |
FR2518565B1 (en) | TUBE FOR THERMAL CRACKING OR HYDROCARBON REFORMING | |
FR2517572B1 (en) | PROCESS FOR ASSEMBLING A TUBE WITH A HOLE WALL AND DEVICE FOR CARRYING OUT SAID METHOD |