Sugimoto et al., 2016 - Google Patents
4D CAD-based evaluation system for crane deployment plans in construction of nuclear power plantsSugimoto et al., 2016
- Document ID
- 2193411575912699053
- Author
- Sugimoto Y
- Seki H
- Samo T
- Nakamitsu N
- Publication year
- Publication venue
- Automation in Construction
External Links
Snippet
To optimize a crane deployment plan is an important problem to reduce construction cost. Previous researches focused on developing methods to find an optimal crane deployment plan automatically, which minimizes total operating time under physical constraints such as …
- 238000010276 construction 0 title abstract description 57
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
- G06F17/5018—Computer-aided design using simulation using finite difference methods or finite element methods
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5004—Architectural design, e.g. building design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
- G06F2217/34—Pipes
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/05—Geographic models
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
- G06F2217/04—CAD in a network environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
- G06F2217/74—Symbolic schematics
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
- G06F2217/02—Component-based CAD
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/30—Creation or generation of source code
- G06F8/34—Graphical or visual programming
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Scherer et al. | BIMification: How to create and use BIM for retrofitting | |
Sugimoto et al. | 4D CAD-based evaluation system for crane deployment plans in construction of nuclear power plants | |
Moon et al. | Development of workspace conflict visualization system using 4D object of work schedule | |
Banihashemi et al. | Integration of parametric design into modular coordination: A construction waste reduction workflow | |
Sanchez et al. | Deconstruction programming for adaptive reuse of buildings | |
Popov et al. | The use of a virtual building design and construction model for developing an effective project concept in 5D environment | |
Kim et al. | BIM-based decision-support method for master planning of sustainable large-scale developments | |
Lee et al. | BIM-assisted labor productivity measurement method for structural formwork | |
Cheng et al. | Dynamic construction material layout planning optimization model by integrating 4D BIM | |
Chen et al. | A framework for an automated and integrated project scheduling and management system | |
Candelario-Garrido et al. | A quantitative analysis on the feasibility of 4D planning graphic systems versus conventional systems in building projects | |
König et al. | Intelligent BIM-based construction scheduling using discrete event simulation | |
Wang et al. | BIM-based draft schedule generation in reinforced concrete-framed buildings | |
Zavari et al. | Multi-objective optimization of dynamic construction site layout using BIM and GIS | |
Jongeling et al. | Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models | |
Wu et al. | Intelligent optimal design of floor tiles: A goal-oriented approach based on BIM and parametric design platform | |
Shah | A new approach for automation of location-based earthwork scheduling in road construction projects | |
Venkrbec et al. | Construction process optimisation–review of methods, tools and applications | |
Faghirinejadfard et al. | Economic comparison of industrialized building system and conventional construction system using building information modeling | |
Altun et al. | A method for facilitating 4D modeling by automating task information generation and mapping | |
Isaac et al. | Work-path modeling and spatial scheduling with singularity functions | |
Fazeli et al. | Automated 4D BIM development: The resource specification and optimization approach | |
Valinejadshoubi et al. | Automated system for high-accuracy quantity takeoff using BIM | |
Marzouk et al. | Applications of building information modeling in cost estimation of infrastructure bridges | |
Kuzminykh et al. | 4D and 5D design processes automation using databases, classification and applied programming |