Scherer et al., 2018 - Google Patents
BIMification: How to create and use BIM for retrofittingScherer et al., 2018
- Document ID
- 4169583237470877807
- Author
- Scherer R
- Katranuschkov P
- Publication year
- Publication venue
- Advanced Engineering Informatics
External Links
Snippet
Abstract Building Information Modeling (BIM) is rapidly advancing as an efficient new approach to cooperative building design and construction. However, BIM methodology is still mainly developed and applied for new building projects. The strong societal needs to …
- 238000009420 retrofitting 0 title abstract description 48
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5009—Computer-aided design using simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5086—Mechanical design, e.g. parametric or variational design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
- G06F17/5004—Architectural design, e.g. building design
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/08—Construction
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F2217/00—Indexing scheme relating to computer aided design [CAD]
- G06F2217/34—Pipes
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B15/00—Systems controlled by a computer
- G05B15/02—Systems controlled by a computer electric
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Scherer et al. | BIMification: How to create and use BIM for retrofitting | |
GhaffarianHoseini et al. | Application of nD BIM Integrated Knowledge-based Building Management System (BIM-IKBMS) for inspecting post-construction energy efficiency | |
Utkucu et al. | Interoperability and data exchange within BIM platform to evaluate building energy performance and indoor comfort | |
Kamel et al. | Review of BIM's application in energy simulation: Tools, issues, and solutions | |
Rane et al. | Development of project risk management framework based on industry 4.0 technologies | |
Santos et al. | Bibliometric analysis and review of Building Information Modelling literature published between 2005 and 2015 | |
Park et al. | BIM-based idea bank for managing value engineering ideas | |
Porwal et al. | The integration of building information modeling (BIM) and system dynamic modeling to minimize construction waste generation from change orders | |
González et al. | Improving planning reliability and project performance using the reliable commitment model | |
Rahimian et al. | Industry 4.0 solutions for building design and construction: a paradigm of new opportunities | |
Hiyama et al. | A new method for reusing building information models of past projects to optimize the default configuration for performance simulations | |
Xie et al. | Knowledge map and forecast of digital twin in the construction industry: State-of-the-art review using scientometric analysis | |
Begić et al. | Digitalization and automation in construction project's life-cycle: a review. | |
Sugimoto et al. | 4D CAD-based evaluation system for crane deployment plans in construction of nuclear power plants | |
Gourlis et al. | A holistic digital twin simulation framework for industrial facilities: BIM-based data acquisition for building energy modeling | |
Geyer et al. | Component-based machine learning for energy performance prediction by MultiLOD models in the early phases of building design | |
Fedorik et al. | Integration of BIM and FEA in automation of building and bridge engineering design | |
Jongeling | A process model for work-flow management in construction | |
Raffee et al. | Building sustainability assessment framework based on building information modelling | |
Inzerillo et al. | Exploring 4d and 5d Analysis in BIM Environment for Infrastructures: A Case Study | |
Myers et al. | Thriving Smart Cities | |
Wang et al. | Digital Twin Technologies in Transportation Infrastructure Management | |
Jongeling et al. | nD modelling in the development of cast in place concrete structures | |
Isik et al. | Operationalising concepts of digital twins on different maturity levels (foetal, child, adult) for the architectural design process | |
Liao et al. | Improving construction schedule and cost information feedback in building information modelling |