Zhang et al., 2020 - Google Patents
Construction progress control system of assembled building based on BIMZhang et al., 2020
- Document ID
- 1946144463000296761
- Author
- Zhang T
- Man Q
- Publication year
- Publication venue
- International Conference on Construction and Real Estate Management 2020
External Links
Snippet
At present, the construction industry is still faced with such prominent problems as large resource consumption, low construction efficiency, and rising labor demand, thus the industrial architecture reappeared in our vision. However, the development of prefabricated …
- 238000010276 construction 0 title abstract description 76
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Song et al. | Lean construction implementation and its implication on sustainability: a contractor’s case study | |
Getuli et al. | A BIM-based construction supply chain framework for monitoring progress and coordination of site activities | |
CN109583149A (en) | Super large lid rolling stock section in-depth modernization system and its construction method based on BIM management | |
CN106997511A (en) | Railway beam yard management system and railway beam yard management method based on BIM technology | |
CN104680321A (en) | BIM technology-based visual material control system and method | |
Begić et al. | Digitalization and automation in construction project's life-cycle: a review. | |
Sergei et al. | An interactive construction project for method of statement based on BIM technologies for high-speed modular building | |
Wu et al. | BIM-based estimation of vertical transportation demands during the construction of high-rise buildings | |
Rui et al. | Construction project management based on building information modeling (Bim) | |
Azman et al. | Factors affecting quality management of construction project using industrialized building system: A review | |
Shen et al. | Research on the rework risk core tasks in prefabricated construction in China | |
Ko et al. | Making formwork design lean | |
CN109784693B (en) | Three-dimensional dynamic production management system for prefabricated part field | |
Yang | Application of BIM during lean construction of high-rise buildings | |
Marx et al. | Modeling and simulating spatial requirements of construction activities | |
Zhang et al. | Construction progress control system of assembled building based on BIM | |
Liao et al. | Application of BIM technology in the design of prefabricated architecture | |
Mourgues et al. | A work instruction template for cast-in-place concrete construction laborers | |
Rong | Research on optimization of prefabricated construction building process based on bim technology | |
Wu et al. | Automatic generation of the vertical transportation demands during the construction of high-rise buildings using BIM | |
Zhang et al. | A review of the application of BIM in the assembly construction | |
He | Research on the Application of BIM Technology in Prefabricated Building Construction | |
Koroteev et al. | Cost analysis of the combined application of 3D-printing and BIM technologies in the construction industry | |
Kim et al. | Real-time progress management system for steel structure construction | |
Ting et al. | Identification of significant factors impacting precast utilization in Cambodia construction industry |