Zhou et al., 2022 - Google Patents
Timetable Rescheduling for High-Speed Railways under Temporary Segment Blockage based on Genetic Simulated Annealing AlgorithmZhou et al., 2022
- Document ID
- 1869798094793498485
- Author
- Zhou M
- Liu Y
- Mo H
- Shang J
- Dong H
- Publication year
- Publication venue
- 2022 China Automation Congress (CAC)
External Links
Snippet
In case of temporary segment blockage due to server weather, equipment failure, and other factors, the dispatcher shall arrange for affected trains to stop at nearby stations as soon as possible. After the segment recovers its capacity, the delayed trains will be organized …
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central traffic control systems; Track-side control or specific communication systems
- B61L27/0011—Regulation, e.g. scheduling, time tables
- B61L27/0027—Track-side optimisation of vehicle or vehicle train operation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Yin et al. | Research and development of automatic train operation for railway transportation systems: A survey | |
CN109733445B (en) | Distributed scheduling method based on multi-agent system model under emergency | |
CN114312926B (en) | Method and system for optimizing operation adjustment scheme of urban rail transit train | |
Bai et al. | Cooperative control of metro trains to minimize net energy consumption | |
CN112706803B (en) | Automatic subway train rescue adjusting method and system | |
Dai et al. | Dynamic scheduling, operation control and their integration in high-speed railways: A review of recent research | |
Zhou et al. | Integrated timetable rescheduling for multidispatching sections of high-speed railways during large-scale disruptions | |
Li et al. | Joint optimization of delay-recovery and energy-saving in a metro system: A case study from China | |
Yang et al. | An efficient train timetable scheduling approach with regenerative-energy supplementation strategy responding to potential power interruptions | |
Chen et al. | An Integrated Train Scheduling Optimization Approach for Virtual Coupling Trains | |
Zhou et al. | Timetable Rescheduling for High-Speed Railways under Temporary Segment Blockage based on Genetic Simulated Annealing Algorithm | |
Long et al. | A train rescheduling optimization model with considering the train control for a high-speed railway line under temporary speed restriction | |
Chen et al. | Enhancing Subway Efficiency on Y-Shaped Lines: A Dynamic Scheduling Model for Virtual Coupling Train Control | |
Zhou et al. | Integrated optimization of dispatching decision and speed trajectory for high-speed railway under disturbances | |
Zhao et al. | Train scheduling with flexible coupling and decoupling at stations for an urban rail transit line | |
Yu et al. | Dynamic scheduling method of high-speed trains based on improved particle swarm optimization | |
CN117382704A (en) | Method for collaborative adjustment of passenger-cargo collinear down-take connection and train operation diagram | |
Yin et al. | Mixed-integer linear programming models for coordinated train timetabling with dynamic demand | |
CN113619655B (en) | Method and system for controlling train late point to propagate in road network based on operation diagram | |
Wu | A mixed integer nonlinear optimization model to coordinate passenger inflow control with train skip-stopping on an over-saturated metro line | |
Shang et al. | Hybrid Strategy based Timetable Rescheduling for High-Speed Railways under Disturbances | |
RU2511742C1 (en) | Dispatch control over train motion at its approach to occupied track section and system to this end | |
Liu et al. | A driving strategy based integrated rescheduling Model for high-Speed railway by using the parallel intelligent method | |
Ji et al. | A Robust Optimization Approach for Trains Schedule Problem under Uncertain Maintenance Plans | |
Yang et al. | Moving Block System based Dispatching Method with Optimized Speed in case of Segment Blockages |