Gunduz et al., 2015 - Google Patents
An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysisGunduz et al., 2015
View PDF- Document ID
- 17852699662988501408
- Author
- Gunduz M
- Sahin H
- Publication year
- Publication venue
- Journal of Civil Engineering and Management
External Links
Snippet
Energy is increasingly becoming more important in today's world, whereas energy sources are drastically decreasing. One of the most valuable energy sources is hydro energy. Because of limited energy sources and excessive energy usage, cost of energy is rising …
- 230000001537 neural 0 title abstract description 30
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Gunduz et al. | An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis | |
Shaktawat et al. | Risk management of hydropower projects for sustainable development: a review | |
Borunda et al. | Bayesian networks in renewable energy systems: A bibliographical survey | |
Xu et al. | Short‐term inflow forecasting using an artificial neural network model | |
More et al. | Forecasting wind with neural networks | |
Bordin et al. | Machine learning for hydropower scheduling: State of the art and future research directions | |
Ioannou et al. | Stochastic financial appraisal of offshore wind farms | |
Babaei et al. | Risk assessment of agricultural water conveyance and delivery systems by fuzzy fault tree analysis method | |
KR20170127087A (en) | Method for Management of River Facility through River Diagnosis and System thereof | |
Bousquet et al. | Bayesian gamma processes for optimizing condition‐based maintenance under uncertainty | |
Bøhm et al. | Simple models for operational optimisation | |
Majumder et al. | Real time reliability monitoring of hydro‐power plant by combined cognitive decision‐making technique | |
Elkharbotly et al. | Toward sustainable water: prediction of non-revenue water via artificial neural network and multiple linear regression modelling approach in Egypt | |
Baccarini | The maturing concept of estimating project cost contingency: A review | |
Olofintoye et al. | Real-time optimal water allocation for daily hydropower generation from the Vanderkloof dam, South Africa | |
Ruliandi | Geothermal power plant system performance prediction using artificial neural networks | |
Bubtiena et al. | Application of artificial neural networks in modeling water networks | |
Ahmad et al. | Efficient energy planning with decomposition-based evolutionary neural networks | |
Kumar et al. | Application of artificial intelligence for the optimization of hydropower energy generation | |
Parvizsedghy et al. | Deterioration assessment models for water pipelines | |
Preis et al. | Online hydraulic state prediction for water distribution systems | |
Majumder et al. | Real-time monitoring of power production in modular hydropower plant: most significant parameter approach | |
Bozorg-Haddad et al. | Choosing an optimization method for water resources problems based on the features of their solution spaces | |
Majazi Dalfard et al. | Incorporating the effects of hike in energy prices into energy consumption forecasting: a fuzzy expert system | |
Łangowski et al. | Optimised robust placement of hard quality sensors for robust monitoring of quality in drinking water distribution systems |