[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Bøhm et al., 2002 - Google Patents

Simple models for operational optimisation

Bøhm et al., 2002

View PDF
Document ID
16942077046101582482
Author
Bøhm B
Ha S
Kim W
Kim B
Koljonen T
Larsen H
Lucht M
Park Y
Sipilä K
Wigbels M
Wistbacka M
Publication year
Publication venue
Contract

External Links

Snippet

Conclusions The neural network method works in forecasting the state of DH network like a simulation. However, the method needs further development to take care of the time delay, especially for a step response of the supply temperature. Based on physical simulations of …
Continue reading at www.academia.edu (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06FELECTRICAL DIGITAL DATA PROCESSING
    • G06F17/00Digital computing or data processing equipment or methods, specially adapted for specific functions
    • G06F17/50Computer-aided design
    • G06F17/5009Computer-aided design using simulation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S40/00Communication or information technology specific aspects supporting electrical power generation, transmission, distribution or end-user application management
    • Y04S40/20Information technology specific aspects
    • Y04S40/22Computer aided design [CAD]; Simulation; Modelling
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B17/00Systems involving the use of models or simulators of said systems
    • G05B17/02Systems involving the use of models or simulators of said systems electric
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B13/00Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
    • G05B13/02Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
    • G05B13/04Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"

Similar Documents

Publication Publication Date Title
Bøhm et al. Simple models for operational optimisation
Hosseini et al. Optimal planning and operation of multi-vector energy networks: A systematic review
Mahbub et al. Combining multi-objective evolutionary algorithms and descriptive analytical modelling in energy scenario design
Teegavarapu et al. Short-term operation model for coupled hydropower reservoirs
Baviere et al. Optimal control of district heating systems using dynamic simulation and mixed integer linear programming
Gunduz et al. An early cost estimation model for hydroelectric power plant projects using neural networks and multiple regression analysis
CN110795845B (en) Heat supply system margin quantitative calculation method and system
Reis et al. A review of operational control strategies in water supply systems for energy and cost efficiency
Fischetti et al. Vattenfall optimizes offshore wind farm design
Kim et al. Optimization models for the cost-effective design and operation of renewable-integrated energy systems
Hidalgo et al. Efficiency curves for hydroelectric generating units
De Oliveira et al. Optimization model for economic evaluation of wind farms-How to optimize a wind Energy project economically and technically
Pálsson Methods for planning and operating decentralized combined heat and power plants
Gardumi A multi-dimensional approach to the modelling of power plant flexibility
Leobner Modeling of energy systems for complex simulations
Heidarzade et al. Placement of wind farms based on a hybrid multi criteria decision making for Iran
Alzbutas et al. Uncertainty and sensitivity analysis for economic optimisation of new energy source in Lithuania
Wu et al. Neural Network Based Fea sible Region Approximation Model for Optimal Operation of Integrated Electricity and Heating System
Corbus et al. Eastern wind integration and transmission study--preliminary findings
Horn et al. Solar hybrid heating & cooling systems on district level–The Austrian project CiQuSo
Zlotnik et al. Assessing risk of gas shortage in coupled gas-electricity infrastructures
Schwarz Energy, economic and quality of service assessment using dynamic modelling and optimization for smart management of district heating networks
Knight et al. GTPOM: thermo-economic optimization of whole gas turbine plant
Lu et al. A multiobjective evaluation method for short‐term hydrothermal scheduling
Parrado-Hernando et al. Method to Model the Hourly Variability of Renewable Energy Sources in Integrated Assessment Models.