[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Kaveshgar et al., 2015 - Google Patents

Integrated quay crane and yard truck scheduling for unloading inbound containers

Kaveshgar et al., 2015

Document ID
16871017480087578949
Author
Kaveshgar N
Huynh N
Publication year
Publication venue
International Journal of Production Economics

External Links

Snippet

To lower vessel turn time, it is crucial that the operations of quay cranes, yard trucks, and yard cranes are well coordinated. Most studies have sought to optimize each of these processes independently. Since the operations by quay cranes and yard trucks are highly …
Continue reading at www.sciencedirect.com (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders

Similar Documents

Publication Publication Date Title
Kaveshgar et al. Integrated quay crane and yard truck scheduling for unloading inbound containers
Yang et al. An integrated scheduling method for AGV routing in automated container terminals
Tang et al. Modeling and solution of the joint quay crane and truck scheduling problem
Chen et al. A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal
Nishimura et al. Container storage and transshipment marine terminals
Chen et al. Integrated scheduling of crane handling and truck transportation in a maritime container terminal
Hu et al. A three-stage decomposition method for the joint vehicle dispatching and storage allocation problem in automated container terminals
Kizilay et al. Constraint programming models for integrated container terminal operations
Roy et al. Stochastic modeling of unloading and loading operations at a container terminal using automated lifting vehicles
Robenek et al. A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports
Lu et al. A study on multi-ASC scheduling method of automated container terminals based on graph theory
Cao et al. Integrated quay crane and yard truck schedule problem in container terminals
He et al. A hybrid parallel genetic algorithm for yard crane scheduling
Skinner et al. Optimisation for job scheduling at automated container terminals using genetic algorithm
Hop et al. Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem
Guan et al. The crane scheduling problem: models and solution approaches
Zhuang et al. Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals
Yan et al. An investigation into knowledge-based yard crane scheduling for container terminals
Petering Real-time container storage location assignment at an RTG-based seaport container transshipment terminal: problem description, control system, simulation model, and penalty scheme experimentation
Naeem et al. A comprehensive review and directions for future research on the integrated scheduling of quay cranes and automated guided vehicles and yard cranes in automated container terminals
Xu et al. Load-in-load-out AGV route planning in automatic container terminal
Zhang et al. Optimization for two-stage double-cycle operations in container terminals
Hu et al. Optimal strategies for the yard truck scheduling in container terminal with the consideration of container clusters
Liang et al. A multi-objective genetic algorithm for yard crane scheduling problem with multiple work lines
Kaoud et al. Scheduling problems of automated guided vehicles in job shop, flow shop, and container terminals