Kaveshgar et al., 2015 - Google Patents
Integrated quay crane and yard truck scheduling for unloading inbound containersKaveshgar et al., 2015
- Document ID
- 16871017480087578949
- Author
- Kaveshgar N
- Huynh N
- Publication year
- Publication venue
- International Journal of Production Economics
External Links
Snippet
To lower vessel turn time, it is crucial that the operations of quay cranes, yard trucks, and yard cranes are well coordinated. Most studies have sought to optimize each of these processes independently. Since the operations by quay cranes and yard trucks are highly …
- 238000000034 method 0 abstract description 23
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Kaveshgar et al. | Integrated quay crane and yard truck scheduling for unloading inbound containers | |
Yang et al. | An integrated scheduling method for AGV routing in automated container terminals | |
Tang et al. | Modeling and solution of the joint quay crane and truck scheduling problem | |
Chen et al. | A tabu search algorithm for the integrated scheduling problem of container handling systems in a maritime terminal | |
Nishimura et al. | Container storage and transshipment marine terminals | |
Chen et al. | Integrated scheduling of crane handling and truck transportation in a maritime container terminal | |
Hu et al. | A three-stage decomposition method for the joint vehicle dispatching and storage allocation problem in automated container terminals | |
Kizilay et al. | Constraint programming models for integrated container terminal operations | |
Roy et al. | Stochastic modeling of unloading and loading operations at a container terminal using automated lifting vehicles | |
Robenek et al. | A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports | |
Lu et al. | A study on multi-ASC scheduling method of automated container terminals based on graph theory | |
Cao et al. | Integrated quay crane and yard truck schedule problem in container terminals | |
He et al. | A hybrid parallel genetic algorithm for yard crane scheduling | |
Skinner et al. | Optimisation for job scheduling at automated container terminals using genetic algorithm | |
Hop et al. | Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem | |
Guan et al. | The crane scheduling problem: models and solution approaches | |
Zhuang et al. | Optimization for integrated scheduling of intelligent handling equipment with bidirectional flows and limited buffers at automated container terminals | |
Yan et al. | An investigation into knowledge-based yard crane scheduling for container terminals | |
Petering | Real-time container storage location assignment at an RTG-based seaport container transshipment terminal: problem description, control system, simulation model, and penalty scheme experimentation | |
Naeem et al. | A comprehensive review and directions for future research on the integrated scheduling of quay cranes and automated guided vehicles and yard cranes in automated container terminals | |
Xu et al. | Load-in-load-out AGV route planning in automatic container terminal | |
Zhang et al. | Optimization for two-stage double-cycle operations in container terminals | |
Hu et al. | Optimal strategies for the yard truck scheduling in container terminal with the consideration of container clusters | |
Liang et al. | A multi-objective genetic algorithm for yard crane scheduling problem with multiple work lines | |
Kaoud et al. | Scheduling problems of automated guided vehicles in job shop, flow shop, and container terminals |