Hu et al., 2019 - Google Patents
Optimal strategies for the yard truck scheduling in container terminal with the consideration of container clustersHu et al., 2019
- Document ID
- 6599634173124975421
- Author
- Hu X
- Guo J
- Zhang Y
- Publication year
- Publication venue
- Computers & Industrial Engineering
External Links
Snippet
In container loading and unloading operations, container clusters are more suitable for large- scale operation and coupling scheduling of loading and unloading equipment. Taking a container cluster as a work unit, this study analyzes the multi-vessel large container clusters …
- 238000011068 load 0 abstract description 39
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06316—Sequencing of tasks or work
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Hu et al. | Optimal strategies for the yard truck scheduling in container terminal with the consideration of container clusters | |
Yang et al. | An integrated scheduling method for AGV routing in automated container terminals | |
Hu et al. | A three-stage decomposition method for the joint vehicle dispatching and storage allocation problem in automated container terminals | |
Tang et al. | Modeling and solution of the joint quay crane and truck scheduling problem | |
He et al. | A hybrid parallel genetic algorithm for yard crane scheduling | |
Tavakkoli-Moghaddam et al. | An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports | |
Lu et al. | A study on multi-ASC scheduling method of automated container terminals based on graph theory | |
Hop et al. | Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem | |
Facchini et al. | Optimal dry port configuration for container terminals: A non-linear model for sustainable decision making | |
CN111861205B (en) | Automatic container wharf outlet box space distribution method | |
Cao et al. | Integrated quay crane and yard truck schedule problem in container terminals | |
Naeem et al. | A comprehensive review and directions for future research on the integrated scheduling of quay cranes and automated guided vehicles and yard cranes in automated container terminals | |
Zeng et al. | Optimizing berth allocation and storage space in direct transshipment operations at container terminals | |
Zhang et al. | Optimization for two-stage double-cycle operations in container terminals | |
Cao et al. | A decision support method for truck scheduling and storage allocation problem at container | |
Xin et al. | Mixed-integer nonlinear programming for energy-efficient container handling: Formulation and customized genetic algorithm | |
Yang et al. | An intelligent storage determining method for inbound containers in container terminals | |
Cai et al. | Robust multi-equipment scheduling for U-shaped container terminals concerning double-cycling mode and uncertain operation time with cascade effects | |
Liang et al. | Joint dispatch of shipment equipment considering underground container logistics | |
Zeng et al. | Models and algorithms for multi-crane oriented scheduling method in container terminals | |
Chang et al. | Modeling and solution of joint storage space allocation and handling operation for outbound containers in rail-water intermodal container terminals | |
Yang et al. | Applications of chaotic quantum adaptive satin bower bird optimizer algorithm in berth-tugboat-quay crane allocation optimization | |
Jiang et al. | Optimization of integrated scheduling of restricted channels, berths, and yards in bulk cargo ports considering carbon emissions | |
Liang et al. | Genetic mechanism-based coupling algorithm for solving coordinated scheduling problems of yard systems in container terminals | |
Yue et al. | Joint configuration and scheduling optimization of the dual trolley quay crane and AGV for automated container terminal |