Bliss, 1996 - Google Patents
National Ignition Facility, subsystem design requirements beam control {ampersand} laser diagnostics SSDR 1.7Bliss, 1996
View PDF- Document ID
- 14274893337365641612
- Author
- Bliss E
- Publication year
External Links
Snippet
This Subsystem Design Requirement document is a development specification that establishes the performance, design, development, and test requirements for the Alignment subsystem (WBS 1.7. 1), Beam Diagnostics (WBS 1.7. 2), and the Wavefront Control …
- 238000007374 clinical diagnostic method 0 title abstract description 71
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104871182A (en) | System for inspection and maintenance of a plant or other facility | |
Bliss | National Ignition Facility, subsystem design requirements beam control {ampersand} laser diagnostics SSDR 1.7 | |
Bliss | National Ignition Facility, subsystem design requirements beam control and laser diagnostics SSDR 1.7 | |
La Palombara et al. | The product assurance programme of the ASTRI mini-array project | |
Larson et al. | National Ignition Facility System Design Requirements Laser System SDR002 | |
Richardson | National Ingition Facility subsystem design requirements optical mounts SSDR 1.4. 4 | |
Meick | National Ignition Facility subsystem design requirements beam transport enclosures SSDR 1.4. 1 | |
Keane | National ignition facility user guide | |
Yakuma et al. | National Ignition Facility subsystem design requirements transportation {ampersand} handling, SSDR 1.1. 1.3. 2 | |
Hughes | I&C inspection and regulatory control | |
GUIDE | Maintenance, Testing, Surveillance and Inspection in Nuclear Power Plants | |
Board | Quality assurance in nuclear power plants | |
Murray | ICF quarterly report January-March 1997 volume 7, number 3 | |
Canadian Nuclear Safety Commission | REGDOC-2.3. 1, Conduct of Licensed Activities: Construction and Commissioning Programs | |
Sommer et al. | National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan | |
Assurance | Production Plant Preliminary Quality Assurance Plan and Assessment | |
Yakuma et al. | National Ignition Facility subsystem design requirements transportation and handling, SSDR 1.1. 1.3. 2 | |
Brereton et al. | Operations on the National Ignition Facility | |
Meldrom | Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3 | |
Stephenson | Maintenance implementation plan for fuel supply shutdown | |
VanArsdall et al. | National Ignition Facility sub-system design requirements automatic alignment system SSDR 1.5. 5 | |
CODE | QUALITY ASSURANCE IN NUCLEAR POWER PLANTS | |
Wolfe | National Ignition Facility quality assurance plan for laser materials and optical technology | |
CONTRACT | Quality-assurance plan (RADL Item 1-2) | |
Perez-Calpena et al. | Baseline of the GTC operation and maintenance plan |