[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

Bliss, 1996 - Google Patents

National Ignition Facility, subsystem design requirements beam control {ampersand} laser diagnostics SSDR 1.7

Bliss, 1996

View PDF
Document ID
14274893337365641612
Author
Bliss E
Publication year

External Links

Snippet

This Subsystem Design Requirement document is a development specification that establishes the performance, design, development, and test requirements for the Alignment subsystem (WBS 1.7. 1), Beam Diagnostics (WBS 1.7. 2), and the Wavefront Control …
Continue reading at www.osti.gov (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0635Risk analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading, distribution or shipping; Inventory or stock management, e.g. order filling, procurement or balancing against orders

Similar Documents

Publication Publication Date Title
CN104871182A (en) System for inspection and maintenance of a plant or other facility
Bliss National Ignition Facility, subsystem design requirements beam control {ampersand} laser diagnostics SSDR 1.7
Bliss National Ignition Facility, subsystem design requirements beam control and laser diagnostics SSDR 1.7
La Palombara et al. The product assurance programme of the ASTRI mini-array project
Larson et al. National Ignition Facility System Design Requirements Laser System SDR002
Richardson National Ingition Facility subsystem design requirements optical mounts SSDR 1.4. 4
Meick National Ignition Facility subsystem design requirements beam transport enclosures SSDR 1.4. 1
Keane National ignition facility user guide
Yakuma et al. National Ignition Facility subsystem design requirements transportation {ampersand} handling, SSDR 1.1. 1.3. 2
Hughes I&C inspection and regulatory control
GUIDE Maintenance, Testing, Surveillance and Inspection in Nuclear Power Plants
Board Quality assurance in nuclear power plants
Murray ICF quarterly report January-March 1997 volume 7, number 3
Canadian Nuclear Safety Commission REGDOC-2.3. 1, Conduct of Licensed Activities: Construction and Commissioning Programs
Sommer et al. National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan
Assurance Production Plant Preliminary Quality Assurance Plan and Assessment
Yakuma et al. National Ignition Facility subsystem design requirements transportation and handling, SSDR 1.1. 1.3. 2
Brereton et al. Operations on the National Ignition Facility
Meldrom Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3
Stephenson Maintenance implementation plan for fuel supply shutdown
VanArsdall et al. National Ignition Facility sub-system design requirements automatic alignment system SSDR 1.5. 5
CODE QUALITY ASSURANCE IN NUCLEAR POWER PLANTS
Wolfe National Ignition Facility quality assurance plan for laser materials and optical technology
CONTRACT Quality-assurance plan (RADL Item 1-2)
Perez-Calpena et al. Baseline of the GTC operation and maintenance plan