Bliss, 1996 - Google Patents

National Ignition Facility, subsystem design requirements beam control and laser diagnostics SSDR 1.7

Bliss, 1996

View PDF
Document ID
9418686269564667714
Author
Bliss E
Publication year

External Links

Snippet

H 2.1 2.1. 1 2.1. 2 2.1. 3 2.2 2.2. 1 2.2. 2 2.3 2.4 3.0 3.1 3.1. 1 3.1. 2 3.1. 3 3.1. 3.1 3.1. 4 3.1. 5 3.2 3.2. 1 3.2. 1.1 3.2. 1.1. 01 3.2. 1.1. 02 3.2. 1.1. 03 3.2. 1, 1.04 3.2. 1.1. 05 3.2. 1.1. 06 3.2. 1.1. 07 3.2. 1.1. 08 3.2. 1.1. 09 3.2. 1.1. 10 3.2. 1.1. 11 3.2. 1.2 3.2. 1.2. 1 3.2. 1.2. 2 3.2 …
Continue reading at inis.iaea.org (PDF) (other versions)

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0635Risk analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING; COUNTING
    • G06QDATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
    • G06Q10/063Operations research or analysis
    • G06Q10/0639Performance analysis
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING STRUCTURES OR APPARATUS NOT OTHERWISE PROVIDED FOR
    • G01M11/00Testing of optical apparatus; Testing structures by optical methods not otherwise provided for
    • G01M11/02Testing of optical properties of lenses
    • G01M11/0242Testing of optical properties of lenses by measuring geometrical properties or aberrations

Similar Documents

Publication Publication Date Title
CN104871182A (en) System for inspection and maintenance of a plant or other facility
Bliss National Ignition Facility, subsystem design requirements beam control and laser diagnostics SSDR 1.7
Bliss National Ignition Facility, subsystem design requirements beam control {ampersand} laser diagnostics SSDR 1.7
La Palombara et al. The product assurance programme of the ASTRI mini-array project
Larson et al. National Ignition Facility System Design Requirements Laser System SDR002
Richardson National Ingition Facility subsystem design requirements optical mounts SSDR 1.4. 4
Meick National Ignition Facility subsystem design requirements beam transport enclosures SSDR 1.4. 1
Hughes I&C inspection and regulatory control
GUIDE Maintenance, Testing, Surveillance and Inspection in Nuclear Power Plants
Board Quality assurance in nuclear power plants
Keane National ignition facility user guide
Yakuma et al. National Ignition Facility subsystem design requirements transportation {ampersand} handling, SSDR 1.1. 1.3. 2
Canadian Nuclear Safety Commission REGDOC-2.3. 1, Conduct of Licensed Activities: Construction and Commissioning Programs
Sommer et al. National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan
LA PALOMBARA Demonstration of VERT-X Critical Items Product Assurance Plan
Assurance Production Plant Preliminary Quality Assurance Plan and Assessment
Yakuma et al. National Ignition Facility subsystem design requirements transportation and handling, SSDR 1.1. 1.3. 2
Meldrom Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3
CODE QUALITY ASSURANCE IN NUCLEAR POWER PLANTS
Bogard RADCAL operations manual radiation calibration laboratory protocol
Stephenson Maintenance implementation plan for fuel supply shutdown
Brereton et al. Operations on the National Ignition Facility
Perez-Calpena et al. Baseline of the GTC operation and maintenance plan
Wayne Second quarterly progress report input to WANL for CY 1968
Wolfe National Ignition Facility quality assurance plan for laser materials and optical technology