Bliss, 1996 - Google Patents
National Ignition Facility, subsystem design requirements beam control and laser diagnostics SSDR 1.7Bliss, 1996
View PDF- Document ID
- 9418686269564667714
- Author
- Bliss E
- Publication year
External Links
Snippet
H 2.1 2.1. 1 2.1. 2 2.1. 3 2.2 2.2. 1 2.2. 2 2.3 2.4 3.0 3.1 3.1. 1 3.1. 2 3.1. 3 3.1. 3.1 3.1. 4 3.1. 5 3.2 3.2. 1 3.2. 1.1 3.2. 1.1. 01 3.2. 1.1. 02 3.2. 1.1. 03 3.2. 1, 1.04 3.2. 1.1. 05 3.2. 1.1. 06 3.2. 1.1. 07 3.2. 1.1. 08 3.2. 1.1. 09 3.2. 1.1. 10 3.2. 1.1. 11 3.2. 1.2 3.2. 1.2. 1 3.2. 1.2. 2 3.2 …
- 238000007374 clinical diagnostic method 0 title description 69
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING STRUCTURES OR APPARATUS NOT OTHERWISE PROVIDED FOR
- G01M11/00—Testing of optical apparatus; Testing structures by optical methods not otherwise provided for
- G01M11/02—Testing of optical properties of lenses
- G01M11/0242—Testing of optical properties of lenses by measuring geometrical properties or aberrations
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104871182A (en) | System for inspection and maintenance of a plant or other facility | |
Bliss | National Ignition Facility, subsystem design requirements beam control and laser diagnostics SSDR 1.7 | |
Bliss | National Ignition Facility, subsystem design requirements beam control {ampersand} laser diagnostics SSDR 1.7 | |
La Palombara et al. | The product assurance programme of the ASTRI mini-array project | |
Larson et al. | National Ignition Facility System Design Requirements Laser System SDR002 | |
Richardson | National Ingition Facility subsystem design requirements optical mounts SSDR 1.4. 4 | |
Meick | National Ignition Facility subsystem design requirements beam transport enclosures SSDR 1.4. 1 | |
Hughes | I&C inspection and regulatory control | |
GUIDE | Maintenance, Testing, Surveillance and Inspection in Nuclear Power Plants | |
Board | Quality assurance in nuclear power plants | |
Keane | National ignition facility user guide | |
Yakuma et al. | National Ignition Facility subsystem design requirements transportation {ampersand} handling, SSDR 1.1. 1.3. 2 | |
Canadian Nuclear Safety Commission | REGDOC-2.3. 1, Conduct of Licensed Activities: Construction and Commissioning Programs | |
Sommer et al. | National Ignition Facility. Facility and Infrastructure Systems Maintenance Plan | |
LA PALOMBARA | Demonstration of VERT-X Critical Items Product Assurance Plan | |
Assurance | Production Plant Preliminary Quality Assurance Plan and Assessment | |
Yakuma et al. | National Ignition Facility subsystem design requirements transportation and handling, SSDR 1.1. 1.3. 2 | |
Meldrom | Maintenance implementation plan for the Plutonium Finishing Plant. Revision 3 | |
CODE | QUALITY ASSURANCE IN NUCLEAR POWER PLANTS | |
Bogard | RADCAL operations manual radiation calibration laboratory protocol | |
Stephenson | Maintenance implementation plan for fuel supply shutdown | |
Brereton et al. | Operations on the National Ignition Facility | |
Perez-Calpena et al. | Baseline of the GTC operation and maintenance plan | |
Wayne | Second quarterly progress report input to WANL for CY 1968 | |
Wolfe | National Ignition Facility quality assurance plan for laser materials and optical technology |