Meng et al., 2014 - Google Patents
Regional environmental risk assessment for the Nanjing Chemical Industry Park: an analysis based on information-diffusion theoryMeng et al., 2014
- Document ID
- 8416178736695873612
- Author
- Meng X
- Zhang Y
- Yu X
- Bai J
- Chai Y
- Li Y
- Publication year
- Publication venue
- Stochastic Environmental Research and Risk Assessment
External Links
Snippet
A recent Chinese policy requires that all enterprises that store and use hazardous chemicals must become part of a chemical industry park. Although this reduces the environmental risk caused by the establishment of uncontrolled sites, it cannot eliminate the risk within the …
- 238000005039 chemical industry 0 title abstract description 29
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0631—Resource planning, allocation or scheduling for a business operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for a specific business sector, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public service
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation, e.g. computer aided management of electronic mail or groupware; Time management, e.g. calendars, reminders, meetings or time accounting
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Meng et al. | Regional environmental risk assessment for the Nanjing Chemical Industry Park: an analysis based on information-diffusion theory | |
Mahdevari et al. | Human health and safety risks management in underground coal mines using fuzzy TOPSIS | |
Qi et al. | Challenges and needs for process safety in the new millennium | |
Masalegooyan et al. | A comprehensive framework for risk probability assessment of landfill fire incidents using fuzzy fault tree analysis | |
Hao et al. | Hazard identification, risk assessment and management of industrial system: Process safety in mining industry | |
Busini et al. | Definition of a short-cut methodology for assessing earthquake-related Na-Tech risk | |
Zhao et al. | A safety vulnerability assessment for chemical enterprises: a hybrid of a data envelopment analysis and fuzzy decision-making | |
Ding et al. | Environmental risk assessment approaches for industry park and their applications | |
Moshashaei et al. | Fire risk assessment: A systematic review of the methodology and functional areas | |
Wang et al. | Segmented pinch analysis for environmental risk management | |
Dadkani et al. | Risk analysis of gas leakage in gas pressure reduction station and its consequences: A case study for Zahedan | |
Li et al. | Superposition risk assessment of the working position of gas explosions in chinese coal mines | |
Rad et al. | A risk-based methodology for optimum placement of flammable gas detectors within open process plants | |
Basri et al. | Regulatory requirements for nuclear power plant site selection in Malaysia—a review | |
Liu et al. | Petrochemical plant multi-objective and multi-stage fire emergency management technology system based on the fire risk prediction | |
Feng et al. | The hybrid systems method integrating human factors analysis and classification system and grey relational analysis for the analysis of major coal mining accidents | |
Aliabadi et al. | Locating urban CNG stations using quantitative risk assessment: using the Bayesian network | |
Burgherr et al. | Comparative assessment of accident risks in the energy sector | |
Sengupta et al. | Challenges for introducing risk assessment into land use planning decisions in an Indian context | |
Kang et al. | Temporal assessment of emergency response and rescue capability for hybrid hydrogen-gasoline fueling stations based on dynamic scenario construction | |
Zhang et al. | Safety resilience evaluation of hydrogen refueling stations based on improved TOPSIS approach | |
Qi et al. | Quantitative risk assessment of leakage accident of crude oil storage tank based on fuzzy Bayesian network and improved AHP | |
Sánchez-Squella et al. | Risk analysis, regulation proposal and technical guide for pilot tests of hydrogen vehicles in underground mining | |
Zhang et al. | Formal probabilistic risk analysis of accidental air pollution in a development zone using Bayesian networks | |
Alam et al. | Various risks and safety analysis to reduce fire in oil refinery plant |