Zhang et al., 2022 - Google Patents
Formal probabilistic risk analysis of accidental air pollution in a development zone using Bayesian networksZhang et al., 2022
- Document ID
- 14832367623561094449
- Author
- Zhang H
- Liu R
- Liu J
- Zhang Z
- Publication year
- Publication venue
- Journal of cleaner production
External Links
Snippet
The potential risk caused by the leakage of toxic and hazardous substances during air pollution accidents poses a great threat to local environmental safety, human heath, and even property security. Uncertainties and causalities are important components that should …
- 238000003915 air pollution 0 title abstract description 42
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0635—Risk analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation, e.g. linear programming, "travelling salesman problem" or "cutting stock problem"
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Zhang et al. | Formal probabilistic risk analysis of accidental air pollution in a development zone using Bayesian networks | |
Hou et al. | A real-time, dynamic early-warning model based on uncertainty analysis and risk assessment for sudden water pollution accidents | |
Cao et al. | An integrated emergency response model for toxic gas release accidents based on cellular automata | |
AlRukaibi et al. | Optimal route risk-based algorithm for hazardous material transport in Kuwait | |
Mi et al. | An integrated method for fire risk assessment in residential buildings | |
Galderisi et al. | A method for na-tech risk assessment as supporting tool for land use planning mitigation strategies | |
Milazzo et al. | Risk management of terrorist attacks in the transport of hazardous materials using dynamic geoevents | |
Armand et al. | Topical 3D modelling and simulation of air dispersion hazards as a new paradigm to support emergency preparedness and response | |
Agarwal et al. | Fire code inspection and compliance: A game-theoretic model between fire inspection agencies and building owners | |
Chen et al. | A combined method to build Bayesian network for fire risk assessment of historical buildings | |
Meng et al. | A dynamic emergency decision support model for emergencies in urban areas | |
Liu et al. | An integrated risk assessment method for urban areas due to chemical leakage accidents | |
He et al. | Identification and Evaluation of Urban Rail Transit Operation Risk Factors Based on Entropy‐AHP Hybrid Constrained DEA Method | |
Ju et al. | Safety risk assessment of sustainable construction based on projection pursuit model optimized by multi-intelligent algorithm: a case study of new chemical projects | |
Torretta et al. | APPLICATION OF A DECISION SUPPORT SYSTEM TO THE TRANSPORT OF HAZARDOUS MATERIALS. | |
Nicolet–Monnier | Integrated regional risk assessment: The situation in Switzerland | |
Ma et al. | Fleet scheduling optimization of hazardous materials transportation: A literature review | |
Kanj | Contribution to risk analysis related to the transport of hazardous materials by agent-based simulation | |
Gong et al. | Classification of Emergency Responses to Fatal Traffic Accidents in Chinese Urban Areas. | |
Marseguerra et al. | A fuzzy modeling approach to road transport with application to a case of spent nuclear fuel transport | |
Zhang et al. | How does evacuation risk change over time? Influences on evacuation strategies during accidental toxic gas releases | |
Liu et al. | Evacuation traffic management under low visibility and toxic-gas leakage disasters | |
Ponti | An index-based risk assessment approach for accidental contaminant release from waste management facilities during flood events | |
Tomasoni et al. | Toxic Release Damage Distance Assessment Based on the Short-Cut Method: A Case Study for the Transport of Chlorine and Hydrochloric Acid in Densely Urbanized Areas in the Mediterranean Region | |
Li et al. | Comprehensive Risk System Analysis and Factor Coupling in Underground Railway Space |