Buchinskiy et al., 2018 - Google Patents
Conceptual approach for gas field clusters development in terms of synergy effectBuchinskiy et al., 2018
- Document ID
- 693169347191974429
- Author
- Buchinskiy S
- Kovalenko A
- Permyakov A
- Khakimov A
- Savchuk D
- Publication year
- Publication venue
- SPE Russian Petroleum Technology Conference?
External Links
Snippet
The article is devoted to creation problems of the strategy for involving of fields group in development, taking account of geological, logistic, organization factors, and aspects of forming the unite field facilities construction. In the present work the importance of …
- 230000000694 effects 0 title description 4
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30286—Information retrieval; Database structures therefor; File system structures therefor in structured data stores
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30861—Retrieval from the Internet, e.g. browsers
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
- E21B43/017—Production satellite stations, i.e. underwater installations comprising a plurality of satellite well heads connected to a central station
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimizing the spacing of wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/25—Methods for stimulating production
- E21B43/26—Methods for stimulating production by forming crevices or fractures
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Rodrigues et al. | Integrated optimization model for location and sizing of offshore platforms and location of oil wells | |
Wang et al. | Optimal design and scheduling for offshore oil-field development | |
CN105247546A (en) | Determining well parameters for optimization of well performance | |
CN106062311A (en) | Ranking drilling locations among shale plays | |
Litvak et al. | Field development optimization with subsurface uncertainties | |
Ozdogan et al. | Efficient assessment and optimization of a deepwater asset development using fixed pattern approach | |
Castiñeira et al. | Automated identification of optimal deviated and horizontal well targets | |
O'Brien et al. | Maximizing mature field production-A novel approach to screening mature fields revitalization options | |
Popa et al. | A data mining approach to unlock potential from an old heavy oil field | |
Buchinskiy et al. | Conceptual approach for gas field clusters development in terms of synergy effect | |
Pérez et al. | An Innovative Integrated Asset Modeling for an Offshore-Onshore Field Development. Tomoporo Field Case | |
Cottini-Loureiro et al. | Optimized well location by combination of multiple realization approach and quality map methods | |
von Hohendorff Filho et al. | Evaluation of reservoir and production system integration in production strategy selection | |
Wehunt et al. | An Efficient Decision Framework for Optimizing Tight and Unconventional Resources | |
Absalyamov et al. | Coupled static and dynamic high resolution modelling on high performance computer clusters | |
Antonenko et al. | Integrated modeling of the Priobskoe oilfield | |
Orlov et al. | Maximization of Major Oil&Gas Project Value at Identification/Access Stage by Reframing of Exploration Strategy | |
Chan et al. | A process to evaluate unconventional resources | |
Farooq et al. | Improving the Value: A Case Study of Integrated Asset Modelling of a Giant Contaminated Gas Field | |
Espinola et al. | A Case Study of Integrated Asset Modeling To Support Reservoir Management Strategies For Four Dry Gas Fields Sharing Production Facilities | |
Tilke et al. | High-speed field development planning in the presence of uncertainty and risk through the use of constrained numerical optimization and analytical simulation | |
Sharma et al. | Integrated Modelling Workflow for Life Cycle Development of a Large Scale Coal Seam Gas Field | |
Khedr et al. | On the Importance and Application of Integrated Asset Modeling of a Giant Offshore Oil Field | |
Rossi et al. | Simplified Network Simulation Vs. Integrated Asset Modelling for Management and Development of Offshore Gas Fields | |
Kiselev et al. | Setting a Development Strategy for Low-Permeable Turonian Gas Reservoirs |