Espinola et al., 2014 - Google Patents
A Case Study of Integrated Asset Modeling To Support Reservoir Management Strategies For Four Dry Gas Fields Sharing Production FacilitiesEspinola et al., 2014
- Document ID
- 707481594874056253
- Author
- Espinola O
- Rocha M
- Alvarez N
- Ramirez J
- Solis A
- Guzman-Arevalo J
- Publication year
- Publication venue
- SPE Trinidad and Tobago Section Energy Resources Conference?
External Links
Snippet
The integrated asset modeling has gained popularity in the last years because it has a positive impact on field development, optimization and reservoir management. Especially it has become a must be to properly analyze the interaction between a reservoir and its …
- 238000004519 manufacturing process 0 title abstract description 48
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/30—Information retrieval; Database structures therefor; File system structures therefor
- G06F17/30286—Information retrieval; Database structures therefor; File system structures therefor in structured data stores
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06Q—DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTING PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management, e.g. organising, planning, scheduling or allocating time, human or machine resources; Enterprise planning; Organisational models
- G06Q10/063—Operations research or analysis
- G06Q10/0639—Performance analysis
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING; COUNTING
- G06F—ELECTRICAL DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/50—Computer-aided design
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/14—Obtaining from a multiple-zone well
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Morales et al. | A new modified genetic algorithm for well placement optimization under geological uncertainties | |
Kornberger et al. | Experiences With an Efficient Rate-Management Approach for the 8th Tortonian Reservoir in the Vienna Basin | |
O'Brien et al. | Maximizing mature field production-A novel approach to screening mature fields revitalization options | |
Ageh et al. | Using Integrated Production Modeling (IPM) as an Optimization Tool for Field Development Planning and Management | |
Espinola et al. | A Case Study of Integrated Asset Modeling To Support Reservoir Management Strategies For Four Dry Gas Fields Sharing Production Facilities | |
Pérez et al. | An Innovative Integrated Asset Modeling for an Offshore-Onshore Field Development. Tomoporo Field Case | |
Rodríguez et al. | Integration of subsurface, surface and economics under uncertainty in orocual field | |
Odusote | Deepwater Nigeria field development: Challenges, best practices and lessons learned from the Agbami field | |
Kabir et al. | Lessons learned from energy models: Iraq's South Rumaila case study | |
Eli et al. | Integrated production System Modeling (IPSM) as an opportunity Realization and optimization tool for improved asset management | |
Bustamante et al. | Understanding reservoir performance and uncertainty using a multiple history matching process | |
Abbas et al. | An Efficient Method to Control Oilfield Wells Through Advanced Field Management Ensemble Based Optimization Capabilities | |
von Hohendorff Filho et al. | Evaluation of reservoir and production system integration in production strategy selection | |
Rehman et al. | A Generic model for optimizing the selection of artificial lift methods for liquid loaded gas wells | |
Stevenson et al. | Lessons Learned from Building a Large Integrated Production Model for Offshore Assets in Nigeria | |
Saputelli et al. | Waterflood recovery optimization using intelligent wells and decision analysis | |
Sifuentes et al. | Samarang Integrated Operations (IO): Integrated Asset Modeling-An Innovative Approach For Long Term Production Planning Focused On Enhance Oil Recovery | |
Gouveia et al. | A Statistical Approach to the Effective Economic Modeling and Portfolio Selection of Unconventional Resource Opportunities | |
Siew Hiang et al. | Adoption of Integrated Asset Modeling Approach to Kick-Start the Corporate Digital Transformation Strategy | |
Isaiah et al. | Performing reservoir simulation with Neural Network enhanced data | |
Rossi et al. | Simplified Network Simulation Vs. Integrated Asset Modelling for Management and Development of Offshore Gas Fields | |
Marir et al. | Fully-Coupled Surface Network Model with Stacked Multi-Reservoir Model of a New Abu Dhabi Offshore Field | |
Guo et al. | An integrated optimization model for CO2 rich, high temperature and high pressure, boundary water gas field group | |
Rahmawati et al. | The benefit of integrated asset modeling and optimization in evaluating production strategies under various oil and gas price scenarios | |
Ogbuagu et al. | Infill opportunities validation for a mature Niger Delta Reservoir: lessons learned and best practices |