[go: up one dir, main page]
More Web Proxy on the site http://driver.im/Jump to content

Yantan Dam

Coordinates: 24°02′26″N 107°30′43″E / 24.04056°N 107.51194°E / 24.04056; 107.51194
From Wikipedia, the free encyclopedia
Yantan Dam
Yantan Dam is located in China
Yantan Dam
Location of Yantan Dam in China
CountryChina
LocationDahua Yao Autonomous County, Guangxi
Coordinates24°02′26″N 107°30′43″E / 24.04056°N 107.51194°E / 24.04056; 107.51194
StatusIn use
Construction began1985
Opening date1995
Owner(s)Guangxi Electric Power Bureau
Dam and spillways
Type of damGravity
ImpoundsHongshui River
Height110 m (361 ft)
Length525 m (1,722 ft)
Spillways7
Spillway typeService, crest overflow
Spillway capacity33,400 m3/s (1,179,510 cu ft/s)
Reservoir
CreatesYantan Reservoir
Total capacity2,612,000,000 m3 (2,117,583 acre⋅ft)
Catchment area106,580 km2 (41,151 sq mi)
Surface area107.5 km2 (42 sq mi)
Power Station
Commission date1992-1995
Hydraulic head85 m (279 ft) (max.)
Turbines4 x 302.5 MW Francis turbines
Installed capacity1,210 MW
Annual generation56.6 million kWh

The Yantan Dam (Chinese: 岩滩大坝; pinyin: Yántān Dàbà) is a gravity dam on the Hongshui River near Dahua County, Guangxi China. The main purpose of the dam is hydroelectric power production and it has an associated 1,210 MW power station consisting of 4 x 302.5 MW Francis turbine-generators.

Construction

[edit]

The dam was placed on the state key project list in 1984 and construction began in March 1985. By November 1987, the river was diverted and in March 1992, the dam began to impound the reservoir. On September 16, 1992, the first generator was operational nine months ahead of schedule. The second generator was operation in August 1993, the third in June 1994 and the fourth in June 1995. By the end of 1995, the entire project was complete. The dam is owned by Guangxi Electric Power Bureau while Guangxi Electricpower Investigation and Design Institute designed it and Guangxi Yantan Hydropower Project Construction Corporation constructed it. 43,176 people were relocated as a result of the project.[1]

Design

[edit]

The facility is composed of the dam, its power station and a ship lift. The dam is a 110 m (361 ft) high and 525 m (1,722 ft) long gravity dam. It withholds a reservoir with a normal capacity of 2,612,000,000 m3 (2,117,583 acre⋅ft), maximum capacity of 3,432,000,000 m3 (2,782,368 acre⋅ft) and active or "useful" storage of 1,572,000,000 m3 (1,274,441 acre⋅ft). The dam's spillway contains seven radial steel gates with a maximum discharge capacity of 33,400 m3/s (1,179,510 cu ft/s). The power station at its right toe is 200 m (656 ft) long, 60 m (197 ft) wide and 72 m (236 ft) high. The power station is supported by four intakes, penstocks and tailraces. It contains 4 x 302.5 MW Francis turbines for an installed capacity of 1,210 but operates at a firm capacity of 242 MW. The Yantan Ship Lift is a vertical lift type designed for a maximum 250 ton barge vessel.[1]

See also

[edit]
[edit]

References

[edit]
  1. ^ a b "Yantan Hydropower Station". China Water. Archived from the original on 19 April 2014. Retrieved 11 January 2011.