No abstract available.
Module-based modeling of flow-type multistage manufacturing systems adopting dual-card Kanban system
A systematic procedure of module-based modeling is designed and proposed to develop a simulation of any flow-type multistage manufacturing system adopting especially the dual-card Kanban system. First, functional analysis is performed to present kanban ...
Optimal lot-sizing with capacity constraints and auto-correlated interarrival times
There have been recent advances in using queuing relationships to determine lot sizes that minimize mean flowtimes when multiple product types are being produced at capacity-constrained resources. However, these relationships assume lot interarrival ...
Simulation-based layout planning of a production plant
This paper presents a study that uses simulation to improve shop floor performance by means of two layout types and certain operational parameters. In this study, an overview of the plant layout problem is covered for the particular company. The ...
Index Terms
- Proceedings of the 36th conference on Winter simulation
Recommendations
Acceptance Rates
Year | Submitted | Accepted | Rate |
---|---|---|---|
WSC '18 | 260 | 183 | 70% |
WSC '15 | 296 | 202 | 68% |
WSC '14 | 320 | 205 | 64% |
WSC '12 | 384 | 189 | 49% |
WSC '11 | 270 | 203 | 75% |
WSC '10 | 281 | 184 | 65% |
WSC '09 | 256 | 137 | 54% |
WSC '08 | 304 | 249 | 82% |
WSC '07 | 244 | 152 | 62% |
WSC '06 | 252 | 177 | 70% |
WSC '05 | 316 | 209 | 66% |
WSC '04 | 171 | 144 | 84% |
WSC '03 | 189 | 128 | 68% |
WSC '02 | 185 | 166 | 90% |
WSC '01 | 155 | 111 | 72% |
WSC '99 | 206 | 139 | 67% |
WSC '98 | 216 | 164 | 76% |
WSC '97 | 191 | 121 | 63% |
WSC '96 | 187 | 128 | 68% |
WSC '95 | 183 | 122 | 67% |
WSC '94 | 209 | 100 | 48% |
Overall | 5,075 | 3,413 | 67% |