[go: up one dir, main page]
More Web Proxy on the site http://driver.im/ skip to main content
10.1109/APSEC.2004.77guideproceedingsArticle/Chapter ViewAbstractPublication PagesConference Proceedingsacm-pubtype
Article

Project Management Capability Levels: An Empirical Study

Published: 30 November 2004 Publication History

Abstract

This paper outlines existing maturity models of project management and their underlying constructs. Organizations involved in software development in Sydney, Australia were interviewed about their project management practices and their responses analysed to determine whether different project managers used different levels of project management practices and whether the practices were in accordance with a process based maturity model. This did not seem to be the case, yet the data suggested that, as a possible alternative, a systems theory based approach might be more tenable. The overall conclusion, that a system theory based maturity model appears to be better correlated with organizational size and software development maturity than a process based maturity model, is briefly discussed and additional research is suggested that could investigate this novel conclusion further.

Cited By

View all
  • (2006)A case study on the success of introducing general non-construction activities for project management and planning improvementProceedings of the 7th international conference on Product-Focused Software Process Improvement10.1007/11767718_15(151-165)Online publication date: 12-Jun-2006

Recommendations

Comments

Please enable JavaScript to view thecomments powered by Disqus.

Information & Contributors

Information

Published In

cover image Guide Proceedings
APSEC '04: Proceedings of the 11th Asia-Pacific Software Engineering Conference
November 2004
704 pages
ISBN:0769522459

Publisher

IEEE Computer Society

United States

Publication History

Published: 30 November 2004

Qualifiers

  • Article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 21 Dec 2024

Other Metrics

Citations

Cited By

View all
  • (2006)A case study on the success of introducing general non-construction activities for project management and planning improvementProceedings of the 7th international conference on Product-Focused Software Process Improvement10.1007/11767718_15(151-165)Online publication date: 12-Jun-2006

View Options

View options

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media