Zeleni Vir Hydroelectric Power Plant is a hydroelectric power plant located near the town of Skrad, Gorski Kotar region in Croatia. The Zeleni Vir Hydroelectric Power Plant is a high-pressure diversion plant that harnesses the water power of the Curak Brook with head of about 50 m. It was built in 1921. It is operated by Hrvatska elektroprivreda.
Property | Value |
---|---|
dbo:abstract |
|
dbo:wikiPageID |
|
dbo:wikiPageLength |
|
dbo:wikiPageRevisionID |
|
dbo:wikiPageWikiLink |
|
dbp:wikiPageUsesTemplate | |
dct:subject | |
gold:hypernym | |
rdf:type | |
rdfs:comment |
|
rdfs:label |
|
owl:sameAs | |
prov:wasDerivedFrom | |
foaf:isPrimaryTopicOf | |
is dbo:wikiPageWikiLink of | |
is foaf:primaryTopic of |