Gojak Hydroelectric Power Plant is a hydroelectric power plant on river Dobra, near the town of Ogulin, in Karlovac County, Croatia. Its total capacity is 55.5 MW. The Gojak Hydroelectric Power Plant is a high pressure diversion plant which harnesses the river power of the Ogulinska Dobra and Zagorska Mrežnica rivers.It is operated by the Croatian state-owned electrical company, Hrvatska elektroprivreda.

Property Value
dbo:abstract
  • Gojak Hydroelectric Power Plant is a hydroelectric power plant on river Dobra, near the town of Ogulin, in Karlovac County, Croatia. Its total capacity is 55.5 MW. The Gojak Hydroelectric Power Plant is a high pressure diversion plant which harnesses the river power of the Ogulinska Dobra and Zagorska Mrežnica rivers.It is operated by the Croatian state-owned electrical company, Hrvatska elektroprivreda. (en)
  • ГЕС Гояк — гідроелектростанція в Хорватії на півночі Далмації. Ресурс для роботи станції постачається із карстової долини . Її дренують річки Горня Добра (верхня течія Добри, правої притоки Купи) та Загорська Мрежниця (притока Горньої Добри, яка впадає в неї під землею після виходу з Огулінского поля). Для роботи ГЕС на них спорудили греблі Буковник (бетонна) та Sabljaki (земляна). Далі через тунель довжиною 9,4 км здійснюється подача води на схід, до машинного залу в долині річки Добра, невдовзі після її виходу з-під землі. Машинний зал обладнаний трьома турбінами типу Френсіс. При введенні станції в експлуатацію у 1959 році їхня загальна потужність становила 48 МВт, проте після проведеної у середині 2000-х років модернізації зросла до 55,5 МВт. Описана вище схема забезпечує роботу з напором у 118 метрів. На початку 2010-х років виробництво електроенергії на ГЕС Гояк коливалось від 126 до 316 млн кВт·год. (uk)
dbo:wikiPageID
  • 21790764 (xsd:integer)
dbo:wikiPageLength
  • 1608 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 933271831 (xsd:integer)
dbo:wikiPageWikiLink
dbp:wikiPageUsesTemplate
dcterms:subject
gold:hypernym
georss:point
  • 45.29888888888889 15.263333333333334
rdf:type
rdfs:comment
  • Gojak Hydroelectric Power Plant is a hydroelectric power plant on river Dobra, near the town of Ogulin, in Karlovac County, Croatia. Its total capacity is 55.5 MW. The Gojak Hydroelectric Power Plant is a high pressure diversion plant which harnesses the river power of the Ogulinska Dobra and Zagorska Mrežnica rivers.It is operated by the Croatian state-owned electrical company, Hrvatska elektroprivreda. (en)
  • ГЕС Гояк — гідроелектростанція в Хорватії на півночі Далмації. Ресурс для роботи станції постачається із карстової долини . Її дренують річки Горня Добра (верхня течія Добри, правої притоки Купи) та Загорська Мрежниця (притока Горньої Добри, яка впадає в неї під землею після виходу з Огулінского поля). Для роботи ГЕС на них спорудили греблі Буковник (бетонна) та Sabljaki (земляна). Далі через тунель довжиною 9,4 км здійснюється подача води на схід, до машинного залу в долині річки Добра, невдовзі після її виходу з-під землі. (uk)
rdfs:label
  • Gojak Hydroelectric Power Plant (en)
  • ГЕС Гояк (uk)
owl:sameAs
geo:geometry
  • POINT(15.263333320618 45.298889160156)
geo:lat
  • 45.298889 (xsd:float)
geo:long
  • 15.263333 (xsd:float)
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License