dbo:abstract
|
- The Next Generation Bi-Level Passenger Rail Car was a failed design of bilevel intercity railroad passenger cars that was to be built by Sumitomo, with construction subcontracted to Nippon Sharyo. The contract was awarded in 2012 with delivery scheduled between 2015 and 2018. After delays in production, a prototype car failed buff strength test in August 2015, leading to the cancellation of the contract with Nippon Sharyo. Siemens replaced Nippon Sharyo as the construction subcontractor in late 2017 and under the new contract, Siemens Venture railcars will be delivered between 2020 and 2023 instead of the bilevel design. The bilevel cars were designed by the Next Generation Corridor Equipment Pool Committee (NGCE) under the provisions of the Passenger Rail Investment and Improvement Act of 2008. The cars were intended to replace single-level Amfleet and Horizon cars in the Midwest and supplement the bilevel Surfliner railcar and California Car railcars in California. (en)
- CALIDOT(カリドット)は、シーメンスがカリフォルニア州やイリノイ州などアメリカ各地でアムトラックが運営する鉄道路線へ向けて製造する客車の愛称。2020年から2023年にかけての登場を予定している。 この項目では、"CALIDOT"以前に日本車輌製造が住友商事と共に受注を獲得しながらも様々な要因が重なり製造を断念した2階建て客車についても解説する。この大型案件の失敗は、日本車輌製造の決算の最終赤字やアメリカ合衆国の工場閉鎖にも繋がった。 (ja)
|
dbo:manufacturer
| |
dbo:numberBuilt
|
- 4 (xsd:nonNegativeInteger)
|
dbo:thumbnail
| |
dbo:wikiPageExternalLink
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 9192 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:assembly
| |
dbp:caption
|
- Rendering of the Next Generation Bi-Level Passenger Rail Car (en)
|
dbp:carbody
| |
dbp:designer
| |
dbp:family
| |
dbp:imagealt
|
- Silver two-story railcar (en)
|
dbp:manufacturer
| |
dbp:name
|
- Next Generation Bi-Level Passenger Car (en)
|
dbp:numberbuilt
| |
dbp:successor
| |
dbp:wikiPageUsesTemplate
| |
dct:subject
| |
rdf:type
| |
rdfs:comment
|
- CALIDOT(カリドット)は、シーメンスがカリフォルニア州やイリノイ州などアメリカ各地でアムトラックが運営する鉄道路線へ向けて製造する客車の愛称。2020年から2023年にかけての登場を予定している。 この項目では、"CALIDOT"以前に日本車輌製造が住友商事と共に受注を獲得しながらも様々な要因が重なり製造を断念した2階建て客車についても解説する。この大型案件の失敗は、日本車輌製造の決算の最終赤字やアメリカ合衆国の工場閉鎖にも繋がった。 (ja)
- The Next Generation Bi-Level Passenger Rail Car was a failed design of bilevel intercity railroad passenger cars that was to be built by Sumitomo, with construction subcontracted to Nippon Sharyo. The contract was awarded in 2012 with delivery scheduled between 2015 and 2018. After delays in production, a prototype car failed buff strength test in August 2015, leading to the cancellation of the contract with Nippon Sharyo. Siemens replaced Nippon Sharyo as the construction subcontractor in late 2017 and under the new contract, Siemens Venture railcars will be delivered between 2020 and 2023 instead of the bilevel design. (en)
|
rdfs:label
|
- CALIDOT (ja)
- Next Generation Bi-Level Passenger Rail Car (en)
|
owl:sameAs
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
foaf:name
|
- Next Generation Bi-Level Passenger Car (en)
|
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |