WO2024166582A1 - 作業機械の再生制御装置 - Google Patents
作業機械の再生制御装置 Download PDFInfo
- Publication number
- WO2024166582A1 WO2024166582A1 PCT/JP2023/047190 JP2023047190W WO2024166582A1 WO 2024166582 A1 WO2024166582 A1 WO 2024166582A1 JP 2023047190 W JP2023047190 W JP 2023047190W WO 2024166582 A1 WO2024166582 A1 WO 2024166582A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- regeneration
- arm
- bucket
- state
- responsiveness
- Prior art date
Links
- 230000008929 regeneration Effects 0.000 title claims abstract description 365
- 238000011069 regeneration method Methods 0.000 title claims abstract description 365
- 230000004043 responsiveness Effects 0.000 claims abstract description 80
- 230000007704 transition Effects 0.000 claims abstract description 26
- 238000009412 basement excavation Methods 0.000 claims description 106
- 239000010720 hydraulic oil Substances 0.000 claims description 82
- 230000004044 response Effects 0.000 description 69
- 238000010586 diagram Methods 0.000 description 20
- 239000002689 soil Substances 0.000 description 16
- 230000008859 change Effects 0.000 description 15
- 230000007935 neutral effect Effects 0.000 description 12
- 230000007423 decrease Effects 0.000 description 11
- 238000001514 detection method Methods 0.000 description 8
- 238000000034 method Methods 0.000 description 8
- 230000008569 process Effects 0.000 description 8
- 238000004891 communication Methods 0.000 description 4
- 239000004576 sand Substances 0.000 description 4
- 230000001052 transient effect Effects 0.000 description 4
- 238000013459 approach Methods 0.000 description 3
- 238000007599 discharging Methods 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 2
- 230000006866 deterioration Effects 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000007257 malfunction Effects 0.000 description 2
- 239000003921 oil Substances 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 239000004575 stone Substances 0.000 description 2
- 238000011144 upstream manufacturing Methods 0.000 description 2
- 244000208734 Pisonia aculeata Species 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000035515 penetration Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/28—Dredgers; Soil-shifting machines mechanically-driven with digging tools mounted on a dipper- or bucket-arm, i.e. there is either one arm or a pair of arms, e.g. dippers, buckets
- E02F3/36—Component parts
- E02F3/42—Drives for dippers, buckets, dipper-arms or bucket-arms
- E02F3/43—Control of dipper or bucket position; Control of sequence of drive operations
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F9/00—Component parts of dredgers or soil-shifting machines, not restricted to one of the kinds covered by groups E02F3/00 - E02F7/00
- E02F9/20—Drives; Control devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F15—FLUID-PRESSURE ACTUATORS; HYDRAULICS OR PNEUMATICS IN GENERAL
- F15B—SYSTEMS ACTING BY MEANS OF FLUIDS IN GENERAL; FLUID-PRESSURE ACTUATORS, e.g. SERVOMOTORS; DETAILS OF FLUID-PRESSURE SYSTEMS, NOT OTHERWISE PROVIDED FOR
- F15B11/00—Servomotor systems without provision for follow-up action; Circuits therefor
- F15B11/02—Systems essentially incorporating special features for controlling the speed or actuating force of an output member
- F15B11/024—Systems essentially incorporating special features for controlling the speed or actuating force of an output member by means of differential connection of the servomotor lines, e.g. regenerative circuits
Definitions
- This disclosure relates to a regeneration control device for a work machine such as a hydraulic excavator.
- Patent Document 1 discloses a hydraulic control device for a hydraulic excavator that can easily and reliably perform level pulling operations.
- an arm regeneration operation may be performed, which is a regeneration operation for driving the arm cylinder.
- the arm regeneration operation is an operation in which, when the arm cylinder is extended to move the arm in the arm retracting direction, at least a portion of the discharged hydraulic oil, which is the hydraulic oil discharged from the rod side chamber of the arm cylinder, is resupplied to the head side chamber of the arm cylinder without being returned to the tank. This arm regeneration operation makes it possible to accelerate the arm retracting operation of the arm.
- the controller of the work machine controls switching between a regeneration state in which arm regeneration operation is performed and a regeneration release state in which arm regeneration operation is not performed, depending on the state of the hydraulic circuit (e.g. pump pressure) that changes during work.
- a regeneration state in which arm regeneration operation is performed
- a regeneration release state in which arm regeneration operation is not performed
- the present disclosure aims to provide a regeneration control device for a work machine that can suppress the occurrence of hunting and improve energy efficiency in a work machine that performs arm regeneration operations.
- the regeneration control device for a work machine includes an arm cylinder that moves an arm by receiving hydraulic oil discharged from a pump and operates to do so; a regeneration circuit that can switch between a regeneration state in which an opening of a hydraulic oil flow path that returns discharged hydraulic oil from the arm cylinder to a tank is made smaller so that at least a portion of the discharged hydraulic oil is resupplied to the arm cylinder through the regeneration flow path, and a regeneration release state in which the regeneration state is released by making the opening larger than the regeneration state; and a controller that controls the regeneration circuit so that, when the regeneration circuit is transitioned from the regeneration state to the regeneration release state, if a predetermined judgment condition for judging a specific task of storing an object in a bucket is not satisfied, the transition from the regeneration state to the regeneration release state is performed with a first responsiveness, and if the judgment condition is satisfied, the transition from the regeneration state to the regeneration release state is performed with a second responsiveness higher than the first responsiveness.
- FIG. 1 is a side view showing a hydraulic excavator, which is a work machine equipped with a regeneration control device according to an embodiment of the present disclosure.
- FIG. 2 is a diagram showing a hydraulic circuit mounted on the hydraulic excavator.
- FIG. 2 is a block diagram showing main functions of a controller of the playback control device.
- 1A to 1C are diagrams illustrating the operation of the working device during excavation work.
- 11A to 11C are diagrams illustrating the operation of the working device during horizontal pulling work.
- 11A to 11C are diagrams illustrating the operation of the working device in a pressing and leveling operation.
- 11 is a graph showing an example of changes over time in the lever operation amount for each of an excavation operation, a leveling operation, and a pressing and leveling operation.
- 11A and 11B are diagrams for explaining pump pressure, regeneration release flag, arm pull meter-out throttle opening, and arm pull meter-out loss during excavation work using the work machine according to the reference example.
- 11A to 11D are diagrams for explaining the regeneration cancellation response characteristics, pump pressure, regeneration cancellation flag, arm retraction meter-out throttle opening, and arm retraction meter-out loss during excavation work using the work machine according to the embodiment.
- 4 is a flowchart showing an arithmetic control process performed by the controller.
- 10 is a flowchart showing a modified example of the arithmetic control process performed by the controller.
- 13 is a diagram showing the relationship between the lever operation amount and response characteristics of the bucket operation in the modified example.
- FIG. 1 shows a hydraulic excavator 100, which is a work machine equipped with a regeneration control device according to this embodiment.
- the regeneration control device according to this disclosure is not limited to the hydraulic excavator 100 shown here, but can be widely applied to work machines that have a machine body and a working device and operate using hydraulic pressure as the main power source.
- the hydraulic excavator 100 comprises a lower running body 10 capable of running on the ground G, an upper rotating body 12 supported by the lower running body 10, and a working device 14 supported by the upper rotating body 12.
- the upper rotating body 12 includes a rotating frame 15, which is supported by the lower running body 10 so as to be rotatable about a vertical axis Z.
- the upper rotating body 12 further includes a plurality of elements supported by the rotating frame 15, which include a cab 16 serving as a driver's compartment, and an engine room 18 that houses an engine, etc.
- the working device 14 includes a boom 20, an arm 22, and a bucket 24.
- the fore-aft direction X is defined based on the orientation of the upper rotating body 12.
- the boom 20 has a base end that is attached to the front end of the upper rotating body 12 so as to be rotatable around a horizontal axis in the boom-raising direction and the boom-lowering direction, and a tip end on the opposite side.
- the boom-raising direction is the direction in which the boom 20 rotates so that the tip of the boom 20 moves away from the ground G
- the boom-lowering direction is the direction opposite to the boom-raising direction.
- the arm 22 has a base end that is attached to the tip of the boom 20 so as to be rotatable around a horizontal axis in the arm retracting direction and the arm pushing direction, and a tip end on the opposite side.
- the arm retracting direction is the rotation direction in which the arm 22 approaches the boom 20 so that the tip of the arm 22 moves rearward
- the arm pushing direction is the rotation direction opposite to the arm retracting direction.
- the bucket 24 has a base end that is attached to the tip of the arm 22 so as to be rotatable around a horizontal axis in the bucket excavation direction and the bucket opening direction, and a tip end 24E on the opposite side.
- the bucket excavation direction is the direction in which the bucket 24 rotates so that the tip end 24E of the bucket 24 approaches the upper rotating body 12 or the boom 20, and the bucket opening direction is the rotation direction opposite to the bucket excavation direction.
- the bucket 24 has a bottom surface 24S that is used in the pressing and leveling work described below.
- the hydraulic excavator 100 further includes a plurality of work actuators for hydraulically moving the work equipment 14, and a rotation motor 30 for hydraulically rotating the upper rotating body 12.
- the plurality of work actuators include a boom cylinder 26 for moving the boom 20, an arm cylinder 27 for moving the arm 22, and a bucket cylinder 28 for moving the bucket 24.
- Each of these cylinders 26 to 28 is composed of a hydraulic cylinder that expands and contracts when supplied with hydraulic oil.
- the boom cylinder 26 is connected to the boom 20 and the upper rotating body 12 so that the boom 20 rises and falls, i.e., rotates in the boom-up direction and the boom-down direction, as the boom cylinder 26 extends and retracts.
- the arm cylinder 27 is connected to the arm 22 and the boom 20 so that the arm 22 rotates in the arm-pulling direction and the arm-pushing direction, as the arm cylinder 27 extends and retracts.
- the bucket cylinder 28 is connected to the arm 22 and the bucket 24 so that the bucket 24 rotates in the bucket digging direction and the bucket opening direction, as the bucket cylinder 28 extends and retracts.
- the slewing motor 30 is composed of a hydraulic motor having an output shaft, which is connected to the upper rotating body 12 via a reduction gear (not shown).
- the output shaft rotates in a direction corresponding to the direction of the supply, making it possible to rotate the upper rotating body 12 in both the left and right directions.
- the hydraulic excavator 100 has a hydraulic circuit. As shown in FIG. 2, the hydraulic circuit includes a portion for causing the arm 22 to rotate and a portion for causing the bucket 24 to rotate. These portions include the arm cylinder 27, the bucket cylinder 28, the first main pump 31, the second main pump 32, the pilot pump 33, an operating device, an arm control valve 41, the bucket control valve 42, a regeneration switching valve 72, and a regeneration operating valve 74 (meter-out throttle opening adjustment valve).
- the operating device includes an arm operator 34 and a bucket operator 35.
- the arm operator 34 is provided with arm pulling and arm pushing operations by the operator
- the bucket operator 35 is provided with bucket digging and bucket opening operations by the operator.
- the first main pump 31, the second main pump 32, and the pilot pump 33 are all driven by the engine, thereby discharging oil from the tank.
- the first main pump 31 is a hydraulic pump connected to the arm cylinder 27 and discharging hydraulic oil to be supplied thereto.
- the second main pump 32 is a hydraulic pump connected to the bucket cylinder 28 and discharging hydraulic oil to be supplied thereto.
- the pilot pump 33 is a hydraulic pump that discharges the hydraulic oil from the tank as pilot oil to generate pilot pressure to be supplied to the arm control valve 41, pilot pressure to be supplied to the bucket control valve 42, and pilot pressure to be supplied to the regeneration switching valve 72.
- Each of the first main pump 31 and the second main pump 32 in this embodiment is a variable displacement hydraulic pump, but may be a fixed displacement hydraulic pump.
- the arm cylinder 27 includes a cylinder body 27a, a piston 27b, and a cylinder rod 27c.
- the cylinder body 27a surrounds a cylinder chamber.
- the piston 27b is loaded into the cylinder chamber and divides the cylinder chamber into a head side chamber 27d and a rod side chamber 27e.
- the cylinder rod 27c extends from the piston 27b through the rod side chamber 27e and protrudes to the outside of the cylinder body 27a.
- the bucket cylinder 28 includes a cylinder body 28a, a piston 28b, and a cylinder rod 28c.
- the cylinder body 28a surrounds the cylinder chamber.
- the piston 28b is loaded into the cylinder chamber and divides the cylinder chamber into a head side chamber 28d and a rod side chamber 28e.
- the cylinder rod 28c extends from the piston 28b through the rod side chamber 28e and protrudes to the outside of the cylinder body 28a.
- Each of the arm control valve 41 and the bucket control valve 42 consists of a hydraulic pilot switching valve, and when supplied with pilot pressure from the pilot pump 33, it operates in the valve opening direction with a stroke according to the magnitude of the pilot pressure. Therefore, the arm control valve 41 allows hydraulic oil to be supplied to either the head side chamber 28d or the rod side chamber 28e of the arm cylinder 27 at a flow rate corresponding to the pilot pressure.
- the bucket control valve 42 allows hydraulic oil to be supplied to either the head side chamber 28d or the rod side chamber 28e of the bucket cylinder 28 at a flow rate corresponding to the pilot pressure.
- the hydraulic circuit includes a center bypass line 51, a supply line 52, an arm pull-back line 53, and an arm push-back line 54 as flow paths for the hydraulic oil discharged from the first main pump 31.
- the center bypass line 51 is arranged to extend from the discharge port of the first main pump 31 to the tank, and the arm control valve 41 is arranged midway along the center bypass line 51.
- the supply line 52 is a line that allows the hydraulic oil discharged from the first main pump 31 to be supplied to the arm control valve 41.
- the supply line 52 branches off from the center bypass line 51 at a position upstream of the arm control valve 41 and leads to the inlet port of the arm control valve 41.
- the arm retraction line 53 is a line for guiding the discharged hydraulic oil discharged from the arm cylinder 27 to the tank when the arm 22 is rotating in the arm retraction direction.
- the arm push return line 54 is a line for guiding the discharged hydraulic oil discharged from the arm cylinder 27 to the tank when the arm 22 is rotating in the arm push direction.
- the arm control valve 41 is a three-position pilot switching valve, and has an arm pull pilot port 41a and an arm push pilot port 41b.
- the arm control valve 41 is kept in the neutral position 41N, and the hydraulic oil from the first main pump 31 is released directly to the tank by blocking communication between the first main pump 31 and the arm cylinder 27 and opening the center bypass line 51.
- the arm control valve 41 shifts from the neutral position 41N to the arm-pull position 41A with a stroke corresponding to the magnitude of the arm-pull pilot pressure, and at this arm-pull position 41A, it allows hydraulic oil from the first main pump 31 to be supplied to the head side chamber 27d of the arm cylinder 27 at a flow rate corresponding to the stroke, and forms a flow path for guiding the discharged hydraulic oil discharged from the rod side chamber 27e of the arm cylinder 27 to the arm-pull return line 53.
- the arm control valve 41 connects the supply line 52 to the head side chamber line 55 connected to the head side chamber 27d, and connects the rod side chamber line 56 connected to the rod side chamber 27e to the arm-pull return line 53.
- the arm cylinder 27 is extended at a speed corresponding to the stroke, causing the arm 22 to rotate in the arm-pull direction, and causing the discharged hydraulic oil from the arm cylinder 27 to flow to the arm-pull return line 53.
- the arm control valve 41 shifts from the neutral position 41N to the arm push position 41B with a stroke corresponding to the magnitude of the arm push pilot pressure, and in this arm push position 41B, it allows hydraulic oil from the first main pump 31 to be supplied to the rod side chamber 27e of the arm cylinder 27 at a flow rate corresponding to the stroke, and forms a flow path for guiding the discharged hydraulic oil discharged from the head side chamber 27d of the arm cylinder 27 to the arm push return line 54.
- the arm control valve 41 connects the supply line 52 to the rod side chamber line 56, and connects the head side chamber line 55 to the arm push return line 54.
- the arm cylinder 27 contracts in the arm push direction at a speed corresponding to the stroke, rotating the arm 22 in the arm push direction, and causing the discharged hydraulic oil from the arm cylinder 27 to flow to the arm push return line 54.
- the hydraulic circuit includes a center bypass line 61, a supply line 62, and a bucket return line 63 as flow paths for the hydraulic oil discharged from the second main pump 32.
- the center bypass line 61 is arranged to extend from the discharge port of the second main pump 32 to the tank, and the bucket control valve 42 is arranged midway along the center bypass line 61.
- the supply line 62 is a line that allows the hydraulic oil discharged from the second main pump 32 to be supplied to the bucket control valve 42.
- the supply line 62 branches off from the center bypass line 61 at a position upstream of the bucket control valve 42 and leads to the inlet port of the bucket control valve 42.
- the bucket return line 63 is a line that guides the discharged hydraulic oil discharged from the bucket cylinder 28 to the tank.
- the bucket control valve 42 is a three-position pilot switching valve and has a bucket excavation pilot port 42a and a bucket opening pilot port 42b.
- the bucket control valve 42 is kept in the neutral position 42N, and the hydraulic oil from the second main pump 32 is released directly to the tank by blocking communication between the second main pump 32 and the bucket cylinder 28 and opening the center bypass line 61.
- the bucket control valve 42 shifts from the neutral position 42N to the bucket excavation position 42A with a stroke corresponding to the magnitude of the bucket excavation pilot pressure, and at this bucket excavation position 42A, it allows hydraulic oil from the second main pump 32 to be supplied to the head side chamber 28d of the bucket cylinder 28 at a flow rate corresponding to the stroke, and forms a flow path for guiding the discharged hydraulic oil discharged from the rod side chamber 28e of the bucket cylinder 28 to the return line 63.
- the bucket control valve 42 connects the supply line 62 to the head side chamber line 65 connected to the head side chamber 28d, and connects the rod side chamber line 66 connected to the rod side chamber 28e to the return line 63.
- the bucket cylinder 28 is extended at a speed corresponding to the stroke, causing the bucket 24 to rotate in the bucket excavation direction, and causing the discharged hydraulic oil from the bucket cylinder 28 to flow to the return line 63.
- the bucket control valve 42 shifts from the neutral position 42N to the bucket opening position 42B with a stroke corresponding to the magnitude of the bucket opening pilot pressure, and at this bucket opening position 42B, it allows hydraulic oil from the second main pump 32 to be supplied to the rod side chamber 28e of the bucket cylinder 28 at a flow rate corresponding to the stroke, and forms a flow path for guiding the discharged hydraulic oil discharged from the head side chamber 28d of the bucket cylinder 28 to the return line 63.
- the bucket control valve 42 connects the supply line 62 to the rod side chamber line 66, and connects the head side chamber line 65 to the return line 63.
- the bucket cylinder 28 contracts in the bucket opening direction at a speed corresponding to the stroke, rotating the bucket 24 in the bucket opening direction, and causing the discharged hydraulic oil from the bucket cylinder 28 to flow to the return line 63.
- the arm operator 34 includes an arm lever 34a and an arm pilot valve 34b.
- the arm operator 34 is provided in the cab 16 so that the arm lever 34a can be operated by the operator.
- the arm lever 34a is a part where the operator applies arm operation to extend and retract the arm cylinder 27 to rotate the arm 22.
- the arm lever 34a is connected to the arm pilot valve 34b so that it can rotate around the base end of the arm lever 34a.
- the arm operation is an arm pulling operation in which the arm lever 34a is rotated in one direction to rotate the arm 22 in the arm pulling direction, or an arm pushing operation in which the arm lever 34a is rotated in the direction opposite to the one direction to rotate the arm 22 in the arm pushing direction.
- the arm pilot valve 34b constitutes an arm command section together with the pilot pump 33.
- the arm command section causes the arm control valve 41 to perform an opening and closing operation in a direction that operates the arm cylinder 27 in a direction corresponding to the arm operation applied to the arm lever 34a.
- the arm pilot valve 34b has an inlet port connected to the pilot pump 33 and a pair of outlet ports. The pair of outlet ports are connected to the arm pull pilot port 41a and the arm push pilot port 41b of the arm control valve 41 via the arm pull pilot line 36A and the arm push pilot line 36B, respectively.
- the arm pilot valve 34b When the arm lever 34a is in a neutral position with substantially no arm operation applied thereto, that is, when the arm lever 34a is in a neutral state in which the magnitude of the arm operation is substantially zero, the arm pilot valve 34b maintains a closed valve state that blocks communication between the pilot pump 33 and the arm pull and arm push pilot ports 41a, 41b.
- the arm pilot valve 34b When the arm lever 34a is rotated from the neutral position, that is, when an arm operation is applied to the arm lever 34a, the arm pilot valve 34b opens in response to the arm operation to allow pilot pressure having a magnitude corresponding to the magnitude of the arm operation to be supplied from the pilot pump 33 to the pilot port corresponding to the direction of the arm operation among the arm pull and arm push pilot ports 41a, 41b.
- the arm control valve 41 opens in a direction corresponding to the direction of the arm operation applied to the arm lever 34a with a stroke corresponding to the magnitude of the arm operation.
- the bucket operator 35 includes a bucket lever 35a and a bucket pilot valve 35b.
- the bucket operator 35 is provided in the cab 16 so that the bucket lever 35a can be operated by the operator.
- the bucket lever 35a is a part where the bucket operation for rotating the bucket 24 by extending and retracting the bucket cylinder 28 is provided by the operator.
- the bucket lever 35a is connected to the bucket pilot valve 35b so that it can rotate around the base end of the bucket lever 35a.
- the bucket operation is a bucket excavation operation in which the bucket lever 35a is rotated in one direction to rotate the bucket 24 in the bucket excavation direction, or a bucket opening operation in which the bucket lever 35a is rotated in the opposite direction to the one direction to rotate the bucket 24 in the bucket opening direction.
- the bucket pilot valve 35b constitutes a bucket command section together with the pilot pump 33.
- the bucket command section causes the bucket control valve 42 to perform an opening and closing operation in a direction that operates the bucket cylinder 28 in a direction corresponding to the bucket operation applied to the bucket lever 35a.
- the bucket pilot valve 35b has an inlet port connected to the pilot pump 33 and a pair of outlet ports. The pair of outlet ports are connected to the bucket excavation pilot port 42a and the bucket opening pilot port 42b of the bucket control valve 42 via the bucket excavation pilot line 37A and the bucket opening pilot line 37B, respectively.
- the bucket pilot valve 35b When the bucket lever 35a is not substantially subjected to the bucket operation and the bucket lever 35a is in a neutral position, that is, when the bucket lever 35a is in a neutral state in which the magnitude of the bucket operation is substantially zero, the bucket pilot valve 35b maintains a closed state that blocks communication between the pilot pump 33 and the bucket excavation and bucket opening pilot ports 42a, 42b.
- the bucket pilot valve 35b When the bucket lever 35a is rotated from the neutral position, that is, when a bucket operation is applied to the bucket lever 35a, the bucket pilot valve 35b opens in response to the bucket operation to allow pilot pressure having a magnitude corresponding to the magnitude of the bucket operation to be supplied from the pilot pump 33 to the pilot port corresponding to the direction of the bucket operation among the bucket excavation and bucket opening pilot ports 42a, 42b.
- the bucket control valve 42 opens in a direction corresponding to the direction of the bucket operation applied to the bucket lever 35a with a stroke corresponding to the magnitude of the bucket operation.
- the hydraulic circuit further includes a regeneration circuit 70.
- the regeneration circuit 70 enables a portion of the discharged hydraulic oil discharged from the rod side chamber 27e of the arm cylinder 27 when the arm cylinder 27 is extended to move the arm 22 in the arm retraction direction to be resupplied to the head side chamber 27d, thereby enabling the speed of the extension operation of the arm cylinder 27 to be increased.
- the regeneration circuit 70 includes a regeneration flow path 71, a regeneration switching valve 72, and a regeneration operation valve 74.
- the regeneration flow path 71 is formed by the arm control valve 41 when it is shifted to the arm retract position 41A.
- the regeneration flow path 71 is a flow path that guides a portion of the discharged hydraulic oil to the head side chamber line 55 that connects to the head side chamber 27d of the arm cylinder 27, separate from the normal return flow path 43 at the arm retract position 41A.
- the normal return flow path 43 is a flow path that guides the discharged hydraulic oil that is returned to the arm control valve 41 from the rod side chamber 27e of the arm cylinder 27 through the rod side chamber line 56 during the arm retract operation, to the arm retract return line 53.
- the regeneration switching valve 72 is a switching valve having a regeneration position 72R and a regeneration release position 72C, and in this embodiment is configured as a two-position pilot switching valve having a regeneration pilot port 72a.
- the regeneration pilot port 72a is connected to the pilot pump 33 via a regeneration pilot line 73.
- the regeneration switching valve 72 is maintained in the regeneration release position 72C when no regeneration pilot pressure is supplied to the regeneration pilot port 72a.
- the regeneration switching valve 72 shifts from the regeneration release position 72C toward the regeneration position 72R with a stroke corresponding to the magnitude of the regeneration pilot pressure, and when a predetermined level of regeneration pilot pressure is supplied to the regeneration pilot port 72a, the regeneration switching valve 72 switches to the regeneration position 72R.
- the opening degree of the regeneration switching valve 72 is adjusted continuously or stepwise according to the magnitude of the regeneration pilot pressure supplied to the regeneration pilot port 72a.
- the regeneration switching valve 72 may be configured to be maintained in the regeneration position 72R when no regeneration pilot pressure is supplied to the regeneration pilot port 72a, to shift from the regeneration position 72R toward the regeneration release position 72C with a stroke corresponding to the magnitude of the regeneration pilot pressure when a certain level of regeneration pilot pressure is supplied to the regeneration pilot port 72a, and to switch to the regeneration release position 72C when a predetermined level of regeneration pilot pressure is supplied to the regeneration pilot port 72a.
- the regeneration switching valve 72 When the regeneration switching valve 72 is switched to the regeneration position 72R, it restricts the flow rate of the discharged hydraulic oil flowing through the arm retraction line 53, i.e., the arm retraction flow rate, by providing a throttle in the arm retraction line 53. As a result, at least a portion of the discharged hydraulic oil flowing into the arm control valve 41 through the rod side chamber line 56 flows into the regeneration flow path 71 instead of the return flow path 43 and is resupplied to the head side chamber 27d of the arm cylinder 27. In other words, when the regeneration switching valve 72 is switched to the regeneration position 72R, the regeneration circuit 70 switches to a regeneration state, i.e., a state in which arm regeneration operation can be performed.
- a regeneration state i.e., a state in which arm regeneration operation can be performed.
- the regeneration switching valve 72 when the regeneration switching valve 72 is switched to the regeneration release position 72C, it fully opens the arm retraction return line 53 and releases the restriction on the arm retraction flow rate. This makes the pressure in the arm retraction return line 53 sufficiently lower than the pressure in the head side chamber line 55, and almost all of the discharged hydraulic oil flows to the return flow path 43 instead of the regeneration flow path 71.
- the regeneration switching valve 72 when the regeneration switching valve 72 is switched to the regeneration release position 72C, the regeneration circuit 70 switches to a regeneration release state (regeneration cut state), i.e., a state in which the arm regeneration operation is not performed.
- the regeneration operation valve 74 is provided in the middle of the regeneration pilot line 73.
- the regeneration operation valve 74 operates to adjust the magnitude of the regeneration pilot pressure supplied to the regeneration pilot port 72a of the regeneration switching valve 72 through the regeneration pilot line 73 in response to a regeneration command signal input from a controller 90, which will be described later.
- the regeneration operation valve 74 is composed of an electromagnetic proportional valve (electromagnetic pressure reducing valve) having a solenoid 74a. When a regeneration command signal is not input to the solenoid 74a, the regeneration operation valve 74 closes to block the supply of regeneration pilot pressure from the pilot pump 33 to the regeneration pilot port 72a of the regeneration switching valve 72.
- the regeneration operation valve 74 opens at an opening degree corresponding to the regeneration command signal to adjust the magnitude of the regeneration pilot pressure supplied from the pilot pump 33 to the regeneration pilot port 72a of the regeneration switching valve 72.
- the hydraulic excavator further includes a plurality of sensors and a controller 90 shown in Figs. 2 and 3.
- the controller 90 is connected to the hydraulic circuit shown in Fig. 2 and controls the arm regeneration operation.
- the plurality of sensors acquires information necessary to enable control by the controller 90 and provides this information to the controller 90.
- the plurality of sensors include a pump pressure sensor 81, an arm retraction pilot pressure sensor 82, a bucket digging pilot pressure sensor 83, and a bucket opening pilot pressure sensor 84.
- the pump pressure sensor 81 detects the pump pressure, which is the pressure of the hydraulic oil discharged from the first main pump 31. Specifically, the pump pressure sensor 81 is connected to a pump line that leads to the discharge port of the first main pump 31.
- the pump pressure sensor 81 is composed of a pressure sensor, and converts the pump pressure into an electrical signal, i.e., a pump pressure detection signal, and inputs it to the controller 90.
- the arm pull pilot pressure sensor 82 is an arm pull operation detector that detects the arm pull operation applied to the arm operator 34. Specifically, the arm pull pilot pressure sensor 82 is connected to the arm pull pilot line 36A, and detects the arm pull pilot pressure supplied from the arm operator 34 to the arm pull pilot port 41a of the arm control valve 41 through the arm pull pilot line 36A.
- the arm pull pilot pressure sensor 82 is composed of a pressure sensor, and converts the arm pull pilot pressure into an electrical signal, i.e., an arm pull pilot pressure detection signal, and inputs it to the controller 90.
- the bucket excavation pilot pressure sensor 83 is a bucket excavation operation detector that detects the bucket excavation operation applied to the bucket operator 35. Specifically, the bucket excavation pilot pressure sensor 83 is connected to the bucket excavation pilot line 37A, and detects the bucket excavation pilot pressure supplied from the bucket operator 35 to the bucket excavation pilot port 42a of the bucket control valve 42 through the bucket excavation pilot line 37A.
- the bucket excavation pilot pressure sensor 83 is composed of a pressure sensor, and converts the bucket excavation pilot pressure into an electrical signal, i.e., a bucket excavation pilot pressure detection signal, and inputs it to the controller 90.
- the bucket opening pilot pressure sensor 84 is a bucket opening operation detector that detects the bucket opening operation applied to the bucket operator 35. Specifically, the bucket opening pilot pressure sensor 84 is connected to the bucket opening pilot line 37B, and detects the bucket opening pilot pressure supplied from the bucket operator 35 to the bucket opening pilot port 42b of the bucket control valve 42 through the bucket opening pilot line 37B.
- the bucket opening pilot pressure sensor 84 is composed of a pressure sensor, and converts the bucket opening pilot pressure into an electrical signal, i.e., a bucket opening pilot pressure detection signal, and inputs it to the controller 90.
- the controller 90 includes a computer including a processor such as a CPU or MPU, and a memory.
- the controller 90 includes a mode setting unit 91, a response characteristic setting unit 92, and a playback control command unit 93, as shown in FIG. 3, as functions for controlling the arm playback operation, including switching between the playback state and the playback cancellation state.
- the mode setting unit 91 switches the control mode of the arm regeneration operation.
- the control modes include a regeneration mode that allows the arm regeneration operation to be performed, and a regeneration release mode that does not allow the arm regeneration operation to be performed.
- the mode setting unit 91 switches the regeneration release flag (regeneration cut flag) from “OFF” to "ON” when a predetermined flag ON condition is met.
- the regeneration release flag is "ON”
- the control mode is the regeneration release mode.
- the mode setting unit 91 switches the regeneration release flag from "ON” to "OFF” when a predetermined flag OFF condition is met.
- the control mode is the regeneration mode.
- the flag ON condition may be that the pump pressure exceeds a predetermined set pressure (P_cut1). That is, the mode setting unit 91 may determine whether the pump pressure exceeds the predetermined set pressure (P_cut1) based on the pump pressure detection signal input from the pump pressure sensor 81 to the controller 90, and switch the regeneration release flag from "OFF" to "ON” when the pump pressure exceeds the set pressure (P_cut1).
- the flag OFF condition may be, for example, that the pump pressure becomes equal to or lower than a predetermined set pressure (P_cut2).
- the set pressure (P_cut2) may be the same value as the set pressure (P_cut1), or may be a value smaller than the set pressure (P_cut1).
- the flag OFF condition may be, for example, that the elapsed time from the time when the regeneration release flag is switched from "OFF" to "ON" is equal to or greater than a predetermined flag OFF setting time.
- the flag OFF condition may be, for example, that the amount of arm pulling operation becomes less than a predetermined flag OFF setting value.
- the response characteristic setting unit 92 sets the response characteristic (transient characteristic) when the regeneration circuit 70 transitions from the regeneration state to the regeneration release state based on the arm retraction pilot pressure detection signal, bucket excavation pilot pressure detection signal, and bucket opening pilot pressure detection signal input to the controller 90 from the arm retraction pilot pressure sensor 82, bucket excavation pilot pressure sensor 83, and bucket opening pilot pressure sensor 84.
- the response characteristic setting unit 92 sets the response characteristic to a predetermined first responsiveness when a predetermined judgment condition for judging excavation work (an example of a specific work) is not satisfied, and sets the response characteristic to a predetermined second responsiveness when the judgment condition is satisfied.
- the second responsiveness is set higher than the first responsiveness.
- Excavation work is work for storing soil and sand from the ground in a bucket.
- the first responsiveness is set in advance so as to suppress the occurrence of hunting when work other than excavation work, specifically, for example, pressing and leveling work, is performed.
- the second responsiveness is set in advance so as to improve energy efficiency when excavation work is performed.
- the judgment conditions may include the operation amount of the arm pulling operation given to the arm operator 34 becoming equal to or greater than a predetermined arm setting value, and the operation amount of the bucket excavation operation given to the bucket operator 35 becoming equal to or greater than a predetermined bucket setting value (first judgment condition).
- the judgment conditions may also include the operation amount of the bucket excavation operation becoming equal to or greater than a predetermined bucket setting value before the time during which the operation amount of the arm pulling operation is maintained equal to or greater than the predetermined arm setting value elapses for a predetermined set time (second judgment condition).
- the regeneration control command unit 93 adjusts the secondary pressure of the regeneration operation valve 74, i.e., the magnitude of the regeneration pilot pressure supplied to the regeneration pilot port 72a of the regeneration switching valve 72 through the regeneration pilot line 73, by giving a command (regeneration command signal) to the regeneration operation valve 74 to control the operation of the regeneration operation valve 74.
- the regeneration control command unit 93 inputs a regeneration command signal to the solenoid 74a of the regeneration operation valve 74 such that a regeneration pilot pressure for switching the regeneration switching valve 72 to the regeneration position 72R is supplied from the regeneration operation valve 74 to the regeneration pilot port 72a of the regeneration switching valve 72.
- the regeneration switching valve 72 switches to the regeneration position 72R, and the regeneration circuit 70 switches to the regeneration state.
- the regeneration control command unit 93 inputs a regeneration command signal to the solenoid 74a of the regeneration operation valve 74 such that the regeneration circuit 70 transitions from the regeneration state to the regeneration release state with the response characteristic (first response or second response) set by the response characteristic setting unit 92.
- the secondary pressure of the regeneration operation valve 74 changes at a speed corresponding to the response characteristic
- the opening of the regeneration switching valve 72 changes from the opening at the regeneration position 72R to the opening at the regeneration release position 72C at a speed corresponding to the response characteristic.
- the regeneration control command unit 93 can change the response characteristics by changing the amount of change per time of the command value input to the solenoid 74a of the regeneration operation valve 74. Specifically, when the response characteristic setting unit 92 sets the response characteristics to the first responsiveness, the regeneration control command unit 93 inputs a regeneration command signal to the solenoid 74a of the regeneration operation valve 74 such that the amount of change per time of the command value input to the solenoid 74a of the regeneration operation valve 74 becomes a first predetermined value. This causes the regeneration circuit 70 to transition from the regeneration state to the regeneration release state with the first responsiveness.
- the regeneration control command unit 93 inputs a regeneration command signal to the solenoid 74a of the regeneration operation valve 74 such that the amount of change per time of the command value input to the solenoid 74a of the regeneration operation valve 74 becomes a second predetermined value. This causes the regeneration circuit 70 to transition from the regeneration state to the regeneration release state with the second responsiveness.
- the second predetermined value (the amount of change in the command value per unit time) is greater than the first predetermined value (the amount of change in the command value per unit time).
- FIG. 4 is a diagram explaining the operation of the working device 14 in excavation work
- FIG. 5 is a diagram explaining the operation of the working device 14 in leveling work
- FIG. 6 is a diagram explaining the operation of the working device 14 in pressing and leveling work.
- FIG. 7 is a graph showing an example of the change over time in the amount of operation (lever operation amount) given by the operator to the operating device for each of excavation work, leveling work, and pressing and leveling work.
- the amount of operation for the arm pulling operation is shown by a solid line
- the amount of operation for the bucket operation bucket excavation operation or bucket opening operation
- excavation work is the work of storing soil and sand from the ground (an example of a target object) in the bucket 24.
- the operator performs a bucket digging operation almost simultaneously with the start of the arm pulling operation to make it easier to penetrate the bucket 24 into the soil.
- the operator performs a boom raising operation together with the arm pulling operation and bucket digging operation to adjust the penetration depth of the bucket 24 into the soil.
- the operator usually increases the amount of bucket digging operation performed relatively in the initial stage of starting the arm pulling operation (initial stage of the excavation operation).
- the horizontal pulling operation involves simultaneously pulling the arm and raising the boom so that the tip 24E of the bucket 24 moves rearward almost horizontally along the ground.
- the operator usually does not increase the amount of bucket digging operation very much in the initial stage of starting the arm pulling operation (the initial stage of the horizontal pulling operation).
- the pressing and leveling work involves simultaneously pulling the arm and raising the boom so that the bottom surface 24S of the bucket 24 (see Figure 1) moves backward along the ground while being approximately horizontal to the ground.
- the operator simultaneously pulls the arm and opens the bucket to maintain the bottom surface 24S of the bucket 24 approximately horizontal to the ground during the work.
- Figure 8 is a diagram to explain the pump pressure, regeneration release flag, arm pull meter-out throttle opening, and arm pull meter-out loss during excavation work using a work machine according to the reference example.
- the operator pulls the arm to penetrate the bucket 24 into the ground.
- a relatively high pressure is generated in the pump 31 due to the resistance of the soil.
- the controller controls the regeneration release flag to switch from “OFF” to "ON”.
- the controller gives a regeneration command signal to the solenoid valve (not shown) to increase the opening (meter-out throttle opening) of the hydraulic oil flow path that returns the discharged hydraulic oil, which is the hydraulic oil discharged from the arm cylinder, to the tank in order to switch the regeneration circuit from the regeneration state to the regeneration release state.
- the meter-out throttle opening increases from Amo1 to Amo2.
- the response characteristic (transient characteristic) when the meter-out throttle opening increases from Amo1 to Amo2 is set to the first responsiveness, and this first responsiveness corresponds to the slope of the straight line indicated by the arrow in the second graph from the bottom in Figure 8.
- the first responsiveness is the characteristic of the change in the meter-out throttle opening in the transient stage when the regeneration circuit transitions from a regeneration state to a regeneration release state.
- the response characteristic is set to be significantly smaller than the first response during leveling and pressing work, hunting may occur, in which the regeneration circuit frequently switches between the regeneration state and the regeneration release state in a short period of time. For this reason, in the work machine of the reference example, suppressing hunting is prioritized, and the response characteristic is set to the first response, which has a small rate of change in the meter-out throttle opening.
- the meter-out throttle opening changes to the opening Amo2 over a relatively long period of time, and the meter-out throttle opening remains small for a long time during this transitional stage, resulting in large arm pull meter-out loss.
- FIG. 9 is a diagram for explaining the regeneration release response characteristic, pump pressure, regeneration release flag, arm pull meter-out throttle opening, and arm pull meter-out loss during excavation work using a hydraulic excavator 100 equipped with a regeneration control device according to this embodiment.
- the regeneration release response characteristic is the response characteristic when transitioning from a regeneration state to a regeneration release state
- the arm pull meter-out throttle opening is the size of the opening of the hydraulic oil flow path that returns the discharged hydraulic oil, which is the hydraulic oil discharged from the arm cylinder 27, to the tank
- the arm pull meter-out loss is the pressure loss that occurs at the opening of the hydraulic oil flow path.
- the arm pull meter-out throttle opening (the size of the opening of the hydraulic oil flow path) is the opening of the regeneration switch valve 72.
- the controller 90 when the controller 90 transitions the regeneration circuit 70 from the regeneration state to the regeneration release state, if a predetermined judgment condition (the first judgment condition or the second judgment condition) for determining whether excavation work is being performed is not satisfied, the controller 90 controls the regeneration circuit 70 so that the transition from the regeneration state to the regeneration release state is performed with a first responsiveness, and if the judgment condition is satisfied, the transition from the regeneration state to the regeneration release state is performed with a second responsiveness that is higher than the first responsiveness.
- the second responsiveness is higher than the first responsiveness.
- the second responsiveness corresponds to the slope of the straight line indicated by the arrow in the second graph from the bottom in Figure 9.
- the controller 90 when excavation work is being performed among the various tasks including the arm pulling operation, the controller 90 sets the response characteristic (transient characteristic) when the meter-out throttle opening increases from Amo1 to Amo2 to the second responsiveness shown in FIG. 9, and when work other than excavation work is being performed among the various tasks including the arm pulling operation, the controller 90 sets the response characteristic to the first responsiveness shown in FIG. 8.
- the work other than excavation work is at least one of horizontal pulling work and pressing and leveling work.
- the operator penetrates the bucket 24 into the soil of the ground by performing an arm pulling operation to have the working device 14 perform excavation work.
- excavation work the operator simultaneously performs a bucket digging operation at almost the same time as starting the arm pulling operation to make it easier to penetrate the bucket 24 into the soil.
- P_cut1 the set pressure
- the regeneration control command unit 93 of the controller 90 gives a regeneration command signal (command current) to the regeneration operation valve 74 to increase the opening of the hydraulic oil flow path that returns the discharged hydraulic oil, which is the hydraulic oil discharged from the arm cylinder 27, to the tank, i.e., the opening degree (meter-out throttle opening degree) of the regeneration switching valve 72, in order to switch the regeneration circuit 70 from the regeneration state to the regeneration release state.
- This regeneration command signal is a command current that increases the opening degree (meter-out throttle opening degree) of the regeneration switching valve 72 from Amo1 to Amo2 at a rate of change specified by the second responsiveness. As a result, the opening of the regeneration switching valve 72 (meter-out throttle opening) increases with the second responsiveness from Amo1 to Amo2.
- the response characteristic is switched from the first responsiveness to the second responsiveness as shown in the second graph from the top in Figure 9, so that the time during which the meter-out throttle opening remains small in the initial stage after the start of excavation work can be shortened compared to when the response characteristic is maintained at the first responsiveness (see the second graph from the bottom in Figure 9).
- the arm pull meter-out loss can be prevented from increasing, and energy savings in excavation work can be improved.
- the controller 90 maintains the response characteristic at the first responsiveness without switching to the second responsiveness.
- the controller 90 can determine that leveling work or pressing and leveling work is being performed, rather than excavation work, based on the above first or second judgment condition.
- the controller 90 controls the regeneration release flag to switch from “OFF” to "ON”, and provides the regeneration operation valve 74 with a regeneration command signal (command current) to switch the regeneration circuit from the regeneration state to the regeneration release state.
- the meter-out throttle opening gradually increases from Amo1 to Amo2.
- the meter-out throttle opening would rapidly increase from Amo1 to Amo2, causing the flow rate of hydraulic oil resupplied to the arm cylinder 27 to rapidly decrease, causing the speed of the arm pulling operation to rapidly decrease. In this case, the balance between the speed of the boom raising operation and the arm pulling operation would be lost, and the tip 24E of the bucket 24 would lift off the ground, making it impossible to move the bucket 24 horizontally backward.
- the response characteristic is maintained at the first responsiveness, rather than being switched to the second responsiveness.
- the regeneration circuit 70 is controlled so that its responsiveness when it transitions from a regeneration state to a regeneration release state is lower than when excavation work is being performed. This makes it possible to prevent a sudden drop in the speed of the arm retraction operation, even if the resistance force acting on the arm 22 temporarily increases during leveling work, and makes it difficult for the balance between the speed of the boom raising operation and the arm retraction operation to be lost. This makes it possible to prevent a decrease in the efficiency of the leveling work.
- the operator may increase the amount of operation of the bucket excavation operation in the latter stage of the leveling operation, as shown in the center part (b) of FIG. 7.
- the amount of operation of the bucket excavation operation may become larger than the bucket set value (Pi_bk_dig1), but this often occurs in the latter stage of the leveling operation.
- the controller 90 can maintain the response characteristic at the first responsiveness without switching to the second responsiveness.
- the controller 90 performs control to maintain the response characteristic at the first responsiveness without switching to the second responsiveness based on the above-mentioned first or second judgment condition.
- the force (pressing force) pressing the bottom surface 24S of the bucket 24 against the ground may change.
- the resistance force of the ground acting on the arm 22 in the direction opposite to the direction of the arm pulling operation changes according to the change in the pressing force.
- the pressing force is small, the resistance force acting on the arm 22 is also small, so the pump pressure is below the set pressure (P_cut1).
- the controller 90 controls to maintain the regeneration release flag at "OFF", thereby performing the arm regeneration operation.
- the controller 90 controls the regeneration cancellation flag to switch from “OFF” to "ON” and provides the regeneration control valve 74 with a regeneration command signal (command current) to switch the regeneration circuit from the regeneration state to the regeneration cancellation state.
- the meter-out throttle opening gradually increases from Amo1 to Amo2.
- the response characteristic is set to the second response characteristic, which has high response even in the pressing and leveling work, the meter-out throttle opening rapidly increases from Amo1 to Amo2, and the flow rate of hydraulic oil resupplied to the arm cylinder 27 rapidly decreases, causing a rapid drop in the speed of the arm pulling operation.
- the balance between the speed of the boom raising operation and the arm pulling operation is lost, and the bottom surface 24S of the bucket 24 quickly moves upward from the ground.
- the resistance acting on the arm 22 decreases, and the pump pressure falls below the set pressure (P_cut1).
- the controller 90 controls the regeneration release flag to change from “ON” to “OFF”, and provides the regeneration command signal (command current) to the regeneration operation valve 74 to switch the regeneration circuit from the regeneration release state to the regeneration state. Therefore, even during pressing and leveling work, if the response characteristic is set to the second response, which has high response, the regeneration circuit 70 frequently switches between the regeneration state and the regeneration disabled state in a short period of time, which can cause hunting, a state in which the bottom surface 24S of the bucket 24 is repeatedly pressed against the ground and then lifted off the ground.
- the response characteristic is not switched to the second response but is maintained at the first response.
- the regeneration circuit 70 is controlled so that the response when the regeneration circuit 70 transitions from a regeneration state to a regeneration release state is lower than when excavation work is performed. This makes it possible to prevent a sudden decrease in the speed of the arm retraction operation even if the pressing force changes during pressing and leveling work, and makes it difficult for the balance between the speed of the boom raising operation and the arm retraction operation to be lost. This makes it possible to prevent hunting from occurring and to prevent a decrease in the work efficiency of pressing and leveling work.
- FIG. 10 is a flowchart showing the calculation control process performed by the controller 90.
- the calculation process in FIG. 10 shows the flow in which the controller 90 sets the response characteristics.
- the response characteristic setting unit 92 of the controller 90 determines whether the operation amount of the arm pulling operation is equal to or greater than the arm set value (step S11). If the operation amount of the arm pulling operation is less than the arm set value (NO in step S11), the response characteristic setting unit 92 of the controller 90 sets the response characteristic to the first responsiveness (step S16).
- the controller 90 starts measuring the elapsed time from the point when the amount of arm pulling operation becomes equal to or greater than the arm set value (step S12).
- the response characteristic setting unit 92 of the controller 90 determines whether the operation amount of the bucket excavation operation is equal to or greater than the bucket set value (step S13). If the operation amount of the bucket excavation operation is less than the bucket set value (NO in step S13), the response characteristic setting unit 92 of the controller 90 sets the response characteristic to the first responsiveness (step S16).
- the response characteristic setting unit 92 of the controller 90 determines whether the elapsed time is less than a predetermined set time (step S14). If the elapsed time is equal to or greater than the set time (NO in step S14), the response characteristic setting unit 92 of the controller 90 sets the response characteristic to the first responsiveness (step S16). On the other hand, if the elapsed time is less than the set time (YES in step S14), the response characteristic setting unit 92 of the controller 90 sets the response characteristic to the second responsiveness (step S15).
- FIG. 11 is a flowchart showing a modified example of the calculation control process performed by the controller 90.
- the calculation process in FIG. 11 shows the flow in which the controller 90 sets the response characteristics.
- steps S11-S14 and S16 in the calculation process according to the modified example shown in FIG. 11 is similar to the processing of steps S11-S14 and S16 in the calculation process shown in FIG. 10, so a description of these will be omitted.
- the response characteristic setting unit 92 of the controller 90 changes the second responsiveness according to the operation amount of the bucket excavation operation at that time (step S17). Specifically, if it is determined in step S13 that the operation amount of the bucket excavation operation is equal to or greater than the bucket set value (Pi_bk1) and if it is determined in step S14 that the elapsed time is less than the set time, as shown in FIG. 12, the response characteristic setting unit 92 of the controller 90 changes the second responsiveness so that the second responsiveness is higher when the operation amount of the bucket excavation operation is large compared to when the operation amount of the bucket excavation operation is small.
- the operator tends to perform a bucket excavation operation that actively moves the bucket 24 in the bucket excavation direction, and the operation amount of the bucket excavation operation can be one indicator for determining whether or not excavation work is being performed.
- the response characteristic setting unit 92 of the controller 90 can switch the regeneration circuit 70 from the regeneration state to the regeneration release state with high responsiveness.
- the controller 90 controls the regeneration circuit so that the transition from the regeneration state to the regeneration release state is performed quickly with a second responsiveness higher than the first responsiveness.
- the controller 90 controls the regeneration circuit so that the transition from the regeneration state to the regeneration release state is performed with a first responsiveness lower than the second responsiveness.
- the force acting on the arm 22 from the object may fluctuate, and this force fluctuation may cause fluctuations in the state of the hydraulic circuit, such as fluctuations in pump pressure. Due to such fluctuations in the state of the hydraulic circuit, the regeneration circuit 70 may frequently switch between the regeneration state and the regeneration release state in a short period of time.
- the regeneration control device when tasks other than the specific tasks are performed, the regeneration circuit 70 is controlled so that the transition from the regeneration state to the regeneration release state is performed with a first responsiveness that is lower than the second responsiveness, thereby making it possible to suppress the fluctuation range of the speed of the arm pulling operation from becoming large even if the force acting on the arm 22 from the object fluctuates. This makes it possible to suppress a decrease in work efficiency when tasks other than the specific tasks are performed. From the above, this regeneration control device can suppress a decrease in work efficiency and improve energy efficiency in the hydraulic excavator 100 in which the arm regeneration operation is performed.
- the arm operator 34 and the bucket operator 35 are not limited to those including the arm pilot valve 34b and the bucket pilot valve 35b, respectively.
- At least one of the arm operator and the bucket operator may include an electric lever device that generates an electric signal corresponding to an operation given by an operator and inputs the electric signal to the controller 90, and a pilot pressure command unit that is included in the controller 90 and inputs a command signal to a solenoid operated valve in a pilot line so that a pilot pressure is applied to the pilot port of the arm control valve or the bucket control valve based on the electric signal input from the electric lever device.
- the regeneration circuit according to the present disclosure is not limited to a circuit including a combination of the arm control valve 41 including the regeneration flow path 71 and the regeneration switching valve 72 that limits the return flow rate as shown in Fig. 2.
- the regeneration circuit may include a single regeneration switching valve independent of the arm control valve, specifically, a switching valve that can be switched between a regeneration position that forms a regeneration flow path for resupplying the discharged hydraulic oil discharged from the arm cylinder to the arm cylinder, and a regeneration release position that releases the discharged hydraulic oil directly to the tank.
- the specific work is an excavation work for excavating soil and sand from the ground, but the specific work according to the present disclosure is not limited to an excavation work and may be other work for storing an object in a bucket.
- the object to be stored in the bucket may be something other than soil and sand, such as crushed stone or waste.
- the present disclosure provides a regeneration control device for a work machine that can suppress the occurrence of hunting and improve energy efficiency in a work machine that performs arm regeneration operations.
- the regeneration control device for a work machine includes an arm cylinder that moves an arm by receiving hydraulic oil discharged from a pump and operates to do so; a regeneration circuit that can switch between a regeneration state in which an opening of a hydraulic oil flow path that returns discharged hydraulic oil from the arm cylinder to a tank is made smaller so that at least a portion of the discharged hydraulic oil is resupplied to the arm cylinder through the regeneration flow path, and a regeneration release state in which the regeneration state is released by making the opening larger than the regeneration state; and a controller that controls the regeneration circuit so that, when the regeneration circuit is transitioned from the regeneration state to the regeneration release state, if a predetermined judgment condition for judging a specific task of storing an object in a bucket is not satisfied, the transition from the regeneration state to the regeneration release state is performed with a first responsiveness, and if the judgment condition is satisfied, the transition from the regeneration state to the regeneration release state is performed with a second responsiveness higher than the first responsiveness.
- this regeneration control device when the judgment condition is met, that is, when a specific task of storing an object in the bucket (e.g., excavation work) is being performed, the transition from the regeneration state to the regeneration release state is made quickly with the second responsiveness, thereby improving energy efficiency, and since a relatively high resistance from the object often continues to act on the bucket during this specific task, hunting is unlikely to occur even if the responsiveness is set high.
- the judgment condition when the judgment condition is not met, the transition from the regeneration state to the regeneration release state is made with the first responsiveness, which is lower than the second responsiveness, thereby preventing hunting. Therefore, with this regeneration control device, it is possible to prevent hunting and improve energy efficiency in a work machine that performs arm regeneration operations.
- the playback control device preferably further includes an operating device that receives an arm pulling operation and a bucket digging operation, and the judgment conditions include that the operation amount of the arm pulling operation is equal to or greater than a predetermined arm setting value, and that the operation amount of the bucket digging operation is equal to or greater than a predetermined bucket setting value.
- the controller can appropriately judge whether a specific task is being performed using the judgment conditions.
- the playback control device further includes an operating device that receives an arm pulling operation and a bucket digging operation, and that the judgment condition includes that the operation amount of the bucket digging operation becomes equal to or exceeds a predetermined bucket setting value before the time during which the operation amount of the arm pulling operation is maintained at or above a predetermined arm setting value elapses a predetermined set time.
- the controller can more appropriately judge whether a specific task is being performed by using the judgment condition that includes a time element.
- the controller preferably changes the second responsiveness so that the second responsiveness is higher when the operation amount of the bucket excavation operation is large than when the operation amount of the bucket excavation operation is small.
- the operation amount of the bucket excavation operation can be one of the indicators for judging whether or not a specific task is being performed. That is, when the operation amount of the bucket excavation operation is large, it is more likely that a specific task is being performed than when the operation amount of the bucket excavation operation is small.
- the controller can switch the regeneration circuit from the regeneration state to the regeneration release state with high responsiveness.
- the responsiveness according to the operation amount of the bucket excavation operation, it is possible to suppress a deterioration in the operation feeling due to a sudden change in responsiveness.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Operation Control Of Excavators (AREA)
- Fluid-Pressure Circuits (AREA)
Abstract
再生制御装置は、アームシリンダ(27)と、再生状態と再生解除状態とに切り換わることが可能な再生回路(70)と、再生回路(70)を再生状態から再生解除状態に移行させる場合において、バケット(24)に対象物を収容する特定作業を判定するための所定の判定条件が満たされないときには再生状態から再生解除状態への移行が第1の応答性で行われ、前記判定条件が満たされるときには再生状態から再生解除状態への移行が第1の応答性よりも高い第2の応答性で行われるように再生回路(70)を制御するコントローラ(90)と、を備える。
Description
本開示は、油圧ショベルなどの作業機械の再生制御装置に関する。
油圧ショベルなどの作業機械は、ブーム、アーム及びバケットを含む作業装置を備え、当該作業装置を用いて種々の作業を行う。オペレータは、種々の作業のそれぞれに必要な動作を作業装置が行うように操作レバーに対してレバー操作を与え、作業機械のコントローラは、レバー操作に基づいて作業装置の動作を制御する。例えば、特許文献1は、水平引き作業を簡単かつ確実に行える油圧ショベルの油圧制御装置を開示している。
ところで、再生回路を備える作業機械では、アームシリンダの駆動についての再生動作であるアーム再生動作が行われることがある。アーム再生動作は、アームをアーム引き方向に動かすためにアームシリンダを伸張させるときに、アームシリンダのロッド側室から排出される作動油である排出作動油の少なくとも一部をタンクに戻さずに当該アームシリンダのへッド側室に再供給する動作である。このアーム再生動作は、アームのアーム引き動作を増速させることを可能にする。
作業機械のコントローラは、作業中に変動する油圧回路の状態(例えばポンプ圧)に応じて、アーム再生動作が行われる再生状態と、アーム再生動作が行われない再生解除状態と、を切り換える制御を行う。
しかしながら、作業中にバケットを介してアームに作用する土の抵抗が変動すると、油圧回路の状態(例えばポンプ圧)も変動するので、この変動に伴って再生回路が再生状態と再生解除状態との間で短時間に頻繁に切り換わる不具合(いわゆるハンチング)が発生することがある。このような不具合の発生を抑制するためには、再生回路が再生状態から再生解除状態に移行するときの応答性を低くするような制御を行う必要があるが、再生回路の応答性を低くするとエネルギー効率が低下するという問題がある。
本開示は、アーム再生動作が行われる作業機械においてハンチングの発生を抑制するとともにエネルギー効率を改善することができる作業機械の再生制御装置を提供することを目的とする。
提供される作業機械の再生制御装置は、ポンプから吐出される作動油の供給を受けて作動することによりアームを動かすアームシリンダと、前記アームシリンダから排出される作動油である排出作動油をタンクに戻す作動油流路の開口を小さくすることで前記排出作動油の少なくとも一部が再生流路を通じて前記アームシリンダに再供給される再生状態と前記開口を前記再生状態に比べて大きくすることで前記再生状態を解除する再生解除状態とに切り換わることが可能な再生回路と、前記再生回路を前記再生状態から前記再生解除状態に移行させる場合において、バケットに対象物を収容する特定作業を判定するための所定の判定条件が満たされないときには前記再生状態から前記再生解除状態への移行が第1の応答性で行われ、前記判定条件が満たされるときには前記再生状態から前記再生解除状態への移行が前記第1の応答性よりも高い第2の応答性で行われるように前記再生回路を制御するコントローラと、を備える。
本開示の実施形態を、図面を参照しながら説明する。
図1は、本実施形態に係る再生制御装置を備える作業機械である油圧ショベル100を示す。なお、本開示に係る再生制御装置は、ここに示される油圧ショベル100に限らず、機械本体と作業装置とを備えかつ油圧を主たる動力として作動する作業機械に広く適用され得るものである。
油圧ショベル100は、地面G上を走行可能な下部走行体10と、下部走行体10に支持される上部旋回体12と、上部旋回体12に支持される作業装置14と、を備える。上部旋回体12は、旋回フレーム15を含み、旋回フレーム15は、縦軸Z回りに旋回可能となるように下部走行体10に支持される。上部旋回体12は、旋回フレーム15に支持される複数の要素をさらに含み、当該複数の要素は、運転室であるキャブ16と、エンジン等を収容するエンジンルーム18と、を含む。作業装置14は、ブーム20と、アーム22と、バケット24と、を含む。本実施形態では、上部旋回体12の向きを基準に前後方向Xが規定される。
ブーム20は、上部旋回体12の前端部に水平軸を中心としてブーム上げ方向及びブーム下げ方向に回動可能に取り付けられる基端部と、その反対側の先端部と、を有する。ブーム上げ方向は、ブーム20の先端部が地面Gから遠ざかるようにブーム20が回動する方向であり、ブーム下げ方向は、ブーム上げ方向と逆の方向である。
アーム22は、ブーム20の先端部に水平軸を中心としてアーム引き方向及びアーム押し方向に回動可能に取付けられる基端部と、その反対側の先端部と、を有する。アーム引き方向は、アーム22の先端部が後方に移動するようにアーム22がブーム20に近づく回動方向であり、アーム押し方向は、アーム引き方向と逆の回動方向である。
バケット24は、アーム22の先端部に水平軸を中心としてバケット掘削方向及びバケット開放方向に回動可能に取付けられる基端部と、その反対側の先端部24Eと、を有する。バケット掘削方向は、バケット24の先端部24Eが上部旋回体12又はブーム20に近づくようにバケット24が回動する方向であり、バケット開放方向は、バケット掘削方向と逆の回動方向である。バケット24は、後述する押し付け均し作業において用いられる底面24Sを有する。
油圧ショベル100は、作業装置14を油圧により動かすための複数の作業アクチュエータと、上部旋回体12を油圧により旋回させるための旋回モータ30と、をさらに備える。複数の作業アクチュエータは、ブーム20を動かすためのブームシリンダ26と、アーム22を動かすためのアームシリンダ27と、バケット24を動かすためのバケットシリンダ28と、を含む。これらのシリンダ26~28のそれぞれは、作動油の供給を受けることにより伸縮動作する油圧シリンダにより構成される。
ブームシリンダ26は、当該ブームシリンダ26の伸縮に伴なってブーム20が起伏するように、つまりブーム上げ方向及びブーム下げ方向にそれぞれ回動するように、ブーム20と上部旋回体12とに連結される。アームシリンダ27は、当該アームシリンダ27の伸縮に伴なってアーム22がアーム引き方向及びアーム押し方向にそれぞれ回動するようにアーム22とブーム20とに連結される。バケットシリンダ28は、当該バケットシリンダ28の伸縮に伴ってバケット24がバケット掘削方向及びバケット開放方向にそれぞれ回動するようにアーム22とバケット24とに連結される。
旋回モータ30は、出力軸を有する油圧モータにより構成され、当該出力軸が図略の減速機を介して上部旋回体12に連結されている。旋回モータ30は、作動油の供給を受けることによりその供給の方向に対応した方向に前記出力軸が回転するように動作し、これにより、上部旋回体12を左旋回方向及び右旋回方向に旋回させることが可能である。
油圧ショベル100は、油圧回路を備える。当該油圧回路は、図2に示すようにアーム22の回動を生じさせるための部分と、バケット24の回動を生じさせるための部分と、を含む。これらの部分は、アームシリンダ27と、バケットシリンダ28と、第1メインポンプ31と、第2メインポンプ32と、パイロットポンプ33と、操作装置と、アーム制御弁41と、バケット制御弁42と、再生切換弁72と、再生操作弁74(メータアウト絞り開度調節弁)と、を含む。前記操作装置は、アーム操作器34と、バケット操作器35と、を含む。アーム操作器34には、オペレータによるアーム引き操作及びアーム押し操作が与えられ、バケット操作器35には、オペレータによるバケット掘削操作及びバケット開放操作が与えられる。
第1メインポンプ31、第2メインポンプ32及びパイロットポンプ33は、いずれも前記エンジンによって駆動され、これによりタンク内の油を吐出する。第1メインポンプ31は、アームシリンダ27に接続されてこれに供給されるべき作動油を吐出する油圧ポンプである。第2メインポンプ32は、バケットシリンダ28に接続されてこれに供給されるべき作動油を吐出する油圧ポンプである。パイロットポンプ33は、アーム制御弁41に供給されるべきパイロット圧、バケット制御弁42に供給されるべきパイロット圧、及び再生切換弁72に供給されるべきパイロット圧を生成するために、前記タンク内の作動油をパイロット油として吐出する油圧ポンプである。本実施形態に係る第1メインポンプ31及び第2メインポンプ32のそれぞれは、可変容量型油圧ポンプであるが、固定容量型油圧ポンプであってもよい。
アームシリンダ27は、シリンダ本体27aと、ピストン27bと、シリンダロッド27cと、を含む。シリンダ本体27aはシリンダ室を囲む。ピストン27bはシリンダ室内に装填されて当該シリンダ室をヘッド側室27dとロッド側室27eとに区画する。シリンダロッド27cはピストン27bからロッド側室27eを貫通するように延びてシリンダ本体27aの外部に突出する。へッド側室27dに作動油が供給されることによりピストン27b及びシリンダロッド27cが前進してアームシリンダ27全体が伸長し、これによりアーム22をアーム引き方向に回動させる一方、ロッド側室27e内の作動油が排出される。逆に、ロッド側室27eに作動油が供給されることによりピストン27b及びシリンダロッド27cが後退してアームシリンダ27全体が収縮し、これによりアーム22をアーム押し方向に回動させる一方、へッド側室27d内の作動油が排出される。
バケットシリンダ28は、シリンダ本体28aと、ピストン28bと、シリンダロッド28cと、を含む。シリンダ本体28aはシリンダ室を囲む。ピストン28bはシリンダ室内に装填されて当該シリンダ室をヘッド側室28dとロッド側室28eとに区画する。シリンダロッド28cはピストン28bからロッド側室28eを貫通するように延びてシリンダ本体28aの外部に突出する。へッド側室28dに作動油が供給されることによりピストン28b及びシリンダロッド28cが前進してバケットシリンダ28全体が伸長し、これによりバケット24をバケット掘削方向に回動させる一方、ロッド側室28e内の作動油が排出される。逆に、ロッド側室28eに作動油が供給されることによりピストン28b及びシリンダロッド28cが後退してバケットシリンダ28全体が収縮し、これによりバケット24をバケット開放方向に回動させる一方、へッド側室28d内の作動油が排出される。
アーム制御弁41及びバケット制御弁42のそれぞれは油圧パイロット切換弁からなり、パイロットポンプ33からのパイロット圧の供給を受けることによりそのパイロット圧の大きさに応じたストロークで開弁方向に作動する。従って、アーム制御弁41は、パイロット圧に対応した流量でアームシリンダ27のヘッド側室28d及びロッド側室28eのいずれかに作動油が供給されることを許容する。バケット制御弁42はパイロット圧に対応した流量でバケットシリンダ28のへッド側室28d及びロッド側室28eのいずれかに作動油が供給されることを許容する。
前記油圧回路は、第1メインポンプ31から吐出される作動油の流路として、センターバイパスライン51と、供給ライン52と、アーム引き戻りライン53と、アーム押し戻りライン54と、を含む。センターバイパスライン51は、第1メインポンプ31の吐出口からタンクに至るように配置され、当該センターバイパスライン51の途中にアーム制御弁41が配置される。供給ライン52は、第1メインポンプ31から吐出される作動油がアーム制御弁41に供給されることを許容するラインである。供給ライン52は、アーム制御弁41の上流側の位置でセンターバイパスライン51から分岐して当該アーム制御弁41の入口ポートに至る。
アーム引き戻りライン53は、アーム22がアーム引き方向に回動しているときにアームシリンダ27から排出された排出作動油をタンクまで導くためのラインである。アーム押し戻りライン54は、アーム22がアーム押し方向に回動しているときにアームシリンダ27から排出された排出作動油をタンクまで導くためのラインである。
アーム制御弁41は、3位置のパイロット切換弁であり、アーム引きパイロットポート41a及びアーム押しパイロットポート41bを有する。アーム制御弁41は、アーム引きパイロットポート41a及びアーム押しパイロットポート41bにそれぞれ供給されるパイロット圧、すなわちアーム引きパイロット圧及びアーム押しパイロット圧、がいずれも0または微小である場合は中立位置41Nに保たれ、第1メインポンプ31とアームシリンダ27との間を遮断してセンターバイパスライン51を開通することにより第1メインポンプ31からの作動油をそのままタンクに逃がす。
アーム制御弁41は、アーム引きパイロットポート41aに一定以上のアーム引きパイロット圧が供給されると当該アーム引きパイロット圧の大きさに対応したストロークで中立位置41Nからアーム引き位置41Aにシフトし、このアーム引き位置41Aでは第1メインポンプ31からの作動油が前記ストロークに対応した流量でアームシリンダ27のへッド側室27dに供給されるのを許容するとともに当該アームシリンダ27のロッド側室27eから排出される排出作動油をアーム引き戻りライン53に導くための流路を形成する。具体的に、アーム制御弁41は、供給ライン52とへッド側室27dにつながるヘッド側室ライン55とを接続するとともにロッド側室27eにつながるロッド側室ライン56をアーム引き戻りライン53に接続する。これにより、アームシリンダ27を前記ストロークに対応する速度で伸長させてアーム22をアーム引き方向に回動させるとともに当該アームシリンダ27からの排出作動油をアーム引き戻りライン53に流す。
逆に、アーム制御弁41は、アーム押しパイロットポート41bに一定以上のアーム押しパイロット圧が供給されると当該アーム押しパイロット圧の大きさに対応したストロークで中立位置41Nからアーム押し位置41Bにシフトし、このアーム押し位置41Bでは第1メインポンプ31からの作動油が前記ストロークに対応した流量でアームシリンダ27のロッド側室27eに供給されるのを許容するとともに当該アームシリンダ27のへッド側室27dから排出された排出作動油をアーム押し戻りライン54に導くための流路を形成する。具体的に、アーム制御弁41は、供給ライン52とロッド側室ライン56とを接続するとともにへッド側室ライン55をアーム押し戻りライン54に接続する。これにより、アームシリンダ27を前記ストロークに対応する速度でアーム押し方向に収縮させてアーム22をアーム押し方向に回動させるとともに当該アームシリンダ27からの排出作動油をアーム押し戻りライン54に流す。
前記油圧回路は、第2メインポンプ32から吐出される作動油の流路として、センターバイパスライン61と、供給ライン62と、バケット戻りライン63と、を含む。センターバイパスライン61は、第2メインポンプ32の吐出口からタンクに至るように配置され、当該センターバイパスライン61の途中にバケット制御弁42が配置される。供給ライン62は、第2メインポンプ32から吐出される作動油がバケット制御弁42に供給されることを許容するラインである。供給ライン62は、バケット制御弁42の上流側の位置でセンターバイパスライン61から分岐して当該バケット制御弁42の入口ポートに至る。バケット戻りライン63は、バケットシリンダ28から排出された排出作動油をタンクまで導くためのラインである。
バケット制御弁42は、3位置のパイロット切換弁であり、バケット掘削パイロットポート42a及びバケット開放パイロットポート42bを有する。バケット制御弁42は、バケット掘削パイロットポート42a及びバケット開放パイロットポート42bにそれぞれ供給されるパイロット圧、すなわちバケット掘削パイロット圧及びバケット開放パイロット圧、がいずれも0または微小である場合は中立位置42Nに保たれ、第2メインポンプ32とバケットシリンダ28との間を遮断してセンターバイパスライン61を開通することにより第2メインポンプ32からの作動油をそのままタンクに逃がす。
バケット制御弁42は、バケット掘削パイロットポート42aに一定以上のバケット掘削パイロット圧が供給されると当該バケット掘削パイロット圧の大きさに対応したストロークで中立位置42Nからバケット掘削位置42Aにシフトし、このバケット掘削位置42Aでは第2メインポンプ32からの作動油が前記ストロークに対応した流量でバケットシリンダ28のへッド側室28dに供給されるのを許容するとともに当該バケットシリンダ28のロッド側室28eから排出される排出作動油を戻りライン63に導くための流路を形成する。具体的に、バケット制御弁42は、供給ライン62とへッド側室28dにつながるヘッド側室ライン65とを接続するとともにロッド側室28eにつながるロッド側室ライン66を戻りライン63に接続する。これにより、バケットシリンダ28を前記ストロークに対応する速度で伸長させてバケット24をバケット掘削方向に回動させるとともに当該バケットシリンダ28からの排出作動油を戻りライン63に流す。
逆に、バケット制御弁42は、バケット開放パイロットポート42bに一定以上のバケット開放パイロット圧が供給されると当該バケット開放パイロット圧の大きさに対応したストロークで中立位置42Nからバケット開放位置42Bにシフトし、このバケット開放位置42Bでは第2メインポンプ32からの作動油が前記ストロークに対応した流量でバケットシリンダ28のロッド側室28eに供給されるのを許容するとともに当該バケットシリンダ28のへッド側室28dから排出された排出作動油を戻りライン63に導くための流路を形成する。具体的に、バケット制御弁42は、供給ライン62とロッド側室ライン66とを接続するとともにへッド側室ライン65を戻りライン63に接続する。これにより、バケットシリンダ28を前記ストロークに対応する速度でバケット開放方向に収縮させてバケット24をバケット開放方向に回動させるとともに当該バケットシリンダ28からの排出作動油を戻りライン63に流す。
アーム操作器34は、アームレバー34aとアームパイロット弁34bとを含む。当該アーム操作器34は、アームレバー34aがオペレータにより操作されることが可能となるようにキャブ16内に設けられる。
アームレバー34aは、アームシリンダ27を伸縮させてアーム22を回動させるためのアーム操作がオペレータにより与えられる部分である。アームレバー34aは、当該アームレバー34aの基端部を中心として回動可能となるようにアームパイロット弁34bに連結される。前記アーム操作は、アーム22をアーム引き方向に回動させるためにアームレバー34aを一方向に回動させるアーム引き操作、又はアーム22をアーム押し方向に回動させるためにアームレバー34aを前記一方向と反対の方向に回動させるアーム押し操作である。
アームパイロット弁34bは、パイロットポンプ33とともにアーム指令部を構成する。当該アーム指令部は、アームレバー34aに与えられたアーム操作に対応した方向にアームシリンダ27を作動させる方向の開閉動作をアーム制御弁41に行わせる。具体的に、アームパイロット弁34bは、パイロットポンプ33に接続される入口ポートと、一対の出口ポートと、を有する。当該一対の出口ポートは、アーム引きパイロットライン36A及びアーム押しパイロットライン36Bをそれぞれ介してアーム制御弁41のアーム引きパイロットポート41a及びアーム押しパイロットポート41bにそれぞれ接続されている。アームパイロット弁34bは、アームレバー34aに前記アーム操作が実質上与えられず当該アームレバー34aが中立位置にあるとき、つまり当該アーム操作の大きさが実質上0である中立状態にあるときは、パイロットポンプ33とアーム引き及びアーム押しパイロットポート41a,41bとの間を遮断する閉弁状態を保つ。アームパイロット弁34bは、アームレバー34aが前記中立位置から回動操作されると、つまり当該アームレバー34aにアーム操作が与えられると、アーム引き及びアーム押しパイロットポート41a,41bのうち前記アーム操作の方向に対応するパイロットポートに対して当該アーム操作の大きさに対応した大きさをもつパイロット圧がパイロットポンプ33から供給されるのを許容するように、当該アーム操作に応じて開弁動作する。これにより、アーム制御弁41はアームレバー34aに与えられる前記アーム操作の方向に対応した方向に当該アーム操作の大きさに対応したストロークで開弁動作する。
バケット操作器35は、バケットレバー35aとバケットパイロット弁35bとを含む。当該バケット操作器35は、バケットレバー35aがオペレータにより操作されることが可能となるようにキャブ16内に設けられる。
バケットレバー35aは、バケットシリンダ28を伸縮させてバケット24を回動させるためのバケット操作がオペレータにより与えられる部分である。バケットレバー35aは、当該バケットレバー35aの基端部を中心として回動可能となるようにバケットパイロット弁35bに連結される。前記バケット操作は、バケット24をバケット掘削方向に回動させるためにバケットレバー35aを一方向に回動させるバケット掘削操作、又はバケット24をバケット開放方向に回動させるためにバケットレバー35aを前記一方向と反対の方向に回動させるバケット開放操作である。
バケットパイロット弁35bは、パイロットポンプ33とともにバケット指令部を構成する。当該バケット指令部は、バケットレバー35aに与えられたバケット操作に対応した方向にバケットシリンダ28を作動させる方向の開閉動作をバケット制御弁42に行わせる。具体的に、バケットパイロット弁35bは、パイロットポンプ33に接続される入口ポートと、一対の出口ポートと、を有する。当該一対の出口ポートは、バケット掘削パイロットライン37A及びバケット開放パイロットライン37Bをそれぞれ介してバケット制御弁42のバケット掘削パイロットポート42a及びバケット開放パイロットポート42bにそれぞれ接続されている。バケットパイロット弁35bは、バケットレバー35aに前記バケット操作が実質上与えられず当該バケットレバー35aが中立位置にあるとき、つまり当該バケット操作の大きさが実質上0である中立状態にあるときは、パイロットポンプ33とバケット掘削及びバケット開放パイロットポート42a,42bとの間を遮断する閉弁状態を保つ。バケットパイロット弁35bは、バケットレバー35aが前記中立位置から回動操作されると、つまり当該バケットレバー35aにバケット操作が与えられると、バケット掘削及びバケット開放パイロットポート42a,42bのうち前記バケット操作の方向に対応するパイロットポートに対して当該バケット操作の大きさに対応した大きさをもつパイロット圧がパイロットポンプ33から供給されるのを許容するように、当該バケット操作に応じて開弁動作する。これにより、バケット制御弁42はバケットレバー35aに与えられる前記バケット操作の方向に対応した方向に当該バケット操作の大きさに対応したストロークで開弁動作する。
前記油圧回路は、再生回路70をさらに含む。当該再生回路70は、アーム22をアーム引き方向に動かすようにアームシリンダ27が伸長しているときに当該アームシリンダ27のロッド側室27eから排出される排出作動油の一部がへッド側室27dに再供給されることを可能にし、これにより、当該アームシリンダ27の伸長動作の増速を可能にする。
具体的に、再生回路70は、再生流路71と、再生切換弁72と、再生操作弁74と、を含む。
再生流路71は、この実施形態では、アーム引き位置41Aにシフトされたときのアーム制御弁41によって形成される。具体的に、当該再生流路71は、アーム引き位置41Aにおける正規の戻り流路43とは別に、前記排出作動油の一部をアームシリンダ27のへッド側室27dにつながる前記へッド側室ライン55に導く流路である。前記正規の戻り流路43は、アーム引き動作においてアームシリンダ27のロッド側室27eからロッド側室ライン56を通じてアーム制御弁41に戻される排出作動油をアーム引き戻りライン53に導く流路である。
再生切換弁72は、再生位置72Rと再生解除位置72Cとを有する切換弁であり、この実施形態では再生パイロットポート72aを有する2位置のパイロット切換弁により構成される。再生パイロットポート72aは、再生パイロットライン73を介してパイロットポンプ33に接続される。再生切換弁72は、再生パイロットポート72aに再生パイロット圧が供給されないときは再生解除位置72Cに保たれる。再生切換弁72は、再生パイロットポート72aに一定以上の再生パイロット圧が供給されると当該再生パイロット圧の大きさに対応したストロークで再生解除位置72Cから再生位置72Rに向かってシフトし、再生パイロットポート72aに所定値以上の再生パイロット圧が供給されると再生位置72Rに切り換わる。すなわち、再生切換弁72の開度は、再生パイロットポート72aに供給される再生パイロット圧の大きさに応じて連続的に又は段階的に調節される。
なお、再生切換弁72は、再生パイロットポート72aに再生パイロット圧が供給されないときは再生位置72Rに保たれ、再生パイロットポート72aに一定以上の再生パイロット圧が供給されると当該再生パイロット圧の大きさに対応したストロークで再生位置72Rから再生解除位置72Cに向かってシフトし、再生パイロットポート72aに所定値以上の再生パイロット圧が供給されると再生解除位置72Cに切り換わるように構成されていてもよい。
再生切換弁72は、再生位置72Rに切り換えられたときにはアーム引き戻りライン53の途中に絞りを与えて当該アーム引き戻りライン53を流れる排出作動油の流量すなわちアーム引き戻り流量を制限する。これにより、ロッド側室ライン56を通じてアーム制御弁41に流れ込む排出作動油の少なくとも一部が戻り流路43ではなく再生流路71に流れてアームシリンダ27のへッド側室27dに再供給される。つまり、再生切換弁72が再生位置72Rに切り換えられると、再生回路70は、再生状態、すなわち、アーム再生動作を行うことが可能な状態に切り換わる。
一方、再生切換弁72は、再生解除位置72Cに切り換えられたときにはアーム引き戻りライン53を全開にしてアーム引き戻り流量の制限を解除する。これにより、アーム引き戻りライン53における圧力がへッド側室ライン55における圧力よりも十分低くなり、排出作動油の略全量が再生流路71ではなく戻り流路43に流れる。つまり、再生切換弁72が再生解除位置72Cに切り換えられると、再生回路70は、再生解除状態(再生カット状態)、すなわち、アーム再生動作が行われない状態に切り換わる。
再生操作弁74は、再生パイロットライン73の途中に設けられている。再生操作弁74は、当該再生パイロットライン73を通じて再生切換弁72の再生パイロットポート72aに供給される再生パイロット圧の大きさを、後述するコントローラ90から入力される再生指令信号に応じて調節するように動作する。再生操作弁74は、ソレノイド74aを有する電磁式比例弁(電磁式減圧弁)により構成される。再生操作弁74は、ソレノイド74aに再生指令信号が入力されないときは閉弁してパイロットポンプ33から再生切換弁72の再生パイロットポート72aへの再生パイロット圧の供給を遮断する。一方、再生操作弁74は、ソレノイド74aに再生指令信号が入力されると、その再生指令信号に応じた開度で開弁してパイロットポンプ33から再生切換弁72の再生パイロットポート72aに供給される再生パイロット圧の大きさを調節する。
本実施形態に係る油圧ショベルは、図2及び図3に示される複数のセンサ及びコントローラ90をさらに備える。コントローラ90は、図2に示される油圧回路に接続されて前記アーム再生動作の制御を行う。前記複数のセンサは、コントローラ90による制御を可能にするために必要な情報を取得して当該コントローラ90に与えるものである。前記複数のセンサは、ポンプ圧センサ81と、アーム引きパイロット圧センサ82と、バケット掘削パイロット圧センサ83と、バケット開放パイロット圧センサ84と、を含む。
ポンプ圧センサ81は、第1メインポンプ31から吐出される作動油の圧力であるポンプ圧を検出する。具体的に、ポンプ圧センサ81は、第1メインポンプ31の吐出口につながるポンプラインに接続される。当該ポンプ圧センサ81は、圧力センサにより構成され、前記ポンプ圧を電気信号すなわちポンプ圧検出信号に変換してコントローラ90に入力する。
アーム引きパイロット圧センサ82は、アーム操作器34に与えられるアーム引き操作を検出するアーム引き操作検出器である。具体的に、当該アーム引きパイロット圧センサ82は、アーム引きパイロットライン36Aに接続され、当該アーム引きパイロットライン36Aを通じてアーム操作器34からアーム制御弁41のアーム引きパイロットポート41aに供給されるアーム引きパイロット圧を検出する。当該アーム引きパイロット圧センサ82は、圧力センサにより構成され、アーム引きパイロット圧を電気信号すなわちアーム引きパイロット圧検出信号に変換してコントローラ90に入力する。
バケット掘削パイロット圧センサ83は、バケット操作器35に与えられるバケット掘削操作を検出するバケット掘削操作検出器である。具体的に、当該バケット掘削パイロット圧センサ83は、バケット掘削パイロットライン37Aに接続され、当該バケット掘削パイロットライン37Aを通じてバケット操作器35からバケット制御弁42のバケット掘削パイロットポート42aに供給されるバケット掘削パイロット圧を検出する。当該バケット掘削パイロット圧センサ83は、圧力センサにより構成され、バケット掘削パイロット圧を電気信号すなわちバケット掘削パイロット圧検出信号に変換してコントローラ90に入力する。
バケット開放パイロット圧センサ84は、バケット操作器35に与えられるバケット開放操作を検出するバケット開放操作検出器である。具体的に、当該バケット開放パイロット圧センサ84は、バケット開放パイロットライン37Bに接続され、当該バケット開放パイロットライン37Bを通じてバケット操作器35からバケット制御弁42のバケット開放パイロットポート42bに供給されるバケット開放パイロット圧を検出する。当該バケット開放パイロット圧センサ84は、圧力センサにより構成され、バケット開放パイロット圧を電気信号すなわちバケット開放パイロット圧検出信号に変換してコントローラ90に入力する。
コントローラ90は、CPU、MPUなどの演算処理装置と、メモリと、を含むコンピュータを備える。コントローラ90は、再生状態と再生解除状態の切り換えを含むアーム再生動作の制御を行うための機能として、図3に示すようなモード設定部91と、応答特性設定部92と、再生制御指令部93と、を含む。
モード設定部91は、アーム再生動作の制御モードを切り換える。制御モードは、アーム再生動作を行うことを許容する再生モードと、アーム再生動作を行うことを許容しない再生解除モードと、を含む。モード設定部91は、所定のフラグON条件を満たした場合に再生解除フラグ(再生カットフラグ)を「OFF」から「ON」に切り換える。再生解除フラグが「ON」であるときには前記制御モードは再生解除モードである。モード設定部91は、所定のフラグOFF条件を満たした場合に再生解除フラグを「ON」から「OFF」に切り換える。再生解除フラグが「OFF」であるときには前記制御モードは再生モードである。
前記フラグON条件は、ポンプ圧が所定の設定圧(P_cut1)を超えることであってもよい。すなわち、モード設定部91は、ポンプ圧センサ81からコントローラ90に入力されるポンプ圧検出信号に基づいてポンプ圧が所定の設定圧(P_cut1)を超えたか否かを判定し、ポンプ圧が設定圧(P_cut1)を超えた場合に、再生解除フラグを「OFF」から「ON」に切り換えてもよい。
前記フラグOFF条件は、例えば、ポンプ圧が所定の設定圧(P_cut2)以下になることであってもよい。設定圧(P_cut2)は、設定圧(P_cut1)と同じ値であってもよく、設定圧(P_cut1)より小さい値であってもよい。また、前記フラグOFF条件は、例えば、再生解除フラグが「OFF」から「ON」に切り換わった時点からの経過時間が所定のフラグOFF設定時間以上になることであってもよい。また、前記フラグOFF条件は、例えば、アーム引き操作の操作量が所定のフラグOFF設定値未満になることであってもよい。
応答特性設定部92は、アーム引きパイロット圧センサ82、バケット掘削パイロット圧センサ83、及びバケット開放パイロット圧センサ84からコントローラ90に入力されるアーム引きパイロット圧検出信号、バケット掘削パイロット圧検出信号、及びバケット開放パイロット圧検出信号に基づいて、再生回路70が再生状態から再生解除状態へ移行するときの応答特性(過渡特性)を設定する。
具体的には、応答特性設定部92は、掘削作業(特定作業の一例)を判定するための所定の判定条件が満たされないときには前記応答特性を所定の第1の応答性に設定し、前記判定条件が満たされるときには前記応答特性を所定の第2の応答性に設定する。第2の応答性は第1の応答性よりも高く設定されている。掘削作業は、バケットに地盤の土砂を収容するための作業である。第1の応答性は、掘削作業以外の作業、具体的には例えば押し付け均し作業、が行われるときにハンチングの発生を抑制することができるように予め設定されている。第2の応答性は、掘削作業が行われるときにエネルギー効率を改善することができるように予め設定されている。
前記判定条件は、アーム操作器34に与えられるアーム引き操作の操作量が所定のアーム設定値以上になり、バケット操作器35に与えられるバケット掘削操作の操作量が所定のバケット設定値以上になることを含むものであってもよい(第1判定条件)。また、前記判定条件は、アーム引き操作の操作量が所定のアーム設定値以上であることが維持される時間が所定の設定時間を経過する前に、バケット掘削操作の操作量が所定のバケット設定値以上になることを含むものであってもよい(第2判定条件)。
再生制御指令部93は、再生操作弁74の動作を制御するために再生操作弁74に指令(再生指令信号)を与えることにより、再生操作弁74の二次圧、すなわち、再生パイロットライン73を通じて再生切換弁72の再生パイロットポート72aに供給される再生パイロット圧の大きさを調節する。
モード設定部91が前記制御モードを再生モードに設定している場合、すなわち、再生解除フラグが「OFF」である場合、再生制御指令部93は、再生切換弁72を再生位置72Rに切り換えるための再生パイロット圧が再生操作弁74から再生切換弁72の再生パイロットポート72aに供給されるような再生指令信号を、再生操作弁74のソレノイド74aに入力する。これにより、再生切換弁72が再生位置72Rに切り換わり、再生回路70が再生状態に切り換わる。
前記モード設定部91により設定される前記制御モードが再生モードから再生解除モードに切り換わった場合、すなわち、再生解除フラグが「OFF」から「ON」に切り換わった場合、再生制御指令部93は、応答特性設定部92が設定した応答特性(第1の応答性又は第2の応答性)で再生回路70が再生状態から再生解除状態に移行するような再生指令信号を、再生操作弁74のソレノイド74aに入力する。これにより、再生操作弁74の2次圧が前記応答特性に対応する速度で変化するので、再生切換弁72の開度は、前記応答特性に対応する速度で再生位置72Rにおける開度から再生解除位置72Cにおける開度まで変化する。再生切換弁72が再生解除位置72Cに切り換わると、再生回路70が再生解除状態に切り換わる。
再生制御指令部93は、再生操作弁74のソレノイド74aに入力する指令値の時間当たりの変化量を変えることで応答特性を変えることができる。具体的には、応答特性設定部92が応答特性を第1の応答性に設定した場合、再生制御指令部93は、再生操作弁74のソレノイド74aに入力される指令値の時間当たりの変化量が第1の所定値になるような再生指令信号を再生操作弁74のソレノイド74aに入力する。これにより、第1の応答性で再生回路70が再生状態から再生解除状態に移行する。応答特性設定部92が応答特性を第2の応答性に設定した場合、再生制御指令部93は、再生操作弁74のソレノイド74aに入力される指令値の時間当たりの変化量が第2の所定値になるような再生指令信号を再生操作弁74のソレノイド74aに入力する。これにより、第2の応答性で再生回路70が再生状態から再生解除状態に移行する。第2の所定値(指令値の時間当たりの変化量)は、第1の所定値(指令値の時間当たりの変化量)よりも大きな値である。
アーム22のアーム引き動作を含む作業としては、掘削作業、水平引き作業、押し付け均し作業などの種々の作業を例示することができる。図4は、掘削作業における作業装置14の動作を説明する図であり、図5は、水平引き作業における作業装置14の動作を説明する図であり、図6は、押し付け均し作業における作業装置14の動作を説明する図である。図7は、掘削作業、水平引き作業、及び押し付け均し作業のそれぞれについて、オペレータが操作装置に与える操作量(レバー操作量)の経時変化の一例を示すグラフである。図7において、アーム引き操作の操作量は実線で示され、バケット操作(バケット掘削操作又はバケット開放操作)の操作量は破線で示されている。
図4に示すように、掘削作業は、地盤の土砂(対象物の一例)をバケット24に収容する作業である。図7の上図(a)に示すように、掘削作業では、オペレータは、バケット24を土に貫入しやすくするためにアーム引き操作の開始とほぼ同時に、バケット掘削操作を行う。また、掘削作業では、オペレータは、バケット24の土への貫入深さを調整するためにブーム上げ操作を、アーム引き操作及びバケット掘削操作とともに行う。図7の上図(a)に示すように、オペレータは、通常、アーム引き操作を開始した初期段階(掘削操作の初期段階)にはバケット掘削操作の操作量を比較的大きくする。
図5に示すように、水平引き作業は、バケット24の先端部24Eが地面に沿ってほぼ水平に後方に向かって移動するようにアーム引き動作とブーム上げ動作を同時に行わせる作業である。図7の中央図(b)に示すように、オペレータは、通常、アーム引き操作を開始した初期段階(水平引き作業の初期段階)にはバケット掘削操作の操作量をあまり大きくしない。
図6に示すように、押し付け均し作業は、地面に対してバケット24の底面24S(図1参照)がほぼ水平になる状態でバケット24の底面24Sが地面に沿って後方に向かって移動するようにアーム引き動作とブーム上げ動作を同時に行わせる作業である。この押し付け均し作業では、その作業中にバケット24の底面24Sが地面に対してほぼ水平な状態を維持するために、オペレータは、アーム引き操作とバケット開放操作を同時に行う。
図8は、参考例に係る作業機械を用いた掘削作業におけるポンプ圧、再生解除フラグ、アーム引きメータアウト絞り開度、及びアーム引きメータアウト損失について説明するための図である。
この参考例に係る掘削作業では、オペレータは、アーム引き操作を行うことでバケット24を地盤の土中に貫入させる。バケット24が土中に貫入すると、土の抵抗によりポンプ31に比較的高い圧力が発生する。コントローラは、ポンプ圧が設定圧(P_cut1)を超えた場合、再生解除フラグを「OFF」から「ON」に切り換える制御を行う。再生解除フラグが「ON」に切り換わると、コントローラは、再生回路を再生状態から再生解除状態に切り換えるために、アームシリンダから排出される作動油である排出作動油をタンクに戻す作動油流路の開口(メータアウト絞り開度)を大きくするための再生指令信号を図略の電磁弁に与える。これにより、メータアウト絞り開度は、Amo1からAmo2まで大きくなる。
参考例に係る掘削作業では、メータアウト絞り開度がAmo1からAmo2に増加するときの応答特性(過渡特性)は、第1の応答性に設定されており、この第1の応答性は、図8における下から2つ目のグラフにおいて矢印で示された部分の直線の傾きに相当する。すなわち、第1の応答性は、再生回路が再生状態から再生解除状態に移行するときの過渡的な段階におけるメータアウト絞り開度の変化の特性である。
掘削作業の開始後の初期段階では、図8における下から2つ目のグラフに示されているように、アームシリンダから排出される作動油である排出作動油をタンクに戻す作動油流路の開口の大きさ(メータアウト絞り開度)は開度Amo2には達していないため、図8における最下のグラフに示されているように、作動油流路の開口において圧力損失(アーム引きメータアウト損失)が発生する。この圧力損失は、作動油流路の開口(メータアウト絞り開度)が開度Amo2に近づくと低下する。
仮に、水平引き作業及び押し付け均し作業において応答特性が第1の応答性よりも大幅に小さく設定されると、再生回路が再生状態と再生解除状態との間で短時間に頻繁に切り換わるハンチングが生じるおそれがある。このため、参考例の作業機械では、ハンチングを抑制することが優先され、応答特性は、メータアウト絞り開度の変化速度が小さい第1の応答性に設定されている。このように再生回路を再生状態から再生解除状態に移行させるときの応答特性が第1の応答性に設定されている場合には、掘削作業の開始後の初期段階において、メータアウト絞り開度が比較的長い時間をかけて開度Amo2まで変化するため、この過渡的な段階においてメータアウト絞り開度が小さい状態が長く続き、その結果、前記アーム引きメータアウト損失が大きくなる。
図9は、本実施形態に係る再生制御装置を備える油圧ショベル100を用いた掘削作業における再生解除応答特性、ポンプ圧、再生解除フラグ、アーム引きメータアウト絞り開度、及びアーム引きメータアウト損失について説明するための図である。図9において、再生解除応答特性は、再生状態から再生解除状態へ移行するときの応答特性であり、アーム引きメータアウト絞り開度は、アームシリンダ27から排出される作動油である排出作動油をタンクに戻す作動油流路の開口の大きさであり、アーム引きメータアウト損失は、前記作動油流路の開口において生じる圧力損失である。本実施形態では、アーム引きメータアウト絞り開度(前記作動油流路の開口の大きさ)は、再生切換弁72の開度である。
本実施形態では、コントローラ90は、再生回路70を再生状態から再生解除状態に移行させる場合において、掘削作業を判定するための所定の判定条件(前記第1判定条件又は前記第2判定条件)が満たされないときには再生状態から前記再生解除状態への移行が第1の応答性で行われ、前記判定条件が満たされるときには再生状態から再生解除状態への移行が第1の応答性よりも高い第2の応答性で行われるように再生回路70を制御する。第2の応答性は、第1の応答性よりも高い。第2の応答性は、図9における下から2つ目のグラフにおいて矢印で示された部分の直線の傾きに相当する。
本実施形態では、コントローラ90は、アーム引き動作を含む種々の作業のうちで掘削作業が行われる場合には、メータアウト絞り開度がAmo1からAmo2に増加するときの応答特性(過渡特性)を図9に示す第2の応答性に設定し、アーム引き動作を含む種々の作業のうちで掘削作業以外の作業が行われる場合には、前記応答特性を図8に示す第1の応答性に設定する。本実施形態では、掘削作業以外の作業は、水平引き作業及び押し付け均し作業の少なくとも一方である。
本実施形態では、図7における上図(a)及び図8における最上の図に示すように、オペレータは、作業装置14に掘削作業を行わせるために、アーム引き操作を行うことでバケット24を地盤の土中に貫入させる。上述したように、掘削作業では、オペレータは、バケット24を土に貫入しやすくするためにアーム引き操作の開始とほぼ同時に、バケット掘削操作を同時に行う。バケット24が土中に貫入すると、土の抵抗によりポンプ31に比較的高い圧力が発生する。コントローラ90のモード設定部91は、ポンプ圧が設定圧(P_cut1)を超えた場合、再生解除フラグを「OFF」から「ON」に切り換える制御を行う。
再生解除フラグが「OFF」から「ON」に切り換わると、コントローラ90の再生制御指令部93は、再生回路70を再生状態から再生解除状態に切り換えるために、アームシリンダ27から排出される作動油である排出作動油をタンクに戻す作動油流路の開口、すなわち、再生切換弁72の開度(メータアウト絞り開度)を大きくするための再生指令信号(指令電流)を、再生操作弁74に与える。この場合において、アーム引き操作が開始されてからアーム引き操作の操作量が前記アーム設定値以上であることが維持される時間が所定の設定時間t1(図7参照)を経過する前に、バケット掘削操作の操作量が所定のバケット設定値(Pi_bk_dig1)以上になると、コントローラ90は、前記応答特性を第1の応答性から第2の応答性に切り換える。この再生指令信号は、再生切換弁72の開度(メータアウト絞り開度)がAmo1からAmo2まで第2の応答性で特定される変化速度で大きくなるような指令電流である。これにより、再生切換弁72の開度(メータアウト絞り開度)は、Amo1からAmo2まで第2の応答性で大きくなる。
上記のように、本実施形態では、掘削作業が行われるときに、図9における上から2つ目のグラフに示すように応答特性が第1の応答性から第2の応答性に切り換えられるので、応答特性が第1の応答性に維持される場合に比べて、掘削作業の開始後の初期段階においてメータアウト絞り開度が小さい状態が続く時間を短縮することができる(図9における下から2つ目のグラフを参照)。その結果、図9における最下のグラフに示すように、前記アーム引きメータアウト損失が大きくなることを抑制でき、掘削作業における省エネ性を向上させることができる。
一方、コントローラ90は、アーム引き動作を含む種々の作業のうちで掘削作業以外の作業(水平引き作業又は押し付け均し作業)が行われる場合には、前記応答特性を第2の応答性に切り換えずに第1の応答性に維持する。
図5及び図7における中央の図(b)に示すように、水平引き作業では、アーム引き操作を開始したタイミングでのバケット掘削操作の操作量はあまり大きくなく、バケット設定値(Pi_bk_dig1)より小さい。また、図6及び図7における最下の図(c)に示すように、押し付け均し作業では、バケット24の底面24Sが地面に対してほぼ水平な状態を維持するために、アーム引き操作とバケット開放操作が同時に行われる。従って、コントローラ90は、上記の第1判定条件又は第2判定条件に基づいて、掘削作業ではなく、水平引き作業又は押し付け均し作業が行われていることを判定できる。
水平引き作業では、アーム22がアーム引き動作を行うときに、アーム引き動作の方向とは反対方向にアーム22に対して土の抵抗力が作用するが、この抵抗力は比較的小さい。また、アーム22の自重がアーム引き動作の方向に沿う方向に作用するため、アームシリンダ27においてヘッド側室27dの圧力よりもロッド側室27eの圧力の方が高くなり、ポンプ圧は設定圧(P_cut1)以下となる。この圧力関係においてはアーム再生動作を行うことが可能であり、アーム再生動作によってアーム引き動作を増速させることが可能である。従って、水平引き作業において、コントローラ90は、ポンプ圧が設定圧(P_cut1)以下である場合、再生解除フラグを「OFF」に維持する制御を行い、これにより、アーム再生動作が行われる。
この水平引き作業において、例えばバケット24が地面にある石や岩などの障害物に引っかかった場合、アーム22に作用する抵抗力が一時的に増加して、ポンプ圧が設定圧(P_cut1)を超える場合がある。この場合、コントローラ90は、再生解除フラグを「OFF」から「ON」に切り換える制御を行い、再生回路を再生状態から再生解除状態に切り換えるための再生指令信号(指令電流)を再生操作弁74に与える。これにより、メータアウト絞り開度は、Amo1からAmo2に向かって次第に大きくなる。
仮に、水平引き作業においても応答特性が応答性の高い第2の応答性に設定されている場合、メータアウト絞り開度がAmo1からAmo2に迅速に大きくなってアームシリンダ27に再供給される作動油の流量が急激に小さくなるので、アーム引き動作の速度が急激に低下する。この場合、ブーム上げ動作とアーム引き動作の速度のバランスが崩れ、バケット24の先端部24Eが地面から上に離れるので、バケット24を水平に後方に向かって移動させることができない。
そこで、本実施形態では、水平引き作業が行われる場合には、応答特性が第2の応答性に切り換えられずに第1の応答性に維持される。すなわち、水平引き作業が行われる場合には、掘削作業が行われる場合に比べて、再生回路70が再生状態から再生解除状態に移行するときの応答性が低くなるように再生回路70が制御される。これにより、水平引き作業中にアーム22に作用する抵抗力が一時的に増加した場合であっても、アーム引き動作の速度が急激に低下することを抑制することができ、ブーム上げ動作とアーム引き動作の速度のバランスが崩れにくくなる。これにより、水平引き作業の作業効率の低下を抑制できる。
なお、水平引き作業では、作業中にバケット24の内部に土が次第に溜まるため、これを掻きだすためにオペレータは、水平引き作業の後半の段階で図7における中央部(b)に示すようにバケット掘削操作の操作量を大きくする場合がある。この場合、バケット掘削操作の操作量がバケット設定値(Pi_bk_dig1)よりも大きくなることがあるが、これは、水平引き作業の後半の段階で生じることが多い。従って、前記判定条件として第2判定条件が用いられる場合には、水平引き作業の後半の段階、すなわち、アーム引き操作が開始されてからアーム引き操作の操作量が前記アーム設定値以上であることが維持される時間が所定の設定時間t1を経過した後の段階、でバケット掘削操作の操作量が大きくなったとしても、コントローラ90は、前記応答特性を第2の応答性に切り換えずに第1の応答性に維持することができる。
押し付け均し作業では、上述したように、バケット24の底面24Sが地面に対してほぼ水平な状態を維持するために、アーム引き操作とバケット開放操作が同時に行われるので、コントローラ90は、上記の第1判定条件又は第2判定条件に基づいて、前記応答特性を第2の応答性に切り換えずに第1の応答性に維持する制御を行う。
押し付け均し作業では、バケット24の底面24Sを地面に押し付ける力(押し付け力)が変化する場合がある。アーム22がアーム引き動作を行うときにアーム引き動作の方向とは反対方向にアーム22に対して作用する地面の抵抗力は、押し付け力の変化に応じて変化する。押し付け力が小さい場合には、アーム22に作用する抵抗力も小さいため、ポンプ圧は設定圧(P_cut1)以下となる。押し付け均し作業において、コントローラ90は、ポンプ圧が設定圧(P_cut1)以下である場合、再生解除フラグを「OFF」に維持する制御を行い、これにより、アーム再生動作が行われる。一方、押し付け均し作業において、押し付け力が増加し、アーム22に作用する抵抗力が大きくなり、ポンプ圧が設定圧(P_cut1)を超える場合もある。この場合、コントローラ90は、再生解除フラグを「OFF」から「ON」に切り換える制御を行い、再生回路を再生状態から再生解除状態に切り換えるための再生指令信号(指令電流)を再生操作弁74に与える。これにより、メータアウト絞り開度は、Amo1からAmo2に向かって次第に大きくなる。
仮に、押し付け均し作業においても応答特性が応答性の高い第2の応答性に設定されている場合、メータアウト絞り開度がAmo1からAmo2に迅速に大きくなってアームシリンダ27に再供給される作動油の流量が急激に小さくなるので、アーム引き動作の速度が急激に低下する。この場合、ブーム上げ動作とアーム引き動作の速度のバランスが崩れ、バケット24の底面24Sが地面から上に迅速に離れる。バケット24の底面24Sが地面から離れると、アーム22に作用する抵抗力が小さくなり、ポンプ圧が設定圧(P_cut1)以下になる。この場合、コントローラ90は、再生解除フラグを「ON」から「OFF」に切り換える制御を行い、再生回路を再生解除状態から再生状態に切り換えるための再生指令信号(指令電流)を再生操作弁74に与える。従って、押し付け均し作業においても応答特性が応答性の高い第2の応答性に設定されている場合、再生回路70が再生状態と再生解除状態との間で短時間に頻繁に切り換わり、バケット24の底面24Sが地面に押し付けられることと地面から離れることを繰り返す状態であるハンチングが生じることがある。
そこで、本実施形態では、押し付け均し作業が行われる場合には、応答特性が第2の応答性に切り換えられずに第1の応答性に維持される。すなわち、押し付け均し作業が行われる場合には、掘削作業が行われる場合に比べて、再生回路70が再生状態から再生解除状態に移行するときの応答性が低くなるように再生回路70が制御される。これにより、押し付け均し作業中に前記押し付け力が変化した場合であっても、アーム引き動作の速度が急激に低下することを抑制することができ、ブーム上げ動作とアーム引き動作の速度のバランスが崩れにくくなる。これにより、ハンチングが生じることを抑制でき、押し付け均し作業の作業効率の低下を抑制できる。
図10は、コントローラ90が行う演算制御処理を示すフローチャートである。図10の演算処理は、コントローラ90が応答特性を設定する流れを示している。
コントローラ90の応答特性設定部92は、アーム引き操作の操作量がアーム設定値以上であるか否かを判定する(ステップS11)。アーム引き操作の操作量がアーム設定値未満である場合(ステップS11においてNO)、コントローラ90の応答特性設定部92は、応答特性を第1の応答性に設定する(ステップS16)。
コントローラ90は、アーム引き操作の操作量がアーム設定値以上になった時点からの経過時間の計測を開始する(ステップS12)。
コントローラ90の応答特性設定部92は、バケット掘削操作の操作量がバケット設定値以上であるか否かを判定する(ステップS13)。バケット掘削操作の操作量がバケット設定値未満である場合(ステップS13においてNO)、コントローラ90の応答特性設定部92は、応答特性を第1の応答性に設定する(ステップS16)。
一方、バケット掘削操作の操作量がバケット設定値以上である場合(ステップS13においてYES)、コントローラ90の応答特性設定部92は、前記経過時間が所定の設定時間未満であるか否かを判定する(ステップS14)。前記経過時間が前記設定時間以上である場合(ステップS14においてNO)、コントローラ90の応答特性設定部92は、応答特性を第1の応答性に設定する(ステップS16)。一方、前記経過時間が前記設定時間未満である場合(ステップS14においてYES)、コントローラ90の応答特性設定部92は、応答特性を第2の応答性に設定する(ステップS15)。
図11は、コントローラ90が行う演算制御処理の変形例を示すフローチャートである。図11の演算処理は、コントローラ90が応答特性を設定する流れを示している。
図11に示す変形例に係る演算処理におけるステップS11-S14,S16の処理は、図10に示す演算処理におけるステップS11-S14,S16の処理と同様であるので、これらの説明を省略する。
図11に示す変形例では、前記経過時間が前記設定時間未満である場合(ステップS14においてYES)、コントローラ90の応答特性設定部92は、その時点におけるバケット掘削操作の操作量に応じて第2の応答性を変える(ステップS17)。具体的には、ステップS13において、バケット掘削操作の操作量がバケット設定値(Pi_bk1)以上であると判定され、かつ、ステップS14において、前記経過時間が前記設定時間未満であると判定された場合には、図12に示すように、コントローラ90の応答特性設定部92は、バケット掘削操作の操作量が小さいときに比べてバケット掘削操作の操作量が大きいときの方が第2の応答性が高くなるように第2の応答性を変化させる。
バケット24に土砂(対象物の一例)を収容する掘削作業(特定作業の一例)において、オペレータはバケット24をバケット掘削方向に積極的に動かすようなバケット掘削操作を行う傾向にあり、バケット掘削操作の操作量は掘削作業が行われているか否かの判定の指標の一つになり得る。すなわち、バケット掘削操作の操作量が小さいときに比べてバケット掘削操作の操作量が大きいときの方が、掘削作業が行われている可能性が高い。従って、この変形例では、この可能性が低いときよりも可能性が高いときに、コントローラ90の応答特性設定部92は、再生回路70を再生状態から再生解除状態に高い応答性で切り換えることができる。また、バケット掘削操作の操作量に応じて前記応答性を調節することで、応答性の急激な変化による操作フィーリングの低下を抑制することができる。
以上説明したように本実施形態に係る再生制御装置では、バケット24に土砂を収容する掘削作業のように作業中のポンプ圧が比較的高い状態が維持される特定作業が行われる場合、すなわち、前記判定条件が満たされる場合、コントローラ90は、再生状態から再生解除状態への移行が第1の応答性よりも高い第2の応答性で迅速に行われるように再生回路を制御する。これにより、アームシリンダ27から排出される排出作動油をタンクに戻す作動油流路の開口を小さい状態から大きな状態へ迅速に切り換えることができ、特定作業の開始後の初期段階、すなわち、再生状態から再生解除状態への移行が行われる過渡的な段階において、前記作動油流路の開口が小さい状態が長く続くことを抑制できる。その結果、前記過渡的な段階において前記作動油流路における圧力損失が大きくなることを抑制できる。一方、水平引き作業、押し付け均し作業などのような特定作業以外の作業が行われる場合、すなわち、前記判定条件が満たされない場合、コントローラ90は、再生状態から再生解除状態への移行が第2の応答性よりも低い第1の応答性で行われるように再生回路を制御する。水平引き作業、押し付け均し作業などのような特定作業以外の作業においても、アーム22に対して対象物から作用する力が変動することがあり、この力の変動は、ポンプ圧の変動などのように油圧回路の状態の変動の原因となり得る。このような油圧回路の状態の変動に起因して、再生回路70が再生状態と再生解除状態との間で短時間に頻繁に切り換わることがある。この場合において、仮に、再生状態から再生解除状態への移行が高い応答性で行われると、アーム引き動作の速度の変動幅も大きくなりやすい。このことは、作業効率の低下の原因となる。従って、本実施形態に係る再生制御装置では、特定作業以外の作業が行われる場合には、再生状態から再生解除状態への移行が第2の応答性よりも低い第1の応答性で行われるように再生回路70を制御することで、アーム22に対して対象物から作用する力が変動した場合であってもアーム引き動作の速度の変動幅が大きくなることを抑制することができる。これにより、特定作業以外の作業が行われる場合における作業効率の低下を抑制できる。以上のことから、この再生制御装置では、アーム再生動作が行われる油圧ショベル100において作業効率の低下を抑制すること及びエネルギー効率を改善することができる。
[変形例]
以上、本開示の実施形態について説明したが、本開示は前記実施形態に限定されるものではなく、例えば以下のような変形例を含む。
以上、本開示の実施形態について説明したが、本開示は前記実施形態に限定されるものではなく、例えば以下のような変形例を含む。
(A)操作装置について
本開示に係るアーム操作器34及びバケット操作器35は、アームパイロット弁34b及びバケットパイロット弁35bを含むものにそれぞれ限定されない。アーム操作器及びバケット操作器の少なくとも一方は、オペレータにより与えられた操作に対応した電気信号を生成してコントローラ90に入力する電気レバー装置と、コントローラ90に含まれ、前記電気レバー装置から入力される前記電気信号に基づいてパイロット圧がアーム制御弁又はバケット制御弁のパイロットポートに与えられるようにパイロットライン中の電磁操作弁に指令信号を入力するパイロット圧指令部と、を含むものでもよい。
本開示に係るアーム操作器34及びバケット操作器35は、アームパイロット弁34b及びバケットパイロット弁35bを含むものにそれぞれ限定されない。アーム操作器及びバケット操作器の少なくとも一方は、オペレータにより与えられた操作に対応した電気信号を生成してコントローラ90に入力する電気レバー装置と、コントローラ90に含まれ、前記電気レバー装置から入力される前記電気信号に基づいてパイロット圧がアーム制御弁又はバケット制御弁のパイロットポートに与えられるようにパイロットライン中の電磁操作弁に指令信号を入力するパイロット圧指令部と、を含むものでもよい。
(B)再生回路について
本開示に係る再生回路は、図2に示されるような前記再生流路71を含む前記アーム制御弁41と戻り流量を制限する前記再生切換弁72との組み合わせを含む回路に限定されない。当該再生回路は、アーム制御弁とは独立した単一の再生切換弁、具体的には、アームシリンダから排出される排出作動油を当該アームシリンダに再供給するための再生流路を形成する再生位置と当該排出作動油をそのままタンクに逃がす再生解除位置とに切換可能な切換弁、を含むものであってもよい。
本開示に係る再生回路は、図2に示されるような前記再生流路71を含む前記アーム制御弁41と戻り流量を制限する前記再生切換弁72との組み合わせを含む回路に限定されない。当該再生回路は、アーム制御弁とは独立した単一の再生切換弁、具体的には、アームシリンダから排出される排出作動油を当該アームシリンダに再供給するための再生流路を形成する再生位置と当該排出作動油をそのままタンクに逃がす再生解除位置とに切換可能な切換弁、を含むものであってもよい。
(C)特定作業について
前記実施形態では特定作業が、地盤の土砂を掘削する掘削作業であるが、本開示に係る特定作業は、掘削作業に限られず、バケットに対象物を収容する他の作業であってもよい。具体的には、バケットに収容する対象物は、例えば砕石、廃棄物などのように土砂以外のものであってもよい。
前記実施形態では特定作業が、地盤の土砂を掘削する掘削作業であるが、本開示に係る特定作業は、掘削作業に限られず、バケットに対象物を収容する他の作業であってもよい。具体的には、バケットに収容する対象物は、例えば砕石、廃棄物などのように土砂以外のものであってもよい。
本開示によれば、アーム再生動作が行われる作業機械においてハンチングの発生を抑制するとともにエネルギー効率を改善することができる作業機械の再生制御装置が提供される。
提供される作業機械の再生制御装置は、ポンプから吐出される作動油の供給を受けて作動することによりアームを動かすアームシリンダと、前記アームシリンダから排出される作動油である排出作動油をタンクに戻す作動油流路の開口を小さくすることで前記排出作動油の少なくとも一部が再生流路を通じて前記アームシリンダに再供給される再生状態と前記開口を前記再生状態に比べて大きくすることで前記再生状態を解除する再生解除状態とに切り換わることが可能な再生回路と、前記再生回路を前記再生状態から前記再生解除状態に移行させる場合において、バケットに対象物を収容する特定作業を判定するための所定の判定条件が満たされないときには前記再生状態から前記再生解除状態への移行が第1の応答性で行われ、前記判定条件が満たされるときには前記再生状態から前記再生解除状態への移行が前記第1の応答性よりも高い第2の応答性で行われるように前記再生回路を制御するコントローラと、を備える。
この再生制御装置では、前記判定条件が満たされるとき、すなわち、バケットに対象物を収容する特定作業(例えば掘削作業)が行われるときには、再生状態から再生解除状態への移行が第2の応答性で迅速に行われるので、エネルギー効率を改善することができ、しかも、この特定作業中には対象物から受ける比較的高い抵抗がバケットに対して作用し続けることが多いため、応答性が高く設定されていてもハンチングは生じにくい。一方、前記判定条件が満たされないときには、再生状態から再生解除状態への移行が第2の応答性よりも低い第1の応答性で行われるので、ハンチングの発生を抑制することができる。従って、この再生制御装置では、アーム再生動作が行われる作業機械においてハンチングの発生を抑制するとともにエネルギー効率を改善することができる。
前記再生制御装置は、アーム引き操作及びバケット掘削操作を受ける操作装置をさらに備え、前記判定条件は、前記アーム引き操作の操作量が所定のアーム設定値以上になり、前記バケット掘削操作の操作量が所定のバケット設定値以上になることを含むことが好ましい。この構成では、コントローラは、前記判定条件を用いて特定作業が行われているか否かを適切に判定することができる。
前記再生制御装置は、アーム引き操作及びバケット掘削操作を受ける操作装置をさらに備え、前記判定条件は、前記アーム引き操作の操作量が所定のアーム設定値以上であることが維持される時間が所定の設定時間を経過する前に、前記バケット掘削操作の操作量が所定のバケット設定値以上になることを含むことがより好ましい。この構成では、コントローラは、時間の要素を含む前記判定条件を用いて特定作業が行われているか否かをより適切に判定することができる。
前記コントローラは、前記判定条件が満たされる場合に、前記バケット掘削操作の操作量が小さいときに比べて前記バケット掘削操作の操作量が大きいときの方が前記第2の応答性が高くなるように前記第2の応答性を変化させることが好ましい。バケットに対象物を収容する特定作業において、オペレータはバケットをバケット掘削方向に積極的に動かすようなバケット掘削操作を行う傾向にあり、バケット掘削操作の操作量は特定作業が行われているか否かの判定の指標の一つになり得る。すなわち、前記バケット掘削操作の操作量が小さいときに比べて前記バケット掘削操作の操作量が大きいときの方が、特定作業が行われている可能性が高い。従って、この構成では、この可能性が低いときよりも可能性が高いときに、コントローラは、再生回路を再生状態から再生解除状態に高い応答性で切り換えることができる。また、バケット掘削操作の操作量に応じて前記応答性を調節することで、応答性の急激な変化による操作フィーリングの低下を抑制することができる。
Claims (4)
- ポンプから吐出される作動油の供給を受けて作動することによりアームを動かすアームシリンダと、
前記アームシリンダから排出される作動油である排出作動油をタンクに戻す作動油流路の開口を小さくすることで前記排出作動油の少なくとも一部が再生流路を通じて前記アームシリンダに再供給される再生状態と前記開口を前記再生状態に比べて大きくすることで前記再生状態を解除する再生解除状態とに切り換わることが可能な再生回路と、
前記再生回路を前記再生状態から前記再生解除状態に移行させる場合において、バケットに対象物を収容する特定作業を判定するための所定の判定条件が満たされないときには前記再生状態から前記再生解除状態への移行が第1の応答性で行われ、前記判定条件が満たされるときには前記再生状態から前記再生解除状態への移行が前記第1の応答性よりも高い第2の応答性で行われるように前記再生回路を制御するコントローラと、を備える作業機械の再生制御装置。 - アーム引き操作及びバケット掘削操作を受ける操作装置をさらに備え、
前記判定条件は、前記アーム引き操作の操作量が所定のアーム設定値以上になり、前記バケット掘削操作の操作量が所定のバケット設定値以上になることを含む、請求項1に記載の作業機械の再生制御装置。 - アーム引き操作及びバケット掘削操作を受ける操作装置をさらに備え、
前記判定条件は、前記アーム引き操作の操作量が所定のアーム設定値以上であることが維持される時間が所定の設定時間を経過する前に、前記バケット掘削操作の操作量が所定のバケット設定値以上になることを含む、請求項1に記載の作業機械の再生制御装置。 - 前記コントローラは、前記判定条件が満たされる場合に、前記バケット掘削操作の操作量が小さいときに比べて前記バケット掘削操作の操作量が大きいときの方が前記第2の応答性が高くなるように前記第2の応答性を変化させる、請求項2または3に記載の作業機械の再生制御装置。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2023-018469 | 2023-02-09 | ||
JP2023018469A JP2024113468A (ja) | 2023-02-09 | 2023-02-09 | 作業機械の再生制御装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2024166582A1 true WO2024166582A1 (ja) | 2024-08-15 |
Family
ID=92262279
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2023/047190 WO2024166582A1 (ja) | 2023-02-09 | 2023-12-28 | 作業機械の再生制御装置 |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP2024113468A (ja) |
WO (1) | WO2024166582A1 (ja) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2016166510A (ja) * | 2015-03-10 | 2016-09-15 | 住友重機械工業株式会社 | ショベル |
US20170016460A1 (en) * | 2014-01-27 | 2017-01-19 | Volvo Construction Equipment Ab | Device for controlling regenerated flow rate for construction machine and method for controlling same |
JP2019199881A (ja) * | 2018-05-14 | 2019-11-21 | 株式会社神戸製鋼所 | 作業機械の油圧駆動装置 |
JP2022001769A (ja) * | 2020-06-19 | 2022-01-06 | 川崎重工業株式会社 | 液圧駆動システム |
-
2023
- 2023-02-09 JP JP2023018469A patent/JP2024113468A/ja active Pending
- 2023-12-28 WO PCT/JP2023/047190 patent/WO2024166582A1/ja unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20170016460A1 (en) * | 2014-01-27 | 2017-01-19 | Volvo Construction Equipment Ab | Device for controlling regenerated flow rate for construction machine and method for controlling same |
JP2016166510A (ja) * | 2015-03-10 | 2016-09-15 | 住友重機械工業株式会社 | ショベル |
JP2019199881A (ja) * | 2018-05-14 | 2019-11-21 | 株式会社神戸製鋼所 | 作業機械の油圧駆動装置 |
JP2022001769A (ja) * | 2020-06-19 | 2022-01-06 | 川崎重工業株式会社 | 液圧駆動システム |
Also Published As
Publication number | Publication date |
---|---|
JP2024113468A (ja) | 2024-08-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100807923B1 (ko) | 작업용 차량의 속도제어장치 및 그의 속도제어방법 | |
KR100824662B1 (ko) | 작업기계의 유압구동장치 | |
EP2660478B1 (en) | Boom-swivel compound drive hydraulic control system of construction machine | |
CN107532409B (zh) | 工程机械的控制装置 | |
KR101693129B1 (ko) | 작업 기계 | |
EP2354331B1 (en) | Hydraulic drive device for hydraulic excavator | |
US9074346B2 (en) | Work machine and control method for work machines | |
CN109563696B (zh) | 作业机械 | |
KR20110046529A (ko) | 유압 작업 기계의 엔진 러그 다운 억제 장치 | |
EP2568181B1 (en) | Work vehicle | |
KR20120123109A (ko) | 유압 작업기 | |
KR102159596B1 (ko) | 건설 기계 | |
EP3409846A1 (en) | Shovel | |
EP2037127A1 (en) | Working machine, and quick load-dropping method | |
KR20180037369A (ko) | 건설기계의 제어 시스템 및 건설기계의 제어 방법 | |
CN110325747B (zh) | 作业机械 | |
JP2004251441A (ja) | 作業車両の作業機用油圧ポンプの制御方法と制御装置 | |
JP6683641B2 (ja) | 油圧ショベル | |
WO2024166582A1 (ja) | 作業機械の再生制御装置 | |
KR102246421B1 (ko) | 건설기계의 제어 시스템 및 건설기계의 제어 방법 | |
JP7472321B2 (ja) | 作業機械 | |
CN111148906B (zh) | 油压挖掘机驱动系统 | |
EP3865628B1 (en) | Control method for construction machinery and control system for construction machinery | |
EP4102081A1 (en) | Work machine | |
JP2009014122A (ja) | 建設機械の油圧駆動装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 23921400 Country of ref document: EP Kind code of ref document: A1 |