[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

WO2021068593A1 - Daily production and daily clearing accounting method, apparatus and device, and computer-readable storage medium - Google Patents

Daily production and daily clearing accounting method, apparatus and device, and computer-readable storage medium Download PDF

Info

Publication number
WO2021068593A1
WO2021068593A1 PCT/CN2020/102776 CN2020102776W WO2021068593A1 WO 2021068593 A1 WO2021068593 A1 WO 2021068593A1 CN 2020102776 W CN2020102776 W CN 2020102776W WO 2021068593 A1 WO2021068593 A1 WO 2021068593A1
Authority
WO
WIPO (PCT)
Prior art keywords
nissan
finished product
data
work order
product data
Prior art date
Application number
PCT/CN2020/102776
Other languages
French (fr)
Chinese (zh)
Inventor
肖光昱
郑保明
Original Assignee
深圳点链科技有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 深圳点链科技有限公司 filed Critical 深圳点链科技有限公司
Publication of WO2021068593A1 publication Critical patent/WO2021068593A1/en

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management

Definitions

  • This application relates to the field of data processing, and in particular to a method, device, equipment and computer-readable storage medium for Nissan’s daily settlement accounting.
  • the supply chain collaboration SaaS platform is based on order collaboration, procurement collaboration, logistics collaboration, etc. It can quickly calculate how much a company’s daily investment and daily output, but it is impossible to know the company’s daily production input and production output. Whether the accounting is balanced, so that managers cannot accurately and timely grasp the daily production situation of the enterprise.
  • the main purpose of this application is to propose a method, device, equipment, and computer-readable storage medium for daily settlement of Nissan, which aims to solve the problem that enterprise managers cannot grasp the production situation of the enterprise on that day.
  • this application provides a Nissan daily settlement accounting method, and the Nissan daily settlement accounting method includes:
  • the method further includes:
  • the production work order is established.
  • the step of establishing the production work order based on the bill of materials and preset loss calculation rules includes:
  • the necessary material data for production is calculated based on the loss interval and the material usage data on the material list, and the production work order is established according to the necessary material data.
  • the method further includes:
  • the production work order is updated until the qualified finished product data is greater than or equal to the preset value.
  • step of entering the over-collection process and establishing the over-collection list includes:
  • an over-received order is created.
  • Finished product data (material usage data + reasonable loss data + over-recovery data-returned material data)/unit finished product material data, where the material usage data, the reasonable loss data, the over-collected data, and the returned material
  • the material usage data, the reasonable loss data, the over-collected data, and the returned material Both the quantity and the unit finished product material data are the material parameters.
  • the method further includes:
  • the finished product After determining that the calculation result is still invalid, the finished product is determined to be lost, and/or the material is lost, and the instruction information attributable to the production department is output.
  • this application also provides a Nissan daily settlement accounting device, which includes:
  • Obtaining module configured to obtain the production work order to be accounted
  • An extraction module configured to extract finished product data in the production work order
  • the substitution module is configured to, after determining that the qualified finished product data in the finished product data is greater than or equal to a preset value, substitute the finished product data and the material parameters in the production work order into the Nissan Nisshin constant equation;
  • the judgment module is configured to judge whether to close the production work order according to the calculation result of the Nissan Nissin Heng equation
  • the closing module after determining that the calculation result is that the identity is established, closes the production work order.
  • this application also provides a Nissan daily settlement accounting device, which includes a memory, a processor, and a Nissan daily that is stored in the memory and can run on the processor.
  • a liquidation accounting program which implements the steps of the above-mentioned Nissan daily accounting method when the Nissan daily accounting program is executed by the processor.
  • the present application also provides a computer-readable storage medium on which the Nissan daily settlement accounting program is stored, which is realized when the Nissan daily settlement accounting program is executed by a processor.
  • This application obtains the production work order to be calculated and extracts the finished product data in the production work order. After confirming that the qualified finished product data in the finished product data is greater than or equal to the preset value, the finished product data and the material parameters in the production work order are substituted into Nissan In the Nissin Heng equation, it is judged whether to close the production work order according to whether the Nissan Nissin Heng equation is established. If it is, the production work order is closed, which realizes the judgment of whether the calculation of the daily input and output of the enterprise is balanced, and further enables the management of the enterprise The person knows the daily production situation of the enterprise in a timely and accurate manner, and tracks whether materials and products are lost.
  • FIG. 1 is a schematic diagram of the hardware structure of a device that implements each embodiment of the present application
  • Fig. 2 is a schematic flow chart of the first embodiment of the daily settlement accounting method for applying for Nissan.
  • FIG. 1 is a schematic structural diagram of a hardware operating environment involved in a solution of an embodiment of this application.
  • Fig. 1 can be a structural diagram of the hardware operating environment of the Nissan Nissan’s accounting equipment.
  • the Nissan daily settlement accounting equipment in the embodiment of the present application may be a PC, a portable computer, a server and other equipment.
  • the Nissan daily settlement accounting device may include: a processor 1001, such as a CPU, a memory 1005, a user interface 1003, a network interface 1004, and a communication bus 1002.
  • the communication bus 1002 is used to implement connection and communication between these components.
  • the user interface 1003 may include a display screen (Display) and an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface.
  • the network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a WI-FI interface).
  • the memory 1005 may be a high-speed RAM memory, or a stable memory (non-volatile memory), such as a magnetic disk memory.
  • the memory 1005 may also be a storage device independent of the aforementioned processor 1001.
  • the Nissan Nissin accounting device may also include an RF (Radio Frequency, radio frequency) circuit, sensor, WiFi module, and so on.
  • RF Radio Frequency, radio frequency
  • the memory 1005 which is a computer-readable storage medium, may include an operating system, a network communication module, a user interface module, and a Nissan daily settlement accounting program.
  • the operating system is a program that manages and controls the hardware and software resources of Nissan's Nissan Nissan's accounting equipment, and supports the operation of Nissan's Nissan's accounting and other software or programs.
  • the Nissan Nissin accounting device shown in Figure 1 can be configured as Nissan Nissin accounting.
  • the user interface 1003 is mainly used to detect or output various information, such as detecting finished product data and outputting information that the Nissan Nissin constant equation is not established;
  • the network interface 1004 is mainly used to interact with the background server and communicate;
  • the processor 1001 can be used to call the Nissan daily settlement accounting program stored in the memory 1005, and perform the following operations:
  • the processor 1001 is also used to call the daily settlement accounting program stored in the memory 1005 and perform the following operations :
  • the production work order is established.
  • the step of establishing the production work order based on the bill of materials and preset loss calculation rules includes:
  • the necessary material data for production is calculated based on the loss interval and the material usage data on the material list, and the production work order is established according to the necessary material data.
  • the processor 1001 is further configured to call the daily settlement accounting program of Nissan stored in the memory 1005, and perform the following operations :
  • the production work order is updated until the qualified finished product data is greater than or equal to the preset value.
  • step of entering the over-collection process and establishing the over-collection list includes:
  • an over-received order is created.
  • Finished product data (material usage data + reasonable loss data + over-recovery data-returned material data)/unit finished product material data, where the material usage data, the reasonable loss data, the over-collected data, and the returned material
  • the material usage data, the reasonable loss data, the over-collected data, and the returned material Both the quantity and the unit finished product material data are the material parameters.
  • the processor 1001 is further configured to call the Nissan Nissan accounting program stored in the memory 1005, and perform the following operations:
  • the finished product After determining that the calculation result is still invalid, the finished product is determined to be lost, and/or the material is lost, and the instruction information attributable to the production department is output.
  • the finished product data and the material parameters in the production work order are substituted into In the Nissan Nissin Heng equation, it is judged whether to close the production work order based on whether the Nissan Nissin Heng equation is established. If it is, the production work order is closed, which realizes the judgment of whether the production input and output is balanced, so that the manager can grasp the production of the enterprise in time Circumstances, and track whether materials and products are missing.
  • the implementation of the mobile terminal of this application is basically the same as the following various embodiments of the Nissan daily settlement accounting method, and will not be repeated here.
  • This application provides an accounting method for Nissan's daily settlement.
  • Fig. 1 is a schematic flowchart of a first embodiment of a method for calculating daily settlement of Nissan according to the application.
  • the daily settlement accounting method of Nissan includes:
  • Step S10 Obtain the production work order to be calculated, and extract the finished product data in the production work order.
  • the Nissan Nissan’s accounting method is applied to the supply chain collaboration SaaS platform. First, obtain the production work order that needs to be accounted, and extract the finished product data from the production work order. It is understandable that what needs to be calculated is the data in the production work order, and the finished product data is one of all the data in the production work order. It should be noted that the data mentioned in all the examples agree with the quantity.
  • Step S20 After it is determined that the qualified finished product data in the finished product data is greater than or equal to a preset value, the finished product data and the material parameters in the production work order are substituted into the daily production and daily clearing identity.
  • the preset value is set manually, and the size of the preset value can be the number of products required by the customer on the day, or greater than the number of products required by the customer on the day.
  • the finished product data includes the qualified finished product data and the unqualified finished product data. The products required by the customer should be qualified finished products. When the qualified finished product data in the finished product data is greater than or equal to the preset value, it means that the daily production volume has met the customer's requirements.
  • step S30 it is judged whether to close the production work order according to the calculation result of the Nissan Nissin constant equation.
  • Nissan Nissin's constant equation There are two calculation results of Nissan Nissin's constant equation, namely, the identity is established and the identity is not established. Whether the Nissan Nissin constant equation is established is the standard for judging whether the daily input and output of the enterprise are balanced. When the data of the finished product is equal to the input material. When the finished product data is output, it indicates that the production input and output of the enterprise are balanced at this time, and step S30 is executed.
  • the finished product data calculated by the formula (1) is equal to the finished product data calculated by the formula (2), the input and output of the enterprise's production are balanced.
  • the material usage data, reasonable loss data, over-claim data, returned material data and unit finished product material data are all material parameters. These material parameters are calculated based on the number of products required by the customer and the built-in calculation rules .
  • the material usage data is the total amount of materials needed to produce the products required by the customer; the reasonable loss data is the amount of wastage inevitably caused during production; the over-required data is the qualified finished product data obtained when the materials are used up for the first time. Does not meet customer requirements, and needs to continue production to complete the material requested for the second time; the returned material data is the amount of unused materials remaining after the number of products required by the customer is produced; the unit finished product material data is the production of a single finished product The amount of material required.
  • Step S40 after determining that the calculation result is that the identity is established, the production work order is closed.
  • step S20 it further includes:
  • Step a After determining that the calculation result is that the identity is not established, re-acquire the finished product data and the material parameters, and substitute the re-acquired finished product data and the material parameters into the Nissan Nisshin identity;
  • Step b After determining that the Nissan Nissin Constant Equation is still invalid, it is determined that the finished product is lost and/or the material is lost, and the instruction information attributable to the production department is output.
  • the finished product data produced is not equal to the finished product data of the input materials, it means that the production input and output of the enterprise are imbalanced at this time, that is to say, the Nissan Nissan Constant equation is not established, then the Nissan Nissan’s accounting is not Finished, the production work order cannot be closed.
  • the Nissan Nissin constant equation is not established, the output is attributable to the production department's instruction information, reminding the staff that the finished product has not been put in the warehouse, or there are surplus materials involved in the production, but not in the warehouse, that is, the remaining materials are not completely put in. The situation of the library. The finished products and remaining materials that have not been put in storage are likely to be lost on the production line.
  • the finished product data and material data are also material parameters
  • they are substituted into the Nissan Nissin Heng equation.
  • the Nissan Nissin Heng equation is invalid, it indicates that the finished product or the remaining materials are lost, and the output is attributable to the production
  • the department s instruction information to tell the manager; after confirming that the Nissan Nissin constant equation is established, close the production work order.
  • a prompt message is output to urge the staff to check the production line to prevent the loss of finished products or remaining materials.
  • the access status of the materials can be checked, the used materials can be settled with the customer in a timely manner, and the materials that need to be returned to the customer can be counted. Return material.
  • This embodiment obtains the production work order to be calculated, extracts the finished product data in the production work order, and determines that the qualified finished product data in the finished product data is greater than or equal to the preset value, and then substitutes the finished product data and the material parameters in the production work order into Nissan In the Nisshin Heng equation, judge whether to close the production work order according to whether the Nissan Nissin Heng equation is established or not. If it is, the production work order is closed, and the finished product data and material parameters are put into the Nissan Nissin Heng equation to realize the production input and production output. Whether to balance the accounting, so that the company’s managers can know the company’s production in a timely and accurate manner based on the accounting results, and track whether materials and products are lost.
  • the second embodiment of the daily settlement accounting method for Nissan in this application is proposed.
  • the difference between the second embodiment of the Nissan daily settlement accounting method and the first embodiment of the Nissan daily settlement accounting method is that before the step of obtaining the production work order to be calculated and extracting the finished product data in the production work order, Also includes:
  • Step c create a bill of materials according to the customer's order.
  • Step d Establish the production work order based on the material list and preset loss calculation rules.
  • the amount of materials used for production is calculated according to the bill of materials and preset loss calculation rules, and a production work order is established to record the calculated data.
  • step d also includes:
  • Step e Calculate the loss interval of the bill of materials according to a preset loss calculation rule.
  • the batch wastage is a value estimated by the staff based on production experience, which is artificially set.
  • the loss on the ladder and the loss under the ladder do not exist at the same time, it is determined according to the situation.
  • the down-step loss is taken; when the number of work orders is greater than the number of steps or the number of steps is zero, the up-step loss is taken.
  • the number of work orders is the number of products required by the customer, and the number of steps is set by the staff based on production experience.
  • Three scenarios are set up below and three calculation formulas for total loss are proposed:
  • Scenario 2 The number of work orders is less than or equal to the number of steps, and the loss rate under the steps is less than 1, and the loss under the steps is taken.
  • Scenario 3 The number of work orders is less than or equal to the number of steps, and the loss rate under the steps is greater than or equal to 1, and the loss under the steps is still taken.
  • the total loss is calculated, and then the loss interval is estimated based on the total loss.
  • the calculated total loss must belong to the loss interval.
  • Step f Calculate the necessary material data for production based on the loss interval and the material usage data on the material list, and establish the production work order according to the necessary material data.
  • the material list is established according to the customer order, and then the loss interval of the material list is calculated based on the material list and preset loss calculation rules, and the necessary material data for production is calculated according to the loss interval and the material usage data on the material list, and the establishment Production work orders.
  • This method of establishing production work orders provides staff with a reliable data reference for the quantity of materials received, avoiding the difficulty of follow-up accounting caused by blind receipt of staff, and avoiding staff from taking less and increasing the process of overtaking. The number of times.
  • the third embodiment of the daily settlement accounting method of Nissan in this application is proposed.
  • the difference between the third embodiment of the Nissan daily settlement accounting method and the first or second embodiment of the Nissan daily settlement accounting method is that the method of obtaining the production work order to be calculated and extracting the finished product data in the production work order After the steps, it also includes:
  • Step g After determining that the qualified finished product data in the finished product data is less than the preset value, enter the over-collection process to create an over-collection order.
  • the qualified finished product data in the finished product data is less than the preset value, indicating that the number of qualified finished products produced by the company has not reached the number of products required by the customer.
  • Leading process First, estimate the difference based on the difference between the qualified finished product data and the preset value, and calculate the material data required to produce the product with the difference based on the difference, and then calculate the production again according to the loss calculation rule described in the second embodiment Necessary material data to create an over-collection list.
  • Step h based on the over-receipt order, update the production work order until the qualified finished product data is greater than or equal to the preset value.
  • step of entering the over-collection process in step g and establishing the over-collection list includes:
  • Step i Enter the over-receiving process, and estimate the over-received material data based on the difference between the qualified finished product data and the preset value.
  • the difference is estimated based on the difference between the qualified finished product data and the preset value, and the material data required to produce the product with the difference is calculated based on the difference, and again according to the loss calculation rules described in the second embodiment Calculate the over-required material data.
  • Step j Create an over-receiving list based on the over-received material data and the returned material data after the end of production.
  • the qualified finished product data when it enters the over-recovery process, estimates the over-required material data based on the difference between the qualified finished product data and the preset value, and then based on the over-required material data and after the end of production
  • the return data is used to create an over-receiving order, and the original production work order is updated according to the over-receiving order until the qualified finished product data is greater than or equal to the preset value.
  • This kind of re-production is carried out when the qualified finished product data does not meet the customer’s required product volume.
  • the re-recording of the data changes caused by reproduction reflects the flexibility of Nissan's daily settlement accounting process, and the timely update of production work orders also improves the accuracy of the data used for Nissan's daily settlement accounting.
  • the embodiment of the present application also proposes a Nissan daily settlement accounting device, and the Nissan daily settlement accounting device includes:
  • Obtaining module configured to obtain the production work order to be accounted
  • An extraction module configured to extract finished product data in the production work order
  • the substitution module is configured to, after determining that the qualified finished product data in the finished product data is greater than or equal to a preset value, substitute the finished product data and the material parameters in the production work order into the Nissan Nisshin constant equation;
  • the judgment module is configured to judge whether to close the production work order according to the calculation result of the Nissan Nissin Heng equation
  • the closing module is configured to close the production work order after determining that the calculation result is that the identity is established.
  • Nissan daily settlement accounting module further includes:
  • Establish a module which is configured to create a bill of materials according to customer orders
  • the establishment module is further configured to establish the production work order based on the bill of materials and preset loss calculation rules.
  • the establishment module further includes:
  • the calculation unit is configured to calculate the loss interval of the bill of materials according to a preset loss calculation rule
  • the calculation unit is further configured to calculate necessary material data for production based on the loss interval and the material usage data on the material list;
  • the establishment unit is configured to establish the production work order according to the necessary material data.
  • the Nissan daily settlement accounting device further includes:
  • Enter the module configured to enter the over-collaring process after determining that the qualified finished product data in the finished product data is less than the preset value
  • the establishment module is also configured to establish over-collection orders
  • the update module is configured to update the production work order based on the over-receipt order until the qualified finished product data is greater than or equal to the preset value.
  • the entry module further includes:
  • the estimating unit is configured to estimate the over-required material data based on the difference between the qualified finished product data and the preset value;
  • the establishing unit is further configured to create an over-receiving list based on the over-received material data and the returned material data after the production ends.
  • the obtaining module is further configured to obtain the finished product data and the material parameters again after determining that the calculation result is that the identity is not established;
  • the substitution module is further configured to substitute the re-acquired finished product data and the material parameters into the Nissan Nissin constant equation;
  • the determining module is configured to determine that the finished product is lost and/or the material is lost after determining that the calculation result is still invalid.
  • the output module is configured to output the instruction information attributed to the production department.
  • the implementation of the Nissan daily clearing accounting device described in this application is basically the same as the above-mentioned various embodiments of the Nissan daily clearing accounting method, and will not be repeated here.
  • an embodiment of the present application also proposes a computer-readable storage medium that stores a Nissan daily settlement accounting program, and when the Nissan daily settlement accounting program is executed by a processor, the above-mentioned Nissan daily The various steps of the Nissin accounting method.
  • the computer-readable storage medium may be set in the Nissan Nissan’s accounting equipment.
  • the implementation of the computer-readable storage medium of the present application is basically the same as the above-mentioned various embodiments of the Nissan daily settlement accounting method, and will not be repeated here.
  • the technical solution of this application essentially or the part that contributes to the existing technology can be embodied in the form of a software product, and the computer software product is stored in a storage medium (such as ROM/RAM, magnetic disk, The optical disc) includes several instructions to enable a terminal device (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the method described in each embodiment of the present application.
  • a terminal device which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A daily production and daily clearing accounting method, apparatus and device, and a readable storage medium. The method comprises the following steps: acquiring a production work order to undergo accounting, and extracting finished product data from the production work order (S10); after determining that the qualified finished product data in the finished product data is greater than or equal to a preset value, substituting the finished product data and material parameters in the production work order into a daily production and daily clearing identity (S20); according to a daily production and daily clearing identity calculation result, determining whether to close the production work order (S30); and after determining that the calculation result is that the identity is established, closing the production work order (S40).

Description

日产日清核算方法、装置、设备及计算机可读存储介质Nissan daily settlement accounting method, device, equipment and computer readable storage medium
本申请要求于2019年10月10日提交中国专利局、申请号为201910971754.4、发明名称为“日产日清核算方法、装置、设备及计算机可读存储介质”的中国专利申请的优先权,其全部内容通过引用结合在申请中。This application claims the priority of a Chinese patent application filed with the Chinese Patent Office on October 10, 2019, the application number is 201910971754.4, and the invention title is "Nissan Nissan’s accounting method, device, equipment, and computer-readable storage medium", all of which The content is incorporated in the application by reference.
技术领域Technical field
本申请涉及数据处理领域,尤其涉及一种日产日清核算方法、装置、设备及计算机可读存储介质。This application relates to the field of data processing, and in particular to a method, device, equipment and computer-readable storage medium for Nissan’s daily settlement accounting.
背景技术Background technique
目前供应链协同SaaS平台都是基于订单协同、采购协同、物流协同等,可以很快地计算出企业每日投入多少和每日产出多少,但是无法知道企业每日的生产投入和生产产出的核算是否平衡,以至于管理者不能够准确且及时地掌握企业每天的生产情况。At present, the supply chain collaboration SaaS platform is based on order collaboration, procurement collaboration, logistics collaboration, etc. It can quickly calculate how much a company’s daily investment and daily output, but it is impossible to know the company’s daily production input and production output. Whether the accounting is balanced, so that managers cannot accurately and timely grasp the daily production situation of the enterprise.
技术解决方案Technical solutions
本申请的主要目的在于提出一种日产日清核算方法、装置、设备及计算机可读存储介质,旨在解决企业管理者无法掌握企业当日的生产情况的问题。The main purpose of this application is to propose a method, device, equipment, and computer-readable storage medium for daily settlement of Nissan, which aims to solve the problem that enterprise managers cannot grasp the production situation of the enterprise on that day.
为实现上述目的,本申请提供了一种日产日清核算方法,所述日产日清核算方法包括:In order to achieve the above objective, this application provides a Nissan daily settlement accounting method, and the Nissan daily settlement accounting method includes:
获取待核算的生产工单,并提取所述生产工单中的成品数据;Obtain the production work order to be calculated, and extract the finished product data in the production work order;
确定所述成品数据中的合格成品数据大于或等于预设值后,将所述成品数据和所述生产工单中的物料参数代入日产日清恒等式中;After determining that the qualified finished product data in the finished product data is greater than or equal to a preset value, substitute the finished product data and the material parameters in the production work order into the Nissan Nisshin constant equation;
根据所述日产日清恒等式计算结果,判断是否关闭所述生产工单;According to the calculation result of the Nissan Nissin Constant Equation, determine whether to close the production work order;
确定所述计算结果为恒等式成立后,关闭所述生产工单。After it is determined that the calculation result is that the identity is established, the production work order is closed.
进一步地,所述获取待核算的生产工单,并提取所述生产工单中的成品数据的步骤之前,还包括:Further, before the step of obtaining the production work order to be calculated and extracting the finished product data in the production work order, the method further includes:
根据客户订单建立物料清单;Create a bill of materials according to customer orders;
基于所述物料清单和预设的损耗计算规则,建立所述生产工单。Based on the bill of materials and preset loss calculation rules, the production work order is established.
进一步地,所述基于所述物料清单和预设的损耗计算规则,建立所述生产工单的步骤包括:Further, the step of establishing the production work order based on the bill of materials and preset loss calculation rules includes:
根据预设的损耗计算规则,计算出所述物料清单的损耗区间;Calculate the loss interval of the bill of materials according to the preset loss calculation rules;
基于所述损耗区间和所述物料清单上的物料用量数据计算出生产的必需物料数据,并根据所述必需物料数据建立所述生产工单。The necessary material data for production is calculated based on the loss interval and the material usage data on the material list, and the production work order is established according to the necessary material data.
进一步地,所述获取待核算的生产工单,并提取所述生产工单中的成品数据的步骤之后,还包括:Further, after the step of obtaining the production work order to be calculated and extracting the finished product data in the production work order, the method further includes:
确定所述成品数据中的合格成品数据小于所述预设值后,进入超领流程,建立超领单;After determining that the qualified finished product data in the finished product data is less than the preset value, enter the over-collection process, and create an over-collection order;
基于所述超领单,更新所述生产工单,直至所述合格成品数据大于或等于所述预设值。Based on the over-receiving order, the production work order is updated until the qualified finished product data is greater than or equal to the preset value.
进一步地,所述进入超领流程,建立超领单的步骤包括:Further, the step of entering the over-collection process and establishing the over-collection list includes:
进入超领流程,根据所述合格成品数据与所述预设值之间的差值,估算超领物料数据;Enter the over-collection process, and estimate the over-collected material data based on the difference between the qualified finished product data and the preset value;
根据所述超领物料数据和生产结束后的退料数据,建立超领单。According to the over-received material data and the returned material data after the end of production, an over-received order is created.
进一步地,所述日产日清恒等式为:成品数据=合格成品数据+不合格成品数据;Further, the Nissan Nisshin constant equation is: finished product data = qualified finished product data + unqualified finished product data;
成品数据=(物料用量数据+合理损耗数据+超领数据-退料数据)/单位成品物料数据,其中,所述物料用量数据、所述合理损耗数据、所述超领数据、所述退料数量和所述单位成品物料数据均为所述物料参数。Finished product data = (material usage data + reasonable loss data + over-recovery data-returned material data)/unit finished product material data, where the material usage data, the reasonable loss data, the over-collected data, and the returned material Both the quantity and the unit finished product material data are the material parameters.
进一步地,所述根据所述日产日清恒等式计算结果,判断是否关闭所述生产工单的步骤之后,还包括:Further, after the step of judging whether to close the production work order according to the calculation result of the Nissan Nissin Heng equation, the method further includes:
确定所述计算结果为恒等式不成立后,重新获取所述成品数据和所述物料参数,将重新获取的所述成品数据和所述物料参数代入所述日产日清恒等式中;After determining that the calculation result is that the identity is not established, re-acquire the finished product data and the material parameter, and substitute the re-acquired finished product data and the material parameter into the Nissan Nisshin identity;
确定所述计算结果仍为恒等式不成立后,确定成品丢失,和/或物料丢失,输出归责于生产部门的指示信息。After determining that the calculation result is still invalid, the finished product is determined to be lost, and/or the material is lost, and the instruction information attributable to the production department is output.
此外,为实现上述目的,本申请还提供一种日产日清核算装置,所述日产日清核算装置包括:In addition, in order to achieve the above objective, this application also provides a Nissan daily settlement accounting device, which includes:
获取模块,配置为获取待核算的生产工单;Obtaining module, configured to obtain the production work order to be accounted;
提取模块,配置为提取所述生产工单中的成品数据;An extraction module, configured to extract finished product data in the production work order;
代入模块,配置为确定所述成品数据中的合格成品数据大于或等于预设值后,将所述成品数据和所述生产工单中的物料参数代入日产日清恒等式中;The substitution module is configured to, after determining that the qualified finished product data in the finished product data is greater than or equal to a preset value, substitute the finished product data and the material parameters in the production work order into the Nissan Nisshin constant equation;
判断模块,配置为根据所述日产日清恒等式计算结果,判断是否关闭所述生产工单;The judgment module is configured to judge whether to close the production work order according to the calculation result of the Nissan Nissin Heng equation;
关闭模块,确定所述计算结果为恒等式成立后,关闭所述生产工单。The closing module, after determining that the calculation result is that the identity is established, closes the production work order.
此外,为实现上述目的,本申请还提供一种日产日清核算设备,所述日产日清核算设备包括存储器、处理器及存储在所述存储器上并可在所述处理器上运行的日产日清核算程序,所述日产日清核算程序被所述处理器执行时实现如上所述的日产日清核算方法的步骤。In addition, in order to achieve the above-mentioned object, this application also provides a Nissan daily settlement accounting device, which includes a memory, a processor, and a Nissan daily that is stored in the memory and can run on the processor. A liquidation accounting program, which implements the steps of the above-mentioned Nissan daily accounting method when the Nissan daily accounting program is executed by the processor.
此外,为实现上述目的,本申请还提供一种计算机可读存储介质,所述计算机可读存储介质上存储有所述日产日清核算程序,所述日产日清核算程序被处理器执行时实现如上所述的日产日清核算方法的步骤。In addition, in order to achieve the above object, the present application also provides a computer-readable storage medium on which the Nissan daily settlement accounting program is stored, which is realized when the Nissan daily settlement accounting program is executed by a processor. The steps of the Nissan Nissan’s accounting method as described above.
本申请通过获取待核算的生产工单,并提取生产工单中的成品数据,确定成品数据中的合格成品数据大于或等于预设值后,将成品数据和生产工单中的物料参数代入日产日清恒等式中,根据日产日清恒等式是否成立判断是否关闭生产工单,若是,则关闭生产工单,实现了对企业每日投入和产出的核算是否平衡的判断,进一步地使得企业的管理者及时且准确的知道企业每天的生产情况,并追踪物料及产品是否丢失。This application obtains the production work order to be calculated and extracts the finished product data in the production work order. After confirming that the qualified finished product data in the finished product data is greater than or equal to the preset value, the finished product data and the material parameters in the production work order are substituted into Nissan In the Nissin Heng equation, it is judged whether to close the production work order according to whether the Nissan Nissin Heng equation is established. If it is, the production work order is closed, which realizes the judgment of whether the calculation of the daily input and output of the enterprise is balanced, and further enables the management of the enterprise The person knows the daily production situation of the enterprise in a timely and accurate manner, and tracks whether materials and products are lost.
附图说明Description of the drawings
图1为实现本申请各个实施例一种设备的硬件结构示意图;FIG. 1 is a schematic diagram of the hardware structure of a device that implements each embodiment of the present application;
图2为本申请日产日清核算方法第一实施例的流程示意图。Fig. 2 is a schematic flow chart of the first embodiment of the daily settlement accounting method for applying for Nissan.
本申请目的的实现、功能特点及优点将结合实施例,参照附图做说明。。The realization, functional characteristics and advantages of the purpose of this application will be described in conjunction with the embodiments and with reference to the accompanying drawings. .
本申请的实施方式Implementation of this application
应当理解,此处所描述的实施例仅仅用以解释本申请,并不用于限定本申请。It should be understood that the embodiments described here are only used to explain the present application, and are not used to limit the present application.
本申请提供了一种日产日清核算设备,参照图1,图1是本申请实施例方案涉及的硬件运行环境的结构示意图。This application provides a daily settlement accounting device for Nissan. Referring to FIG. 1, FIG. 1 is a schematic structural diagram of a hardware operating environment involved in a solution of an embodiment of this application.
需要说明的是,图1即可为日产日清核算设备的硬件运行环境的结构示意图。本申请实施例日产日清核算设备可以是PC,便携计算机,服务器等设备。It should be noted that Fig. 1 can be a structural diagram of the hardware operating environment of the Nissan Nissan’s accounting equipment. The Nissan daily settlement accounting equipment in the embodiment of the present application may be a PC, a portable computer, a server and other equipment.
如图1所示,该日产日清核算设备可以包括:处理器1001,例如CPU,存储器1005,用户接口1003,网络接口1004,通信总线1002。其中,通信总线1002用于实现这些组件之间的连接通信。用户接口1003可以包括显示屏(Display)、输入单元比如键盘(Keyboard),可选用户接口1003还可以包括标准的有线接口、无线接口。网络接口1004可选的可以包括标准的有线接口、无线接口(如WI-FI接口)。存储器1005可以是高速RAM存储器,也可以是稳定的存储器(non-volatile memory),例如磁盘存储器。存储器1005可选的还可以是独立于前述处理器1001的存储装置。As shown in FIG. 1, the Nissan daily settlement accounting device may include: a processor 1001, such as a CPU, a memory 1005, a user interface 1003, a network interface 1004, and a communication bus 1002. Among them, the communication bus 1002 is used to implement connection and communication between these components. The user interface 1003 may include a display screen (Display) and an input unit such as a keyboard (Keyboard), and the optional user interface 1003 may also include a standard wired interface and a wireless interface. The network interface 1004 may optionally include a standard wired interface and a wireless interface (such as a WI-FI interface). The memory 1005 may be a high-speed RAM memory, or a stable memory (non-volatile memory), such as a magnetic disk memory. Optionally, the memory 1005 may also be a storage device independent of the aforementioned processor 1001.
可选地,日产日清核算设备还可以包括RF(Radio Frequency,射频)电路,传感器、WiFi模块等等。Optionally, the Nissan Nissin accounting device may also include an RF (Radio Frequency, radio frequency) circuit, sensor, WiFi module, and so on.
本领域技术人员可以理解,图1中示出的日产日清核算设备结构并不构成日产日清核算设备的限定,可以包括比图示更多或更少的部件,或者组合某些部件,或者不同的部件布置。Those skilled in the art can understand that the structure of the Nissan Nissan’s accounting equipment shown in Figure 1 does not constitute a limitation of the Nissan’s Nissan accounting equipment, and may include more or less components than shown in the figure, or a combination of certain components, or Different component arrangements.
如图1所示,作为一种计算机存储可读存储介质的存储器1005中可以包括操作系统、网络通信模块、用户接口模块以及日产日清核算程序。其中,操作系统是管理和控制日产日清核算设备硬件和软件资源的程序,支持日产日清核算程序以及其它软件或程序的运行。As shown in FIG. 1, the memory 1005, which is a computer-readable storage medium, may include an operating system, a network communication module, a user interface module, and a Nissan daily settlement accounting program. Among them, the operating system is a program that manages and controls the hardware and software resources of Nissan's Nissan Nissan's accounting equipment, and supports the operation of Nissan's Nissan's accounting and other software or programs.
图1所示的日产日清核算设备,可配置为日产日清的核算,用户接口1003主要用于侦测或者输出各种信息,如侦测成品数据和输出日产日清恒等式不成立的信息等;网络接口1004主要用于与后台服务器交互,进行通信;处理器1001可以用于调用存储器1005中存储的日产日清核算程序,并执行以下操作:The Nissan Nissin accounting device shown in Figure 1 can be configured as Nissan Nissin accounting. The user interface 1003 is mainly used to detect or output various information, such as detecting finished product data and outputting information that the Nissan Nissin constant equation is not established; The network interface 1004 is mainly used to interact with the background server and communicate; the processor 1001 can be used to call the Nissan daily settlement accounting program stored in the memory 1005, and perform the following operations:
获取待核算的生产工单,并提取所述生产工单中的成品数据;Obtain the production work order to be calculated, and extract the finished product data in the production work order;
确定所述成品数据中的合格成品数据大于或等于预设值后,将所述成品数据和所述生产工单中的物料参数代入日产日清恒等式中;After determining that the qualified finished product data in the finished product data is greater than or equal to a preset value, substitute the finished product data and the material parameters in the production work order into the Nissan Nisshin constant equation;
根据所述日产日清恒等式计算结果,判断是否关闭所述生产工单;According to the calculation result of the Nissan Nissin Constant Equation, determine whether to close the production work order;
确定所述计算结果为恒等式成立后,关闭所述生产工单。After it is determined that the calculation result is that the identity is established, the production work order is closed.
进一步地,所述获取待核算的生产工单,并提取所述生产工单中的成品数据的步骤之前,处理器1001还用于调用存储器1005中存储的日产日清核算程序,并执行以下操作:Further, before the step of obtaining the production work order to be calculated and extracting the finished product data in the production work order, the processor 1001 is also used to call the daily settlement accounting program stored in the memory 1005 and perform the following operations :
根据客户订单建立物料清单;Create a bill of materials according to customer orders;
基于所述物料清单和预设的损耗计算规则,建立所述生产工单。Based on the bill of materials and preset loss calculation rules, the production work order is established.
进一步地,所述基于所述物料清单和预设的损耗计算规则,建立所述生产工单的步骤包括:Further, the step of establishing the production work order based on the bill of materials and preset loss calculation rules includes:
根据预设的损耗计算规则,计算出所述物料清单的损耗区间;Calculate the loss interval of the bill of materials according to the preset loss calculation rules;
基于所述损耗区间和所述物料清单上的物料用量数据计算出生产的必需物料数据,并根据所述必需物料数据建立所述生产工单。The necessary material data for production is calculated based on the loss interval and the material usage data on the material list, and the production work order is established according to the necessary material data.
进一步地,所述获取待核算的生产工单,并提取所述生产工单中的成品数据的步骤之后,处理器1001还用于调用存储器1005中存储的日产日清核算程序,并执行以下操作:Further, after the steps of obtaining the production work order to be calculated and extracting the finished product data in the production work order, the processor 1001 is further configured to call the daily settlement accounting program of Nissan stored in the memory 1005, and perform the following operations :
确定所述成品数据中的合格成品数据小于所述预设值后,进入超领流程,建立超领单;After determining that the qualified finished product data in the finished product data is less than the preset value, enter the over-collection process, and create an over-collection order;
基于所述超领单,更新所述生产工单,直至所述合格成品数据大于或等于所述预设值。Based on the over-receiving order, the production work order is updated until the qualified finished product data is greater than or equal to the preset value.
进一步地,所述进入超领流程,建立超领单的步骤包括:Further, the step of entering the over-collection process and establishing the over-collection list includes:
进入超领流程,根据所述合格成品数据与所述预设值之间的差值,估算超领物料数据;Enter the over-collection process, and estimate the over-collected material data based on the difference between the qualified finished product data and the preset value;
根据所述超领物料数据和生产结束后的退料数据,建立超领单。According to the over-received material data and the returned material data after the end of production, an over-received order is created.
进一步地,所述日产日清恒等式为:成品数据=合格成品数据+不合格成品数据;Further, the Nissan Nisshin constant equation is: finished product data = qualified finished product data + unqualified finished product data;
成品数据=(物料用量数据+合理损耗数据+超领数据-退料数据)/单位成品物料数据,其中,所述物料用量数据、所述合理损耗数据、所述超领数据、所述退料数量和所述单位成品物料数据均为所述物料参数。Finished product data = (material usage data + reasonable loss data + over-recovery data-returned material data)/unit finished product material data, where the material usage data, the reasonable loss data, the over-collected data, and the returned material Both the quantity and the unit finished product material data are the material parameters.
进一步地,所述根据所述日产日清恒等式计算结果,判断是否关闭所述生产工单的步骤之后,处理器1001还用于调用存储器1005中存储的日产日清核算程序,并执行以下操作:Further, after the step of judging whether to close the production work order according to the calculation result of the Nissan Nissan constant equation, the processor 1001 is further configured to call the Nissan Nissan accounting program stored in the memory 1005, and perform the following operations:
确定所述计算结果为恒等式不成立后,重新获取所述成品数据和所述物料参数,将重新获取的所述成品数据和所述物料参数代入所述日产日清恒等式中;After determining that the calculation result is that the identity is not established, re-acquire the finished product data and the material parameter, and substitute the re-acquired finished product data and the material parameter into the Nissan Nisshin identity;
确定所述计算结果仍为恒等式不成立后,确定成品丢失,和/或物料丢失,输出归责于生产部门的指示信息。After determining that the calculation result is still invalid, the finished product is determined to be lost, and/or the material is lost, and the instruction information attributable to the production department is output.
本实施例通过获取待核算的生产工单,并提取生产工单中的成品数据,确定成品数据中的合格成品数据大于或等于预设值后,将成品数据和生产工单中的物料参数代入日产日清恒等式中,根据日产日清恒等式是否成立判断是否关闭生产工单,若是,则关闭生产工单,实现了对生产投入和产出是否平衡的判断,使得管理者及时的掌握企业的生产情况,并追踪物料及产品是否丢失。In this embodiment, by obtaining the production work order to be accounted, and extracting the finished product data in the production work order, after determining that the qualified finished product data in the finished product data is greater than or equal to the preset value, the finished product data and the material parameters in the production work order are substituted into In the Nissan Nissin Heng equation, it is judged whether to close the production work order based on whether the Nissan Nissin Heng equation is established. If it is, the production work order is closed, which realizes the judgment of whether the production input and output is balanced, so that the manager can grasp the production of the enterprise in time Circumstances, and track whether materials and products are missing.
本申请移动终端实施方式与下述日产日清核算方法各实施例基本相同,在此不再赘述。The implementation of the mobile terminal of this application is basically the same as the following various embodiments of the Nissan daily settlement accounting method, and will not be repeated here.
基于上述结构,提出本申请日产日清核算方法的各个实施例。Based on the above structure, various embodiments of the daily settlement accounting method of Nissan in this application are proposed.
本申请提供一种日产日清核算方法。This application provides an accounting method for Nissan's daily settlement.
参照图1,图1为本申请日产日清核算方法第一实施例的流程示意图。Referring to Fig. 1, Fig. 1 is a schematic flowchart of a first embodiment of a method for calculating daily settlement of Nissan according to the application.
在本实施例中,提供了日产日清核算方法的实施例,需要说明的是,虽然在流程图中示出了逻辑顺序,但是在某些情况下,可以以不同于此处的顺序执行所示出或描述的步骤。In this embodiment, an embodiment of the Nissan’s daily settlement accounting method is provided. It should be noted that although the logical sequence is shown in the flowchart, in some cases, all operations can be performed in a different order than here. Steps shown or described.
在本实施例中,日产日清核算方法包括:In this embodiment, the daily settlement accounting method of Nissan includes:
步骤S10,获取待核算的生产工单,并提取所述生产工单中的成品数据。Step S10: Obtain the production work order to be calculated, and extract the finished product data in the production work order.
日产日清核算方法应用于供应链协同SaaS平台。首先,获取需要进行核算的生产工单,并从该生产工单中提取成品数据。可以理解的是,需要进行核算的是生产工单中的数据,成品数据是生产工单中所有数据中的一个。需要说明的是,所有实施例中提及的数据均与数量同意。The Nissan Nissan’s accounting method is applied to the supply chain collaboration SaaS platform. First, obtain the production work order that needs to be accounted, and extract the finished product data from the production work order. It is understandable that what needs to be calculated is the data in the production work order, and the finished product data is one of all the data in the production work order. It should be noted that the data mentioned in all the examples agree with the quantity.
步骤S20,确定所述成品数据中的合格成品数据大于或等于预设值后,将所述成品数据和所述生产工单中的物料参数代入日产日清恒等式中。Step S20: After it is determined that the qualified finished product data in the finished product data is greater than or equal to a preset value, the finished product data and the material parameters in the production work order are substituted into the daily production and daily clearing identity.
预设值是人为设定的,预设值的大小可以是当日客户需要的产品数量,或者大于当日客户需要的产品数量。成品数据包括合格成品数据和不合格成品数据,客户需要的产品应是合格成品。当成品数据中的合格成品数据大于或者等于预设值时,说明当日生产量已经满足客户的要求。The preset value is set manually, and the size of the preset value can be the number of products required by the customer on the day, or greater than the number of products required by the customer on the day. The finished product data includes the qualified finished product data and the unqualified finished product data. The products required by the customer should be qualified finished products. When the qualified finished product data in the finished product data is greater than or equal to the preset value, it means that the daily production volume has met the customer's requirements.
步骤S30,根据所述日产日清恒等式计算结果,判断是否关闭所述生产工单。In step S30, it is judged whether to close the production work order according to the calculation result of the Nissan Nissin constant equation.
日产日清恒等式的计算结果有两种,分别为恒等式成立和恒等式不成立日产日清恒等式是否成立是判断每日企业投入和产出是否平衡的标准,当生产出的成品数据等于投入的物料所应该产出的成品数据时,说明此时企业生产投入和产出是平衡的,就执行步骤S30。There are two calculation results of Nissan Nissin's constant equation, namely, the identity is established and the identity is not established. Whether the Nissan Nissin constant equation is established is the standard for judging whether the daily input and output of the enterprise are balanced. When the data of the finished product is equal to the input material. When the finished product data is output, it indicates that the production input and output of the enterprise are balanced at this time, and step S30 is executed.
进一步地,所述日产日清恒等式:成品数据=合格成品数据+不合格成品数据,此为(1)式;成品数据=(物料用量数据+合理损耗数据+超领数据-退料数据)/单位成品物料数据,此为(2)式,当(1)式计算出的成品数据等于(2)式计算出的成品数据时,企业生产的投入和产出是平衡的,其中,(2)式中的物料用量数据、合理损耗数据、超领数据、退料数据和单位成品物料数据均为物料参数,这些物料参数均是根据客户所需的产品数量以及内设的计算法则计算得出的。Further, the Nissan Nisshin constant equation: finished product data = qualified finished product data + unqualified finished product data, which is equation (1); finished product data = (material usage data + reasonable loss data + over-return data-return data)/ The unit finished product material data, this is the formula (2). When the finished product data calculated by the formula (1) is equal to the finished product data calculated by the formula (2), the input and output of the enterprise's production are balanced. Among them, (2) In the formula, the material usage data, reasonable loss data, over-claim data, returned material data and unit finished product material data are all material parameters. These material parameters are calculated based on the number of products required by the customer and the built-in calculation rules .
物料用量数据是生产客户所需产品的总的物料量;合理损耗数据是生产中不可避免地造成地损耗量;超领数据是当第一次领料生产,物料用完后得到的合格成品数据不满足客户要求,需要继续生产以完成客户要求的第二次所领的物料;退料数据是生产出客户所需的产品数后剩余未用的物料量;单位成品物料数据是生产单个成品所需的物料量。The material usage data is the total amount of materials needed to produce the products required by the customer; the reasonable loss data is the amount of wastage inevitably caused during production; the over-required data is the qualified finished product data obtained when the materials are used up for the first time. Does not meet customer requirements, and needs to continue production to complete the material requested for the second time; the returned material data is the amount of unused materials remaining after the number of products required by the customer is produced; the unit finished product material data is the production of a single finished product The amount of material required.
为当生产出的成品数据不等于投入的物料所应该产出的成品数据时,说明此时企业生产投入和产出是不平衡的。When the data of the finished product produced is not equal to the data of the finished product of the input material, it means that the production input and output of the enterprise are imbalanced at this time.
步骤S40,确定所述计算结果为恒等式成立后,关闭所述生产工单。Step S40, after determining that the calculation result is that the identity is established, the production work order is closed.
当生产出的成品数据等于投入的物料所应该产出的成品数据时,说明此时企业生产投入和产出是平衡的,也就是说日产日清恒等式是成立的,此时日产日清核算完成,可以关闭生产工单。When the data of the finished product produced is equal to the data of the finished product of the input material, it means that the production input and output of the company are balanced at this time, that is to say, the Nissan Nissin constant equation is established, and the Nissan Nisshin accounting is completed at this time , You can close the production work order.
进一步地,步骤S20之后,还包括:Further, after step S20, it further includes:
步骤a,确定所述计算结果为恒等式不成立后,重新获取所述成品数据和所述物料参数,将重新获取的所述成品数据和所述物料参数代入所述日产日清恒等式中;Step a: After determining that the calculation result is that the identity is not established, re-acquire the finished product data and the material parameters, and substitute the re-acquired finished product data and the material parameters into the Nissan Nisshin identity;
步骤b,确定所述日产日清恒等式仍不成立后,确定成品丢失,和/或物料丢失,输出归责于生产部门的指示信息。Step b: After determining that the Nissan Nissin Constant Equation is still invalid, it is determined that the finished product is lost and/or the material is lost, and the instruction information attributable to the production department is output.
当生产出的成品数据不等于投入的物料所应该产出的成品数据时,说明此时企业生产投入和产出是不平衡的,也就是说日产日清恒等式不成立的,那么日产日清核算未完成,不能关闭生产工单。当日产日清恒等式不成立时,输出归责于生产部门的指示信息,提示工作人员存在成品未入库的情况,或者存在参与生产的物料有剩余,但未入库,即剩余的物料未完全入库的情况。未入库的成品和剩余的物料很可能丢失在生产线上。When the finished product data produced is not equal to the finished product data of the input materials, it means that the production input and output of the enterprise are imbalanced at this time, that is to say, the Nissan Nissan Constant equation is not established, then the Nissan Nissan’s accounting is not Finished, the production work order cannot be closed. When the Nissan Nissin constant equation is not established, the output is attributable to the production department's instruction information, reminding the staff that the finished product has not been put in the warehouse, or there are surplus materials involved in the production, but not in the warehouse, that is, the remaining materials are not completely put in. The situation of the library. The finished products and remaining materials that have not been put in storage are likely to be lost on the production line.
需要说明的是,当线下的工作人员接收到上述的指示信息,会去线上重新盘点成品数据和剩余的物料数据,得到新的成品数据或者新的物料数据。It should be noted that when the offline staff receives the above instructions, they will go to the online to re-count the finished product data and remaining material data to obtain new finished product data or new material data.
当再次获取到成品数据和物料数据(物料数据也是物料参数)时,再将其代入日产日清恒等式中,确定日产日清恒等式不成立后,说明成品丢失或者剩余的物料丢失,输出归责于生产部门的指示信息,以告诉管理者;确定日产日清恒等式成立后,关闭该生产工单。When the finished product data and material data (material data are also material parameters) are obtained again, they are substituted into the Nissan Nissin Heng equation. After determining that the Nissan Nissin Heng equation is invalid, it indicates that the finished product or the remaining materials are lost, and the output is attributable to the production The department’s instruction information to tell the manager; after confirming that the Nissan Nissin constant equation is established, close the production work order.
本实施例中,当日产日清恒等式不成立时,输出提示信息以督促工作人员去产线盘点核对,防止成品或者剩余的物料丢失。需要说明的是,当生产为物料由客户提供的生产时,可根据日产日清恒等式,检查物料的存取情况,及时地与客户结算已用物料,并统计出需要退回给客户的物料,即退料。In this embodiment, when the Nissan Nissin Constant equation does not hold, a prompt message is output to urge the staff to check the production line to prevent the loss of finished products or remaining materials. It should be noted that when the production is the production of materials provided by the customer, according to the Nissan Nisshin constant equation, the access status of the materials can be checked, the used materials can be settled with the customer in a timely manner, and the materials that need to be returned to the customer can be counted. Return material.
本实施例通过获取待核算的生产工单,提取生产工单中的成品数据,确定成品数据中的合格成品数据大于或者等于预设值后,将成品数据和生产工单中的物料参数代入日产日清恒等式中,根据日产日清恒等式是否成立判断是否关闭生产工单,若是,则关闭生产工单,将成品数据和物料参数待入日产日清恒等式中,实现了对生产投入和生产产出是否平衡进行核算,以使企业的管理者根据核算结果及时且准确的知道企业的生产情况,并追踪物料及产品是否丢失。This embodiment obtains the production work order to be calculated, extracts the finished product data in the production work order, and determines that the qualified finished product data in the finished product data is greater than or equal to the preset value, and then substitutes the finished product data and the material parameters in the production work order into Nissan In the Nisshin Heng equation, judge whether to close the production work order according to whether the Nissan Nissin Heng equation is established or not. If it is, the production work order is closed, and the finished product data and material parameters are put into the Nissan Nissin Heng equation to realize the production input and production output. Whether to balance the accounting, so that the company’s managers can know the company’s production in a timely and accurate manner based on the accounting results, and track whether materials and products are lost.
进一步地,提出本申请日产日清核算方法的第二实施例。日产日清核算方法的第二实施例与日产日清核算方法的第一实施例的区别在于,所述获取待核算的生产工单,并提取所述生产工单中的成品数据的步骤之前,还包括:Further, the second embodiment of the daily settlement accounting method for Nissan in this application is proposed. The difference between the second embodiment of the Nissan daily settlement accounting method and the first embodiment of the Nissan daily settlement accounting method is that before the step of obtaining the production work order to be calculated and extracting the finished product data in the production work order, Also includes:
步骤c,根据客户订单建立物料清单。Step c, create a bill of materials according to the customer's order.
首先接收到由客户发来的客户订单,根据客户订单上记录的产品名称,产品零件及产品零件数量等计算生产客户所需产品需要的物料种类和物料数量,并建立物料清单,以记录物料种类和物料数量。First receive the customer order sent by the customer, calculate the type and quantity of materials required to produce the product required by the customer based on the product name, product parts, and number of product parts recorded on the customer order, and establish a bill of materials to record the type of material And the quantity of the material.
步骤d,基于所述物料清单和预设的损耗计算规则,建立所述生产工单。Step d: Establish the production work order based on the material list and preset loss calculation rules.
可以理解的是,企业在生产过程必定会造成损耗,所以仅仅使用物料清单上的数据去领料生产是无法完成客户所需的产品数量的,因此用于生产的物料必需大于物料清单上的数据,以保证有多出的物料弥补由于合理损耗造成的物料损失。It is understandable that the company will inevitably cause losses in the production process, so only using the data on the bill of materials to pick and produce cannot complete the number of products required by the customer, so the materials used for production must be larger than the data on the bill of materials , In order to ensure that there are excess materials to make up for the material loss caused by reasonable loss.
用于生产的物料量根据物料清单和预设的损耗计算规则计算得出,并建立生产工单以记录计算得出的数据。The amount of materials used for production is calculated according to the bill of materials and preset loss calculation rules, and a production work order is established to record the calculated data.
进一步地,步骤d还包括:Further, step d also includes:
步骤e,根据预设的损耗计算规则,计算出所述物料清单的损耗区间。Step e: Calculate the loss interval of the bill of materials according to a preset loss calculation rule.
生产损耗有两种,分别是:批次损耗和阶梯损耗,阶梯损耗也有两种,分别是阶梯上损耗和阶梯下损耗。批次损耗量是由工作人员根据生产经验估算的一个值,是人为设定的。阶梯上损耗和阶梯下损耗不是同时存在的,根据情况判定。当工单数量小于或等于阶梯数量时取阶梯下损耗;当工单数量大于阶梯数量或者阶梯数量为零时取阶梯上损耗。工单数量是客户所需的产品数量,阶梯数量由工作人员根据生产经验设定。阶梯下损耗量的计算公式为:阶梯下损耗量=单位成品用量*阶梯下损耗率,阶梯下损耗率由工作人员根据工作经验设定;阶梯上损耗量的计算公式为:阶梯上损耗量=单位用量*阶梯上损耗*工单数量,阶梯上损耗率由工作人员根据工作经验设定。下面设定三种场景并提出三种总损耗量的计算公式:There are two types of production loss, namely: batch loss and step loss. There are also two types of step loss, namely up-stairs loss and down-stairs loss. The batch wastage is a value estimated by the staff based on production experience, which is artificially set. The loss on the ladder and the loss under the ladder do not exist at the same time, it is determined according to the situation. When the number of work orders is less than or equal to the number of steps, the down-step loss is taken; when the number of work orders is greater than the number of steps or the number of steps is zero, the up-step loss is taken. The number of work orders is the number of products required by the customer, and the number of steps is set by the staff based on production experience. The calculation formula for the loss under the ladder is: loss under the ladder = unit product consumption * loss rate under the ladder, the loss rate under the ladder is set by the staff based on work experience; the calculation formula for the loss on the ladder is: loss on the ladder = Unit consumption * loss on the ladder * number of work orders, the loss rate on the ladder is set by the staff based on their work experience. Three scenarios are set up below and three calculation formulas for total loss are proposed:
场景一,阶梯数量为零或者工单数量大于阶梯数量,取阶梯上损耗,总损耗量的计算公式为总损耗量=工单数量*单位成品用量*(1+阶梯上损耗率)+批次损耗量,例如,批次损耗量50,阶梯数量5000,阶梯下损耗率为0.06,阶梯上损耗率为0.02,工单数量5001,单位成品用量2,那么总损耗量=5001*2*(1+0.02)+50=10252.04;Scenario 1: If the number of steps is zero or the number of work orders is greater than the number of steps, take the loss on the steps, and the calculation formula for the total loss is total loss = number of work orders * unit finished product consumption * (1 + loss rate on the steps) + batch Loss amount, for example, the batch loss amount is 50, the number of steps is 5000, the loss rate under the steps is 0.06, the loss rate on the steps is 0.02, the number of work orders is 5001, and the unit amount of finished products is 2, then the total loss = 5001*2*(1 +0.02)+50=10252.04;
场景二,工单数量小于或等于阶梯数量,且阶梯下损耗率小于1,取阶梯下损耗,总损耗量的计算公式为总损耗量=工单数量*单位成品用量*(1+阶梯下损耗率)+批次损耗量,例如,批次损耗量50,阶梯数量5000,阶梯下损耗率0.06,阶梯上损耗率0.02,工单数量5000,单位成品用量2,那么总损耗量=5000*2*(1+0.06)+50=10650;Scenario 2: The number of work orders is less than or equal to the number of steps, and the loss rate under the steps is less than 1, and the loss under the steps is taken. The calculation formula for the total loss is total loss = number of work orders * unit finished product consumption * (1 + loss under the steps Rate) + batch loss, for example, batch loss is 50, step number is 5000, step loss rate is 0.06, step loss rate is 0.02, work order number is 5000, unit finished product is 2, then total loss = 5000*2 *(1+0.06)+50=10650;
场景三,工单数量小于或等于阶梯数量,且阶梯下损耗率大于或等于1,仍取阶梯下损耗,总损耗量的计算公式为总损耗量=工单数量*单位成品用量+阶梯下损耗率*单位成品用量+批次损耗量,例如,批次损耗量50,阶梯数量5000,阶梯下损耗率30,阶梯上损耗率0.02,工单数量5000,单位成品用量2,那么总损耗量=5000*2+30*2+50=10110。Scenario 3: The number of work orders is less than or equal to the number of steps, and the loss rate under the steps is greater than or equal to 1, and the loss under the steps is still taken. The calculation formula of the total loss is total loss = number of work orders * unit finished product consumption + loss under the steps Rate * unit finished product usage + batch loss, for example, batch loss is 50, step number is 5000, step loss rate is 30, step loss rate is 0.02, work order number is 5000, unit product consumption is 2, then total loss = 5000*2+30*2+50=10110.
根据上述的损耗计算规则,计算出总损耗量,再根据总损耗量估算出损耗区间,计算得出的总损耗量一定属于该损耗区间。According to the above-mentioned loss calculation rules, the total loss is calculated, and then the loss interval is estimated based on the total loss. The calculated total loss must belong to the loss interval.
步骤f,基于所述损耗区间和所述物料清单上的物料用量数据计算出生产的必需物料数据,并根据所述必需物料数据建立所述生产工单。Step f: Calculate the necessary material data for production based on the loss interval and the material usage data on the material list, and establish the production work order according to the necessary material data.
在损耗区间中取出一个数,加上物料清单中记录的生产客户所需产品的物料数量,得到需要投入生产的物料的必需物料数据,根据该必需物料数据建立生产工单。Take a number from the loss interval and add the number of materials required to produce the customer's products recorded in the material list to obtain the necessary material data of the materials that need to be put into production, and create a production work order based on the necessary material data.
本实施例通过根据客户订单建立物料清单,再基于物料清单和预设的损耗计算规则计算出物料清单的损耗区间,根据损耗区间和物料清单上的物料用量数据计算出生产的必须物料数据,建立生产工单,这种建立生产工单的方式给工作人员提供了领取物料数量的可靠数据参考,避免工作人员盲目领取而导致后续核算的困难,也避免工作人员少取而增加了走超领流程的次数。In this embodiment, the material list is established according to the customer order, and then the loss interval of the material list is calculated based on the material list and preset loss calculation rules, and the necessary material data for production is calculated according to the loss interval and the material usage data on the material list, and the establishment Production work orders. This method of establishing production work orders provides staff with a reliable data reference for the quantity of materials received, avoiding the difficulty of follow-up accounting caused by blind receipt of staff, and avoiding staff from taking less and increasing the process of overtaking. The number of times.
进一步地,提出本申请日产日清核算方法的第三实施例。日产日清核算方法的第三实施例与日产日清核算方法的第一或第二实施例的区别在于,所述获取待核算的生产工单,并提取所述生产工单中的成品数据的步骤之后,还包括:Further, the third embodiment of the daily settlement accounting method of Nissan in this application is proposed. The difference between the third embodiment of the Nissan daily settlement accounting method and the first or second embodiment of the Nissan daily settlement accounting method is that the method of obtaining the production work order to be calculated and extracting the finished product data in the production work order After the steps, it also includes:
步骤g,确定所述成品数据中的合格成品数据小于所述预设值后,进入超领流程,建立超领单。Step g: After determining that the qualified finished product data in the finished product data is less than the preset value, enter the over-collection process to create an over-collection order.
提取生产工单中的成品数据,成品数据中的合格成品数据小于预设值,说明该企业生产出的合格成品数量未达到客户需要的产品数量,需要再次领取物料进行生产,此时需要走超领流程。首先根据合格成品数据与预设值的差值估算出差额,并根据差额计算出生产差额量的产品所需的物料数据,再次根据第二实施例中所述的损耗计算规则计算出再次进行生产的必需物料数据,以建立超领单。Extract the finished product data in the production work order. The qualified finished product data in the finished product data is less than the preset value, indicating that the number of qualified finished products produced by the company has not reached the number of products required by the customer. Leading process. First, estimate the difference based on the difference between the qualified finished product data and the preset value, and calculate the material data required to produce the product with the difference based on the difference, and then calculate the production again according to the loss calculation rule described in the second embodiment Necessary material data to create an over-collection list.
步骤h,基于所述超领单,更新所述生产工单,直至所述合格成品数据大于或等于所述预设值。Step h, based on the over-receipt order, update the production work order until the qualified finished product data is greater than or equal to the preset value.
基于已建立的超领单,将原先建立的生产工单与超领单中的数据综合起来,达到更新该生产工单的目的,确定再次生产得到的合格成品数据仍小于预设值后,继续走超领流程,直至合格成品数据大于或等于预设值为止。一般情况下,进入超领流程只需一次即可完成生产任务。Based on the established over-receipt order, integrate the data in the original production work order and the over-requisite order to achieve the purpose of updating the production work order. After confirming that the data of the qualified finished product obtained in the re-production is still less than the preset value, continue Go through the over-lead process until the qualified finished product data is greater than or equal to the preset value. Under normal circumstances, it only takes one time to complete the production task after entering the over-collar process.
进一步地,步骤g中所述进入超领流程,建立超领单的步骤包括:Further, the step of entering the over-collection process in step g and establishing the over-collection list includes:
步骤i,进入超领流程,根据所述合格成品数据与所述预设值之间的差值,估算超领物料数据。Step i: Enter the over-receiving process, and estimate the over-received material data based on the difference between the qualified finished product data and the preset value.
进入超领流程后,根据合格成品数据与预设值的差值估算出差额,并根据差额计算出生产差额量的产品所需的物料数据,再次根据第二实施例中所述的损耗计算规则计算出超领物料数据。After entering the over-collaring process, the difference is estimated based on the difference between the qualified finished product data and the preset value, and the material data required to produce the product with the difference is calculated based on the difference, and again according to the loss calculation rules described in the second embodiment Calculate the over-required material data.
步骤j,根据所述超领物料数据和生产结束后的退料数据,建立超领单。Step j: Create an over-receiving list based on the over-received material data and the returned material data after the end of production.
记录再次生产前领取的超领物料数据和再次生产结束后的退料数据以建立超领单。Record the over-received material data received before the re-production and the returned material data after the re-production to create the over-received list.
本实施例通过当合格成品数据小于预设值时,进入超领流程,根据合格成品数据与预设值之间的差值,估算超领物料数据,再根据超领物料数据和生产结束后的退料数据建立超领单,根据该超领单更新原先建立的生产工单,直至合格成品数据大于或等于预设值,这种对当合格成品数据不满足客户所需产品量时进行再生产,再生产所引起的各数据的变化的重新记录体现了日产日清核算流程的灵活性,且对生产工单的及时更新也提高了用于日产日清核算的数据的准确性。In this embodiment, when the qualified finished product data is less than the preset value, it enters the over-recovery process, estimates the over-required material data based on the difference between the qualified finished product data and the preset value, and then based on the over-required material data and after the end of production The return data is used to create an over-receiving order, and the original production work order is updated according to the over-receiving order until the qualified finished product data is greater than or equal to the preset value. This kind of re-production is carried out when the qualified finished product data does not meet the customer’s required product volume. The re-recording of the data changes caused by reproduction reflects the flexibility of Nissan's daily settlement accounting process, and the timely update of production work orders also improves the accuracy of the data used for Nissan's daily settlement accounting.
此外,本申请实施例还提出一种日产日清核算装置,所述日产日清核算装置包括:In addition, the embodiment of the present application also proposes a Nissan daily settlement accounting device, and the Nissan daily settlement accounting device includes:
获取模块,配置为获取待核算的生产工单;Obtaining module, configured to obtain the production work order to be accounted;
提取模块,配置为提取所述生产工单中的成品数据;An extraction module, configured to extract finished product data in the production work order;
代入模块,配置为确定所述成品数据中的合格成品数据大于或等于预设值后,将所述成品数据和所述生产工单中的物料参数代入日产日清恒等式中;The substitution module is configured to, after determining that the qualified finished product data in the finished product data is greater than or equal to a preset value, substitute the finished product data and the material parameters in the production work order into the Nissan Nisshin constant equation;
判断模块,配置为根据所述日产日清恒等式计算结果,判断是否关闭所述生产工单;The judgment module is configured to judge whether to close the production work order according to the calculation result of the Nissan Nissin Heng equation;
关闭模块,配置为确定所述计算结果为恒等式成立后,关闭所述生产工单。The closing module is configured to close the production work order after determining that the calculation result is that the identity is established.
进一步地,所述日产日清核算模块还包括:Further, the Nissan daily settlement accounting module further includes:
建立模块,配置为根据客户订单建立物料清单;Establish a module, which is configured to create a bill of materials according to customer orders;
所述建立模块还配置为基于所述物料清单和预设的损耗计算规则,建立所述生产工单。The establishment module is further configured to establish the production work order based on the bill of materials and preset loss calculation rules.
进一步地,所述建立模块还包括:Further, the establishment module further includes:
计算单元,配置为根据预设的损耗计算规则,计算出所述物料清单的损耗区间;The calculation unit is configured to calculate the loss interval of the bill of materials according to a preset loss calculation rule;
所述计算单元还配置为基于所述损耗区间和所述物料清单上的物料用量数据计算出生产的必需物料数据;The calculation unit is further configured to calculate necessary material data for production based on the loss interval and the material usage data on the material list;
建立单元,配置为根据所述必需物料数据建立所述生产工单。The establishment unit is configured to establish the production work order according to the necessary material data.
进一步地,所述日产日清核算装置还包括:Further, the Nissan daily settlement accounting device further includes:
进入模块,配置为确定所述成品数据中的合格成品数据小于所述预设值后,进入超领流程;Enter the module, configured to enter the over-collaring process after determining that the qualified finished product data in the finished product data is less than the preset value;
所述建立模块还配置为建立超领单;The establishment module is also configured to establish over-collection orders;
更新模块,配置为基于所述超领单,更新所述生产工单,直至所述合格成品数据大于或等于所述预设值。The update module is configured to update the production work order based on the over-receipt order until the qualified finished product data is greater than or equal to the preset value.
进一步地,所述进入模块还包括:Further, the entry module further includes:
估算单元配置为根据所述合格成品数据与所述预设值之间的差值,估算超领物料数据;The estimating unit is configured to estimate the over-required material data based on the difference between the qualified finished product data and the preset value;
所述建立单元还配置为根据所述超领物料数据和生产结束后的退料数据,建立超领单。The establishing unit is further configured to create an over-receiving list based on the over-received material data and the returned material data after the production ends.
进一步地,所述获取模块还配置为确定所述计算结果为恒等式不成立后,则重新获取所述成品数据和所述物料参数;Further, the obtaining module is further configured to obtain the finished product data and the material parameters again after determining that the calculation result is that the identity is not established;
所述代入模块还配置为将重新获取的所述成品数据和所述物料参数代入所述日产日清恒等式中;The substitution module is further configured to substitute the re-acquired finished product data and the material parameters into the Nissan Nissin constant equation;
确定模块,配置为确定所述计算结果仍为恒等式不成立后,确定成品丢失,和/或物料丢失;The determining module is configured to determine that the finished product is lost and/or the material is lost after determining that the calculation result is still invalid.
输出模块,配置为输出归责于生产部门的指示信息。The output module is configured to output the instruction information attributed to the production department.
本申请所述日产日清核算装置实施方式与上述日产日清核算方法各实施例基本相同,在此不再赘述。The implementation of the Nissan daily clearing accounting device described in this application is basically the same as the above-mentioned various embodiments of the Nissan daily clearing accounting method, and will not be repeated here.
此外,本申请实施例还提出一种计算机可读存储介质,所述计算机可读存储介质上存储有日产日清核算程序,所述日产日清核算程序被处理器执行时实现如上所述的日产日清核算方法的各个步骤。In addition, an embodiment of the present application also proposes a computer-readable storage medium that stores a Nissan daily settlement accounting program, and when the Nissan daily settlement accounting program is executed by a processor, the above-mentioned Nissan daily The various steps of the Nissin accounting method.
需要说明的是,计算机可读存储介质可设置在日产日清核算设备中。It should be noted that the computer-readable storage medium may be set in the Nissan Nissan’s accounting equipment.
本申请计算机可读存储介质实施方式与上述日产日清核算方法各实施例基本相同,在此不再赘述。The implementation of the computer-readable storage medium of the present application is basically the same as the above-mentioned various embodiments of the Nissan daily settlement accounting method, and will not be repeated here.
需要说明的是,在本文中,术语“包括”、“包含”或者其任何其它变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者系统不仅包括那些要素,而且还包括没有明确列出的其它要素,或者是还包括为这种过程、方法、物品或者系统所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括该要素的过程、方法、物品或者系统中还存在另外的相同要素。It should be noted that in this article, the terms "include", "include" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or system including a series of elements not only includes those elements, It also includes other elements that are not explicitly listed, or elements inherent to the process, method, article, or system. Without more restrictions, the element defined by the sentence "including a..." does not exclude the existence of other identical elements in the process, method, article, or system that includes the element.
上述本申请实施例序号仅仅为了描述,不代表实施例的优劣。The serial numbers of the foregoing embodiments of the present application are only for description, and do not represent the superiority of the embodiments.
通过以上的实施方式的描述,本领域的技术人员可以清楚地了解到上述实施例方法可借助软件加必需的通用硬件平台的方式来实现,当然也可以通过硬件,但很多情况下前者是更佳的实施方式。基于这样的理解,本申请的技术方案本质上或者说对现有技术做出贡献的部分可以以软件产品的形式体现出来,该计算机软件产品存储在一个存储介质(如ROM/RAM、磁碟、光盘)中,包括若干指令用以使得一台终端设备(可以是手机,计算机,服务器,空调器,或者网络设备等)执行本申请各个实施例所述的方法。Through the description of the above implementation manners, those skilled in the art can clearly understand that the above-mentioned embodiment method can be implemented by means of software plus the necessary general hardware platform, of course, it can also be implemented by hardware, but in many cases the former is better.的实施方式。 Based on this understanding, the technical solution of this application essentially or the part that contributes to the existing technology can be embodied in the form of a software product, and the computer software product is stored in a storage medium (such as ROM/RAM, magnetic disk, The optical disc) includes several instructions to enable a terminal device (which can be a mobile phone, a computer, a server, an air conditioner, or a network device, etc.) to execute the method described in each embodiment of the present application.
以上仅为本申请的优选实施例,并非因此限制本申请的专利范围,凡是利用本申请说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本申请的专利保护范围内。The above are only the preferred embodiments of the application, and do not limit the scope of the patent for this application. Any equivalent structure or equivalent process transformation made using the content of the description and drawings of the application, or directly or indirectly applied to other related technical fields , The same reason is included in the scope of patent protection of this application.

Claims (10)

  1. 一种日产日清核算方法,其中,所述日产日清核算方法应用于供应链协同SaaS平台,所述日产日清核算方法包括以下步骤:A Nissan daily settlement accounting method, wherein the Nissan daily settlement accounting method is applied to a supply chain collaboration SaaS platform, and the Nissan daily settlement accounting method includes the following steps:
    获取待核算的生产工单,并提取所述生产工单中的成品数据;Obtain the production work order to be calculated, and extract the finished product data in the production work order;
    确定所述成品数据中的合格成品数据大于或等于预设值后,将所述成品数据和所述生产工单中的物料参数代入日产日清恒等式中;After determining that the qualified finished product data in the finished product data is greater than or equal to a preset value, substitute the finished product data and the material parameters in the production work order into the Nissan Nisshin constant equation;
    根据所述日产日清恒等式计算结果,确定关闭所述生产工单;Determine to close the production work order according to the calculation result of the Nissan Nissin Heng equation;
    确定所述计算结果为恒等式成立后,关闭所述生产工单。After it is determined that the calculation result is that the identity is established, the production work order is closed.
  2. 如权利要求1所述的日产日清核算方法,其中,所述获取待核算的生产工单,并提取所述生产工单中的成品数据的步骤之前,还包括:5. The Nissan daily settlement accounting method according to claim 1, wherein before the step of obtaining the production work order to be calculated and extracting the finished product data in the production work order, the method further comprises:
    根据客户订单建立物料清单;Create a bill of materials according to customer orders;
    基于所述物料清单和预设的损耗计算规则,建立所述生产工单。Based on the bill of materials and preset loss calculation rules, the production work order is established.
  3. 如权利要求2所述的日产日清核算方法,其中,所述基于所述物料清单和预设的损耗计算规则,建立所述生产工单的步骤包括:3. The Nissan daily settlement accounting method according to claim 2, wherein the step of establishing the production work order based on the bill of materials and preset loss calculation rules comprises:
    根据预设的损耗计算规则,计算出所述物料清单的损耗区间;Calculate the loss interval of the bill of materials according to the preset loss calculation rules;
    基于所述损耗区间和所述物料清单上的物料用量数据计算出生产的必需物料数据,并根据所述必需物料数据建立所述生产工单。The necessary material data for production is calculated based on the loss interval and the material usage data on the material list, and the production work order is established according to the necessary material data.
  4. 如权利要求1所述的日产日清核算方法,其中,所述获取待核算的生产工单,并提取所述生产工单中的成品数据的步骤之后,还包括:The Nissan daily settlement accounting method according to claim 1, wherein after the step of obtaining the production work order to be calculated and extracting the finished product data in the production work order, the method further comprises:
    确定所述成品数据中的合格成品数据小于所述预设值后,进入超领流程,建立超领单;After determining that the qualified finished product data in the finished product data is less than the preset value, enter the over-collection process, and create an over-collection order;
    基于所述超领单,更新所述生产工单,直至所述合格成品数据大于或等于所述预设值。Based on the over-receiving order, the production work order is updated until the qualified finished product data is greater than or equal to the preset value.
  5. 如权利要求4所述的日产日清核算方法,其中,所述进入超领流程,建立超领单的步骤包括:The Nissan daily settlement accounting method according to claim 4, wherein the step of entering the over-collection process and establishing the over-collection slip comprises:
    进入超领流程,根据所述合格成品数据与所述预设值之间的差值,估算超领物料数据;Enter the over-collection process, and estimate the over-collected material data based on the difference between the qualified finished product data and the preset value;
    根据所述超领物料数据和生产结束后的退料数据,建立超领单。According to the over-received material data and the returned material data after the end of production, an over-received order is created.
  6. 如权利要求1所述的日产日清核算方法,其中,所述日产日清恒等式为:成品数据=合格成品数据+不合格成品数据;The Nissan daily settlement accounting method according to claim 1, wherein the Nissan daily settlement constant equation is: finished product data = qualified finished product data + unqualified finished product data;
    成品数据=(物料用量数据+合理损耗数据+超领数据-退料数据)/单位成品物料数据,其中,所述物料用量数据、所述合理损耗数据、所述超领数据、所述退料数量和所述单位成品物料数据均为所述物料参数。Finished product data = (material usage data + reasonable loss data + over-recovery data-returned material data)/unit finished product material data, where the material usage data, the reasonable loss data, the over-collected data, and the returned material Both the quantity and the unit finished product material data are the material parameters.
  7. 如权利要求1至6任一项所述的日产日清核算方法,其中,所述根据所述日产日清恒等式计算结果,确定关闭所述生产工单的步骤之后,还包括:7. The Nissan Nissan's daily settlement accounting method according to any one of claims 1 to 6, wherein, after determining the step of closing the production work order according to the calculation result of the Nissan Nissan's constant equation, the method further comprises:
    确定所述计算结果为恒等式不成立后,重新获取所述成品数据和所述物料参数,将重新获取的所述成品数据和所述物料参数代入所述日产日清恒等式中;After determining that the calculation result is that the identity is not established, re-acquire the finished product data and the material parameter, and substitute the re-acquired finished product data and the material parameter into the Nissan Nisshin identity;
    确定所述计算结果仍为恒等式不成立后,确定成品丢失,和/或物料丢失,输出归责于生产部门的指示信息。After determining that the calculation result is still invalid, the finished product is determined to be lost, and/or the material is lost, and the instruction information attributable to the production department is output.
  8. 一种日产日清核算装置,其中,所述日产日清核算装置包括:A Nissan daily settlement accounting device, wherein the Nissan daily settlement accounting device includes:
    获取模块,设置为获取待核算的生产工单;The acquisition module is set to acquire the production work order to be accounted;
    提取模块,设置为提取所述生产工单中的成品数据;An extraction module, configured to extract the finished product data in the production work order;
    代入模块,设置为确定所述成品数据中的合格成品数据大于或等于预设值后,将所述成品数据和所述生产工单中的物料参数代入日产日清恒等式中;Substitution module, set to determine that the qualified finished product data in the finished product data is greater than or equal to a preset value, and then substitute the finished product data and the material parameters in the production work order into the Nissan Nissan Constant Equation;
    判断模块,设置为根据所述日产日清恒等式计算结果,确定关闭所述生产工单;以及The judgment module is configured to determine to close the production work order according to the calculation result of the Nissan Nissin Heng equation; and
    关闭模块,设置为确定所述计算结果为恒等式成立后,关闭所述生产工单。The closing module is configured to close the production work order after determining that the calculation result is that the identity is established.
  9. 一种日产日清核算设备,其中,所述日产日清核算设备包括存储器、处理器及存储在所述存储器上并可在所述处理器上运行的日产日清核算程序,所述日产日清核算程序被所述处理器执行时实现如权利要求1至7中任一项所述的日产日清核算方法的步骤。A Nissan daily clearing accounting device, wherein the Nissan daily clearing accounting device includes a memory, a processor, and a Nissan daily clearing accounting program stored on the memory and running on the processor, and the Nissan daily clearing accounting program When the accounting program is executed by the processor, the steps of the Nissan daily settlement accounting method according to any one of claims 1 to 7 are realized.
  10. 一种可读存储介质,其中,所述可读存储介质上存储有日产日清核算程序,所述日产日清核算程序被处理器执行时实现如权利要求1至7中任一项所述的日产日清核算方法的步骤。A readable storage medium, wherein a Nissan daily settlement accounting program is stored on the readable storage medium, and when the Nissan daily settlement accounting program is executed by a processor, the method according to any one of claims 1 to 7 is realized. Steps of Nissan Nissan’s accounting method.
PCT/CN2020/102776 2019-10-10 2020-07-17 Daily production and daily clearing accounting method, apparatus and device, and computer-readable storage medium WO2021068593A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910971754.4A CN110782142A (en) 2019-10-10 2019-10-10 Daily birth daily clearing accounting method, device, equipment and computer readable storage medium
CN201910971754.4 2019-10-10

Publications (1)

Publication Number Publication Date
WO2021068593A1 true WO2021068593A1 (en) 2021-04-15

Family

ID=69385288

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2020/102776 WO2021068593A1 (en) 2019-10-10 2020-07-17 Daily production and daily clearing accounting method, apparatus and device, and computer-readable storage medium

Country Status (2)

Country Link
CN (1) CN110782142A (en)
WO (1) WO2021068593A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115423390A (en) * 2022-08-01 2022-12-02 深圳智汇创想科技有限责任公司 Method, device, equipment and medium for identifying size of container product

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110782142A (en) * 2019-10-10 2020-02-11 深圳点链科技有限公司 Daily birth daily clearing accounting method, device, equipment and computer readable storage medium
CN112837171A (en) * 2021-01-12 2021-05-25 柏丽德珠宝(广州)有限公司 Material information calculation method and device for ornament process flow

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1414499A (en) * 2001-10-26 2003-04-30 英业达股份有限公司 Method of automatic calculating manufacturer's record, usance from feed stock inspection result
US20100138256A1 (en) * 2007-12-05 2010-06-03 Management Systems Resources, Inc. Free trade qualification method and system
CN109784631A (en) * 2018-12-12 2019-05-21 广州永霸信息科技股份有限公司 A kind of production work order generates processing method, system, platform and storage medium
CN110060110A (en) * 2019-04-28 2019-07-26 锋泾(中国)建材集团有限公司 A kind of the determination method, apparatus and computer readable storage medium of product cost
CN110782142A (en) * 2019-10-10 2020-02-11 深圳点链科技有限公司 Daily birth daily clearing accounting method, device, equipment and computer readable storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1414499A (en) * 2001-10-26 2003-04-30 英业达股份有限公司 Method of automatic calculating manufacturer's record, usance from feed stock inspection result
US20100138256A1 (en) * 2007-12-05 2010-06-03 Management Systems Resources, Inc. Free trade qualification method and system
CN109784631A (en) * 2018-12-12 2019-05-21 广州永霸信息科技股份有限公司 A kind of production work order generates processing method, system, platform and storage medium
CN110060110A (en) * 2019-04-28 2019-07-26 锋泾(中国)建材集团有限公司 A kind of the determination method, apparatus and computer readable storage medium of product cost
CN110782142A (en) * 2019-10-10 2020-02-11 深圳点链科技有限公司 Daily birth daily clearing accounting method, device, equipment and computer readable storage medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115423390A (en) * 2022-08-01 2022-12-02 深圳智汇创想科技有限责任公司 Method, device, equipment and medium for identifying size of container product

Also Published As

Publication number Publication date
CN110782142A (en) 2020-02-11

Similar Documents

Publication Publication Date Title
WO2021068593A1 (en) Daily production and daily clearing accounting method, apparatus and device, and computer-readable storage medium
US8527317B2 (en) Service level agreement work prioritization system
US8705723B2 (en) Systems and methods for scheduling contact center agents
US20120221709A1 (en) Mechanism to allow hosted and on-site implementations to manage product assets as specified by a third party
US10410152B2 (en) System and method for automatically and efficiently monitoring software development life cycles
WO2021068591A1 (en) Blockchain-based daily production and daily clearing accounting method, apparatus and device, and storage medium
CN109543891A (en) Method for building up, equipment and the computer readable storage medium of capacity prediction model
CN111695877A (en) Computer-implemented project resource management method, system, device and readable medium
CN111367530A (en) Code auditing method, terminal and server based on self-defined auditing rule
US7640531B1 (en) Productivity measurement and management tool
US20200027043A1 (en) Construction project management system and method thereof
CN115471200A (en) Cloud computing-based human resource data management system, method and device
CN113129036A (en) Intelligent management method and device
CN106651290A (en) Flow management software system and the authority management method thereof
CN113570175B (en) Method for establishing industrial refined working hour and quantity management platform
CN107016573B (en) Application evaluation method and evaluation system
JP2010140430A (en) System, method and program for managing attendance
Kang et al. A framework for measuring and managing value achievement in business processes
Simonova Identification of IT-service metrics for a business process when planning a transition to outsourcing
CN114912880A (en) False duty processing method and device, computer equipment and storage medium
CN114519626A (en) Salary management method and system based on BIM model
US20200097870A1 (en) Work task commitment manager
CN108683551A (en) A kind of method and device of duct type flow control
CN111754120A (en) Technical resource productivity analysis method, device, storage medium and equipment
CN111159988A (en) Model processing method and device, computer equipment and storage medium

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20873787

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 20873787

Country of ref document: EP

Kind code of ref document: A1

122 Ep: pct application non-entry in european phase

Ref document number: 20873787

Country of ref document: EP

Kind code of ref document: A1

32PN Ep: public notification in the ep bulletin as address of the adressee cannot be established

Free format text: NOTING OF LOSS OF RIGHTS PURSUANT TO RULE 112(1) EPC (EPO FORM 1205A DATED 23.09.2022)

122 Ep: pct application non-entry in european phase

Ref document number: 20873787

Country of ref document: EP

Kind code of ref document: A1