WO2017171516A1 - 무선 통신 시스템에서 상향링크 제어 정보의 전송 또는 수신 방법 및 이를 위한 장치 - Google Patents
무선 통신 시스템에서 상향링크 제어 정보의 전송 또는 수신 방법 및 이를 위한 장치 Download PDFInfo
- Publication number
- WO2017171516A1 WO2017171516A1 PCT/KR2017/003624 KR2017003624W WO2017171516A1 WO 2017171516 A1 WO2017171516 A1 WO 2017171516A1 KR 2017003624 W KR2017003624 W KR 2017003624W WO 2017171516 A1 WO2017171516 A1 WO 2017171516A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- channel
- uplink control
- uplink
- transmitted
- transmission
- Prior art date
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/32—TPC of broadcast or control channels
- H04W52/325—Power control of control or pilot channels
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/23—Control channels or signalling for resource management in the downlink direction of a wireless link, i.e. towards a terminal
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W52/00—Power management, e.g. TPC [Transmission Power Control], power saving or power classes
- H04W52/04—TPC
- H04W52/30—TPC using constraints in the total amount of available transmission power
- H04W52/34—TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading
- H04W52/346—TPC management, i.e. sharing limited amount of power among users or channels or data types, e.g. cell loading distributing total power among users or channels
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/20—Control channels or signalling for resource management
- H04W72/21—Control channels or signalling for resource management in the uplink direction of a wireless link, i.e. towards the network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1268—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
Definitions
- the present invention relates to a wireless communication system, and more particularly, to a method and apparatus for transmitting or receiving uplink control information in a wireless communication system.
- TTI transmission time interval
- a service / UE that is less sensitive to latency longer TTIs can be used to send and receive data.
- data can be sent repeatedly at the same low power or with a higher TTI.
- the present invention proposes a method of transmitting or receiving uplink control information for enabling such an operation.
- the present invention proposes a scheme for allocating, transmitting or receiving resource of uplink control information in a wireless communication system and an operation related thereto.
- the method is performed by a terminal and is applied to a plurality of cells.
- uplink control information according to the relationship between the TTI length of the uplink data channel and the TTI length of the uplink control channel.
- the method may include transmitting in an uplink data channel or the uplink control channel of one cell of a plurality of cells.
- the uplink control in a cell transmitting an uplink data channel having the shortest TTI length among the plurality of cells. Information can be transmitted.
- the uplink control information may be transmitted in a specific cell determined by a predefined rule.
- transmission of the uplink control information in a cell transmitting an uplink data channel having the shortest TTI length among the plurality of cells may be performed when the TTI length of the uplink data channel is greater than or equal to a predetermined value. Can be.
- uplink control information transmitted on an uplink data channel of one cell of the plurality of cells is uplink control to be transmitted on the control channel. It may be part of the information.
- the remaining uplink control information other than the partial uplink control information is transmitted or dropped in the uplink control channel when the uplink data channel and the uplink control channel are simultaneously transmitted in one subframe. And, if the uplink data channel and the uplink control channel is not transmitted simultaneously in one subframe may be dropped.
- the uplink data channel and the uplink control channel are not transmitted simultaneously in one subframe, the uplink data channel is dropped and the uplink control information is transmitted in the uplink control channel. Can be.
- the shortest of the plurality of cells may be transmitted in a cell transmitting an uplink data channel having a TTI length.
- the shortest of the plurality of cells In a cell transmitting an uplink data channel having a TTI length some of uplink control information to be transmitted in the control channel may be transmitted.
- the remaining uplink control information other than the partial uplink control information is transmitted or dropped in the uplink control channel when the uplink data channel and the uplink control channel are simultaneously transmitted in one subframe. And, if the uplink data channel and the uplink control channel is not transmitted simultaneously in one subframe may be dropped.
- the uplink data channel and the uplink control channel are not transmitted simultaneously in one subframe, the uplink data channel is dropped and all or all of the uplink control information in the uplink control channel or Some may be sent.
- the uplink data channel is dropped and among the uplink control information in the uplink control channel. Some may be sent.
- a terminal configured to support one or more transmission time interval (TTI) lengths and transmit uplink control information in a wireless communication system according to another embodiment of the present invention, comprising: a transmitter and a receiver; And a processor configured to control the transmitter and the receiver, the processor: receiving an uplink grant for a plurality of cells and transmitting timing of an uplink data channel and an uplink control channel according to the uplink grant
- TTI transmission time interval
- the processor receiving an uplink grant for a plurality of cells and transmitting timing of an uplink data channel and an uplink control channel according to the uplink grant
- uplink control information is transmitted in an uplink data channel of one cell of the plurality of cells or the uplink control channel according to a relationship between the TTI length of the uplink data channel and the TTI length of the uplink control channel.
- mapping, transmission, or reception of uplink control information may be efficiently performed in a wireless communication system.
- FIG. 1 illustrates an example of a radio frame structure used in a wireless communication system.
- FIG. 2 illustrates an example of a downlink / uplink (DL / UL) slot structure in a wireless communication system.
- FIG 3 illustrates a downlink (DL) subframe structure used in a 3GPP LTE / LTE-A system.
- FIG. 4 illustrates an example of an uplink (UL) subframe structure used in a 3GPP LTE / LTE-A system.
- FIG. 5 illustrates timing of DL reception and UL transmission of UEs operating in different transmission time intervals (TTIs).
- TTIs transmission time intervals
- FIG. 6 illustrates processing when uplink channels of different TTI lengths overlap in transmission timing.
- TTI 7 illustrates that a relatively short length TTI is included in a relatively long length TTI.
- FIG. 10 shows a block diagram of an apparatus for implementing an embodiment (s) of the present invention.
- a user equipment may be fixed or mobile, and various devices which transmit and receive user data and / or various control information by communicating with a base station (BS) belong to this.
- the UE may be a terminal equipment (MS), a mobile station (MS), a mobile terminal (MT), a user terminal (UT), a subscriber station (SS), a wireless device, a personal digital assistant (PDA), or a wireless modem. It may be called a modem, a handheld device, or the like.
- a BS generally refers to a fixed station communicating with the UE and / or another BS, and communicates with the UE and another BS to exchange various data and control information.
- BS includes Advanced Base Station (ABS), Node-B (NB), evolved-NodeB (eNB), Base Transceiver System (BTS), Access Point, Processing Server (PS), Transmission Point (TP) May be called in other terms.
- ABS Advanced Base Station
- NB Node-B
- eNB evolved-NodeB
- BTS Base Transceiver System
- PS Processing Server
- TP Transmission Point
- BS is collectively referred to as eNB.
- a node refers to a fixed point capable of transmitting / receiving a radio signal by communicating with a user equipment.
- Various forms of eNBs may be used as nodes regardless of their name.
- the node may be a BS, an NB, an eNB, a pico-cell eNB (PeNB), a home eNB (HeNB), a relay, a repeater, and the like.
- the node may not be an eNB.
- it may be a radio remote head (RRH), a radio remote unit (RRU).
- RRHs, RRUs, etc. generally have a power level lower than the power level of the eNB.
- RRH or RRU, RRH / RRU is generally connected to an eNB by a dedicated line such as an optical cable
- RRH / RRU and eNB are generally compared to cooperative communication by eNBs connected by a wireless line.
- cooperative communication can be performed smoothly.
- At least one antenna is installed at one node.
- the antenna may mean a physical antenna or may mean an antenna port, a virtual antenna, or an antenna group.
- Nodes are also called points. Unlike conventional centralized antenna systems (ie, single node systems) where antennas are centrally located at base stations and controlled by one eNB controller, in a multi-node system A plurality of nodes are typically located farther apart than a predetermined interval.
- the plurality of nodes may be managed by one or more eNBs or eNB controllers that control the operation of each node or schedule data to be transmitted / received through each node.
- Each node may be connected to the eNB or eNB controller that manages the node through a cable or dedicated line.
- the same cell identifier (ID) may be used or different cell IDs may be used for signal transmission / reception to / from a plurality of nodes.
- ID cell identifier
- each of the plurality of nodes behaves like some antenna group of one cell.
- a multi-node system may be regarded as a multi-cell (eg, macro-cell / femto-cell / pico-cell) system.
- the network formed by the multiple cells is particularly called a multi-tier network.
- the cell ID of the RRH / RRU and the cell ID of the eNB may be the same or may be different.
- both the RRH / RRU and the eNB operate as independent base stations.
- one or more eNB or eNB controllers connected with a plurality of nodes may control the plurality of nodes to simultaneously transmit or receive signals to the UE via some or all of the plurality of nodes.
- multi-node systems depending on the identity of each node, the implementation of each node, etc., these multi-nodes in that multiple nodes together participate in providing communication services to the UE on a given time-frequency resource.
- the systems are different from single node systems (eg CAS, conventional MIMO system, conventional relay system, conventional repeater system, etc.).
- embodiments of the present invention regarding a method for performing data cooperative transmission using some or all of a plurality of nodes may be applied to various kinds of multi-node systems.
- a node generally refers to an antenna group spaced apart from another node by a predetermined distance or more
- embodiments of the present invention described later may be applied even when the node means any antenna group regardless of the interval.
- the eNB may control the node configured as the H-pol antenna and the node configured as the V-pol antenna, and thus embodiments of the present invention may be applied. .
- a communication scheme that enables different nodes to receive the uplink signal is called multi-eNB MIMO or CoMP (Coordinated Multi-Point TX / RX).
- Cooperative transmission schemes among such cooperative communication between nodes can be largely classified into joint processing (JP) and scheduling coordination.
- the former may be divided into joint transmission (JT) / joint reception (JR) and dynamic point selection (DPS), and the latter may be divided into coordinated scheduling (CS) and coordinated beamforming (CB).
- DPS is also called dynamic cell selection (DCS).
- JP Joint Processing Protocol
- JR refers to a communication scheme in which a plurality of nodes receive the same stream from the UE.
- the UE / eNB combines the signals received from the plurality of nodes to recover the stream.
- the reliability of signal transmission may be improved by transmit diversity.
- DPS in JP refers to a communication technique in which a signal is transmitted / received through one node selected according to a specific rule among a plurality of nodes.
- DPS since a node having a good channel condition between the UE and the node will be selected as a communication node, the reliability of signal transmission can be improved.
- a cell refers to a certain geographic area in which one or more nodes provide a communication service. Therefore, in the present invention, communication with a specific cell may mean communication with an eNB or a node that provides a communication service to the specific cell.
- the downlink / uplink signal of a specific cell means a downlink / uplink signal from / to an eNB or a node that provides a communication service to the specific cell.
- the cell providing uplink / downlink communication service to the UE is particularly called a serving cell.
- the channel state / quality of a specific cell means a channel state / quality of a channel or communication link formed between an eNB or a node providing a communication service to the specific cell and a UE.
- a UE transmits a downlink channel state from a specific node on a channel CSI-RS (Channel State Information Reference Signal) resource to which the antenna port (s) of the specific node is assigned to the specific node. Can be measured using CSI-RS (s).
- CSI-RS Channel State Information Reference Signal
- adjacent nodes transmit corresponding CSI-RS resources on CSI-RS resources orthogonal to each other.
- Orthogonality of CSI-RS resources means that the CSI-RS is allocated by CSI-RS resource configuration, subframe offset, and transmission period that specify symbols and subcarriers carrying the CSI-RS. This means that at least one of a subframe configuration and a CSI-RS sequence for specifying the specified subframes are different from each other.
- Physical Downlink Control CHannel / Physical Control Format Indicator CHannel (PCFICH) / PHICH (Physical Hybrid automatic retransmit request Indicator CHannel) / PDSCH (Physical Downlink Shared CHannel) are respectively DCI (Downlink Control Information) / CFI ( Control Format Indicator) / Downlink ACK / NACK (ACKnowlegement / Negative ACK) / Downlink Means a set of time-frequency resources or a set of resource elements, and also a PUCCH (Physical Uplink Control CHannel) / PUSCH (Physical) Uplink Shared CHannel / PACH (Physical Random Access CHannel) means a set of time-frequency resources or a set of resource elements that carry uplink control information (UCI) / uplink data / random access signals, respectively.
- UCI Uplink Control Information
- PACH Physical Random Access CHannel
- the PDCCH / PCFICH / PHICH / PDSCH / PUCCH / PUSCH / PRACH resource is referred to below ..
- the user equipment transmits the PUCCH / PUSCH / PRACH, respectively.
- PDCCH / PCFICH / PHICH / PDSCH is used for downlink data / control information on or through PDCCH / PCFICH / PHICH / PDSCH, respectively. It is used in the same sense as sending it.
- Figure 1 illustrates an example of a radio frame structure used in a wireless communication system.
- Figure 1 (a) shows a frame structure for frequency division duplex (FDD) used in the 3GPP LTE / LTE-A system
- Figure 1 (b) is used in the 3GPP LTE / LTE-A system
- the frame structure for time division duplex (TDD) is shown.
- a radio frame used in a 3GPP LTE / LTE-A system has a length of 10 ms (307200 Ts), and is composed of 10 equally sized subframes (SF). Numbers may be assigned to 10 subframes in one radio frame.
- Each subframe has a length of 1 ms and consists of two slots. 20 slots in one radio frame may be sequentially numbered from 0 to 19. Each slot is 0.5ms long.
- the time for transmitting one subframe is defined as a transmission time interval (TTI).
- the time resource may be classified by a radio frame number (also called a radio frame index), a subframe number (also called a subframe number), a slot number (or slot index), and the like.
- the radio frame may be configured differently according to the duplex mode. For example, in the FDD mode, since downlink transmission and uplink transmission are divided by frequency, a radio frame includes only one of a downlink subframe or an uplink subframe for a specific frequency band. In the TDD mode, since downlink transmission and uplink transmission are separated by time, a radio frame includes both a downlink subframe and an uplink subframe for a specific frequency band.
- Table 1 illustrates a DL-UL configuration of subframes in a radio frame in the TDD mode.
- D represents a downlink subframe
- U represents an uplink subframe
- S represents a special subframe.
- the singular subframe includes three fields of Downlink Pilot TimeSlot (DwPTS), Guard Period (GP), and Uplink Pilot TimeSlot (UpPTS).
- DwPTS is a time interval reserved for downlink transmission
- UpPTS is a time interval reserved for uplink transmission.
- Table 2 illustrates the configuration of a singular frame.
- FIG. 2 illustrates an example of a downlink / uplink (DL / UL) slot structure in a wireless communication system.
- FIG. 2 shows a structure of a resource grid of a 3GPP LTE / LTE-A system. There is one resource grid per antenna port.
- a slot includes a plurality of Orthogonal Frequency Division Multiplexing (OFDM) symbols in the time domain and a plurality of resource blocks (RBs) in the frequency domain.
- OFDM symbol may mean a symbol period.
- the signal transmitted in each slot is * Subcarriers and It may be represented by a resource grid composed of OFDM symbols.
- Represents the number of resource blocks (RBs) in the downlink slot Represents the number of RBs in the UL slot.
- Wow Depends on the DL transmission bandwidth and the UL transmission bandwidth, respectively.
- Denotes the number of OFDM symbols in the downlink slot Denotes the number of OFDM symbols in the UL slot.
- the OFDM symbol may be called an OFDM symbol, a Single Carrier Frequency Division Multiplexing (SC-FDM) symbol, or the like according to a multiple access scheme.
- the number of OFDM symbols included in one slot may vary depending on the channel bandwidth and the length of the cyclic prefix (CP). For example, in case of a normal CP, one slot includes 7 OFDM symbols, whereas in case of an extended CP, one slot includes 6 OFDM symbols.
- FIG. 2 illustrates a subframe in which one slot includes 7 OFDM symbols for convenience of description, embodiments of the present invention can be applied to subframes having other numbers of OFDM symbols in the same manner. 2, each OFDM symbol, in the frequency domain, * Subcarriers are included.
- the types of subcarriers may be divided into data subcarriers for data transmission, reference signal subcarriers for transmission of reference signals, null subcarriers for guard band, and direct current (DC) components.
- the null subcarrier for the DC component is a subcarrier left unused and is mapped to a carrier frequency f0 during an OFDM signal generation process or a frequency upconversion process.
- the carrier frequency is also called the center frequency.
- 1 RB in the time domain It is defined as (eg, seven) consecutive OFDM symbols, and is defined by c (for example 12) consecutive subcarriers in the frequency domain.
- a resource composed of one OFDM symbol and one subcarrier is called a resource element (RE) or tone. Therefore, one RB is * It consists of three resource elements.
- Each resource element in the resource grid may be uniquely defined by an index pair (k, 1) in one slot. k is from 0 in the frequency domain * Index given up to -1, where l is from 0 in the time domain Index given up to -1.
- Two RBs one in each of two slots of the subframe, occupying the same consecutive subcarriers, are called a physical resource block (PRB) pair.
- PRB physical resource block
- Two RBs constituting a PRB pair have the same PRB number (or also referred to as a PRB index).
- VRB is a kind of logical resource allocation unit introduced for resource allocation.
- VRB has the same size as PRB.
- FIG 3 illustrates a downlink (DL) subframe structure used in a 3GPP LTE / LTE-A system.
- a DL subframe is divided into a control region and a data region in the time domain.
- up to three (or four) OFDM symbols located in the first slot of a subframe correspond to a control region to which a control channel is allocated.
- a resource region available for PDCCH transmission in a DL subframe is called a PDCCH region.
- the remaining OFDM symbols other than the OFDM symbol (s) used as the control region correspond to a data region to which a Physical Downlink Shared CHannel (PDSCH) is allocated.
- PDSCH Physical Downlink Shared CHannel
- a resource region available for PDSCH transmission in a DL subframe is called a PDSCH region.
- Examples of DL control channels used in 3GPP LTE include a physical control format indicator channel (PCFICH), a physical downlink control channel (PDCCH), a physical hybrid ARQ indicator channel (PHICH), and the like.
- the PCFICH is transmitted in the first OFDM symbol of a subframe and carries information about the number of OFDM symbols used for transmission of a control channel within the subframe.
- the PHICH carries a Hybrid Automatic Repeat Request (HARQ) ACK / NACK (acknowledgment / negative-acknowledgment) signal in response to the UL transmission.
- HARQ Hybrid Automatic Repeat Request
- DCI downlink control information
- DL-SCH downlink shared channel
- UL-SCH uplink shared channel
- paging channel a downlink shared channel
- the transmission format and resource allocation information of a downlink shared channel may also be called DL scheduling information or a DL grant, and may be referred to as an uplink shared channel (UL-SCH).
- the transmission format and resource allocation information is also called UL scheduling information or UL grant.
- the DCI carried by one PDCCH has a different size and use depending on the DCI format, and its size may vary depending on a coding rate.
- various formats such as formats 0 and 4 for uplink and formats 1, 1A, 1B, 1C, 1D, 2, 2A, 2B, 2C, 3, and 3A are defined for uplink.
- Hopping flag RB allocation, modulation coding scheme (MCS), redundancy version (RV), new data indicator (NDI), transmit power control (TPC), and cyclic shift DMRS Control information such as shift demodulation reference signal (UL), UL index, CQI request, DL assignment index, HARQ process number, transmitted precoding matrix indicator (TPMI), and precoding matrix indicator (PMI) information
- MCS modulation coding scheme
- RV redundancy version
- NDI new data indicator
- TPC transmit power control
- cyclic shift DMRS Control information such as shift demodulation reference signal (UL), UL index, CQI request, DL assignment index, HARQ process number, transmitted precoding matrix indicator (TPMI), and precoding matrix indicator (PMI) information
- UL shift demodulation reference signal
- CQI request UL assignment index
- HARQ process number transmitted precoding matrix indicator
- PMI precoding matrix indicator
- the DCI format that can be transmitted to the UE depends on the transmission mode (TM) configured in the UE.
- TM transmission mode
- not all DCI formats may be used for a UE configured in a specific transmission mode, but only certain DCI format (s) corresponding to the specific transmission mode may be used.
- the PDCCH is transmitted on an aggregation of one or a plurality of consecutive control channel elements (CCEs).
- CCE is a logical allocation unit used to provide a PDCCH with a coding rate based on radio channel conditions.
- the CCE corresponds to a plurality of resource element groups (REGs). For example, one CCE corresponds to nine REGs and one REG corresponds to four REs.
- REGs resource element groups
- a CCE set in which a PDCCH can be located is defined for each UE.
- the set of CCEs in which a UE can discover its PDCCH is referred to as a PDCCH search space, simply a search space (SS).
- SS search space
- An individual resource to which a PDCCH can be transmitted in a search space is called a PDCCH candidate.
- the collection of PDCCH candidates that the UE will monitor is defined as a search space.
- a search space for each DCI format may have a different size, and a dedicated search space and a common search space are defined.
- the dedicated search space is a UE-specific search space and is configured for each individual UE.
- the common search space is configured for a plurality of UEs.
- An aggregation level defining the search space is as follows.
- One PDCCH candidate corresponds to 1, 2, 4 or 8 CCEs depending on the CCE aggregation level.
- the eNB sends the actual PDCCH (DCI) on any PDCCH candidate in the search space, and the UE monitors the search space to find the PDCCH (DCI).
- monitoring means attempting decoding of each PDCCH in a corresponding search space according to all monitored DCI formats.
- the UE may detect its own PDCCH by monitoring the plurality of PDCCHs. Basically, since the UE does not know where its PDCCH is transmitted, every Pframe attempts to decode the PDCCH until every PDCCH of the corresponding DCI format has detected a PDCCH having its own identifier. It is called blind detection (blind decoding).
- the eNB may transmit data for the UE or the UE group through the data area.
- Data transmitted through the data area is also called user data.
- a physical downlink shared channel (PDSCH) may be allocated to the data area.
- Paging channel (PCH) and downlink-shared channel (DL-SCH) are transmitted through PDSCH.
- the UE may read data transmitted through the PDSCH by decoding control information transmitted through the PDCCH.
- Information indicating to which UE or UE group data of the PDSCH is transmitted, how the UE or UE group should receive and decode PDSCH data, and the like are included in the PDCCH and transmitted.
- a specific PDCCH is masked with a cyclic redundancy check (CRC) with a Radio Network Temporary Identity (RNTI) of "A", a radio resource (eg, a frequency location) of "B” and a transmission of "C".
- CRC cyclic redundancy check
- RNTI Radio Network Temporary Identity
- format information eg, transport block size, modulation scheme, coding information, etc.
- a reference signal reference signal (RS) to be compared with the data signal.
- the reference signal refers to a signal of a predetermined special waveform that the eNB and the UE know each other, which the eNB transmits to the UE or the eNB, and is also called a pilot.
- Reference signals are divided into a cell-specific RS shared by all UEs in a cell and a demodulation RS (DM RS) dedicated to a specific UE.
- DM RS demodulation RS
- the DM RS transmitted by the eNB for demodulation of downlink data for a specific UE may be specifically referred to as a UE-specific RS.
- the DM RS and the CRS may be transmitted together, but only one of the two may be transmitted.
- the DM RS transmitted by applying the same precoder as the data may be used only for demodulation purposes, and thus RS for channel measurement should be separately provided.
- an additional measurement RS, CSI-RS is transmitted to the UE.
- the CSI-RS is transmitted every predetermined transmission period consisting of a plurality of subframes, unlike the CRS transmitted every subframe, based on the fact that the channel state is relatively not changed over time.
- FIG. 4 illustrates an example of an uplink (UL) subframe structure used in a 3GPP LTE / LTE-A system.
- the UL subframe may be divided into a control region and a data region in the frequency domain.
- One or several physical uplink control channels may be allocated to the control region to carry uplink control information (UCI).
- One or several physical uplink shared channels may be allocated to a data region of a UL subframe to carry user data.
- subcarriers having a long distance based on a direct current (DC) subcarrier are used as a control region.
- subcarriers located at both ends of the UL transmission bandwidth are allocated for transmission of uplink control information.
- the DC subcarrier is a component that is not used for signal transmission and is mapped to a carrier frequency f0 during frequency upconversion.
- the PUCCH for one UE is allocated to an RB pair belonging to resources operating at one carrier frequency in one subframe, and the RBs belonging to the RB pair occupy different subcarriers in two slots.
- the PUCCH allocated in this way is expressed as that the RB pair allocated to the PUCCH is frequency hopped at the slot boundary. However, if frequency hopping is not applied, RB pairs occupy the same subcarrier.
- PUCCH may be used to transmit the following control information.
- SR Service Request: Information used for requesting an uplink UL-SCH resource. It is transmitted using OOK (On-Off Keying) method.
- HARQ-ACK A response to a PDCCH and / or a response to a downlink data packet (eg, codeword) on a PDSCH. This indicates whether the PDCCH or PDSCH is successfully received.
- One bit of HARQ-ACK is transmitted in response to a single downlink codeword, and two bits of HARQ-ACK are transmitted in response to two downlink codewords.
- HARQ-ACK response includes a positive ACK (simple, ACK), negative ACK (hereinafter, NACK), DTX (Discontinuous Transmission) or NACK / DTX.
- the term HARQ-ACK is mixed with HARQ ACK / NACK, ACK / NACK.
- CSI Channel State Information
- MIMO Multiple Input Multiple Output
- RI rank indicator
- PMI precoding matrix indicator
- the amount of uplink control information (UCI) that a UE can transmit in a subframe depends on the number of SC-FDMA available for control information transmission.
- SC-FDMA available for UCI means the remaining SC-FDMA symbol except for the SC-FDMA symbol for transmitting the reference signal in the subframe, and in the case of a subframe including a Sounding Reference Signal (SRS), the last SC of the subframe
- SRS Sounding Reference Signal
- the -FDMA symbol is also excluded.
- the reference signal is used for coherent detection of the PUCCH.
- PUCCH supports various formats according to the transmitted information.
- Table 4 shows a mapping relationship between PUCCH format and UCI in LTE / LTE-A system.
- PUCCH format Modulation scheme Number of bits per subframe Usage Etc.
- One N / A N / A (exist or absent) SR (Scheduling Request) 1a BPSK One ACK / NACK orSR + ACK / NACK
- One codeword 1b QPSK 2 ACK / NACK orSR + ACK / NACK
- Two codeword 2 QPSK 20 CQI / PMI / RI Joint coding ACK / NACK (extended CP) 2a QPSK + BPSK 21 CQI / PMI / RI + ACK / NACK Normal CP only 2b QPSK + QPSK 22 CQI / PMI / RI + ACK / NACK Normal CP only 3 QPSK 48 ACK / NACK orSR + ACK / NACK orCQI / PMI / RI + ACK / NACK
- the PUCCH format 1 series is mainly used to transmit ACK / NACK information
- the PUCCH format 2 series is mainly used to carry channel state information (CSI) such as CQI / PMI / RI
- the PUCCH format 3 series is mainly used to transmit ACK / NACK information.
- the transmitted packet is transmitted through a wireless channel
- signal distortion may occur during the transmission process.
- the distortion In order to correctly receive the distorted signal at the receiving end, the distortion must be corrected in the received signal using the channel information.
- a method of transmitting the signal known to both the transmitting side and the receiving side and finding the channel information with the distortion degree when the signal is received through the channel is mainly used.
- the signal is called a pilot signal or a reference signal.
- the reference signal may be divided into an uplink reference signal and a downlink reference signal.
- an uplink reference signal as an uplink reference signal,
- DM-RS Demodulation-Reference Signal
- SRS sounding reference signal
- DM-RS Demodulation-Reference Signal
- CSI-RS Channel State Information Reference Signal
- MBSFN Multimedia Broadcast Single Frequency Network
- Reference signals can be classified into two types according to their purpose. There is a reference signal for obtaining channel information and a reference signal used for data demodulation. In the former, since the UE can acquire channel information on the downlink, it should be transmitted over a wide band, and even if the UE does not receive downlink data in a specific subframe, it should receive the reference signal. It is also used in situations such as handover.
- the latter is a reference signal transmitted together with a corresponding resource when the base station transmits a downlink, and the terminal can demodulate data by performing channel measurement by receiving the reference signal. This reference signal should be transmitted in the area where data is transmitted.
- the present invention relates to a method of providing a plurality of different services in one system, but applying different system parameters for each service or for each UE to satisfy the requirements of each service.
- a short transmission time interval TTI
- TTI transmission time interval
- TTI transmission time interval
- data can be sent repeatedly at the same low power or with a higher TTI.
- the basic TTI assumes 1ms currently used in the LTE / LTE-A system, and the basic system is also based on the LTE / LTE-A system.
- a data / control channel having a TTI of 1 ms at a base station of an LTE / LTE-A system, that is, a different service / UE based on a subframe length, and having a TTI of less than 1 ms for a latency-sensitive service / UE We would like to propose a method of transmitting.
- a TTI of 1 ms is called a normal TTI, and a unit smaller than 1 ms, for example, a TTI of 0.5 ms is a short TTI, a TTI longer than 1 ms, for example, a TTI of 2 ms is a long TTI. It is called.
- the short TTI may be represented by the number of symbols. As described above, in the LTE / LTE-A system, one slot is 0.5 ms, and one slot is composed of seven symbols assuming a general CP. Therefore, the short TTI may be composed of fewer symbols than 7 in the case of the general CP, for example, a short TTI such as 2 symbols, 4 symbols, or the like is possible.
- a response to a downlink channel transmitted in a specific nth subframe may be received by an eNB in n + 4th subframe, but transmission of 0.5ms TTI
- a response to a downlink channel transmitted in a specific nth subframe may be received by an eNB in an n + 2th subframe. Therefore, in order to support TTIs of different lengths, backward compability should be supported so that downlink and uplink multiplexing of channels having different TTIs does not affect the UE operating only in the existing system.
- a TTI which is a unit applied to physical channel transmission such as PDSCH / PUSCH / PUCCH, may be set to less than 1 msec in order to reduce latency in communication between eNB and UE according to a scenario.
- the TTI applied to each channel may be different.
- an LTE (LTE-A) system will be described as an example for convenience of description.
- the present invention is not only applied to the LTE (LTE-A) system, it is natural that it can be applied to the communication system to be developed later.
- the TTI may be 1 msec as a general subframe size in the LTE system (ie, a general TTI), and a short TTI (ie, sTTI) refers to a smaller value and a single / plural OFDM or SC-FDMA symbol. Although it may be a unit, the scope of the present invention is not limited to the name of the symbol.
- the UL data / control channel transmitted by the sTTI is referred to as sPUSCH / sPUCCH, respectively.
- TTI lengths are set between multiple channels (especially between PUCCH and PUSCH).
- a UL transmission scheme can also be applied to a UL transmission scheme of a terminal when different TTI lengths between cells are configured.
- a similar concept can be applied to multiplexing between TTI lengths that vary when the system supports more than one subcarrier spacing. For example, when the subcarrier spacing is X and 2 * X, the subcarrier spacing is similar to the case of dividing one subframe into two sTTIs.
- the invention will be described based on LTE, but the contents can be applied to a technique using another waveform / frame structure, such as new rat.
- the UE may report to the base station whether simultaneous transmission for PUCCH and PUSCH having different TTI lengths is possible.
- the terminal may report whether the UL channel having the specific TTI length and the remaining UL channels can be simultaneously transmitted to the base station. For example, whether to simultaneously transmit PUCCH / PUSCH for each TTI length of the PUSCH may be independently set, but may be independent of the PUCCH TTI length.
- the terminal may report the simultaneous transmission capability for the combination of UL channels having a specific TTI length to the base station. More specifically, the UE may report the simultaneous transmission capability of the PUSCH and sPUSCH and / or PUCCH and sPUCCH and / or sPUSCH and sPUSCH and / or sPUCCH and sPUCCH having different TTI lengths to the base station. .
- This example may be set along the downlink TTI length in the case of PUCCH and along the TTI length set in the uplink in case of PUSCH. If multiple downlink CCs are configured with different TTI lengths as in the case of CA (carrier aggregation), the PUCCH is followed by a PCell or a master cell or an sTTI length configured in one reference downlink CC. Can follow.
- CA carrier aggregation
- the TTI length of the PUCCH is named N_C
- the TTI length of the PUSCH is named N_S
- the N_C and N_S have different values
- the transmission scheme of (s) PUCCH and (s) PUSCH may be determined by a combination of the following proposals.
- Proposal 1 A rule may be defined such that UCI performs piggyback with (s) PUSCH only when N_S is greater than or equal to a predetermined value.
- Proposal 2 If N_S is less than or equal to a certain value, a rule may be defined such that UCI is not piggybacked and is transmitted in (s) PUCCH.
- Proposal 3 A rule may be defined to determine whether to piggyback considering N_S and the number of scheduled RBs.
- Proposal 3-1 Considering N_S and the number of scheduled RBs, only some UCIs are piggybacked and the remaining UCIs are transmitted on (s) PUCCH. At this time, the UCI to be piggybacked may be determined in consideration of a predefined priority and the UCI payload size.
- Proposal 3-2 When simultaneous transmission of (s) PUCCH / (s) PUSCH is impossible, only some UCIs may be piggybacked and the remaining UCIs may be dropped or delayed (in TTI units). Although simultaneous transmission of (s) PUCCH / (s) PUSCH is possible, only some UCIs may be piggybacked and the remaining UCIs may be dropped or delayed (in TTI units).
- UCI transmission scheme may be differently determined by the relationship between N_C and N_S.
- Proposal 4-1 For faster transmission of UCI, a rule may be defined such that when N_C> N_S, the UCI is piggybacked by (s) PUSCH. In this case, when there are a plurality of sPUSCH scheduled cells, it may be piggybacked to a cell having the shortest sPUSCH TTI length. If the sPUSCH TTI lengths for a plurality of sPUSCH scheduled cells are the same, a rule may be defined such that the UCI is piggybacked into a specific cell (eg, the cell with the lowest cell index) determined by a predefined rule. . The above rules may be applied even if simultaneous (s) PUCCH / sPUSCH transmission is possible.
- Proposal 4-2 Basically, a rule may be defined to transmit UCI on (s) PUCCH. However, only when N_S is greater than or equal to a certain number, the entire UCI may be piggybacked into the sPUSCH of the cell determined according to the rule of the proposal 4-1. Alternatively, only when the N_C is below a certain number, only some UCIs can be piggybacked into the sPUSCH of the cell determined according to the rule of Proposal 4-1, where UCIs to be piggybacked have priority according to a predefined priority. Rules may be defined such that high UCI is piggybacked.
- the remaining UCI that is not piggybacked may be transmitted or dropped in (s) PUCCH when (s) PUCCH / sPUSCH simultaneous transmission is possible, and may be dropped when (s) PUCCH / sPUSCH simultaneous transmission is impossible.
- Proposal 4-3 If simultaneous transmission of (s) PUCCH / sPUSCH is not possible, a rule may be defined such that data is dropped or sPUSCH transmission is delayed (in TTI units), and only UCI is transmitted in (s) PUCCH.
- Proposal 4-4 Basically, a rule may be defined to transmit UCI on (s) PUCCH. However, only when N_C is less than or equal to a certain number, the entire UCI may be piggybacked into the (s) PUSCH of the cell determined according to the rule of the proposal 4-1. Alternatively, only when the N_C is below a certain number, only some UCIs can be piggybacked into the sPUSCH of the cell determined according to the rule of Proposal 4-1, where UCIs to be piggybacked have priority according to a predefined priority. Rules may be defined such that high UCI is sent on sPUCCH.
- the remaining UCI that is not piggybacked may be transmitted or dropped on sPUCCH when sPUCCH / (s) PUSCH simultaneous transmission is possible, and may be dropped when sPUCCH / (s) PUSCH simultaneous transmission is impossible.
- Proposal 4-5 If simultaneous transmission of sPUCCH / (s) PUSCH is not possible, a rule may be defined such that data is dropped or (s) PUSCH transmission is delayed (in TTI units), and only UCI is transmitted on sPUCCH. Characteristically, rules may be defined such that only some UCIs are sent on the sPUCCH and the remaining UCIs are dropped. Alternatively, a rule may be defined such that PUSCH is dropped and only some UCI are transmitted on sPUCCH regardless of whether simultaneous transmission is configured.
- Proposal 5 Regardless of the TTI length relationship of (s) PUCCH / (s) PUSCH, if simultaneous transmission of (s) PUCCH / (s) PUSCH is not possible, drop data or (s) PUSCH transmission (in TTI units). Delay).
- Proposal 6 In the above proposals, a rule may be defined so that piggyback performance is possible only when (s) PUCCH transmission TTI and (s) PUSCH transmission TTI overlap and (s) PUSCH is scheduled.
- Proposal 7 If the TTI lengths of the PUCCH and the PUSCH are different, piggyback may not be allowed.
- Proposal 1 If the TTI end time of (s) PUCCH is the same as (s) PUSCH, a rule may be defined to transmit UCI on (s) PUCCH. If simultaneous transmission of (s) PUCCH / (s) PUSCH is impossible, a rule may be defined to piggyback UCI with (s) PUSCH.
- Proposal 2 If the TTI end time of (s) PUCCH is later than (s) PUSCH, a rule may be defined to piggyback UCI with (s) PUSCH.
- Proposal 3 If the TTI end time of (s) PUCCH is earlier than (s) PUSCH, a rule may be defined to transmit UCI on (s) PUCCH. If simultaneous transmission of (s) PUCCH / (s) PUSCH is not possible, drop data or piggyback UCI, or data is sent as is on (s) PUSCH, delay UCI transmission and transmit on (s) PUCCH Rules can be defined to help. In this case, when piggybacking UCI, as shown in FIG. 6, a rule may be defined such that UCI is not mapped to a symbol after the TTI end time of (s) PUCCH among (s) PUSCH symbols.
- Proposal 4 In the above proposals, a rule may be defined such that piggyback performance is possible only when (s) PUCCH transmission TTI and (s) PUSCH transmission TTI overlap and (s) PUSCH is scheduled.
- a plurality of channel combinations (e.g., (s) PUCCH and (s) PUSCH or (s) PUCCH / (s) PUCCH or (s) PUSCH / (s) PUSCH or PUSCH / SRS or PUCCH / SRS and / or three
- the following priority rule may be applied.
- a rule may be defined such that legacy PUSCH / PUCCH has a higher priority than sPUSCH / sPUCCH, respectively. For example, when a larger number of UL channels are to be transmitted simultaneously compared to the multi-cluster capability of the UE, the sTTI UL channel among the legacy UL channel and the sTTI UL channel may be dropped first. Alternatively, in the case where low latency is more important, a rule may be defined such that sPUSCH / sPUCCH has a higher priority than legacy PUSCH / PUCCH.
- Proposal 1-1 A rule may be defined such that a shorter TTI has a higher priority. Or, to avoid the complexity of power allocation, a rule may be defined such that a longer TTI length has a higher priority.
- Proposal 2 When piggyback of UCI occurs due to simultaneous transmission capability (capability) of the UE, a rule may be defined such that the piggybacked sPUSCH has a higher priority than the PUSCH including only UL data.
- Proposal 1 Power allocation of (s) PUCCH or sTTI UL carrier (or higher priority TTI length) is prioritized, and for power remaining thereafter, (s) PUSCH or longer TTI UL carrier (s) ( Or lower priority TTI length (s)).
- the rule may be applied.
- Proposal 1-1 In another way, guaranteed power may be introduced to guarantee the power of an sPUSCH or a longer TTI length UL carrier above a certain level. More specifically, the minimum / maximum power can be allocated through higher layer signaling for the sPUSCH or longer TTI length UL carrier, and (s) the power for the ULC (s) for PUCCH or shorter TTI length is allocated. The allocation may be performed for the remaining excluding the minimum / maximum power for the corresponding sPUSCH or UL carrier of longer TTI length.
- power allocation may be performed for the UL carrier of the sPUSCH or longer TTI length, and if the power for the sPUSCH or UL carrier of the longer TTI length is smaller than the guaranteed power, only the corresponding power may be allocated. have. If the power for the UL carrier of the sPUSCH or longer TTI length is higher than the guaranteed power, the carrier (s) of the sPUCCH or shorter TTI length may be allocated and used more than the guaranteed power for the remaining power. In addition, the guaranteed power may be set in advance or higher layer for each TTI length or TTI length group.
- Proposal 2 When the TTI of the sPUSCH includes the TTI of the sPUCCH or when a part of the TTI of the sPUSCH overlaps with the TTI of the sPUCCH, or when UL CCs of different TTI lengths partially or completely overlap each other.
- the existing power control method is conservatively reused.
- the power-limited condition is limited to less than necessary.
- set the power to the maximum TTI length between overlapping channels or 1msec subframes or the maximum possible TTI length in the system
- power may be limited by maintaining a constant power regardless of the number of channels or TTIs transmitted for a UL carrier having one channel or one TTI. To be more effective, it may be desirable to transmit the same power even when partially overlapped.
- the terminal when there is only sPUSCH transmission, the terminal transmits the transmission to the sPUSH using the transmission power A + B, and the sPUSCH.
- transmit power may be transmitted to A and B, and again, only sPUSCH may be transmitted using transmit power A + B. If this is not the case, a power transition period of the terminal may appear every time the transmission power is changed. In consideration of these, it may be considered to operate with one TTI length even if UL of several CCs is CA.
- a rule may be defined such that the TTI of the sPUSCH is set to be different from the time interval corresponding to the symbol that does not overlap with the time interval corresponding to the symbol where the TTI of the sPUCCH overlaps.
- a rule may be defined such that power control of the sPUSCH is set differently in symbol units.
- power control of a symbol in which the TTI of the sPUSCH overlaps with the TTI of the sPUCCH is performed by the following equation,
- Power control of a symbol in which the TTI of the sPUSCH does not overlap the TTI of the sPUCCH may be set to follow the following equation.
- the above scheme can be extended to other cases as well as when the TTI of the sPUSCH includes the TTI of the sPUCCH or when a part of the TTI of the sPUSCH overlaps with the TTI of the sPUCCH.
- Whether to apply power control for each time duration or symbol may be set to the UE through a higher layer or physical layer signal.
- Proposal 3 Alternatively, a power allocation scheme that considers guaranteed power in a form similar to Proposal 1-1 above may be applied.
- the guaranteed power may be set for the sPUCCH and the sPUSCH, respectively. More specifically, it is possible to allocate guaranteed power for each TTI length or TTI length group for each channel. More specifically, the power of a specific channel (hereinafter referred to as a first channel) is allocated for the rest except for a guaranteed power value for another channel (hereinafter referred to as a second channel). Subsequently, transmit power for the second channel is allocated to the remaining power (which can be allocated from minimum guaranteed power to ⁇ maximum transmit power of UE-transmit power allocated to the first channel ⁇ according to power allocation of the first channel). .
- a first channel the power of a specific channel
- a second channel a guaranteed power value for another channel
- transmit power for the second channel is allocated to the remaining power (which can be allocated from minimum guaranteed power to ⁇ maximum transmit power of UE-transmit power allocated to the first channel ⁇ according to power allocation of the first channel).
- the actual transmission power for the second channel is calculated, and the transmission power for the first channel is calculated. May be allocated from "minimum ⁇ UE maximum transmit power-guaranteed power of the second channel ⁇ to maximum ⁇ UE maximum transmit power-transmit power allocated to the second channel ⁇ " according to the power allocation of the second channel.
- the UE maximum transmit power may be Pcmax, c which is the maximum allowable power for a specific cell c. More specifically, the first channel and the second channel may be selected in the following manner.
- the first channel may correspond to sPUCCH and the second channel may correspond to sPUSCH, or vice versa.
- the first channel may be a channel having a faster transmission time point among the sPUCCH and the sPUSCH, and the second channel may be a channel having a slow transmission time point.
- the first channel may be a channel having a short TTI length
- the second channel may be a channel having a large TTI length, or vice versa.
- Sub-proposal 4 Depending on the importance or priority of the UCI type, the higher one may be the first channel and the rest may be the second channel.
- Sub-Suggestion 5 The first channel and the second channel may be configured in a combination of the above methods according to the start time difference between the two channels. For example, if the start time difference between two channels is less than or equal to a threshold set in advance or higher layer (that is, when a forward prediction of a subsequent channel is possible), proposal 1 or sub-proposal 1 or sub-proposal 3 or Sub-proposal 4 may be carried out, and sub-proposal 3 may be performed in other cases.
- a threshold set in advance or higher layer that is, when a forward prediction of a subsequent channel is possible
- proposal 1 or sub-proposed 1 or sub-proposed 3 or sub -Proposal 4 can be carried out, and sub-proposal 3 can be performed in other cases.
- the method may be used / applied even when dropping or stopping transmission of a specific channel.
- Proposal 4 When transmission timings for two or more UL channel combinations overlap in time, a power allocation scheme for setting total guaranteed power for each specific UL channel combination may be applied.
- one channel combination may include a plurality of channels. More specifically, the power of a particular channel combination (hereinafter referred to as the first channel combination) is allocated for the remainder except for the overall guaranteed power value for the other channel combination (hereinafter referred to as the second channel combination). Thereafter, power for the second channel combination may be allocated to the remaining power (which may be allocated from the minimum total guaranteed power to the UE maximum transmit power depending on the power allocation of the first channel combination).
- the first channel combination may correspond to sPUCCH and / or PUCCH and the second channel combination may correspond to sPUSCH and / or PUSCH.
- the first channel combination may correspond to sPUCCH and / or sPUSCH and the second channel combination may correspond to PUCCH and / or PUSCH.
- the first channel combination may correspond to some channels in ascending order from the channel having the smallest TTI among the entire channels, and the second channel combination may correspond to the remaining channels.
- the plurality of channel transmissions may be transmitted in the same cell or may be transmitted separately in the plurality of cells.
- simultaneous transmission of PUCCH and PUSCH has been described, but may be applicable to other combinations (eg, PUCCH / PUCCH or PUSCH / PUSCH or PUSCH / SRS or PUCCH / SRS and / or a combination of three or more).
- the plurality of channel transmissions may be applicable to a case where subcarrier spacing is different.
- Proposal 1 Among the overlapping UL channels, the transmit power of a UL channel (eg, a legacy UL channel) having a long TTI length or a specific TTI length is kept constant within the TTI.
- a UL channel eg, a legacy UL channel
- Proposal 2 Among the overlapping UL channels, a rule is required to change the transmission power of a UL channel having a long TTI length or a specific TTI length (eg, a legacy UL channel) in units of a time interval (predefined / committed or signaled). Can be defined. More specifically, the UL channel in which the transmission power changes in units of time intervals may be limited to an UL channel having a legacy TTI length or an UL channel having a long TTI length among overlapping UL channels. The time interval during which the transmission power remains unchanged may be shorter than the TTI length of the corresponding UL channel.
- a rule is required to change the transmission power of a UL channel having a long TTI length or a specific TTI length (eg, a legacy UL channel) in units of a time interval (predefined / committed or signaled). Can be defined. More specifically, the UL channel in which the transmission power changes in units of time intervals may be limited to an UL channel having a legacy TTI length
- the time interval during which the transmission power is maintained unchanged may be set by the network or determined by the capability of the terminal, and the terminal may provide information about the time interval during which the transmission power is maintained unchanged (eg, Minimum time interval) related terminal capability may be reported to the network.
- Proposal 3 In a situation where a UE transmits a plurality of UL channels and transmission timings of the UL channels overlap, a channel having a relatively quick start time of a UL channel is called a first channel and a slow channel is a second channel.
- a channel having a relatively quick start time of a UL channel is called a first channel and a slow channel is a second channel.
- the total transmit power of the terminal may vary greatly.
- a specific time interval for changing a transmission power of a terminal is defined as a transient period, and the transmission power requirement of the terminal is not applied during this time period.
- the transient period overlaps with the DM-RS transmission interval of the first channel, drop the second channel or delay the transmission start timing of the second channel (by a predefined / committed time or by a signaled time).
- Rules can be defined. Alternatively, a rule may be defined to stop transmission of the first channel and transmit the second channel by a previously defined / committed priority.
- a terminal In an LTE system, a terminal generally calculates a PHR for each configured cell and reports it periodically or when a specific event is met, through a medium access control (MAC) signaling or an RRC signaling.
- the PHR value for any cell transmitted in any subframe is basically the maximum allowable power Pcmax, c for the corresponding cell c calculated in the corresponding subframe and the UE transmits the corresponding cell in the corresponding subframe. It is a difference value of the transmission power of the signal.
- the PHR value for any cell transmitted in any subframe is a difference value from the virtually calculated transmission power when no signal is transmitted through the cell in the subframe.
- the Pcmax, c value in any subframe may be transmitted in the cell under the condition that the UE satisfies the restriction on the transmission spectrum in consideration of all transmissions in the cell or other cells in the subframe. Maximum power is calculated as a parameter.
- the rule when a rule is defined such that power may change within one TTI, the rule may be defined to calculate / report a separate PHR in units of time intervals in which power changes.
- a reference TTI length for PHR transmission is separately configured.
- the reference TTI length may be set to one even when there are several UL CCs.
- Proposal 1 UL channel with a small subcarrier spacing among overlapping UL channels or with a specific subcarrier spacing (e.g., a subcarrier spacing previously defined / set as default, 15 kHz may be used or may be another value) Is maintained constant within the TTI.
- a specific subcarrier spacing e.g., a subcarrier spacing previously defined / set as default, 15 kHz may be used or may be another value
- Proposal 2 A rule may be defined such that a transmission power (predefined / committed or signaled) of a UL channel having a small subcarrier interval or a specific subcarrier interval among overlapping UL channels changes in units of time intervals. . More specifically, an UL channel whose power varies in time intervals may have a small channel interval or a specific subcarrier interval (e.g., a pre-defined / set subcarrier interval by default, 15 kHz may be used or another value). It may be limited to the UL channel having.
- the time interval during which the transmission power is maintained unchanged may be set by a network or determined by the capability of the terminal, and the terminal may relate information (eg, a minimum time interval) about the time interval during which the transmission power is maintained unchanged. You can also report capabilities to the network. Alternatively, a rule may be determined such that the power of the UL channel is kept constant for each time period by being divided into a time period that overlaps with another channel and a time period that is not.
- the transmit power When determining the transmit power, it may be specified to increase according to (subcarrier spacing * number of subcarriers in the allocated RB) rather than increasing the power according to the allocated number of RBs.
- the parameter may be set to transmit power per subcarrier or based on reference numerology.
- numerology means determining the length of the TTI to be applied to the wireless communication system, the subcarrier spacing, and the like.
- the subframe length may vary.
- the downlink subcarrier interval and the uplink subcarrier interval may be different. Since each timing is determined based on the DL / UL subcarrier spacing and the TTI, the time it takes to allocate each transmit power (when transmitting PUCCH or PUSCH) may vary, and short TTI length channels during transmission of longer TTI length channels. The transmission of can be started.
- the power transient period is assumed to be the current PUSCH or PUCCH, the impact thereof increases, so the transient period is transmitted symbol like the transmission of SRS. It can be assumed to exist outside. Since such a transient period may affect the existing longer TTI transmission, the terminal may drop the entire transmission if at least such an impact collides with a channel in which reliability is important, such as DM-RS and SRS. Alternatively, such transient periods can be prevented by maintaining transmission power. This may mean that power transmitted in one channel is reduced in the middle, but it is assumed that the overall power is maintained.
- a network when transmitting a long TTI PUSCH, a network may be configured by setting a large transmission power in consideration of the transmission of a short TTI PUCCH / PUSCH, and this transmission power may be maintained for the entire time when two channels are transmitted. Can be. If longer TTI length UL transmission overlaps with one or more short TTI length UL transmissions, it may be set according to the maximum power and the terminal may maintain this power regardless of the number of transmitted channels. This may be the case in which the terminal shares one amplifier, otherwise it may not be subject to this restriction.
- This constraint may be more useful when the transient period is relatively overhead using a large subcarrier interval, etc., and if the channels with different transmission powers are transmitted continuously, the largest of the transmitted channels It can be applied by transmitting power while maintaining power. That is, in order to reduce transmission power change between successive transmission channels (when not overlapped or overlapping), for example, uplink power transmitted in one subframe may be kept constant. This may be to configure a rule so that when the terminal transmits a continuous channel, there is no increase or decrease in transmit power. In some cases, the transmission power of the terminal may be larger or smaller than the set transmission power. Such a transient period may be assumed at a guard period or subframe boundary.
- the subcarrier spacing is wide, it may be assumed that the first one or more and / or at least one or several OFDM symbols of the subframe are used as needed (except for continuous UL transmission) in the power transient period. In this case, several symbols can be punctured. To this end, GP may be considered even when switching from DL to UL.
- the UE may define a rule to calculate / report a separate PHR for each subcarrier interval (or for each newage).
- a reference subcarrier interval for PHR transmission is separately configured. In this case, it may be assumed that one PHR may be transmitted and the reference subcarrier interval may be set as one even when there are several UL CCs.
- the transmission timings for multiple UL channels with different numerologies overlap each other in time, for example UL channels with longer TTI length and shorter TTI length
- numerologies eg, TTI length, subcarrier spacing, etc.
- the transmission timings of are overlapped. Since the transmission timing of each channel is determined based on the DL / UL subcarrier interval and the TTI, the time taken to allocate each power (when transmitting PUCCH or PUSCH) may be different, and short TTI during transmission of a longer length of TTI. The transmission of can be started.
- numerologies eg, TTI lengths, subcarrier intervals, etc.
- specific numerologies may be used only when the overlapping time interval is greater than or equal to a certain number.
- Rules may be defined to stop or drop transmission of a UL channel (eg, a longer TTI UL channel) that has a transmission.
- transmission timings for a plurality of UL channels having different numerologies may overlap each other in time, only when the overlapping time interval is less than or equal to a certain numerology Rules may be defined such that puncturing or power reduction is applied to the superimposed symbols of UL channel (eg, longer TTI UL channel) transmissions.
- UL channels with specific numerologies eg, longer Whether to stop or drop TTI UL channel
- the rule (s) are identical / similarly even when a plurality of DL channel transmission timings overlap or when DL and UL channel transmission timings overlap. Can be applied.
- the UL channel having a particular numerology eg, a longer TTI UL channel
- Rules can be defined to drop only part of the transmission. This includes dividing an UL channel (eg, a longer TTI UL channel) with a particular numerology into a predefined unit (eg, a slot) and dropping the unit part overlapped with another channel and transmitting only the remaining units. can do.
- information about a portion to be dropped and a portion to be transmitted may be indicated to the terminal through a higher / physical layer signal.
- the rule is defined such that only the portion corresponding to the first slot of the PUSCH is dropped and the second slot is transmitted. Can be. Compared to the operation of dropping the entire PUSCH as described above, even when some of the PUSCH is transmitted, it can be seen in terms of latency in that it can be used for retransmission to improve reliability and reduce the retransmission probability.
- an UL channel having a specific numerology eg, a longer TTI UL channel. It is also possible to set whether to drop / stop the entire transmission or drop / stop only a portion of the transmission.
- a UL channel having a particular numerology eg, a longer TTI UL channel
- the rule may be defined such that the UCI is mapped to only the TTI during or during the TTI corresponding to the timing of the UL channel to be originally transmitted.
- a UCI when mapped to an UL channel (eg, a longer TTI UL channel) with a particular numerology, divide that UL channel into predefined predefined time units (e.g., slots) and only for overlapping time units Rules can be defined so that UCIs are mapped.
- predefined predefined time units e.g., slots
- a rule may be defined such that UCI for a DL allocation channel or DL data channel with a particular numerology and / or TTI length and / or processing time is preferentially stacked.
- a rule may be defined such that UCIs that should have been transmitted are preferentially stacked if the transmission timing of the HARQ-ACK has not overlapped with a UL channel having a particular numerology and / or TTI length and / or processing time. Can be.
- the stacking priority may be determined according to the transmission timing of DL data. More specifically, a rule may be defined such that the UCI for stacking the start and / or end of DL data transmission is prioritized preferentially.
- a rule may be defined such that UCI for stacking the DL allocation channel (eg, (s) PDCCH) scheduling DL data is prioritized.
- DL allocation channel eg, (s) PDCCH
- UCI stacking order may be defined in ascending order (or descending order) of HARQ process IDs related to DL data.
- UCI stacking order may be defined in ascending order (or descending order) of DAI (DL assignment index) related to DL data.
- Some (or all) combinations of the above proposals may determine the stacking order of the UCI.
- Rules may be defined to map HARQ-ACK bits to RE resources at different locations by numerology and / or TTI length and / or processing time.
- rules may be defined such that UCI is piggybacked in different PRBs for different numerologies and / or TTI lengths and / or processing times.
- a rule may be defined such that UCI is piggybacked on a particular symbol that is predefined or signaled as a higher / physical layer signal by different numerology and / or TTI length and / or processing time.
- a channel having a particular numerology and / or TTI length and / or processing time (first channel) ) All or part of may be dropped / stopped and only the remaining channels (second channel) may be transmitted.
- the case may include a case where the first channel is a 1 ms TTI PUSCH and the second channel is an sPUSCH having a shorter TTI length.
- the UCI transmission operation may be defined differently in consideration of the following matters.
- the UCI type to be included and transmitted in the second channel may be determined according to the numerology and / or TTI length and / or processing time of the second channel. For example, when the TTI length of the first channel is 1 ms TTI and the TTI length of the second channel is 2-symbol, the CSI is dropped without being transmitted, and when the 4 / 7-symbol is included, the CSI is included together in the second channel. Can be sent.
- Second proposal In consideration of the UCI payload size of the first channel, it may be determined whether the UCI of the first channel is included together in the second channel and transmitted. Alternatively, when the second channel is the (s) PUSCH, it may be determined whether UCI of the first channel is included in the second channel and transmitted by frequency resource allocation.
- Third Proposal It may be determined whether the transmission is included in the second channel for each UCI type of the first channel. For example, when the UCI of the first channel is HARQ-ACK, the UCI may be included together in the second channel and transmitted, and in the case of CSI, the UCI may be dropped without being transmitted.
- the UCI type of the first channel that is allowed to be transmitted together in the second channel may be differently determined according to a power allocation situation of the terminal.
- the UCI of the first channel may be dropped in the power-limiting case, and in the case of the non-power-limiting case, all or part of the UCI of the first channel may be included together in the second channel and transmitted.
- Some (or all) combinations of the above proposals may define a terminal operation when the UCI of the first channel is piggybacked and transmitted to the second channel.
- a rule is defined to puncture and map the piggybacked channel for a particular type of UCI of a particular UL channel.
- the transmission timing of a PUSCH or PUCCH of 1 ms TTI and a PUSCH of shorter TTI is overlapped
- the UCI of a channel PUSCH or PUCCH of 1 ms TTI is piggybacked and transmitted to the sPUSCH
- the corresponding UCI is RI (and / or).
- CQI / PMI and / or CRI may be transmitted by puncturing the RE to be transmitted in the original sPUSCH. This may be useful if the UL grant-to-UL data timing of the sPUSCH is insufficient to calculate, rate match and map the UCI of the 1 ms TTI channel.
- the UCI transmission scheme needs to be defined.
- the following is an embodiment of a UCI transmission scheme in the above case.
- First proposal send all or some UCI on sPUSCH.
- a rule may be defined such that the joint encoding is applied to the UCI to be transmitted through the sPUSCH (at least for the same UCI type). This generally has a merit that high performance can be expected compared to UCI individual coding by coding gain.
- Second proposal Transmit all or some UCI on sPUSCH, but separate coding is applied for each TTI length or TTI length group.
- a rule may be defined such that the sPUSCH RE mapping of the UCI is placed in the preceding RE index from the UCI of the channel having a short TTI length (similarly large numerology or short processing time).
- a rule may be defined such that the maximum number of REs to which UCI is mapped is always calculated so that the sPUSCH data of this portion is punctured or rate matched.
- a rule is defined such that UCI (eg HARQ-ACK) of a channel with a long TTI (similarly large or short processing time) is transmitted (spatially) with all or some UCI transmitted on sPUSCH Can be.
- the Bundling operation may be performed by the UCI payload size of a channel having a long TTI length (similarly large or short processing time) and / or the number of PRBs allocated to the sPUSCH and / or the MCS and / or TTI of the sPUSCH.
- Whether to bundle may be determined by the length / numerology / processing time difference and / or the TTI length / numerology / processing time of the sPUSCH.
- a rule may be defined such that UCI is transmitted on a channel including the original UCI regardless of whether HARQ-ACK and CSI simultaneous transmission are configured or only when HARQ-ACK and CSI simultaneous transmission are configured.
- UCI of a channel having a shorter TTI length (larger numerology or shorter processing time) is used.
- Rules can be defined to be sent.
- the channel to which the UCI is transmitted may always be determined according to the UCI type.
- HARQ-ACK is a channel with a shorter TTI (similarly higher numerology or shorter processing time) and CSI is a channel with a longer TTI length (similarly smaller numerology or longer processing time).
- Rules may be defined to be sent.
- a rule may be defined such that only the UCI of the data channel is transmitted and the UCI of the control channel is dropped. It may be. This may be always applied regardless of whether simultaneous transmission is set.
- a channel having a particular numerology and / or TTI length and / or processing time (first channel) ) All or part of may be dropped / stopped, and only the remaining channels (second channel) may be transmitted. More specifically, when the transmission timing of a first channel having a longer TTI length and a plurality of second channels (groups) having a shorter TTI length compared to the first channel overlap, all or part of the UCI of the first channel is overlapped.
- the case may include a case where one 1 ms TTI PUSCH (or PUCCH) and a plurality of two-symbol TTI sPUSCHs (or sPUCCH or a combination of sPUSCH and sPUCCH) overlap the transmission timing in a specific subframe.
- a rule may be defined such that a channel to be piggybacked among a plurality of second channels is determined according to the UCI type of the first channel.
- a rule may be defined to piggyback on a second channel having a higher priority of a channel to be piggybacked among a plurality of second channels in the order of priority of the UCI type of the first channel.
- UCI eg, HARQ-ACK
- UCI eg, HARQ-ACK
- the priority of the second channel is "sPUSCH with self-contained DM-RS"> sPUCCH> "sPUSCH without self-contained DM-RS”, or "sPUSCH with self-contained DM-RS”> "sPUSCH without self -contained DM-RS "> sPUCCH can be defined.
- a rule may be defined such that the UCI of the first channel is preferentially piggybacked to a second channel having a higher priority of the channel to be piggybacked among the plurality of second channels.
- a rule may be defined such that all of the UCI of the first channel is piggybacked to the second channel without dropping, or only a part of the UCI of the first channel having a higher priority is piggybacked to the plurality of second channels.
- a rule may be defined such that all or part of the UCI of the first channel is piggybacked on only some of the channels having a higher priority among the plurality of second channels.
- the priority according to the UCI type of the first channel may be defined as HARQ-ACK> RI> CQI / PMI.
- a rule may be defined to piggyback in order of transmission time of a channel to be piggybacked among a plurality of second channels in the order of high priority of the UCI type of the first channel.
- the HARQ-ACK of the first channel is preferentially piggybacked to the first overlapping channel of the plurality of second channels, and the RI and / or CQI / PMI of the first channel is subsequently piggybacked to the overlapping channels sequentially.
- Rules may be defined.
- a rule may be defined such that the UCI type of the first channel to be piggybacked is determined according to the TTI lengths of the plurality of second channels superimposed with the first channel. For example, when a plurality of second channels overlapped with the first channel have different TTI lengths, the RI and / or CQI / PMI of the first channel may be piggybacked on the sTTI UL channel having the longer TTI length among the second channels. The HARQ-ACK of the first channel may be piggybacked on the sTTI UL channel having a shorter TTI length.
- the UCI type of the first channel whether or not the UCI of the first channel is repeatedly piggybacked on the plurality of second channels may be previously defined / defined or set through a higher layer signal. For example, when the HARQ-ACK of the first channel overlaps a plurality of second channels, the HARQ-ACK of the first channel may be piggybacked and repeatedly transmitted on all (or some) second channels.
- a rule may be defined such that an operation of piggybacking UCI of the first channel is applied only to an sTTI channel in which the DM-RS is self-contained among the plurality of second channels.
- a rule may be defined such that an operation of piggybacking UCI of the first channel is applied only to an sTTI channel in which the DM-RS does not exist in the corresponding sTTI.
- the channel estimation is more accurate, resulting in more reliable UCI transmission, but the coding rate of the sTTIs may be relatively higher than for sTTIs where the DM-RSs do not exist in the sTTIs.
- the network may set up one of them through a higher layer (or physical layer) signal.
- some (or all) combinations of the above proposals may define a terminal operation when the UCI of the first channel is piggybacked and transmitted to all or some of the plurality of second channels.
- 9 illustrates an operation of a terminal according to an embodiment of the present invention. 9 relates to a method of transmitting uplink control information for a terminal configured to support one or more transmission time interval (TTI) lengths.
- TTI transmission time interval
- the terminal may receive an uplink grant for a plurality of cells (S910).
- uplink control Information may be transmitted in an uplink data channel or the uplink control channel of one cell of the plurality of cells (S920).
- the uplink control information may be transmitted in a cell transmitting an uplink data channel having the shortest TTI length among the plurality of cells.
- the uplink control information may be transmitted in a specific cell determined by a predefined rule.
- transmission of the uplink control information in a cell transmitting an uplink data channel having the shortest TTI length among the plurality of cells may be performed when the TTI length of the uplink data channel is greater than or equal to a predetermined value.
- uplink control information transmitted on an uplink data channel of one cell of the plurality of cells may be part of uplink control information to be transmitted on the control channel. Can be.
- the remaining uplink control information other than the partial uplink control information is: when the uplink data channel and the uplink control channel are simultaneously transmitted in one subframe, the uplink control channel is transmitted or dropped, and the uplink data If the channel and the uplink control channel are not transmitted simultaneously in one subframe, they may be dropped.
- the uplink data channel may be dropped and the uplink control information may be transmitted in the uplink control channel.
- an uplink having the shortest TTI length among the plurality of cells may be transmitted in a cell transmitting a link data channel.
- the TTI length of the uplink data channel is equal to or longer than the TTI length of the uplink control channel and the TTI length of the uplink control channel is less than or equal to a predetermined value
- an uplink having the shortest TTI length among the plurality of cells may be transmitted.
- the remaining uplink control information other than the partial uplink control information is transmitted or dropped in the uplink control channel when the uplink data channel and the uplink control channel are simultaneously transmitted in one subframe, and If the uplink data channel and the uplink control channel are not transmitted simultaneously in one subframe, they may be dropped. Alternatively, if the uplink data channel and the uplink control channel are not simultaneously transmitted in one subframe, the uplink data channel is dropped and all or part of the uplink control information is transmitted in the uplink control channel. Can be. Alternatively, regardless of whether the uplink data channel and the uplink control channel are simultaneously transmitted in one subframe, the uplink data channel is dropped and some of the uplink control information is transmitted in the uplink control channel. Can be.
- the embodiment related to FIG. 9 may alternatively or additionally include at least some of the above-described embodiment (s).
- FIG. 10 is a block diagram illustrating components of a transmitter 10 and a receiver 20 that perform embodiments of the present invention.
- the transmitter 10 and the receiver 20 are associated with transmitters / receivers 13 and 23 capable of transmitting or receiving radio signals carrying information and / or data, signals, messages, etc.
- Memory 12, 22 for storing a variety of information, the transmitter / receiver 13, 23 and the memory 12, 22 and the like is operatively connected to control the components to control the components described above
- the memories 12 and 22 may store a program for processing and controlling the processors 11 and 21, and may temporarily store input / output information.
- the memories 12 and 22 may be utilized as buffers.
- the processors 11 and 21 typically control the overall operation of the various modules in the transmitter or receiver. In particular, the processors 11 and 21 may perform various control functions for carrying out the present invention.
- the processors 11 and 21 may also be called controllers, microcontrollers, microprocessors, microcomputers, or the like.
- the processors 11 and 21 may be implemented by hardware or firmware, software, or a combination thereof.
- firmware or software When implementing the present invention using hardware, application specific integrated circuits (ASICs) or digital signal processors (DSPs), digital signal processing devices (DSPDs), programmable logic devices (PLDs), FPGAs ( field programmable gate arrays) may be provided in the processors 11 and 21.
- ASICs application specific integrated circuits
- DSPs digital signal processors
- DSPDs digital signal processing devices
- PLDs programmable logic devices
- FPGAs field programmable gate arrays
- firmware or software may be configured to include a module, a procedure, or a function for performing the functions or operations of the present invention, and configured to perform the present invention.
- the firmware or software may be provided in the processors 11 and 21 or stored in the memory 12 and 22 to be driven by the processors 11 and 21.
- the processor 11 of the transmission apparatus 10 is predetermined from the processor 11 or a scheduler connected to the processor 11 and has a predetermined encoding and modulation on a signal and / or data to be transmitted to the outside. After performing the transmission to the transmitter / receiver (13). For example, the processor 11 converts the data sequence to be transmitted into K layers through demultiplexing, channel encoding, scrambling, and modulation.
- the coded data string is also called a codeword and is equivalent to a transport block, which is a data block provided by the MAC layer.
- One transport block (TB) is encoded into one codeword, and each codeword is transmitted to a receiving device in the form of one or more layers.
- the transmitter / receiver 13 may include an oscillator for frequency upconversion.
- the transmitter / receiver 13 may include Nt transmit antennas, where Nt is a positive integer greater than or equal to one.
- the signal processing of the receiver 20 is the reverse of the signal processing of the transmitter 10.
- the transmitter / receiver 23 of the receiver 20 receives a radio signal transmitted by the transmitter 10.
- the transmitter / receiver 23 may include Nr receive antennas, and the transmitter / receiver 23 frequency down-converts each of the signals received through the receive antennas to restore baseband signals. do.
- Transmitter / receiver 23 may include an oscillator for frequency downconversion.
- the processor 21 may decode and demodulate a radio signal received through a reception antenna to restore data originally transmitted by the transmission apparatus 10.
- the transmitter / receiver 13, 23 is equipped with one or more antennas.
- the antenna transmits a signal processed by the transmitter / receiver 13, 23 to the outside or receives a radio signal from the outside under the control of the processors 11 and 21, thereby transmitting / receiving the transmitter / receiver. It performs the function of forwarding to (13, 23).
- Antennas are also called antenna ports.
- Each antenna may correspond to one physical antenna or may be configured by a combination of more than one physical antenna elements.
- the signal transmitted from each antenna can no longer be decomposed by the receiver 20.
- a reference signal (RS) transmitted in correspondence with the corresponding antenna defines the antenna as viewed from the perspective of the receiver 20, and whether the channel is a single radio channel from one physical antenna or includes the antenna.
- RS reference signal
- the receiver 20 enables channel estimation for the antenna. That is, the antenna is defined such that a channel carrying a symbol on the antenna can be derived from the channel through which another symbol on the same antenna is delivered.
- MIMO multi-input multi-output
- the terminal or the UE operates as the transmitter 10 in the uplink and the receiver 20 in the downlink.
- the base station or eNB operates as the receiving device 20 in the uplink, and operates as the transmitting device 10 in the downlink.
- the transmitter and / or the receiver may perform at least one or a combination of two or more of the embodiments of the present invention described above.
- the present invention can be used in a wireless communication device such as a terminal, a relay, a base station, and the like.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
본 발명의 일 실시예에 따른 무선 통신 시스템에서 하나 이상의 TTI(transmission time interval) 길이를 지원하도록 설정된 단말을 위한 상향링크 신호 전송 방법에 있어서, 상기 방법은 단말에 의해 수행되며, 복수의 셀에 대한 상향링크 승인을 수신하는 단계; 및 상기 상향링크 승인에 따른 상향링크 데이터 채널과 상향링크 제어 채널의 전송 타이밍이 중첩되면, 상기 상향링크 데이터 채널의 TTI 길이와 상기 상향링크 제어 채널의 TTI 길이의 관계에 따라 상향링크 제어 정보를 상기 복수의 셀 중 하나의 셀의 상향링크 데이터 채널 또는 상기 상향링크 제어 채널에서 전송하는 단계를 포함할 수 있다.
Description
본 발명은 무선 통신 시스템에 관한 것으로서, 구체적으로 무선 통신 시스템에서 상향링크 제어 정보의 전송 또는 수신 방법 및 이를 위한 장치에 관한 것이다.
무선 셀룰러 통신 시스템에서, 레이턴시(latency) 에 민감한 서비스/UE에 대해서는 짧은 TTI(transmission time interval)를 사용하여 데이터를 짧은 시간동안 최대한 빨리 보내도록 하고 이에 대한 응답에 대해서도 짧은 시간에 보낼 수 있도록 하여 레이턴시를 최대한 줄일 수 있도록 하는 송수신 방안에 대해 논의되고 있다. 반면, 레이턴시에 덜 민감한 서비스/UE에 대해서는 좀더 긴 TTI를 사용하여 데이터를 송/수신할 수 있게 할 수 있을 것이다. 레이턴시 보다는 전력 효율성에 민감한 서비스/UE에 대해서는 동일한 저전력으로 데이터를 반복하여 전송하거나 TTI를 좀더 늘려서 전송할 수 있다. 본 발명에서는 이러한 동작을 가능하게 하기 위한 상향링크 제어 정보의 전송 또는 수신 방식을 제안한다.
본 발명은 무선 통신 시스템에서 상향링크 제어 정보의 자원 할당, 전송 또는 수신하기 위한 방안과 그와 관련된 동작을 제안하고자 한다.
본 발명에서 이루고자 하는 기술적 과제들은 상기 기술적 과제로 제한되지 않으며, 언급하지 않은 또 다른 기술적 과제들은 아래의 기재로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.
본 발명의 일 실시예에 따른 무선 통신 시스템에서 하나 이상의 TTI(transmission time interval) 길이를 지원하도록 설정된 단말을 위한 상향링크 제어 정보 전송 방법에 있어서, 상기 방법은 단말에 의해 수행되며, 복수의 셀에 대한 상향링크 승인을 수신하는 단계; 및 상기 상향링크 승인에 따른 상향링크 데이터 채널과 상향링크 제어 채널의 전송 타이밍이 중첩되면, 상기 상향링크 데이터 채널의 TTI 길이와 상기 상향링크 제어 채널의 TTI 길이의 관계에 따라 상향링크 제어 정보를 상기 복수의 셀 중 하나의 셀의 상향링크 데이터 채널 또는 상기 상향링크 제어 채널에서 전송하는 단계를 포함할 수 있다.
추가로 또는 대안으로, 상기 상향링크 데이터 채널의 TTI 길이가 상기 상향링크 제어 채널의 TTI 길이보다 짧은 경우, 상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 상향링크 제어 정보가 전송될 수 있다.
추가로 또는 대안으로, 상기 복수의 셀이 동일한 TTI 길이의 상향링크 데이터 채널을 전송하는 경우, 미리 정의된 규칙에 의해 결정된 특정 셀에서 상기 상향링크 제어 정보가 전송될 수 있다.
추가로 또는 대안으로, 상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 상향링크 제어 정보의 전송은, 상기 상향링크 데이터 채널의 TTI 길이가 일정 값 이상인 경우에 수행될 수 있다.
추가로 또는 대안으로, 상기 상향링크 제어 채널의 TTI 길이가 일정 값 이하이면, 상기 복수의 셀 중 하나의 셀의 상향링크 데이터 채널에서 전송되는 상향링크 제어 정보는 상기 제어 채널에서 전송될 상향링크 제어 정보 중 일부일 수 있다.
추가로 또는 대안으로, 상기 일부 상향링크 제어 정보 외의 나머지 상향링크 제어 정보는: 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되면 상기 상향링크 제어 채널에서 전송되거나 드롭되고, 그리고 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면 드롭될 수 있다.
추가로 또는 대안으로, 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면, 상기 상향링크 데이터 채널이 드롭되고 상기 상향링크 제어 채널에서 상기 상향링크 제어 정보가 전송될 수 있다.
추가로 또는 대안으로, 상기 상향링크 데이터 채널의 TTI 길이가 상기 상향링크 제어 채널의 TTI 길이와 같거나 그 보다 길고 상기 상향링크 제어 채널의 TTI 길이가 일정 값 이하인 경우, 상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 상향링크 제어 정보가 전송될 수 있다.
추가로 또는 대안으로, 상기 상향링크 데이터 채널의 TTI 길이가 상기 상향링크 제어 채널의 TTI 길이와 같거나 그 보다 길고 상기 상향링크 제어 채널의 TTI 길이가 일정 값 이하인 경우, 상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 제어 채널에서 전송될 상향링크 제어 정보 중 일부가 전송될 수 있다.
추가로 또는 대안으로, 상기 일부 상향링크 제어 정보 외의 나머지 상향링크 제어 정보는: 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되면 상기 상향링크 제어 채널에서 전송되거나 드롭되고, 그리고 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면 드롭될 수 있다.
추가로 또는 대안으로, 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면, 상기 상향링크 데이터 채널은 드롭되고 상기 상향링크 제어 채널에서 상기 상향링크 제어 정보 중 전부 또는 일부가 전송될 수 있다.
추가로 또는 대안으로, 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송 여부와 관계없이, 상기 상향링크 데이터 채널은 드롭되고 상기 상향링크 제어 채널에서 상기 상향링크 제어 정보 중 일부가 전송될 수 있다.
본 발명의 또다른 일 실시예에 따른 무선 통신 시스템에서 하나 이상의 TTI(transmission time interval) 길이를 지원하고 상향링크 제어 정보를 전송하도록 구성된 단말로서, 송신기 및 수신기; 및 상기 송신기 및 상기 수신기를 제어하도록 구성된 프로세서를 포함하고, 상기 프로세서는: 복수의 셀에 대한 상향링크 승인을 수신하고, 그리고 상기 상향링크 승인에 따른 상향링크 데이터 채널과 상향링크 제어 채널의 전송 타이밍이 중첩되면, 상기 상향링크 데이터 채널의 TTI 길이와 상기 상향링크 제어 채널의 TTI 길이의 관계에 따라 상향링크 제어 정보를 상기 복수의 셀 중 하나의 셀의 상향링크 데이터 채널 또는 상기 상향링크 제어 채널에서 전송하도록 구성될 수 있다.
상기 과제 해결방법들은 본 발명의 실시예들 중 일부에 불과하며, 본원 발명의 기술적 특징들이 반영된 다양한 실시예들이 당해 기술분야의 통상적인 지식을 가진 자에 의해 이하 상술할 본 발명의 상세한 설명을 기반으로 도출되고 이해될 수 있다.
본 발명의 일 실시예에 의하면, 무선 통신 시스템에서 상향링크 제어 정보의 맵핑, 송신 또는 수신이 효율적으로 수행되도록 할 수 있다.
본 발명에서 얻은 수 있는 효과는 이상에서 언급한 효과들로 제한되지 않으며, 언급하지 않은 또 다른 효과들은 아래의 기재로부터 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.
본 발명에 관한 이해를 돕기 위해 상세한 설명의 일부로 포함되는, 첨부 도면은 본 발명에 대한 실시예를 제공하고, 상세한 설명과 함께 본 발명의 기술적 사상을 설명한다.
도 1 무선 통신 시스템에서 사용되는 무선 프레임 구조의 일 예를 나타낸 것이다.
도 2는 무선 통신 시스템에서 하향링크/상향링크(DL/UL) 슬롯 구조의 일례를 나타낸 것이다.
도 3은 3GPP LTE/LTE-A 시스템에서 사용되는 하향링크(downlink, DL) 서브프레임 구조를 예시한 것이다.
도 4 는 3GPP LTE/LTE-A 시스템에서 사용되는 상향링크(uplink, UL) 서브프레임 구조의 일례를 나타낸 것이다.
도 5는 서로 다른 TTI(transmission time interval)에서 동작하는 단말(UE)들의 DL 수신 및 UL 송신의 타이밍을 도시한다.
도 6은 상이한 TTI 길이의 상향링크 채널이 전송 타이밍이 중첩되는 경우의 처리를 예시한다.
도 7은 상대적으로 짧은 길이의 TTI가 상대적으로 긴 길이의 TTI에 포함되는 것을 도시한다.
도 8은 상이한 길이의 TTI들의 관계를 도시한다.
도 9는 단말의 동작을 도시한다.
도 10은 본 발명의 실시예(들)을 구현하기 위한 장치의 블록도를 도시한다.
이하, 본 발명에 따른 바람직한 실시 형태를 첨부된 도면을 참조하여 상세하게 설명한다. 첨부된 도면과 함께 이하에 개시될 상세한 설명은 본 발명의 예시적인 실시형태를 설명하고자 하는 것이며, 본 발명이 실시될 수 있는 유일한 실시형태를 나타내고자 하는 것이 아니다. 이하의 상세한 설명은 본 발명의 완전한 이해를 제공하기 위해서 구체적 세부사항을 포함한다. 그러나, 당업자는 본 발명이 이러한 구체적 세부사항 없이도 실시될 수 있음을 안다.
몇몇 경우, 본 발명의 개념이 모호해지는 것을 피하기 위하여 공지의 구조 및 장치는 생략되거나, 각 구조 및 장치의 핵심기능을 중심으로 한 블록도 형식으로 도시될 수 있다. 또한, 본 명세서 전체에서 동일한 구성요소에 대해서는 동일한 도면 부호를 사용하여 설명한다.
본 발명에 있어서, 사용자기기(user equipment, UE)는 고정되거나 이동성을 가질 수 있으며, 기지국(base station, BS)와 통신하여 사용자데이터 및/또는 각종 제어정보를 송수신하는 각종 기기들이 이에 속한다. UE는 단말(Terminal Equipment), MS(Mobile Station), MT(Mobile Terminal), UT(User Terminal), SS(Subscribe Station), 무선기기(wireless device), PDA(Personal Digital Assistant), 무선 모뎀(wireless modem), 휴대기기(handheld device) 등으로 불릴 수 있다. 또한, 본 발명에 있어서, BS는 일반적으로 UE 및/또는 다른 BS와 통신하는 고정국(fixed station)을 말하며, UE 및 타 BS와 통신하여 각종 데이터 및 제어정보를 교환한다. BS는 ABS(Advanced Base Station), NB(Node-B), eNB(evolved-NodeB), BTS(Base Transceiver System), 엑세스 포인트(Access Point), PS(Processing Server), 전송 포인트(transmission point; TP)등 다른 용어로 불릴 수 있다. 이하의 본 발명에 관한 설명에서는, BS를 eNB로 통칭한다.
본 발명에서 노드(node)라 함은 사용자기기와 통신하여 무선 신호를 전송/수신할 수 있는 고정된 지점(point)을 말한다. 다양한 형태의 eNB들이 그 명칭에 관계없이 노드로서 이용될 수 있다. 예를 들어, BS, NB, eNB, 피코-셀 eNB(PeNB), 홈 eNB(HeNB), 릴레이, 리피터 등이 노드가 될 수 있다. 또한, 노드는 eNB가 아니어도 될 수 있다. 예를 들어, 무선 리모트 헤드(radio remote head, RRH), 무선 리모트 유닛(radio remote unit, RRU)가 될 수 있다. RRH, RRU 등은 일반적으로 eNB의 전력 레벨(power level) 보다 낮은 전력 레벨을 갖는다. RRH 혹은 RRU이하, RRH/RRU)는 일반적으로 광 케이블 등의 전용 회선(dedicated line)으로 eNB에 연결되어 있기 때문에, 일반적으로 무선 회선으로 연결된 eNB들에 의한 협력 통신에 비해, RRH/RRU와 eNB에 의한 협력 통신이 원활하게 수행될 수 있다. 일 노드에는 최소 하나의 안테나가 설치된다. 상기 안테나는 물리 안테나를 의미할 수도 있으며, 안테나 포트, 가상 안테나, 또는 안테나 그룹을 의미할 수도 있다. 노드는 포인트(point)라고 불리기도 한다. 안테나들이 기지국에 집중되어 위치하여 하나의 eNB 컨트롤러(controller)에 의해 제어되는 기존의(conventional) 중앙 집중형 안테나 시스템(centralized antenna system, CAS)(즉, 단일 노드 시스템)과 달리, 다중 노드 시스템에서 복수의 노드는 통상 일정 간격 이상으로 떨어져 위치한다. 상기 복수의 노드는 각 노드의 동작을 제어하거나, 각 노드를 통해 송/수신될 데이터를 스케줄링(scheduling)하는 하나 이상의 eNB 혹은 eNB 컨트롤러에 의해 관리될 수 있다. 각 노드는 해당 노드를 관리하는 eNB 혹은 eNB 컨트롤러와 케이블(cable) 혹은 전용 회선(dedicated line)을 통해 연결될 수 있다. 다중 노드 시스템에서, 복수의 노드들로의/로부터의 통한 신호 전송/수신에는 동일한 셀 식별자(identity, ID)가 이용될 수도 있고 서로 다른 셀 ID가 이용될 수도 있다. 복수의 노드들이 동일한 셀 ID를 갖는 경우, 상기 복수의 노드 각각은 하나의 셀의 일부 안테나 집단처럼 동작한다. 다중 노드 시스템에서 노드들이 서로 다른 셀 ID를 갖는다면, 이러한 다중 노드 시스템은 다중 셀(예를 들어, 매크로-셀/펨토-셀/피코-셀) 시스템이라고 볼 수 있다. 복수의 노드들 각각이 형성한 다중 셀들이 커버리지에 따라 오버레이되는 형태로 구성되면, 상기 다중 셀들이 형성한 네트워크를 특히 다중-계층(multi-tier) 네트워크라 부른다. RRH/RRU의 셀 ID와 eNB의 셀 ID는 동일할 수도 있고 다를 수도 있다. RRH/RRU가 eNB가 서로 다른 셀 ID를 사용하는 경우, RRH/RRU와 eNB는 모두 독립적인 기지국으로서 동작하게 된다.
이하에서 설명될 본 발명의 다중 노드 시스템에서, 복수의 노드와 연결된 하나 이상의 eNB 혹은 eNB 컨트롤러가 상기 복수의 노드 중 일부 또는 전부를 통해 UE에 동시에 신호를 전송 혹은 수신하도록 상기 복수의 노드를 제어할 수 있다. 각 노드의 실체, 각 노드의 구현 형태 등에 따라 다중 노드 시스템들 사이에는 차이점이 존재하지만, 복수의 노드가 함께 소정 시간-주파수 자원 상에서 UE에 통신 서비스를 제공하는 데 참여한다는 점에서, 이들 다중 노드 시스템들은 단일 노드 시스템(예를 들어, CAS, 종래의 MIMO 시스템, 종래의 중계 시스템, 종래의 리피터 시스템 등)과 다르다. 따라서, 복수의 노드들 중 일부 또는 전부를 사용하여 데이터 협력 전송을 수행하는 방법에 관한 본 발명의 실시예들은 다양한 종류의 다중 노드 시스템에 적용될 수 있다. 예를 들어, 노드는 통상 타 노드와 일정 간격 이상으로 떨어져 위치한 안테나 그룹을 일컫지만, 후술하는 본 발명의 실시예들은 노드가 간격에 상관없이 임의의 안테나 그룹을 의미하는 경우에도 적용될 수 있다. 예를 들어, X-pol(Cross polarized) 안테나를 구비한 eNB의 경우, 상기 eNB가 H-pol 안테나로 구성된 노드와 V-pol 안테나로 구성된 노드를 제어한다고 보고 본 발명의 실시예들이 적용될 수 있다.
복수의 전송(Tx)/수신(Rx) 노드를 통해 신호를 전송/수신하거나, 복수의 전송/수신 노드들 중에서 선택된 적어도 하나의 노드를 통해 신호를 전송/수신하거나, 하향링크 신호를 전송하는 노드와 상향링크 신호를 수신하는 노드를 다르게 할 수 있는 통신 기법을 다중-eNB MIMO 또는 CoMP(Coordinated Multi-Point TX/RX)라 한다. 이러한 노드 간 협력 통신 중 협력 전송 기법은 크게 JP(joint processing)과 스케줄링 협력(scheduling coordination)으로 구분될 수 있다. 전자는 JT(joint transmission)/JR(joint reception)과 DPS(dynamic point selection)으로 나뉘고 후자는 CS(coordinated scheduling)과 CB(coordinated beamforming)으로 나뉠 수 있다. DPS는 DCS(dynamic cell selection)으로 불리기도 한다. 다른 협력 통신 기법에 비해, 노드 간 협력 통신 기법들 중 JP가 수행될 때, 보다 더 다양한 통신환경이 형성될 수 있다. JP 중 JT는 복수의 노드들이 동일한 스트림을 UE로 전송하는 통신 기법을 말하며, JR은 복수의 노드들이 동일한 스트림을 UE로부터 수신하는 통신 기법을 말한다. 상기 UE/eNB는 상기 복수의 노드들로부터 수신한 신호들을 합성하여 상기 스트림을 복원한다. JT/JR의 경우, 동일한 스트림이 복수의 노드들로부터/에게 전송되므로 전송 다이버시티(diversity)에 의해 신호 전송의 신뢰도가 향상될 수 있다. JP 중 DPS는 복수의 노드들 중 특정 규칙에 따라 선택된 일 노드를 통해 신호가 전송/수신되는 통신 기법을 말한다. DPS의 경우, 통상적으로 UE와 노드 사이의 채널 상태가 좋은 노드가 통신 노드로서 선택되게 될 것이므로, 신호 전송의 신뢰도가 향상될 수 있다.
한편, 본 발명에서 셀(cell)이라 함은 하나 이상의 노드가 통신 서비스를 제공하는 일정 지리적 영역을 말한다. 따라서, 본 발명에서 특정 셀과 통신한다고 함은 상기 특정 셀에 통신 서비스를 제공하는 eNB 혹은 노드와 통신하는 것을 의미할 수 있다. 또한, 특정 셀의 하향링크/상향링크 신호는 상기 특정 셀에 통신 서비스를 제공하는 eNB 혹은 노드로부터의/로의 하향링크/상향링크 신호를 의미한다. UE에게 상/하향링크 통신 서비스를 제공하는 셀을 특히 서빙 셀(serving cell)이라고 한다. 또한, 특정 셀의 채널 상태/품질은 상기 특정 셀에 통신 서비스를 제공하는 eNB 혹은 노드와 UE 사이에 형성된 채널 혹은 통신 링크의 채널 상태/품질을 의미한다. 3GPP LTE-A 기반의 시스템에서, UE는 특정 노드로부터의 하향링크 채널 상태를 상기 특정 노드의 안테나 포트(들)이 상기 특정 노드에 할당된 채널 CSI-RS(Channel State Information Reference Signal) 자원 상에서 전송하는 CSI-RS(들)을 이용하여 측정할 수 있다. 일반적으로 인접한 노드들은 서로 직교하는 CSI-RS 자원들 상에서 해당 CSI-RS 자원들을 전송한다. CSI-RS 자원들이 직교한다고 함은 CSI-RS를 나르는 심볼 및 부반송파를 특정하는 CSI-RS 자원 구성(resource configuration), 서브프레임 오프셋(offset) 및 전송 주기(transmission period) 등에 의해 CSI-RS가 할당된 서브프레임들을 특정하는 서브프레임 구성(subframe configuration), CSI-RS 시퀀스 중 최소 한가지가 서로 다름을 의미한다.
본 발명에서 PDCCH(Physical Downlink Control CHannel)/PCFICH(Physical Control Format Indicator CHannel)/PHICH((Physical Hybrid automatic retransmit request Indicator CHannel)/PDSCH(Physical Downlink Shared CHannel)은 각각 DCI(Downlink Control Information)/CFI(Control Format Indicator)/하향링크 ACK/NACK(ACKnowlegement/Negative ACK)/하향링크 데이터를 나르는 시간-주파수 자원의 집합 혹은 자원요소의 집합을 의미한다. 또한, PUCCH(Physical Uplink Control CHannel)/PUSCH(Physical Uplink Shared CHannel)/PRACH(Physical Random Access CHannel)는 각각 UCI(Uplink Control Information)/상향링크 데이터/랜덤 엑세스 신호를 나르는 시간-주파수 자원의 집합 혹은 자원요소의 집합을 의미한다. 본 발명에서는, 특히, PDCCH/PCFICH/PHICH/PDSCH/PUCCH/PUSCH/PRACH에 할당되거나 이에 속한 시간-주파수 자원 혹은 자원요소(Resource Element, RE)를 각각 PDCCH/PCFICH/PHICH/PDSCH/PUCCH/PUSCH/PRACH RE 또는 PDCCH/PCFICH/PHICH/PDSCH/PUCCH/PUSCH/PRACH 자원이라고 칭한다. 이하에서 사용자기기가 PUCCH/PUSCH/PRACH를 전송한다는 표현은, 각각, PUSCH/PUCCH/PRACH 상에서 혹은 통해서 상향링크 제어정보/상향링크 데이터/랜덤 엑세스 신호를 전송한다는 것과 동일한 의미로 사용된다. 또한, eNB가 PDCCH/PCFICH/PHICH/PDSCH를 전송한다는 표현은, 각각, PDCCH/PCFICH/PHICH/PDSCH 상에서 혹은 통해서 하향링크 데이터/제어정보를 전송한다는 것과 동일한 의미로 사용된다.
도 1은 무선 통신 시스템에서 사용되는 무선 프레임 구조의 일 예를 나타낸 것이다. 특히, 도 1(a)는 3GPP LTE/LTE-A 시스템에서 사용되는 주파수분할듀플렉스(frequency division duplex, FDD)용 프레임 구조를 나타낸 것이고, 도 1(b)는 3GPP LTE/LTE-A 시스템에서 사용되는 시분할듀플렉스(time division duplex, TDD)용 프레임 구조를 나타낸 것이다.
도 1을 참조하면, 3GPP LTE/LTE-A 시스템에서 사용되는 무선프레임은 10ms(307200Ts)의 길이를 가지며, 10개의 균등한 크기의 서브프레임(subframe, SF)으로 구성된다. 일 무선프레임 내 10개의 서브프레임에는 각각 번호가 부여될 수 있다. 여기에서, Ts는 샘플링 시간을 나타내고, Ts=1/(2048*15kHz)로 표시된다. 각각의 서브프레임은 1ms의 길이를 가지며 2개의 슬롯으로 구성된다. 일 무선프레임 내에서 20개의 슬롯들은 0부터 19까지 순차적으로 넘버링될 수 있다. 각각의 슬롯은 0.5ms의 길이를 가진다. 일 서브프레임을 전송하기 위한 시간은 전송시간간격(transmission time interval, TTI)로 정의된다. 시간 자원은 무선프레임 번호(혹은 무선 프레임 인덱스라고도 함)와 서브프레임 번호(혹은 서브프레임 번호라고도 함), 슬롯 번호(혹은 슬롯 인덱스) 등에 의해 구분될 수 있다.
무선 프레임은 듀플레스(duplex) 모드에 따라 다르게 구성(configure)될 수 있다. 예를 들어, FDD 모드에서, 하향링크 전송 및 상향링크 전송은 주파수에 의해 구분되므로, 무선 프레임은 특정 주파수 대역에 대해 하향링크 서브프레임 또는 상향링크 서브프레임 중 하나만을 포함한다. TDD 모드에서 하향링크 전송 및 상향링크 전송은 시간에 의해 구분되므로, 특정 주파수 대역에 대해 무선 프레임은 하향링크 서브프레임과 상향링크 서브프레임을 모두 포함한다.
표 1은 TDD 모드에서, 무선 프레임 내 서브프레임들의 DL-UL 구성(configuration)을 예시한 것이다.
DL-UL configuration | Downlink-to-Uplink Switch-point periodicity | Subframe number | |||||||||
0 | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | ||
0 | 5ms | D | S | U | U | U | D | S | U | U | U |
1 | 5ms | D | S | U | U | D | D | S | U | U | D |
2 | 5ms | D | S | U | D | D | D | S | U | D | D |
3 | 10ms | D | S | U | U | U | D | D | D | D | D |
4 | 10ms | D | S | U | U | D | D | D | D | D | D |
5 | 10ms | D | S | U | D | D | D | D | D | D | D |
6 | 5ms | D | S | U | U | U | D | S | U | U | D |
표 1에서, D는 하향링크 서브프레임을, U는 상향링크 서브프레임을, S는 특이(special) 서브프레임을 나타낸다. 특이 서브프레임은 DwPTS(Downlink Pilot TimeSlot), GP(Guard Period), UpPTS(Uplink Pilot TimeSlot)의 3개 필드를 포함한다. DwPTS는 하향링크 전송용으로 유보되는 시간 구간이며, UpPTS는 상향링크 전송용으로 유보되는 시간 구간이다. 표 2는 특이 프레임의 구성(configuration)을 예시한 것이다.
Special subframe configuration | Normal cyclic prefix in downlink | Extended cyclic prefix in downlink | ||||
DwPTS | UpPTS | DwPTS | UpPTS | |||
Normal cyclic prefix in uplink | Extended cyclic prefix in uplink | Normal cyclic prefix in uplink | Extended cyclic prefix in uplink | |||
0 | 6592·Ts | 2192·Ts | 2560·Ts | 7680·Ts | 2192·Ts | 2560·Ts |
1 | 19760·Ts | 20480·Ts | ||||
2 | 21952·Ts | 23040·Ts | ||||
3 | 24144·Ts | 25600·Ts | ||||
4 | 26336·Ts | 7680·Ts | 4384·Ts | 5120·Ts | ||
5 | 6592·Ts | 4384·Ts | 5120·Ts | 20480·Ts | ||
6 | 19760·Ts | 23040·Ts | ||||
7 | 21952·Ts | 12800·Ts | ||||
8 | 24144·Ts | - | - | - | ||
9 | 13168·Ts | - | - | - |
도 2는 무선 통신 시스템에서 하향링크/상향링크(DL/UL) 슬롯 구조의 일례를 나타낸 것이다. 특히, 도 2는 3GPP LTE/LTE-A 시스템의 자원격자(resource grid)의 구조를 나타낸다. 안테나 포트당 1개의 자원격자가 있다.
도 2를 참조하면, 슬롯은 시간 도메인에서 복수의 OFDM(Orthogonal Frequency Division Multiplexing) 심볼을 포함하고, 주파수 도메인에서 다수의 자원블록(resource block, RB)을 포함한다. OFDM 심볼은 일 심볼 구간을 의미하기도 한다. 도 2를 참조하면, 각 슬롯에서 전송되는 신호는 *개의 부반송파(subcarrier)와 개의 OFDM 심볼로 구성되는 자원격자(resource grid)로 표현될 수 있다. 여기서, 은 하향링크 슬롯에서의 자원블록(resource block, RB)의 개수를 나타내고, 은 UL 슬롯에서의 RB의 개수를 나타낸다. 와 은 DL 전송 대역폭과 UL 전송 대역폭에 각각 의존한다. 은 하향링크 슬롯 내 OFDM 심볼의 개수를 나타내며, 은 UL 슬롯 내 OFDM 심볼의 개수를 나타낸다. 는 하나의 RB를 구성하는 부반송파의 개수를 나타낸다.
OFDM 심볼은 다중 접속 방식에 따라 OFDM 심볼, SC-FDM(Single Carrier Frequency Division Multiplexing) 심볼 등으로 불릴 수 있다. 하나의 슬롯에 포함되는 OFDM 심볼의 수는 채널 대역폭, CP(cyclic prefix)의 길이에 따라 다양하게 변경될 수 있다. 예를 들어, 정규(normal) CP의 경우에는 하나의 슬롯이 7개의 OFDM 심볼을 포함하나, 확장(extended) CP의 경우에는 하나의 슬롯이 6개의 OFDM 심볼을 포함한다. 도 2에서는 설명의 편의를 위하여 하나의 슬롯이 7 OFDM 심볼로 구성되는 서브프레임을 예시하였으나, 본 발명의 실시예들은 다른 개수의 OFDM 심볼을 갖는 서브프레임들에도 마찬가지의 방식으로 적용될 수 있다. 도 2를 참조하면, 각 OFDM 심볼은, 주파수 도메인에서, *개의 부반송파를 포함한다. 부반송파의 유형은 데이터 전송을 위한 데이터 부반송파, 참조신호(reference signal)의 전송 위한 참조신호 부반송파, 가드 밴드(guard band) 및 직류(Direct Current, DC) 성분을 위한 널(null) 부반송파로 나뉠 수 있다. DC 성분을 위한 널 부반송파는 미사용인 채 남겨지는 부반송파로서, OFDM 신호 생성 과정 혹은 주파수 상향변환 과정에서 반송파 주파수(carrier frequency, f0)로 맵핑(mapping)된다. 반송파 주파수는 중심 주파수(center frequency)라고도 한다.
일 RB는 시간 도메인에서 개(예를 들어, 7개)의 연속하는 OFDM 심볼로서 정의되며, 주파수 도메인에서 c개(예를 들어, 12개)의 연속하는 부반송파에 의해 정의된다. 참고로, 하나의 OFDM 심볼과 하나의 부반송파로 구성된 자원을 자원요소(resource element, RE) 혹은 톤(tone)이라고 한다. 따라서, 하나의 RB는 *개의 자원요소로 구성된다. 자원격자 내 각 자원요소는 일 슬롯 내 인덱스 쌍 (k, 1)에 의해 고유하게 정의될 수 있다. k는 주파수 도메인에서 0부터 *-1까지 부여되는 인덱스이며, l은 시간 도메인에서 0부터 -1까지 부여되는 인덱스이다.
일 서브프레임에서 개의 연속하는 동일한 부반송파를 점유하면서, 상기 서브프레임의 2개의 슬롯 각각에 1개씩 위치하는 2개의 RB를 물리자원블록(physical resource block, PRB) 쌍(pair)이라고 한다. PRB 쌍을 구성하는 2개의 RB는 동일한 PRB 번호(혹은, PRB 인덱스(index)라고도 함)를 갖는다. VRB는 자원할당을 위해 도입된 일종의 논리적 자원할당 단위이다. VRB는 PRB와 동일한 크기를 갖는다. VRB를 PRB로 맵핑하는 방식에 따라, VRB는 로컬라이즈(localized) 타입의 VRB와 분산(distributed) 타입의 VRB로 구분된다. 로컬라이즈 타입의 VRB들은 PRB들에 바로 맵핑되어, VRB 번호(VRB 인덱스라고도 함)가 PRB 번호에 바로 대응된다. 즉, nPRB=nVRB가 된다. 로컬라이즈 타입의 VRB들에는 0부터 -1순으로 번호가 부여되며, = 이다. 따라서, 로컬라이즈 맵핑 방식에 의하면, 동일한 VRB 번호를 갖는 VRB가 첫 번째 슬롯과 두 번째 슬롯에서, 동일 PRB 번호의 PRB에 맵핑된다. 반면, 분산 타입의 VRB는 인터리빙을 거쳐 PRB에 맵핑된다. 따라서, 동일한 VRB 번호를 갖는 분산 타입의 VRB는 첫 번째 슬롯과 두 번째 슬롯에서 서로 다른 번호의 PRB에 맵핑될 수 있다. 서브프레임의 두 슬롯에 1개씩 위치하며 동일한 VRB 번호를 갖는 2개의 PRB를 VRB 쌍이라 칭한다.
도 3은 3GPP LTE/LTE-A 시스템에서 사용되는 하향링크(downlink, DL) 서브프레임 구조를 예시한 것이다.
도 3을 참조하면, DL 서브프레임은 시간 도메인에서 제어영역(control region)과 데이터영역(data region)으로 구분된다. 도 3을 참조하면, 서브프레임의 첫 번째 슬롯에서 앞부분에 위치한 최대 3(혹은 4)개의 OFDM 심볼은 제어 채널이 할당되는 제어영역(control region)에 대응한다. 이하, DL 서브프레임에서 PDCCH 전송에 이용가능한 자원 영역(resource region)을 PDCCH 영역이라 칭한다. 제어영역으로 사용되는 OFDM 심볼(들)이 아닌 남은 OFDM 심볼들은 PDSCH(Physical Downlink Shared CHannel)가 할당되는 데이터영역(data region)에 해당한다. 이하, DL 서브프레임에서 PDSCH 전송에 이용가능한 자원 영역을 PDSCH 영역이라 칭한다. 3GPP LTE에서 사용되는 DL 제어 채널의 예는 PCFICH(Physical Control Format Indicator Channel), PDCCH(Physical Downlink Control Channel), PHICH(Physical hybrid ARQ indicator Channel) 등을 포함한다. PCFICH는 서브프레임의 첫 번째 OFDM 심볼에서 전송되고 서브프레임 내에서 제어 채널의 전송에 사용되는 OFDM 심볼의 개수에 관한 정보를 나른다. PHICH는 UL 전송에 대한 응답으로 HARQ(Hybrid Automatic Repeat Request) ACK/NACK(acknowledgment/negative-acknowledgment) 신호를 나른다.
PDCCH를 통해 전송되는 제어 정보를 상향링크 제어 정보(downlink control information, DCI)라고 지칭한다. DCI는 UE 또는 UE 그룹을 위한 자원 할당 정보 및 다른 제어 정보를 포함한다. 예를 들어, DCI는 DL 공유 채널(downlink shared channel, DL-SCH)의 전송 포맷 및 자원 할당 정보, UL 공유 채널(uplink shared channel, UL-SCH)의 전송 포맷 및 자원 할당 정보, 페이징 채널(paging channel, PCH) 상의 페이징 정보, DL-SCH 상의 시스템 정보, PDSCH 상에서 전송되는 임의 접속 응답과 같은 상위 계층(upper layer) 제어 메시지의 자원 할당 정보, UE 그룹 내의 개별 UE들에 대한 전송 전력 제어 명령(Transmit Control Command Set), 전송 전력 제어(Transmit Power Control) 명령, VoIP(Voice over IP)의 활성화(activation) 지시 정보, DAI(Downlink Assignment Index) 등을 포함한다. DL 공유 채널(downlink shared channel, DL-SCH)의 전송 포맷(Transmit Format) 및 자원 할당 정보는 DL 스케줄링 정보 혹은 DL 그랜트(DL grant)라고도 불리며, UL 공유 채널(uplink shared channel, UL-SCH)의 전송 포맷 및 자원 할당 정보는 UL 스케줄링 정보 혹은 UL 그랜트(UL grant)라고도 불린다. 일 PDCCH가 나르는 DCI는 DCI 포맷에 따라서 그 크기와 용도가 다르며, 부호화율에 따라 그 크기가 달라질 수 있다. 현재 3GPP LTE 시스템에서는 상향링크용으로 포맷 0 및 4, 하향링크용으로 포맷 1, 1A, 1B, 1C, 1D, 2, 2A, 2B, 2C, 3, 3A 등의 다양한 포맷이 정의되어 있다. DCI 포맷 각각의 용도에 맞게, 호핑 플래그, RB 할당(RB allocation), MCS(modulation coding scheme), RV(redundancy version), NDI(new data indicator), TPC(transmit power control), 순환 천이 DMRS(cyclic shift demodulation reference signal), UL 인덱스, CQI(channel quality information) 요청, DL 할당 인덱스(DL assignment index), HARQ 프로세스 넘버, TPMI(transmitted precoding matrix indicator), PMI(precoding matrix indicator) 정보 등의 제어정보가 취사 선택된 조합이 하향링크 제어정보로서 UE에게 전송된다.
일반적으로, UE에 구성된 전송 모드(transmission mode, TM)에 따라 상기 UE에게 전송될 수 있는 DCI 포맷이 달라진다. 다시 말해, 특정 전송 모드로 구성된 UE를 위해서는 모든 DCI 포맷이 사용될 수 있는 것이 아니라, 상기 특정 전송 모드에 대응하는 일정 DCI 포맷(들)만이 사용될 수 있다.
PDCCH는 하나 또는 복수의 연속된 제어 채널 요소(control channel element, CCE)들의 집성(aggregation) 상에서 전송된다. CCE는 PDCCH에 무선 채널 상태에 기초한 부호화율(coding rate)를 제공하기 위해 사용되는 논리적 할당 유닛(unit)이다. CCE는 복수의 자원 요소 그룹(resource element group, REG)에 대응한다. 예를 들어, 하나의 CCE는 9개의 REG에 대응되고 하나의 REG는 4개의 RE에 대응한다. 3GPP LTE 시스템의 경우, 각각의 UE을 위해 PDCCH가 위치할 수 있는 CCE 세트를 정의하였다. UE가 자신의 PDCCH를 발견할 수 있는 CCE 세트를 PDCCH 탐색 공간, 간단히 탐색 공간(Search Space, SS)라고 지칭한다. 탐색 공간 내에서 PDCCH가 전송될 수 있는 개별 자원을 PDCCH 후보(candidate)라고 지칭한다. UE가 모니터링(monitoring)할 PDCCH 후보들의 모음은 탐색 공간으로 정의된다. 3GPP LTE/LTE-A 시스템에서 각각의 DCI 포맷을 위한 탐색 공간은 다른 크기를 가질 수 있으며, 전용(dedicated) 탐색 공간과 공통(common) 탐색 공간이 정의되어 있다. 전용 탐색 공간은 UE-특정(specific) 탐색 공간이며, 각각의 개별 UE를 위해 구성(configuration)된다. 공통 탐색 공간은 복수의 UE들을 위해 구성된다. 상기 탐색 공간을 정의하는 집성 레벨(aggregation level)은 다음과 같다.
Search Space SK (L) | Number of PDCCH candidates M(L) | ||
Type | Aggregation Level L | Size[in CCEs] | |
UE-specific | 1 | 6 | 6 |
2 | 12 | 6 | |
4 | 8 | 2 | |
8 | 16 | 2 | |
Common | 4 | 16 | 4 |
8 | 16 | 2 |
하나의 PDCCH 후보는 CCE 집성 레벨에 따라 1, 2, 4 또는 8개의 CCE에 대응한다. eNB는 탐색 공간 내의 임의의 PDCCH 후보 상에서 실제 PDCCH (DCI)를 전송하고, UE는 PDCCH (DCI)를 찾기 위해 탐색 공간을 모니터링한다. 여기서, 모니터링이라 함은 모든 모니터링되는 DCI 포맷들에 따라 해당 탐색 공간 내의 각 PDCCH의 복호(decoding)를 시도(attempt)하는 것을 의미한다. UE는 상기 복수의 PDCCH를 모니터링하여, 자신의 PDCCH를 검출할 수 있다. 기본적으로 UE는 자신의 PDCCH가 전송되는 위치를 모르기 때문에, 매 서브프레임마다 해당 DCI 포맷의 모든 PDCCH를 자신의 식별자를 가진 PDCCH를 검출할 때까지 PDCCH의 복호를 시도하는데, 이러한 과정을 블라인드 검출(blind detection)(블라인드 복호(blind decoding, BD))이라고 한다.
eNB는 데이터영역을 통해 UE 혹은 UE 그룹을 위한 데이터를 전송할 수 있다. 상기 데이터영역을 통해 전송되는 데이터를 사용자데이터라 칭하기도 한다. 사용자데이터의 전송을 위해, 데이터영역에는 PDSCH(Physical Downlink Shared CHannel)가 할당될 수 있다. PCH(Paging channel) 및 DL-SCH(Downlink-shared channel)는 PDSCH를 통해 전송된다. UE는 PDCCH를 통해 전송되는 제어정보를 복호하여 PDSCH를 통해 전송되는 데이터를 읽을 수 있다. PDSCH의 데이터가 어떤 UE 혹은 UE 그룹에게 전송되는지, 상기 UE 혹은 UE 그룹이 어떻게 PDSCH 데이터를 수신하고 복호해야 하는지 등을 나타내는 정보가 PDCCH에 포함되어 전송된다. 예를 들어, 특정 PDCCH가 "A"라는 RNTI(Radio Network Temporary Identity)로 CRC(cyclic redundancy check) 마스킹(masking)되어 있고, "B"라는 무선자원(예, 주파수 위치) 및 "C"라는 전송형식정보(예, 전송 블록 사이즈, 변조 방식, 코딩 정보 등)를 이용해 전송되는 데이터에 관한 정보가 특정 DL 서브프레임을 통해 전송된다고 가정한다. UE는 자신이 가지고 있는 RNTI 정보를 이용하여 PDCCH를 모니터링하고, "A"라는 RNTI를 가지고 있는 UE는 PDCCH를 검출하고, 수신한 PDCCH의 정보를 통해 "B"와 "C"에 의해 지시되는 PDSCH를 수신한다.
UE가 eNB로부터 수신한 신호의 복조를 위해서는 데이터 신호와 비교될 참조신호 참조신호(reference signal, RS)가 필요하다. 참조신호라 함은 eNB가 UE로 혹은 UE가 eNB로 전송하는, eNB와 UE가 서로 알고 있는, 기정의된 특별한 파형의 신호를 의미하며, 파일럿(pilot)이라고도 불린다. 참조신호들은 셀 내 모든 UE들에 의해 공용되는 셀-특정(cell-specific) RS와 특정 UE에게 전용되는 복조(demodulation) RS(DM RS)로 구분된다. eNB가 특정 UE를 위한 하향링크 데이터의 복조를 위해 전송하는 DM RS를 UE-특정적(UE-specific) RS라 특별히 칭하기도 한다. 하향링크에서 DM RS와 CRS는 함께 전송될 수도 있으나 둘 중 한 가지만 전송될 수도 있다. 다만, 하향링크에서 CRS없이 DM RS만 전송되는 경우, 데이터와 동일한 프리코더를 적용하여 전송되는 DM RS는 복조 목적으로만 사용될 수 있으므로, 채널측정용 RS가 별도로 제공되어야 한다. 예를 들어, 3GPP LTE(-A)에서는 UE가 채널 상태 정보를 측정할 수 있도록 하기 위하여, 추가적인 측정용 RS인 CSI-RS가 상기 UE에게 전송된다. CSI-RS는 채널상태가 상대적으로 시간에 따른 변화도가 크지 않다는 사실에 기반하여, 매 서브프레임마다 전송되는 CRS와 달리, 다수의 서브프레임으로 구성되는 소정 전송 주기마다 전송된다.
도 4는 3GPP LTE/LTE-A 시스템에서 사용되는 상향링크(uplink, UL) 서브프레임 구조의 일례를 나타낸 것이다.
도 4를 참조하면, UL 서브프레임은 주파수 도메인에서 제어영역과 데이터영역으로 구분될 수 있다. 하나 또는 여러 PUCCH(physical uplink control channel)가 상향링크 제어 정보(uplink control information, UCI)를 나르기 위해, 상기 제어영역에 할당될 수 있다. 하나 또는 여러 PUSCH(physical uplink shared channel)가 사용자 데이터를 나르기 위해, UL 서브프레임의 데이터영역에 할당될 수 있다.
UL 서브프레임에서는 DC(Direct Current) 부반송파를 기준으로 거리가 먼 부반송파들이 제어영역으로 활용된다. 다시 말해, UL 전송 대역폭의 양쪽 끝부분에 위치하는 부반송파들이 상향링크 제어정보의 전송에 할당된다. DC 부반송파는 신호 전송에 사용되지 않고 남겨지는 성분으로서, 주파수 상향변환 과정에서 반송파 주파수 f0로 맵핑된다. 일 UE에 대한 PUCCH는 일 서브프레임에서, 일 반송파 주파수에서 동작하는 자원들에 속한 RB 쌍에 할당되며, 상기 RB 쌍에 속한 RB들은 두 개의 슬롯에서 각각 다른 부반송파를 점유한다. 이와 같이 할당되는 PUCCH를, PUCCH에 할당된 RB 쌍이 슬롯 경계에서 주파수 호핑된다고 표현한다. 다만, 주파수 호핑이 적용되지 않는 경우에는, RB 쌍이 동일한 부반송파를 점유한다.
PUCCH는 다음의 제어 정보를 전송하는데 사용될 수 있다.
- SR(Scheduling Request): 상향링크 UL-SCH 자원을 요청하는데 사용되는 정보이다. OOK(On-Off Keying) 방식을 이용하여 전송된다.
- HARQ-ACK: PDCCH에 대한 응답 및/또는 PDSCH 상의 하향링크 데이터 패킷(예, 코드워드)에 대한 응답이다. PDCCH 혹은 PDSCH가 성공적으로 수신되었는지 여부를 나타낸다. 단일 하향링크 코드워드에 대한 응답으로 HARQ-ACK 1비트가 전송되고, 두 개의 하향링크 코드워드에 대한 응답으로 HARQ-ACK 2비트가 전송된다. HARQ-ACK 응답은 포지티브 ACK(간단히, ACK), 네거티브 ACK(이하, NACK), DTX(Discontinuous Transmission) 또는 NACK/DTX를 포함한다. 여기서, HARQ-ACK이라는 용어는 HARQ ACK/NACK, ACK/NACK과 혼용된다.
- CSI(Channel State Information): 하향링크 채널에 대한 피드백 정보(feedback information)이다. MIMO(Multiple Input Multiple Output)-관련 피드백 정보는 RI(Rank Indicator) 및 PMI(Precoding Matrix Indicator)를 포함한다.
UE가 서브프레임에서 전송할 수 있는 상향링크 제어정보(UCI)의 양은 제어 정보 전송에 가용한 SC-FDMA의 개수에 의존한다. UCI에 가용한 SC-FDMA는 서브프레임에서 참조 신호 전송을 위한 SC-FDMA 심볼을 제외하고 남은 SC-FDMA 심볼을 의미하고, SRS(Sounding Reference Signal)가 구성된 서브프레임의 경우에는 서브프레임의 마지막 SC-FDMA 심볼도 제외된다. 참조 신호는 PUCCH의 코히런트(coherent) 검출에 사용된다. PUCCH는 전송되는 정보에 따라 다양한 포맷을 지원한다.
표 4는 LTE/LTE-A 시스템에서 PUCCH 포맷과 UCI의 맵핑 관계를 나타낸다.
PUCCH format | Modulation scheme | Number of bits per subframe | Usage | Etc. |
1 | N/A | N/A (exist or absent) | SR (Scheduling Request) | |
1a | BPSK | 1 | ACK/NACK orSR + ACK/NACK | One codeword |
1b | QPSK | 2 | ACK/NACK orSR + ACK/NACK | Two codeword |
2 | QPSK | 20 | CQI/PMI/RI | Joint coding ACK/NACK (extended CP) |
2a | QPSK+BPSK | 21 | CQI/PMI/RI + ACK/NACK | Normal CP only |
2b | QPSK+QPSK | 22 | CQI/PMI/RI + ACK/NACK | Normal CP only |
3 | QPSK | 48 | ACK/NACK orSR + ACK/NACK orCQI/PMI/RI + ACK/NACK |
표 4를 참조하면, PUCCH 포맷 1 계열은 주로 ACK/NACK 정보를 전송하는 데 사용되며, PUCCH 포맷 2 계열은 주로 CQI/PMI/RI 등의 채널상태정보(channel state information, CSI)를 나르는 데 사용되고, PUCCH 포맷 3 계열은 주로 ACK/NACK 정보를 전송하는 데 사용된다.
참조 신호 (Reference Signal; RS)
무선 통신 시스템에서 패킷을 전송할 때, 전송되는 패킷은 무선 채널을 통해서 전송되기 때문에 전송과정에서 신호의 왜곡이 발생할 수 있다. 왜곡된 신호를 수신측에서 올바로 수신하기 위해서는 채널 정보를 이용하여 수신 신호에서 왜곡을 보정하여야 한다. 채널 정보를 알아내기 위해서, 송신측과 수신측에서 모두 알고 있는 신호를 전송하여, 상기 신호가 채널을 통해 수신될 때의 왜곡 정도를 가지고 채널 정보를 알아내는 방법을 주로 사용한다. 상기 신호를 파일럿 신호(Pilot Signal) 또는 참조신호(Reference Signal)라고 한다.
다중안테나를 사용하여 데이터를 송수신하는 경우에는 각 송신 안테나와 수신 안테나 사이의 채널 상황을 알아야 올바른 신호를 수신할 수 있다. 따라서, 각 송신 안테나 별로, 좀더 자세하게는 안테나 포트(안테나 포트)별로 별도의 참조신호가 존재하여야 한다.
참조신호는 상향링크 참조신호와 하향링크 참조신호로 구분될 수 있다. 현재 LTE 시스템에는 상향링크 참조신호로써,
i) PUSCH 및 PUCCH를 통해 전송된 정보의 코히런트(coherent)한 복조를 위한 채널 추정을 위한 복조 참조신호(DeModulation-Reference Signal, DM-RS)
ii) 기지국이, 네트워크가 다른 주파수에서의 상향링크 채널 품질을 측정하기 위한 사운딩 참조신호(Sounding Reference Signal, SRS)가 있다.
한편, 하향링크 참조신호에는,
i) 셀 내의 모든 단말이 공유하는 셀-특정 참조신호(Cell-specific Reference Signal, CRS)
ii) 특정 단말만을 위한 단말-특정 참조신호(UE-specific Reference Signal)
iii) PDSCH가 전송되는 경우 코히런트한 복조를 위해 전송되는 (DeModulation-Reference Signal, DM-RS)
iv) 하향링크 DMRS가 전송되는 경우 채널 상태 정보(Channel State Information; CSI)를 전달하기 위한 채널상태정보 참조신호(Channel State Information- Reference Signal, CSI-RS)
v) MBSFN(Multimedia Broadcast Single Frequency Network) 모드로 전송되는 신호에 대한 코히런트한 복조를 위해 전송되는 MBSFN 참조신호(MBSFN Reference Signal)
vi) 단말의 지리적 위치 정보를 추정하는데 사용되는 위치 참조신호(Positioning Reference Signal)가 있다.
참조신호는 그 목적에 따라 크게 두 가지로 구분될 수 있다. 채널 정보 획득을 위한 목적의 참조신호와 데이터 복조를 위해 사용되는 참조신호가 있다. 전자는 UE가 하향 링크로의 채널 정보를 획득할 수 있는데 그 목적이 있으므로, 광대역으로 전송되어야 하고, 특정 서브 프레임에서 하향 링크 데이터를 수신하지 않는 단말이라도 그 참조신호를 수신하여야 한다. 또한 이는 핸드 오버 등의 상황에서도 사용된다. 후자는 기지국이 하향링크를 보낼 때 해당 자원에 함께 보내는 참조신호로서, 단말은 해당 참조신호를 수신함으로써 채널 측정을 하여 데이터를 복조할 수 있게 된다. 이 참조신호는 데이터가 전송되는 영역에 전송되어야 한다.
본 발명은 한 시스템에서 복수 개의 서로 다른 서비스를 제공하되 각각의 서비스의 요구사항을 만족시키기 위해서 서비스 별로 혹은 UE 별로 서로 다른 시스템 파라미터들을 적용하여 이들을 서비스하는 방식에 관한 것이다. 특히, 레이턴시(latency) 에 민감한 서비스/UE에 대해서는 짧은 TTI(transmission time interval)를 사용하여 데이터를 짧은 시간동안 최대한 빨리 보내도록 하고 이에 대한 응답에 대해서도 짧은 시간에 보낼 수 있도록 하여 레이턴시를 최대한 줄일 수 있도록 하는 것이다. 반면, 레이턴시에 덜 민감한 서비스/UE에 대해서는 좀더 긴 TTI를 사용하여 데이터를 송/수신할 수 있게 할 수 있다. 레이턴시 보다는 전력 효율성에 민감한 서비스/UE에 대해서는 동일한 저전력으로 데이터를 반복하여 전송하거나 TTI를 좀더 늘려서 전송할 수 있다.
설명의 편의를 위하여 기본 TTI는 현재 LTE/LTE-A 시스템에서 사용하는 1ms을 가정하고, 기본 시스템 역시 LTE/LTE-A 시스템을 기반으로 한다. LTE/LTE-A 시스템의 한 기지국에서 1ms 의 TTI, 즉 서브프레임 길이를 기반으로 서로 다른 서비스/UE를 서비스하면서, 레이턴시에 민감한 서비스/UE에 대해서는 1ms 보다 짧은 단위의 TTI를 갖는 데이터/제어 채널을 전송하는 방식을 제안하고자 한다. 이하에서는 1ms의 TTI를 일반(normal) TTI라 칭하고, 1ms 보다 작은 단위, 예를 들어 0.5ms의 TTI를 짧은(short) TTI, 1ms보다 긴 TTI, 예를 들어 2ms의 TTI를 긴(long) TTI라 칭한다.
또한, 짧은 TTI는 심볼의 수로도 표현될 수 있다. 앞서 설명한대로, LTE/LTE-A 시스템에서 한 슬롯은 0.5 ms이고, 한 슬롯은 일반 CP를 가정하였을 때 7개의 심볼로 구성된다. 따라서, 짧은 TTI는 일반 CP인 경우 7보다 작은 수의 심볼로 이루어질 수 있고, 예를 들어, 2심볼, 4심볼 등의 짧은 TTI가 가능하다.
일차적으로는 기존 LTE/LTE-A 시스템에서 사용되는 1ms 단위의 일반 TTI를 기본으로 하는 시스템에서 1ms보다 작은 단위의 짧은 TTI를 지원하기 위한 방식에 대하여 기술하고자 한다. 먼저, 하향링크를 살펴보면, eNB에서의 서로 다른 크기의 TTI를 갖는 채널들 간의 다중화 및 이에 대한 상향링크 전송에 관한 예가 도 5에 도시된다. TTI가 짧을수록 이를 수신한 UE가 버퍼링(buffering)하고 제어 채널과 데이터 채널을 디코딩(decoding)하는 시간이 짧아지고, 이에 대한 상향링크 전송을 하기까지의 시간이 짧아진다. 도 5의 예에서 볼 수 있듯이, 1ms TTI의 전송에 대해서는 특정 n번째 서브프레임에서 전송한 하향링크 채널에 대한 응답이 n+4번째 서브프레임에서 eNB가 수신할 수 있게 되지만, 0.5ms TTI의 전송에 대해서는 특정 n번째 서브프레임에서 전송된 하향링크 채널에 대한 응답은 n+2번째 서브프레임에서 eNB가 수신할 수 있다. 따라서, 서로 다른 길이의 TTI를 지원하고자 하는 경우, 이렇게 다른 TTI를 갖는 채널들의 하향 링크 및 상향 링크 다중화에 대해서 기존 시스템에서만 동작하는 UE에 대한 영향이 없도록 역방향 호환성(backward compability)을 지원해야 한다.
차기 시스템에서는 다양한 적용분야에서의 요구사항을 충족하기 위해서 모든 혹은 특정 물리 채널에 대하여 TTI를 다양하게 설정하는 상황을 고려할 수 있다. 좀 더 특징적으로 3GPP LTE 시스템을 예로 들면, 시나리오에 따라서 eNB와 UE간 통신 시 레이턴시를 줄이기 위한 목적으로 PDSCH/PUSCH/PUCCH 등의 물리 채널 전송에 적용되는 단위인 TTI를 1msec보다 작게 설정할 수 있다. 또한, 단일 UE 혹은 복수의 UE에 대해서 단일 서브프레임(예를 들어, 1msec) 내에서 복수의 물리 채널이 존재할 때, 각 채널 별로 적용되는 TTI가 다를 수도 있다. 본 발명의 이하의 설명에서는 설명의 편의상 LTE(LTE-A) 시스템을 예로 들어 설명한다. 다만, 본 발명이 LTE(LTE-A) 시스템에서만 적용되는 것은 아니고, 이후 개발될 통신 시스템에 적용될 수 있는 것은 당연하다. 이 때, TTI는 LTE 시스템에서의 일반적인 서브프레임 크기로서 1msec일 수 있고(즉, 일반 TTI), 짧은 TTI (즉, sTTI)는 이보다 작은 값을 지칭하며, 단일/복수의 OFDM 혹은 SC-FDMA 심볼 단위일 수 있으나, 심볼의 명칭에 본 발명의 범위기 제한되지는 않는다. 또한, sTTI에서 전송하는 UL 데이터/제어 채널은 각각 sPUSCH/sPUCCH로 지칭한다.
본 발명에서는 기존 LTE/LTE-A 시스템에서의 1ms TTI와 상이한 하나 혹은 복수의 TTI 길이(예컨대, 1ms보다 짧은)가 지원 가능한 상황에서, 복수 채널 간에 (특히 PUCCH와 PUSCH간에) 상이한 TTI 길이가 설정된 경우 단말의 UL 송신 방안을 제안한다. 본 발명은 셀 간 상이한 TTI 길이가 설정된 경우의 단말의 UL 송신 방안에도 적용될 수 있다. 혹은 시스템이 하나 이상의 서브캐리어 간격(subcarrier spacing)을 지원할 때 달라지는 TTI 길이 간 다중화(multiplexing)에도 유사한 개념을 적용 가능하다. 일례로, 서브캐리어 간격이 X인 경우와 2 * X의 경우, 한 서브프레임을 두 개의 sTTI로 나눈 경우와 유사하게 적용 가능하다.
편의상 발명을 LTE에 기반하여 설명하나 해당 내용은 뉴 랫(new RAT) 등 다른 웨이브폼/프레임 구조(waveform/frame structure)를 사용하는 기술에도 적용 가능하다.
PUCCH와 PUSCH 간 상이한 TTI 길이를 위한 UCI 전송
UE 능력(capability)
단말은 상이한 TTI 길이를 갖는 PUCCH와 PUSCH에 대한 동시 전송 가능 여부를 기지국에게 보고할 수 있다.
혹은, 단말은 특정 TTI 길이를 갖는 UL 채널과 나머지 UL 채널의 동시 전송 가능 여부를 기지국에게 보고할 수 있다. 일례로, PUSCH의 TTI 길이 별로 PUCCH/PUSCH 동시 전송 가능 여부를 독립적으로 설정하되 PUCCH TTI 길이와는 무관할 수도 있다.
혹은, 단말은 특정 TTI 길이를 갖는 UL 채널의 조합에 대한 동시 전송 능력을 기지국에게 보고할 수도 있다. 좀더 상세하게, 단말은 PUSCH와 sPUSCH 그리고/혹은 PUCCH와 sPUCCH 그리고/혹은 서로 다른 TTI 길이를 갖는 sPUSCH와 sPUSCH 그리고/혹은 서로 다른 TTI 길이를 갖는 sPUCCH와 sPUCCH 의 동시 전송 능력을 기지국에게 보고할 수 있다.
이러한 일례는 PUCCH의 경우 하향링크 TTI 길이를 따라 설정되고 PUSCH의 경우 상향링크에 설정된 TTI 길이를 따라 갈 수 있다. 만약 CA(carrier aggregation)의 케이스처럼 여러 개의 하향링크 CC(compoent carrier)가 다른 TTI 길이로 구성된 경우, PUCCH의 경우 PCell or 마스터(master) 셀을 따라 가거나, 하나의 기준 하향링크 CC에 설정된 sTTI 길이를 따라갈 수 있다.
PUCCH와 PUSCH의 TTI 길이에 따른 UCI 전송 방안
(s)PUCCH와 (s)PUSCH의 TTI가 겹치는 경우에 UCI 전송 방안을 설명하고자 한다.
(s)PUCCH의 TTI 길이를 N_C라고 명명하고 (s)PUSCH의 TTI 길이를 N_S라고 명명하며 N_C와 N_S가 상이한 값을 가지는 경우, UCI 전송 방안을 다음과 같이 제안한다. (s)PUCCH와 (s)PUSCH의 전송 방안은 아래의 제안들의 조합으로 결정될 수도 있다.
제안 1: N_S가 일정 값 이상인 경우에만 UCI가 (s)PUSCH로 피기백(piggyback)이 수행되도록 규칙이 정의될 수 있다.
제안 2: N_S가 일정 값 이하인 경우 UCI는 피기백되지 않고 (s)PUCCH로 전송되도록 규칙이 정의될 수 있다.
제안 3: N_S와 스케줄링된 RB수를 고려하여 피기백 여부가 결정되도록 규칙이 정의될 수 있다.
제안 3-1: N_S와 스케줄링된 RB 수를 고려하여, 일부 UCI만 피기백하고 나머지 UCI는 (s)PUCCH로 전송된다. 이 때, 피기백될 UCI는 사전에 정의된 우선 순위와 UCI 페이로드 크기를 고려해 결정될 수 있다.
제안 3-2: (s)PUCCH/(s)PUSCH 동시 전송이 불가한 경우, 일부 UCI만 피기백하고 나머지 UCI는 드롭(drop)하거나 (TTI 단위로) 지연시킬 수도 있다. (s)PUCCH/(s)PUSCH 동시 전송이 가능하더라도, 일부 UCI만 피기백하고 나머지 UCI는 드롭하거나 (TTI 단위로) 지연시킬 수도 있다.
제안 4: N_C와 N_S의 관계에 의해 UCI 전송 방안이 상이하게 결정될 수 있다.
■Case 1: N_C > N_S
제안 4-1: UCI의 더욱 신속한 전송을 위하여, N_C > N_S인 경우 UCI가 (s)PUSCH로 피기백되도록 규칙이 정의될 수 있다. 이 때, sPUSCH 스케줄링된 셀이 복수인 경우, 그 중 가장 짧은 sPUSCH TTI 길이를 갖는 셀로 피기백될 수 있다. 만약 sPUSCH 스케줄링된 복수의 셀에 대한 sPUSCH TTI 길이가 동일한 경우, 사전에 정의된 규칙에 의해 결정되는 특정 셀(예컨대, 가장 낮은 셀 인덱스를 갖는 셀)로 UCI가 피기백되도록 규칙이 정의될 수 있다. (s)PUCCH/sPUSCH 동시 전송이 가능하더라도 상기 규칙들이 적용될 수도 있다.
제안 4-2: 기본적으로 UCI는 (s)PUCCH로 전송하도록 규칙이 정의될 수 있다. 다만, N_S가 일정 이상인 경우에 한해서 제안 4-1의 규칙에 따라 결정된 셀의 sPUSCH로 전체 UCI가 피기백될 수 있다. 혹은, N_C가 일정 이하인 경우에 한해서 제안 4-1의 규칙에 따라 결정된 셀의 sPUSCH로 일부의 UCI만 피기백될 수 있는데, 이 때 피기백될 UCI는 사전에 정의된 우선 순위에 따라서 우선 순위가 높은 UCI가 피기백되도록 규칙이 정의될 수도 있다. 또한, 피기백되지 않는 나머지 UCI는 (s)PUCCH/sPUSCH 동시 전송이 가능한 경우 (s)PUCCH로 전송되거나 드롭될 수 있고, (s)PUCCH/sPUSCH 동시 전송이 불가능한 경우 드롭될 수 있다.
제안 4-3: 만약 (s)PUCCH/sPUSCH 동시 전송이 불가한 경우에는 데이터를 드롭하거나 sPUSCH 전송을 (TTI 단위로) 지연시키고, UCI만 (s)PUCCH로 전송되도록 규칙이 정의될 수도 있다.
■Case 2: N_C <= N_S
제안 4-4: 기본적으로 UCI는 (s)PUCCH로 전송하도록 규칙이 정의될 수 있다. 다만, N_C가 일정 이하인 경우에 한해서 제안 4-1의 규칙에 따라 결정된 셀의 (s)PUSCH로 전체 UCI가 피기백될 수 있다. 혹은, N_C가 일정 이하인 경우에 한해서 제안 4-1의 규칙에 따라 결정된 셀의 sPUSCH로 일부의 UCI만 피기백될 수 있는데, 이 때 피기백될 UCI는 사전에 정의된 우선 순위에 따라서 우선 순위가 높은 UCI가 sPUCCH로 전송되도록 규칙이 정의될 수도 있다. 또한 피기백되지 않는 나머지 UCI는 sPUCCH/(s)PUSCH 동시 전송이 가능한 경우 sPUCCH로 전송되거나 드롭될 수 있고, sPUCCH/(s)PUSCH 동시 전송이 불가능한 경우 드롭될 수 있다.
제안 4-5: 만약 sPUCCH/(s)PUSCH 동시 전송이 불가한 경우에는 데이터를 드롭하거나 (s)PUSCH 전송을 (TTI 단위로) 지연시키고, UCI만 sPUCCH로 전송되도록 규칙이 정의될 수도 있다. 특징적으로 일부 UCI만 sPUCCH로 전송되고 나머지 UCI는 드롭되도록 규칙이 정의될 수 있다. 또는, 동시 전송 설정 여부와 상관없이 PUSCH는 드롭되고 일부 UCI만 sPUCCH로 전송되도록 규칙이 정의될 수도 있다.
제안 5: (s)PUCCH/(s)PUSCH의 TTI 길이 관계와 무관하게, 만약 (s)PUCCH/(s)PUSCH 동시 전송이 불가한 경우에는 데이터를 드롭하거나 (s)PUSCH 전송을 (TTI 단위로) 지연시킬 수 있다.
제안 6: 상기 제안들에서 피기백 수행은 (s)PUCCH 전송 TTI와 (s)PUSCH 전송 TTI가 중첩되고 (s)PUSCH가 스케줄링된 경우에 한해 가능하도록 규칙이 정의될 수 있다.
제안 7: PUCCH와 PUSCH의 TTI 길이가 다른 경우는 피기백을 허용하지 않을 수 있다.
(s)PUCCH와 (s)PUSCH의 TTI 종료 타이밍에 따른 UCI 전송 방안
제안 1: (s)PUCCH의 TTI 종료 시점이 (s)PUSCH와 동일할 경우, (s)PUCCH로 UCI 전송되도록 규칙이 정의될 수 있다. 만약 (s)PUCCH/(s)PUSCH 동시 전송이 불가한 경우, (s)PUSCH로 UCI를 피기백하도록 규칙이 정의될 수 있다.
제안 2: (s)PUCCH의 TTI 종료 시점이 (s)PUSCH보다 늦을 경우, (s)PUSCH로 UCI를 피기백하도록 규칙이 정의될 수 있다.
제안 3: (s)PUCCH의 TTI 종료 시점이 (s)PUSCH보다 앞설 경우, (s)PUCCH로 UCI 전송되도록 규칙이 정의될 수 있다. (s)PUCCH/(s)PUSCH 동시 전송이 불가한 경우, 데이터를 드롭하거나, 혹은 UCI를 피기백하거나, 혹은 데이터는 그대로 (s)PUSCH로 전송되고 UCI 전송을 지연시키고 (s)PUCCH로 전송되도록 규칙이 정의될 수 있다. 이 때, UCI를 피기백하는 경우, 도 6과 같이 (s)PUSCH의 심볼 중 (s)PUCCH의 TTI 종료 시점 이후의 심볼에는 UCI가 맵핑되지 않도록 규칙이 정의될 수 있다.
제안 4: 상기 제안들에서 피기백 수행은 (s)PUCCH 전송 TTI와 (s)PUSCH 전송 TTI가 중첩되고 (s)PUSCH가 스케줄링된 경우에 한해 가능하도록 규칙이 정의될 수 있다.
드롭 및 우선순위 규칙
복수의 채널 조합(예컨대, (s)PUCCH 및 (s)PUSCH 또는 (s)PUCCH/(s)PUCCH 또는 (s)PUSCH/(s)PUSCH 또는 PUSCH/SRS 또는 PUCCH/SRS 등 그리고/또는 세 개 이상의 조합)이 시간 상에서 중첩되는 경우, 다음의 우선 순위 규칙이 적용될 수도 있다.
제안 1: 레가시(legacy) PUSCH/PUCCH가 각각 sPUSCH/sPUCCH에 비해 높은 우선 순위를 갖도록 규칙이 정의될 수 있다. 일례로, 단말이 가진 멀티-클러스트(multi-cluster) 능력에 비해 더 많은 수의 UL 채널이 동시 전송되어야 하는 경우, 레가시 UL 채널과 sTTI UL 채널 중 sTTI UL 채널이 먼저 드롭될 수 있다. 혹은 반대로, 로우 레이턴시(low latency)가 좀 더 중요한 상황과 같은 경우에는 sPUSCH/sPUCCH가 레가시 PUSCH/PUCCH에 비해 높은 우선 순위를 갖도록 규칙이 정의될 수도 있다.
제안 1-1: TTI 길이가 짧을수록 높은 우선 순위를 갖도록 규칙이 정의될 수도 있다. 혹은, 전력 할당의 복잡함을 회피하고자, TTI 길이가 길수록 높은 우선 순위를 갖도록 규칙이 정의될 수도 있다.
제안 2: 단말의 동시 전송 능력(capability) 등으로 인하여 UCI의 피기백이 일어난 경우, 피기백된 sPUSCH가 UL 데이터만을 포함하는 PUSCH에 비해 높은 우선 순위를 갖도록 규칙이 정의될 수 있다.
상이한 TTI 길이를 갖는 UL 채널들 사이 및/또는 UL 반송파 사이의 상이한 TTI 길이를 위한 전력 제어
(s)PUCCH와 (s)PUSCH의 TTI 길이가 상이한 경우의 전력 제어
제안 1: (s)PUCCH 또는 sTTI UL 반송파(또는 더 높은 우선 순위의 TTI 길이)의 전력 할당이 우선시 되고, 이후에 남는 전력에 대해서 (s)PUSCH의 전력 또는 더 긴 TTI UL 반송파(들)(또는 더 낮은 우선 순위의 TTI 길이(들))를 할당할 수 있다. 좀더 상세하게는, 도 7과 같이 sPUSCH의 TTI가 (s)PUCCH의 TTI에 포함될 경우, 상기 규칙이 적용될 수 있다.
제안 1-1: 또 다른 방식으로 sPUSCH 또는 더 긴 TTI길이의 UL 반송파의 전력을 일정 수준 이상으로 보장하기 위해서 보장된 전력(guaranteed power)을 도입할 수 있다. 좀더 구체적으로 sPUSCH 또는 더 긴 TTI 길이의 UL 반송파에 대해 상위 계층 시그널링을 통해서 최소/최대 전력을 할당해 줄 수 있고, (s)PUCCH 또는 더 짧은 TTI 길이의 UL 반송파(들)에 대한 전력을 할당 시에 해당 sPUSCH 또는 더 긴 TTI 길이의 UL 반송파에 대한 최소/최대 전력을 제외한 나머지에 대하여 할당을 수행할 수 있다. 이후에 sPUSCH 또는 더 긴 TTI 길이의 UL 반송파에 대한 전력 할당을 수행할 수 있으며, 만약에 sPUSCH 또는 더 긴 TTI 길이의 UL 반송파에 대한 전력이 보장된 전력보다 작은 경우에는 해당 전력만큼만 전력 할당할 수 있다. 만약 sPUSCH 또는 더 긴 TTI 길이의 UL 반송파에 대한 전력이 보장된 전력보다 높은 경우에는 sPUCCH 또는 더 짧은 TTI 길이의 반송파(들)을 할당하고 남은 전력에 대해서 그만큼 보장된 전력보다 더 많이 사용할 수도 있다. 추가로, 상기 보장된 전력은 TTI 길이 혹은 TTI 길이 그룹 별로 미리 혹은 상위 계층에서 설정하는 것일 수 있다.
제안 2: sPUSCH의 TTI가 sPUCCH의 TTI를 포함할 경우 또는 sPUSCH의 TTI 일부가 sPUCCH의 TTI와 중첩(overlap)되는 경우 또는 다른 TTI 길이의 UL CC가 서로 부분적으로 또는 완전히 중첩되는 경우
sPUCCH의 TTI가 중첩되기만 하면, 보수적으로 기존의 전력 제어 방법을 재사용한다. 이 경우, sPUCCH가 실제로 전송되지 않는 시간 동안에도 sPUCCH의 전력만큼을 제외한 나머지 전력으로 sPUSCH를 전송하므로 전력-제한(power-limited) 조건이 필요 이하로 제한되게 된다. 동일하게 TTI 길이가 다른 경우에 부분적으로 중첩되는 경우에도, 최대 TTI 길이에 맞추어(중첩되는 채널 간 혹은 1msec 서브프레임 혹은 시스템에서 가능한 최대 TTI 길이) 전력을 설정하고 각 채널의 전력이 중첩 여부에 상관없이 일정하게 유지될 수 있도록 한다. 이러한 방법은 한 채널 혹은 한 TTI를 갖는 UL 반송파에 대해서 일정한 전력을 전송되는 채널 혹은 TTI 개수에 상관없이 유지하여 전력의 제약이 있을 수 있다. 이는 좀 더 효과적이려면 부분적으로 중첩된 경우에도 동일한 전력을 전송해 주면 좋을 수 있다.
따라서, 남는 파워를 전송하는 채널에 모아서 전송할 수도 있다. 일례로, 도 8의 좌측 상단의 도에서 sPUSCH의 전송 전력을 A라고 하고 sPUCCH의 전송 전력을 B라고 할 때, sPUSCH 전송만 있는 경우 단말은 sPUSH에 전송 전력 A+B를 사용하여 전송하고, sPUSCH+sPUCCH 전송시 각각 전송 전력을 A, B로 전송하고, 다시 sPUSCH만 전송시 전송 전력 A+B를 사용하여 전송할 수 있다. 이러한 경우가 아니라면 단말의 전력 전이 구간(power transition period)이 전송 전력을 변동할 때마다 나타날 수 있어, 이러한 것들을 고려하면 여러 CC의 UL이 CA 되어 있더라도 하나의 TTI 길이로 동작하는 것을 고려할 수 있다.
따라서, sPUSCH의 TTI가 sPUCCH의 TTI가 중첩되는 심볼에 해당하는 시간 구간과 중첩되지 않는 심볼에 해당하는 시간 구간의 전력을 별도로 상이하게 설정되도록 규칙이 정의될 수 있다. 혹은, sPUSCH의 전력 제어를 심볼 단위로 상이하게 설정되도록 규칙이 정의될 수 있다.
일례로, sPUSCH의 TTI가 sPUCCH의 TTI가 중첩되는 심볼의 전력 제어는 다음의 수학식을 따르고,
sPUSCH의 TTI가 sPUCCH의 TTI가 중첩되지 않는 심볼의 전력 제어는 다음의 수학식을 따르도록 설정될 수 있다.
상기 방안은 sPUSCH의 TTI가 sPUCCH의 TTI를 포함할 경우 또는 sPUSCH의 TTI 일부가 sPUCCH의 TTI와 중첩되는 경우 뿐 아니라 다른 케이스에도 확장 적용될 수 있다.
이러한 time duration 별 혹은 symbol 별 power control을 적용할지 여부에 대해 상위 계층 또는 물리 계층 신호를 통해 단말에게 설정해 줄 수도 있다.
제안 3: 또 다른 방식으로 위의 제안 1-1과 유사한 형태로 보장된 전력을 고려한 전력 할당 기법을 적용할 수도 있다.
좀 더 구체적으로, 이 경우에 보장된 전력은 sPUCCH와 sPUSCH에 대해서 각각 설정할 수 있다. 좀더 상세하게는, 각 채널에 대해서 각 TTI 길이 혹은 TTI 길이 그룹 별로 보장된 전력을 할당할 수 있다. 좀더 상세하게는, 특정 채널(이하, 제 1 채널)의 전력을 다른 채널(이하, 제 2 채널)에 대한 보장된 전력 값을 제외한 나머지에 대해서 할당한다. 이후에 남는 전력(제 1 채널의 전력 할당에 따라서 최소 보장된 전력부터 {UE의 최대 전송 전력 - 제 1 채널에 할당된 전송 전력}까지 할당 가능)에 대해서 제 2 채널에 대한 전송 전력을 할당한다. 혹은 제 2 채널(제 1 채널에 비교하여 전송 시작 시점이 느린 채널)에 대한 전송 예측(look ahead)이 가능한 경우에는, 제 2 채널에 대한 실제 전송 전력을 계산하고, 제 1 채널에 대한 전송 전력을 제 2 채널의 전력 할당에 따라서 "최소 {UE 최대 전송 전력 - 제 2 채널의 보장된 전력}에서 최대 {UE 최대 전송 전력 - 제 2 채널에 할당된 전송 전력}"까지 할당할 수 있다. 여기서 UE 최대 전송 전력은 특정 셀 c에 대한 최대 허용 전력인 Pcmax,c일 수 있다. 좀 더 구체적으로 제 1 채널과 제 2 채널은 다음의 방식으로 선택될 수 있다.
부-제안 1: 제 1 채널은 sPUCCH에 대응되고 제 2 채널은 sPUSCH에 대응할 수 있다, 혹은 그 반대일 수도 있다.
부-제안 2: 제 1 채널은 sPUCCH와 sPUSCH 중에서 전송 시점이 빠른 채널, 제 2 채널은 전송 시점이 느린 채널일 수 있다.
부-제안 3: 제 1 채널은 TTI 길이가 짧은 채널, 제 2 채널은 TTI 길이가 큰 채널일 수 있고, 혹은 그 반대일 수 있다.
부-제안 4: UCI 타입(type)의 중요도 혹은 우선 순위에 따라서 높은 쪽이 제 1 채널, 나머지가 제 2 채널일 수 있다.
부-제안 5: 제 1 채널과 제 2 채널은 두 채널간 시작 시점 차이에 따라서 상기 방법의 조합으로 구성될 수 있다. 일례로 두 채널간 시작 시점 차이가 미리 혹은 상위 계층에서 설정한 임계값 이하인 경우(즉, 후속 채널의 전송 예측(look ahead)이 가능한 경우)에는 제안 1 혹은 부-제안 1 혹은 부-제안 3 혹은 부-제안 4를 수행하고, 그 외의 경우에는 부-제안 3을 수행할 수 있다. 또 다른 일례로, 두 채널간의 TTI 길이 차이가 미리 혹은 상위 계층에서 설정한 임계값 이하인 경우(즉, 후속 채널의 전송 예측이 가능한 경우)에는 제안 1 혹은 부-제안 1 혹은 부-제안 3 혹은 부-제안 4를 수행하고, 그 외의 경우에는 부-제안 3을 수행할 수 있다.
상기 방식은 전력 할당 방식 외에도 특정 채널에 대한 드롭(drop) 혹은 전송 중단 시에도 활용/적용하는 것일 수 있다.
제안 4: 둘 이상의 복수 개의 UL 채널 조합에 대한 전송 타이밍이 시간 상에서 중첩되는 경우, 특정 UL 채널 조합에 대해 각각 전체 보장된 전력을 설정하는 전력 할당 기법이 적용될 수 있다. 여기서, 하나의 채널 조합은 복수 개의 채널을 포함할 수도 있다. 좀더 상세하게는, 특정 채널 조합(이하, 제 1 채널 조합)의 전력을 다른 채널 조합(이하, 제 2 채널 조합)에 대한 전체 보장된 전력 값을 제외한 나머지에 대해 할당한다. 이후에, 남는 전력(제 1 채널 조합의 전력 할당에 따라서 최소 전체 보장된 전력부터 UE 최대 전송 전력까지 할당 가능)에 대해서 제 2 채널 조합에 대한 전력을 할당할 수 있다.
부-제안 1: 제 1 채널 조합은 sPUCCH 그리고/혹은 PUCCH 에 대응되고 제 2 채널 조합은 sPUSCH 그리고/혹은 PUSCH에 대응할 수 있다.
부-제안 2: 제 1 채널 조합은 sPUCCH 그리고/혹은 sPUSCH 에 대응되고 제 2 채널 조합은 PUCCH 그리고/혹은 PUSCH에 대응할 수 있다.
부-제안 3: 제 1 채널 조합은 전체 채널들 중 TTI 길이가 가장 작은 채널로부터 오름차순으로 일부의 채널들에 대응되고 제 2 채널 조합은 나머지 채널들에 대응할 수 있다.
상기 복수의 채널 전송은 동일 셀에서 전송되는 것일 수도 있고 복수의 셀에서 개별적으로 전송되는 것일 수도 있다. 또한, 본 실시예에서는 PUCCH와 PUSCH 동시 전송을 설명하였으나, 그 외의 조합(예컨대, PUCCH/PUCCH 또는 PUSCH/PUSCH 또는 PUSCH/SRS 또는 PUCCH/SRS 등 그리고/또는 세 개 이상의 조합)에서도 적용 가능할 수 있다. 또한, 상기 복수의 채널 전송은 서브캐리어 간격(subcarrier spacing)이 상이한 경우에 대해서도 적용 가능할 수 있다.
복수의 채널 조합에 대한 전송 타이밍 중첩 시 전력 제어
복수의 채널 조합에 대한 전송 타이밍(예컨대, (s)PUCCH & (s)PUSCH 또는 (s)PUCCH/(s)PUCCH 또는 (s)PUSCH/(s)PUSCH 또는 PUSCH/SRS 또는 PUCCH/SRS 등 그리고/또는 세 개 이상의 조합) 시간 상에서 중첩되는 경우, 다음의 UL 전력 제어를 제안한다.
제안 1: 중첩되는 UL 채널 중 긴 TTI 길이를 갖는 혹은 특정 TTI 길이의 UL 채널(예컨대, 레가시 UL 채널)의 전송 전력은 TTI 내에서 일정하게 유지된다.
제안 2: 중첩되는 UL 채널 중 긴 TTI 길이를 갖는 혹은 특정 TTI 길이의 UL 채널(예컨대, 레가시 UL 채널)의 전송 전력은 (사전에 정의/약속된 혹은 시그널링된) 시간 구간 단위로 변하도록 규칙이 정의될 수 있다. 좀더 상세하게는, 전송 전력이 시간 구간 단위로 변하는 UL 채널은 레가시 TTI 길이를 가진 UL 채널 또는 중첩되는 UL 채널 중 긴 TTI 길이를 갖는 UL 채널로 한정될 수도 있다. 상기의 전송 전력이 변하지 않고 유지되는 시간 구간은 해당 UL 채널의 TTI 길이보다는 짧을 수도 있다. 또는, 상기의 전송 전력이 변하지 않고 유지되는 시간 구간은 네트워크에 의해 설정되거나 단말의 능력(capability)에 의해 결정될 수 있고, 단말은 상기의 전송 전력이 변하지 않고 유지되는 시간 구간에 대한 정보(예컨대, 최소 시간 구간) 관련 단말 능력을 네트워크에 보고할 수 있다.
제안 3: 단말이 복수의 UL 채널을 전송하고 이 UL 채널들의 전송 타이밍이 중첩되는 상황에서 UL 채널의 전송 시작 시점이 상대적으로 빠른 채널을 제 1 채널이라 하고 느린 채널을 제 2 채널이라고 하자. 중첩되는 UL 채널들에 각각의 전송 전력을 설정하는 경우, 제 2 채널이 시작될 때, 단말의 총 전송 전력이 크게 변동할 수 있다. LTE 표준에서는 단말의 전송 전력을 변경할 수 있는 특정 시간 구간을 과도 구간(transient period)이라 정의하고 이 시간 구간 동안은 단말의 전송 전력 요구 사항(requirement)을 적용하지 않는다. 해당 과도 구간이 제 1 채널의 DM-RS 전송 구간과 중첩되는 경우, 제 2 채널을 드롭하거나 혹은 제 2 채널의 전송 시작 타이밍이 (사전에 정의/약속된 시간만큼 또는 시그널링된 시간만큼) 지연되도록 규칙이 정의될 수 있다. 또는 사전에 정의/약속된 우선 순위에 의해, 제 1 채널의 전송을 중지하고 제 2 채널을 전송하도록 규칙이 정의될 수도 있다.
PHR(power head room) 보고
LTE 시스템에서 일반적으로 단말을 설정된 셀 각각에 대한 PHR을 계산하여 주기적으로, 혹은 특정 이벤트를 충족한 경우에 기지국에게 MAC(medium access control) 시그널링 혹은 RRC 시그널링을 통해서 보고하게 된다. 이 때, 임의의 서브프레임에서 전송되는 임의의 셀에 대한 PHR 값은 기본적으로 해당 서브프레임에서 계산되는 해당 셀 c에 대한 최대 허용 전력인 Pcmax,c 와 단말이 해당 서브프레임에서 해당 셀을 통해 전송하는 신호의 전송 전력의 차이 값이 된다. 혹은, 임의의 서브프레임에서 전송되는 임의의 셀에 대한 PHR 값은 해당 서브프레임에서 해당 셀을 통해서 신호를 전송하지 않을 경우에는 가상적으로 계산되는 전송 전력과의 차이 값이 된다. 이 때, 임의의 서브프레임에서의 Pcmax,c 값은 해당 서브프레임에서 해당 셀, 혹은 다른 셀들에서의 전송을 모두 고려하여 단말이 전송 스펙트럼에 대한 제한 요구를 만족시키는 조건에서 해당 셀에서 전송할 수 있는 최대 전력을 파라미터로 계산된다.
특정 UL 채널에 대해, 하나의 TTI 내에서 전력이 변할 수 있도록 규칙이 정의된 경우, 단말은 전력이 변하는 시간 구간 단위로 별도의 PHR을 계산/보고하도록 규칙이 정의될 수 있다.
혹은 PHR 전송을 위한 기준(reference) TTI 길이가 별도로 구성되는 것을 고려할 수 있다. 이 경우, 하나의 PHR이 전송될 수 있으며 여러 UL CC가 있는 경우에도 기준 TTI 길이는 하나로 설정될 수 있음을 가정할 수 있다.
상이한 서브캐리어 간격의 복수의 채널의 전송 타이밍이 중첩되는 경우의 UL 전력 제어
서로 상이한 서브캐리어 간격을 갖는 복수의 채널들에 대한 전송 타이밍이 시간 상에서 중첩되는 경우, 다음의 UL 전력 제어를 제안한다.
제안 1: 중첩되는 UL 채널 중 작은 서브캐리어 간격을 갖는 혹은 특정 서브캐리어 간격(예컨대, 디폴트(default)로 사전에 정의/설정된 서브캐리어 간격, 15kHz가 사용되거나 또 다른 값일 수도 있음)을 갖는 UL 채널의 전력은 TTI 내에서 일정하게 유지된다.
제안 2: 중첩되는 UL 채널 중 작은 서브캐리어 간격을 갖는 혹은 특정 서브캐리어 간격을 갖는 UL 채널의 전송 전력(사전에 정의/약속된 혹은 시그널링된)이 시간 구간 단위로 변하도록 규칙이 정의될 수 있다. 좀더 상세하게는, 전력이 시간 구간 단위로 변하는 UL 채널은 작은 채널 간격을 갖는 혹은 특정 서브캐리어 간격(예컨대, 디폴트로 사전에 정의/설정된 서브캐리어 간격, 15kHz가 사용되거나 또 다른 값일 수도 있음)을 갖는 UL 채널로 한정될 수도 있다. 상기의 전송 전력이 변하지 않고 유지되는 시간 구간은 네트워크에 의해 설정되거나 단말의 능력에 의해 결정될 수 있고, 단말은 상기의 전송 전력이 변하지 않고 유지되는 시간 구간에 대한 정보(예컨대, 최소 시간 구간) 관련 능력을 네트워크에 보고할 수도 있다. 또는, 타 채널과 중첩되는 시간 구간과 그렇지 않은 시간 구간으로 나뉘어 각 시간 구간 동안 UL 채널의 전력이 일정하게 유지되도록 규칙이 정해질 수도 있다.
전송 전력을 결정할 때, 할당 받은 RB 수에 따라 전력을 증가시키기 보다는 (할당 받은 RB 내의 서브캐리어 간격 * 서브캐리어 수)에 따라 증가시키도록 지정할 수 있다. 이러한 구성을 위하여 파라미터는 서브캐리어 당 전송 전력으로 설정되거나 기준 뉴멀로지(reference numerology)에 의거해 설정될 수 있다. 여기서, 뉴멀로지라 함은, 해당 무선 통신 시스템에 적용될 TTI의 길이, 서브캐리어 간격 등의 정함을 의미한다.
서브캐리어 간격이 달라짐에 따라 서브프레임 길이가 달라질 수 있다. 더불어, 하향링크 서브캐리어 간격 및 상향링크 서브캐리어 간격이 다를 수 있다. 각 타이밍이 DL/UL 서브캐리어 간격 및 TTI에 의거해서 결정되므로, 각 전송 전력을 할당하기 까지 (PUCCH 또는 PUSCH 전송 시) 걸리는 시간이 다를 수 있고, 더 긴 TTI 길이 채널의 전송 중에 짧은 TTI 길이 채널의 전송이 시작될 수 있다. 이러한 경우, 더 긴 TTI 길이 채널의 전송 전력 결정시 더 짧은 TTI 길이 채널의 전송 전력을 고려하기 어려울 수 있으므로, 더 짧은 TTI 길이 채널이 전송 전력을 차지해야 하는 경우, 일시적으로 더 긴 TTI 길이의 심볼을 펑쳐링(puncture)하거나 전송 전력을 낮출 수 있거나, 더 짧은 TTI를 위한 보장된 전력을 예비(reserve)해두고 사용하지 못하도록 할 수 있다.
또한, 짧은 TTI의 UL 전송의 경우(예컨대, 1 내지 2 OFDM 심볼 전송), 전력 과도 구간이 현재 PUSCH 또는 PUCCH처럼 가정되면 이에 따른 영향(impact)이 커지므로, 과도 구간은 SRS의 전송처럼 전송 심볼 밖에 존재하는 것으로 가정할 수 있다. 이러한 과도 구간이 기존 더 긴 TTI 전송에 영향을 줄 수 있으므로, 적어도 이러한 영향이 DM-RS, SRS 등 신뢰도(reliability)가 중요한 채널과 충돌될 경우, 단말은 전체 전송을 드롭할 수 있다. 또는 전송 전력을 유지해서 전송함으로써 이러한 과도 구간을 방지할 수 있다. 이는 한 채널에 전송되는 전력이 중간에 줄어드는 것을 의미할 수 있으나 전체 전력은 유지됨을 가정한다. 예를 들어, 긴 TTI의 PUSCH의 전송시, 짧은 TTI의 PUCCH/PUSCH의 전송을 고려하여 네트워크가 큰 전송 전력을 설정하여 구성할 수있으며, 이러한 전송 전력은 두 채널이 전송되는 전체 시간동안 유지될 수 있다. 만약 더 긴 TTI 길이의 UL 전송이 하나 이상의 짧은 TTI 길이의 UL 전송과 겹치는 경우 최대 전력에 맞추어 설정하고 단말은 이러한 전력을 전송되는 채널 수에 상관없이 유지할 수 있다. 이는 단말이 하나의 증폭기를 공유하는 경우일 수 있으며, 그러하지 않은 경우 이러한 제약을 받지 않을 수 있다.
이러한 제약은 큰 서브캐리어 간격 등을 사용해서 과도 구간이 상대적으로 오버헤드가 큰 경우에는 더욱 더 유용할 수 있으며, 만약 전송 전력이 다른 채널들이 연속적으로 전송되는 경우라고 하면 전송되는 채널들 중 가장 큰 전력을 유지하며 전송하는 것으로 적용할 수 있다. 즉, 연속적인 전송 채널 간 (중첩 또는 중첩되지 않는 경우) 전송 전력 변화를 감소하기 위하여, 일례로 한 서브프레임에 전송되는 상향링크 전력이 일정하게 유지될 수 있다. 이는 단말이 연속 채널을 전송시, 전송 전력 증가나 감소가 없도록 규칙을 구성하는 것일 수 있다. 경우에 따라 단말의 전송 전력은 설정받은 전송 전력보다 크거나 작을 수 있다. 이러한 과도 구간은 GP(guard period) 또는 서브프레임 경계 등에서 가정될 수 있다. 또는 서브캐리어 간격이 넓은 경우, 서브프레임의 첫 하나 또는 더 많은 및/또는 적어도 하나 또는 몇몇 OFDM 심볼이 전력 과도 구간으로 (연속적인 UL 전송을 제외하고) 필요에 따라 사용된다고 가정할 수 있다. 이러한 경우, 몇개의 심볼이 펑쳐링될 수 있다. 이를 위하여, DL에서 UL로 스위칭 시에도 GP 를 고려할 수 있다.
단말은 서브캐리어 간격 별로 (혹은 뉴멀로지 별로) 별도의 PHR을 계산/보고하도록 규칙이 정의될 수 있다. 혹은 PHR전송을 위한 기준 서브캐리어 간격이 별도로 구성되는 것을 고려할 수 있다. 이 경우, 하나의 PHR이 전송될 수 있으며 여러 UL CC가 있는 경우에도 기준 서브캐리어 간격은 하나로 설정될 수 있음을 가정할 수 있다.
상이한 뉴멀로지를 갖는 복수의 채널의 전송 타이밍이 중첩되는 경우의 UL 전력 제어 처리 1
서로 상이한 뉴멀로지(예컨대, TTI 길이, 서브캐리어 간격 등)를 갖는 복수의 UL 채널들에 대한 전송 타이밍이 시간 상에서 중첩되는 경우, 예를 들어 더 긴 TTI 길이와 더 짧은 TTI 길이를 갖는 UL 채널의 전송 타이밍이 중첩되는 경우를 가정해 보자. 각 채널의 전송 타이밍은 DL/UL 서브캐리어 간격 및 TTI에 의거해서 결정되므로, 각 전력을 할당하기까지 (PUCCH 또는 PUSCH 전송 시) 걸리는 시간이 다를 수 있고, 더 긴 길이의 TTI의 전송 중에 짧은 TTI의 전송이 시작될 수 있다. 이러한 경우, 더 긴 TTI의 전송 전력 결정시 더 짧은 TTI의 전력을 고려하기 어려울 수 있으므로, (1) 더 긴 TTI의 전송을 멈추거나 또는 (2) 더 짧은 TTI와 중첩되는 심볼들을 펑쳐링/전력 감소시킬 수도 있다. 하지만 전자의 경우에는 더 긴 TTI UL 채널을 항상 드롭해야 하기 때문에 더 긴 TTI UL의 레이턴시가 악화될 수 있고, 반면 후자의 경우에는 더 짧은 TTI와 중첩되는 심볼 수가 늘어날수록 펑쳐링/전력 감소된 더 긴 TTI UL 채널의 신뢰도가 나빠질 수 있다.
따라서, 서로 상이한 뉴멀로지(예컨대, TTI 길이, 서브캐리어 간격 등)를 갖는 복수의 UL 채널들에 대한 전송 타이밍이 시간 상에서 중첩되는 경우, 중첩되는 시간 구간이 일정 이상인 경우에 한해서만 특정 뉴멀로지를 갖는 UL 채널(예컨대, 더 긴 TTI UL 채널) 전송을 멈추거나 드롭하도록 규칙이 정의될 수 있다. 또는, 서로 상이한 뉴멀로지(예컨대, TTI 길이, 서브캐리어 간격)를 갖는 복수의 UL 채널들에 대한 전송 타이밍이 시간 상에서 중첩되는 경우, 중첩되는 시간 구간이 일정 이하인 경우에 한해서만 특정 뉴멀로지를 갖는 UL 채널(예컨대, 더 긴 TTI UL 채널) 전송의 중첩된 심볼에 대해서 펑쳐링 혹은 전력 감소가 적용되도록 규칙이 정의될 수 있다. 또 다른 방안으로, 서로 상이한 뉴멀로지(예컨대, TTI 길이, 서브캐리어 간격)를 갖는 복수의 UL 채널들에 대한 전송 타이밍이 시간 상에서 중첩되는 경우, 특정 뉴멀로지를 갖는 UL 채널(예컨대, 더 긴 TTI UL 채널) 전송을 중단하거나 드롭할 것인지 혹은 펑쳐링/전력 감소시킬 것인지가 반-정적으로 또는 동적으로 단말에게 지시될 수 있다. 본 제안에서는 복수의 UL 채널 전송 타이밍이 중첩되는 경우에 대해서 설명했지만, 복수의 DL 채널 전송 타이밍이 중첩되거나 혹은 DL과 UL 채널의 전송 타이밍이 중첩되는 경우에도 상기 규칙(들)이 동일/유사하게 적용될 수 있다.
상이한 뉴멀로지를 갖는 복수의 채널의 전송 타이밍이 중첩되는 경우의 UL 전력 제어 처리 2
서로 상이한 뉴멀로지(예컨대, TTI 길이, 서브캐리어 간격)를 갖는 복수의 UL 채널들에 대한 전송 타이밍이 시간 상에서 중첩되는 경우, 특정 뉴멀로지를 갖는 UL 채널(예컨대, 더 긴 TTI UL 채널)의 전송 중 일부만을 드롭하도록 규칙이 정의될 수 있다. 이는, 특정 뉴멀로지를 갖는 UL 채널(예컨대, 더 긴 TTI UL 채널)을 사전에 정의된 특정 단위(예컨대, 슬롯)로 나누고 타 채널과 중첩된 단위 부분은 드롭하고 나머지 단위만을 전송하는 동작을 포함할 수 있다. 혹은, 드롭될 부분과 전송될 부분에 대한 정보가 상위/물리 계층 신호를 통해 단말에게 지시될 수도 있다.
특징적인 일례로, 레가시 TTI 길이를 가지는 PUSCH와 sTTI 길이를 가지는 sPUSCH의 전송 타이밍이 첫번째 슬롯에서 중첩된 경우, PUSCH의 첫 번째 슬롯에 해당하는 부분에 대해서만 드롭되고 두 번째 슬롯은 전송되도록 규칙이 정의될 수 있다. 전체 PUSCH를 드롭하는 동작에 비하여 상기와 같이 일부의 PUSCH라도 전송되는 경우 재전송에 활용함으로써 신뢰도를 향상시키고 및 재전송 확률을 줄일 수 있다는 점에서 레이턴시 측면에서도 이롭다고 볼 수 있다.
혹은 서로 상이한 뉴멀로지(예컨대, TTI 길이, 서브캐리어 간격 등)를 갖는 복수의 UL 채널들에 대한 전송 타이밍이 시간 상에서 중첩되는 경우, 특정 뉴멀로지를 갖는 UL 채널(예컨대, 더 긴 TTI UL 채널)의 전송 전체를 드롭/중단할지 혹은 일부만 드롭/중단할지를 단말에게 설정해 줄 수도 있다.
상이한 뉴멀로지를 갖는 복수의 채널의 전송 타이밍이 중첩되는 경우의 UCI-TTI 맵핑
서로 상이한 뉴멀로지(예컨대, TTI 길이, 서브캐리어 간격)를 갖는 복수의 UL 채널들에 대한 전송 타이밍이 시간 상에서 중첩되는 경우, 특정 뉴멀로지를 갖는 UL 채널(예컨대, 더 긴 TTI UL 채널)로 UCI가 피기백되도록 규칙이 정의되었다면, 이 때 UCI가 원래 전송될 UL 채널의 타이밍에 해당하는 TTI 동안 또는 해당 TTI부터 해당 TTI 이후의 TTI에만 맵핑되도록 규칙이 정의될 수 있다.
또는, 특정 뉴멀로지를 갖는 UL 채널(예컨대, 더 긴 TTI UL 채널)로 UCI가 맵핑될 때, 해당 UL 채널을 사전에 정의된 특정 시간 단위(예컨대, 슬롯)로 나누고, 중첩된 시간 단위에 대해서만 UCI가 맵핑되도록 규칙이 정의될 수 있다.
상이한 TTI 길이, 뉴멀로지, 프로세싱 시간들을 위한 UCI 전송
UCI의 스택킹(stacking) 순서
상이한 뉴멀로지 및/또는 TTI 길이 그리고/혹은 프로세싱 시간을 갖는 DL 데이터 채널에 대한 HARQ-ACK의 전송 타이밍이 시간 상에서 중첩되고, 해당 HARQ-ACK을 하나의 UL 채널로 전송하고자 하는 경우, UCI의 신뢰도를 보장하기 위해 HARQ-ACK의 스택킹 순서를 정의할 필요가 있다. 다음은 상기와 같은 상황에서 HARQ-ACK 스택킹 순서에 대한 제안의 보다 구체적인 예이다.
제1 제안: 특정 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간을 갖는 DL 할당 채널 혹은 DL 데이터 채널에 대한 UCI가 우선적으로 스택킹되도록 규칙이 정의될 수 있다.
제2 제안: 특정 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간을 갖는 UL 채널로 HARQ-ACK의 전송 타이밍이 중첩되지 않았을 경우에 전송되었어야 할 UCI가 우선적으로 스택킹되도록 규칙이 정의될 수 있다.
제3 제안: DL 데이터의 전송 타이밍에 의해 스택킹 우선 순위가 결정될 수 있다. 보다 구체적으로는, DL 데이터 전송의 시작 및/또는 종료 시점이 앞서는 것에 대한 UCI가 우선적으로 스택킹되도록 규칙이 정의될 수 있다.
제4 제안: DL 데이터를 스케줄링하는 DL 할당 채널(예컨대, (s)PDCCH)의 시작 및/또는 종료 시점이 앞서는 것에 대한 UCI가 우선적으로 스택킹되도록 규칙이 정의될 수 있다.
제5 제안: DL 데이터와 관련된 HARQ 프로세스 ID의 오름차순(혹은 내림차순)으로 UCI 스택킹 순서가 정의될 수 있다.
제6 제안: DL 데이터와 관련된 DAI(DL assignment index)의 오름차순(혹은 내림차순)으로 UCI 스택킹 순서가 정의될 수 있다.
상기 제안들 중 일부(혹은 전체의) 조합에 의해 UCI의 스택킹 순서가 결정될 수 있다.
상이한 TTI 길이/뉴멀로지/프로세싱 시간을 위한 UCI 맵핑
상이한 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간을 갖는 DL 데이터 채널에 대한 HARQ-ACK의 전송 타이밍이 시간 상에서 중첩되고, 해당 HARQ-ACK을 (s)PUSCH로 피기백하고자 하는 경우, 상이한 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간 별로 HARQ-ACK 비트를 다른 위치의 RE 자원에 맵핑되도록 규칙이 정의될 수 있다. 구체적인 일례로, 상이한 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간 별로 상이한 PRB에 UCI가 피기백되도록 규칙이 정의될 수도 있다. 혹은, 상이한 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간 별로 사전에 정의되었거나 상위/물리 계층 신호로 시그널링된 특정 심볼에 UCI가 피기백되도록 규칙이 정의될 수도 있다.
UCI 전송의 조건
상이한 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간을 갖는 복수의 UL 채널 전송 타이밍이 시간 상에서 중첩되는 경우, 특정 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간을 갖는 채널(제 1 채널)의 전체 혹은 일부가 드롭/중단되고 나머지 채널(제 2 채널)만이 전송될 수 있다. 일례로, 상기 경우는 제 1 채널이 1ms TTI PUSCH, 제 2 채널이 보다 짧은 TTI 길이를 갖는 sPUSCH인 경우를 포함할 수 있다. 이 경우, 다음의 사항을 고려하여 UCI 전송 동작이 상이하게 정의될 수 있다.
제1 제안: 제 2 채널의 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간에 따라, 제 1 채널의 UCI가 제 2 채널에 함께 포함되어 전송될지 여부가 결정될 수 있다. 혹은 제 2 채널의 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간에 따라, 제 2 채널에 함께 포함되어 전송될 UCI 타입이 결정될 수 있다. 일례로, 제 1 채널의 TTI 길이는 1ms TTI이고 제 2 채널의 TTI 길이가 2-심볼인 경우에는 CSI가 전송되지 않고 드롭되고, 4/7-심볼인 경우에는 CSI가 제 2 채널에 함께 포함되어 전송될 수 있다.
제2 제안: 제 1 채널의 UCI 페이로드 크기를 고려하여 제 1 채널의 UCI가 제 2 채널에 함께 포함되어 전송될지 여부가 결정될 수 있다. 혹은, 제 2 채널이 (s)PUSCH일 경우, 주파수 자원 할당에 의해 제 1 채널의 UCI가 제 2 채널에 함께 포함되어 전송될지 여부가 결정될 수 있다.
제3 제안: 제 1 채널의 UCI 타입 별로 제 2 채널에 함께 포함되어 전송될지 여부가 결정될 수 있다. 일례로, 제 1 채널의 UCI가 HARQ-ACK인 경우에는 제 2 채널에 함께 포함되어 전송되고, CSI인 경우에는 전송되지 않고 드롭될 수 있다.
제4 제안: 단말의 전력 할당 상황에 따라 제 1 채널의 UCI가 제 2 채널에 함께 포함되어 전송될지 여부가 결정될 수 있다. 혹은 단말의 전력 할당 상황에 따라 제 2 채널에 함께 전송되는 것이 허용되는 제 1 채널의 UCI 타입이 상이하게 결정될 수도 있다. 일례로, 전력-제한 케이스에는 제 1 채널의 UCI가 드롭될 수 있고, 전력-제한 케이스가 아닌 경우에는 제 1 채널의 전체 혹은 일부의 UCI가 제 2 채널에 함께 포함되어 전송될 수 있다.
상기 제안들 중 일부 (혹은 전체의) 조합에 의해 제 1 채널의 UCI가 제 2 채널에 피기백되어 전송될 경우의 단말 동작이 정의될 수 있다.
상이한 TTI 길이/뉴멀로지/프로세싱 시간을 갖는 중첩된 복수의 UL 채널에 대한 UCI의 처리
서로 다른 TTI 길이 그리고/혹은 프로세싱 시간 그리고/혹은 뉴멀로지를 갖는 복수의 UL 채널 전송 타이밍이 중첩되는 경우, 특정 UL 채널의 특정 타입의 UCI에 대해서는 피기백되는 채널을 펑쳐링하여 맵핑되도록 규칙이 정의될 수 있다. 일례로 1ms TTI의 PUSCH 혹은 PUCCH와 그보다 짧은 TTI의 PUSCH의 전송 타이밍이 중첩된 상황에서, 1ms TTI의 채널 PUSCH 혹은 PUCCH의 UCI가 sPUSCH로 피기백되어 전송되는 경우, 해당 UCI가 RI(그리고/혹은 CQI/PMI 그리고/혹은 CRI)이면 원래 sPUSCH에서 전송될 RE를 펑처링하여 전송될 수 있다. 이는 sPUSCH의 UL 승인-대-UL 데이터 타이밍이 1ms TTI 채널의 UCI를 계산하고 레이트 매칭(rate matching)하여 맵핑하기에 부족할 경우 유용할 수 있다.
서로 다른 TTI 길이의 중첩된 복수의 UL 채널에 대한 UCI 전송 방안
sTTI PUSCH와 이보다 긴 TTI 길이를 갖는 PUSCH 혹은 PUCCH(예컨대, 1ms TTI PUSCH/PUCCH)의 전송 타이밍이 중첩되는 경우, UCI 전송 방안이 정의될 필요가 있다. 다음은 상기 경우에서 UCI 전송 방안에 대한 실시 예이다.
제 1 제안: sPUSCH로 모든 혹은 일부 UCI를 전송한다. 이 때, sPUSCH를 통해 전송될 UCI는 (적어도 동일 UCI 타입에 대해서는) 조인트 인코딩이 적용되도록 규칙이 정의될 수 있다. 이는 일반적으로 코딩 이득(coding gain)에 의해 UCI 개별 코딩에 비해 높은 성능을 기대할 수 있는 장점이 있다.
제 2 제안: sPUSCH로 모든 혹은 일부 UCI를 전송하되, TTI 길이 또는 TTI 길이 그룹 별로 개별적인 코딩이 적용된다. 이 경우, UCI의 sPUSCH RE 맵핑은 TTI 길이가 짧은 (유사하게 뉴멀로지가 큰 혹은 프로세싱 시간이 짧은) 채널의 UCI부터 앞선 RE 인덱스에 배치되도록 규칙이 정의될 수 있다. 또 다른 방안으로, 만약 동적인 코드북 크기가 지원되는 경우에는 항상 UCI가 맵핑될 최대 RE 수를 계산하여 이 부분의 sPUSCH 데이터는 펑쳐링 혹은 레이트 매칭되도록 규칙이 정의될 수도 있다.
제 3 제안: sPUSCH로 모든 혹은 일부 UCI를 전송하되, TTI 길이가 긴 (유사하게 뉴멀로지가 큰 혹은 프로세싱 시간이 짧은) 채널의 UCI(예컨대, HARQ-ACK)는 (공간) 번들링되도록 규칙이 정의될 수 있다. 특징적으로, 상기 번딜링 동작은 TTI 길이가 긴 (유사하게 뉴멀로지가 큰 혹은 프로세싱 시간이 짧은) 채널의 UCI 페이로드 크기 그리고/혹은 sPUSCH에 할당된 PRB 수 그리고/혹은 sPUSCH의 MCS 그리고/혹은 TTI 길이/뉴멀로지/프로세싱 시간 차이 그리고/혹은 sPUSCH의 TTI 길이/뉴멀로지/프로세싱 시간 등에 의해 번들링 여부가 결정될 수 있다.
상향링크 제어 채널 및 상향링크 데이터 채널의 동시 전송의 경우 UCI 전송
복수의 UL 채널에 대한 동시 전송(예컨대, PUCCH/PUSCH 동시 전송 그리고/혹은 sPUCCH/sPUSCH 그리고/혹은 서로 다른 TTI 길이/뉴멀로지/프로세싱 시간에 대한 복수의 UL 채널에 대한 동시 전송)이 설정된 단말의 경우, HARQ-ACK 및 CSI 동시 전송에 대한 상위 계층에서의 설정 유무와 관계없이 혹은 HARQ-ACK 및 CSI 동시 전송이 설정된 경우에만 UCI는 원래 UCI가 포함된 채널로 전송되도록 규칙이 정의될 수 있다.
또는 상기 단말의 경우, HARQ-ACK 및 주기적 CSI 동시 전송에 대한 상위 계층에서의 설정 유무와 관계없이, TTI 길이가 보다 짧은 (뉴멀로지가 보다 크거나, 프로세싱 시간이 보다 짧거나) 채널의 UCI만 전송되도록 규칙이 정의될 수 있다. 또는 상기 단말의 경우, 항상 UCI 타입에 따라 UCI가 전송될 채널이 결정될 수도 있다. 일례로, HARQ-ACK은 보다 TTI 길이가 짧은 (유사하게 뉴멀로지가 큰 혹은 프로세싱 시간이 짧은) 채널로, CSI는 보다 TTI 길이가 긴 (유사하게 뉴멀로지가 작은 혹은 프로세싱 시간이 긴) 채널로 전송되도록 규칙이 정의될 수도 있다.
또 다른 방안으로, 서로 다른 TTI 길이/뉴멀로지/프로세싱 시간을 갖는 데이터 채널과 제어 채널의 전송 타이밍이 중첩되는 경우, 항상 데이터 채널의 UCI만 전송되고 제어 채널의 UCI는 드롭되도록 규칙이 정의될 수도 있다. 이는 동시 전송 설정 여부와 관계없이 항상 적용되는 것일 수도 있다.
상이한 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간을 갖는 중첩된 복수의 UL 채널의 UCI 전송
상이한 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간을 갖는 복수의 UL 채널 전송 타이밍이 시간 상에서 중첩되는 경우, 특정 뉴멀로지 그리고/혹은 TTI 길이 그리고/혹은 프로세싱 시간을 갖는 채널(제 1 채널)의 전체 혹은 일부가 드롭/중단되고, 나머지 채널(제 2 채널)만이 전송될 수 있다. 보다 특징적으로, 보다 긴 TTI 길이를 갖는 제 1 채널과, 제 1 채널에 비해 짧은 TTI 길이를 갖는 복수의 제 2 채널(그룹)의 전송 타이밍이 중첩되는 경우, 제 1 채널의 UCI를 모든 혹은 일부의 제 2 채널로 전송하는 방안을 제안한다. 일례로, 상기 경우는 하나의 1ms TTI PUSCH (혹은 PUCCH)와 여러 개의 2-심볼 TTI sPUSCH(혹은 sPUCCH 혹은 sPUSCH와 sPUCCH의 조합)가 특정 서브프레임에서 전송 타이밍이 중첩된 경우를 포함할 수 있다.
제 1 제안: 제 1 채널의 UCI 타입에 따라 복수의 제 2 채널 중 피기백될 채널이 결정되도록 규칙이 정의될 수 있다. 특징적으로, 제 1 채널의 UCI 타입의 우선 순위가 높은 순서대로 복수의 제 2 채널 중 피기백될 채널의 우선 순위가 높은 제 2 채널에 피기백되도록 규칙이 정의될 수 있다. 일례로, 제 1 채널의 보다 높은 우선 순위를 갖는 UCI(예컨대, HARQ-ACK)는 제 2 채널 중 우선순위가 높은 채널로 피기백될 수 있다. 이 때, 제 2 채널의 우선순위는 "sPUSCH with self-contained DM-RS" > sPUCCH > "sPUSCH without self-contained DM-RS", 혹은 "sPUSCH with self-contained DM-RS" > "sPUSCH without self-contained DM-RS" > sPUCCH순으로 정의될 수 있다.
보다 일반적으로는, 제 1 채널의 UCI가 복수의 제 2 채널 중 피기백될 채널의 우선 순위가 높은 제 2 채널에 우선적으로 피기백되도록 규칙이 정의될 수 있다. 이 때, 제 1 채널의 UCI는 드롭없이 모두 제 2 채널에 피기백되거나 혹은 제 1 채널의 UCI 중 우선 순위가 높은 일부만 복수의 제 2 채널에 피기백되도록 규칙이 정의될 수도 있다. 또한, 제 1 채널의 UCI 중 전체 혹은 일부는 복수의 제 2 채널 중 우선 순위가 높은 일부의 채널에만 피기백되도록 규칙이 정의될 수도 있다. 제 1 채널의 UCI 타입에 따른 우선 순위는 HARQ-ACK > RI > CQI/PMI로 정의될 수 있다.
제 2 제안: 또 다른 방안으로는, 제 1 채널의 UCI 타입의 우선 순위가 높은 순서대로 복수의 제 2 채널 중 피기백 될 채널의 전송 시간 순서대로 피기백되도록 규칙이 정의될 수도 있다. 일례로, 제 1 채널의 HARQ-ACK은 복수의 제 2 채널 중 가장 먼저 중첩되는 채널에 우선적으로 피기백되고 제 1 채널의 RI 그리고/혹은 CQI/PMI는 이후 중첩되는 채널에 순차적으로 피기백되도록 규칙이 정의될 수도 있다.
제 3 제안: 제 1 채널과 중첩된 복수의 제 2 채널들의 TTI 길이에 따라 피기백될 제 1 채널의 UCI 타입이 결정되도록 규칙이 정의될 수 있다. 일례로 제 1 채널과 중첩된 복수의 제 2 채널들이 상이한 TTI 길이를 갖는 경우, 제 2 채널 중 보다 긴 TTI 길이를 갖는 sTTI UL 채널에는 제 1 채널의 RI 그리고/혹은 CQI/PMI가 피기백될 수 있고, 보다 짧은 TTI 길이를 갖는 sTTI UL 채널에는 제 1 채널의 HARQ-ACK이 피기백될 수 있다.
제 4 제안: 제 1 채널의 UCI 타입에 따라 복수의 제 2 채널에 제 1 채널의 UCI가 반복적으로 피기백될지 여부가 사전에 약속/정의되거나 혹은 상위 계층 신호를 통해 설정될 수 있다. 일례로, 제 1 채널의 HARQ-ACK에 대해서는 복수의 제 2 채널과 중첩되는 경우, 모든 (혹은 일부의) 제 2 채널에 제 1 채널의 HARQ-ACK이 피기백되어 반복 전송될 수 있다. 특징적으로, 복수의 제 2 채널 중 DM-RS가 self-contained인 sTTI 채널에 대해서만 제 1 채널의 UCI를 피기백하는 동작이 적용되도록 규칙이 정의될 수도 있다. 혹은, 반대로 복수의 제 2 채널 중 DM-RS가 해당 sTTI 내 존재하지 않는 sTTI 채널에 한해서만 제 1 채널의 UCI를 피기백하는 동작이 적용되도록 규칙이 정의될 수도 있다. 이는, DM-RS가 self-contained인 sTTI의 경우 채널 추정의 정확도가 높아져 좀 더 신뢰성 높은 UCI 전송이 가능하지만 해당 sTTI의 코딩 레이트는 DM-RS가 sTTI 내 존재하지 않는 sTTI에 비해 상대적으로 높을 수 있기 때문에 트레이드오프(trade off) 관계에 있다고 볼 수 있고, 따라서 둘 중 하나의 규칙이 적용되도록 사전에 정의하고 단말이 이에 따라 피기백 동작을 수행할 수 있다. 혹은, 네트워크가 둘 중 하나를 상위 계층 (혹은 물리 계층) 신호를 통해 설정해 줄 수도 있다.
또한, 상기 제안들 중 일부 (혹은 전체의) 조합에 의해 제 1 채널의 UCI가 복수의 제 2 채널 중 모든 혹은 일부에 피기백되어 전송될 경우의 단말 동작이 정의될 수 있다.
도 9는 본 발명의 실시예에 따른 단말의 동작을 도시한다. 도 9는 하나 이상의 TTI(transmission time interval) 길이를 지원하도록 설정된 단말을 위한 상향링크 제어 정보의 전송 방법에 관한 것이다.
상기 단말은 복수의 셀에 대한 상향링크 승인을 수신할 수 있다(S910). 상기 단말은 상기 상향링크 승인에 따른 상향링크 데이터 채널과 상향링크 제어 채널의 전송 타이밍이 중첩되면, 상기 상향링크 데이터 채널의 TTI 길이와 상기 상향링크 제어 채널의 TTI 길이의 관계에 따라, 상향링크 제어 정보를 상기 복수의 셀 중 하나의 셀의 상향링크 데이터 채널 또는 상기 상향링크 제어 채널에서 전송할 수 있다(S920).
상기 상향링크 데이터 채널의 TTI 길이가 상기 상향링크 제어 채널의 TTI 길이보다 짧은 경우, 상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 상향링크 제어 정보가 전송될 수 있다. 또한, 상기 복수의 셀이 동일한 TTI 길이의 상향링크 데이터 채널을 전송하는 경우, 미리 정의된 규칙에 의해 결정된 특정 셀에서 상기 상향링크 제어 정보가 전송될 수 있다. 아울러, 상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 상향링크 제어 정보의 전송은, 상기 상향링크 데이터 채널의 TTI 길이가 일정 값 이상인 경우에 수행될 수 있다.
추가로, 상기 상향링크 제어 채널의 TTI 길이가 일정 값 이하이면, 상기 복수의 셀 중 하나의 셀의 상향링크 데이터 채널에서 전송되는 상향링크 제어 정보는 상기 제어 채널에서 전송될 상향링크 제어 정보 중 일부일 수 있다. 상기 일부 상향링크 제어 정보 외의 나머지 상향링크 제어 정보는: 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되면 상기 상향링크 제어 채널에서 전송되거나 드롭되고, 그리고 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면 드롭될 수 있다.
또한, 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면, 상기 상향링크 데이터 채널이 드롭되고 상기 상향링크 제어 채널에서 상기 상향링크 제어 정보가 전송될 수 있다.
또는, 상기 상향링크 데이터 채널의 TTI 길이가 상기 상향링크 제어 채널의 TTI 길이와 같거나 그 보다 길고 상기 상향링크 제어 채널의 TTI 길이가 일정 값 이하인 경우, 상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 상향링크 제어 정보가 전송될 수 있다.
또는, 상기 상향링크 데이터 채널의 TTI 길이가 상기 상향링크 제어 채널의 TTI 길이와 같거나 그 보다 길고 상기 상향링크 제어 채널의 TTI 길이가 일정 값 이하인 경우, 상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 제어 채널에서 전송될 상향링크 제어 정보 중 일부가 전송될 수 있다.
추가로, 상기 일부 상향링크 제어 정보 외의 나머지 상향링크 제어 정보는: 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되면 상기 상향링크 제어 채널에서 전송되거나 드롭되고, 그리고 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면 드롭될 수 있다. 또는, 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면, 상기 상향링크 데이터 채널은 드롭되고 상기 상향링크 제어 채널에서 상기 상향링크 제어 정보 중 전부 또는 일부가 전송될 수 있다. 또는, 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송 여부와 관계없이, 상기 상향링크 데이터 채널은 드롭되고 상기 상향링크 제어 채널에서 상기 상향링크 제어 정보 중 일부가 전송될 수 있다.
이상으로 도 9를 참조하여 본 발명에 따른 실시예들을 간략히 설명하였으나, 도 9와 관련된 실시예는 앞서 설명한 실시예(들) 중 적어도 일부를 대안적으로 또는 추가적으로 포함할 수 있을 것이다.
도 10은 본 발명의 실시예들을 수행하는 전송장치(10) 및 수신장치(20)의 구성요소를 나타내는 블록도이다. 전송장치(10) 및 수신장치(20)는 정보 및/또는 데이터, 신호, 메시지 등을 나르는 무선 신호를 전송 또는 수신할 수 있는 송신기/수신기(13, 23)와, 무선통신 시스템 내 통신과 관련된 각종 정보를 저장하는 메모리(12, 22), 상기 송신기/수신기(13, 23) 및 메모리(12, 22)등의 구성요소와 동작적으로 연결되어, 상기 구성요소를 제어하여 해당 장치가 전술한 본 발명의 실시예들 중 적어도 하나를 수행하도록 메모리(12, 22) 및/또는 송신기/수신기(13,23)을 제어하도록 구성된 프로세서(11, 21)를 각각 포함한다.
메모리(12, 22)는 프로세서(11, 21)의 처리 및 제어를 위한 프로그램을 저장할 수 있고, 입/출력되는 정보를 임시 저장할 수 있다. 메모리(12, 22)가 버퍼로서 활용될 수 있다. 프로세서(11, 21)는 통상적으로 전송장치 또는 수신장치 내 각종 모듈의 전반적인 동작을 제어한다. 특히, 프로세서(11, 21)는 본 발명을 수행하기 위한 각종 제어 기능을 수행할 수 있다. 프로세서(11, 21)는 컨트롤러(controller), 마이크로 컨트롤러(microcontroller), 마이크로 프로세서(microprocessor), 마이크로 컴퓨터(microcomputer) 등으로도 불릴 수 있다. 프로세서(11, 21)는 하드웨어(hardware) 또는 펌웨어(firmware), 소프트웨어, 또는 이들의 결합에 의해 구현될 수 있다. 하드웨어를 이용하여 본 발명을 구현하는 경우에는, 본 발명을 수행하도록 구성된 ASICs(application specific integrated circuits) 또는 DSPs(digital signal processors), DSPDs(digital signal processing devices), PLDs(programmable logic devices), FPGAs(field programmable gate arrays) 등이 프로세서(11, 21)에 구비될 수 있다. 한편, 펌웨어나 소프트웨어를 이용하여 본 발명을 구현하는 경우에는 본 발명의 기능 또는 동작들을 수행하는 모듈, 절차 또는 함수 등을 포함하도록 펌웨어나 소프트웨어가 구성될 수 있으며, 본 발명을 수행할 수 있도록 구성된 펌웨어 또는 소프트웨어는 프로세서(11, 21) 내에 구비되거나 메모리(12, 22)에 저장되어 프로세서(11, 21)에 의해 구동될 수 있다.
전송장치(10)의 프로세서(11)는 상기 프로세서(11) 또는 상기 프로세서(11)와 연결된 스케줄러로부터 스케줄링되어 외부로 전송될 신호 및/또는 데이터에 대하여 소정의 부호화(coding) 및 변조(modulation)를 수행한 후 송신기/수신기(13)에 전송한다. 예를 들어, 프로세서(11)는 전송하고자 하는 데이터 열을 역다중화 및 채널 부호화, 스크램블링, 변조과정 등을 거쳐 K개의 레이어로 변환한다. 부호화된 데이터 열은 코드워드로 지칭되기도 하며, MAC 계층이 제공하는 데이터 블록인 전송 블록과 등가이다. 일 전송블록(transport block, TB)은 일 코드워드로 부호화되며, 각 코드워드는 하나 이상의 레이어의 형태로 수신장치에 전송되게 된다. 주파수 상향 변환을 위해 송신기/수신기(13)는 오실레이터(oscillator)를 포함할 수 있다. 송신기/수신기(13)는 Nt개(Nt는 1보다 이상의 양의 정수)의 전송 안테나를 포함할 수 있다.
수신장치(20)의 신호 처리 과정은 전송장치(10)의 신호 처리 과정의 역으로 구성된다. 프로세서(21)의 제어 하에, 수신장치(20)의 송신기/수신기(23)는 전송장치(10)에 의해 전송된 무선 신호를 수신한다. 상기 송신기/수신기(23)는 Nr개의 수신 안테나를 포함할 수 있으며, 상기 송신기/수신기(23)는 수신 안테나를 통해 수신된 신호 각각을 주파수 하향 변환하여(frequency down-convert) 기저대역 신호로 복원한다. 송신기/수신기(23)는 주파수 하향 변환을 위해 오실레이터를 포함할 수 있다. 상기 프로세서(21)는 수신 안테나를 통하여 수신된 무선 신호에 대한 복호(decoding) 및 복조(demodulation)를 수행하여, 전송장치(10)가 본래 전송하고자 했던 데이터를 복원할 수 있다.
송신기/수신기(13, 23)는 하나 이상의 안테나를 구비한다. 안테나는, 프로세서(11, 21)의 제어 하에 본 발명의 일 실시예에 따라, 송신기/수신기(13, 23)에 의해 처리된 신호를 외부로 전송하거나, 외부로부터 무선 신호를 수신하여 송신기/수신기(13, 23)로 전달하는 기능을 수행한다. 안테나는 안테나 포트로 불리기도 한다. 각 안테나는 하나의 물리 안테나에 해당하거나 하나보다 많은 물리 안테나 요소(element)의 조합에 의해 구성될 수 있다. 각 안테나로부터 전송된 신호는 수신장치(20)에 의해 더 이상 분해될 수 없다. 해당 안테나에 대응하여 전송된 참조신호(reference signal, RS)는 수신장치(20)의 관점에서 본 안테나를 정의하며, 채널이 일 물리 안테나로부터의 단일(single) 무선 채널인지 혹은 상기 안테나를 포함하는 복수의 물리 안테나 요소(element)들로부터의 합성(composite) 채널인지에 관계없이, 상기 수신장치(20)로 하여금 상기 안테나에 대한 채널 추정을 가능하게 한다. 즉, 안테나는 상기 안테나 상의 심볼을 전달하는 채널이 상기 동일 안테나 상의 다른 심볼이 전달되는 상기 채널로부터 도출될 수 있도록 정의된다. 복수의 안테나를 이용하여 데이터를 송수신하는 다중 입출력(Multi-Input Multi-Output, MIMO) 기능을 지원하는 송신기/수신기의 경우에는 2개 이상의 안테나와 연결될 수 있다.
본 발명의 실시예들에 있어서, 단말 또는 UE는 상향링크에서는 전송장치(10)로 동작하고, 하향링크에서는 수신장치(20)로 동작한다. 본 발명의 실시예들에 있어서, 기지국 또는 eNB는 상향링크에서는 수신장치(20)로 동작하고, 하향링크에서는 전송장치(10)로 동작한다.
상기 전송장치 및/또는 상기 수신장치는 앞서 설명한 본 발명의 실시예들 중 적어도 하나 또는 둘 이상의 실시예들의 조합을 수행할 수 있다.
상술한 바와 같이 개시된 본 발명의 바람직한 실시예들에 대한 상세한 설명은 당업자가 본 발명을 구현하고 실시할 수 있도록 제공되었다. 상기에서는 본 발명의 바람직한 실시예들을 참조하여 설명하였지만, 해당 기술 분야의 숙련된 당업자는 하기의 특허 청구의 범위에 기재된 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다. 따라서, 본 발명은 여기에 나타난 실시형태들에 제한되려는 것이 아니라, 여기서 개시된 원리들 및 신규한 특징들과 일치하는 최광의 범위를 부여하려는 것이다.
본 발명은 단말, 릴레이, 기지국 등과 같은 무선 통신 장치에 사용될 수 있다.
Claims (13)
- 무선 통신 시스템에서 하나 이상의 TTI(transmission time interval) 길이를 지원하도록 설정된 단말을 위한 상향링크 제어 정보 전송 방법에 있어서, 상기 방법은 단말에 의해 수행되며,복수의 셀에 대한 상향링크 승인을 수신하는 단계; 및상기 상향링크 승인에 따른 상향링크 데이터 채널과 상향링크 제어 채널의 전송 타이밍이 중첩되면, 상기 상향링크 데이터 채널의 TTI 길이와 상기 상향링크 제어 채널의 TTI 길이의 관계에 따라 상향링크 제어 정보를 상기 복수의 셀 중 하나의 셀의 상향링크 데이터 채널 또는 상기 상향링크 제어 채널에서 전송하는 단계를 포함하는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제1항에 있어서, 상기 상향링크 데이터 채널의 TTI 길이가 상기 상향링크 제어 채널의 TTI 길이보다 짧은 경우,상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 상향링크 제어 정보가 전송되는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제2항에 있어서, 상기 복수의 셀이 동일한 TTI 길이의 상향링크 데이터 채널을 전송하는 경우, 미리 정의된 규칙에 의해 결정된 특정 셀에서 상기 상향링크 제어 정보가 전송되는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제2항에 있어서, 상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 상향링크 제어 정보의 전송은,상기 상향링크 데이터 채널의 TTI 길이가 일정 값 이상인 경우에 수행되는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제2항에 있어서, 상기 상향링크 제어 채널의 TTI 길이가 일정 값 이하이면,상기 복수의 셀 중 하나의 셀의 상향링크 데이터 채널에서 전송되는 상향링크 제어 정보는 상기 제어 채널에서 전송될 상향링크 제어 정보 중 일부인 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제5항에 있어서, 상기 일부 상향링크 제어 정보 외의 나머지 상향링크 제어 정보는:상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되면 상기 상향링크 제어 채널에서 전송되거나 드롭되고, 그리고상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면 드롭되는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제2항에 있어서, 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면, 상기 상향링크 데이터 채널이 드롭되고 상기 상향링크 제어 채널에서 상기 상향링크 제어 정보가 전송되는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제1항에 있어서, 상기 상향링크 데이터 채널의 TTI 길이가 상기 상향링크 제어 채널의 TTI 길이와 같거나 그 보다 길고 상기 상향링크 제어 채널의 TTI 길이가 일정 값 이하인 경우,상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 상향링크 제어 정보가 전송되는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제1항에 있어서, 상기 상향링크 데이터 채널의 TTI 길이가 상기 상향링크 제어 채널의 TTI 길이와 같거나 그 보다 길고 상기 상향링크 제어 채널의 TTI 길이가 일정 값 이하인 경우,상기 복수의 셀 중 가장 짧은 TTI 길이의 상향링크 데이터 채널을 전송하는 셀에서 상기 제어 채널에서 전송될 상향링크 제어 정보 중 일부가 전송되는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제9항에 있어서, 상기 일부 상향링크 제어 정보 외의 나머지 상향링크 제어 정보는:상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되면 상기 상향링크 제어 채널에서 전송되거나 드롭되고, 그리고상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면 드롭되는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제8항에 있어서, 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송되지 않으면, 상기 상향링크 데이터 채널은 드롭되고 상기 상향링크 제어 채널에서 상기 상향링크 제어 정보 중 전부 또는 일부가 전송되는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 제8항에 있어서, 상기 상향링크 데이터 채널과 상기 상향링크 제어 채널이 하나의 서브프레임에서 동시 전송 여부와 관계없이, 상기 상향링크 데이터 채널은 드롭되고 상기 상향링크 제어 채널에서 상기 상향링크 제어 정보 중 일부가 전송되는 것을 특징으로 하는, 상향링크 제어 정보 전송 방법.
- 무선 통신 시스템에서 하나 이상의 TTI(transmission time interval) 길이를 지원하고 상향링크 제어 정보를 전송하도록 구성된 단말로서,송신기 및 수신기; 및상기 송신기 및 상기 수신기를 제어하도록 구성된 프로세서를 포함하고,상기 프로세서는:복수의 셀에 대한 상향링크 승인을 수신하고, 그리고상기 상향링크 승인에 따른 상향링크 데이터 채널과 상향링크 제어 채널의 전송 타이밍이 중첩되면, 상기 상향링크 데이터 채널의 TTI 길이와 상기 상향링크 제어 채널의 TTI 길이의 관계에 따라 상향링크 제어 정보를 상기 복수의 셀 중 하나의 셀의 상향링크 데이터 채널 또는 상기 상향링크 제어 채널에서 전송하도록 구성되는 것을 특징으로 하는, 단말.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US16/090,272 US10750533B2 (en) | 2016-04-01 | 2017-04-03 | Method for transmitting or receiving uplink control information in wireless communication system, and device therefor |
Applications Claiming Priority (14)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201662316681P | 2016-04-01 | 2016-04-01 | |
US62/316,681 | 2016-04-01 | ||
US201662334374P | 2016-05-10 | 2016-05-10 | |
US62/334,374 | 2016-05-10 | ||
US201662406380P | 2016-10-10 | 2016-10-10 | |
US62/406,380 | 2016-10-10 | ||
US201662417320P | 2016-11-03 | 2016-11-03 | |
US62/417,320 | 2016-11-03 | ||
US201662421282P | 2016-11-12 | 2016-11-12 | |
US62/421,282 | 2016-11-12 | ||
US201762458506P | 2017-02-13 | 2017-02-13 | |
US62/458,506 | 2017-02-13 | ||
US201762459610P | 2017-02-16 | 2017-02-16 | |
US62/459,610 | 2017-02-16 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2017171516A1 true WO2017171516A1 (ko) | 2017-10-05 |
Family
ID=59966124
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/KR2017/003624 WO2017171516A1 (ko) | 2016-04-01 | 2017-04-03 | 무선 통신 시스템에서 상향링크 제어 정보의 전송 또는 수신 방법 및 이를 위한 장치 |
Country Status (2)
Country | Link |
---|---|
US (1) | US10750533B2 (ko) |
WO (1) | WO2017171516A1 (ko) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2020033941A1 (en) | 2018-08-10 | 2020-02-13 | Intel Corporation | Prioritization of control and data transmsission for different services |
WO2020067750A1 (ko) * | 2018-09-27 | 2020-04-02 | 엘지전자 주식회사 | Harq-ack 정보를 전송하는 방법 및 통신 장치 |
CN111587554A (zh) * | 2018-01-13 | 2020-08-25 | 韦勒斯标准与技术协会公司 | 无线通信系统的信道复用方法和复用的信道传输方法及使用该方法的设备 |
CN111699734A (zh) * | 2018-02-09 | 2020-09-22 | 株式会社Ntt都科摩 | 用户终端以及无线通信方法 |
EP3745752A4 (en) * | 2018-02-12 | 2021-02-24 | Huawei Technologies Co., Ltd. | METHOD OF TRANSMISSION OF AN UPLINK SIGNAL AND COMMUNICATION DEVICE |
US12114329B2 (en) | 2019-10-07 | 2024-10-08 | Wilus Institute Of Standards And Technology Inc. | Method, device, and system for cancelling uplink transmission in wireless communication system |
Families Citing this family (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10728922B2 (en) | 2016-04-12 | 2020-07-28 | Motorola Mobility Llc | Scheduling of transmission time intervals |
US10602454B2 (en) * | 2016-05-10 | 2020-03-24 | Lg Electronics Inc. | Method for controlling uplink transmission power in wireless communication system and device therefor |
WO2018027540A1 (en) * | 2016-08-09 | 2018-02-15 | Panasonic Intellectual Property Corporation Of America | Terminal and communication method |
CN109565385B (zh) * | 2016-08-12 | 2021-02-12 | 华为技术有限公司 | 上行信道发送方法和装置 |
CN107770855B (zh) | 2016-08-19 | 2023-08-04 | 北京三星通信技术研究有限公司 | 一种功率头上空间报告的方法及装置 |
WO2018052018A1 (ja) * | 2016-09-14 | 2018-03-22 | 株式会社Nttドコモ | ユーザ端末及び無線通信方法 |
CN107889252B (zh) * | 2016-09-29 | 2019-09-17 | 电信科学技术研究院 | 一种功率分配方法及装置 |
CN116506260A (zh) | 2016-09-29 | 2023-07-28 | 松下电器(美国)知识产权公司 | 通信方法、通信装置和通信系统 |
CN107889229B (zh) * | 2016-09-29 | 2019-12-13 | 电信科学技术研究院 | 一种上行控制信息uci的传输方法和设备 |
EP3540997B1 (en) * | 2016-11-12 | 2022-02-09 | LG Electronics Inc. | Method for transmitting uplink signal in wireless communication system and device therefor |
US10772084B2 (en) | 2017-01-09 | 2020-09-08 | Motorola Mobility Llc | Method and apparatus for scheduling information for a downlink data channel |
CN108347782B (zh) * | 2017-01-25 | 2019-12-20 | 电信科学技术研究院 | 一种上行控制信息发送、接收方法、终端及基站 |
US11716729B2 (en) * | 2017-02-06 | 2023-08-01 | Apple Inc. | Resource mapping and multiplexing of uplink control channel and uplink data channel |
US10624070B2 (en) * | 2017-04-14 | 2020-04-14 | Qualcomm Incorporated | Scheduling and transmission scheme for periodic and aperiodic control information |
CN108923896B (zh) | 2017-04-19 | 2021-03-26 | 上海朗帛通信技术有限公司 | 一种被用于寻呼的用户设备、基站中的方法和装置 |
US11310778B2 (en) * | 2017-05-02 | 2022-04-19 | Ntt Docomo, Inc. | User terminal and radio communication method |
KR102367153B1 (ko) | 2017-05-02 | 2022-02-24 | 삼성전자 주식회사 | 무선 셀룰라 통신 시스템에서 상향 링크 전송 전력 제어 방법 및 장치 |
US10470140B2 (en) * | 2017-05-04 | 2019-11-05 | Qualcomm Incorporated | Power headroom report for uplink split bearer communications |
US10931484B2 (en) * | 2017-05-26 | 2021-02-23 | Qualcomm Incorporated | Transmit power and frequency hopping configurations for control information transmissions |
JP2020120142A (ja) * | 2017-05-26 | 2020-08-06 | シャープ株式会社 | 端末装置、基地局装置、通信方法、および、集積回路 |
US10492151B2 (en) * | 2017-06-09 | 2019-11-26 | Qualcomm Incorporated | Power control in new radio systems |
WO2019033071A1 (en) | 2017-08-10 | 2019-02-14 | Babaei Alireza | MULTIPLEXING UPLINK CONTROL INFORMATION |
EP3682699A1 (en) * | 2017-09-11 | 2020-07-22 | Telefonaktiebolaget LM Ericsson (publ) | Control information on data channel in a radio access network |
CN109714827B (zh) * | 2017-10-26 | 2023-09-01 | 华为技术有限公司 | 上行控制信息的传输方法和装置 |
US10680698B2 (en) * | 2017-10-31 | 2020-06-09 | Qualcomm Incorporated | Uplink control information mapping on a shortened uplink shared channel |
US10681652B2 (en) * | 2017-11-28 | 2020-06-09 | Qualcomm Incorporated | Power control for dual radio access technology (RAT) communication |
CN111656814B (zh) | 2018-01-11 | 2023-09-08 | 富士通株式会社 | 无线通信系统、基站、终端和通信方法 |
EP3703452B1 (en) * | 2018-02-08 | 2022-11-02 | Guangdong Oppo Mobile Telecommunications Corp., Ltd. | Method for transmitting information, method for receiving information, terminal device, and network device |
CN113597805B (zh) * | 2019-03-27 | 2024-07-26 | 鸿颖创新有限公司 | 用于上行链路传输的方法和用户设备 |
EP4173418A4 (en) * | 2020-06-25 | 2024-03-20 | Qualcomm Incorporated | RULE FOR MULTIPLEXING UPLINK CONTROL INFORMATION FOR TRANSMISSION OF UPLINK CONTROL CHANNEL AND SIMULTANEOUS UPLINK SHARED CHANNEL |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160021653A1 (en) * | 2009-01-30 | 2016-01-21 | Samsung Electronics Co., Ltd. | Transmitting uplink control information over a data channel or over a control channel |
WO2016040290A1 (en) * | 2014-09-08 | 2016-03-17 | Interdigital Patent Holdings, Inc. | Systems and methods of operating with different transmission time interval (tti) durations |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011071291A2 (ko) * | 2009-12-07 | 2011-06-16 | 엘지전자 주식회사 | 상향링크 CoMP 통신 시스템에서 사운딩 참조 신호 송신 방법 및 이를 위한 장치 |
CN102378274A (zh) * | 2010-08-19 | 2012-03-14 | 宏达国际电子股份有限公司 | 处理上链路控制信息回报的方法及其通讯装置 |
US9363820B2 (en) * | 2011-08-11 | 2016-06-07 | Industrial Technology Research Institute | Method of uplink control information transmission |
CN104081838B (zh) * | 2012-01-30 | 2018-05-08 | 松下电器(美国)知识产权公司 | 无线通信终端装置及发送功率控制方法 |
US9398573B2 (en) * | 2012-03-08 | 2016-07-19 | Samsung Electronics Co., Ltd. | Transmission of uplink control information for coordinated multi-point reception |
KR102123434B1 (ko) * | 2013-08-09 | 2020-06-17 | 삼성전자 주식회사 | 셀룰러 이동 통신 시스템에서 스케쥴링 요청 방법 및 장치 |
DE102013018149A1 (de) * | 2013-12-04 | 2015-06-11 | Daimler Ag | Lenksäulenanordnung Mantelrohr für eine Lenksäulenanordnung, und Fahrzeug mit einer Lenksäulenanordnung |
WO2016121537A1 (ja) * | 2015-01-28 | 2016-08-04 | シャープ株式会社 | 端末装置、基地局装置および方法 |
US10015778B2 (en) * | 2015-03-17 | 2018-07-03 | Telefonaktiebolaget Lm Ericsson (Publ) | Systems and methods for uplink control information signaling design |
-
2017
- 2017-04-03 WO PCT/KR2017/003624 patent/WO2017171516A1/ko active Application Filing
- 2017-04-03 US US16/090,272 patent/US10750533B2/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160021653A1 (en) * | 2009-01-30 | 2016-01-21 | Samsung Electronics Co., Ltd. | Transmitting uplink control information over a data channel or over a control channel |
WO2016040290A1 (en) * | 2014-09-08 | 2016-03-17 | Interdigital Patent Holdings, Inc. | Systems and methods of operating with different transmission time interval (tti) durations |
Non-Patent Citations (3)
Title |
---|
HUAWEI ET AL.: "Open Issues on UCI Transmission in case of Configuration of Simultaneous PUCCH and PUSCH", R1-160287, 3GPP TSG RAN WG1 MEETING #84, 6 February 2016 (2016-02-06), XP051064105 * |
HUAWEI ET AL.: "UCI Transmission for eLAA", R1-160747, 3GPP TSG RAN WG1 MEETING #84, 6 February 2016 (2016-02-06), XP051064353 * |
SAMSUNG: "Remaining Issues on UCI Transmission in case of Simultaneous PUCCH and PUSCH in eCA", R1-160502, 3GPP TSG RAN WG1 MEETING #84, 6 February 2016 (2016-02-06), XP051064200 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111587554A (zh) * | 2018-01-13 | 2020-08-25 | 韦勒斯标准与技术协会公司 | 无线通信系统的信道复用方法和复用的信道传输方法及使用该方法的设备 |
US11950226B2 (en) | 2018-01-13 | 2024-04-02 | Wilus Institute Of Standards And Technology Inc. | Channel multiplexing method and multiplexed channel transmission method for wireless communication system and device using same |
US11956774B2 (en) | 2018-01-13 | 2024-04-09 | Wilus Institute Of Standards And Technology Inc. | Channel multiplexing method and multiplexed channel transmission method for wireless communication system and device using same |
CN111587554B (zh) * | 2018-01-13 | 2024-04-26 | 韦勒斯标准与技术协会公司 | 无线通信系统的信道复用方法和复用的信道传输方法及使用该方法的设备 |
CN111699734A (zh) * | 2018-02-09 | 2020-09-22 | 株式会社Ntt都科摩 | 用户终端以及无线通信方法 |
EP3745752A4 (en) * | 2018-02-12 | 2021-02-24 | Huawei Technologies Co., Ltd. | METHOD OF TRANSMISSION OF AN UPLINK SIGNAL AND COMMUNICATION DEVICE |
US11870727B2 (en) | 2018-02-12 | 2024-01-09 | Huawei Technologies Co., Ltd. | Method for transmitting uplink signal and communications apparatus |
WO2020033941A1 (en) | 2018-08-10 | 2020-02-13 | Intel Corporation | Prioritization of control and data transmsission for different services |
EP3834567A4 (en) * | 2018-08-10 | 2022-05-11 | INTEL Corporation | PRIORIZATION OF CONTROL AND DATA TRANSMISSION FOR DIFFERENT SERVICES |
WO2020067750A1 (ko) * | 2018-09-27 | 2020-04-02 | 엘지전자 주식회사 | Harq-ack 정보를 전송하는 방법 및 통신 장치 |
US12047324B2 (en) | 2018-09-27 | 2024-07-23 | Lg Electronics Inc. | Method for transmitting HARQ-ACK information, and communication device |
US12114329B2 (en) | 2019-10-07 | 2024-10-08 | Wilus Institute Of Standards And Technology Inc. | Method, device, and system for cancelling uplink transmission in wireless communication system |
Also Published As
Publication number | Publication date |
---|---|
US20190116611A1 (en) | 2019-04-18 |
US10750533B2 (en) | 2020-08-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017171516A1 (ko) | 무선 통신 시스템에서 상향링크 제어 정보의 전송 또는 수신 방법 및 이를 위한 장치 | |
WO2018208087A1 (ko) | 무선 통신 시스템에서 상향링크 신호를 전송하기 위한 방법 및 이를 위한 장치 | |
WO2018174450A1 (ko) | 무선 통신 시스템에서 복수의 전송 시간 간격, 복수의 서브캐리어 간격, 또는 복수의 프로세싱 시간을 지원하는 단말을 위한 상향링크 신호 전송 또는 수신 방법 및 이를 위한 장치 | |
WO2018030714A1 (ko) | 무선 통신 시스템에서 채널 상태 보고를 위한 방법 및 이를 위한 장치 | |
WO2017135745A1 (ko) | 무선 통신 시스템에서 상향링크 제어 정보의 맵핑, 전송, 또는 수신 방법 및 이를 위한 장치 | |
WO2017078326A1 (ko) | 무선 통신 시스템에서 상향링크 제어 채널 전송 방법 및 이를 위한 장치 | |
WO2017105135A2 (ko) | 무선 통신 시스템에서 상향링크 참조 신호 전송 또는 수신 방법 및 이를 위한 장치 | |
WO2019143131A1 (ko) | 무선 통신 시스템에서 상향링크 신호를 송신하는 방법 및 장치 | |
WO2018164452A1 (ko) | 무선 통신 시스템에서 하향링크 신호를 수신 또는 전송하기 위한 방법 및 이를 위한 장치 | |
WO2019194619A1 (en) | Method of transmitting or receiving signal in wireless communication system and apparatus therefor | |
WO2018038418A1 (ko) | 무선 통신 시스템에서 상향링크 전송을 위한 방법 및 이를 위한 장치 | |
WO2018203732A1 (ko) | 무선 통신 시스템에서 상향링크 신호를 전송하기 위한 방법 및 이를 위한 장치 | |
WO2019156466A1 (ko) | 무선 통신 시스템에서 신호를 송신 또는 수신하는 방법 및 이를 위한 장치 | |
WO2018128340A1 (ko) | 무선 통신 시스템에서 채널 상태 보고를 위한 방법 및 이를 위한 장치 | |
WO2016144050A1 (ko) | 무선 통신 시스템에서 신호를 전송하기 위한 방법 및 이를 위한 장치 | |
WO2018088857A1 (ko) | 무선 통신 시스템에서 상향링크 신호를 전송하기 위한 방법 및 이를 위한 장치 | |
WO2017078338A1 (ko) | 무선 통신 시스템에서 채널 상태 보고 방법 및 이를 위한 장치 | |
WO2016126063A1 (ko) | 무선 통신 시스템에서 채널 상태 보고 방법 및 이를 위한 장치 | |
WO2018236117A1 (ko) | 무선 통신 시스템에서 harq-ack/nack 피드백을 위한 방법 및 이를 위한 장치 | |
WO2018021815A1 (ko) | 무선 통신 시스템에서 채널 상태 보고를 위한 방법 및 이를 위한 장치 | |
WO2013043026A2 (ko) | 상향링크 신호 전송방법 및 사용자기기와, 상향링크 신호 수신방법 및 기지국 | |
WO2015064896A1 (ko) | 복수의 셀에 동시 접속한 사용자 장치가 harq ack/nack을 전송하는 방법 | |
WO2017091033A1 (ko) | 무선 통신 시스템에서 하향링크 제어 채널 수신 방법 및 이를 위한 장치 | |
WO2018203624A1 (ko) | 무선 통신 시스템에서 참조 신호를 수신하기 위한 방법 및 이를 위한 장치 | |
WO2018143701A1 (ko) | 무선 통신 시스템에서 복수의 전송 시간 간격, 복수의 서브캐리어 간격, 또는 복수의 프로세싱 시간을 지원하기 위한 방법 및 이를 위한 장치 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 17775940 Country of ref document: EP Kind code of ref document: A1 |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 17775940 Country of ref document: EP Kind code of ref document: A1 |