[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

WO2017004484A1 - Methods for monitoring well cementing operations - Google Patents

Methods for monitoring well cementing operations Download PDF

Info

Publication number
WO2017004484A1
WO2017004484A1 PCT/US2016/040634 US2016040634W WO2017004484A1 WO 2017004484 A1 WO2017004484 A1 WO 2017004484A1 US 2016040634 W US2016040634 W US 2016040634W WO 2017004484 A1 WO2017004484 A1 WO 2017004484A1
Authority
WO
WIPO (PCT)
Prior art keywords
well
cement
placement
casing
combination
Prior art date
Application number
PCT/US2016/040634
Other languages
French (fr)
Inventor
Gunnar Gerard DE BRUIJN
Pavel NYAGA
Edward SMETAK
Andrew WHIDDON
Jose CONTRERAS ESCALANTE
Nicolas Flamant
Original Assignee
Schlumberger Technology Corporation
Schlumberger Canada Limited
Services Petroliers Schlumberger
Schlumberger Technology B.V.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Schlumberger Technology Corporation, Schlumberger Canada Limited, Services Petroliers Schlumberger, Schlumberger Technology B.V. filed Critical Schlumberger Technology Corporation
Priority to EP16818866.2A priority Critical patent/EP3317488A4/en
Publication of WO2017004484A1 publication Critical patent/WO2017004484A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes

Definitions

  • the present disclosure broadly relates to methods for monitoring well cementing operations.
  • the methods relate to monitoring well cementing parameters and comparing the parameters to cement placement simulations in real time.
  • Primary cementing is a technique for placing cement slurries in the annular space between the casing and the borehole. After placement, the cement hardens to form a hydraulic seal in the wellbore, preventing the migration of formation fluids in the annulus. Therefore, primary cementing is one of the most important stages during the drilling and completion of a well. This procedure must be planned and executed carefully, as there is but one chance to complete the job successfully.
  • the set cement sheath should anchor and support the casing string (preventing formation sloughing or caving into the wellbore) and protect the casing string against corrosion by formation fluids.
  • Uncemented steel casing can corrode rapidly when exposed to hot formation brines and hydrogen sulfide. It can also be subjected to erosion by the high velocity of produced fluids, particularly when solid particles such as formation sand are being transported. Lateral loads on poorly cemented casing strings can result in buckling or collapse because of overloading at certain points. On the other hand, properly cemented casing is subjected to a nearly uniform loading approximately equal to the overburden pressure.
  • the density of cement slurries is usually higher than those of the drilling fluid, chemical wash or spacer.
  • a hydrostatic pressure imbalance is created between the inside of the casing and the annulus.
  • the cement slurry has a tendency to "free-fall” and draws a vacuum inside the upper part of the casing.
  • Computer simulators are also used to determine the number of centralizers on a casing string to achieve optimal standoff and encourage complete removal of drilling fluids from the annulus. Other factors that the simulators consider in their calculations include temperature, wellbore geometry, formation fracture gradients, mud conditioning, rheological properties of cementing fluids (e.g., mud, chemical washes, spacer fluids and cement slurries), casing movement via reciprocation and rotation and pump rates.
  • cementing fluids e.g., mud, chemical washes, spacer fluids and cement slurries
  • the simulators may generate several predictions, including mud displacement, cement slurry coverage, flow rates, temperature and pressure evolution at various locations in the well and well control.
  • One such simulator is CEMENTICS, available from Schlumberger.
  • CEMENTICS available from Schlumberger.
  • Piot B "Primary Cement Job Design," in Nelson EB and Guillot D (eds.): Well Cementing-2nd Edition, Houston: Schlumberger (2006): 435-458.
  • the present disclosure reveals methods relating to monitoring well cementing parameters and comparing the parameters to cement placement simulations in real time. Additionally, adjustments to the cementing operation may be performed in real time in response to operational deviations from the simulation predictions.
  • embodiments relate to methods for cementing a subterranean well.
  • a cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall.
  • real-time of cementing parameters takes place. The parameters may be temperature, pressure or return rate or a combination thereof.
  • the real-time monitored parameters are then compared to a previously generated cement placement simulation, or a previously generated post-placement simulation or both.
  • embodiments relate to methods for confirming cement-placement events.
  • a cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall.
  • real-time of cementing parameters takes place. The parameters may be temperature, pressure or return rate or a combination thereof.
  • the real-time monitored parameters are then compared to a previously generated cement placement simulation, or a previously generated post-placement simulation or both.
  • embodiments relate to methods for confirming cement- placement events.
  • a cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall.
  • real-time monitoring of cementing parameters takes place. The parameters may be pump rate, pressure, fluid volume, fluid density or fluid temperature or a combination thereof. The real-time monitored parameters are then entered into a cement placement simulator, and the simulator is allowed to predict future cement placement events.
  • Figure 1 is a well diagram showing the location of sensors that are employed in the disclosed methods.
  • the term about should be understood as any amount or range within 10% of the recited amount or range (for example, a range from about 1 to about 10 encompasses a range from 0.9 to 11). Also, in the summary and this detailed description, it should be understood that a concentration range listed or described as being useful, suitable, or the like, is intended that any concentration within the range, including the end points, is to be considered as having been stated. For example, "a range of from 1 to 10" is to be read as indicating each possible number along the continuum between about 1 and about 10. Furthermore, one or more of the data points in the present examples may be combined together, or may be combined with one of the data points in the specification to create a range, and thus include each possible value or number within this range.
  • cement placement simulations and post-placement simulations are traditionally performed before the cementing operation takes place. Several simulation iterations may be performed, allowing engineers to develop an optimal cement treatment design. When the cementing operation takes place, engineers may follow the procedure prescribed by the simulator. After the operation is complete and the cement has set, logging operations may be performed to verify that the goals of the cementing operation have been met.
  • Applicant has determined that advantages may be gleaned by monitoring the progress of the cementing operation in real time, thereby allowing a determination of whether cementing events are unfolding as predicted by the simulator. If deviations from the plan occur, some realtime adjustments may be made to improve cementing results.
  • embodiments relate to methods for cementing a subterranean well.
  • a cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall.
  • real-time monitoring of cementing parameters takes place. The parameters may be temperature, pressure or return rate or a combination thereof. The real-time monitored parameters are then compared to a previously generated cement placement simulation, or a previously generated post-placement simulation or both.
  • the cement placement events may comprise landing of a cementing plug, landing of a cementing dart, passage of a fluid interface past a given location in a well, setting of the cement slurry, or arrival of a cement slurry at a given location in the well, or combinations thereof.
  • embodiments relate to methods for confirming cement-placement events.
  • a cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall.
  • real-time monitoring of cementing parameters takes place. The parameters may be temperature, pressure or return rate or a combination thereof. The real-time monitored parameters are then compared to a previously generated cement placement simulation, or a previously generated post-placement simulation or both.
  • embodiments relate to methods for confirming cement- placement events.
  • a cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall.
  • real-time monitoring of cementing parameters takes place. The parameters may be pump rate, pressure, fluid volume, fluid density or fluid temperature or a combination thereof. The real-time monitored parameters are then entered into a cement placement simulator, and the simulator is allowed to predict future cement placement events.
  • the cement placement events may comprise landing of a cementing plug, landing of a cementing dart, passage of a fluid interface past a given location in a well, setting of the cement slurry, or arrival of a cement slurry at a given location in the well, or combinations thereof.
  • a cement placement simulation may or may not have been performed before pumping the slurry into the well.
  • temperature sensors may be located at a wellhead, at a casing shoe, along fibers installed throughout the well, or at a return line or a combination thereof.
  • pressure sensors may be located at a wellhead, at a casing shoe, along fibers installed throughout the well, or at a return line or a combination thereof.
  • flow rate sensors may be located at a wellhead, at a casing shoe, along fibers installed throughout the well, at a mud pit, or at a return line or a combination thereof.
  • the monitored parameters may be synchronized and displayed together on a computer screen.
  • the post-placement simulation may employ calorimetry data to provide a post-placement well temperature prediction.
  • the monitored parameters may provide a real-time prediction of when the cement slurry will reach a given location in the well.
  • the parameters may be monitored at a wellsite or from a remote location.
  • the cement placement simulation may include a U-tube simulator.
  • the monitored parameters may provide a real-time prediction of when the cement slurry will reach a given location in the well.
  • the telemetry between the sensors and the receivers may be transmitted along wires, optical fibers or wirelessly or a combination thereof.
  • Wireless communication may be in the form of electromagnetic signals, acoustic signals or both.
  • An example well 100 comprises several elements: a wellhead 101, a casing string 102, a casing shoe 103, a return line 104, a mud pit 105, a fiber cable 106 placed along the casing string 102, a temperature sensor 107, a pressure sensor 108 and a flow rate sensor 109.
  • the sensors 107-109 are shown only at the casing shoe 102, they may also be located at the wellhead 101, along the fiber cable 106, at the return line 104 or at the mud pits or a combination thereof.

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

Cement placement simulations and post-placement simulations are traditionally performed before the cementing operation takes place. Several simulation iterations may be performed, allowing engineers to develop an optimal cement treatment design. When the cementing operation takes place, engineers may follow the procedure prescribed by the simulator. After the operation is complete and the cement has set, logging operations may be performed to verify that the goals of the cementing operation have been met. Monitoring the progress of the cementing operation in real time allows a determination of whether cementing events are unfolding as predicted by the simulator. If deviations from the plan occur, some real-time adjustments may be made to improve cementing results.

Description

METHODS FOR MONITORING WELL CEMENTING OPERATIONS
BACKGROUND
[0001] The statements in this section merely provide background information related to the present disclosure and may not constitute prior art.
[0002] The present disclosure broadly relates to methods for monitoring well cementing operations. In particular, the methods relate to monitoring well cementing parameters and comparing the parameters to cement placement simulations in real time.
[0003] Primary cementing is a technique for placing cement slurries in the annular space between the casing and the borehole. After placement, the cement hardens to form a hydraulic seal in the wellbore, preventing the migration of formation fluids in the annulus. Therefore, primary cementing is one of the most important stages during the drilling and completion of a well. This procedure must be planned and executed carefully, as there is but one chance to complete the job successfully.
[0004] In addition to providing zonal isolation, the set cement sheath should anchor and support the casing string (preventing formation sloughing or caving into the wellbore) and protect the casing string against corrosion by formation fluids. Uncemented steel casing can corrode rapidly when exposed to hot formation brines and hydrogen sulfide. It can also be subjected to erosion by the high velocity of produced fluids, particularly when solid particles such as formation sand are being transported. Lateral loads on poorly cemented casing strings can result in buckling or collapse because of overloading at certain points. On the other hand, properly cemented casing is subjected to a nearly uniform loading approximately equal to the overburden pressure.
[0005] In principle, primary cementing techniques are the same regardless of casing-string purpose and size. The cement slurry is pumped down inside the string to be cemented, exits the bottom, and displaces drilling mud as it moves up the annulus. Or, a "reverse cementing" technique may be performed wherein fluids are pumped in the opposite direction— down the annulus and up the casing.
[0006] Pumping dense fluids such as cement slurries down a casing string can result in a phenomenon known as free-fall or U-tubing. The fluids inside the casing and in the annulus will naturally tend to achieve a hydrostatic-pressure equilibrium. During the course of the cement job, some interesting effects may be observed.
[0007] The density of cement slurries is usually higher than those of the drilling fluid, chemical wash or spacer. When the cement slurry is introduced inside the casing, a hydrostatic pressure imbalance is created between the inside of the casing and the annulus. As a result, the cement slurry has a tendency to "free-fall" and draws a vacuum inside the upper part of the casing.
[0008] In many cementing operations, the pump rate into the casing, Qin, is insufficient to keep the casing full during the early part of thejob. This results in a net flow or efflux of fluid from the well. The rate of efflux, Qout, may be much greater than Qin. Eventually, as hydrostatic pressure equilibrium is approached, Qout falls below Qin and the casing gradually refills. At some point, Qout may reach zero and the fluid column in the annulus may become stationary. Such events are easily misinterpreted as partial or complete loss of circulation. Finally, when the casing is again full of fluid, Qin and Qout will be equal. However, these values may not remain so for the remainder of the job. If a low-density wash is present, it may cause an annular-pressure reduction as it flows past the casing shoe. This will in turn cause a second period of free-fall, accompanied by another surge of high returns. The beginning and end of a U-tubing event can easily be detected by measuring the surface pressure during the cement job
[0009] Considering the importance of annular fluid velocities and pressures to the safe and successful execution of a cement job, it is clear that U-tubing must be considered in any job design. Algorithms exist that permit accurate simulations of these phenomena. These algorithms have been validated against carefully measured field parameters during cementing operations.
[0010] Computer simulators are also used to determine the number of centralizers on a casing string to achieve optimal standoff and encourage complete removal of drilling fluids from the annulus. Other factors that the simulators consider in their calculations include temperature, wellbore geometry, formation fracture gradients, mud conditioning, rheological properties of cementing fluids (e.g., mud, chemical washes, spacer fluids and cement slurries), casing movement via reciprocation and rotation and pump rates.
[0011] The simulators may generate several predictions, including mud displacement, cement slurry coverage, flow rates, temperature and pressure evolution at various locations in the well and well control. One such simulator is CEMENTICS, available from Schlumberger. [0012] Further information about well cementing operations and simulators may be found in the following publications.
[0013] Piot B: "Primary Cement Job Design," in Nelson EB and Guillot D (eds.): Well Cementing-2nd Edition, Houston: Schlumberger (2006): 435-458.
[0014] Piot B and Cuvillier G: "Primary Cementing Techniques," in Nelson EB and Guillot D (eds.): Well Cementing-2nd Edition, Houston: Schlumberger (2006): 459-501.
SUMMARY
[0015] This summary is provided to introduce a selection of concepts that are further described below in the detailed description. This summary is not intended to identify key or essential features of the claimed subject matter, nor is it intended to be used as an aid in limiting the scope of the claimed subject matter.
[0016] The present disclosure reveals methods relating to monitoring well cementing parameters and comparing the parameters to cement placement simulations in real time. Additionally, adjustments to the cementing operation may be performed in real time in response to operational deviations from the simulation predictions.
[0017] In an aspect, embodiments relate to methods for cementing a subterranean well. A cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall. During the operation, real-time of cementing parameters takes place. The parameters may be temperature, pressure or return rate or a combination thereof. The real-time monitored parameters are then compared to a previously generated cement placement simulation, or a previously generated post-placement simulation or both.
[0018] In a further aspect, embodiments relate to methods for confirming cement-placement events. A cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall. During the operation, real-time of cementing parameters takes place. The parameters may be temperature, pressure or return rate or a combination thereof. The real-time monitored parameters are then compared to a previously generated cement placement simulation, or a previously generated post-placement simulation or both.
[0019] In yet a further aspect, embodiments relate to methods for confirming cement- placement events. A cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall. During the operation, real-time monitoring of cementing parameters takes place. The parameters may be pump rate, pressure, fluid volume, fluid density or fluid temperature or a combination thereof. The real-time monitored parameters are then entered into a cement placement simulator, and the simulator is allowed to predict future cement placement events.
BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 is a well diagram showing the location of sensors that are employed in the disclosed methods.
DETAILED DESCRIPTION
[0021] At the outset, it should be noted that in the development of any such actual embodiment, numerous implementation— specific decisions are made to achieve the developer's specific goals, such as compliance with system related and business related constraints, which will vary from one implementation to another. Moreover, it will be appreciated that such a development effort might be complex and time consuming but would nevertheless be a routine undertaking for those of ordinary skill in the art having the benefit of this disclosure. In addition, the composition used/disclosed herein can also comprise some components other than those cited. In the summary of the disclosure and this detailed description, each numerical value should be read once as modified by the term "about" (unless already expressly so modified), and then read again as not so modified unless otherwise indicated in context. The term about should be understood as any amount or range within 10% of the recited amount or range (for example, a range from about 1 to about 10 encompasses a range from 0.9 to 11). Also, in the summary and this detailed description, it should be understood that a concentration range listed or described as being useful, suitable, or the like, is intended that any concentration within the range, including the end points, is to be considered as having been stated. For example, "a range of from 1 to 10" is to be read as indicating each possible number along the continuum between about 1 and about 10. Furthermore, one or more of the data points in the present examples may be combined together, or may be combined with one of the data points in the specification to create a range, and thus include each possible value or number within this range. Thus, even if specific data points within the range, or even no data points within the range, are explicitly identified or refer to a few specific, it is to be understood that inventors appreciate and understand that any data points within the range are to be considered to have been specified, and that inventors possessed knowledge of the entire range and the points within the range.
[0022] Cement placement simulations and post-placement simulations are traditionally performed before the cementing operation takes place. Several simulation iterations may be performed, allowing engineers to develop an optimal cement treatment design. When the cementing operation takes place, engineers may follow the procedure prescribed by the simulator. After the operation is complete and the cement has set, logging operations may be performed to verify that the goals of the cementing operation have been met.
[0023] Applicant has determined that advantages may be gleaned by monitoring the progress of the cementing operation in real time, thereby allowing a determination of whether cementing events are unfolding as predicted by the simulator. If deviations from the plan occur, some realtime adjustments may be made to improve cementing results.
[0024] In an aspect, embodiments relate to methods for cementing a subterranean well. A cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall. During the operation, real-time monitoring of cementing parameters takes place. The parameters may be temperature, pressure or return rate or a combination thereof. The real-time monitored parameters are then compared to a previously generated cement placement simulation, or a previously generated post-placement simulation or both.
[0025] The cement placement events may comprise landing of a cementing plug, landing of a cementing dart, passage of a fluid interface past a given location in a well, setting of the cement slurry, or arrival of a cement slurry at a given location in the well, or combinations thereof.
[0026] In a further aspect, embodiments relate to methods for confirming cement-placement events. A cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall. During the operation, real-time monitoring of cementing parameters takes place. The parameters may be temperature, pressure or return rate or a combination thereof. The real-time monitored parameters are then compared to a previously generated cement placement simulation, or a previously generated post-placement simulation or both.
[0027] In yet a further aspect, embodiments relate to methods for confirming cement- placement events. A cement slurry is prepared and pumped into the well through a casing interior. After exiting the casing interior at the bottom of the casing string, the slurry is pumped through an annulus between the casing string exterior and a borehole wall. During the operation, real-time monitoring of cementing parameters takes place. The parameters may be pump rate, pressure, fluid volume, fluid density or fluid temperature or a combination thereof. The real-time monitored parameters are then entered into a cement placement simulator, and the simulator is allowed to predict future cement placement events.
[0028] The cement placement events may comprise landing of a cementing plug, landing of a cementing dart, passage of a fluid interface past a given location in a well, setting of the cement slurry, or arrival of a cement slurry at a given location in the well, or combinations thereof.
[0029] A cement placement simulation may or may not have been performed before pumping the slurry into the well.
[0030] For each aspect, temperature sensors may be located at a wellhead, at a casing shoe, along fibers installed throughout the well, or at a return line or a combination thereof.
[0031] For each aspect, pressure sensors may be located at a wellhead, at a casing shoe, along fibers installed throughout the well, or at a return line or a combination thereof.
[0032] For each aspect, flow rate sensors may be located at a wellhead, at a casing shoe, along fibers installed throughout the well, at a mud pit, or at a return line or a combination thereof.
[0033] For each aspect, the monitored parameters may be synchronized and displayed together on a computer screen. [0034] For each aspect, the post-placement simulation may employ calorimetry data to provide a post-placement well temperature prediction.
[0035] For each aspect, the monitored parameters may provide a real-time prediction of when the cement slurry will reach a given location in the well.
[0036] For each aspect, the parameters may be monitored at a wellsite or from a remote location.
[0037] For each aspect, the cement placement simulation may include a U-tube simulator.
[0038] For each aspect, the monitored parameters may provide a real-time prediction of when the cement slurry will reach a given location in the well.
[0039] For each aspect, the telemetry between the sensors and the receivers may be transmitted along wires, optical fibers or wirelessly or a combination thereof. Wireless communication may be in the form of electromagnetic signals, acoustic signals or both.
[0040] A non-limiting embodiment of the disclosure is portrayed in Fig. 1. An example well 100 comprises several elements: a wellhead 101, a casing string 102, a casing shoe 103, a return line 104, a mud pit 105, a fiber cable 106 placed along the casing string 102, a temperature sensor 107, a pressure sensor 108 and a flow rate sensor 109. Although the sensors 107-109 are shown only at the casing shoe 102, they may also be located at the wellhead 101, along the fiber cable 106, at the return line 104 or at the mud pits or a combination thereof.
[0041] Although various embodiments have been described with respect to enabling disclosures, it is to be understood that this document is not limited to the disclosed embodiments. Variations and modifications that would occur to one of skill in the art upon reading the specification are also within the scope of the disclosure, which is defined in the appended claims.

Claims

1. A method for cementing a subterranean well, comprising:
(i) preparing a cement slurry;
(ii) pumping the slurry into the well through a casing interior and, after exiting the casing interior, through an annulus between a casing exterior and a borehole wall;
(iii) real-time monitoring of parameters comprising temperature, pressure or return rate or a combination thereof; and
(iv) comparing the real-time monitored parameters to a previously generated cement placement simulation or a previously generated post-cement placement simulation or both.
2. The method of claim 1, wherein temperature sensors are located at a wellhead, at a casing shoe, along fibers installed throughout the well, or at a return line or a combination thereof.
3. The method of claim 1, wherein pressure sensors are located at a wellhead, at a casing shoe, along fibers installed throughout the well, or at a return line or a combination thereof.
4. The method of claim 1, wherein flow rate sensors are located at a wellhead, at a casing shoe, along fibers installed throughout the well, at a mud pit, or at a return line or a combination thereof.
5. The method of claim 1, wherein the monitored parameters are synchronized and displayed together on a computer screen.
6. The method of claim 1, wherein the post-placement simulation employs calorimetry data to provide a post-placement well temperature prediction.
7. The method of claim 1, wherein the monitored parameters provide a real-time prediction of when the cement slurry will reach a given location in the well.
8. A method for confirming cement-placement events, comprising:
(i) preparing a cement slurry; (ii) pumping the slurry into a well through a casing interior and, after exiting the casing interior, through an annulus between a casing exterior and a borehole wall;
(iii) real-time monitoring of parameters comprising temperature, pressure or return rate or a combination thereof; and
(iv) comparing the real-time monitored parameters to a previously generated cement placement simulation or a previously generated post-cement placement simulation or both.
9. The method of claim 8 wherein temperature sensors are located at a wellhead, at a casing shoe, along fibers installed throughout the well, or at a return line or a combination thereof.
10. The method of claim 8, wherein pressure sensors are located at a wellhead, at a casing shoe, along fibers installed throughout the well, or at a return line or a combination thereof.
11. The method of claim 8, wherein flow rate sensors are located at a wellhead, at a casing shoe, along fibers installed throughout the well, at a mud pit, or at a return line or a combination thereof.
12. The method of claim 8, wherein the monitored parameters are synchronized and displayed together on a computer screen.
13. The method of claim 8, wherein the post-placement simulation employs calorimetry data to provide a post-placement well temperature prediction.
14. The method of claim 8, wherein the cement-placement events comprise landing of a
cementing plug, landing of a cementing dart, passage of a fluid interface past a given location in a well, setting of the cement slurry, or arrival of a cement slurry at a given location in the well, or combinations thereof.
15. A method for modifying a cement placement simulation, comprising:
(i) preparing a cement slurry; (ii) pumping the slurry into a well through a casing interior and, after exiting the casing interior, through an annulus between a casing exterior and a borehole wall;
(iii) real-time monitoring of parameters comprising pump rate, pressure, fluid volume, fluid density or fluid temperature or combinations thereof;
(iv) entering real-time data into a cement placement simulator and allowing the simulator to predict future cement-placement events.
16. The method of claim 15, wherein a cement placement simulation has been performed
before pumping the slurry into the well.
17. The method of claim 15, wherein a cement placement simulation has not been performed before pumping the slurry into the well, and future cement-placement events are predicted in real time.
18. The method of claim 15, wherein temperature sensors are located at a wellhead, at a casing shoe, along fibers installed throughout the well, or at a return line or a combination thereof.
19. The method of claim 15, wherein pressure sensors are located at a wellhead, at a casing shoe, along fibers installed throughout the well, or at a return line or a combination thereof.
20. The method of claim 15, wherein flow rate sensors are located at a wellhead, at a casing shoe, along fibers installed throughout the well, at a mud pit, or at a return line or a combination thereof.
PCT/US2016/040634 2015-07-02 2016-07-01 Methods for monitoring well cementing operations WO2017004484A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EP16818866.2A EP3317488A4 (en) 2015-07-02 2016-07-01 Methods for monitoring well cementing operations

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US14/791,201 US20170002622A1 (en) 2015-07-02 2015-07-02 Methods for monitoring well cementing operations
US14/791,201 2015-07-02

Publications (1)

Publication Number Publication Date
WO2017004484A1 true WO2017004484A1 (en) 2017-01-05

Family

ID=57609202

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2016/040634 WO2017004484A1 (en) 2015-07-02 2016-07-01 Methods for monitoring well cementing operations

Country Status (3)

Country Link
US (1) US20170002622A1 (en)
EP (1) EP3317488A4 (en)
WO (1) WO2017004484A1 (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111587280A (en) * 2018-01-02 2020-08-25 沙特阿拉伯石油公司 Material design for encapsulation and release of additives
CN108955672B (en) * 2018-06-07 2021-02-02 重庆交通大学 Tunnel grouting slurry track monitoring system and method
US11821284B2 (en) 2019-05-17 2023-11-21 Schlumberger Technology Corporation Automated cementing method and system
US11118422B2 (en) 2019-08-28 2021-09-14 Schlumberger Technology Corporation Automated system health check and system advisor
CN110924927B (en) * 2019-11-15 2023-06-27 长江大学 Method, device, equipment and storage medium for positioning well cementation rubber plug downwards in real time
US11920464B2 (en) 2020-01-31 2024-03-05 Halliburton Energy Services, Inc. Thermal analysis of temperature data collected from a distributed temperature sensor system for estimating thermal properties of a wellbore
US11352850B2 (en) 2020-02-01 2022-06-07 Halliburton Energy Services, Inc. Cement as a battery for detection downhole
US11649692B2 (en) * 2020-07-14 2023-05-16 Saudi Arabian Oil Company System and method for cementing a wellbore
US11566514B2 (en) 2020-10-19 2023-01-31 Halliburton Energy Services, Inc. Bottomhole choke for managed pressure cementing
CN113010132B (en) * 2021-03-24 2023-04-18 成都维泰油气能源技术有限公司 Auxiliary system and method for intelligent well control
WO2022216286A1 (en) * 2021-04-07 2022-10-13 Halliburton Energy Services, Inc. Induction loop cementing progress detection

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4794534A (en) * 1985-08-08 1988-12-27 Amoco Corporation Method of drilling a well utilizing predictive simulation with real time data
US7133778B2 (en) * 2002-02-22 2006-11-07 Halliburton Energy Services, Inc. Methods for selecting a cementing composition for use
US7953587B2 (en) * 2006-06-15 2011-05-31 Schlumberger Technology Corp Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs
US20130118752A1 (en) * 2011-11-16 2013-05-16 Weatherford/Lamb, Inc. Managed pressure cementing
US20130292178A1 (en) * 2012-05-07 2013-11-07 Charlotte N. Burress Methods and systems for real-time monitoring and processing of wellbore data

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10428637B2 (en) * 2013-03-04 2019-10-01 Fereidoun Abbassian System and console for monitoring and managing well site operations

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4794534A (en) * 1985-08-08 1988-12-27 Amoco Corporation Method of drilling a well utilizing predictive simulation with real time data
US7133778B2 (en) * 2002-02-22 2006-11-07 Halliburton Energy Services, Inc. Methods for selecting a cementing composition for use
US7953587B2 (en) * 2006-06-15 2011-05-31 Schlumberger Technology Corp Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs
US20130118752A1 (en) * 2011-11-16 2013-05-16 Weatherford/Lamb, Inc. Managed pressure cementing
US20130292178A1 (en) * 2012-05-07 2013-11-07 Charlotte N. Burress Methods and systems for real-time monitoring and processing of wellbore data

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3317488A4 *

Also Published As

Publication number Publication date
US20170002622A1 (en) 2017-01-05
EP3317488A1 (en) 2018-05-09
EP3317488A4 (en) 2019-03-06

Similar Documents

Publication Publication Date Title
US20170002622A1 (en) Methods for monitoring well cementing operations
US20230313646A1 (en) Integrated well completions
US10557341B2 (en) Methods of evaluating cement isolations and quality
CA2796911C (en) Systems and methods for wellbore optimization
EA031769B1 (en) Well modeling associated with extraction of hydrocarbons from subsurface formations
US11499392B2 (en) Designing a wellbore cement sheath in compacting or subsiding formations
US20190277133A1 (en) Advanced perforation modeling
US20150315894A1 (en) Model for strengthening formations
Beirute The phenomenon of free fall during primary cementing
WO2018093374A1 (en) Optimized stimulation for increased production
Pham Estimation of sand production rate using geomechanical and hydromechanical models
NO20171557A1 (en) Draw-down pressure apparatus, systems, and methods
Van der Bol et al. ICD design optimisation with single-well dynamic 3D modelling and real-time operation support
Valisevich et al. The Evolution of Geomechanics Application in the Korchagina Field, North Caspian Sea
Khaksar et al. Integrated Geomechanical Study for Hole Stability, Sanding Potential, and Completion Selection: A Case Study From Southeast Asia
Ibekwe et al. Magnolia casing design for compaction
Laidler et al. A risk analysis approach using stress analysis models to design for cement sheath integrity in a multilateral well
Chong et al. Well Architecture: Prediction of the Life Cycle Critical Drawdown Offered by Means of Passive Sand Control
Gui et al. Numerical Sanding Risk Assessment Considering Cement Bond Coverage
US11732579B2 (en) Method to tailor cement properties and optimize injection schedule for near wellbore integrity in carbon storage/injection wells
Wreden et al. Development and validation of a hydraulics simulator for estimating subsurface reverse cementing placement pressures
US20240209849A1 (en) Method for simulating the effect of plugs on cement placement
Hannegan et al. HPHT Well Construction with Closed-Loop Cementing Technology
Pourpak et al. Solids Production Geomechanical Evaluation in a Fractured/Vuggy Carbonate Reservoir from Abu Dhabi Offshore Field: Postmortem Analysis and Advanced Finite Element Simulations
Kristoffersen A Comparison of Different Models for Probabilistic Kick Tolerance Calculations

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16818866

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

WWE Wipo information: entry into national phase

Ref document number: 2016818866

Country of ref document: EP