WO2015015528A1 - 給電制御装置 - Google Patents
給電制御装置 Download PDFInfo
- Publication number
- WO2015015528A1 WO2015015528A1 PCT/JP2013/004609 JP2013004609W WO2015015528A1 WO 2015015528 A1 WO2015015528 A1 WO 2015015528A1 JP 2013004609 W JP2013004609 W JP 2013004609W WO 2015015528 A1 WO2015015528 A1 WO 2015015528A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- power supply
- control device
- switches
- control unit
- Prior art date
Links
- 238000010248 power generation Methods 0.000 claims abstract description 77
- 238000005259 measurement Methods 0.000 claims description 43
- 230000005611 electricity Effects 0.000 claims description 29
- 230000007935 neutral effect Effects 0.000 claims description 10
- 210000000352 storage cell Anatomy 0.000 abstract 5
- 230000007423 decrease Effects 0.000 description 6
- 230000005855 radiation Effects 0.000 description 5
- 230000006866 deterioration Effects 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 230000005355 Hall effect Effects 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 101000581533 Homo sapiens Methylcrotonoyl-CoA carboxylase beta chain, mitochondrial Proteins 0.000 description 1
- 102100027320 Methylcrotonoyl-CoA carboxylase beta chain, mitochondrial Human genes 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/12—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for AC mains or AC distribution networks for adjusting voltage in AC networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
- H02J3/144—Demand-response operation of the power transmission or distribution network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/10—The dispersed energy generation being of fossil origin, e.g. diesel generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2310/00—The network for supplying or distributing electric power characterised by its spatial reach or by the load
- H02J2310/50—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads
- H02J2310/54—The network for supplying or distributing electric power characterised by its spatial reach or by the load for selectively controlling the operation of the loads according to a pre-established time schedule
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/20—Climate change mitigation technologies for sector-wide applications using renewable energy
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Definitions
- the present invention relates to a power supply control device that controls power supply from a distributed power source to a plurality of consumers.
- a power failure compensation time corresponding to the priority is set for a plurality of power supply lines each connected to a load.
- the secondary battery supplies power to each power supply line, and when the power failure compensation time set for each power supply line elapses from the time of the power failure, power is supplied from the secondary battery to the power supply line. Is to be stopped.
- power is supplied from the secondary battery to the power supply line with the highest priority until the remaining power of the secondary battery runs out.
- the present invention has been made in view of the above-described reasons, and an object thereof is to provide a power supply control device that can sufficiently use the power stored in the storage battery.
- a power supply control device includes a switch connected between a distributed power source and a load that accumulates power generated by a power generation device in a storage battery and supplies the power stored in the storage battery to the outside, and the switch A control unit that controls on / off of the battery, a first measurement unit that measures the remaining amount of electricity stored in the storage battery, and a prediction unit that predicts the power generation amount of the power generation device and the demand amount of the load in a predetermined period in the future.
- the control unit predicts that the remaining amount of electricity measured by the first measurement unit falls below a first threshold and the power generation amount falls below the demand amount in the predetermined period in the future.
- the prediction is configured that the switch is turned off, and the remaining amount of electricity measured by the first measurement unit is below the first threshold, and the power generation amount exceeds the demand amount in the predetermined period in the future. If the department predicts, The control unit is characterized in that it is configured to turn on the switch.
- each of the plurality of switches is connected to the load for a corresponding usage, and the control unit includes a plurality of switches. It is also preferable that each of the switches is configured to be turned on or off separately.
- control unit is configured to set, for each usage, an on time period in which each of the plurality of switches is turned on and an off time period in which each of the plurality of switches is turned off. It is also preferred that
- control unit sets, for each of the plurality of switches, a second threshold value in which the remaining power amount measured by the first measurement unit is lower than the first threshold value even during the on-time period. It is also preferable to be configured to turn it off if it is below.
- the control unit has a power storage remaining amount measured by the first measurement unit equal to or higher than a third threshold value that is higher than the first threshold value even in the off-time period for each of the plurality of switches. If present, it is also preferably configured to be turned on.
- the control unit predicts that the power generation amount exceeds the demand amount in the predetermined period in the future even for each of the plurality of switches even in the off-time period. For example, it is also preferable to be configured to be turned on.
- control unit sets the priority of power supply for each of the plurality of switches according to usage, and gives priority to a switch having a higher priority among the plurality of switches. It is also preferable to be configured to be turned on.
- the load is divided and connected to a plurality of branch circuits, and the switch is connected to each of the plurality of branch circuits, and the power consumption is individually measured for each of the plurality of branch circuits.
- a control unit configured to control on / off of the switch for each of the plurality of branch circuits based on a measurement result of the second measurement unit. It is also preferable.
- control unit is configured to turn off the switch of the branch circuit in which the power consumption measured by the second measurement unit of the plurality of branch circuits exceeds a predetermined limit value. It is also preferable.
- each of the plurality of switches and the corresponding load are connected to each other via a distribution line, and each of the plurality of distribution lines includes a neutral line and a voltage line. It is also preferable that the distribution line is configured to share the neutral line.
- FIG. 3A is a diagram showing a time change in the remaining amount of electricity stored in the storage battery
- FIG. 3B is a diagram showing an on / off state of the switch
- FIG. 3C is a diagram showing a time change in the amount of solar radiation.
- movement of embodiment It is a figure explaining operation
- movement of embodiment It is a figure explaining operation
- movement of embodiment It is a figure showing an example of a power distribution system in an embodiment. It is a figure explaining operation
- the power supply control device of this embodiment is used in a power distribution system that supplies power from a distributed power source to a plurality of consumers.
- a power distribution system to which the power supply control device of the present embodiment is applied is installed in a non-electrified area such as a remote area or an island, and power generated by a distributed power source is supplied to a consumer (for example, a general dwelling unit) It is a relatively small system that is supplied to public facilities such as schools, hospitals, etc.
- FIG. 1 is a diagram illustrating an example of a power distribution system.
- This power distribution system includes a power supply control device 1 that distributes power generated by a distributed power supply 10 (for example, AC 220V AC power) to dwelling units 20 of a plurality of consumers. I have.
- the power distribution destination of the power distribution system is not limited to the general dwelling unit 20 where individual consumers live, but may be a public facility such as a school facility or a hospital, or a business facility such as a factory or a store.
- the distributed power source 10 includes a photovoltaic power generation (PV) 11, a DC / DC converter 12, a storage battery 13, and a DC / AC converter 14.
- PV photovoltaic power generation
- the solar power generation device 11 includes a plurality of solar battery panels that convert sunlight into electric energy, and the power generation capacity is determined according to the power demand of the supply destination.
- the DC / DC converter 12 stabilizes the output of the solar power generator 11 and converts it into a substantially constant DC voltage (for example, DC 48 V), and charges the storage battery 13.
- the storage battery 13 is made of, for example, a lead storage battery, and stores the electric power generated by the solar power generation device 11.
- the DC / AC converter 14 converts the direct current voltage discharged from the storage battery 13 into alternating current (for example, AC 220 V) and outputs it to the power supply control device 1.
- the power generation capacity of the solar power generation device 11 and the storage capacity of the storage battery 13 are prepared in a necessary and sufficient amount with respect to the scale of the load, a large amount of money is required for the introduction and operation of the power distribution system. Therefore, in this embodiment, the power generation capacity and the storage capacity are not prepared in an amount sufficient to satisfy the demand for the entire load, and when the power demand exceeds the power supply amount, the power supply to the entire load is stopped. there is a possibility. In addition, when the storage battery 13 is used in a state where the remaining amount of stored electricity is low, there is a possibility that deterioration will progress and the life will be shortened.
- the power supply control device 1 supplies power to the load based on the power generation amount of the solar power generation device 11, the remaining amount of power stored in the storage battery 13, and the power demand at the load. The operation is switched to a state where the power supply to is cut off, and this operation will be described later.
- the power feeding control device 1 and the plurality of dwelling units 20 are connected via two sets of distribution lines 31 and 32, respectively.
- Each dwelling unit 20 has a plurality of electric devices (loads), and is divided into two types according to usage.
- the electric device used in the dwelling unit 20 is an electric device 21 of the first category indispensable for life such as a lighting fixture, and an entertainment such as a television or an audio device.
- the electric appliance 21 of the first category is connected to the distribution line 31.
- each dwelling unit 20 is provided with an outlet 23 connected to a distribution line 32, and an electric device 22 of the second category is connected to the outlet 23.
- the first category electrical device 21 may be detachably connected to an outlet (not shown) connected to the distribution line 31, and the second category electrical device 22 is directly connected to the distribution line 32. It may be done.
- the distribution line 31 to which the first category electrical device 21 is connected has a higher priority for power supply than the distribution line 32 to which the second category electrical device 22 is connected.
- the two sets of distribution lines 31 and 32 each have a voltage line and a neutral line, and the distribution lines 31 and 32 share the neutral line (see FIG. 10).
- MCCB Molded Case Circuit Breaker
- the power supply control device 1 includes switches 2 ⁇ / b> A and 2 ⁇ / b> B, a measurement unit 3 (first measurement unit), a control unit 4, and a storage unit 5.
- the power supply control device 1 is configured by accommodating switches 2A and 2B, a measurement unit 3, a control unit 4, and a storage unit 5 inside a box made of, for example, a 20-foot container.
- the power supply control device 1 is installed near the distributed power supply 10 and supplies power to the dwelling units 20 of a plurality of consumers via distribution lines 31 and 32.
- the distributed power source 10 is connected to the primary side of the switch 2A, and the distribution lines 31 from each dwelling unit 20 are connected in parallel to the secondary side of the switch 2A.
- the switch 2 ⁇ / b> A is switched on / off by the control unit 4.
- the switch 2A When the switch 2A is turned on, electric power is supplied from the distributed power source 10 to the first category electric device 21 via the distribution line 31, and when the switch 2A is turned off, the electric power source 21 of the first category from the distributed power source 10 is supplied. The power supply to is cut off.
- the distributed power supply 10 is connected to the primary side of the switch 2B, and the distribution line 32 from each dwelling unit 20 is connected in parallel to the secondary side of the switch 2B.
- the switch 2 ⁇ / b> B is switched on / off by the control unit 4.
- the switch 2B When the switch 2B is turned on, power is supplied from the distributed power supply 10 to the second category electrical device 22 via the distribution line 32.
- the switch 2B When the switch 2B is turned off, the second category electrical device 22 is supplied from the distributed power supply 10. The power supply to is cut off.
- the measuring unit 3 measures the power supplied from the DC / AC converter 14 to the load based on the current value measured by the current sensor 6A.
- the current sensor 6A is composed of, for example, a magnetoelectric conversion element using the Hall effect, and measures the output current of the DC / AC converter 14.
- the measuring unit 3 measures the output voltage of the storage battery 13 and estimates the remaining storage amount of the storage battery 13 from this output voltage.
- the measuring unit 3 measures the output power of the DC / DC converter 12 based on the output current of the DC / DC converter 12 measured by the current sensor 6B, and the generated power of the solar power generation device 11 from this output power. Seeking.
- the current sensor 6B is composed of, for example, a magnetoelectric conversion element using the Hall effect, and measures the output current of the DC / DC converter 12.
- the storage unit 5 includes an electrically rewritable nonvolatile memory such as an EEPROM (ElectricallyrErasable Programmable Read-Only Memory) or a RAM (Random Access Memory) provided with a backup power source.
- the storage unit 5 stores data such as the power demand at the load measured by the measurement unit 3, the remaining amount of power stored in the storage battery 13, and the generated power of the solar power generation device 11.
- the storage unit 5 is preset with a first threshold value W1, a second threshold value, and a third threshold value, which will be described later.
- the control unit 4 individually controls on / off of the switches 2A and 2B based on the measurement value of the measurement unit 3, the data stored in the storage unit 5, and the threshold value.
- the control unit 4 receives a predicted value of the amount of solar radiation during the day of the day from an operator of the power distribution system, and predicts the power generated by the photovoltaic power generator 11 based on the predicted value. To do. Further, the control unit 4 predicts a temporal change in the power demand in a future predetermined period (for example, 1 hour) based on the past power demand stored in the storage unit 5. That is, the control unit 4 has a function as a prediction unit that predicts the power generation amount of the solar power generation device 11 and the load demand amount in a future predetermined period.
- an input unit 7 is connected to the power supply control device 1.
- the input unit 7 is used by the operator of the power distribution system to set in the storage unit 5 an on-time zone in which power is supplied to the load and an off-time zone in which power supply to the load is cut off.
- the power distribution system of the present embodiment has the above-described configuration, and the operation will be described below with reference to FIG. 3A shows the remaining amount of electricity stored in the storage battery 13, FIG. 3B shows on / off of the switches 2A and 2B, and FIG. 3C shows the predicted value of the amount of solar radiation.
- the solid line L2 in FIG. 3A and FIG. 3B is based on only the result of comparing the power storage remaining amount of the storage battery 13 with the first threshold W1 without predicting the power generation amount and the power demand as in this embodiment.
- the operation when the switches 2A and 2B are turned on or off is shown.
- a one-dot chain line L1 in FIGS. 3A and 3B indicates that the switches 2A and 2B are turned on or off based on the power generation amount and the predicted value of the power demand when the remaining power of the storage battery 13 falls below the first threshold value W1.
- movement of this embodiment turned off is shown.
- the control unit 4 compares the output voltage (battery voltage) of the storage battery 13 measured by the measurement unit 3 with the predetermined first threshold value W1. If the battery voltage is equal to or higher than the first threshold value W1 (before time t1), the control unit 4 turns on both the switches 2A and 2B and feeds power from the distributed power supply 10 to the loads connected to the distribution lines 31 and 32.
- the control unit 4 opens and closes based on the result of predicting the generated power of the solar power generation device 11 and the demand amount (power demand) at the load.
- the on / off of the devices 2A and 2B is controlled. That is, the control unit 4 predicts the power generation amount of the solar power generation device 11 in the future predetermined period based on the predicted value of the solar radiation amount, and predicts the power demand in the future predetermined period based on the past power demand. To do.
- the control unit 4 determines that the remaining amount of power stored in the storage battery 13 recovers to the first threshold value W1 or more, turns on the switches 2A and 2B, Let the power supply. In this case, since the power demand exceeds the amount of power generation from time t1 to time t2, the remaining amount of power stored in the storage battery 13 gradually decreases as shown by the one-dot chain line L1 in FIG. 3A, but power generation from time t2 to time t4. Since the amount exceeds the electric power demand, the remaining amount of electricity stored in the storage battery 13 gradually increases and becomes almost fully charged at time t4.
- the amount of power generation decreases as the amount of solar radiation decreases, and the power demand exceeds the amount of power generation. Therefore, the remaining amount of power stored in the storage battery 13 decreases after time t5. Since the battery is charged, there is no shortage of the remaining amount of electricity stored in the storage battery 13. Thus, even if the battery voltage falls below the first threshold value W1, if the control unit 4 can predict that the battery voltage of the storage battery 13 will recover based on the prediction of the amount of power generation and the power demand, the switches 2A and 2B are switched on. Keep on.
- the control unit 4 turns off the switches 2A and 2B.
- the switches 2A and 2B are turned off from time t1 to time t3.
- the switches 2A and 2B are kept on as shown by the one-dot chain line L1 in FIG. 3B, and the on-time of the switches 2A and 2B becomes longer. Can be used effectively.
- the period during which the storage battery 13 is fully charged is shortened, the period during which the storage battery 13 has an empty capacity, that is, the period during which the power generated by the solar power generation device 11 can be charged is increased. It can be used effectively.
- the controller 4 turns off the switches 2A and 2B when it is predicted that the power generation amount will fall below the power demand as a result of predicting the power generation amount and power demand in a predetermined period in the future. Thereby, the abnormal fall of the electrical storage residual amount of the storage battery 13 is suppressed, and deterioration of the storage battery 13 becomes difficult to advance.
- the distributed power supply 10 is provided with the solar power generation device 11, the electric power generated by the wind power generation device (not shown) is stored in the storage battery 13 and discharged from the storage battery 13. May be supplied to the load. Since the air volume and wind direction at a certain point are stabilized to some extent depending on the season and time, the control unit 4 determines future predetermined values based on past actual values stored in the storage unit 5 and surrounding weather information. The air volume in the period can be predicted, and the power generation amount of the wind turbine generator can be predicted from the air volume.
- the power generation device provided in the distributed power source 10 is not limited to a power generation device whose power generation amount fluctuates under natural conditions, such as the solar power generation device 11 and the wind power generation device.
- a simple diesel generator may be used. If the operator of the power distribution system sets the power generation capacity of the diesel generator smaller than the power demand of the load in order to reduce the introduction cost, the power demand may exceed the power generation amount.
- the amount of power generated by the diesel generator can be determined to a desired value by the operator of the power distribution system, but the power demand is expected to fluctuate depending on the time zone and the weather conditions of the day.
- the control unit 4 predicts power demand based on past results and weather conditions, and opens and closes based on the power generation amount and power demand in a predetermined period in the future.
- the on / off of the devices 2A and 2B may be controlled.
- the load of each dwelling unit 20 is connected to a separate distribution line for each usage, but the power supply method may be changed for each usage. The operation in that case will be described below.
- the first category of electrical equipment that is indispensable for daily life is connected to the power distribution line 31, and the second category of electrical equipment that provides entertainment is connected to the power distribution line 32.
- the distribution line 31 from each dwelling unit 20 is connected to the switch 2A
- the distribution line 32 from each dwelling unit 20 is connected to the switch 2B
- the control unit 4 connects the switches 2A and 2B. It can be turned on / off individually.
- the control unit 4 When the control unit 4 predicts that the remaining amount of power measured by the measurement unit 3 is less than the first threshold value W1 and the power generation amount falls below the demand amount in a future predetermined period, the control unit 4 turns off the switch 2B. Thus, the power supply to the distribution line 32 is cut off, but the switch 2A is turned on to continue the power supply to the distribution line 31. Thereby, since the power supply to the electric equipment of the second category is stopped, the power demand is suppressed, and the situation where the power supply to all the dwelling units is stopped due to power shortage hardly occurs. Moreover, the abnormal fall of the electrical storage residual amount of the storage battery 13 can be suppressed, and deterioration of the storage battery 13 becomes difficult to advance. Moreover, since electric power supply is continued to the electric appliance of the 1st category, the electric equipment indispensable for life, such as a lighting fixture, can operate
- the power supply control device 1 may set an on-time zone in which power is supplied to the electrical device and an off-time zone in which power supply to the electrical device is stopped for each usage of the electrical device. Since the time zone in which the electrical device is used is determined to some extent depending on the usage, the storage unit 5 is preset with an on-time zone and an off-time zone for each usage of the electrical device.
- Fig. 4 shows an example of setting the on-time zone.
- the on time zone D1 is set to the time zone from 10:00 to 12:00 and from 18:00 to 21:00, and the other time zones are set to the off time zone.
- the on time zone D2 is set to the time zone from 13:00 to 16:00, and the other time zones are set to the off time zone.
- the control unit 4 cuts off the power supply to the first category of electrical equipment and the power supply to the second category of electrical equipment during the off-time period set for each usage of the electrical equipment. Accordingly, since the electric device for the intended use is not used during the off time period set for each intended use, it is possible to suppress the wasteful consumption of power during the off time period, and to reduce the remaining amount of power stored in the storage battery 13. Can be secured.
- the control unit 4 in the predetermined period in the future as described above.
- On / off control of the switches 2 ⁇ / b> A and 2 ⁇ / b> B is controlled based on the prediction result of the power generation amount and the power demand.
- an on-time zone and an off-time zone may be set in advance for each usage of the electric device, and the operator of the power distribution system can perform registration or change using the input unit 7. It may be.
- the on-time period D2 of the electrical device of the second category is set in the storage unit 5 from 13:00 to 16:00, since the power supply to the television is cut off after 16:00, from 15:00 on that day You cannot watch the second half of the program that is broadcast until 18:00.
- the operator of the power distribution system changes the on-time period D2 of the electrical equipment of the second category from 15:00 to 18:00 using the input unit 7 (see FIG. 5), the power supply to the television is up to 18:00.
- the on-time zone and the off-time zone can be set for each use application of the electrical equipment, but the power supply control device 1 of the present embodiment is measured by the measurement unit 3 even in the on-time zone. It is preferable to turn off the switches 2 ⁇ / b> A and 2 ⁇ / b> B if the remaining amount of power storage is below the second threshold.
- the second threshold value is set to a value lower than the first threshold value W1.
- the storage battery 13 will deteriorate. For example, as shown in FIG. 4, when the on-time zone D1 is set and the remaining charge of the storage battery 13 falls below the second threshold during the on-time zone D1, the control unit 4 turns off the switch 2A. In this way, power supply to the electrical equipment of the first category is cut off. Thereby, it can suppress that the electrical storage residual amount of the storage battery 13 falls below a 2nd threshold value, and can suppress degradation of the storage battery 13.
- the control unit 4 turns on the corresponding switch if the remaining power amount measured by the measurement unit 3 is equal to or greater than the third threshold value even in the off-time period. Is also preferable. Thereby, the electric power accumulate
- the third threshold value is set to a value larger than the first threshold value W1 described above.
- the control unit 4 predicts that the power generation amount exceeds the demand amount in a predetermined period in the future.
- the electric power stored in the storage battery 13 can be used effectively even during the off-time period, and the electric device can be used. Time can be made longer.
- control unit 4 sets the priority of power supply for each of the plurality of switches 2A and 2B according to the intended use, and turns on the switch with higher priority with priority.
- the control unit 4 switches to the electric device that is being fed in the on-time period. It is necessary to stop the power supply. If the remaining amount of electricity stored in the storage battery 13 is less than the first threshold value and the amount of power generation is predicted to be less than the power demand in a predetermined period in the future, if there are a plurality of types of electrical equipment in the on-time period, the control unit 4 Cuts off the power supply to the electric equipment for use with a low priority. For example, as shown in FIG.
- the on-time period D1 of the electrical device in the first category is set from 12:00 to 15:00 and from 19:00 to 22:00, and the on-time period of the electrical device in the second category.
- D2 is set from 13:00 to 17:00.
- the control unit 4 stops the power supply to the electric device for the intended use having a low priority.
- the second category electric device providing entertainment is set to have a lower priority than the first category electric device indispensable for daily life.
- the power supply to the category electrical devices is cut off, and power is continuously supplied to the first category electrical devices having a high priority.
- the control part 4 when the electrical storage remaining amount of the storage battery 13 is more than a 3rd threshold value, or when it is estimated that an electric power generation amount will exceed an electric power demand in a predetermined period in the future, the control part 4 will be the use use set to the off time slot
- the power supply control device 1 supplies power also to the electrical device set in the off-time period, and therefore fully utilizes the remaining amount of electricity stored in the storage battery 13. And the time for operating the electric device can be lengthened.
- the control unit 4 supplies power to an electric device for use with a high priority.
- an on-time zone D1 of an electric device of the first category and an on-time zone D2 of the second category are set.
- the off-time zone of the first category electrical equipment is a time zone other than the on-time zone D1
- the off-time zone of the second category electrical equipment is a time zone other than the on-time zone D2.
- the control unit 4 supplies power to the first category of electrical equipment having a higher priority.
- the power supply control device 1 supplies power also to the first category of electrical equipment set in the off time zone. It can be fully utilized, and the time for operating the electrical equipment can be lengthened.
- the power supply control device 1 supplies power to an electric device for use that has been set to a higher priority, and prioritizes power supply to the electric device having a higher priority to operate the electric device having a higher priority. Can do.
- the electric device as a load is divided and connected to a plurality of branch circuits, and a switch 8 may be connected to each of the plurality of branch circuits.
- a distribution line 31 or a distribution line 32 is connected to each switch 8.
- the switch 8 connected to the distribution line 31 is connected to the first category of electrical equipment indispensable for daily life (for example, lighting fixtures of each dwelling unit 20, lighting fixtures 24 of common facilities, schools, etc.) via the distribution line 31.
- An electrical device of the public facility 25) is connected.
- the switch 8 connected to the distribution line 32 is connected via the distribution line 32 to a second category of electrical equipment (for example, a television set of each dwelling unit 20) that provides entertainment.
- each switch 8 is connected to a current sensor 6C for detecting the current flowing through the branch circuit via the switch 8, and the measured value of each current sensor 6C is input to the measuring unit 3. Yes.
- the measuring unit 3 as the second measuring unit measures the power used by each branch circuit based on the current value of each branch circuit measured by the current sensor 6C.
- the measurement unit 3 measures the generated power of the solar power generation device 11 based on the output current of the DC / DC converter 12 measured by the current sensor 6B.
- the measuring unit 3 as the first measuring unit measures the remaining amount of electricity stored in the storage battery 13 based on the output voltage of the storage battery 13.
- the control unit 4 receives the power used by each branch circuit measured by the measurement unit 3 and controls on / off of the switch 8 for each branch circuit based on the power used by each branch circuit. It is configured as follows. It should be noted that the lighting equipment 24 of the common facility and the electrical equipment of the public facility 25 such as a school are classified into the first category of electrical equipment like the lighting equipment of each dwelling unit 20, and are set with high priority.
- the switch 8 is configured to be turned off.
- the control unit 4 turns on the switch 8 when it is predicted that the remaining amount of electricity measured by the measurement unit 3 is less than the first threshold value and the power generation amount exceeds the demand amount in a predetermined period in the future. It is configured.
- the control unit 4 turns on / off the switch 8 provided in each branch circuit based on the power used by each branch circuit measured by the measurement unit 3, and thus enables finer control.
- the control unit 4 can set the priority for each branch circuit, and may control the on / off of the switch 8 according to the priority.
- control unit 4 turns off the switch 8 connected to the branch circuit when the power consumption of a certain branch circuit measured by the measurement unit 3 exceeds a predetermined limit value.
- a lighting apparatus is assumed as the first category electric device having a high priority, and the limit value of the power used in the distribution line 31 to which the first category electric device is connected is. It is assumed that it is set to 200W. Since the distribution line 31 is fed with priority over the distribution line 32, a second category electrical device (such as a television) that provides entertainment is connected to the distribution line 31, and the second category electrical device can be used for as long as possible. It is conceivable that some users will try to do so.
- a first category of electrical equipment 21 for example, a lighting fixture
- the outlet 26 connected to the distribution line 31 belongs to the second category.
- An electric device 22 (for example, a television) is connected.
- the rated power consumption of the television is 150 W, and if a lighting fixture with a rated power consumption of 200 W and a television are used at the same time, the power consumption of this branch circuit is 350 W, which exceeds the limit value of 200 W.
- the control unit 4 compares the power usage of the branch circuit measured by the measurement unit 3 with a predetermined upper limit value. If the power usage of the branch circuit exceeds the upper limit value, the control unit 4 determines that the power is excessively used.
- the switch 8 connected to this branch circuit is turned off, and the power used by each branch circuit can be suppressed to a limit value or less.
- a distribution line 33 to another dwelling unit 27 is connected to a distribution line 31 to a certain dwelling unit 20, and the power supplied to the dwelling unit 20 is stolen and illegally used by the electric equipment of the dwelling unit 27. It can also be used.
- the control unit 4 determines that the power is abnormally used because the power consumption measured by the measurement unit 3 exceeds the upper limit value, and turns off the corresponding switch 8 to connect to this branch circuit. The power supply is cut off, and unauthorized use of power can be suppressed.
- the power supply control device 1 can measure the power consumption of each branch circuit to cut off the power supply to the branch circuit that is using too much power or to the branch circuit that is being stolen, and use the power appropriately. Can be made.
- the power supply control device of this embodiment includes the switches 2A, 2B, 8, the control unit 4, the measurement unit 3 (first measurement unit), and the prediction unit.
- the switches 2A, 2B, and 8 are disposed between the load and the distributed power source 10 that stores the power generated by the solar power generation device 11 (power generation device) in the storage battery 13 and supplies the power stored in the storage battery 13 to the outside. It is connected.
- the control unit 4 controls on / off of the switches 2A, 2B, and 8.
- the measuring unit 3 measures the remaining amount of electricity stored in the storage battery 13.
- the control unit 4 as the prediction unit predicts the power generation amount of the solar power generation device 11 and the demand amount of the load in a predetermined period in the future.
- control unit 4 predicts that the remaining amount of electricity measured by the measurement unit 3 is less than the first threshold value and the power generation amount is below the demand amount in a predetermined period in the future, the control unit 4 switches the switches 2A, 2B, 8 Configured to turn off. If the control unit 4 predicts that the remaining amount of electricity measured by the measurement unit 3 is less than the first threshold and the power generation amount exceeds the demand amount in a predetermined period in the future, the control unit 4 switches the switches 2A, 2B, 8 Configured to turn on.
- a plurality of switches 2A and 2B are provided for each usage of the load, and the load for the corresponding usage is connected to each of the plurality of switches 2A and 2B.
- the control unit 4 sets an on-time zone in which each of the plurality of switches 2A, 2B is turned on and an off-time zone in which each of the plurality of switches 2A, 2B is turned off for each usage. It is also preferable to be configured to do so. Since an on-time zone for supplying power to the load and an off-time zone for cutting off power supply to the load can be set for each usage, a time zone in which the load can be used can be set.
- the control unit 4 has the remaining amount of power measured by the measuring unit 3 below the second threshold value lower than the first threshold value for each of the plurality of switches 2A and 2B even during the on-time period. If so, it is also preferable to be configured to be turned off. When the remaining amount of electricity stored in the storage battery 13 is lower than the second threshold value, the deterioration of the storage battery 13 can be suppressed by cutting off the power supply to the load.
- the control unit 4 has, for each of the plurality of switches 2A and 2B, the remaining amount of electricity measured by the measuring unit 3 is equal to or higher than a third threshold value that is higher than the first threshold value even in the off time period. It is also preferred to be configured to turn on. If the remaining amount of electricity stored in the storage battery 13 is equal to or greater than the third threshold value, the power stored in the storage battery 13 can be used effectively by supplying power from the storage battery 13 to the load.
- the control unit 4 predicts that the power generation amount exceeds the demand amount in a predetermined period in the future for each of the plurality of switches 2A and 2B even in the off-time period. If so, it is also preferable to be configured to be turned on. Even if it is an off time zone, if it is predicted that the storage battery 13 will be charged in the future, the power stored in the storage battery 13 can be effectively used by supplying power from the storage battery 13 to the load.
- control unit 4 sets the priority of power supply for each of the plurality of switches 2A and 2B according to the usage, and the priority is higher among the plurality of switches 2A and 2B. It is also preferable that the switch is turned on with priority. Thereby, according to the priority set according to the intended use, it can be controlled whether electric power is supplied.
- the load is divided and connected to a plurality of branch circuits, and a switch 8 is connected to each of the plurality of branch circuits, and second power for individually measuring the power used for each of the plurality of branch circuits.
- a measurement unit (measurement unit 3) is provided, and the control unit 4 is configured to control on / off of the switch 8 for each of a plurality of branch circuits based on the measurement result of the measurement unit 3. Is also preferable. Thereby, it is possible to control whether or not power is supplied in accordance with the used power measured for each branch circuit.
- control unit 4 may be configured to turn off the switch 8 of the branch circuit in which the power used by the measuring unit 3 among the plurality of branch circuits exceeds a predetermined limit value. preferable. Thereby, the power supply to the branch circuit where the power is used exceeding the limit value can be cut off.
- the load corresponding to each of the plurality of switches 8 is connected via the distribution lines 31 and 32, respectively, and the plurality of distribution lines 31 and 32 are neutral lines and voltage lines. It is also preferable that each of the distribution lines 31 and 32 is configured to share the neutral line. Since the plurality of distribution lines 31 and 32 share the neutral line, the number of wirings can be reduced, and the wiring cost can be reduced.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
Claims (10)
- 発電装置によって発電された電力を蓄電池に蓄積し前記蓄電池に蓄えた電力を外部に供給する分散電源と負荷との間に接続された開閉器と、
前記開閉器のオン/オフを制御する制御部と、
前記蓄電池の蓄電残量を計測する第1計測部と、
今後の所定期間における前記発電装置の発電量及び前記負荷の需要量を予測する予測部とを備え、
前記第1計測部が計測した蓄電残量が第1閾値を下回り、且つ、今後の前記所定期間において前記発電量が前記需要量を下回ると前記予測部が予測すれば、前記制御部は前記開閉器をオフさせるように構成され、
前記第1計測部が計測した蓄電残量が前記第1閾値を下回り、且つ、今後の前記所定期間において前記発電量が前記需要量を上回ると前記予測部が予測すれば、前記制御部は前記開閉器をオンさせるように構成された
ことを特徴とする給電制御装置。 - 前記開閉器が前記負荷の使用用途別に複数設けられ、
複数の前記開閉器の各々には、対応する使用用途の前記負荷が接続されており、
前記制御部は、複数の前記開閉器の各々を別個にオン又はオフするように構成された
ことを特徴とする請求項1記載の給電制御装置。 - 前記制御部は、複数の前記開閉器の各々をオンさせるオン時間帯、及び、複数の前記開閉器の各々をオフさせるオフ時間帯を使用用途毎に設定するように構成された
ことを特徴とする請求項2記載の給電制御装置。 - 前記制御部は、複数の前記開閉器の各々について、前記オン時間帯でも、前記第1計測部が計測した蓄電残量が、前記第1閾値よりも低い第2閾値を下回っていれば、オフさせるように構成された
ことを特徴とする請求項3記載の給電制御装置。 - 前記制御部は、複数の前記開閉器の各々について、前記オフ時間帯でも、前記第1計測部が計測した蓄電残量が、前記第1閾値よりも高い第3閾値以上あれば、オンさせるように構成された
ことを特徴とする請求項3記載の給電制御装置。 - 前記制御部は、複数の前記開閉器の各々について、前記オフ時間帯でも、今後の前記所定期間において前記発電量が前記需要量を上回ると前記予測部が予測していれば、オンさせるように構成された
ことを特徴とする請求項3記載の給電制御装置。 - 前記制御部は、複数の前記開閉器の各々について、電力供給の優先度を使用用途に応じて設定し、複数の前記開閉器のうち、優先度の高い開閉器を優先してオンさせるように構成された
ことを特徴とする請求項3記載の給電制御装置。 - 前記負荷は複数の分岐回路に分かれて接続されており、
前記複数の分岐回路の各々に前記開閉器が接続され、
前記複数の分岐回路の各々について使用電力を個別に計測する第2計測部が設けられ、
前記制御部は、前記第2計測部の計測結果をもとに、前記複数の分岐回路の各々について前記開閉器のオン/オフを制御するように構成された
ことを特徴とする請求項3記載の給電制御装置。 - 前記制御部は、前記複数の分岐回路のうち前記第2計測部によって計測された使用電力が所定の制限値を超えた分岐回路の前記開閉器をオフさせるように構成された
ことを特徴とする請求項8記載の給電制御装置。 - 複数の前記開閉器の各々と対応する前記負荷の間はそれぞれ配電線を介して接続されており、
複数の前記配電線は中性線と電圧線とをそれぞれ備え、複数の前記配電線が前記中性線を共有するように構成された
ことを特徴とする請求項3記載の給電制御装置。
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2013/004609 WO2015015528A1 (ja) | 2013-07-30 | 2013-07-30 | 給電制御装置 |
JP2015529216A JP6187920B2 (ja) | 2013-07-30 | 2013-07-30 | 給電制御装置及び配電システム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2013/004609 WO2015015528A1 (ja) | 2013-07-30 | 2013-07-30 | 給電制御装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2015015528A1 true WO2015015528A1 (ja) | 2015-02-05 |
Family
ID=52431111
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2013/004609 WO2015015528A1 (ja) | 2013-07-30 | 2013-07-30 | 給電制御装置 |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP6187920B2 (ja) |
WO (1) | WO2015015528A1 (ja) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2018188872A1 (de) * | 2017-04-13 | 2018-10-18 | Sma Solar Technology Ag | System zur verteilung lokal erzeugter energie auf mehrere lasteinheiten |
EP3422519A1 (fr) * | 2017-06-29 | 2019-01-02 | Sagemcom Energy & Telecom SAS | Procédé de distribution d'une énergie électrique issue d'une énergie solaire à une pluralité de groupes d'au moins une installation électrique |
JP2019154218A (ja) * | 2018-03-01 | 2019-09-12 | 日新電機株式会社 | 移動体を用いた電力供給システム |
CN117200459A (zh) * | 2023-11-06 | 2023-12-08 | 深圳海辰储能科技有限公司 | 储能系统的信息交互处理方法及相关装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61173636A (ja) * | 1984-12-18 | 1986-08-05 | 三菱電機株式会社 | 電源装置 |
JPH09135541A (ja) * | 1995-11-06 | 1997-05-20 | Hitachi Ltd | 給電システム |
JP2003032890A (ja) * | 2001-07-19 | 2003-01-31 | Senaa Kk | 負荷電力制御装置 |
JP2012228043A (ja) * | 2011-04-18 | 2012-11-15 | Kyocera Corp | 制御装置、電力制御システム、及び電力制御方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006352933A (ja) * | 2005-06-13 | 2006-12-28 | Hitachi Ltd | 電力供給制御方法および電力供給制御システム |
JP5891386B2 (ja) * | 2010-12-15 | 2016-03-23 | パナソニックIpマネジメント株式会社 | 電力制御装置及びそれを用いた電力供給システム |
-
2013
- 2013-07-30 JP JP2015529216A patent/JP6187920B2/ja not_active Expired - Fee Related
- 2013-07-30 WO PCT/JP2013/004609 patent/WO2015015528A1/ja active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61173636A (ja) * | 1984-12-18 | 1986-08-05 | 三菱電機株式会社 | 電源装置 |
JPH09135541A (ja) * | 1995-11-06 | 1997-05-20 | Hitachi Ltd | 給電システム |
JP2003032890A (ja) * | 2001-07-19 | 2003-01-31 | Senaa Kk | 負荷電力制御装置 |
JP2012228043A (ja) * | 2011-04-18 | 2012-11-15 | Kyocera Corp | 制御装置、電力制御システム、及び電力制御方法 |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2020517211A (ja) * | 2017-04-13 | 2020-06-11 | エスエムエイ ソーラー テクノロジー アクティエンゲゼルシャフトSMA Solar Technology AG | ローカルで生成されたエネルギーを複数の負荷ユニットに分配するためのシステム |
US11527887B2 (en) | 2017-04-13 | 2022-12-13 | Sma Solar Technology Ag | System for distributing locally generated energy to multiple load units |
JP7000448B2 (ja) | 2017-04-13 | 2022-01-19 | エスエムエイ ソーラー テクノロジー アクティエンゲゼルシャフト | ローカルで生成されたエネルギーを複数の負荷ユニットに分配するためのシステム |
WO2018188872A1 (de) * | 2017-04-13 | 2018-10-18 | Sma Solar Technology Ag | System zur verteilung lokal erzeugter energie auf mehrere lasteinheiten |
CN109478785A (zh) * | 2017-04-13 | 2019-03-15 | 艾思玛太阳能技术股份公司 | 用于将本地产生的能量分配到多个负载单元上的系统 |
US11043807B2 (en) | 2017-04-13 | 2021-06-22 | Sma Solar Technology Ag | System for distributing locally generated energy to multiple load units |
CN109217356A (zh) * | 2017-06-29 | 2019-01-15 | 萨基姆通讯能源及电信联合股份公司 | 将从太阳能导出的电能分配给多个群组的方法 |
FR3068530A1 (fr) * | 2017-06-29 | 2019-01-04 | Sagemcom Energy & Telecom Sas | Procede de distribution d'une energie electrique issue d'une energie solaire a une pluralite de groupes d'au moins une installation electrique |
CN109217356B (zh) * | 2017-06-29 | 2022-05-13 | 萨基姆通讯能源及电信联合股份公司 | 将从太阳能导出的电能分配给多个群组的方法 |
EP3422519A1 (fr) * | 2017-06-29 | 2019-01-02 | Sagemcom Energy & Telecom SAS | Procédé de distribution d'une énergie électrique issue d'une énergie solaire à une pluralité de groupes d'au moins une installation électrique |
JP2019154218A (ja) * | 2018-03-01 | 2019-09-12 | 日新電機株式会社 | 移動体を用いた電力供給システム |
JP7101337B2 (ja) | 2018-03-01 | 2022-07-15 | 日新電機株式会社 | 移動体を用いた電力供給システム |
CN117200459A (zh) * | 2023-11-06 | 2023-12-08 | 深圳海辰储能科技有限公司 | 储能系统的信息交互处理方法及相关装置 |
CN117200459B (zh) * | 2023-11-06 | 2024-02-27 | 深圳海辰储能科技有限公司 | 储能系统的信息交互处理方法及相关装置 |
Also Published As
Publication number | Publication date |
---|---|
JP6187920B2 (ja) | 2017-08-30 |
JPWO2015015528A1 (ja) | 2017-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5663645B2 (ja) | 制御装置及び制御方法 | |
US9343926B2 (en) | Power controller | |
RU2475923C2 (ru) | Управление энергией альтернативных источников | |
US9099893B2 (en) | Power control device for a power grid, comprising a control unit for controlling an energy flow between the power generation unit, the energy storage unit, the consumer unit and/or the power grid | |
JP5652196B2 (ja) | パワーコンディショナ | |
EP2475060B1 (en) | Energy storage system | |
US9651971B2 (en) | Control device, power control system, and power control method | |
US6680547B1 (en) | Power sharing system including rechargeable power source | |
CN102549902B (zh) | 配电系统 | |
US9620990B2 (en) | Electricity supply management device | |
KR101264142B1 (ko) | 가정과 마이크로그리드에 적용 가능한 신재생에너지시스템 | |
JP2011250673A (ja) | エネルギーコントローラおよび制御方法 | |
JP2012249476A (ja) | 電力供給システム | |
JP2011083084A (ja) | 電力供給システム及び電力供給システムの制御装置 | |
JP5944269B2 (ja) | 電力供給システム | |
US20210296891A1 (en) | System for distributing locally generated energy to multiple load units | |
JP2010041782A (ja) | 配電システム | |
JP2012257365A (ja) | 蓄電池の充放電方法 | |
JP6187920B2 (ja) | 給電制御装置及び配電システム | |
JP6361949B2 (ja) | 充放電制御装置 | |
JP5373528B2 (ja) | 配電装置 | |
KR20200005862A (ko) | 에너지 관리 시스템 및 그 에너지 관리 시스템을 구비한 에너지 저장 시스템 | |
JP2017077092A (ja) | 系統連系システム | |
JP2007049855A (ja) | トンネル内電気設備の電力供給システム | |
JP6783288B2 (ja) | 電力制御装置、及び電力制御方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13890612 Country of ref document: EP Kind code of ref document: A1 |
|
ENP | Entry into the national phase |
Ref document number: 2015529216 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
WWE | Wipo information: entry into national phase |
Ref document number: IDP00201601307 Country of ref document: ID |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 13890612 Country of ref document: EP Kind code of ref document: A1 |