WO2014207884A1 - 経路探索装置、端末装置及び経路探索方法 - Google Patents
経路探索装置、端末装置及び経路探索方法 Download PDFInfo
- Publication number
- WO2014207884A1 WO2014207884A1 PCT/JP2013/067775 JP2013067775W WO2014207884A1 WO 2014207884 A1 WO2014207884 A1 WO 2014207884A1 JP 2013067775 W JP2013067775 W JP 2013067775W WO 2014207884 A1 WO2014207884 A1 WO 2014207884A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- route
- charging
- unit
- search
- destination
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims description 100
- 238000004364 calculation method Methods 0.000 claims abstract description 87
- 230000008569 process Effects 0.000 description 86
- 238000012545 processing Methods 0.000 description 43
- 230000005540 biological transmission Effects 0.000 description 33
- 238000004891 communication Methods 0.000 description 26
- 238000001514 detection method Methods 0.000 description 20
- 238000010586 diagram Methods 0.000 description 11
- FFBHFFJDDLITSX-UHFFFAOYSA-N benzyl N-[2-hydroxy-4-(3-oxomorpholin-4-yl)phenyl]carbamate Chemical compound OC1=C(NC(=O)OCC2=CC=CC=C2)C=CC(=C1)N1CCOCC1=O FFBHFFJDDLITSX-UHFFFAOYSA-N 0.000 description 7
- 230000008901 benefit Effects 0.000 description 5
- 230000004048 modification Effects 0.000 description 5
- 238000012986 modification Methods 0.000 description 5
- 239000000284 extract Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 230000002093 peripheral effect Effects 0.000 description 3
- 238000005265 energy consumption Methods 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 125000002066 L-histidyl group Chemical group [H]N1C([H])=NC(C([H])([H])[C@](C(=O)[*])([H])N([H])[H])=C1[H] 0.000 description 1
- 230000001133 acceleration Effects 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 230000001629 suppression Effects 0.000 description 1
- 210000000707 wrist Anatomy 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C21/00—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
- G01C21/26—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 specially adapted for navigation in a road network
- G01C21/34—Route searching; Route guidance
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L5/00—Current collectors for power supply lines of electrically-propelled vehicles
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/30—Constructional details of charging stations
- B60L53/305—Communication interfaces
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/30—Constructional details of charging stations
- B60L53/32—Constructional details of charging stations by charging in short intervals along the itinerary, e.g. during short stops
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/62—Monitoring or controlling charging stations in response to charging parameters, e.g. current, voltage or electrical charge
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/64—Optimising energy costs, e.g. responding to electricity rates
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/66—Data transfer between charging stations and vehicles
- B60L53/665—Methods related to measuring, billing or payment
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/60—Monitoring or controlling charging stations
- B60L53/67—Controlling two or more charging stations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L58/00—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles
- B60L58/10—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries
- B60L58/12—Methods or circuit arrangements for monitoring or controlling batteries or fuel cells, specially adapted for electric vehicles for monitoring or controlling batteries responding to state of charge [SoC]
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C21/00—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
- G01C21/26—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 specially adapted for navigation in a road network
- G01C21/34—Route searching; Route guidance
- G01C21/3453—Special cost functions, i.e. other than distance or default speed limit of road segments
- G01C21/3469—Fuel consumption; Energy use; Emission aspects
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C21/00—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
- G01C21/26—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 specially adapted for navigation in a road network
- G01C21/34—Route searching; Route guidance
- G01C21/36—Input/output arrangements for on-board computers
- G01C21/3667—Display of a road map
- G01C21/3676—Overview of the route on the road map
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C21/00—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00
- G01C21/26—Navigation; Navigational instruments not provided for in groups G01C1/00 - G01C19/00 specially adapted for navigation in a road network
- G01C21/34—Route searching; Route guidance
- G01C21/36—Input/output arrangements for on-board computers
- G01C21/3697—Output of additional, non-guidance related information, e.g. low fuel level
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L2240/00—Control parameters of input or output; Target parameters
- B60L2240/60—Navigation input
- B60L2240/62—Vehicle position
- B60L2240/622—Vehicle position by satellite navigation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L2240/00—Control parameters of input or output; Target parameters
- B60L2240/60—Navigation input
- B60L2240/64—Road conditions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L2240/00—Control parameters of input or output; Target parameters
- B60L2240/60—Navigation input
- B60L2240/68—Traffic data
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L2240/00—Control parameters of input or output; Target parameters
- B60L2240/70—Interactions with external data bases, e.g. traffic centres
- B60L2240/72—Charging station selection relying on external data
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L2240/00—Control parameters of input or output; Target parameters
- B60L2240/80—Time limits
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L2250/00—Driver interactions
- B60L2250/16—Driver interactions by display
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/70—Energy storage systems for electromobility, e.g. batteries
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/7072—Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/60—Other road transportation technologies with climate change mitigation effect
- Y02T10/72—Electric energy management in electromobility
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/12—Electric charging stations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/14—Plug-in electric vehicles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/16—Information or communication technologies improving the operation of electric vehicles
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02T90/10—Technologies relating to charging of electric vehicles
- Y02T90/16—Information or communication technologies improving the operation of electric vehicles
- Y02T90/167—Systems integrating technologies related to power network operation and communication or information technologies for supporting the interoperability of electric or hybrid vehicles, i.e. smartgrids as interface for battery charging of electric vehicles [EV] or hybrid vehicles [HEV]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S30/00—Systems supporting specific end-user applications in the sector of transportation
- Y04S30/10—Systems supporting the interoperability of electric or hybrid vehicles
- Y04S30/14—Details associated with the interoperability, e.g. vehicle recognition, authentication, identification or billing
Definitions
- the present invention relates to a route search device, a terminal device, a route search method, a route search program, and a recording medium on which the route search program is recorded.
- the use of the “charging lane” has the above-mentioned advantages (i) and (ii) and the above-mentioned disadvantage (iii).
- the use of the “charging spot” has an advantage that the charging cost is lower than the case of using the “charging lane”.
- the route information including the charging plan giving priority to the charging by the “charging lane” and the route information including the charging plan giving priority to the charging by the “charging spot” are presented to the user to assist the user in route selection.
- Meeting this requirement is one of the problems to be solved by the present invention.
- the present invention has been made in view of the above circumstances, and performs a route search including a charging plan using a charging lane and a charging spot to improve a user's convenience,
- An object is to provide a terminal device and a route search method.
- the present invention is a route search device for searching for a route to a destination, and charging by a charging lane that charges a battery held by the moving body when the moving body travels.
- a search unit that searches for a first route that is prioritized and a second route that is prioritized for charging by a charging spot that charges the battery while the moving body is stopped; and the first route and the second route
- a route search device comprising: a generation unit that generates presentation information.
- the present invention is a terminal device arranged in a mobile body that has a battery, and charging by the charging lane that charges the battery as the searched mobile body travels.
- a receiving unit that receives presentation information related to the first route that is prioritized and information related to the second route that is prioritized to be charged by a charging spot that charges the battery while the moving body is stopped; received by the receiving unit; And a presentation unit for presenting the presented presentation information.
- the present invention is a route search method used in a route search device for searching for a route to a destination, and charging a battery held by the mobile object by the mobile object traveling
- the present invention is a route search program characterized by causing a computer included in a route search device for searching for a route to a destination to execute the route search method of the present invention.
- a recording medium on which the route search program of the present invention is recorded so as to be readable by a computer included in a route search device for searching for a route to a destination. is there.
- FIG. 15 is a block diagram schematically showing the configuration of the server device of FIG. 14.
- Control unit a search part, a search part, a calculation part, a production
- 110C Control unit (search unit, search unit, calculation unit, generation unit) 130 ... Sound output unit (presentation part) 140 ... Display unit (presentation part) 300 ... Terminal device 320 ... Wireless communication unit (receiver) 400 ... Server device (route search device) 700 ... route search device 750 ... search unit 760 ... search unit 770 ... calculation unit (first calculation unit, second calculation unit) 780 ... generating unit 790 ... presenting unit 810 ... terminal device 811 ... transmitting unit 812 ... receiving unit 820 ... route search device
- FIG. 1 is a block diagram showing the configuration of a route search apparatus 700 according to the first embodiment.
- the route search device 700 is disposed in a mobile MV (for example, an electric vehicle) that uses electric energy as all of driving energy.
- a mobile MV for example, an electric vehicle
- the moving body MV is equipped with a battery 910 and an ECU (Electrical Control Unit) 920 in addition to the route search device 700.
- a presentation unit 790 is arranged in the moving body MV.
- the moving body MV moves using such driving energy.
- the ECU 920 collects detection results from various sensors that detect the state of the moving body MV.
- the ECU 920 controls and manages the traveling of the moving body MV while sequentially deriving various parameter values useful for controlling the traveling of the moving body MV based on the collected detection results.
- the parameter value derived by the ECU 920 includes the current value of the remaining energy (remaining power amount) of the battery 910. Then, ECU 920 sends the current value of the remaining amount of energy of battery 910 to route search apparatus 700 via an in-vehicle communication network that operates according to a communication protocol such as CAN (Controller Area Network).
- CAN Controller Area Network
- the presentation unit 790 includes a display unit, a sound output unit, and the like.
- the presentation unit 790 receives the presentation data sent from the route search device 700. Then, the presentation unit 790 performs display output, sound output, and the like based on the presentation data.
- the route search device 700 includes an input unit 710, a position detection unit 720, and a recording unit 730, as shown in FIG.
- the route search apparatus 700 includes an acquisition unit 740A, a search unit 750, a search unit 760, and a calculation unit 770.
- the route search apparatus 700 includes a generation unit 780.
- the calculation unit 770 functions as a first calculation unit and a second calculation unit.
- the input unit 710 includes a keyboard and the like.
- the route search command is sent to the acquisition unit 740A.
- the position detection unit 720 described above sequentially detects the current position of the moving body MV. Then, the position detection unit 720 sends the detected current position to the acquisition unit 740A.
- map information includes node (intersection etc.) position information, road link information connecting the nodes, travel time information and travel distance information of each road link, energy consumption information, road type information, and the like. include.
- the “map information” includes information on the section of “charging lane”, the amount of charge per unit mileage or unit time of the charging lane, and the charging fee. Further, the “map information” includes information on the position information of the “charging spot”, the charging amount per unit time of the charging spot, and the charging fee.
- the search unit 750, search unit 760, and calculation unit 770 can access the recording unit 730 via the acquisition unit 740A.
- the acquisition unit 740A acquires the destination set in the route search command sent from the input unit 710. Further, the acquisition unit 740A acquires the current position sent from the position detection unit 720. The destination and the current position acquired in this way are sent to the search unit 750.
- the acquisition unit 740A acquires map information in the recording unit 730 in response to acquisition requests from the search unit 750, the search unit 760, and the calculation unit 770. Then, the acquisition unit 740A sends the acquired map information to the search unit 750, the search unit 760, and the calculation unit 770.
- the acquiring unit 740A acquires the current value of the remaining energy sent from the ECU 920.
- the current value of the remaining energy acquired in this way is sent to search section 750 and calculation section 770.
- the search unit 750 receives the current position and the destination sent from the acquisition unit 740A. In addition, the search unit 750 acquires “map information” in the recording unit 730 via the acquisition unit 740A. In the first embodiment, the search unit 750 first searches for a route to the destination with the shortest travel time as a provisional route while referring to the map information based on the current position and the destination. . Subsequently, the search unit 750 sends information related to the searched temporary route to the search unit 760 and the calculation unit 770.
- the search unit 750 also sends information about “search charge lanes” and “search charge spots” to be described later sent from the search unit 760, and “charge lane travel distance” and “spots” sent from the calculation unit 770. Receives the amount of charge used. Furthermore, search unit 750 receives the current value of the remaining energy sent from acquisition unit 740A. Then, based on the information, the search unit 750 refers to the map information, and charges the first route giving priority to charging by the “charging lane” from the current position to the destination, and charging by the “charging spot”. The priority second route is searched. Information on the first route and the second route searched in this way is sent to the generation unit 780 and the calculation unit 770. Details of the search processing of the first route and the second route by the search unit 750 will be described later.
- the search unit 760 receives the information regarding the temporary route sent from the search unit 750.
- the search unit 760 acquires “map information” in the recording unit 730 via the acquisition unit 740A.
- the search unit 760 searches for “charge lanes” existing around the temporary route based on the information about the temporary route and the map information.
- the search unit 760 generates information related to the “search charge lane” including the section information of the searched charge lane (hereinafter also referred to as “search charge lane”).
- Information regarding the “search charge lane” generated in this way is sent to the search unit 750.
- the “search charging lane” is not limited to that existing on the provisional route.
- the search unit 760 searches for “charging spots” existing around the temporary route based on the information about the temporary route and the map information. Then, the search unit 760 generates information related to the “search charge spot” including the position information of the searched charge spot (hereinafter also referred to as “search charge spot”). Information on the “search charging spot” generated in this way is sent to the search unit 750.
- search charging spot is not limited to that existing on the provisional route.
- the calculation unit 770 receives the information on the temporary route sent from the search unit 750. In addition, calculation unit 770 receives the current value of the remaining energy sent from acquisition unit 740A. Furthermore, the calculation unit 770 acquires “map information” in the recording unit 730 via the acquisition unit 740A.
- the calculation part 770 calculates electric energy required in order for the mobile body MV to drive
- the calculation unit 770 compares the calculated amount of electric power with the current value of the remaining energy, and without charging the battery 910, the first predetermined amount of energy (for example, 10% of full charge). The first determination is made as to whether or not the moving body MV can reach the destination. Subsequently, the calculation unit 770 sends the result of the first determination to the search unit 750 and the search unit 760.
- the “first predetermined amount” is an experiment, simulation, experience, from the viewpoint that it is desirable to charge at least when the mobile unit MV reaches the destination for future driving. Etc., based on the above.
- the calculation unit 770 determines the amount of power necessary for the mobile MV to travel to the destination and the current value of the remaining energy, A travel distance (hereinafter also referred to as “charge lane travel distance”) by which the moving body MV should travel in the charging lane in order to travel to the destination is calculated.
- the “charge lane travel distance” calculated in this way is sent to the search unit 750.
- the calculation unit 770 also charges the charging spot to travel to the destination based on the amount of power required for the mobile MV to travel to the destination and the current value of the remaining energy. (Hereinafter, “spot usage charge amount”) is calculated. The “spot usage charge amount” calculated in this way is sent to the search unit 750.
- the calculation unit 770 receives information on the first route and the second route sent from the search unit 750. Then, the calculation unit 770 refers to the map information and calculates the charging fee and the estimated required time for each of the first route and the second route based on the information on the first route and the second route. Information on the charging fee and the estimated required time calculated in this way is sent to the generation unit 780.
- the generation unit 780 receives the information on the first route and the second route sent from the search unit 750. In addition, the generation unit 780 receives the information regarding the charging fee and the information regarding the estimated required time for each of the first route and the second route sent from the calculation unit 770. And the production
- route search processing by the route search apparatus 700 will be described.
- the route search processing it is assumed that the current position of the detected moving body MV is sequentially sent from the position detection unit 720 to the acquisition unit 740A. Further, it is assumed that the current value of the remaining energy of battery 910 is sequentially sent from ECU 920 to acquisition unit 740A.
- the acquisition unit 740A acquires the current position and sends it to the search unit 750.
- acquisition unit 740A acquires the current value of the energy remaining amount and sends it to search unit 750 and calculation unit 770.
- this route search device 700 when a route search command in which a destination is set is input to the input unit 710, and the fact is sent from the input unit 710 to the acquisition unit 740A, the acquisition unit 740A is set. Get a destination. Then, the acquisition unit 740A sends the acquired destination to the search unit 750.
- the search unit 750 that has received the destination sent from the acquisition unit 740A, based on the destination and the current position sent from the acquisition unit 740A, without considering the remaining energy at that time, While referring to the map information in the recording unit 730, the route from the current position where the travel time is the shortest to the destination is searched as a provisional route. When the provisional route is searched in this way, the search unit 750 first sends information on the provisional route to the search unit 760 and the calculation unit 770.
- the calculation unit 770 that has received information on the provisional route first refers to the map information in the recording unit 730 to calculate the amount of power required for the mobile MV to travel to the destination. Based on the calculated power amount and the current value of the remaining energy, the calculation unit 770 leaves the first predetermined amount of energy without charging the battery 910, while the mobile unit MV is at the destination. A first determination is made as to whether it can be reached. Subsequently, the calculation unit 770 sends the result of the first determination to the search unit 750 and the search unit 760.
- the positive first determination result is referred to as “charging unnecessary determination”
- the negative first determination result is referred to as “charging required determination”.
- the search unit 760 that has received the information on the temporary route refers to the map information in the recording unit 730, and Search for “charging lanes” and “charging spots” in the vicinity.
- the search unit 760 When the charging lane is searched in this way, the search unit 760 generates information related to “search charging lane” including section information of the searched charging lane, and sends the information to the searching unit 750.
- the search unit 760 When the charging spot is searched, the search unit 760 generates information related to “search charging spot” including the position information of the searched charging spot, and sends the information to the searching unit 750.
- the search unit 760 searches for “charging lane” and “charging spot”. There is no such thing.
- the calculation unit 770 refers to the map information in the recording unit 730 and calculates the electric energy and the remaining energy required to travel to the destination. Based on the current amount value, a “charge lane travel distance”, which is a travel distance that the mobile unit MV should travel on the charge lane, is calculated. In addition, the calculation unit 770 calculates a “spot use charge amount” that is a charge amount to be charged at a charging spot in order to travel to the destination. When the “charge lane travel distance” and the “spot use charge amount” are calculated in this way, the calculation unit 770 sends the “charge lane travel distance” and the “spot use charge amount” to the search unit 750.
- the search unit 750 Upon receiving the information related to “search charge lane” and “charge spot” sent from the search unit 760 and “charge lane travel distance” and “spot use charge amount” sent from the calculation unit 770, the search unit 750 The first route and the second route from the current position to the destination are searched.
- the search unit 750 when searching for the first route, in the first embodiment, the search unit 750 first charges the second predetermined amount of energy (without charging at the search charging spot based on the information on the “search charging lane”). For example, the second determination is made as to whether or not there is a search charge lane that can be reached from the departure position while leaving 20% of the full charge). When the result of the second determination is affirmative, search unit 750 extracts the reachable charging lane as a charging lane candidate for feeding.
- the extracted charging lane candidates for power supply are not limited to those existing on the provisional route.
- the “second predetermined amount” is determined in advance based on experiments, simulations, experiences, and the like, from the viewpoint that it is desirable to charge for future travel.
- the search unit 750 derives charge lane travel section candidates so that the travel distance of the charge lane becomes the “charge lane travel distance” for each of the extracted power supply charge lane candidates.
- the search unit 750 moves from the charging lane candidate to the destination.
- a charging lane that exists in the direction of travel and can be reached without charging at the charging spot is extracted as a charging lane candidate for the next power feeding.
- search unit 750 derives the next charging lane travel section candidate such that the travel distance in the next power supply charging lane candidate is an insufficient distance of “charging lane travel distance”. Thereafter, the above-described processing is repeated until the traveling distance of the charging lane becomes the “charging lane traveling distance”.
- the search unit 750 first exists between the search charge lane in the direction from the departure position to the destination and the current A search charging spot that can be reached by the mobile unit MV with the remaining energy is extracted as a charging spot for feeding. Then, the search unit 750 makes a charging plan for charging the battery as much as necessary to travel to the nearest search charging lane using the charging spot for power supply via the charging spot for power supply. Subsequently, the search unit 750 sets the closest search charging lane as a charging lane candidate for feeding, and runs the charging lane based on the charging amount based on the charging plan using the charging spot and the estimated amount of remaining energy at that time. A section is derived.
- the search unit 750 charges the charging spot in the direction from the charging lane candidate to the destination when the total distance of the charging lane candidates is less than the “charging lane travel distance”.
- the search charging spot that can be reached by the mobile MV is extracted as the charging spot for power feeding.
- the search unit 750 makes a charging plan for charging the battery necessary for traveling to the nearest search charging lane using the charging charging spot via the extracted charging charging spot.
- the search unit 750 sets the closest search charging lane as a charging lane candidate for feeding, and based on the charging amount based on the charging plan using the charging spot and the estimated amount of remaining energy at that time, the charging lane travel section Is to be derived.
- the search unit 750 travels through the charging lane traveling section candidate in the extracted charging lane candidate for power supply, and the route information in which the traveling time from the current position to the destination is the shortest is the map information in the recording unit 730. Search while referring to. Then, the search unit 750 determines the route having the shortest travel time as the first route from among the routes that travel on the searched power supply charging lane candidates.
- search unit 750 leaves the second predetermined amount of energy without performing charging in the charging lane based on the information related to the “search charging spot”.
- a third determination is made as to whether or not there is a search charging spot that can be reached from the departure position. Then, when the result of the third determination is affirmative, search unit 750 extracts the reachable charging spot as a charging spot candidate for feeding.
- the extracted charging spot candidates for feeding are not limited to those existing on the provisional route.
- the search unit 750 derives charge amount candidates so that the charge amount at the charge spot becomes “spot use charge amount” for each extracted power supply charge spot candidate.
- the search unit 750 exists in a direction from the charging spot candidate for power supply toward the destination, and A charging spot that can be reached without charging in the charging lane is extracted as a charging spot candidate for next power feeding.
- search unit 750 derives the next charge amount candidate such that the charge amount at the next power supply charging spot candidate is an insufficient charge amount of “spot use charge amount”. Thereafter, the above-described processing is repeated until the total charge amount reaches the “spot use charge amount”.
- the search unit 750 first exists between the search charging spot closest to the direction from the departure position to the destination, and at the present time A search charge lane that can be reached by the mobile unit MV with the remaining energy is extracted as a power supply charge lane. Then, the search unit 750 makes a charging plan for charging the battery as much as necessary to travel to the nearest search charging spot using the power supply charging lane via the power supply charging lane. Subsequently, the search unit 750 sets the closest search charging spot as a charging spot candidate for feeding, and calculates the charging amount based on the charging amount based on the charging plan using the charging lane, the estimated amount of remaining energy at that time, and the like. It comes to derive.
- the search unit 750 charges the charging lane in the direction from the charging spot candidate for feeding toward the destination when the total charging amount at the charging spot candidate for feeding is less than the “spot usage charging amount”.
- a search charging lane that can be reached by the mobile MV is extracted as a charging lane for power supply.
- the search unit 750 makes a charging plan for charging the battery necessary for traveling to the nearest search charging spot using the charging charging lane via the extracted charging charging lane. .
- the search unit 750 sets the closest search charging spot as a charging spot candidate for feeding, and calculates the charging amount based on the charging amount based on the charging plan using the charging lane, the estimated amount of remaining energy at that time, and the like. It comes to derive.
- the search unit 750 charges the charge amount candidate via the extracted charging spot candidate for power feeding, and the traveling time from the current position to the destination including the charging time at the search charging spot is the shortest.
- the route to be searched is searched with reference to the map information in the recording unit 730.
- the search unit 750 determines, as a second route, a route having the shortest travel time from among the routes that pass through the searched power supply charging spot candidates.
- search unit 750 sets the provisional route as a recommended route for presentation when the result of the first determination sent from the calculation unit 770 is “charge unnecessary determination”.
- the search unit 750 sends information related to the searched first route and second route to the generation unit 780 and the calculation unit 770.
- the calculation unit 770 receives the information on the first route and the second route, the calculation unit 770 refers to the map information and calculates the charging fee and the estimated required time for each of the first route and the second route. Then, the calculation unit 770 sends information related to the calculated charging charge and estimated required time to the generation unit 780.
- the generation unit 780 presents the information based on the information on the first route and the second route, the charging fee for each of the first route and the second route, and information on the estimated required time. Generate presentation information. Then, the generation unit 780 sends the generated presentation information to the presentation unit 790. As a result, the presentation information regarding the first route and the second route is output by the presentation unit 790.
- the acquisition unit 740A acquires the current position of the moving object MV detected by the position detection unit 720, and sends the current position to the search unit 750.
- the acquisition unit 740A acquires the destination and sends the destination to the search unit 750. Then, based on the current position and the destination of the moving body MV, the search unit 750 first searches for a route to the destination with the shortest travel time as a provisional route.
- the search unit 760 displays “charging” that exists around the provisional route. Search for “lane” and “charging spot”. Further, the calculation unit 770 calculates a shortage from the remaining power amount of the battery 910 with respect to the power amount necessary for the mobile body MV to travel to the destination, and is the distance that the mobile body MV should travel on the charging lane. “Charging lane travel distance” is calculated. In addition, the calculation unit 770 calculates a “spot use charge amount” that is a charge amount to be charged at a charging spot in order to travel to the destination.
- the search unit 750 gives priority to the use of the charging lane and suppresses the charging cost based on the information on the “charging lane travel distance”, the “search charging lane”, the estimated amount of remaining energy, and the like. Search for a route. Further, the search unit 750 gives priority to the use of the charging spot and suppresses the charging cost based on the information on the “spot usage charging amount”, the “search charging spot”, the estimated amount of remaining energy, and the like. Search for a route. Then, the search unit 750 sends information on the first route and the second route to the generation unit 780 and the calculation unit 770.
- the calculation unit 770 that has received the information on the first route and the second route refers to the map information and calculates the charging fee and the estimated required time for each of the first route and the second route. Then, the calculation unit 770 sends information related to the calculated charging charge and estimated required time to the generation unit 780. Next, the generation unit 780 presents the information based on the information on the first route and the second route, the charging fee for each of the first route and the second route, and information on the estimated required time. Presentation information is generated, and the generated presentation information is sent to the presentation unit 790. As a result, the presentation information regarding the first route and the second route is presented by the presentation unit 790.
- the first route giving priority to charging by the charging lane and the second route giving priority to charging by the charging spot are searched for, and the presentation information including the charging fee and the estimated required time for the first route and the second route are It can be presented to the user before leaving for the ground. As a result, the user can select a route along the request.
- the route search including the charging plan using the charging lane and the charging spot is performed, and the convenience for the user can be improved.
- FIG. 2 is a block diagram illustrating configurations of the terminal device 810 and the route search device 820 according to the second embodiment.
- the terminal device 810 is disposed in the moving body MV, and is connected to a battery 910 and an ECU 920 provided in the moving body MV.
- the terminal device 810 and the route search device 820 can communicate with each other via the network 850.
- route search apparatus 820 can communicate with other terminal apparatuses configured in the same manner as the terminal apparatus 810, but only the terminal apparatus 810 is representatively shown in FIG.
- the terminal device 810 includes an input unit 710, a position detection unit 720, an acquisition unit 740B, and a presentation unit 790.
- the terminal device 810 includes a transmission unit 811 and a reception unit 812.
- the terminal device 810 does not include the recording unit 730, the search unit 750, the search unit 760, the calculation unit 770, and the generation unit 780, compared to the route search device 700 (see FIG. 1) of the first embodiment described above.
- the difference is that an acquisition unit 740B is provided instead of the acquisition unit 740A, and a presentation unit 790, a transmission unit 811 and a reception unit 812 are further provided.
- description will be made mainly focusing on these differences.
- the acquisition unit 740B acquires the destination set in the route search command sent from the input unit 710 and the current position sent from the position detection unit 720. In addition, the acquisition unit 740B acquires the current value of the remaining energy sent from the ECU 920. The destination and the current position acquired in this way and the current value of the remaining energy are sent to the transmission unit 811 as terminal transmission data.
- the transmission unit 811 receives the terminal transmission data transmitted from the acquisition unit 740B. Then, the transmission unit 811 transmits the terminal transmission data to the route search device 820 via the network 850.
- the reception unit 812 receives presentation information regarding the first route and the second route sent from the route search device 820 via the network 850 (this information is also referred to as “server transmission data”). Then, the reception unit 812 sends presentation information regarding the first route and the second route to the presentation unit 790.
- the route search device 820 includes a recording unit 730, an acquisition unit 740C, a search unit 750, a search unit 760, a calculation unit 770, and a generation unit 780.
- the route search apparatus 820 includes a receiving unit 821 and a transmitting unit 822.
- the route search device 820 does not include the input unit 710 and the position detection unit 720 as compared with the route search device 700 (see FIG. 1) of the first embodiment described above, and an acquisition unit instead of the acquisition unit 740A.
- the difference is that 740C is provided, and that a receiver 821 and a transmitter 822 are further provided.
- the acquisition unit 740C acquires map information in the recording unit 730 in response to acquisition requests from the search unit 750, the search unit 760, and the calculation unit 770. Then, the acquisition unit 740C sends the acquired map information to the search unit 750, the search unit 760, and the calculation unit 770.
- the receiving unit 821 receives terminal transmission data transmitted from the terminal device 810 via the network 850. Then, the reception unit 821 sends the destination and the current position included in the terminal transmission data to the search unit 750. In addition, the reception unit 821 transmits the current value of the remaining energy included in the terminal transmission data to the search unit 750 and the calculation unit 770.
- the transmission unit 822 receives the presentation information related to the first route and the second route sent from the generation unit 780. Then, the transmission unit 822 transmits presentation information regarding the first route and the second route to the terminal device 810 via the network 850.
- the destination and the current position acquired by the acquisition unit 740B of the terminal device 810 are routed via the transmission unit 811, the network 850, and the reception unit 821. It is sent to the search unit 750 of the search device 820. Also, the current value of the remaining energy acquired by the acquisition unit 740B of the terminal device 810 is transmitted to the search unit 750 and the calculation unit 770 of the route search device 820 via the transmission unit 811, the network 850, and the reception unit 821. become.
- the presentation information related to the first route and the second route generated by the generation unit 780 of the route search device 820 is sent to the reception unit 812 of the terminal device 810 via the transmission unit 822 and the network 850.
- the route search process will be described.
- the current position of the detected moving object MV is sequentially transmitted from the position detection unit 720 to the acquisition unit 740B.
- the current value of the remaining energy of the battery 910 is sequentially sent from the ECU 920 to the acquisition unit 740B.
- the acquisition unit 740B acquires the current position and sends it to the search unit 750 of the route search apparatus 820 via the network 850.
- the acquisition unit 740B acquires the current value of the remaining energy level and sends it to the search unit 750 and the calculation unit 770 of the route search device 820 via the network 850.
- the acquisition unit 740B sets the set destination. To get. Then, the acquisition unit 740B sends the acquired destination to the search unit 750 of the route search device 820 via the network 850.
- the search unit 750 that has received the destination, in the same way as in the first embodiment described above, based on the destination and the current position transmitted from the terminal device 810 the latest amount of energy at that time.
- the route from the current position where the travel time is the shortest to the destination is searched as a provisional route while referring to the map information in the recording unit 730 without considering the above.
- the search unit 750 first sends information on the searched provisional route to the search unit 760 and the calculation unit 770.
- the calculation unit 770 that has received information on the provisional route first determines whether the mobile MV can reach the destination without charging the battery 910, as in the case of the first embodiment described above. A first determination of whether or not is made. Then, the calculation unit 770 sends the result of the first determination to the search unit 750 and the search unit 760.
- the search unit 760 When the result of the first determination sent from the calculation unit 770 is “determination required for charging”, the search unit 760 that has received information on the provisional route performs “search” in the same manner as in the first embodiment described above. Information on “charging lane” and “search charging spot” is generated. Then, the search unit 760 sends information related to the generated “search charge lane” and “search charge spot” to the search unit 750.
- the calculation unit 770 calculates “charge lane travel distance” and “spot use charge amount” in the same manner as in the first embodiment described above. Then, the calculation unit 770 sends the calculated “charge lane travel distance” and “spot usage charge amount” to the search unit 750.
- search unit 750 Upon receiving the information related to “search charging lane” and “search charging spot” sent from search unit 760 and “charge lane travel distance” and “spot usage charge amount” sent from calculation unit 770, search unit 750 is received. Searches for the first route and the second route in the same manner as in the first embodiment described above. Then, the search unit 750 sends information related to the searched first route and second route to the generation unit 780 and the calculation unit 770.
- the calculation unit 770 that has received the information on the first route and the second route calculates the charging fee and the estimated required time for each of the first route and the second route in the same manner as in the first embodiment. Then, the calculation unit 770 sends information related to the calculated charging charge and estimated required time to the generation unit 780.
- the generation unit 780 relates to the information on the first route and the second route, the charging fee for each of the first route and the second route, and the estimated required time. Based on the information, presentation information regarding the first route and the second route is generated. Then, the generation unit 780 sends presentation information regarding the first route and the second route to the reception unit 812 of the terminal device 810 via the network 850.
- the receiving unit 812 that has received the presentation information related to the first route and the second route sends the presentation information presentation information related to the first route and the second route to the presentation unit 790.
- the presentation information regarding the first route and the second route is output by the presentation unit 790 as in the case of the first mode.
- the acquisition unit 740B of the terminal device 810 acquires the current position of the moving object MV detected by the position detection unit 720, and the current position is searched for by the route search device 820. Part 750.
- the acquisition unit 740B acquires the destination, and the destination is searched for by the search unit of the route search device 820. To 750. Then, based on the current position and the destination of the moving body MV, the search unit 750 first searches for a route to the destination with the shortest travel time as a provisional route.
- the calculation unit 770 of the route search device 820 reaches the destination without charging the battery 910 based on the current value of the remaining energy of the battery 910 transmitted from the terminal device 810. It is determined whether or not it can be performed. Then, if it is determined that the mobile unit MV cannot reach the destination without performing battery charging with the current value of the remaining energy level, the search unit 760 displays “charging” that exists around the provisional route. Search for “lane” and “charging spot”. Further, the calculation unit 770 calculates a shortage from the remaining power amount of the battery 910 with respect to the power amount necessary for the mobile body MV to travel to the destination, and is the distance that the mobile body MV should travel on the charging lane. “Charging lane travel distance” is calculated. In addition, the calculation unit 770 calculates a “spot use charge amount” that is a charge amount to be charged at a charging spot in order to travel to the destination.
- the search unit 750 gives priority to the use of the charging lane and suppresses the charging cost based on the information on the “charging lane travel distance”, the “search charging lane”, the estimated amount of remaining energy, and the like. Search for a route. Further, the search unit 750 gives priority to the use of the charging spot and suppresses the charging cost based on the information on the “spot usage charging amount”, the “search charging spot”, the estimated amount of remaining energy, and the like. Search for a route. Then, the search unit 750 sends information on the first route and the second route to the generation unit 780 and the calculation unit 770.
- the calculation unit 770 that has received the information on the first route and the second route refers to the map information and calculates the charging fee and the estimated required time for each of the first route and the second route. Then, the calculation unit 770 sends information related to the calculated charging charge and estimated required time to the generation unit 780. Next, the generation unit 780 presents the information based on the information on the first route and the second route, the charging fee for each of the first route and the second route, and information on the estimated required time. Presentation information is generated and transmitted to the terminal device 810. As a result, the presentation information regarding the first route and the second route is presented by the presentation unit 790.
- the first route giving priority to charging by the charging lane and the second route giving priority to charging by the charging spot are searched, and charging related to the first route and the second route is performed.
- the presentation information including the fee and the estimated required time can be presented to the user before departure to the destination. As a result, the user can select a route along the request.
- a route search including a charging plan using a charging lane or a charging spot can be performed to improve user convenience. it can.
- the search unit searches for a route to the destination with the shortest travel time as a temporary route, but searches for a route with the shortest travel distance as a temporary route. It may be.
- the calculation unit calculates the amount of power necessary for the mobile body to travel to the destination, and calculates the calculated power amount and the current value of the remaining battery energy. Based on the above, the travel distance (charge lane travel distance) that the mobile MV should travel on the charging lane in order to travel to the destination is calculated.
- the search unit searches for the first route to the destination based on the charging lane travel distance and the like.
- the calculation unit based on the calculated electric energy and the current value of the remaining amount of battery energy, travel time (charging) in which the mobile MV should travel in the charging lane in order to travel to the destination (Lane travel time) may be calculated. Then, the search unit may search for the first route to the destination based on the charging lane travel time.
- the calculation unit may calculate both the charging lane traveling time and the charging lane traveling distance. Then, the search unit may search for the first route to the destination based on the charging lane traveling time and the charging lane traveling distance.
- the amount of power required to travel to the destination in the first, second, and third determinations described above is acquired from map data and used directly.
- the power amount may be multiplied by a coefficient based on the power consumption characteristics of the mobile unit MV, past driving performance, or the like.
- the first, second, and third determinations described above are compared between the remaining energy of the moving body MV and the amount of power required to travel to the determination target point.
- the estimated cruising range information acquired from the external ECU 920 may be compared with the distance to the determination target point.
- the search unit searches for a route to the destination with the shortest travel time, but may search for a route with the shortest travel distance.
- the calculation unit calculates the estimated required time to the destination as the presentation information related to the searched route.
- the calculation unit calculates the estimated arrival time of the destination.
- both the estimated required time and the estimated arrival time may be calculated.
- the search unit searches for two types of provisional routes as a provisional route, a toll use provisional route that travels without restricting use of the toll road and a toll avoidance provisional route that travels while avoiding the toll road. It may be.
- the search unit searches for the first route and the second route that travel without restricting the use of the toll road based on the toll use provisional route, and based on the toll avoidance provisional route, The first route and the second route traveling while avoiding the vehicle are searched.
- generation part may produce
- the route search device 700 includes the input unit 710 and the position detection unit 720.
- the terminal device 810 includes the input unit 710 and the position detection unit 720. did.
- the sharable element is used so that the route search device of the first embodiment or the first You may make it abbreviate
- the current value of the remaining energy is reported from the external ECU 920.
- it may be configured to include a sensor or the like for detecting the remaining energy.
- the route search device 820 includes a search unit, a search unit, a calculation unit, and a generation unit.
- the generation unit may be a component of the terminal device. it can.
- the route search device according to the first embodiment described above is not provided with the presentation unit, the route search device according to the first embodiment may include a presentation unit.
- the terminal device of said 2nd Embodiment was provided with the presentation part, when the existing presentation part which can be utilized exists, the said existing presentation part is utilized and a terminal device presents. It is good also as a structure which is not provided with a part.
- the route search device of the first embodiment and the terminal device of the second embodiment may be a device having a screen display function such as a smartphone, or the route search of the second embodiment.
- the device may be a personal computer arranged in the home.
- the information on the charging facility such as the “charging lane” section information and the “charging spot” position information is recorded in the recording unit.
- information on the charging facility may be acquired from an external system server.
- the present invention is applied to a device arranged in an electric vehicle.
- the present invention is applied to a vehicle (for example, a hybrid vehicle) that uses electric energy as part of driving energy.
- a vehicle for example, a hybrid vehicle
- the present invention can be applied to a device to be arranged.
- the acquisition unit, the search unit, the search unit, the calculation unit, and the generation unit of the route search device according to the first embodiment are configured as a computer as a calculation unit including a central processing unit (CPU: Central Processing Unit). Then, a part or all of the processing of these elements may be executed by executing a program prepared in advance on the computer.
- This program is recorded on a computer-readable recording medium such as a hard disk, CD-ROM, or DVD, and is loaded from the recording medium and executed by the computer.
- the program may be acquired in a form recorded on a portable recording medium such as a CD-ROM or DVD, or may be acquired in a form distributed via a network such as the Internet. Also good.
- the acquisition unit of the terminal device of the second embodiment, the acquisition unit, the search unit, the search unit, the calculation unit, and the generation unit of the route search device include a central processing unit (CPU: Central Processing Unit) and the like.
- the computer may be configured as a computing unit, and a part of or all of the processing of these elements may be executed by executing a program prepared in advance on the computer.
- This program is recorded on a computer-readable recording medium such as a hard disk, CD-ROM, or DVD, and is loaded from the recording medium and executed by the computer.
- the program may be acquired in a form recorded on a portable recording medium such as a CD-ROM or DVD, or may be acquired in a form distributed via a network such as the Internet. Also good.
- FIG. 3 is a block diagram illustrating a schematic configuration of the route search apparatus 100 according to the first embodiment.
- This route search device 100 is an aspect of the route search device 700 (see FIG. 1) of the first embodiment described above.
- the route search device 100 is disposed in an electric vehicle CR (hereinafter referred to as “vehicle CR”) that uses electric energy as all of driving energy.
- vehicle CR corresponds to the moving body MV.
- the vehicle CR is equipped with a battery 210 and an ECU 220.
- the battery 210 stores the energy for driving the vehicle CR.
- the vehicle CR travels using this driving energy.
- the battery 210 can be charged with driving energy at “charging lane” and “charging spot”, at home, or the like.
- the ECU 220 collects detection results from various sensors that detect the state of the vehicle CR.
- the ECU 220 controls and manages the traveling of the vehicle CR while sequentially deriving various parameter values useful for controlling the traveling of the vehicle CR based on the collected detection results.
- the parameter value derived by the ECU 220 includes the current value (remaining power amount) of the remaining energy of the battery 210. Then, ECU 220 sends the current value of the remaining amount of energy of battery 210 to route search device 100 using an in-vehicle communication network that operates according to a communication protocol such as CAN (Controller Area Network).
- CAN Controller Area Network
- the route search apparatus 100 includes a control unit 110A and a storage unit 120A as shown in FIG.
- the route search device 100 includes a sound output unit 130, a display unit 140, and an input unit 150.
- the route search device 100 includes a sensor unit 160 and a GPS (Global Positioning System) receiving unit 170.
- GPS Global Positioning System
- the storage unit 120A performs the function of the recording unit 730 described above.
- the sound output unit 130 and the display unit 140 are configured to perform the function of the presentation unit 790 described above.
- the GPS receiving unit 170 is configured to perform the function of the position detection unit 720 described above.
- the control unit 110A described above performs overall control of the entire route search device 100 and executes various processes.
- the control unit 110A will be described later.
- the storage unit 120A includes a non-volatile storage device such as a hard disk device, and stores various information data used in the route search device 100. Such information data includes map information 121 and the like.
- the control unit 110A can access the storage unit 120A.
- the map information 121 includes node position information, road link information connecting the nodes, travel time information and travel distance information of each road link, energy consumption information, information on road type, and the like.
- the “road type” includes an expressway, a general road, a toll road, and the like. For toll roads, information on toll road charges is included.
- the map information 121 includes information on the “charging lane” section information, the charging amount per unit travel distance or unit time of the charging lane, and the charging fee. Further, the map information 121 includes information on the location information of the “charging spot”, the charging amount per unit time of the charging spot, and the charging fee.
- the above-described sound output unit 130 includes a speaker and outputs sound corresponding to the sound data received from the control unit 110A.
- the sound output unit 130 outputs guidance voice such as presentation information regarding the first route and the second route under the control of the control unit 110A.
- the display unit 140 includes a display device such as a liquid crystal panel, and displays an image corresponding to the display data received from the control unit 110A.
- the display unit 140 displays images such as presentation information related to the first route and the second route, guidance information, and the like under the control of the control unit 110A.
- the input unit 150 includes a key unit provided in the main body of the route search device 100 and / or a remote input device including the key unit.
- a key part provided in the main body part a touch panel provided in a display device of the display unit 140 can be used.
- it can replace with the structure which has a key part, or can also employ
- this input unit 150 When the user operates this input unit 150, setting of the operation content of the route search device 100 and an operation command are performed. For example, the user performs a route search command specifying the destination using the input unit 150. Such input contents are sent as input data from the input unit 150 to the control unit 110A.
- the sensor unit 160 includes a vehicle speed sensor, an acceleration sensor, an angular velocity sensor, a tilt sensor, and the like. Detection results from various sensors included in the sensor unit 160 are sent as sensor data to the control unit 110A.
- the GPS receiving unit 170 described above calculates the current position of the vehicle CR based on reception results of radio waves transmitted from a plurality of GPS satellites. Further, the GPS receiving unit 170 measures the current time based on the date / time information transmitted from the GPS satellite. Information regarding these current position and current time is sent to the control unit 110A as GPS data.
- the control unit 110A performs overall control of the entire route search apparatus 100 and executes various processes.
- the control unit 110A includes a central processing unit (CPU) as a calculation means and its peripheral circuits.
- Various functions as the route search device 100 are realized by the control unit 110A executing various programs. These functions include the functions of the acquisition unit 740A, the search unit 750, the search unit 760, the calculation unit 770, and the generation unit 780 in the first embodiment described above. Details of the processing executed by the control unit 110A will be described later.
- control unit 110A is recorded on a computer-readable recording medium such as a hard disk, a CD-ROM, or a DVD, and is loaded from the recording medium and executed.
- the program may be acquired in a form recorded on a portable recording medium such as a CD-ROM or DVD, or may be acquired in a form distributed via a network such as the Internet. Also good.
- the control unit 110A appropriately refers to the map information 121 in the storage unit 120A based on the travel data received from the sensor unit 160 and the GPS data received from the GPS receiving unit 170, and provides navigation information to the user. I do.
- the navigation information providing processing includes (a) a map display for displaying a map of an area designated by the user on the display device of the display unit 140, (b) where the vehicle CR is located on the map, Map matching for calculating which direction the vehicle is heading, (c) search for a recommended route from the current position of the vehicle CR to a destination designated by the user, (d) creation of travel guidance information based on the recommended route, (E) Control for performing guidance display using the display unit 140 and control for performing voice guidance using the sound output unit 130, which are performed in order to present map matching results, information on the searched route, and the like. Etc. are included.
- detection results from various sensors are sequentially sent from the sensor unit 160 to the control unit 110A as sensor data. Further, it is assumed that the current value of the remaining energy is sequentially sent from ECU 220 to control unit 110A. Further, it is assumed that information regarding the current position and the current time is sequentially transmitted from the GPS receiving unit 170 to the control unit 110A as GPS data.
- control unit 110A sequentially performs map matching based on the sensor data sent from the sensor unit 160 and the GPS data sent from the GPS receiving unit 170. Note that the control unit 110A employs a position on the map obtained by map matching as the current position of the vehicle CR.
- the search process for the first route and the second route is executed by the control unit 110A.
- the route search process as shown in FIG. 4, first, in step S ⁇ b> 11, the control unit 110 ⁇ / b> A determines whether or not a route search command with a destination set is input to the input unit 150. If the result of this determination is negative, the process of step S11 is repeated.
- step S12 the control unit 110A refers to the map information 121 in the storage unit 120A based on the destination specified in the route search command and the current position sent to the latest, “paid use”. Search for “provisional route”.
- the control unit 110 ⁇ / b> A does not consider the remaining amount of energy at that time, and does not restrict the use of the toll road, and travels the shortest travel time as a “paid use provisional route”. As you come to explore.
- step S13 the control unit 110A does not charge the battery 210 based on the current value of the remaining amount of energy, leaving the first predetermined amount of energy, and the vehicle CR follows the toll usage provisional route. It is judged whether it can drive
- step S13 when the result of the determination in step S13 is negative (step S13: N), the process proceeds to step S14.
- step S ⁇ b> 14 the control unit 110 ⁇ / b> A refers to the map information 121 and detects a charging lane existing around the pay use provisional route as a “search charging lane”. In addition, the control unit 110A extracts a charging spot existing around the pay usage provisional route as a “search charging spot”.
- step S15 a “paid use route search process” for running without restricting the use of toll roads is performed. Details of the processing in step S15 will be described later.
- step S16 the control unit 110A searches for the “paid avoidance provisional route” while referring to the map information 121 based on the destination and the current position sent to the latest.
- a route having the shortest travel time while traveling while avoiding a toll road is searched as a “paid avoidance provisional route”.
- step S17 the control unit 110A leaves the first predetermined amount of energy based on the current value of the remaining amount of energy and leaves the first predetermined amount of energy, while the vehicle CR travels on the pay avoidance provisional route. It is determined whether or not the destination can be reached. If the result of this determination is affirmative (step S17: Y), the process proceeds to step S20 described later.
- step S17 when the result of the determination in step S17 is negative (step S17: N), the process proceeds to step S18.
- the control unit 110A refers to the map information 121 and detects the charging lanes and charging spots existing around the pay avoidance provisional route as “search charging lane” and “search charging spot”.
- step S19 a “paid avoidance route search process” is performed in which the vehicle travels around a toll road. Details of the processing in step S19 will be described later.
- step S20 the control unit 110A generates presentation information about the search result.
- the control unit 110A if the result of the determination in step S13 is affirmative, the control unit 110A generates presentation information based on the pay usage provisional route, the map information 121, and the like. If the result of the determination in step S13 is negative, the control unit 110A performs the first route and the second route that travel without restricting the use of the toll road determined in step S15, map information Based on 121 etc., the presentation information regarding the searched route is generated.
- step S17 If the result of the determination in step S17 is affirmative, the control unit 110A generates presentation information based on the pay avoidance provisional route, the map information 121, and the like. If the result of the determination in step S17 is negative, the control unit 110A determines that the first route and the second route traveling around the toll road determined in step S19, the map information 121, etc. Based on this, presentation information related to the searched route is generated.
- the information related to the searched route includes the estimated required time, the toll road fee, the charging fee, the estimated amount of battery remaining when the destination is reached, and the like.
- control unit 110A presents the presentation information regarding the generated search route to the user using the sound output unit 130 and the display unit 140.
- the “first route and second route search processing and presentation information presentation processing” by the control unit 110A ends.
- step S31 the control unit 110A calculates the “charge lane travel distance”.
- the control unit 110A calculates the shortage from the remaining power amount of the battery 210 with respect to the power amount required for the vehicle CR to travel to the destination by traveling on the toll use temporary route. calculate.
- the control unit 110A refers to the “charge lane travel distance” that is the travel distance that the vehicle CR should travel on the charge lane when traveling on the charge lane and charging the shortage. Is calculated.
- step S32 “paid use route search process 1 using a charging lane” is performed.
- step S33 “paid use route search process 2 using a charging lane” is performed. Details of the processes in steps S32 and S33 will be described later.
- step S34 the control unit 110A performs charging based on the shortage from the remaining amount of power of the battery 210 with respect to the amount of power necessary for the vehicle CR to travel on the toll destination temporary route and travel to the destination.
- a “spot use charge amount” that is a charge amount to be charged at a spot is calculated. Thereafter, the process proceeds to step S35.
- step S35 “paid use route search process 1 using a charging spot” is performed.
- step S36 “paid use route search process 2 using a charging spot” is performed. Details of the processing in steps S35 and S36 will be described later. Then, when the process of step S36 ends, the process of step S15 ends, and the process proceeds to step S16 of FIG. 4 described above.
- step S41 the second predetermined amount of energy is left without charging at the search charging spot. Then, it is determined whether there is a search charging lane that can be reached from the current position. If the result of this determination is affirmative (step S41: Y), the process proceeds to step S42.
- step S42 the control unit 110A selects one of the reachable search charging lanes and searches for a route to the selected search charging lane. Thereafter, the processing proceeds to step S44 described later.
- step S41 determines whether the result of the determination in step S41 is negative (step S41: N).
- step S43 a search charge spot that exists between the current position and the nearest search charge lane in the direction from the current position to the destination and that can be reached by the vehicle CR with the current remaining energy is determined as a charging charge spot.
- the control unit 110A makes a charging plan for charging the battery necessary for traveling to the nearest search charging lane using the charging spot for power supply via the charging spot for power supply.
- the control unit 110A searches for a route going to the nearest search charging lane via the charging spot for power supply. Then, the process proceeds to step S44.
- step S44 the control unit 110A derives a charge lane travel section candidate based on the charge lane travel distance and the estimated amount of remaining energy when the search charge lane is reached.
- step S45 the control unit 110A calculates an estimated amount of remaining energy after traveling the charging lane traveling section candidate, and based on the estimated amount, the third predetermined amount of energy is left, while the destination It is determined whether or not it is reachable.
- the “third predetermined amount” is 15% of the full charge in the “paid use route search process 1 using the charging lane” from the viewpoint of suppressing the charging cost in the charging lane. If the result of this determination is negative (step S45: N), the process proceeds to step S46. In step S46, "route search using the next search charge lane" is performed. Then, when the process of step S46 ends, the process returns to step S45. Details of the processing in step S46 will be described later.
- step S45 determines whether or not all the search charging lanes that can be reached in step S41 have been selected. If the result of this determination is negative (step S47: N), the process returns to step S42.
- step S47 If the result of the determination in step S47 is affirmative (step S47: Y), the process proceeds to step S48.
- step S48 the control unit 110A has the shortest travel time to the destination out of the route plan to the destination including the charging plan for charging the battery in the search charging lane that is made reachable in step S41.
- the route is determined as the first route (part 1).
- step S32 ends. And a process progresses to step S33 of FIG. 5 mentioned above.
- this “route search using the next search charging lane” is performed by the control unit 110A based on the estimated amount of remaining energy calculated in step S45 described above in step S51.
- step S51: N the process proceeds to step S52.
- step S52 the control unit 110A exists between the end point of the search charging lane for which the estimated amount is calculated and the closest search charging lane in the direction toward the destination, and the estimated amount of remaining energy.
- the search charging spot that can be reached by the vehicle CR is extracted as a charging spot for feeding.
- the control unit 110A makes a charging plan for charging the battery necessary for traveling to the nearest search charging lane using the charging spot for power supply via the charging spot for power supply.
- the control unit 110A searches for a route going to the nearest search charging lane via the charging spot for power supply. Thereafter, the process proceeds to step S53.
- step S53 the control unit 110A derives a charge lane travel section candidate based on the shortage distance of the charge lane travel distance and the estimated amount of remaining energy when reaching the search charge lane determined in step S51 or step S52.
- the process of step S46 ends. And a process returns to step S45 of FIG. 6 mentioned above.
- This “paid use route search process 2 using the charging lane” is different in that “third predetermined amount” is set to 75% of the full charge in order to secure the energy of the battery 210 upon arrival at the destination. Except for this, the first route (part 2) is determined by the same processing procedure (see FIGS. 6 and 7) of the processing of step S32 described above.
- step S35 “paid use route search process 1 using a charging spot” in step S35 described above will be described.
- step S61 the second predetermined amount of energy is left without charging in the search charging lane. Then, it is determined whether there is a search charging spot that can be reached from the current position. If the result of this determination is affirmative (step S61: Y), the process proceeds to step S62. In step S62, the control unit 110A selects one of the reachable search charging spots and searches for a route to the selected search charging spot. And a process progresses to step S64 mentioned later.
- step S61 when the result of the determination in step S61 is negative (step S61: N), the process proceeds to step S63.
- step S63 a search charge lane that exists between the current position and the nearest search charge spot in the direction from the current position to the destination and is reachable with the current remaining energy is extracted as a power supply charge lane. .
- the control unit 110A makes a charging plan for charging the battery as much as necessary to travel through the power supply charging lane and travel to the nearest search charging spot via the power supply charging lane.
- the control unit 110A searches for a route to the nearest search charging spot via the charging lane for power supply. Then, the process proceeds to step S64.
- step S64 the control unit 110A derives the charge amount to be charged at the search charge spot based on the spot use charge amount and the estimated amount of remaining energy when the search charge spot is reached.
- step S65 the control unit 110A calculates an estimated amount of the remaining energy after charging at the search charging spot, and arrives at the destination while leaving a fourth predetermined amount of energy based on the estimated amount. Determine whether it is possible.
- the “fourth predetermined amount” is 15% of the full charge from the viewpoint of suppressing the charging cost at the charging spot. If the result of this determination is negative (step S65: N), the process proceeds to step S66. In step S66, "route search using the next search charge spot" is performed. Then, when the process of step S66 ends, the process returns to step S65. Details of the processing in step S66 will be described later.
- step S65: Y the control unit 110A refers to the map information 121 and the like, passes through the selected search charging spot, and searches for the search charging spot. The route with the shortest travel time to the destination including the charging time at is searched. Then, the process proceeds to step S67. In this step S67, it is determined whether or not the control unit 110A has selected all the search charging spots that can be reached in step S61. If the result of this determination is negative (step S67: N), the process returns to step S62.
- step S67 the control unit 110A includes the charging time at the charging spot from the route plan to the destination including the charging plan for charging the battery at the search charging spot that can be reached in step S61.
- the route with the shortest travel time to the ground is determined as the second route (part 1).
- step S35 ends. Then, the process proceeds to step S36 in FIG.
- this “route search using the next search charging spot” is performed by the control unit 110A based on the estimated amount of remaining energy calculated in step S65 described above in step S71. Whether there is a reachable search charge spot that exists in the direction toward the destination while leaving the second predetermined amount of energy from the search charge spot for which the estimated amount has been calculated without charging in the search charge lane Determine whether. If the result of this determination is affirmative (step S71: Y), a route to the reachable search charging spot is searched. And a process progresses to step S73 mentioned later.
- step S71 If the result of the determination in step S71 is negative (step S71: N), the process proceeds to step S72.
- step S72 the control unit 110A exists between the search charging spot at which the estimated amount is calculated and the nearest search charging spot in the direction toward the destination, and the estimated energy remaining amount is the vehicle.
- a search charge lane that can be reached by the CR is extracted as a power supply charge lane.
- the control unit 110A makes a charging plan for charging the battery as much as necessary to travel through the power supply charging lane and travel to the nearest search charging spot via the power supply charging lane.
- the control unit 110A searches for a route to the nearest search charging spot via the charging lane for power supply. Thereafter, the process proceeds to step S73.
- step S73 the control unit 110A charges at the search charge spot based on the shortage of the charge amount charged at the charge spot and the estimated amount of remaining energy when the search charge spot arrives determined in step S71 or step S72. Deriving the amount of charge.
- step S66 ends. And a process returns to step S65 of FIG. 8 mentioned above.
- step S36 “paid use route search process 2 using a charging spot” in step S36 described above will be described.
- This “paid use route search process 2 using a charging spot” is different in that the “fourth predetermined amount” is set to 75% of the full charge in order to secure the energy of the battery 210 upon arrival at the destination. Except for this, the second route (part 2) is determined by the same processing procedure (see FIGS. 8 and 9) of the processing of step S36 described above.
- step S81 the control unit 110A requires the electric power necessary for the vehicle CR to travel on the pay avoidance provisional route to the destination. Based on the shortage of the battery 210 with respect to the amount, the “charge lane travel distance”, which is the travel distance that the vehicle CR should travel on the charge lane, is calculated.
- step S82 except that the control unit 110A sets the “third predetermined amount” to 30% of the full charge from the viewpoint of charging cost reduction, and performs a route search for traveling while avoiding the toll road.
- the first route (part 3) that prioritizes charging by the charging lane avoiding the toll road is searched for in the same processing procedure as that in step S32 described above (see FIGS. 6 and 7).
- step S84 the control unit 110A performs charging based on the shortage from the remaining power amount of the battery 210 with respect to the power amount necessary for the vehicle CR to travel on the pay avoidance provisional route and travel to the destination.
- a “spot use charge amount” that is a charge amount to be charged at a spot is calculated. Thereafter, the process proceeds to step S85.
- step S85 except that the control unit 110A sets the “fourth predetermined amount” to 30% of the full charge from the viewpoint of charging cost suppression, and performs a route search for traveling while avoiding the toll road.
- a search is made for the second route (part 3) giving priority to charging by a charging spot avoiding a toll road. Then, when the process of step S85 ends, the process of step S19 ends, and the process proceeds to step S20 of FIG. 4 described above.
- the above processing is executed, and the search processing for the first route and the second route and the presentation processing for the presentation information related to the first route and the second route are performed.
- FIG. 11 shows an example of a list of presentation information related to the first route and the second route, in which the departure position is “Kuki City” and the destination is “Sendai City”.
- the “route 1” is a route that travels without restricting the use of the toll road, the first route that gives priority to charging by the charging lane and suppresses the charging cost in the charging lane (part 1) It has become. This “route 1” is determined in step S32 described above.
- “Route 2” is a route that travels avoiding toll roads, and is the first route (part 3) in which charging by the charging lane is prioritized and charging costs are suppressed. This “path 2” is determined in step S82 described above.
- “Route 3” is a route that travels without restricting the use of toll roads, is a first route that prioritizes charging by the charging lane and secures the remaining energy of the battery 210 when reaching the destination. (Part 2). This “path 3” is determined in step S33 described above.
- Ring 4" is a route that travels without restricting the use of toll roads, and is a second route (part 1) that prioritizes charging at a charging spot and suppresses charging costs at the charging spot. It has become.
- This “path 2” is determined in step S35 described above.
- “Route 5” is a route that travels around a toll road, and is a second route (part 3) that prioritizes charging by a charging spot and suppresses charging costs. This “path 5” is determined in step S85 described above.
- “Route 6” is a route that travels without restricting the use of the toll road, and is a second route that prioritizes charging at the charging spot and secures the remaining energy of the battery 210 when reaching the destination. (Part 2). This “path 6” is determined in step S36 described above.
- FIG. 11 shows the list information related to these “route 1” to “route 6”.
- FIG. 11 shows the distance from the departure position to the destination, the estimated required time, the toll road fee, the charging fee, and the remaining battery when the destination is reached. The amount is displayed.
- FIGS. 12A and 12B show an example in which “Route 1” is displayed as a bold line on the map.
- the “charging lane use section” based on the charging plan is indicated by a thick white line.
- the toll road in route 1 is indicated by a thick black line
- the general road in route 1 is indicated by a thick white line.
- FIG. 13 shows an example in which “Route 6” is displayed as a bold line on the map.
- the position of “charging spot” based on the charging plan is displayed as a charging spot mark.
- the control unit 110A sequentially acquires the current position of the vehicle CR and the current value of the remaining amount of energy of the battery 210.
- the control unit 110A travels to the destination where the travel time is the shortest while traveling without restricting the use of the toll road. Search for “paid use provisional route”.
- the control unit 110A determines whether or not the vehicle CR can travel on the toll usage provisional route and reach the destination without charging the battery 210, and the result of the determination is negative. If the target is a target, a search is made for “charge lanes” and “charge spots” existing around the temporary use provisional route.
- the control unit 110A calculates a charging lane travel distance, which is a distance to travel on the charging lane, based on the current position, the current value of the remaining energy, map information, and the like. Further, the control unit 110A calculates a spot use charge amount that is a charge amount to be charged at the charge spot. Subsequently, the control unit 110A gives priority to charging by the charging lane based on the charging lane travel distance, information on the “charging lane”, the estimated amount of remaining energy, and the remaining energy when the destination is reached. The first route that travels without restricting the use of the toll road is searched.
- control unit 110A prioritizes charging at the charging spot based on the spot charge amount, information on the “charging spot”, the estimated amount of remaining energy, etc., and considers the remaining energy when the destination is reached.
- the second route that travels without restricting the use of the toll road is searched.
- control unit 110A searches for a “paid avoidance provisional route” to a destination where the travel time is the shortest while traveling while avoiding the toll road, Search for “charging spot”. Then, the control unit 110A calculates the charging lane travel distance and the spot use charge amount based on the current position, the current value of the remaining energy, the map information, and the like. Subsequently, the control unit 110A gives priority to charging by the charging lane based on the charging lane travel distance, information on the “charging lane”, the estimated amount of remaining energy, and the remaining energy when the destination is reached. A first route that travels while avoiding the toll road is searched.
- control unit 110A prioritizes charging at the charging spot based on the spot charge amount, information on the “charging spot”, the estimated amount of remaining energy, etc., and considers the remaining energy when the destination is reached.
- the second route that travels while avoiding the toll road is searched.
- control unit 110A derives an estimated value of the estimated required time, the toll road fee, the charging fee, and the remaining energy when reaching the destination for each of the first route and the second route.
- control unit 110A reaches the destination for each of the first route and the second route that travel without restricting the use of the toll road, and the first route and the second route that travel while avoiding the toll road.
- Presentation information related to the search route including the distance, the estimated required time, the toll road fee, the charging fee, the estimated value of the remaining energy when the destination is reached, and the like.
- the presentation information regarding the search route generated in this way is presented to the user using the sound output unit 130 and the display unit 140 under the control of the control unit 110A.
- the first route that prioritizes charging by the charging lane and the second route that prioritizes charging by the charging spot are searched, the distance to the destination for each of the first route and the second route, the estimated required time, and the charge Presentation information including a road fee, a charging fee, an estimated amount of remaining energy when the destination is reached, and the like can be presented to the user before departure to the destination.
- a route that travels while avoiding the toll road is also searched.
- Such a route may be selected, for example, by a user who wants to control charging costs and does not rush to reach the destination. In this way, in the first embodiment, it is possible to select a route that meets its own needs.
- the necessity of using the charging facility is determined based on the remaining energy of the battery 210 in the route search performed before the departure to the destination.
- a route search including a charging plan is performed. For this reason, when traveling to the destination, the possibility of re-searching the route including the charging plan is reduced, and it is difficult for a significant delay in the arrival time to the destination.
- the battery charging time and detour travel are assumed at the time of route search before departure, it is possible to prevent the user from being stressed. .
- the remaining energy level at the time of arrival at the destination is estimated, and the traveling section of the charging lane is determined. For this reason, it is possible to suppress an increase in charging cost due to continuing traveling on the charging lane.
- the route search including the charging plan using the charging lane and the charging spot can be performed, and the convenience for the user can be improved.
- FIG. 14 shows an arrangement relationship between the terminal device 300 and the server device 400 according to the second embodiment.
- the terminal device 300 is an aspect of the terminal device 810 in the second embodiment
- the server apparatus 400 is an aspect of the route search device 820 in the second embodiment.
- the terminal device 300 is arranged in the vehicle CR.
- the vehicle CR is equipped with a battery 210 and an ECU 220 as in the case of the first embodiment described above.
- the server device 400 is arranged outside the vehicle CR.
- the terminal device 300 and the server device 400 can communicate with each other via the network 500.
- the server device 400 can communicate with other terminal devices configured in the same manner as the terminal device 300, but only the terminal device 300 is representatively shown in FIG.
- FIG. 15 is a block diagram illustrating a schematic configuration of the terminal device 300.
- the terminal device 300 includes a control unit 110B instead of the control unit 110A, as compared with the route search device 100 of the first embodiment described above, and a storage unit 310 instead of the storage unit 120A.
- a wireless communication unit 320 are different.
- the wireless communication unit 320 functions as the transmission unit 811 and the reception unit 812 described above.
- description will be made mainly focusing on these differences.
- the control unit 110B includes a central processing unit (CPU) and its peripheral circuits, and performs overall control of the entire terminal device 300.
- Various functions as the terminal device 300 are realized by the control unit 110B executing various programs. These functions include the function of the acquisition unit 740B in the second embodiment described above.
- the control unit 110B acquires the GPS data received from the GPS receiving unit 170, and specifies the current position and the current time based on the acquired GPS data. Then, the control unit 110B uses the wireless communication unit 320 to transmit the specified current position to the server device 400 via the network 500 as terminal transmission data.
- control unit 110B acquires the current value of the remaining energy sent from the ECU 220. Then, the control unit 110B uses the wireless communication unit 320 to transmit the acquired current remaining energy value to the server device 400 via the network 500 as terminal transmission data.
- control unit 110B receives input data sent from the input unit 150.
- the control unit 110B uses the wireless communication unit 320, and the network 500 is transmitted using the route search command as terminal transmission data.
- the server device 400 receives input data sent from the input unit 150.
- control unit 110B receives presentation information regarding the first route and the second route transmitted from the server device 400 and received by the wireless communication unit 320 via the network 500. Then, the control unit 110B uses the control for performing guidance display using the display unit 140 and the sound output unit 130, which are performed to present the received presentation information regarding the first route and the second route. Control for performing the voice guidance is performed.
- the program executed by the control unit 110B is recorded on a computer-readable recording medium such as a hard disk, CD-ROM, or DVD, and is loaded from the recording medium and executed.
- the program may be acquired in a form recorded on a portable recording medium such as a CD-ROM or DVD, or may be acquired in a form distributed via a network such as the Internet. Also good.
- control unit 110B Details of processing executed by the control unit 110B will be described later.
- the storage unit 310 includes a non-volatile storage device such as a hard disk device, and stores various information data used in the terminal device 300.
- the storage unit 310 can be accessed by the control unit 110B.
- the wireless communication unit 320 receives the terminal transmission data sent from the control unit 110B. Then, the wireless communication unit 320 transmits the terminal transmission data to the server device 400 via the network 500.
- the wireless communication unit 320 receives server transmission data transmitted from the server device 400 via the network 500. Then, the wireless communication unit 320 sends the server transmission data to the control unit 110B.
- the wireless communication unit 320 functions as the transmission unit 811 and the reception unit 812 described above.
- FIG. 16 shows a schematic configuration of the server 400 in a block diagram.
- the server device 400 includes a control unit 110C, a storage unit 120C, and an external communication unit 410.
- the control unit 110C described above includes a central processing unit (CPU) and its peripheral circuits, and performs overall control of the server device 400 as a whole.
- Various functions as the server device 400 are realized by the control unit 110C executing various programs. These functions include the functions of the acquisition unit 740C, the search unit 750, the search unit 760, the calculation unit 770, and the generation unit 780 in the second embodiment described above.
- the program executed by the control unit 110C is recorded on a computer-readable recording medium such as a hard disk, CD-ROM, or DVD, and is loaded from the recording medium and executed.
- the program may be acquired in a form recorded on a portable recording medium such as a CD-ROM or DVD, or may be acquired in a form distributed via a network such as the Internet. Also good.
- control unit 110C Details of processing executed by the control unit 110C will be described later.
- the above-described storage unit 120C includes a nonvolatile storage device such as a hard disk device, and stores various information data used in the server device 400. Such information data includes the map information 121 described above.
- the control unit 110C can access the storage unit 120C.
- the storage unit 120 ⁇ / b> C functions as the recording unit 730 described above.
- the external communication unit 410 receives terminal transmission data transmitted from the terminal device 300 via the network 500. Then, the external communication unit 410 sends the terminal transmission data to the control unit 110C.
- the external communication unit 410 receives server transmission data sent from the control unit 110C. Then, the external communication unit 410 transmits the server transmission data to the terminal device 300 via the network 500.
- the external communication unit 410 is configured to perform the functions of the reception unit 821 and the transmission unit 822 described above.
- the terminal transmission data output from the control unit 110B is transmitted to the control unit 110C via the wireless communication unit 320, the network 500, and the external communication unit 410. Will be.
- the server transmission data output from the control unit 110C is sent to the control unit 110B via the external communication unit 410, the network 500, and the wireless communication unit 320.
- the current value of the remaining energy is sequentially sent from the ECU 220 to the control unit 110B of the terminal device 300. Further, it is assumed that information regarding the current position and the current time is sequentially transmitted from the GPS receiving unit 170 to the control unit 110B as GPS data.
- the control unit 110B every time the control unit 110B receives the current value of the remaining amount of energy sent from the ECU 220, the current value of the remaining amount of energy is transmitted to the control unit 110C of the server device 400. To do. In addition, whenever the control unit 110B receives GPS data transmitted from the GPS receiving unit 170, the control unit 110B transmits the GPS data to the control unit 110C.
- the control unit 110B when the control unit 110B receives a route search command in which a destination is set as input data sent from the input unit 150, the route search command is transmitted to the control unit 110C. Yes.
- search processing for the first route and the second route is executed.
- the control unit 110C performs steps S12 to S20 executed by the control unit 110A in the first embodiment described above (FIG. 4).
- the process similar to the process of (10) to (10) is executed, the first route and the second route are searched, and the presentation information related to the first route and the second route is generated.
- the control unit 110 ⁇ / b> C transmits the generated presentation information regarding the first route and the second route to the terminal device 300.
- the control unit 110B uses the presentation information on the first route and the second route using the sound output unit 130 and the display unit 140. (See FIGS. 11 to 13).
- the control unit 110B of the terminal device 300 sequentially acquires the current position of the vehicle CR and the current value of the remaining amount of energy of the battery 210, and transmits them to the server device 400.
- the control unit 110B transmits the route search command to the server device 400.
- the control unit 110C searches for a “paid use provisional route” to the destination where the travel time is the shortest while traveling without restricting the use of the toll road. Next, the control unit 110C determines whether or not the vehicle CR can travel on the toll usage provisional route and reach the destination without charging the battery 210, and the result of the determination is negative. If the target is a target, a search is made for “charge lanes” and “charge spots” existing around the temporary use provisional route.
- the control unit 110C calculates the charging lane travel distance and the spot usage charge amount based on the current position, the current value of the remaining energy, the map information, and the like. Subsequently, the control unit 110C gives priority to the charging by the charging lane based on the charging lane travel distance, the information on the “charging lane”, the estimated amount of the remaining energy, and the remaining energy when the destination is reached. The first route that travels without restricting the use of the toll road is searched. Also, the control unit 110C gives priority to charging by the charging spot based on the spot usage charging amount, information on the “charging spot”, the estimated amount of remaining energy, etc., and considers the remaining energy when the destination is reached. The second route that travels without restricting the use of the toll road is searched.
- control unit 110C searches for a “paid avoidance provisional route” to a destination where the travel time is the shortest while traveling while avoiding the toll road, Search for “charging spot”. Then, the control unit 110C calculates the charge lane travel distance and the spot use charge amount based on the current position, the current value of the remaining energy, the map information, and the like. Subsequently, the control unit 110C gives priority to the charging by the charging lane based on the charging lane travel distance, the information on the “charging lane”, the estimated amount of the remaining energy, and the remaining energy when the destination is reached. A first route that travels while avoiding the toll road is searched.
- control unit 110C gives priority to charging by the charging spot based on the spot usage charging amount, information on the “charging spot”, the estimated amount of remaining energy, etc., and considers the remaining energy when the destination is reached.
- the second route that travels while avoiding the toll road is searched.
- the control unit 110C reaches the destination for each of the first route and the second route that travel without restricting the use of the toll road, and the first route and the second route that travel while avoiding the toll road.
- Presentation information related to the search route including the distance, the estimated required time, the toll road fee, the charging fee, the estimated value of the remaining energy when the destination is reached, and the like.
- the control unit 110 ⁇ / b> C transmits presentation information regarding the generated search route to the terminal device 300.
- the presentation information regarding the search route is transmitted to the terminal device 300 in this way, the presentation information regarding the search route is presented to the user using the sound output unit 130 and the display unit 140 under the control of the control unit 110B.
- the first route that prioritizes charging by the charging lane and the second route that prioritizes charging by the charging spot are searched, the distance to the destination for each of the first route and the second route, the estimated required time, and the charge Presentation information including a road fee, a charging fee, an estimated amount of remaining energy when the destination is reached, and the like can be presented to the user before departure to the destination.
- the user can select a route that meets his / her request.
- the necessity of using the charging facility is determined based on the remaining energy of the battery 210. Deciding.
- a route search including a charging plan is performed. For this reason, when traveling to the destination, the possibility of re-searching the route including the charging plan is reduced, and it is difficult for a significant delay in the arrival time to the destination.
- the battery charging time and detour travel are assumed at the time of route search before departure, it is possible to prevent the user from being stressed. .
- the remaining energy level at the time of arrival at the destination is estimated, and the traveling section of the charging lane is determined. For this reason, it is possible to suppress an increase in charging cost due to continuing traveling on the charging lane.
- a route search including a charging plan using a charging lane and a charging spot can be performed to improve user convenience.
- the first route and the second route to the destination are searched in consideration of the length of the travel time, but the purpose is determined in consideration of the length of the travel distance. You may make it search the 1st path
- the display mode of the estimated amount of remaining energy when the destination is reached is the full charge percentage display (see FIG. 11), but other than kWh (kilowatt hour), etc.
- the display mode may be as follows.
- the distance to the destination is displayed as the presentation information related to the searched route.
- the amount of power necessary to travel to the destination is displayed. You may make it write together the travel distance of the charge lane for supplying electric power.
- the planned required time is displayed as the presentation information related to the searched route.
- the charging time at the charging spot for supplying the amount of power necessary to travel to the destination is displayed. You may make it write together.
- the current value of the remaining battery energy is reported from the external ECU 220 to the route search device and the terminal device.
- the route search device and the terminal device may be provided with a sensor or the like for detecting the current value of the remaining energy.
- the information on the charging facility such as the “charging lane” section information and the “charging spot” position information is recorded in the map information in the storage unit.
- information on the charging facility may be acquired from an external system server.
- a route search apparatus of said 1st Example and a terminal device of 2nd Example, apparatuses which have screen display functions, such as a smart phone, may be sufficient, and the server apparatus of said 2nd Example
- a personal computer installed in a home may be used.
- the present invention is applied to an apparatus disposed in an electric vehicle.
- the present invention is disposed in a vehicle (for example, a hybrid vehicle) that uses electric energy as part of driving energy. It goes without saying that the present invention can be applied to such an apparatus.
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Automation & Control Theory (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Sustainable Energy (AREA)
- Sustainable Development (AREA)
- Life Sciences & Earth Sciences (AREA)
- Navigation (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
Description
110A … 制御ユニット(探索部、検索部、算出部、生成部)
110C … 制御ユニット(探索部、検索部、算出部、生成部)
130 … 音出力ユニット(提示部)
140 … 表示ユニット(提示部)
300 … 端末装置
320 … 無線通信ユニット(受信部)
400 … サーバ装置(経路探索装置)
700 … 経路探索装置
750 … 探索部
760 … 検索部
770 … 算出部(第1算出部、第2算出部)
780 … 生成部
790 … 提示部
810 … 端末装置
811 … 送信部
812 … 受信部
820 … 経路探索装置
まず、本発明の第1実施形態を、図1を参照して説明する。
図1には、第1実施形態に係る経路探索装置700の構成がブロック図にて示されている。この経路探索装置700は、電気エネルギを駆動用のエネルギの全部として利用する移動体MV(例えば、電気自動車)内に配置される。
次に、上記の経路探索装置700の構成について、説明する。
上記のように構成された経路探索装置700の動作について、経路探索処理及び経路探索処理結果に基づく提示情報を生成処理に、主に着目して説明する。
かかる第1経路の探索に際して、第1実施形態では、探索部750は、まず、「検索充電レーン」に関する情報に基づいて、検索充電スポットでの充電を行うことなく、第2所定量のエネルギ(例えば、満充電の20%)を残しつつ、出発位置から到達可能な検索充電レーンが存在するか否かの第2判定を行う。そして、探索部750は、第2判定の結果が肯定的である場合には、当該到達可能な充電レーンを、給電用充電レーン候補として抽出する。ここで、抽出される給電用充電レーン候補としては、暫定経路上に存在するものに限られない。また、「第2所定量」は、今後の走行のために充電しておくことが望ましいとの観点から、実験、シミュレーション、経験等に基づいて、予め定めされる。
かかる第2経路の探索処理に際して、第1実施形態では、探索部750は、「検索充電スポット」に関する情報に基づいて、充電レーンでの充電を行うことなく、第2所定量のエネルギを残しつつ、出発位置から到達可能な検索充電スポットが存在するか否かの第3判定を行う。そして、探索部750は、第3判定の結果が肯定的である場合には、当該到達可能な充電スポットを、給電用充電スポット候補として抽出する。ここで、抽出される給電用充電スポット候補としては、暫定経路上に存在するものに限られない。
次に、本発明の第2実施形態を、図2を参照して説明する。
図2には、第2実施形態に係る端末装置810及び経路探索装置820の構成がブロック図にて示されている。図2に示されるように、端末装置810は、移動体MV内に配置され、移動体MVに装備されたバッテリ910及びECU920と接続されている。そして、端末装置810と経路探索装置820とは、ネットワーク850を介して、通信可能となっている。
図2に示されるように、端末装置810は、入力部710と、位置検出部720と、取得部740Bと、提示部790とを備えている。また、端末装置810は、送信部811と、受信部812とを備えている。
図2に示されるように、経路探索装置820は、記録部730と、取得部740Cと、探索部750と、検索部760と、算出部770、生成部780とを備えている。また、経路探索装置820は、受信部821と、送信部822とを備えている。
上記のように構成された端末装置810と経路探索装置820とが協働して実行する経路探索処理及び経路探索処理結果に基づく提示情報を生成処理に、主に着目して説明する。
本発明は、上記の実施形態に限定されるものではなく、様々な変形が可能である。
まず、本発明の第1実施例を、図3~図13を主に参照して説明する。
図3には、第1実施例に係る経路探索装置100の概略的な構成がブロック図にて示されている。この経路探索装置100は、上述した第1実施形態の経路探索装置700(図1参照)の一態様となっている。
次に、上記の経路探索装置100の構成について、説明する。
以上のようにして構成された経路探索装置100の動作について、制御ユニット110Aによる充電レーンによる充電を優先した「第1経路」及び充電スポットによる充電を優先した「第2経路」の探索処理、並びに、第1経路及び第2経路に関する提示情報の提示処理に、主に着目して説明する。
次に、上述したステップS15における「有料利用経路探索処理」について説明する。
次いで、上述したステップS32における「充電レーンを利用した有料利用経路探索処理1」について説明する。
次に、上述したステップS46における「次検索充電レーンを利用した経路探索」について説明する。
次いで、上述したステップS33における「充電レーンを利用した有料利用経路探索処理2」について説明する。
引き続き、上述したステップS35における「充電スポットを利用した有料利用経路探索処理1」について説明する。
次に、上述したステップS66における「次検索充電スポットを利用した経路探索」について説明する。
次いで、上述したステップS36における「充電スポットを利用した有料利用経路探索処理2」について説明する。
次いで、上述したステップS19における「有料回避経路探索処理」について説明する。
次に、上述したステップS20において生成された第1経路(その1~その3)及び第2経路(その1~その3)に関する提示情報の表示ユニット140への表示例を示す。
次に、本発明の第2実施例を、図14~図16を主に参照して説明する。この第2実施例は、上述した第2実施形態(図2参照)の一態様となっている。
図14には、第2実施例に係る端末装置300、及び、サーバ装置400の配置関係が示されている。なお、端末装置300は、第2実施形態における端末装置810の一態様であり、サーバ装置400は、第2実施形態における経路探索装置820の一態様である。
図15には、端末装置300の概略的な構成がブロック図にて示されている。図15に示されるように、端末装置300は、上述した第1実施例の経路探索装置100と比べて、制御ユニット110Aに代えて制御ユニット110Bを備える点、記憶ユニット120Aに代えて記憶ユニット310を備える点、無線通信ユニット320を備える点が異なっている。ここで、無線通信ユニット320は、上述した送信部811及び受信部812の機能を果たすようになっている。以下、これらの相違点に主に着目して説明する。
図16には、サーバ400の概略的な構成がブロック図にて示されている。図16に示されるように、サーバ装置400は、制御ユニット110Cと、記憶ユニット120Cと、外部通信ユニット410とを備えている。
以上のようにして構成された端末装置300とサーバ装置400とが協働して実行する第1経路及び第2経路の探索処理、並びに、第1経路及び第2経路に関する提示情報の提示処理に、主に着目して説明する。
本発明は、上記の実施例に限定されるものではなく、様々な変形が可能である。
Claims (8)
- 目的地までの経路を探索する経路探索装置であって、
移動体が走行することにより前記移動体が保有するバッテリへの充電を行う充電レーンによる充電を優先した第1経路、及び、前記移動体が停止した状態で前記バッテリへの充電を行う充電スポットによる充電を優先した第2経路を探索する探索部と;
前記第1経路及び前記第2経路に関する提示情報を生成する生成部と;
を備えることを特徴とする経路探索装置。 - 前記第1経路及び前記第2経路のそれぞれについての充電料金を算出する第1算出部を更に備え、
前記生成部は、前記第1算出部によって算出された前記第1経路及び前記第2経路のそれぞれについての充電料金に関する提示情報を更に生成する、
ことを特徴とする請求項1に記載の経路探索装置。 - 前記第1経路及び前記第2経路のそれぞれについて、前記目的地までの予定到着時刻及び予定所要時間の少なくとも一方を算出する第2算出部を更に備え、
前記生成部は、前記第2算出部によって算出された前記第1経路による前記目的地への予定到着時刻及び前記目的地までの予定所要時間の少なくとも一方に関する提示情報、及び、前記第2経路による前記目的地への予定到着時刻及び前記目的地までの予定所要時間の少なくとも一方に関する提示情報を更に生成する、
ことを特徴とする請求項1に記載の経路探索装置。 - 前記充電レーン及び前記充電スポットを検索する検索部を更に備え、
前記探索部は、前記検索部により検索された充電レーン及び充電スポットに基づいて、前記第1経路及び前記第2経路を探索する、
ことを特徴とする請求項1に記載の経路探索装置。 - バッテリを保有する移動体に配置される端末装置であって、
探索された前記移動体が走行することにより前記バッテリへの充電を行う充電レーンによる充電を優先した第1経路に関する提示情報、及び、前記移動体が停止した状態で前記バッテリへの充電を行う充電スポットによる充電を優先した第2経路に関する情報を受信する受信部と;
前記受信部により受信された提示情報を提示する提示部と;
を備えることを特徴とする端末装置。 - 目的地までの経路を探索する経路探索装置において使用される経路探索方法であって、
移動体が走行することにより前記移動体が保有するバッテリへの充電を行う充電レーンによる充電を優先した第1経路、及び、前記移動体が停止した状態で前記バッテリへの充電を行う充電スポットによる充電を優先した第2経路を探索する探索工程と;
前記第1経路及び前記第2経路に関する提示情報を生成する生成工程と;
を備えることを特徴とする経路探索方法。 - 目的地までの経路を探索する経路探索装置が有するコンピュータに、請求項6に記載の経路探索方法を実行させる、ことを特徴とする経路探索プログラム。
- 目的地までの経路を探索する経路探索装置が有するコンピュータにより読み取り可能に、請求項7に記載の経路探索プログラムが記録されている、ことを特徴とする記録媒体。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US14/898,662 US9835463B2 (en) | 2013-06-28 | 2013-06-28 | Route searching device, terminal device, and route searching method |
JP2015523769A JP6093857B2 (ja) | 2013-06-28 | 2013-06-28 | 経路探索装置、端末装置及び経路探索方法 |
PCT/JP2013/067775 WO2014207884A1 (ja) | 2013-06-28 | 2013-06-28 | 経路探索装置、端末装置及び経路探索方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2013/067775 WO2014207884A1 (ja) | 2013-06-28 | 2013-06-28 | 経路探索装置、端末装置及び経路探索方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014207884A1 true WO2014207884A1 (ja) | 2014-12-31 |
Family
ID=52141283
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/JP2013/067775 WO2014207884A1 (ja) | 2013-06-28 | 2013-06-28 | 経路探索装置、端末装置及び経路探索方法 |
Country Status (3)
Country | Link |
---|---|
US (1) | US9835463B2 (ja) |
JP (1) | JP6093857B2 (ja) |
WO (1) | WO2014207884A1 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2022188024A (ja) * | 2016-08-02 | 2022-12-20 | ヘーレ グローバル ベスローテン フェンノートシャップ | 車両充電車線 |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160258765A1 (en) * | 2015-03-02 | 2016-09-08 | Lenovo (Singapore) Pte, Ltd. | Apparatus, method, and program product for reducing road travel costs |
CN107430817B (zh) * | 2015-03-03 | 2021-07-13 | 日本先锋公司 | 路径搜索装置、控制方法及非暂时性计算机可读介质 |
JP6404750B2 (ja) * | 2015-03-13 | 2018-10-17 | トヨタ自動車株式会社 | ナビゲーションシステム |
JP6117844B2 (ja) * | 2015-03-31 | 2017-04-19 | 本田技研工業株式会社 | サーバ、クライアントおよびシステム |
CN106207290B (zh) * | 2016-07-11 | 2019-03-15 | 太原理工大学 | 一种基于多源数据的电动汽车充电辅助决策优化方法 |
US10331727B2 (en) * | 2016-12-07 | 2019-06-25 | Google Llc | Graphical user interface to display commonly categorized entities |
US10323951B2 (en) * | 2017-05-11 | 2019-06-18 | General Motors Llc | Method of generating a navigation-based route for a vehicle |
CN114683905B (zh) * | 2017-12-25 | 2023-10-31 | 奥动新能源汽车科技有限公司 | 换电式电动汽车的远程授权充电临时电量生成方法和系统 |
JP2019158646A (ja) * | 2018-03-14 | 2019-09-19 | 本田技研工業株式会社 | 車両制御装置、車両制御方法、及びプログラム |
US10948307B2 (en) * | 2018-08-28 | 2021-03-16 | Qualcomm Incorporated | Enhanced route selection techniques for electric vehicles |
US11733049B2 (en) | 2019-10-07 | 2023-08-22 | Lyft, Inc. | Multi-modal transportation system |
US11226208B2 (en) | 2019-10-07 | 2022-01-18 | Lyft, Inc. | Transportation route planning and generation |
US10746555B1 (en) | 2019-10-07 | 2020-08-18 | Lyft, Inc. | Multi-modal transportation route deviation detection and correction |
US11733046B2 (en) * | 2019-10-07 | 2023-08-22 | Lyft, Inc. | Multi-modal transportation proposal generation |
JP7548729B2 (ja) * | 2020-06-10 | 2024-09-10 | 株式会社Subaru | 運転支援装置 |
US11987237B2 (en) * | 2021-12-20 | 2024-05-21 | Waymo Llc | Systems and methods to determine a lane change strategy at a merge region |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006112932A (ja) * | 2004-10-15 | 2006-04-27 | Fuji Heavy Ind Ltd | 電気自動車のナビゲーションシステム |
JP2011185785A (ja) * | 2010-03-09 | 2011-09-22 | Hitachi Automotive Systems Ltd | 経路計画装置及び経路計画システム |
JP2012047670A (ja) * | 2010-08-30 | 2012-03-08 | Clarion Co Ltd | 車載機器、及び、車載機器の制御方法 |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2010115032A (ja) * | 2008-11-07 | 2010-05-20 | Toyota Motor Corp | 給電制御装置及び車両誘導装置 |
CN102460073B (zh) * | 2009-05-26 | 2015-04-01 | 株式会社日立制作所 | 车辆驾驶支援系统及车辆驾驶支援方法 |
JP4926308B2 (ja) * | 2010-05-10 | 2012-05-09 | パイオニア株式会社 | ナビゲーション装置、制御方法、プログラム、及び記憶媒体 |
US8538694B2 (en) * | 2010-05-21 | 2013-09-17 | Verizon Patent And Licensing Inc. | Real-time route and recharge planning |
US20120109519A1 (en) * | 2010-10-27 | 2012-05-03 | Honda Motor Co., Ltd. | System and method for routing bev to charging station |
US8942919B2 (en) * | 2010-10-27 | 2015-01-27 | Honda Motor Co., Ltd. | BEV routing system and method |
JP2012163511A (ja) * | 2011-02-09 | 2012-08-30 | Panasonic Corp | ナビゲーション装置 |
JP2013200247A (ja) * | 2012-03-26 | 2013-10-03 | Panasonic Corp | ナビゲーション装置 |
JP2013228238A (ja) * | 2012-04-25 | 2013-11-07 | Toyota Motor Corp | 車両用情報提供システム、端末装置、および、サーバー |
US8970341B2 (en) * | 2012-06-25 | 2015-03-03 | Kookmin University Industry Academy Cooperation Foundation | Electric vehicle, battery charging station, battery exchanging reservation system comprising the same and method thereof |
JP5929602B2 (ja) * | 2012-08-02 | 2016-06-08 | 株式会社デンソー | ナビゲーション装置 |
JP5928320B2 (ja) * | 2012-12-07 | 2016-06-01 | 株式会社日立製作所 | 電気自動車向けナビゲーションシステム |
-
2013
- 2013-06-28 WO PCT/JP2013/067775 patent/WO2014207884A1/ja active Application Filing
- 2013-06-28 JP JP2015523769A patent/JP6093857B2/ja active Active
- 2013-06-28 US US14/898,662 patent/US9835463B2/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006112932A (ja) * | 2004-10-15 | 2006-04-27 | Fuji Heavy Ind Ltd | 電気自動車のナビゲーションシステム |
JP2011185785A (ja) * | 2010-03-09 | 2011-09-22 | Hitachi Automotive Systems Ltd | 経路計画装置及び経路計画システム |
JP2012047670A (ja) * | 2010-08-30 | 2012-03-08 | Clarion Co Ltd | 車載機器、及び、車載機器の制御方法 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2022188024A (ja) * | 2016-08-02 | 2022-12-20 | ヘーレ グローバル ベスローテン フェンノートシャップ | 車両充電車線 |
JP7493000B2 (ja) | 2016-08-02 | 2024-05-30 | ヘーレ グローバル ベスローテン フェンノートシャップ | 車両充電レーン |
Also Published As
Publication number | Publication date |
---|---|
JPWO2014207884A1 (ja) | 2017-02-23 |
US20160138925A1 (en) | 2016-05-19 |
JP6093857B2 (ja) | 2017-03-08 |
US9835463B2 (en) | 2017-12-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6093857B2 (ja) | 経路探索装置、端末装置及び経路探索方法 | |
JP6161553B2 (ja) | 自動運転支援システム、自動運転支援方法及びコンピュータプログラム | |
CN104583722A (zh) | 用于路线搜索的设备及方法 | |
JP2014032085A (ja) | ナビゲーション装置 | |
WO2012131963A1 (ja) | 表示制御装置、端末、表示制御システムおよび表示制御方法 | |
JP2015001466A (ja) | 経路探索装置、端末装置及び経路探索方法 | |
JP6894575B2 (ja) | 経路案内装置、経路案内方法、およびプログラム | |
JP2019158413A (ja) | 電子装置、電子システム、経路探索方法および経路案内プログラム | |
JP2014196907A (ja) | 走行支援システム、走行支援方法及びコンピュータプログラム | |
US9511678B2 (en) | Facility information presentation device and facility information presentation method | |
JP6160364B2 (ja) | 地図情報更新システム、地図情報更新装置、地図情報更新方法及びコンピュータプログラム | |
JP6088082B2 (ja) | 管理装置及び端末装置、並びに、経路管理方法及び経路取得方法 | |
JP5717918B2 (ja) | 充電時間導出装置、充電時間管理装置、端末装置及びその方法 | |
JP2019191200A (ja) | 経路探索装置、端末装置及び経路探索方法 | |
JP2021009119A (ja) | 表示装置及びコンピュータプログラム | |
JP5818971B2 (ja) | 探索装置、探索管理装置、端末装置及び算出方法 | |
JP2018059950A (ja) | 経路探索装置、端末装置及び経路探索方法 | |
JP6012711B2 (ja) | 管理装置及び端末装置、並びに、経路管理方法及び経路取得方法 | |
JP7172406B2 (ja) | 充電施設探索システムおよび充電施設探索プログラム | |
JP2010176452A (ja) | 情報処理分散システム、情報処理装置及び情報処理分散方法 | |
WO2014083710A1 (ja) | 経路探索装置、経路探索方法および経路探索プログラム | |
WO2013124967A1 (ja) | 経路探索装置、経路探索管理装置、端末装置及び経路探索方法 | |
JP7062749B2 (ja) | サーバ装置、その制御方法、およびプログラム | |
JP5875488B2 (ja) | 待ち合わせ支援装置およびナビゲーション装置 | |
JP5860136B2 (ja) | 画像処理装置、画像処理管理装置、端末装置及び画像処理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 13888130 Country of ref document: EP Kind code of ref document: A1 |
|
WWE | Wipo information: entry into national phase |
Ref document number: 14898662 Country of ref document: US |
|
ENP | Entry into the national phase |
Ref document number: 2015523769 Country of ref document: JP Kind code of ref document: A |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 13888130 Country of ref document: EP Kind code of ref document: A1 |