[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

WO2014111045A1 - 决定上下行链路重配置期间确认信令时序和调度时序的方法及用户设备 - Google Patents

决定上下行链路重配置期间确认信令时序和调度时序的方法及用户设备 Download PDF

Info

Publication number
WO2014111045A1
WO2014111045A1 PCT/CN2014/070815 CN2014070815W WO2014111045A1 WO 2014111045 A1 WO2014111045 A1 WO 2014111045A1 CN 2014070815 W CN2014070815 W CN 2014070815W WO 2014111045 A1 WO2014111045 A1 WO 2014111045A1
Authority
WO
WIPO (PCT)
Prior art keywords
uplink
timing
hybrid automatic
signaling
downlink
Prior art date
Application number
PCT/CN2014/070815
Other languages
English (en)
French (fr)
Inventor
吴敏
黄建华
Original Assignee
联发科技(新加坡)私人有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 联发科技(新加坡)私人有限公司 filed Critical 联发科技(新加坡)私人有限公司
Priority to US14/761,730 priority Critical patent/US9949284B2/en
Priority to CN201480005283.7A priority patent/CN104938017B/zh
Publication of WO2014111045A1 publication Critical patent/WO2014111045A1/zh

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • H04W72/1263Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
    • H04W72/1268Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of uplink data flows
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/18Automatic repetition systems, e.g. Van Duuren systems
    • H04L1/1812Hybrid protocols; Hybrid automatic repeat request [HARQ]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L1/00Arrangements for detecting or preventing errors in the information received
    • H04L1/12Arrangements for detecting or preventing errors in the information received by using return channel
    • H04L1/16Arrangements for detecting or preventing errors in the information received by using return channel in which the return channel carries supervisory signals, e.g. repetition request signals
    • H04L1/18Automatic repetition systems, e.g. Van Duuren systems
    • H04L1/1829Arrangements specially adapted for the receiver end
    • H04L1/1854Scheduling and prioritising arrangements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • H04L5/0055Physical resource allocation for ACK/NACK
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/14Two-way operation using the same type of signal, i.e. duplex
    • H04L5/143Two-way operation using the same type of signal, i.e. duplex for modulated signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/02Arrangements for optimising operational condition
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/0001Arrangements for dividing the transmission path
    • H04L5/0003Two-dimensional division
    • H04L5/0005Time-frequency
    • H04L5/0007Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT
    • H04L5/001Time-frequency the frequencies being orthogonal, e.g. OFDM(A), DMT the frequencies being arranged in component carriers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/14Two-way operation using the same type of signal, i.e. duplex
    • H04L5/1469Two-way operation using the same type of signal, i.e. duplex using time-sharing

Definitions

  • the present invention relates to wireless communication network technology, and more particularly to processing of a Hybrid Automatic Repeat Request (HARQ) process when a UL-DL configuration changes in a TDD system.
  • HARQ Hybrid Automatic Repeat Request
  • the HARQ mechanism is used to improve the reliability of uplink and downlink data transmission.
  • DL HARQ is asynchronous adaptive HARQ
  • UL HARQ is synchronous adaptive or non-adaptive HARQ.
  • Adaptive HARQ refers to the Modulation and Code Scheme (MCS) of the retransmitted data and the allocated physical resources can change as the Channel Status Information (CSI) changes.
  • Synchronization HARQ refers to a fixed time interval between first transmission and retransmission.
  • the LTE system can support multiple parallel HARQ processes.
  • the ID of the DL HARQ process of the User Equipment (UE) should be notified in the DCI, and the UE can correctly combine the retransmitted data and the corresponding initial transmission data.
  • the interval between the initial transmission and the retransmission of the DL HARQ is not fixed, but a fixed interval should be followed between the DL HARQ-ACK and the corresponding Physical Downlink Shared Channel (PDSCH).
  • PDSCH Physical Downlink Shared Channel
  • the interval between the initial transmission and the retransmission of the UL HARQ is fixed, except that the UL HARQ-ACK and the corresponding Physical Uplink Shared Channel (PUSCH) should follow a fixed interval, uplink scheduling signaling, and scheduled PUSCH.
  • the fixed interval should also be followed.
  • the uplink scheduling signaling includes the uplink grant (UL grant) and the physical HARQ Indicator Channel (PHICH).
  • the UL grant can schedule new data transmission and adaptive/non-adaptive HARQ. Pass, and PHICH can only schedule non-adaptive HARQ retransmissions.
  • the uplink and downlink can support up to eight parallel HARQ processes.
  • HARQ-ACK/uplink scheduling sequence There is only one HARQ-ACK/uplink scheduling sequence, that is, the HARQ-ACK is fed back 4 ms after receiving the data transmission, and the uplink is transmitted 4 ms before the uplink data transmission.
  • Scheduling signaling In the TD-LTE system, the maximum number of HARQ processes that can be supported by the uplink and downlink is related to the UL-DL configuration. If the proportion of UL subframes in a radio frame increases, the number of UL HARQ processes will increase. DL HARQ The number of processes will be reduced, and each UL-DL configuration will have a corresponding HARQ-ACK/uplink scheduling sequence.
  • the present invention provides a method for determining acknowledgment signaling timing and scheduling timing during uplink and downlink reconfiguration. And methods for managing synchronous HARQ processes.
  • An embodiment of the present invention provides a method for determining an acknowledgment signaling timing and a scheduling timing during uplink and downlink reconfiguration, where the method includes: when uplink and downlink reconfiguration, the user equipment configures the current uplink and downlink The first timing of the acknowledgment signaling timing and the uplink scheduling timing of the first frame; and the user equipment uses the second timing for the acknowledgment signaling timing and the uplink scheduling timing of the second frame and subsequent frames of the current uplink and downlink configuration .
  • An embodiment of the present invention provides a user equipment for managing uplink/downlink configuration acknowledgement signaling timing, where the user equipment includes: multiple buffers for buffering acknowledgement signaling corresponding to physical transmission of data for first transmission and retransmission a timing determination module, when the uplink and downlink configuration is reconfigured, the user equipment uses a first timing table for an acknowledgment signaling scheduling sequence of a first frame of a current uplink and downlink configuration for physical shared channel data reception; The second timing table is used for the acknowledgment signaling scheduling sequence of the second frame and the subsequent frame of the current uplink and downlink configuration; the acknowledgment signaling transmission module is configured to transmit the acknowledgment signaling according to the corresponding timing table to confirm the transmission and the weight of the corresponding physical shared data. pass.
  • An embodiment of the present invention provides a method for managing a plurality of synchronous uplink hybrid automatic repeat request processes.
  • the method is used in a time division duplex system uplink and downlink subframe proportion reconfiguration period, and the foregoing method includes: When the number of uplink hybrid automatic repeat request processes of the uplink configuration is increased by the first number compared with the number of uplink hybrid automatic repeat request processes of the previous uplink and downlink configuration, the above-mentioned current uplink and downlink configurations are activated.
  • the number of uplink hybrid automatic repeat request processes is at least the same as the first number; when the uplink uplink automatic repeat request process of the current uplink and downlink configuration is higher than the uplink of the previous uplink and downlink configuration When the number of hybrid automatic repeat request processes is reduced by a second amount, the number of terminated uplink hybrid automatic repeat request processes is at least the same as the second number; and when an uplink hybrid automatic repeat request process is on the uplink and downlink When the subframe ratio reconfiguration period cannot be kept continuous, the above uplink hybrid automatic repeat request process is terminated, and Another uplink hybrid automatic repeat request process.
  • FIG. 1 is a schematic diagram showing a wireless communication system in accordance with an embodiment of the present invention.
  • FIG. 2 is a schematic diagram of a non-contiguous UL HARQ process in accordance with an embodiment of the present invention.
  • FIG. 3 is a schematic diagram showing an increase in the number of UL HARQ processes when a UL-DL configuration is changed according to an embodiment of the present invention.
  • FIG. 4 is a schematic diagram of terminating a UL HARQ process according to an embodiment of the invention.
  • 5A-5B are schematic diagrams of terminating a UL HARQ process according to an embodiment of the invention.
  • FIGS. 6A-6B are schematic diagrams of terminating a UL HARQ process according to an embodiment of the invention.
  • FIG. 7 is a schematic diagram of a decrease in the number of UL HARQ processes when a UL-DL configuration is changed according to an embodiment of the present invention.
  • FIG. 8 is a schematic diagram of the existing DL HARQ-ACK timing being invalid during UL-DL configuration reconfiguration.
  • Figure 9 is a schematic diagram of the existing UL HARQ-ACK timing invalid during UL-DL configuration reconfiguration.
  • FIG. 10 is a schematic diagram of the existing PUSCH scheduling sequence being invalid during the UL-DL configuration reconfiguration. detailed description
  • the multiple access wireless communication system 100 includes a Node B 110, a User Equipment (UE) 120 and 130, and a first antenna group of the User Equipment 120 and the Node B 110.
  • the communication is performed, wherein the first antenna group transmits information to the user equipment 120 through the downlink 124 and receives the information transmitted by the user equipment 120 through an uplink 122.
  • the user equipment 130 communicates with a second antenna group (not shown) of the Node B 110, wherein the second antenna group transmits information to the user equipment 130 via the downlink 134 and receives through an uplink 132.
  • Information transmitted by user device 130 includes a Node B 110, a User Equipment (UE) 120 and 130, and a first antenna group of the User Equipment 120 and the Node B 110.
  • the communication is performed, wherein the first antenna group transmits information to the user equipment 120 through the downlink 124 and receives the information transmitted by the user equipment 120 through an uplink 122.
  • the user equipment 130 communicates with a second antenna group (not shown) of the
  • uplinks 122, 132 and downlinks 124, 134 can communicate using different frequencies.
  • the downlink 124 may be different from the uplink 122.
  • the Node B may be a fixed station or a base station used for communicating with the terminal device, and may also be referred to as an access point or an access network.
  • AN base station
  • evolved base station evolved Node B (eNode B)
  • UE User Equipment
  • AT Access Terminal
  • Node B110 and user equipments 120, 130 in FIG. 1 respectively include at least one transmission unit
  • a module supporting the embodiment of the present invention may be included in the user equipment 120, such as a configuration.
  • the HARQ mechanism should comply with fixed timing requirements.
  • For UL HARQ and DL HARQ there should be a specific time interval between the detection of the data channel and the corresponding HARQ-ACK/NACK reporting (Report).
  • the base station in the subframe for example, Node B, evolved Node B (eNB), etc., hereinafter only the eNB example Description).
  • the PUSCH corresponding to the UL grant should be transmitted in the subframe, and then the HARQ-ACK corresponding to the PUSCH will inform the UE in the subframe.
  • the values of n and are not less than 4. In the FDD LTE system, the values of n and are both 4. In the TD-LTE system, the values of n and , may be different for different UL HARQ processes in different UL-DL configurations.
  • a major advantage of the TDD system is the use of UL-DL configuration to achieve uplink and downlink asymmetric resource allocation.
  • the 3GPP LTE standard there are 7 different UL-DL configurations (see Table 1), and the proportion of UL subframes ranges from 10% to 60%.
  • the uplink and downlink traffic will change in real time. If the UL-DL configuration can be configured according to the uplink and downlink traffic, the system efficiency will be greatly improved. In scenarios where service traffic changes rapidly, it is necessary to dynamically or semi-statically allocate the ratio of uplink and downlink subframes.
  • the HARQ timing requirements of different UL-DL configurations are specified, but the HARQ process when the UL-DL configuration changes are not considered, so it is necessary to modify the existing HARQ timing to support dynamic or semi-static.
  • the HARQ timing during the UL-DL reconfiguration and the beneficial effects of the processing are not limited to the above.
  • the number of uplink and downlink HARQ processes in different UL-DL configurations is shown in Table 2.
  • the number of HARQ processes in different UL-DL configurations may be different, which means that the number of parallel HARQ processes during the uplink and downlink subframe proportion reconfiguration may change.
  • Downlink Control Information Downlink Control Information
  • each HARQ process is indicated in DCI). Since the eNB can reduce or increase the number of parallel HARQ processes by scheduling the process ID, the change in the number of HARQ processes does not have a large impact.
  • the UE may establish a corresponding HARQ module and a buffer according to the maximum number of DL HARQ processes, where each HARQ process may correspond to one HARQ module and one buffer.
  • all other designs and calculations related to the number of DL HARQ processes, such as the calculation of soft channel bits, should be determined based on the maximum number of parallel HARQ processes.
  • the initial transmission and retransmission of each HARQ process correspond to a specific timing, and the change of the number of HARQ processes will have a large impact. For example, when the number of UL HARQ processes decreases, the UL HARQ process that is lost should be terminated; when the number of ULHARQ processes increases, the increased UL HARQ process should be initiated; when one HARQ process cannot be changed during the UL-DL configuration change When kept continuous, this HARQ process is terminated and another HARQ process is started.
  • the continuity of the HARQ process means that the initial transmission in the previous UL-DL configuration can be combined with the retransmission in the current UL-DL configuration.
  • FIG. 2 is a schematic diagram of a non-contiguous UL HARQ process according to an embodiment of the invention.
  • the number of UL HARQ processes does not change, that is, the number of UL HARQ processes of both UL-DL configurations is 2, but because of the subframe of the previous UL-DL configuration #7 is separated from the current UL-DL configuration subframe #3 by only 6 subframes, that is, the interval between two PUSCH transmissions is less than 8 ms, so the UL HARQ process #2 cannot be kept continuous during the UL-DL configuration change.
  • the ID of the added HARQ process may be indicated in the DCI, and the UE only needs to activate the corresponding HARQ module and the HARQ buffer.
  • the UL grant for scheduling the PUSCH needs to be sent to the UE at least 4 subframes before the PUSCH transmission, that is, the UL grant can be used as the starting point of the UL HARQ process, and the UE needs to detect at the starting point of the newly added HARQ process.
  • the UL grant may be transmitted in the previous UL-DL configuration or in the current UL-DL configuration.
  • the UE needs to know the current UL-DL reconfiguration signaling before detecting the UL grant, otherwise the UE may not detect the UL grant, thereby missing the corresponding PUSCH transmission.
  • the current UL-DL reconfiguration signaling should be transmitted to the UE at least before the earliest starting point of the newly added HARQ process. After the UE detects the UL grant at the foregoing starting point, a corresponding HARQ module and a HARQ buffer may be established for the added UL HARQ process.
  • FIG. 3 is a schematic diagram showing an increase in the number of UL HARQ processes according to an embodiment of the present invention, wherein the UL-DL configuration is changed from #2 to #6, and the number of corresponding UL HARQ processes is increased from 2 to 6.
  • the corresponding UL grant should be transmitted in the DL subframes #6 and #9 of the previous UL-DL configuration, that is, the increased UL HARQ process# 3 and #4 should be started in the last frame of the previous UL-DL configuration, while the other two increased UL HARQ processes #5 and #6 are in the first frame of the current UL-DL configuration.
  • Table 3 gives the starting point of the UL HARQ process that is added when the UL-DL configuration is changed.
  • the label Cfg in the table indicates the UL-DL configuration
  • Cfgl ⁇ CfgO indicates the change from configuration 1 to configuration 0, and so on.
  • For increasing the UL HARQ process if in the subframe " When the UL grant is detected, the corresponding PUSCH can be transmitted in the subframe ⁇ .
  • For UL-DL configuration #0 if the lowest bit (LSB) of the UL index in the DCI carrying the UL grant is set to 1, then K UL j ran corpse, otherwise, K UL ⁇ . It can be seen from this table that most of the increased UL HARQ processes can be started in the current UL-DL configuration, and a small number of added UL HARQ processes can be started in the previous UL-DL configuration.
  • the process ID can be indicated in the DCI.
  • the eNB can reduce the number of parallel HARQ processes in one RTT by scheduling the ID of the HARQ process, so the reduction of the number of DL HARQ processes does not affect.
  • each HARQ process corresponds to a fixed timing requirement.
  • some UL HARQ processes should be terminated, and the termination of the UL HARQ process can be automatically retransmitted with the last physical hybrid of the HARQ process.
  • the Physical HARQ Indicator Channel (PHICH) is the termination point. In other words, the termination of the UL HARQ process can be performed after the PHICH.
  • the termination point of the HARQ process may be in the previous UL-DL configuration or in the current UL-DL configuration.
  • Figures 4 to 6B show different processing behaviors of the UE and the eNB when terminating a UL HARQ process.
  • the behavior of the UE side and the eNB side when terminating one UL HARQ process is as shown in FIG. 4.
  • the UE and the eNB may clear the data in the buffer corresponding to the terminated UL HARQ process.
  • the UE clears the data in the corresponding buffer, including the source transport block (TB) data and coding. After the data.
  • TB source transport block
  • the eNB clears the data in the corresponding buffer regardless of whether the PUSCH is successfully decoded and the number of retransmissions reaches the configured maximum number of retransmissions.
  • the foregoing processing is different from the existing HARQ mechanism.
  • the UE In the existing HARQ mechanism, the UE only receives the new data indicated by the New Data Indicator (NDI) in the UL grant or the number of retransmissions reaches the configured maximum retransmission.
  • the data of the corresponding buffer is cleared only when the number of times is cleared.
  • the eNB clears the data of the corresponding buffer only when the PUSCH is successfully decoded or the number of retransmissions reaches the configured maximum number of retransmissions.
  • NDI New Data Indicator
  • the behavior of the UE side and the eNB side when terminating one UL HARQ process is as shown in FIG. 5A and FIG. 5B.
  • the eNB clears the merged data of the corresponding buffer regardless of whether the PUSCH is successfully decoded and whether the number of retransmissions reaches the configured maximum number of retransmissions.
  • the UE clears the data in the buffer corresponding to the HARQ process, including the source TB data and the encoded data.
  • the source TB data of the buffer corresponding to the HARQ process can be waited for and transmitted in other HARQ processes. For example, when the NDI received by the HARQ process #2 indicates that there is new data transmission, and the trasport block size (TBS) in the UL grant is the same as the TBS of the source TB data of the HARQ process # «, The source TB data of the HARQ process is placed in the buffer of the HARQ process #2 as a new data transmission.
  • TBS trasport block size
  • the behavior of the UE side and the eNB side when terminating a UL HARQ process is as shown in FIG. 6A and FIG. 6B.
  • the UL HARQ process #w is terminated, on the UE side, if the HARQ-ACK is detected as an ACK or the number of retransmissions reaches the configured maximum number of retransmissions, the UE clears the data in the buffer corresponding to the HARQ process, for example, Source TB data and encoded TB data.
  • the eNB On the eNB side, if the PUSCH is successfully decoded or the number of retransmissions reaches the configured maximum number of retransmissions, the eNB should clear the data in the buffer corresponding to the HARQ process. On the UE side, if the HARQ-ACK is detected as NACK, and the number of retransmissions does not reach the configured maximum number of retransmissions, the encoded data of the buffer corresponding to the HARQ process may be retransmitted in other activated HARQ processes.
  • a one-to-one mapping relationship between the terminated HARQ process and the activated HARQ process may be defined based on predefined or Radio Resource Control (RRC) signaling, or may be based on
  • RRC Radio Resource Control
  • the pre-defined or RRC signaling specifies that the retransmission of the HARQ process and the retransmission of the corresponding activated HARQ process are prioritized, and may also be dynamically based on physical layer signaling between the retransmission of the terminating HARQ process and the retransmission of the corresponding activated HARQ process. Scheduling.
  • the HARQ process and the activated HARQ process may be terminated based on predefined or RRC signaling requirements.
  • the relationship between the many-to-one mapping may also be based on pre-defined or RRC signaling, and the priority of retransmission of the multiple HARQ processes and the retransmission of the corresponding activated HARQ process may be specified, or may be based on physical layer signaling.
  • the above-mentioned pre-defined mode does not require additional signaling overhead.
  • the RRC signaling mode requires additional signaling overhead.
  • the physical layer signaling mode can reuse the existing physical layer signaling indication domain without adding additional signaling overhead.
  • the physical layer signaling is used to dynamically schedule the retransmission of the HARQ process or the retransmission of the corresponding HARQ process.
  • the retransmission should be based on the UL grant, and the UL grant should indicate which HARQ process the retransmission belongs to.
  • the ratio can be used in DCI 0/4 for UL authorization.
  • the bit is 0 indicating that the retransmission is a regular retransmission for the activated HARQ process, and the bit is 1 indicating that the retransmission is a retransmission for the terminated HARQ process, retransmission
  • the count of the number of times may include the number of retransmissions of the HARQ process # « before the end, and this 1 bit may multiplex the existing indication field in the DCI 0/4, for example, a 1-bit Sounding Reference Signal (SRS) request field.
  • SRS Sounding Reference Signal
  • bits can be used in DCI 0/4 to indicate whether the retransmission is for the active HARQ process or N.
  • the count of the number of retransmissions may include the number of retransmissions before terminating the HARQ process, "log 2 (N+l), the bits can be reused in the existing DCI 0/4
  • the indication field such as a 2-bit PUSCH transmission power control field, or a 3-bit Demodulation Reference Signal (DMRS) cyclic offset indication.
  • DMRS Demodulation Reference Signal
  • the mapping between the HARQ process and the activating HARQ process is terminated based on a predefined rule, and the mapping relationship may be one-to-one or many-to-one. For example, the UE searches for this based on a pre-stored table during operation. Relationship, find the corresponding active HARQ process for each terminated HARQ process for retransmission.
  • the priority of retransmission of the HARQ process and the retransmission of the activated HARQ process are terminated based on a predefined provision, for example, the retransmission of the terminated HARQ process is always better than the retransmission of the corresponding activated HARQ process, or the HARQ is activated correspondingly.
  • the retransmission of the process is always higher than the retransmission of the terminating HARQ process.
  • the retransmission of the earliest ending HARQ process has the highest priority among the multiple terminating HARQ processes.
  • FIG. 7 is a schematic diagram showing a decrease in the number of UL HARQ processes when a UL-DL configuration is changed, according to an embodiment of the present invention.
  • the UL-DL configuration changes from #6 to #2, and the number of UL HARQ processes is reduced from 6 to 2, of which 4 UL HARQ processes need to be terminated.
  • the UL HARQ processes #6 and #1 are respectively terminated in the DL subframes #6 and #9 of the previous UL-DL configuration; and the UL HARQ processes #2 and #3 are respectively in the DL sub-configuration of the current UL-DL. Frames #0 and #1 are terminated.
  • certain UL HARQ processes can be contiguous during reconfiguration, such as UL HARQ processes #4 and #5, similar to FIG. 1, and will not be described again for brevity.
  • Table 4 shows the termination points of all terminated HARQ processes when the UL-DL configuration changes.
  • the transmitted PHICH may correspond to the PUSCH transmitted by the process in the subframe "- ⁇ / ⁇ .
  • ⁇ ⁇ 6.
  • N. w is the number of UL HARQ processes of the previous UL-DL configuration
  • N ew is the number of UL HARQ processes of the current UL-DL configuration, and for most cases in Tables 3 and 4, when N ⁇ w >N.
  • N nOT -N. ld increased UL HARQ processes are initiated, and when N nOT ⁇ N. ld , there are at least N. ld - N reduced UL HARQ processes are terminated.
  • more UL HARQ processes may be terminated or started, because the PUSCH retransmission is at least 8 ms apart from the initial transmission and the HARQ-ACK reporting and the data transmission are separated by at least 4 ms, making it difficult for some UL HARQ processes to be reconfigured in the UL-DL.
  • the HARQ process will be terminated and another HARQ process will be started. For example, when the UL-DL configuration is reconfigured from #1 to #3, although only one UL HARQ process is reduced, there may be two UL HARQs.
  • the process is terminated and one UL HARQ process is started; when the UL-DL configuration is reconfigured from #2 to #3, although only one UL HARQ process is added, there may be two UL HARQ processes started and one UL HARQ process. Terminated; when UL-DL configuration is reconfigured from #2 to #4, although UL HARQ Cheng number has not changed, but you can have a UL HARQ process is terminated and a UL HARQ process is started.
  • HARQ timing which may not be available during UL-DL reconfiguration.
  • 8 is an example in which the existing DL HARQ-ACK timing is invalid during UL-DL reconfiguration, when the UL-DL configuration is reconfigured from #6 to #2, if the existing UL-DL configuration #6 is complied with DL HARQ-ACK timing, HARQ-ACK of PDSCH transmitted on subframes #6 and #9 shall be reported in subframes #3 and #4 of the next frame, but subframes #3 and #4 of UL-DL configuration #2 It is a DL subframe instead of a UL subframe, which makes the HARQ-ACK of some PDSCHs of the last frame of the previous UL-DL configuration unable to be reported in the first frame of the current UL-DL configuration during UL-DL reconfiguration.
  • Figure 9 is an example of the existing UL HARQ-ACK timing invalid during UL-DL reconfiguration, when the UL-DL configuration is from
  • subframe #4 of UL-DL configuration #2 is a UL subframe instead of a DL subframe, which makes HARQ of certain PUSCHs of the last frame of the previous UL-DL configuration during UL-DL reconfiguration.
  • the ACK cannot be reported in the first frame of the current UL-DL configuration.
  • FIG. 10 is an example in which the existing PUSCH scheduling timing is invalid during UL-DL reconfiguration, when the UL-DL configuration is reconfigured from #1 to #2, if the UL HARQ of the existing UL-DL configuration #1 is complied with -ACK timing, the PUSCH transmitted on the next subframe #2 should be based on the UL grant on the previous subframe #8, but the subframe #8 of the UL-DL configuration #1 is the UL subframe instead of the DL subframe, which During UL-DL configuration reconfiguration, certain PUSCHs of the first frame of the current UL-DL configuration cannot be scheduled by UL grant in the last frame of the previous UL-DL configuration.
  • the existing HARQ timing may not be applicable, so it is necessary to design a new HARQ timing, which is mainly used for the first frame of the current UL-DL configuration, and The existing HARQ timing can still be complied with for other frames.
  • Table 5 is the existing DL HARQ-ACK sequence, and the HARQ-ACK on the subframe is transmitted on the corresponding subframe n-k, k e K
  • the last frame and the previous frame of the previous UL-DL configuration may comply with the corresponding DL HARQ-ACK timing in Table 5, and the second frame and subsequent frames of the current UL-DL configuration may also be used.
  • the first frame of the current UL-DL configuration shall comply with the new DL HARQ-ACK timing, which may be the same as in Table 5
  • the current timing of a UL-DL configuration and the current UL-DL configuration is different.
  • Tables 6 through 12 give examples of DL HARQ-ACK timings that can be followed in UL-DL reconfiguration, which can be used for the first frame of the current UL-DL configuration.
  • the following rules can be specifically observed: If the PDSCH is received in the previous UL-DL configuration, then the DL HARQ of the previous UL-DL configuration in Table 5 The -ACK timing can be multiplexed (reu Se ). If multiplexing is not feasible, ie the corresponding UL subframe is actually a DL subframe under the current UL-DL configuration, the HARQ-ACK may be reported in the latest UL subframe, where the most recent UL subframe and the associated PDSCH At least 4 subframes apart.
  • the DL HARQ-ACK timing of the current UL-DL configuration in Table 5 can be multiplexed.
  • the timing tables can be combined from the previous UL-DL configuration in Table 5 and the DL HARQ-ACK timing of the current UL-DL configuration, that is, the first half Similar to the timing of the previous UL-DL configuration, the second half is similar to the timing of the current UL-DL configuration.
  • Table 13 is the existing UL HARQ-ACK timing, the HARQ-ACK corresponding to the sub-frame ⁇ - ⁇ ⁇ transmitted on the sub-frame.
  • UL-DL configuration #0 if in subframe #0 or subframe # 5
  • the last frame and the previous frame of the previous UL-DL configuration may comply with the corresponding UL HARQ-ACK timing in Table 13, and the second frame and subsequent frames of the current UL-DL configuration may also comply with the table.
  • a corresponding UL HARQ-ACK timing in 13 but the first frame of the current UL-DL configuration may comply with a new UL HARQ-ACK timing, which may be the same as the previous UL-DL configuration in Table 13 and The current timing of the current UL-DL configuration is different.
  • Tables 14 to 20 give an example of the UL HARQ-ACK timing that can be complied with when the UL-DL configuration is changed, and the above timing can be used for the first frame of the current UL-DL configuration.
  • the following rules can be observed in accordance with embodiments of the present invention:
  • the DL HARQ-ACK timing of the previous UL-DL configuration in Table 5 can be multiplexed. If multiplexing is not feasible, that is, the corresponding DL subframe is actually a UL subframe under the current UL-DL configuration, the HARQ-ACK may be reported in the latest DL subframe, where the most recent DL subframe and the associated PUSCH At least 4 subframes apart.
  • the UL HARQ-ACK timing of the current UL-DL configuration in Table 13 can be multiplexed.
  • most of the timing tables may be composed of the previous UL-DL configuration in Table 13 and the UL HARQ-ACK timing of the current UL-DL configuration, that is, the first half Similar to the timing of the previous UL-DL configuration, the second half is similar to the timing of the current UL-DL configuration.
  • the last frame and the previous frame of the previous UL-DL configuration may comply with the corresponding ones in Table 21.
  • the PUSCH scheduling sequence, the second frame and the subsequent frame of the current UL-DL configuration may also comply with the corresponding UL PUSCH scheduling sequence in Table 21, but the first frame of the current UL-DL configuration may comply with the new PUSCH scheduling sequence, this new
  • the PUSCH scheduling timing may be different from the previous UL-DL configuration in Table 21 and the current timing of the current UL-DL configuration.
  • Tables 22 through 28 give an example of the PUSCH scheduling timing that can be followed when the UL-DL configuration is changed. The above timing is only used for the first frame of the current UL-DL configuration.
  • the PUSCH scheduling timing may multiplex the timing of the existing previous UL-DL configuration or the current UL-DL configuration. If multiplexing is not possible, and the corresponding DL subframe is actually a UL subframe in the previous UL-DL configuration, then other PUSCH scheduling timings are used, then the scheduling timing can be close to the existing scheduling timing, K puseH The value is close to the existing K puseH .
  • this UL grant may be as close as possible to the associated PUSCH and at least 4 subframes apart. If the UL grant is transmitted under the current UL-DL configuration, the existing PUSCH scheduling timing of the current UL-DL configuration can be multiplexed.
  • most of the PUTS scheduling timings of the previous UL-DL configuration and the current UL-DL configuration in Table 21 may be combined, that is, the first half and the previous UL-DL.
  • the timing of the configuration is similar, and the second half is similar to the timing of the current UL-DL configuration, and different PUSCH scheduling timings can also be used. For example, when the UL-DL configuration changes from #4 to #2, subframe #7
  • K PUSeH 8
  • the UL grant or PHICH of the first 8 subframes corresponding to the PUSCH transmitted in this frame is received, which is different from the existing timing table.
  • parallel channels can be established based on the pulse repetition frequency.
  • parallel channels can also be established based on pulse position or offset.
  • parallel channels can be established based on timing hopping.
  • parallel channels can be established based on pulse repetition frequency, pulse position or offset, and timing hopping.
  • various illustrative logic blocks, modules, and circuits, and various aspects disclosed herein may be implemented in an integrated circuit (IC), an access terminal, an access point, or by an integrated circuit. , access terminal, access point execution.
  • the integrated circuit can be a general purpose processor, a digital signal processor (DSP), an application specific integrated circuit (ASIC), a Field Programmable Gate Array (FPGA), or other programmable Logic device, discrete gate or transistor logic (Tnmsistor Logic;), discrete hardware component, electronic component, optical component, mechanical component, or any combination of the above to complete the functions described herein; and possibly Execution codes or instructions that exist within the integrated circuit, outside the integrated circuit, or both.
  • a general purpose processor may be a microprocessor, but could be any conventional processor, controller, microcontroller, or state machine.
  • the processor may be comprised of a combination of computer devices, such as a combination of a digital signal processor (DSP) and a microcomputer, a plurality of sets of microcomputers, a group of groups of microcomputers, and a digital signal processor core, or any other similar configuration.
  • DSP digital signal processor
  • a software module (including execution instructions and related data) and other data can be stored in the data memory, such as random access memory (RAM), flash memory, read-only memory (Read-Only Memory, ROM), erasable programmable read only memory (EPROM), electronically erasable EEPROM (EEPROM), buffer, hard disk, portable disk, CD Compact Disc Read-Only Memory (CD-ROM) A digital video disc (DVD) or any other computer readable storage medium format in the art.
  • RAM random access memory
  • ROM read-only memory
  • EPROM erasable programmable read only memory
  • EEPROM electronically erasable EEPROM
  • buffer hard disk
  • portable disk CD Compact Disc Read-Only Memory
  • CD-ROM CD Compact Disc Read-Only Memory
  • DVD digital video disc
  • a storage medium can be coupled to a machine device, such as a computing device (for convenience of description, represented by a processor in this specification), the processor can read information (such as Program code), and write information to the storage medium.
  • a storage medium can integrate the processor.
  • An application specific integrated circuit (ASIC) includes a processor and a storage medium.
  • a user device includes a special application integrated circuit.
  • the processor and the storage medium are included in the user device in a manner that is not directly connected to the user device.
  • any product suitable for a computer program includes a readable storage medium, wherein the readable storage medium includes one or more program code associated with the disclosed embodiments.
  • the product of the computer program can include packaging materials.

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

本发明提供一种决定上下行链路重配置期间的混合自动重传请求确认/上行调度时序以及管理同步上行链路混合自动重传请求进程的方法,包含当上下行链路重配置时,判断前一上下行链路配置的最后帧是否具有至少一混合自动重传请求确认信令无法在当前上下行链路配置的第一帧传输;以及当上述前一上下行链路配置的上述最后帧具有上述信令无法在上述当前上下行链路配置的上述第一帧传输时,根据前一上下行链路配置和当前上下行链路配置的混合自动重传请求确认时序表,重新配置上述当前上下行链路配置的上述第一帧的混合自动重传请求确认时序。

Description

决定上下行链路重配置期间确认信令时序和调度时序的方法及用户设备 技术领域
本发明为有关于无线通信网络技术, 且特别有关于在 TDD系统中 UL-DL配置改变时的 混合自动重传请求 (Hybrid Automatic Repeat Request, HARQ)进程的处理。 背景技术
在 3GPP LTE系统中, 使用 HARQ机制提高上下行数据传输的可靠性。 DL HARQ为异步 自适应 HARQ, UL HARQ为同步自适应或非自适应 HARQ。 自适应 HARQ指重传数据的调制 编码方式 (Modulation and Code Scheme, MCS)及分配的物理资源能随着信道状态信息 (Channel Status Information, CSI)改变而改变。 同步 HARQ指初传(first transmission)和重传 (retransmission)之间应间隔固定的时间。 与传统的停等式 (stop-and-wait)ARQ机制相比, LTE系 统可支持多个并行的 HARQ进程 (process)。 对于异步的 DL HARQ, 应在 DCI中告知用户设备 (User Equipment, UE)DL HARQ进程的 ID, UE才能将重传数据和对应的初传数据正确合并。 DL HARQ初传和重传之间的间隔不固定, 但 DL HARQ-ACK和对应的物理下行共享信道 (Physical Downlink Shared Channel, PDSCH)之间应遵循固定的间隔。 而对于同步的 UL HARQ, 则无需指示 UL HARQ进程的 ID。 UL HARQ初传和重传之间的间隔固定, 除了 UL HARQ-ACK和对应的物理上行共享信道 (Physical Uplink Shared Channel, PUSCH)之间应遵循 固定的间隔, 上行调度信令和所调度的 PUSCH之间也应遵循固定的间隔, 上行调度信令包括 上行授权 (UL grant)和物理 HARQ指示信道 (Physical HARQ Indicator Channel, PHICH) , UL grant可以调度新数据传输和自适应 /非自适应 HARQ重传, 而 PHICH只能调度非自适应 HARQ 重传。 在 FDD LTE系统中, 上下行最多可支持 8个并行的 HARQ进程, HARQ-ACK/上行调度 时序只有一种, 即在收到数据传输后 4ms反馈 HARQ-ACK, 在上行数据传输前 4ms传输上行调 度信令; 在 TD-LTE系统中, 上下行可支持的最大 HARQ进程数与 UL-DL配置有关, 如果一个 无线帧内的 UL子帧比例增大, 那么 UL HARQ进程数将增多, DL HARQ进程数将减少, 每个 UL-DL配置都会有对应的 HARQ-ACK/上行调度时序。
然而, 对于 UL-DL配置改变时遵循现有 HARQ-ACK/上行调度时序则无法满足上述需 求。 发明内容
有鉴于此, 本发明提供一种决定上下行链路重配置期间确认信令时序和调度时序的方法 以及管理同步 HARQ进程的方法。
本发明的一实施例提供了一种决定上下行链路重配置期间确认信令时序和调度时序的方 法, 该方法包含: 当上下行链路重配置时, 用户设备对于当前上下行链路配置的第一帧的确 认信令时序和上行调度时序使用第一时序; 以及该用户设备对于该当前上下行链路配置的第 二帧以及之后帧的确认信令时序和上行调度时序使用第二时序。
本发明的一实施例提供了一种管理上下行链路配置确认信令时序的用户设备, 该用户设 备包含: 多个缓冲器, 用于缓冲确认信令对应物理共享数据的首次传输以及重传; 时序决定 模块, 当上下行链路配置重配置时, 该用户设备对于用于物理共享信道数据接收的当前上下 行配置的第一帧的确认信令调度时序使用第一时序表; 以及对于该当前上下行配置的第二帧 以及之后帧的该确认信令调度时序使用第二时序表; 确认信令传输模块, 用于依据对应时序 表传输确认信令以确认对应物理共享数据的传输以及重传。
本发明的一实施例提供了一种管理多个同步上行链路混合自动重传请求进程的方法, 上 述方法用于时分双工系统上下行子帧比例重配置期间, 上述方法包含: 当当前上下行链路配 置的上行链路混合自动重传请求进程数较前一上下行链路配置的上行链路混合自动重传请求 进程数增加第一数量时, 启动的上述当前上下行链路配置的上行链路混合自动重传请求进程 数至少与上述第一数量相同; 当上述当前上下行链路配置的上行链路混合自动重传请求进程 数较上述前一上下行链路配置的上行链路混合自动重传请求进程数减少一第二数量时, 终止 的上行链路混合自动重传请求进程数至少与上述第二数量相同; 以及当一上行链路混合自动 重传请求进程在该上下行子帧比例重配置期间不能保持连续时, 终止上述上行链路混合自动 重传请求进程, 并启动另一上行链路混合自动重传请求进程。
下文为介绍本发明的最佳实施例。 各实施例用以说明本发明的原理, 但非用以限制本发 明。 本发明的范围当以后附的权利要求项为准。 附图说明
图 1为显示根据本发明一实施例的无线通信系统的示意图。
图 2根据本发明一实施例的一非连续 UL HARQ进程的示意图。
图 3为根据本发明一实施例的 UL-DL配置改变时 UL HARQ进程数增加的示意图。
图 4为根据本发明一实施例的终止一 UL HARQ进程的示意图。
图 5A〜图 5B为根据本发明一实施例的终止一 UL HARQ进程的示意图。
图 6A〜图 6B为根据本发明一实施例的终止一 UL HARQ进程的示意图。 图 7为根据本发明一实施例的 UL-DL配置改变时 UL HARQ进程数减少的示意图。 图 8为现有 DL HARQ-ACK时序在 UL-DL配置重配置期间无效的示意图。
图 9为现有 UL HARQ-ACK时序在 UL-DL配置重配置期间无效的示意图。
图 10为现有 PUSCH调度时序在 UL-DL配置重配置期间无效的示意图。 具体实施方式
在说明书及后续的权利要求当中使用了某些词汇来指称特定组件。 所属领域中具有通常 知识者应可理解, 制造商可能会用不同名词来称呼同一个组件。 本说明书及后续的权利要求 并不以名称的差异来作为区分组件的方式, 而是以组件在功能上的差异来作为区分准则。 在 通篇说明书及权利要求当中所提及的"包含"为开放式用语, 故应解释成"包含但不限定于"。 以外, "耦接"一词在此包含任何直接及间接的电气连接手段。 藉由以下的较佳实施例的叙述 并配合附图说明本发明, 但以下叙述中的装置、 组件与方法、 步骤乃用以解释本发明, 而不 应当用来限制本发明。 下面描述实现本发明的具体实施例。 下列描述是为了说明本发明的一 般原则, 不可理解为对本发明的限制。 因此本发明的保护范围当视所附的权利要求所界定者 为准。
图 1为显示根据本发明的实施例所述的多址无线通信系统 100的方块图。 多址无线通信系 统 100包括一节点 B(Node B)110, 一用户设备 (User Equipment, UE)120和 130, 用户设备 120与 节点 B(Node B)110的一第一天线群组 (图未显示) 进行通信, 其中第一天线群组透过一下行 链路 124传输信息至用户设备 120, 并透过一上行链路 122接收由用户设备 120所传送的信息。 用户设备 130与节点 B110的一第二天线群组 (图未显示) 进行通信, 其中第二天线群组透过 一下行链路 134传输信息至用户设备 130, 并透过一上行链路 132接收由用户设备 130所传送的 信息。 在一频分双工 (Frequency Division Duplexing, FDD)系统中, 上行链路 122、 132及下行 链路 124、 134可使用不同频率通信。 举例说明, 下行链路 124可用与上行链路 122不同的频 - 节点 B可以是用来与终端设备进行通信的固定机站或基站, 也可称作接入点、 接入网络 (Access Network, AN)、 基站、 演进基站、 演进节点 B(eNode B)、 或其他专业术语。 用户设备 (User Equipment, UE)也可称作接入终端 (Access Terminal, AT)、 无线通信装置、 终端、 接入 终端、 或其他专业术语。 图 1中的节点 B110及用户设备 120、 130分别至少包括一传送单元
(图未显示) , 一接收单元 (图未显示) 及一处理单元 (图未显示) , 其中上述传送单元及 接收单元耦接至上述处理单元。 用户设备 120中可以包含支持本发明实施例的模块, 例如配置 管理模块, 用于管理 UL-DL配置的决定以及改变的相关运作, UL处理模块以及 DL处理模 块, 分别用于处理 UL以及 DL数据处理等, 以及可选择地, 在用户设备 120以及基站中可以包 含缓冲器模块等。
在 3GPP LTE标准中, HARQ机制都应遵从固定的时序要求。 对于 UL HARQ和 DL HARQ, 数据信道的检测和对应的 HARQ-ACK/NACK上报 (Report)之间都应有一个特定的时间 间隔。 此外, UL HARQ中用于调度 PUSCH的 UL授权 (Grant)和对应的 PUSCH传输之间也应有 一特定的时间间隔。 例如, 对于 DL HARQ进程, 如果 PDSCH在子帧《被检测到, 那么对应的 HARQ-ACK会在子帧 上报给基站 (例如, 节点 B、 演进节点 B(eNB)等, 下文中仅以 eNB示 例说明) 。 与此类似地, 对于 UL HARQ进程, 如果 UL授权在子帧《被检测到, 则该 UL授权对 应的 PUSCH应在子帧 传输, 然后该 PUSCH对应的 HARQ- ACK会在子帧 告知 UE。 为了保证给 UE和 eNB不少于 4毫秒的数据处理时间, n、 及 的取值皆不能小于 4。 在 FDD LTE系统中, n、 及 的取值皆为 4。 在 TD-LTE系统中, 对于不同 UL-DL配置的不同 UL HARQ进程, n、 及 的取值可能皆不相同。
与 FDD系统相比, TDD系统的一大优势是利用 UL-DL配置来实现上下行非对称资源分 配。 在 3GPP LTE标准中, 现有 7种不同的 UL-DL配置 (见表 1 ) , UL子帧的所占的比例范围 为 10%~60%。 对于仅有少量用户的小小区 (Small cell)而言, 上下行业务流量会实时改变, 如 果能根据上下行业务流量配置相近的 UL-DL配置, 将能极大改善系统效率, 对于这些上下行 业务流量改变较快的场景, 动态或半静态分配上下行子帧比例很有必要。 在现有的 3GPP LTE 标准中, 规定了不同 UL-DL配置的 HARQ时序要求, 但并未考虑 UL-DL配置改变时的 HARQ 过程, 因此有必要修改现有的 HARQ时序以支持动态或半静态的 UL-DL配置, 以及有必要考 虑上下行子帧比例重配置期间的 HARQ进程数改变所带来的影响, 如 HARQ进程的终止和启 动等。 所属领域技术人员可以理解, UL-DL重配置期间 HARQ时序以及处理过程的有益效果 不限于上述内容。
表 1 UL-DL配置
Figure imgf000005_0001
2 5ms D S u D D D S u D D
3 10ms D S u u U D D D D D
4 10ms D s u u D D D D D D
5 10ms D s u D D D D D D D
6 5ms D s u u U D S U U D
在 TD-LTE系统中, 不同 UL-DL配置的上下行 HARQ进程数如表 2所示。 不同 UL-DL配置 的 HARQ进程数可能不同, 这意味着上下行子帧比例重配置期间并行的 HARQ进程数可能发 生改变。
对于异步的 DL HARQ而言, 可以在下行链路控制信息 (Downlink Control Information,
DCI)中指示每个 HARQ进程的 ID。 由于 eNB可通过调度进程 ID来减少或增加并行的 HARQ进 程数, 因此 HARQ进程数的改变不会造成较大影响。 UE可以根据最大的 DL HARQ进程数建立 对应的 HARQ模块 (module)和缓冲区 (buffer), 其中, 每个 HARQ进程可以对应一个 HARQ模块 和一个缓冲区。 此外, 应基于最大的并行 HARQ进程数确定所有其他跟 DL HARQ进程数相关 的设计和计算, 如软信道比特 (bit)的计算等。
对于同步 UL HARQ, 每个 HARQ进程的初传和重传都对应特定时序, HARQ进程数的改 变会造成较大影响。 例如, 当 UL HARQ进程数减少时, 被减掉的 UL HARQ进程应被终止; 当 ULHARQ进程数增多时, 被增加的 UL HARQ进程应被启动; 当一个 HARQ进程不能在 UL- DL配置改变期间保持连续时, 这个 HARQ进程就会被终止并启动另一个 HARQ进程。 HARQ 进程的连续性是指前一 UL-DL配置下的初传能和当前 UL-DL配置下的重传进行合并。
图 2为根据本发明一实施例的一非连续 UL HARQ进程的示意图。 当 UL-DL配置从 #2变为 #4时, 虽然 UL HARQ进程的数量没有改变, 即两种 UL-DL配置的 UL HARQ进程数都为 2, 但 因为前一 UL-DL配置的子帧 #7与当前 UL-DL配置的子帧 #3仅间隔 6个子帧, 即两次 PUSCH传 输的间隔小于 8ms, 所以 UL HARQ进程 #2不能在 UL-DL配置改变期间保持连续。 针对非连续 UL HARQ进程, 一种解决方案是终止这个 UL HARQ进程, 且另一个 UL HARQ进程被启动, 即 UL HARQ进程 #2在当前 UL-DL配置的子帧 #1终止, 另一个 UL HARQ进程 #3在前一 UL-DL 配置的子帧 #9开始启动, 然上述实施例仅为示例说明, 本发明的保护范围不以此为限。 表 2 TD-LTE系统中的 HARO进程数
Figure imgf000007_0001
当 HARQ进程数增加时, 对于 DL HARg进程, 可以在 DCI中指示增加的 HARQ进程的 ID , UE只需激活对应的 HARQ模块和 HARQ缓冲区即可。 对于 UL HARQ进程, 用于调度 PUSCH的 UL授权需在 PUSCH传输前至少 4个子帧发送给 UE, 即 UL授权可以作为 UL HARQ进 程的起始点, UE需在这个新增的 HARQ进程的起始点检测 UL授权。 在一个实施例中, UL授 权可以在前一 UL-DL配置下传输, 也可以在当前 UL-DL配置下传输。 如果 UL授权在前一 UL- DL配置下传输, 那么 UE需要在检测此 UL授权前得知当前 UL-DL重配置信令, 否则 UE可能检 测不到该 UL授权, 从而错过对应的 PUSCH传输。 综上所述, 当前 UL-DL重配置信令应至少在 新增 HARQ进程的最早起始点之前传输给 UE。 当 UE在上述起始点检测到 UL授权后, 可以为 该增加的 UL HARQ进程建立对应的 HARQ模块和 HARQ缓冲区。
图 3为根据本发明的一实施例的 UL HARQ进程数增加的示意图, 其中, UL-DL配置从 #2 变为 #6, 对应的 UL HARQ进程数从 2增加到 6。 为了能调度当前 UL-DL配置中增加的 UL子帧 #3和 #4, 对应的 UL授权应在前一 UL-DL配置的 DL子帧 #6和 #9传输, 即增加的 UL HARQ进程 #3和 #4应在前一 UL-DL配置的最后一帧启动, 而另外两个增加的 UL HARQ进程 #5和 #6则在 当前 UL-DL配置的第一帧的子帧 #0和 #5启动, 换言之, 前一 UL-DL配置的两个 HARQ进程, 即进程 #1和 #2延续到当前 UL-DL配置。 所谓进程 #1的延续是指前一 UL-DL配置的子帧 #2 的 PUSCH能和当前 UL-DL配置的子帧 #3的 PUSCH进行合并。
表 3给出了 UL-DL配置改变时增加的 UL HARQ进程的起始点。 表中标号 Cfg表示 UL-DL配 置, Cfgl→CfgO表示从配置 1变为配置 0, 以此类推。 对于增加 UL HARQ进程, 如果在子帧《 检测到 UL授权, 那么可以在子帧 ^传输对应的 PUSCH。 对于 UL-DL配置 #0, 如果承 载 UL授权的 DCI中 UL索引(index)的最低比特位 (LSB)设为 1, 那么 KULjran尸,, 否则, KUL 丽 。 从此表可看出, 大部分增加的 UL HARQ进程可以在当前 UL-DL配置下启动, 小 部分增加的 UL HARQ进程则可以在前一 UL-DL配置下启动。
表 3新启动的 UL HARO进程的起始点, K
TDD UL- 前一 UL-DL配置的子帧 n 当前 UL-DL配置的子帧 n
DL配置重
Cfgl→CfgO
4/7
Cfgl→Cfg3
Cfgl→Cfg6
Cfg2→CfgO
4/7 4/7
Cfg2→Cfgl
Cfg2→Cfg3
Cfg2→Cfg4
Cfg2→Cfg6
Cfg3→Cfg0
4/7
Cfg3→Cfgl
Cfg3→Cfg6
Cfg4→CfgO
4/7 4/7
Cfg4→Cfgl
Cfg4→Cfg3 Cfg4→Cfg6
- - - - - - - 5 - - 7 7 - - - 7 - - -
Cfg5→Cfg0
4 4/7 7 - - - 4/7 - - -
Cfg5→Cfgl
4 - 6 - - 4 - - - -
Cfg5→Cfg2
- - - - - - - - - - - - - 4 - - - - -
Cfg5→Cfg3
4 4 - - - - - - -
Cfg5→Cfg4
4 - - - - - - - -
Cfg5→Cfg6
- - - - - - - 5 - 5 7 7 - - - 7 - - -
对于异步 DL HA Q, 可以在 DCI中指示进程 ID, 当 HARQ进程数减少时, eNB可通过调 度 HARQ进程的 ID来减少一个 RTT内并行的 HARQ进程数, 因此 DL HARQ进程数的减少并不 影响现有的 LTE标准。 对于同步 UL HARQ , 每个 HARQ进程都对应固定的时序要求, 当 HARQ进程数减少时, 一些 UL HARQ进程应被终止, UL HARQ进程的终止可以以该 HARQ进 程的最后一个物理混合自动重传请求指示信道 (Physical HARQ Indicator Channel, PHICH)为终 止点, 换言之, UL HARQ进程的终止可以在 PHICH之后执行。 在一实施例中, HARQ进程的 终止点可以在前一 UL-DL配置下, 也可以在当前 UL-DL配置下。
根据本发明的一个实施例, 终止一个 UL HARQ进程可以有多种解决方案, 图 4〜图 6B给 出了 UE和 eNB在终止一个 UL HARQ进程时不同的处理行为示意图。
根据本发明的一个实施例, UE侧和 eNB侧在终止一个 UL HARQ进程时的行为如图 4所 示。 当 UL HARQ进程 被终止时, UE和 eNB可以清空与该被终止的 UL HARQ进程相对应缓 冲区中的数据。 在 UE侧, 无论收到的 HARQ-ACK是否为 ACK以及重传次数是否达到配置的 最大重传次数, UE均清空对应缓冲区中的数据, 包括源传送块 (Transport Block, TB)数据和 编码后数据。 在 eNB侧, 无论 PUSCH是否被成功解码以及重传次数是否达到配置的最大重传 次数, eNB均清空对应缓冲区中的数据。 上述处理与现有 HARQ机制不同, 在现有 HARQ机制 中, UE只有在收到 UL授权中新数据指示符 (New Data Indicator, NDI)所指示的新数据或者重 传次数达到配置的最大重传次数时才清空对应缓冲区的数据, eNB只有在 PUSCH被成功译码 或者重传次数达到配置的最大重传次数时才清空对应缓冲区的数据。 根据本发明的另一个实施例, UE侧和 eNB侧在终止一个 UL HARQ进程时的行为如图 5A、 图 5B所示。 当 UL HARQ进程 被终止时, 在 eNB侧, 无论 PUSCH是否被成功解码以及 重传次数是否达到配置的最大重传次数, eNB均清空对应缓冲区的已合并数据。 在 UE侧, 如 果检测到 HARQ-ACK为 ACK, 或者重传次数达到配置的最大重传次数, 那么 UE清空与该 HARQ进程对应的缓冲区中的数据, 包括源 TB数据和编码后数据。 如果检测到 HARQ-ACK为 NACK, 并且重传次数没有达到配置的最大重传次数, 那么该 HARQ进程对应的缓冲区的源 TB数据可以等待以及放入其他 HARQ进程中传输。 例如, 当 HARQ进程 #2收到的 UL授权中 NDI指示有新数据传输, 并且 UL授权中的传输块大小 ( ransport Block Size, TBS)与 HARQ进 程#«的源 TB数据的 TBS相同, 则将 HARQ进程 的源 TB数据放入 HARQ进程 #2的缓冲区作为 新数据传输。
根据本发明的另一实施例, UE侧和 eNB侧在终止一个 UL HARQ进程时的行为如图 6A、 图 6B所示。 当 UL HARQ进程 #w被终止时, 在 UE侧, 如果检测到 HARQ-ACK为 ACK或者重传 次数达到配置的最大重传次数, UE则清空与该 HARQ进程对应的缓冲区中的数据, 例如源 TB 数据和编码后的 TB数据。 在 eNB侧, 如果成功译码 PUSCH或者重传次数达到配置的最大重传 次数, eNB则应清空与该 HARQ进程对应的缓冲区中的数据。 在 UE侧, 如果检测到 HARQ- ACK为 NACK, 并且重传次数没有达到配置的最大重传次数, 那么与该 HARQ进程对应的缓 冲区的已编码数据可以在其他激活的 HARQ进程中重传。 如果终止的 HARQ进程数小于或等 于激活的 HARQ进程数, 可以基于预定义或者无线资源控制 (RRC) 信令规定终止的 HARQ 进程与激活的 HARQ进程之间一对一映射的关系, 也可以基于预定义或者 RRC信令规定终止 HARQ进程的重传和对应激活 HARQ进程的重传的优先顺序, 也可以基于物理层信令在终止 HARQ进程的重传和对应激活 HARQ进程的重传之间动态调度。 如果终止的 HARQ进程数大于 激活的 HARQ进程数, 即有多个终止的 HARQ进程数在一个激活的 HARQ进程中重传, 可以基 于预定义或者 RRC信令规定终止的 HARQ进程与激活的 HARQ进程之间多对一映射的关系, 也可以基于预定义或者 RRC信令规定这多个终止 HARQ进程的重传和对应激活 HARQ进程的 重传的优先顺序, 也可以基于物理层信令在这多个终止 HARQ进程的重传和对应激活 HARQ 进程的重传之间动态调度。 上述预定义方式不需要额外的信令开销, RRC信令方式需要额外 的信令开销, 物理层信令方式可以复用现有的物理层信令指示域而不增加额外的信令开销。
在一个实施例中, 利用物理层信令动态调度终止 HARQ进程的重传或对应激活 HARQ进 程的重传, 重传应基于 UL授权, 该 UL授权中应指示本次重传属于哪个 HARQ进程, 当终止 HARQ进程与激活 HARQ进程为一对一映射关系时, 可以在用于 UL授权的 DCI 0/4中使用 1比 特来指示本次重传的信息, 比特位为 0指示该重传是针对该激活 HARQ进程的常规重传, 比特 位为 1则指示该重传是针对已终止 HARQ进程 的重传, 重传次数的计数可以包含 HARQ进程 #«在结束前的重传次数, 这个 1比特可以复用 DCI 0/4中现有的指示域, 例如 1比特的探测参考 信号 (Sounding Reference Signal, SRS)请求域; 当终止 HARQ进程与激活 HARQ进程为多对一映 射关系时, 可以在 DCI 0/4中使用「log2(N+l),个比特来指示该重传是针对该激活 HARQ进程还 是 N个已终止 HARQ进程中的哪一个, 重传次数的计数可以包含终止 HARQ进程在结束前的重 传次数, 这「log2(N+l),个比特可以复用 DCI 0/4中现有的指示域, 如 2比特的 PUSCH发射功率 控制域, 或者 3比特的解调参考信号 (Demodulation Reference Signal, DMRS)循环偏移指示。
在一个实施例中, 基于预定义规定终止 HARQ进程和激活 HARQ进程之间的映射关系, 映射关系可以为一对一或者多对一, 例如 UE在操作时基于一张预存的表格来查找这种关系, 为每个终止 HARQ进程找到对应的激活 HARQ进程用于重传。 在一个实施例中, 基于预定义 规定终止 HARQ进程的重传和激活 HARQ进程的重传的优先顺序, 例如终止 HARQ进程的重传 总是优于对应激活 HARQ进程的重传, 或者对应激活 HARQ进程的重传总是高于终止 HARQ进 程的重传, 当多个终止 HARQ进程对应一个激活 HARQ进程时, 最早结束的 HARQ进程的重传 在这多个终止 HARQ进程中具有最高的优先性。
图 7为根据本发明的一实施例, UL-DL配置改变时 UL HARQ进程数减少的一示意图。 如 图所示, UL-DL配置从 #6变为 #2, UL HARQ进程的数量从 6减少到 2, 其中, 共有 4个 UL HARQ进程需终止。 具体地, UL HARQ进程 #6和 #1分别在前一 UL-DL配置的 DL子帧 #6和 #9终 止; 而 UL HARQ进程 #2和 #3则分别在当前 UL-DL配置的 DL子帧 #0和 #1终止。 所属领域技术 人员可以理解, 某些 UL HARQ进程能在重配置期间保持连续, 如 UL HARQ进程 #4和 #5, 与 图 1相似, 此处简洁起见不再赘述。
表 4给出了 UL-DL配置改变时所有已终止 HARQ进程的终止点。 对于已终止 UL HARQ进 程, 在终止点子帧《传输的 PHICH可以对应本进程在子帧《— ^/οί传输的 PUSCH。 对于 UL- DL配置 #0, 如果在子帧 #0或子帧 #5收到的 PHICH资源对 K 否则, ΚΡ =6。 所属领域技术人员从此表可看出, 一部分 UL HARQ进程可以在前一 UL-DL配置下 终止, 另一部分 UL HARQ进程可以在当前 UL-DL配置下终止, 然本发明保护范围不以此为 限。 表 4终止的 UL HARO进程的终止点, K
UL-DL子帧 前一 UL-DL配置的子帧 n 当前 UL-DL配置的子帧 n
3 4 6 7 8 9 0 1 3 4 6 7 8 9
CfgO→Cfgl
6/7
CfgO→Cfg2
6/7
Cfg0→Cfg3
6/7 6/7
CfgO→Cfg4
6/7 6/7
Cfg0→Cfg5
6/7 6/7
CfgO→Cfg6
Cfgl→Cfg2
Cfgl→Cfg3
Cfgl→Cfg4
Cfgl→Cfg5
Cfg2→Cfg3
Cfg2→Cfg4
Cfg2→Cfg5
Cfg3→Cfg2
Cfg3→Cfg4
Cfg3→Cfg5
Cfg4→Cfg5
Cfg6→Cfgl Cfg6→Cfg2
- - - - - - 4 - - 6 6 4 - - - - - - - -
Cfg6→Cfg3
6 4 - - - - 7 - - - -
Cfg6→Cfg4
6 6 4 - - - 7 - - - -
Cfg6→Cfg5
- - - - - - 4 - - 6 6 4 - - - 7 - - - -
假定 N。w是前一 UL-DL配置的 UL HARQ进程的数量, N„ew是当前 UL-DL配置的 UL HARQ 进程的数量, 对于表 3和表 4中的大多数情况, 当N∞w>N。ld时, 至少有 NnOT-N。ld个增加的 UL HARQ进程被启动, 当 NnOT<N。ld时, 至少有 N。ld-N 个减少的 UL HARQ进程被终止。 在另 一实施例中, 可以有更多的 UL HARQ进程被终止或启动, 因为 PUSCH重传与初传至少间隔 8ms以及 HARQ-ACK上报与数据传输至少间隔 4ms, 使得某些 UL HARQ进程难以在 UL-DL重 配置期间保持连续, 该 HARQ进程将被终止并启动另一个 HARQ进程。 例如, 当 UL-DL配置 从 #1重配置为 #3时, 虽然只减少了一个 UL HARQ进程, 但可以有两个 UL HARQ进程被终止 以及一个 UL HARQ进程被启动; 当 UL-DL配置从 #2重配置为 #3时, 虽然只增加了一个 UL HARQ进程, 但可以有两个 UL HARQ进程被启动以及一个 UL HARQ进程被终止; 当 UL-DL 配置从 #2重配置为 #4时, 虽然 UL HARQ进程数没有变化, 但可以有一个 UL HARQ进程被终 止以及一个 UL HARQ进程被启动。
当 UL-DL重配置时, 除了 HARQ进程的数量发生改变以外, 另一个需要考虑的主要问题 是 HARQ的时序, 现有的 HARQ时序可能无法在 UL-DL重配置期间使用。 图 8为现有的 DL HARQ-ACK时序在 UL-DL重配置期间无效的一示例, 当 UL-DL配置从 #6重配置为 #2时, 如果 遵从现有的 UL-DL配置 #6的 DL HARQ-ACK时序, 子帧 #6和 #9上传输的 PDSCH的 HARQ-ACK 应在下一帧的子帧 #3和 #4上报, 但 UL-DL配置 #2 的子帧 #3和 #4是 DL子帧而不是 UL子帧, 这 使得 UL-DL重配置期间, 前一 UL-DL配置的最后一帧的某些 PDSCH的 HARQ-ACK无法在当 前 UL-DL配置的第一帧上报。
图 9为现有的 UL HARQ-ACK时序在 UL-DL重配置期间无效的一个示例, 当 UL-DL配置从
#1重配置为 #3时, 如果遵从现有的 UL-DL配置 #1的 UL HARQ-ACK时序, 子帧 #8上传输的 PUSCH的 HARQ-ACK应在下一帧的子帧 #4上上报, 但 UL-DL配置 #2的子帧 #4是 UL子帧而不 是 DL子帧, 这使得 UL-DL重配置期间, 前一 UL-DL配置的最后一帧的某些 PUSCH的 HARQ- ACK无法在当前 UL-DL配置的第一帧上报。
图 10为现有的 PUSCH调度时序在 UL-DL重配置期间无效的一个示例, 当 UL-DL配置从 #1 重配置为 #2时, 如果遵从现有的 UL-DL配置 #1的 UL HARQ-ACK时序, 下一子帧 #2上传输的 PUSCH应基于前一子帧 #8上的 UL授权, 但 UL-DL配置 #1的子帧 #8是 UL子帧而不是 DL子帧, 这使得 UL-DL配置重配置期间, 当前 UL-DL配置的第一帧的某些 PUSCH无法在前一 UL-DL配 置的最后一帧通过 UL授权调度。
基于上面的分析, 当 UL-DL配置改变时, 现有的 HARQ时序可能无法适用, 因此有必要 设计新的 HARQ时序, 这个新的 HARQ时序主要用于当前 UL-DL配置的第一帧, 而对于其他 帧仍然能遵从现有的 HARQ时序。
表 5是现有的 DL HARQ-ACK时序, 子帧"上的 HARQ-ACK对应子帧 n-k,k e K上传输的
PDSCH, 集合 的大小为 M =l, 2, 3, 4, 9, 指对应到同一个 UL子帧上报 HARQ-ACK的所有 DL 子帧数。
当 UL-DL配置改变时, 前一 UL-DL配置的最后一帧及之前的帧可以遵从表 5中对应的 DL HARQ-ACK时序, 当前 UL-DL配置的第二帧及之后的帧也可以遵从表 5中对应的 DL HA Q- ACK时序 (见表 5 ) , 但当前 UL-DL配置的第一帧应遵从新 DL HARQ-ACK时序, 该新 DL HARQ-ACK时序可以与表 5中前一 UL-DL配置以及当前 UL-DL配置的现有时序都不同。 表 6〜 12给出了 UL-DL重配置时可以遵从的 DL HARQ-ACK时序的示例, 上述时序可以用于当前 UL-DL配置的第一帧。
为了设计如表 6— 12所描述的 DL HARQ-ACK时序, 具体而言可以遵守下列规则: 如果 PDSCH在前一 UL-DL配置下接收到, 那么表 5 中前一 UL-DL配置的 DL HARQ-ACK 时序可以被复用 (reuSe)。 如果复用不可行, 即对应的 UL子帧在当前 UL-DL配置下实际为 DL子 帧, 那么 HARQ-ACK可以在最近的 UL子帧报告, 其中, 最近的 UL子帧与相关联的 PDSCH至 少相隔 4个子帧。
如果 PDSCH在前一 UL-DL配置下接收到, 那么表 5 中当前 UL-DL配置的 DL HARQ-ACK 时序可以被复用。
基于上面的规则, 在新设计的 DL HARQ-ACK时序中, 大部分时序表可以由表 5中前一 UL-DL配置和当前 UL-DL配置的 DL HARQ-ACK时序组合而成, 即前半段与前一 UL-DL配置 的时序相似, 后半段与当前 UL-DL配置的时序相似。 也可以使用不同的 DL HARQ-ACK时序 以及捆绑 (bundle)/复用 (reuse)的子帧 ¾M。 例如, 当 UL-DL配置从 #3变为 #5, 或者从 #3变为 #2 时, M=5, 当 UL-DL配置从 #3变为 #5时, Μ=Ί。 在表 5中, Μ的取值可以为 M=l, 2, 3, 4, 9, 其 中 M=l, 2, 3, 4能使用 ACK-NACK捆绑和复用两种传输方式, 而 = 9只能使用捆绑传输方式, 对于增加的 M=5, 7, 可以与 M= 9—样使用现有的 ACK-NACK捆绑传输。
表 5 PL HARO-ACK时序表, K: ik„, k, , kM.A
Figure imgf000015_0001
Figure imgf000016_0001
表 8当前 UL-DL配置为 #2
前一 UL- 子帧"
DL配置 0 1 2 3 4 5 6 7 8 9
0 - - 6 - - - - 7, 6,4 - -
1 - - 7,6 - - - - 8, 7, 4, 6 - -
3 - - 7, 6, 11 - - - - 8, 7, 4, 6 - -
4 - - 12, 8,7, 11 - - - - 8, 7, 4, 6 - -
5 - - 13, 12, 9, 8, 7,5,4, 11,6 - - - - 8, 7, 4, 6 - -
6 - - 7,6 - - - - 8, 7, 4, 6 - - 表 9当前 UL-DL配置为 #3
Figure imgf000016_0002
表 11当前 UL-DL配置为 #5
Figure imgf000017_0001
表 13是现有的 UL HARQ-ACK时序, 子帧"上的 HARQ-ACK对应子帧 η-ΚΡΗΚΗ上传输的 PUSCH。 对于 UL-DL配置 #0, 如果在子帧 #0或子帧 #5收到的 PHICH资源对应 IPHKH=0, 那么 ΚΡΗΚΗ=7, 否则, ΚΡΗΚΗ=6。
当 UL-DL配置改变时, 前一 UL-DL配置的最后一帧及之前帧可以遵从表 13中对应的 UL HARQ-ACK时序, 当前 UL-DL配置的第二帧及之后帧也可以遵从表 13中对应的 UL HARQ- ACK时序, 但当前 UL-DL配置的第一帧可以遵从新的 UL HARQ-ACK时序, 该新的 UL HARQ-ACK时序可以与表 13中前一 UL-DL配置以及当前 UL-DL配置的现有时序都不同。 表 14〜20给出了 UL-DL配置改变时可以遵从的 UL HARQ-ACK时序的一个示例, 上述时序可以 用于当前 UL-DL配置的第一帧。 为了设计如表 14〜20所描述的 UL HARQ-ACK时序, 依据本发明的实施例可以遵守下列 规则:
如果 PUSCH在前一 UL-DL配置下接收到, 那么表 5 中前一 UL-DL配置的 DL HARQ-ACK 时序可以被复用。 如果复用不可行, 即对应的 DL子帧在当前 UL-DL配置下实际为 UL子帧, 那么 HARQ-ACK可以在最近的 DL子帧报告, 其中, 最近的 DL子帧与相关联的 PUSCH至少相 隔 4个子帧。
如果 PUSCH在前一 UL-DL配置下接收到, 那么表 13中当前 UL-DL配置的 UL HARQ-ACK 时序可以被复用。
基于上面的规则, 在新设计的 UL HARQ-ACK时序中, 大部分时序表可能由表 13中前一 UL-DL配置和当前 UL-DL配置的 UL HARQ-ACK时序组合而成, 即前半段与前一 UL-DL配置 的时序相似, 后半段与当前 UL-DL配置的时序相似。 也可以使用不同的 UL HARQ-ACK时 序。 例如, 当 UL-DL配置从 #2变为 #5, 子帧 #8的 KPHKH=8, 即收到的 PHICH对应前 8个子帧 的 PUSCH, 这与现有的时序表不同。
表 13 UL HARO-ACK时序表, ΚΡΗΙΓΗ
Figure imgf000018_0001
表 14前一 UL-DL配置为 #0
Figure imgf000018_0002
5 7/6 4 - - - 7/6 - - 6 -
6 7/6 4 - - - 7/6 4 - - 6
表 15前一 UL-DL配置为 #1
Figure imgf000019_0001
4 6 - - - - - - - 6 6
5 6 - - - - - - - 6 -
6 6 - - - - - 4 - - 6 表 18前一 UL-DL配置为 #4
当前 UL- 子帧"
DL配置 0 1 2 3 4 5 6 7 8 9
0 - - - - - - 4 - - -
1 - - - - - - 4 - - 6
2 - - - - - - - - 6 -
3 - - - - - - - - 6 6
5 - - - - - - - - 6 -
6 - - - - - - 4 - - 6 表 19前一 UL-DL配置为 #5
当前 UL-DL 子帧"
配置 0 1 2 3 4 5 6 7 8 9
0 - - - - - - 4 - - -
1 - - - - - - 4 - - 6
2 - - - - - - - - 6 -
3 - - - - - - - - 6 6
4 - - - - - - - - 6 6
6 - - - - - - 4 - - 6 表 20前一 UL-DL配置为 #6
Figure imgf000020_0001
2 6 4 - 5 - - - - 6 -
3 6 4 - - - 7 - - 6 6
4 6 4 - - - 7 - - 6 6
5 6 4 - - - 7 - - 6 - 表 21是现有的 PUSCH调度时序, 在子帧《上传输的 PUSCH应基于子帧 n-KPUSeH检测到的 UL授权或 PHICH。 对于 UL-DL配置 #0, 如果在子帧 #2和 #7上传输的 PUSCH所对应的 UL授权 中 UL索引的 LSB被设置为 1, 那么 KpuseH = 7, 否则 KpuseH = 6。
当 UL-DL配置改变时, 前一 UL-DL配置的最后一帧及之前帧可以遵从表 21中对应的
PUSCH调度时序, 当前 UL-DL配置的第二帧及之后帧也可以遵从表 21中对应的 UL PUSCH调 度时序, 但当前 UL-DL配置的第一帧可以遵从新的 PUSCH调度时序, 这个新的 PUSCH调度时 序可能与表 21 中前一 UL-DL配置以及当前 UL-DL配置的现有时序都不同。 表 22〜28给出了 UL-DL配置改变时可以遵从的 PUSCH调度时序的一个示例, 上述时序只用于当前 UL-DL配置 的第一帧。
为了设计如表 22〜28所描述的 PUSCH调度时序, 依据本发明的一个实施例, 可以遵守下 列规则:
如果 UL授权在前一 UL-DL配置下传输且用于连续的 UL HARQ进程, 那么 PUSCH调度时 序可以复用现有的前一 UL-DL配置或者当前 UL-DL配置的时序。 如果复用不可能, 及对应的 DL子帧在前一 UL-DL配置下实际为 UL子帧, 则使用其他的 PUSCH调度时序, 那么该调度时 序可以与现有的调度时序相接近, KpuseH的取值与现有的 KpuseH接近。
如果 UL授权在前一 UL-DL配置下传输且用于增加的 UL HARQ进程, 那么这个 UL授权可 以尽可能接近相关联的 PUSCH且至少相隔 4个子帧。 如果 UL授权在当前 UL-DL配置下传输, 那么当前 UL-DL配置的现有 PUSCH调度时序可以被复用。
基于上面的规则, 在新设计的 PUSCH调度时序中, 大部分可能由表 21中前一 UL-DL配置 和当前 UL-DL配置的 PUSCH调度时序组合而成, 即前半段与前一 UL-DL配置的时序相似, 后 半段与当前 UL-DL配置的时序相似, 也可以使用不同的 PUSCH调度时序。 例如, 当 UL-DL配 置从 #4变为 #2, 子帧 #7
的 KPUSeH = 8, 即收到本帧传输的 PUSCH对应前 8个子帧的 UL授权或 PHICH, 这与现有 的时序表不同。 表 21 PUSCH调度时序, K
Figure imgf000022_0001
表 22前一 UL-DL配置为 #0
Figure imgf000022_0002
表 23前一 UL-DL配置为 #1
Figure imgf000022_0003
5 - - 6 - - - - - - -
6 7 7 5 - - 7 7 - 表 24前一 UL-DL配置为 #2
当前 UL- 子帧"
DL配置 0 1 2 3 4 5 6 7 8 9
0 - - 4 4 4 - - 6/7 7 4
1 - - 4 4 - - - 6 4 -
3 - - 4 4 4 - - - - -
4 - - 4 4 - - - - - -
5 - - 4 - - - - - - -
6 6 5 5 - - 7 7 - 表 25前一 UL-DL配置为 #3
Figure imgf000023_0001
表 26前一 UL-DL配置为 #4
Figure imgf000023_0002
3 - - 4 4 4 - - - - -
5 - - 4 - - - - - - -
6 5 5 5 - - 7 7 - 表 27前一 UL-DL配置为 #5
当前 UL- 子帧"
DL配置 0 1 2 3 4 5 6 7 8 9
0 - - 4 4 4 - - 6/7 7 4
1 - - 4 4 - - - 6 4 -
2 - - 4 - - - - 4 - -
3 - - 4 4 4 - - - - -
4 - - 4 4 - - - - - -
6 5 5 5 - - 7 7 - 表 28前一 UL-DL配置为 #6
Figure imgf000024_0001
以上实施例使用多种角度描述。 显然这里的教示可以多种方式呈现, 而在范例中揭露的 任何特定架构或功能仅为代表性的状况。 根据本文的教示, 任何所属领域技术人员应理解在 本文呈现的内容可独立利用其他某种型式或综合多种型式作不同呈现。 举例说明, 可遵照前 文中提到任何方式利用某种装置或某种方法实现。 装置的实施或一种方式的执行可用任何其 他架构、 或功能性、 又或架构及功能性来实现在前文所讨论的一种或多种型式上。 再举例说 明以上观点, 在某些情况, 并行的频道可基于脉冲重复频率所建立。 又在某些情况, 并行的 频道也可基于脉波位置或偏位所建立。 在某些情况, 并行的频道可基于时序跳频建立。 在某 一些情况, 并行的频道可基于脉冲重复频率、 脉波位置或偏位、 以及时序跳频建立。
所属领域技术人员将了解信息及信号可用多种不同科技及技巧展现。 举例, 在以上描述 所有可能引用到的数据、 指令、 命令、 信息、 信号、 位、 符号、 以及码片 (chip)可以伏特、 电 流、 电磁波、 磁场或磁粒、 光场或光粒、 或以上任何组合所呈现。
熟知此技术技术人员更会了解在此描述各种说明性的逻辑区块、 模块、 处理器、 装置、 电路、 以及演算步骤与以上所揭露的各种情况可用的电子硬件 (例如用来源编码或其他技术 设计的数字实施、 模拟实施、 或两者的组合) 、 各种形式的程序或与指示作为链接的设计码 (在内文中为方便而称作 "软件"或 "软件模块" ) 、 或两者的组合。 为清楚说明此硬件及 软件间的可互换性, 多种具描述性的组件、 方块、 模块、 电路及步骤在以上的描述大致上以 其功能性为主。 不论此功能以硬件或软件型式呈现, 将视加注在整体系统上的特定应用及设 计限制而定。 所属领域技术人员可为每一特定应用将描述的功能以各种不同方法作实现, 但 此实现的决策不应被解读为偏离本文所揭露的范围。
此外, 多种各种说明性的逻辑区块、 模块、 及电路以及在此所揭露的各种情况可实施在 集成电路 (Integrated Circuit, IC)、 接入终端、 接入点; 或由集成电路、 接入终端、 接入点执 行。 集成电路可由一般用途处理器、 数字信号处理器 (Digital Signal Processor, DSP)、 特定应 用集成电路(Application Specific Integrated Circuit, ASIC)、 现场可编程闸列(Field Programmable Gate Array, FPGA)或其他可编程逻辑设备、 离散闸 (Discrete Gate)或晶体管逻 辑 (Tnmsistor Logic;)、 离散硬件组件、 电子组件、 光学组件、 机械组件、 或任何以上的组合的 设计以完成在此文内描述的功能; 并可能执行存在于集成电路内、 集成电路外、 或两者皆有 的执行码或指令。 一般用途处理器可能是微处理器, 但也可能是任何常规处理器、 控制器、 微控制器、 或状态机。 处理器可由计算机设备的组合所构成, 例如: 数字信号处理器 (DSP)及 一微电脑的组合、 多组微电脑、 一组至多组微电脑以及一数字信号处理器核心、 或任何其他 类似的配置。
值得注意的是, 在此所揭露程序的任何具体顺序或分层的步骤纯为一举例的方式。 基于 设计上的偏好, 必须了解到程序上的任何具体顺序或分层的步骤可在此文件所揭露的范围内 被重新安排。 伴随的方法权利要求以一示例顺序呈现出各种步骤的组件, 也因此不应被此所 展示的特定顺序或阶层所限制。
本发明的说明书所揭露的方法和算法的步骤, 可以直接透过执行一处理器直接应用在硬 件以及软件模块或两者之结合上。 一软件模块 (包括执行指令和相关数据) 和其它数据可储 存在数据内存中, 像是随机接入内存 (Random Access Memory, RAM)、 闪存 (flash memory)、 只读存储器 (Read-Only Memory, ROM), 可抹除可规化只读存储器 (EPROM)、 电子抹除式可 复写只读存储器 (Electrically-Erasable Programmable Read-Only Memory, EEPROM)、 缓存器、 硬盘、 可携式应碟、 光盘只读存储器 (Compact Disc Read-Only Memory, CD-ROM) 数字视 频光盘 (Digital Video Disc, DVD)或在此领域习的技术中任何其它计算机可读取的储存媒体格 式。 一储存媒体可耦接至一机器装置, 举例来说, 像是计算 ίΠ/处理器 (为了说明的方便, 在 本说明书以处理器来表示) , 上述处理器可透过来读取信息 (像是程序代码) , 以及写入信 息至储存媒体。 一储存媒体可整合处理器。 特殊应用集成电路 (ASIC)包括处理器和储存媒 体。 一使用者设备则包括特殊应用集成电路。 换句话说, 处理器和储存媒体以不直接连接用 户设备的方式, 包含于使用者设备中。 此外, 在一些实施例中, 任何适合计算机程序的产品 包括可读取的储存媒体, 其中可读取的储存媒体包括一或多个所揭露实施例相关的程序代 码。 而在一些实施例中, 计算机程序的产品可以包括封装材料。
虽然本发明已以较佳实施例揭露如上, 然其并非用以限定本发明, 任何所属领域技术人 员, 在不脱离本发明的精神和范围内, 当可作些许的更动与润饰, 因此本发明的保护范围当 视后附的申请专利范围所界定者为准。

Claims

权利要求书
1.一种决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特征在于, 该方 法包含:
当上下行链路重配置时, 用户设备对于当前上下行链路配置的第一帧的确认信令时序和 上行调度时序使用第一时序; 以及
该用户设备对于该当前上下行链路配置的第二帧以及之后帧的确认信令时序和上行调度 时序使用第二时序。
2.如权利要求 1所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特 征在于:
该确认信令时序为上行链路混合自动重传请求确认时序, 用于确认物理上行链路共享信 道的传输, 或者该确认信令时序为下行链路混合自动重传请求确认时序, 用于确认物理下行 链路共享信道的传输。
3.如权利要求 1所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特 征在于:
该上行调度时序为上行链路授权所调度的物理上行链路共享信道的时序, 或者该上行调 度时序为物理混合自动重传请求指示信道所调度的物理上行链路共享信道的时序。
4.如权利要求 2所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其 中, 该确认信令时序为上行链路混合自动重传请求确认时序, 其特征在于:
当该当前上下行链路配置的混合自动重传请求进程的数量大于该前一上下行链路配置的 混合自动重传请求进程的数量, 则启动第一数量的混合自动重传请求进程数; 或者
当该当前上下行链路配置的混合自动重传请求进程的数量小于该前一上下行链路配置的 混合自动重传请求进程的数量, 则关闭第二数量的混合自动重传请求进程数; 或者
当该当前上下行链路配置的混合自动重传请求进程的数量等于该前一上下行链路配置的 混合自动重传请求进程的数量, 且某些混合自动重传请求进程在上下行链路重配置期间无法 连续时, 则关闭第三数量的混合自动重传请求进程数, 以及启动第三数量的混合自动重传请 求进程数。
5.如权利要求 4所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特 征在于, 进一步包含:
该用户设备检测出该当前上下行链路配置的混合自动重传请求进程的数量; 以及 该用户设备检测下行链路控制信息信令以检测该当前上下行链路配置的混合自动重传请 求进程的号码。
6.如权利要求 4所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特 征在于, 当启动第一数量的混合自动重传请求进程数之后, 该用户设备进一步激活该第一数 量的混合自动重传请求模块以及该第一数量的缓冲器。
7.如权利要求 4所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特 征在于, 当关闭该第二数量的混合自动重传请求进程数之后, 该用户设备进一步清空与该第 二数量的混合自动重传请求进程相关的该第二数量的缓冲器。
8.如权利要求 4所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特 征在于, 在该进程的最后一个物理混合自动重传请求指示信道之后执行混合自动重传请求进 程的关闭。
9.如权利要求 8所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特 征在于, 进一步包含:
当已关闭混合自动重传请求进程的最后一个确认信令为否定确认以及重传次数小于最大 传输次数时, 该已关闭混合自动重传请求进程对应之未编码数据放置在其他激活混合自动重 传请求进程中作为新数据传输; 以及
当已关闭混合自动重传请求进程的重传次数等于最大重传次数或者该混合自动重传请求 进程的最后一个确认信令为肯定确认时, 该混合自动重传请求进程对应之已编码数据从对应 的缓冲器中清空。
10.如权利要求 8所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特 征在于, 进一步包含:
当已关闭混合自动重传请求进程的最后一个确认信令为否定确认以及重传次数小于最大 传输次数时, 该已关闭混合自动重传请求进程对应之已编码数据放置在其他激活混合自动重 传请求进程中与该其他激活混合自动重传请求进程中进行传输;
当已关闭混合自动重传请求进程的重传次数等于最大重传次数或者该混合自动重传请求 进程的最后一个确认信令为肯定确认时, 该混合自动重传请求进程对应之已编码数据从对应 的缓冲器中清空。
11.如权利要求 10所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其 特征在于, 已关闭混合自动重传请求进程和其他激活混合自动重传请求进程之间具有对应映 射关系。
12.如权利要求 11所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其 特征在于, 该映射关系透过 RRC信令配置。
13.如权利要求 10所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其 特征在于, 透过 RRC信令配置已关闭混合自动重传请求进程的重传和映射的激活混合自动重 传请求进程的重传的优先顺序。
14.如权利要求 10所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其 特征在于, 透过物理层信令动态调度该已关闭混合自动重传请求进程的重传和映射的激活混 合自动重传请求进程的重传。
15.如权利要求 14所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其 特征在于, 该用户设备检测下行链路控制信息, 以得知该已激活混合自动重传请求进程中所 重传的数据对应该已关闭混合自动重传请求进程或者该已激活混合自动重传请求进程。
16.如权利要求 1所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特 征在于, 进一步包含:
该第一时序中, 该当前上下行链路配置的第一帧的确认信令时序根据该前一上下行链路 配置的确认信令时序以及该当前上下行链路配置的第二帧以及以后的确认信令时序所生成; 以及
该当前上下行链路配置的第一帧的上行调度时序根据该前一上下行链路配置的上行调度 时序以及该当前上下行链路配置的第二帧以及以后的上行调度时序所生成。
17. 如权利要求 16所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特征在于, 该当前上下行链路配置的第一帧的确认信令时序根据该前一上下行链路配置的 确认信令时序以及该当前上下行链路配置的第二帧以及以后的确认信令时序所生成进一步包 含:
对应该前一上下行链路配置的确认信令能够以前一上下行链路配置的确认信令时序传输 时, 至少部分复用该前一上下行链路配置的该确认信令对应时序, 当特定确认信令无法复用 该前一上下行配置的确认信令对应时序时, 选择该当前上下行链路配置的一个特定子帧来传 输该特定确认信令, 该特定子帧是该确认信令在该前一上下行链路配置时序下对应子帧的最 邻近同向子帧, 以及该前一上下行链路配置下对应物理共享数据信道传输子帧以及该最邻近 同向子帧至少间隔 4个子帧。
18. 如权利要求 16所述的决定上下行链路重配置期间确认信令时序和调度时序的方法, 其特征在于, 该当前上下行链路配置的第一帧的上行调度时序根据该前一上下行链路配置的 上行调度时序以及该当前上下行链路配置的第二帧以及以后的上行调度时序所生成进一步包 含:
对应该当前上下行链路配置的上行调度信令能够以当前上下行链路配置的上行调度时序 传输时, 至少部分复用该当前上下行链路配置的该上行调度信令对应时序, 当特定上行调度 信令无法复用该当前上下行配置的上行度信令对应时序时, 选择该前一上下行链路配置的一 个特定子帧来传输该特定上行调度信令, 该特定子帧是该上行调度信令在该当前上下行链路 配置时序下对应子帧的最邻近同向子帧, 以及该当前上下行链路配置下对应上行调度数据传 输子帧以及该最邻近同向子帧至少间隔 4个子帧。
19.一种管理上下行链路配置确认信令时序的用户设备, 其特征在于, 该用户设备包含: 多个缓冲器, 用于缓冲确认信令对应物理共享数据的首次传输以及重传;
时序决定模块, 当上下行链路配置重配置时, 该用户设备对于用于物理共享信道数据接 收的当前上下行配置的第一帧的确认信令调度时序使用第一时序表; 以及对于该当前上下行 配置的第二帧以及之后帧的该确认信令调度时序使用第二时序表;
确认信令传输模块, 用于依据对应时序表传输确认信令以确认对应物理共享数据的传输 以及重传。
20.如权利要求 19所述的管理上下行链路配置确认信令时序的用户设备, 该确认信令时序 为上行链路混合自动重传请求确认时序, 或者该确认信令时序为下行链路混合自动重传请求 确认时序时, 其特征在于进一步包含:
进程管理模块, 用于:
当该当前上下行链路配置的混合自动重传请求进程的数量大于该前一上下行链路配置的 混合自动重传请求进程的数量, 则启动第一数量的混合自动重传请求进程数; 或者
当该当前上下行链路配置的混合自动重传请求进程的数量小于该前一上下行链路配置的 混合自动重传请求进程的数量, 则关闭第二数量的混合自动重传请求进程数; 或者
当该当前上下行链路配置的混合自动重传请求进程的数量等于该前一上下行链路配置的 混合自动重传请求进程的数量, 且某些混合自动重传请求进程在上下行链路重配置无法连续 时, 则关闭第三数量的混合自动重传请求进程数, 以及启动第三数量的混合自动重传请求进 程数。
21.如权利要求 20所述的管理上下行链路配置确认信令时序的用户设备, 其特征在于, 当 启动第一数量的确认信令进程数之后, 该用户设备进一步激活第一数量的缓冲器。
22.如权利要求 20所述管理上下行链路配置确认信令时序的用户设备, 其特征在于, 当关 闭该第一数量的确认信令数之后, 该用户设备进一步清空与该第二数量确认信令相关的该第 二数量的缓冲器。
23.如权利要求 22所述管理上下行链路配置确认信令时序的用户设备, 其特征在于, 进一 步包含:
当该第二数量的确认信令之一特定确认信令为否定确认以及重传次数小于最大传输次数 时, 该特定确认信令对应之已编码数据放置在其他混合自动重传请求进程中重传;
当该第二数量的确认信令之的该特定确认信令的重传次数等于最大重传次数或者该特定 确认信令为肯定确认信令时, 该特定确认信令对应之已编码数据从对应的缓冲器中清空。
24.如权利要求 19所述的管理上下行链路配置确认信令时序的用户设备, 其特征在于, 该 时序决定模块依据下列原则生成该第一时序表:
至少部分复用该前一上下行链路配置的确认信令的调度时序, 当特定确认信令无法复用 该前一上行链路 -下行链路配置的确认信令对应时序时, 选择该当前上下行链路配置的一个特 定子帧来传输该特定确认信令, 该特定子帧是该确认信令在该前一上下行链路配置时序下对 应子帧的最邻近同向子帧, 以及该前一上下行链路配置时序下对应子帧以及该最邻近同向子 帧至少间隔 4个子帧。
PCT/CN2014/070815 2013-01-18 2014-01-17 决定上下行链路重配置期间确认信令时序和调度时序的方法及用户设备 WO2014111045A1 (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
US14/761,730 US9949284B2 (en) 2013-01-18 2014-01-17 Methods for determining signaling timing and scheduling timing in determining uplink and downlink reconfiguration, and user equipment
CN201480005283.7A CN104938017B (zh) 2013-01-18 2014-01-17 决定上下行链路重配置期间确认信令时序和调度时序的方法及用户设备

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310018416.1 2013-01-18
CN201310018416 2013-01-18

Publications (1)

Publication Number Publication Date
WO2014111045A1 true WO2014111045A1 (zh) 2014-07-24

Family

ID=51209032

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2014/070815 WO2014111045A1 (zh) 2013-01-18 2014-01-17 决定上下行链路重配置期间确认信令时序和调度时序的方法及用户设备

Country Status (3)

Country Link
US (1) US9949284B2 (zh)
CN (1) CN104938017B (zh)
WO (1) WO2014111045A1 (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108429607A (zh) * 2017-02-14 2018-08-21 普天信息技术有限公司 一种通信系统中的harq重传处理方法
CN108463002A (zh) * 2018-03-16 2018-08-28 武汉虹信通信技术有限责任公司 一种基于tdd-lte基站系统的任务调度方法

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4307601A3 (en) * 2014-03-06 2024-08-14 InterDigital Patent Holdings, Inc. Full duplex operation in wireless systems
KR102467048B1 (ko) * 2015-04-09 2022-11-14 한국전자통신연구원 히든 노드 문제와 사용자 단말들의 채널 점유를 고려한 상향 링크 데이터 전송 방법
KR102658360B1 (ko) * 2015-04-09 2024-04-17 삼성전자주식회사 비면허 대역을 사용하는 셀룰러 네트워크에서의 자원할당 방법 및 그 장치
US20170257858A1 (en) * 2016-03-04 2017-09-07 Qualcomm Incorporated System and Methods for Avoiding Call Performance Degradation in a Wireless Communication Device
US10314037B2 (en) * 2016-07-08 2019-06-04 Qualcomm Incorporated Latency reduction techniques in wireless communications
WO2018029634A1 (en) 2016-08-12 2018-02-15 Telefonaktiebolaget Lm Ericsson (Publ) Dl harq timing with short tti operations in tdd
US10841068B2 (en) * 2016-08-12 2020-11-17 Telefonaktiebolaget Lm Ericsson (Publ) DL HARQ timing in TDD with 1 ms tti and reduced processing time
EP3498012B1 (en) * 2016-08-12 2020-03-25 Telefonaktiebolaget LM Ericsson (PUBL) Ul scheduling timing with short ttis in tdd
US11191073B2 (en) * 2016-08-12 2021-11-30 Telefonaktiebolaget Lm Ericsson (Publ) UL scheduling timing in TDD with 1 MS TTI and reduced processing time
HUE053931T2 (hu) * 2016-08-31 2021-07-28 Ntt Docomo Inc Felhasználói terminál és vezeték nélküli kommunikációs eljárás
US11212765B2 (en) 2016-09-30 2021-12-28 Telefonaktiebolaget Lm Ericsson (Publ) Systems and methods for synchronous control of HARQ configurations
KR20180091527A (ko) * 2017-02-07 2018-08-16 삼성전자주식회사 무선 셀룰라 통신 시스템에서 제어 및 데이터 정보 전송방법 및 장치
CN109152022B (zh) * 2017-06-16 2023-05-09 中国移动通信有限公司研究院 一种定时关系的指示、接收方法、网络侧设备及终端
CN109150421B (zh) * 2017-06-28 2023-03-10 华为技术有限公司 一种重复传输的方法和终端设备
US11304146B2 (en) * 2017-08-03 2022-04-12 Lg Electronics Inc. Method for controlling transmission power in wireless communication system, and apparatus therefor
CN110034866B (zh) 2018-01-12 2020-08-07 华为技术有限公司 一种用于反馈的方法、装置及计算机存储介质
CN109874174B (zh) * 2019-02-26 2022-06-24 北京中科晶上科技股份有限公司 Lte系统mac层下行调度方法
CN111970732A (zh) * 2020-09-10 2020-11-20 杭州六极加科技有限公司 时分双工系统中子帧间负荷均衡方法及系统
CN114614944A (zh) * 2020-12-04 2022-06-10 中国移动通信有限公司研究院 混合自动重传请求功能的控制方法及设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101860898A (zh) * 2009-04-10 2010-10-13 大唐移动通信设备有限公司 一种配置混合自动重传相关信息的方法和系统
CN102255718A (zh) * 2011-07-11 2011-11-23 电信科学技术研究院 一种载波聚合系统中的数据传输方法及装置
CN102271034A (zh) * 2010-12-31 2011-12-07 重庆重邮信科通信技术有限公司 一种lte上行harq控制方法
CN102511189A (zh) * 2011-11-10 2012-06-20 华为技术有限公司 通信方法、用户设备、基站和通信设备
CN102752862A (zh) * 2011-04-20 2012-10-24 华为技术有限公司 上下行数据业务传输的方法、基站及用户设备

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8386875B2 (en) * 2009-08-07 2013-02-26 Research In Motion Limited Method and system for handling HARQ operations during transmission mode changes
US9602251B2 (en) * 2012-01-27 2017-03-21 Sharp Kabushiki Kaisha Devices for reconfiguring uplink and downlink allocations in time domain duplexing wireless systems
US9014064B2 (en) * 2012-05-11 2015-04-21 Intel Corporation Scheduling and hybrid automatic repeat request (HARQ) timing indication for an uplink-downlink (UL-DL) reconfiguration
CN103580830B (zh) * 2012-07-18 2018-11-27 北京三星通信技术研究有限公司 一种发送harq-ack反馈信息的方法
JP6284486B2 (ja) * 2012-11-26 2018-02-28 パナソニック インテレクチュアル プロパティ コーポレーション オブ アメリカPanasonic Intellectual Property Corporation of America 端末装置及び再送方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101860898A (zh) * 2009-04-10 2010-10-13 大唐移动通信设备有限公司 一种配置混合自动重传相关信息的方法和系统
CN102271034A (zh) * 2010-12-31 2011-12-07 重庆重邮信科通信技术有限公司 一种lte上行harq控制方法
CN102752862A (zh) * 2011-04-20 2012-10-24 华为技术有限公司 上下行数据业务传输的方法、基站及用户设备
CN102255718A (zh) * 2011-07-11 2011-11-23 电信科学技术研究院 一种载波聚合系统中的数据传输方法及装置
CN102511189A (zh) * 2011-11-10 2012-06-20 华为技术有限公司 通信方法、用户设备、基站和通信设备

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108429607A (zh) * 2017-02-14 2018-08-21 普天信息技术有限公司 一种通信系统中的harq重传处理方法
CN108463002A (zh) * 2018-03-16 2018-08-28 武汉虹信通信技术有限责任公司 一种基于tdd-lte基站系统的任务调度方法
CN108463002B (zh) * 2018-03-16 2021-07-02 中信科移动通信技术股份有限公司 一种基于tdd-lte基站系统的任务调度方法

Also Published As

Publication number Publication date
CN104938017B (zh) 2018-09-21
CN104938017A (zh) 2015-09-23
US20150365965A1 (en) 2015-12-17
US9949284B2 (en) 2018-04-17

Similar Documents

Publication Publication Date Title
WO2014111045A1 (zh) 决定上下行链路重配置期间确认信令时序和调度时序的方法及用户设备
CN112930706B (zh) 用于在传输时机发送传送块的方法和系统
US8320341B2 (en) Re-transmission capability in semi-persistent transmission
EP4254839A2 (en) Systems and methods for reliable transmission over network resources
CN113748629B (zh) 通信装置、基础设施设备以及方法
JP5453492B2 (ja) セミパーシステントスケジューリングデータパケットの確認応答情報を受信する方法、装置、及びコンピュータ可読記録媒体
JP6651533B2 (ja) 拡張キャリアアグリゲーションのためのソフトバッファ管理
US10779174B2 (en) Method and apparatus for monitoring control candidates based on assignments of data packets with different reliabilities
EP4014406A1 (en) Method and apparatus for transmitting information on an uplink channel
JP2018510549A (ja) マルチプルなトライステートharqプロセス
KR20150140629A (ko) 멀티-서브프레임 스케쥴링을 지원하기 위해 업링크 데이터를 송신하는 방법 및 디바이스
WO2013091578A1 (zh) 通信方法、基站和用户设备
JP2020510335A (ja) ワイヤレス通信システムのための高信頼性で低レイテンシの構成
WO2015106554A1 (zh) 资源管理方法、装置及计算机存储介质
WO2015042973A1 (zh) 控制信息的传输方法、用户设备和基站
WO2020144899A1 (ja) 基地局、端末、送信方法及び受信方法
TW201519680A (zh) 用於傳輸控制資訊的方法和設備
JP6692910B2 (ja) 基地局、端末及び通信方法
WO2015085477A1 (en) Flexible harq timing
US9768936B2 (en) Message transmission in an unlicensed spectrum
JP7130692B2 (ja) 端末、通信方法及び集積回路
CN114374480B (zh) 一种harq-ack码本生成方法、设备和通信系统

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 14741183

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 14761730

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 14741183

Country of ref document: EP

Kind code of ref document: A1