WO2014191067A1 - Method for operating a wind turbine park - Google Patents
Method for operating a wind turbine park Download PDFInfo
- Publication number
- WO2014191067A1 WO2014191067A1 PCT/EP2014/000598 EP2014000598W WO2014191067A1 WO 2014191067 A1 WO2014191067 A1 WO 2014191067A1 EP 2014000598 W EP2014000598 W EP 2014000598W WO 2014191067 A1 WO2014191067 A1 WO 2014191067A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- wind
- maintenance
- wind turbines
- wind turbine
- forecast
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 41
- 238000012423 maintenance Methods 0.000 claims abstract description 103
- 230000000694 effects Effects 0.000 claims description 9
- 239000011159 matrix material Substances 0.000 claims description 7
- 238000005094 computer simulation Methods 0.000 claims description 3
- 238000004393 prognosis Methods 0.000 claims description 2
- 230000001419 dependent effect Effects 0.000 abstract 2
- 238000009434 installation Methods 0.000 description 8
- 230000008439 repair process Effects 0.000 description 5
- 238000011144 upstream manufacturing Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 239000010720 hydraulic oil Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000001556 precipitation Methods 0.000 description 1
- 230000002123 temporal effect Effects 0.000 description 1
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/02—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor
- F03D7/04—Automatic control; Regulation
- F03D7/042—Automatic control; Regulation by means of an electrical or electronic controller
- F03D7/048—Automatic control; Regulation by means of an electrical or electronic controller controlling wind farms
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D80/00—Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
- F03D80/50—Maintenance or repair
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/96—Mounting on supporting structures or systems as part of a wind turbine farm
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2260/00—Function
- F05B2260/82—Forecasts
- F05B2260/821—Parameter estimation or prediction
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2260/00—Function
- F05B2260/82—Forecasts
- F05B2260/821—Parameter estimation or prediction
- F05B2260/8211—Parameter estimation or prediction of the weather
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2270/00—Control
- F05B2270/10—Purpose of the control system
- F05B2270/20—Purpose of the control system to optimise the performance of a machine
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Definitions
- the invention relates to a method for operating a wind energy plant with multiple wind turbines, wherein at least a number of wind turbines are to perform maintenance.
- wind turbines of a wind turbine park and also electronic or electrical components such as substations, transformers and the like require a certain maintenance, especially repairs. While appropriate maintenance is carried out, the wind turbines to be serviced are to be shut down or to run in a reduced-power mode. This leads to yield losses of the operator.
- a wind turbine has a sensor for receiving state data of the wind turbine
- the logic module for determining deviations between the state data and an associated comparison value is designed
- the calculator determined from the ratio of actually generated amount of electrical energy to potentially producible total amount related to the wind turbine availability value, the calculation model determined at a deviation detected by the logic module a probability of failure of the wind turbine, the Re Chen module merges the availability value and the probability of failure to a repair priority and wherein the monitoring center assigns the repair priority of the wind turbine.
- This object is achieved by a method for operating a wind energy plant with multiple wind turbines, wherein at least a number of wind turbines are to carry out maintenance work, with the following process steps:
- the sequence in which maintenance work is to be carried out in order to achieve the lowest possible yield loss of the wind energy plant park. For example, it ensures that wind turbines are maintained, which are in the slipstream of other wind turbines. It is preferable to maintain these wind turbines as long as a corresponding wind direction prevails, since the wind turbines lying in the slipstream have a lower energy yield than the freestanding wind turbines arranged upstream in the wind direction.
- the determination of loss of earnings means the determination of expected loss of earnings. For example, if it is known that the meteorological conditions in a week from today's time look like that more ice formation is pending, preferably maintenance work can be carried out because due to the formation of ice, the energy yield of the wind turbine park is likely to be reduced.
- maintenance work on some of the park's wind turbines may be scheduled at that time in some areas where de-rated operation of the wind turbines is required at certain times, such as in twilight periods where bat flying is likely to increase.
- the control of the operation here preferably includes the execution that the service personnel the order of the maintenance to be performed is displayed and the staff manually shut down the wind turbine or wind turbines on site.
- the determination of yield losses of the wind energy installations preferably takes place as a function of the forecast of the meteorological condition by means of a stored yield matrix of the wind energy plant park and / or by means of computational simulation on the basis of the forecast of the meteorological data. For example, it can be simulated by calculation how high yield losses are with corresponding wind directions, wind speeds and a corresponding air density for the various wind turbines or the locations of the wind turbines of a wind turbine park.
- a forecast of the yield losses is made as a function of the meteorological conditions.
- a yield matrix can be carried out, for example, by means of a method which is described in DE 10 201 1 081 241 A1.
- a corresponding income Matrix can also be created by means of a method which is described for example in DE 1 0 201 1 003 799 B3.
- the method is carried out anew on the basis of an updated forecast of meteorological conditions.
- the yield loss of the wind energy plant due to maintenance work is reduced considerably.
- the object is achieved according to the invention and particularly preferably by a method for operating a wind energy plant with multiple wind turbines, wherein at least a number of wind turbines are to carry out maintenance work, with the following method steps:
- This method according to the invention leads to a very precise analysis of the sequence of maintenance operations to be performed and thus to an optimized energy yield of the wind energy plant park.
- the object is further achieved according to the invention and particularly preferably by a method for operating a wind energy plant park having a plurality of wind energy installations, wherein maintenance work is to be carried out in at least a number of wind energy installations, with the following method steps:
- a wind energy plant arranged in the slipstream of a wind turbine that has been shut down for maintenance generates a higher yield in comparison to the operation of the wind energy turbine in an operating windshield generating wind energy plant.
- This process step makes the knowledge that the loss of yield or the reduction in yield of a wind energy plant standing in the slipstream of another wind energy plant is lower when the other wind energy plant itself is not in operation, but is shut down.
- the shutdown of the wind energy installation arranged upstream in the wind direction essentially no energy is taken from the wind, which is why the wind power plant standing in the slipstream to this wind energy installation can utilize the full energy of the wind.
- a travel time, transport costs, spare parts logistics and / or grouping effects are taken into account.
- the travel time to get to a wind turbine for maintenance as this changed on the one hand, the duration of maintenance and change in meteorological conditions these play a role.
- the economic losses may weigh against each other, so that a shorter travel time would be preferred.
- the consideration of grouping effects includes in particular the consideration of different plant types in a wind turbine park. It may be useful, for example, in a first maintenance cycle in all wind turbines with a hydraulic pitch system or Rotorblattwinkelverstellsys- tem the hydraulic oil and in a second maintenance cycle in all wind turbines with an electric pitch system or Rotorblattwinkelverstellsystem the accumulators of these systems To deceive.
- grouping effects occur when, for example, electrical components in the wind energy plant park have to be maintained.
- some groups of wind turbines are usually provided in wind turbine parks in such a way that several wind turbines are arranged on a respective wiring harness, so that a number or subgroup of wind turbines of the wind turbine park is simultaneously de-energized when maintenance work on the electrical components to be performed.
- Similar grouping effects occur when switching off transformer Stations, substations and so on, which concern more than just a wind turbine.
- Such maintenance should be done in predicted periods of drought. It can also be ensured by providing several service teams that during the maintenance-related shutdown of a substation and the majority of the connected wind turbines is serviced.
- the determination of the yield losses happens at predeterminable time intervals.
- the forecast of the yield losses or the determination of the yield losses is preferably carried out in correspondingly predeterminable time intervals. For this purpose, in particular time intervals of one minute to one hour, in particular from five minutes to twenty minutes and more preferably from ten minutes to twenty minutes are provided.
- the creation of the order of maintenance to be performed iteratively includes in particular that after the creation of a sequence of maintenance operations, according to which a wind turbine or a group of wind turbines is to be maintained first in a period of time, at the end of this period or after this period an order of maintenance to be carried out for the further wind turbines is created again ,
- the iterative creation of the order of maintenance to be performed may also involve iteratively simulating or iteratively calculating how high the loss of revenue is when one or a group of wind turbines is shut down to determine the energy yield of the wind turbine park. In this case, a corresponding determination of the energy yield of the wind energy plant is done iteratively.
- the forecast of meteorological conditions includes a wind speed and a direction.
- past meteorological conditions in particular statistically
- maintenance work which can be postponed in time is suspended at a future statistical forecast for predetermined meteorological conditions, shutdown or reduced power operation of the respective wind turbine.
- this preferred embodiment of the method according to the invention is taken into account for certain situations that occur at certain locations in certain locations seasons and wind speeds, for example, certain wind directions and wind speeds with a high probability, so that, for example, can be considered that with a relatively high probability, for example a lull time is to be expected in a future period of time. It is then carried out with the maintenance work depending on the probability of maintenance work. waited ten preferred meteorological condition or suspended or the reduced power operation of the respective wind turbine exposed.
- a plurality of wind energy installations are connected via an electrical train or a common transformer station and / or a common substation are provided for a plurality of wind energy plants in the wind energy plant park.
- the object is also achieved by a method for operating a wind energy plant with multiple wind turbines, wherein at least a number of wind turbines are to carry out maintenance work, wherein the following method steps are carried out:
- a plurality of scheduled maintenance or service operations is preferably specified
- the wind turbines, on which maintenance work be temporarily shut down or run in a low-power operation are preferably the wind turbines, on which maintenance work be temporarily shut down or run in a low-power operation.
- the object is achieved by a method for operating a wind energy plant with multiple wind turbines, wherein at least a number of wind turbines are to perform maintenance work, wherein the following method steps are performed:
- the operation of the number of wind turbines is controlled so that the respective wind turbine, which is to be maintained or to be maintained, is temporarily shut down or led into a reduced-power operation.
- the database in which the yield data are stored in the case of corresponding meteorological conditions of the past can be created, as in DE 10 201 1 081 241 A1, where the matrix named there corresponds to the database.
- a corresponding database can be used, which is described in DE 10 201 1 003 799 B3.
- the database has in its database fields the energy yield of the wind energy plant park and / or individual wind energy installations of the wind energy plant park, which prevail under certain meteorological conditions.
- a database cell which is assigned to a specific wind direction and a specific wind force, be assigned the energy output of a single specific wind turbine and / or the energy yield of the entire wind turbine park and be assigned accordingly for each wind turbine, the energy yield of wind force and wind direction. Since it is to be expected over a certain extended period of time that a corresponding wind direction occurs more frequently in a given wind direction grid and a corresponding wind force in a predefined corresponding wind force grid, an average value for the energy yield can also be stored in the database and the number of occurrences of corresponding wind data ,
- the wind speed and the wind direction or other weather data from a weather forecast model, then also the wind turbines to be maintained and the duration of the maintenance, as well as Number of possible parallel operations or parallel maintenance work. It can Then based on the weather forecast or weather forecast yield losses are downscaled to temporal means, such as ten minutes averages. The yield losses can thus be determined on the basis of the maintenance work and the maintenance work can be postponed accordingly iteratively in order to comply with the corresponding meteorological conditions. A maintenance working time sequence is then output, by means of which the lowest possible energy yield loss can be achieved.
- Fig. 1 shows schematically a plan view of a wind energy plant park with 48 wind turbines at a given wind.
- FIG. 1 shows a schematic plan view of a wind energy plant park with 48 wind turbines for a specific wind 50 with a wind direction and a wind force.
- the wind energy plant park has the reference numeral 51.
- the wind turbines are marked with the reference numbers 1 to 48.
- the wind turbines 1 to 5 have an optimal flow and thus optimum energy yield.
- the wind turbines 7, 9, 1 1 and 13 have an optimal energy yield, since they are exposed directly to the wind. All in the slipstream of these wind turbines standing wind turbines get the energy from the wind of the upstream wind turbines 1 to 5, 7, 9, 1 1 and 13 to feel and take the wind less energy and thus produce less power.
- the wind power plant 36 and optionally also 20 would be serviced first, given a corresponding wind direction forecast according to the wind 50, since the energy yield loss is the lowest. It would also be attempted to postpone the maintenance of the wind turbine 1 to a later date, when the wind blows, for example, from the opposite direction. This can reduce the loss of revenue.
- wind turbines could also be maintained in parallel.
- the wind direction is as shown in Fig. 1, and later, for the major part of the duration of the maintenance, a storm is to be expected in, for example, the opposite direction
- wind turbulence is generally higher, which means that behind a rear wind turbine in operation, the air is also mixed faster with high-energy flow, so that the flow of the energy extraction "recovered" faster
- the energy yield of the wind turbines 21, 23, 24, 25 and 27 increases because for these wind turbines the distance to the next operating wind turbine increases and the flow thus has more time to accelerate.
- the distances of the wind turbines are relatively large, can be taken into account in the order of maintenance that the time for the maintenance team, for example, to get from the wind turbine 28 to the wind turbine 1, is very large, so that this alone economic aspects are added preferably also to be considered.
- a particularly delineated feature is preferably an optional feature. feature.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Wind Motors (AREA)
Abstract
The invention relates to a method for operating a wind turbine park (51) with multiple wind turbines (1 - 48), wherein maintenance work is to be carried out on at least a number of wind turbines (1 - 48). The method according to the invention is characterized by the following method steps: generating or providing a forecast of meteorological conditions, ascertaining yield losses of the wind turbines (1 - 48) of the number of wind turbines (1 - 48) on which maintenance work is to be carried out dependent on the forecast of meteorological conditions, generating a sequence of maintenance work to be carried out, and controlling the operation of the number of wind turbines (1 - 48) on which maintenance work is to be carried out dependent on the generated sequence of maintenance work to be carried out in order to carry out maintenance work or in order to make it possible to carry out maintenance work. The operation of the number of wind turbines (1 - 48) is controlled so as to provide an intermittent shutdown of each wind turbine (1 - 48) or an output-reduced operation of each wind turbine (1 - 48) on which maintenance work is to be carried out or is being carried out at a specified time.
Description
Verfahren zum Betreiben eines Windenergieanlagenparks Beschreibung Method for operating a wind energy plant Description
Die Erfindung betrifft ein Verfahren zum Betreiben eines Windenergieanlagenparks mit mehreren Windenergieanlagen, wobei bei wenigstens einer Anzahl von Windenergieanlagen Wartungsarbeiten auszuführen sind. The invention relates to a method for operating a wind energy plant with multiple wind turbines, wherein at least a number of wind turbines are to perform maintenance.
Für den Betreiber eines Windenergieanlagenparks ist es wichtig, einen möglichst hohen Ertrag an Leistung des Parks in ein Stromnetz abgeben zu können . Die Windenergieanlagen eines Windenergieanlagenparks und auch elektronische bzw. elektrische Komponenten wie Umspannstationen, Transformatoren und ähnliches benötigen einen gewissen Wartungsaufwand , insbesondere auch Reparaturen. Während entsprechende Wartungen durchgeführt werden, sind die zu wartenden Windenergieanlagen stillzusetzen bzw. in einem leistungsverminderten Betrieb zu fahren . Dieses führt zu Ertragsverlusten des Betreibers. For the operator of a wind turbine park, it is important to be able to deliver the highest possible yield of the park's power into a power grid. The wind turbines of a wind turbine park and also electronic or electrical components such as substations, transformers and the like require a certain maintenance, especially repairs. While appropriate maintenance is carried out, the wind turbines to be serviced are to be shut down or to run in a reduced-power mode. This leads to yield losses of the operator.
Aus DE 1 0 2009 004 385 B4 ist ein Verfahren zum Überwachen des
Betriebs einer Windenergieanlage mit den folgenden Schritten bekannt: DE 1 0 2009 004 385 B4 discloses a method for monitoring the Operating a wind turbine with the following steps:
Aufnehmen von Zustandsdaten der Windenergieanlage; Recording status data of the wind turbine;
Feststellen von Abweichungen zwischen den Zustandsdaten und einem zugehörigen Vergleichswert; Determining deviations between the state data and an associated comparison value;
Ermitteln einer Ausfallwahrscheinlichkeit der Windenergieanlage anhand einer festgestellten Abweichung; Determining a probability of failure of the wind turbine based on a detected deviation;
Ermitteln eines Verfügbarkeitswerts für die Windenergieanlage aus dem Verhältnis von tatsächlich erzeugter elektrischer Energiemenge zu potentiell erzeugbarer Gesamtmenge; Determining an availability value for the wind turbine from the ratio of the amount of electrical energy actually generated to the total amount that can be generated;
Zusammenführen des Verfügbarkeitswerts und der Ausfallwahrscheinlichkeit zu einer Reparaturpriorität und Merging the availability value and the probability of failure into a repair priority and
Zuordnen der Reparaturpriorität zu der Windenergieanlage. Assigning the repair priority to the wind turbine.
Es ist hieraus zudem eine Anordnung aus einer Windenergieanlage, einer Überwachungszentrale, einem Rechenmodul, einem Logikmodul und einem Kalkulator bekannt, wobei die Windenergieanlage einen Sensor zum Aufnehmen von Zustandsdaten der Windenergieanlage aufweist, wobei das Logikmodul zum Ermitteln von Abweichungen zwischen den Zustandsdaten und einem zugehörigen Vergleichswert ausgelegt ist, wobei der Kalkulator aus dem Verhältnis von tatsächlich erzeugter elektrischer Energiemenge zu potentiell erzeugbarer Gesamtmenge einen auf die Windenergieanlage bezogenen Verfügbarkeitswert ermittelt, wobei das Rechenmodell bei einer von dem Logikmodul festgestellten Abweichung eine Ausfallwahrscheinlichkeit der Windenergieanlage ermittelt, wobei das Re-
chenmodul den Verfügbarkeitswert und die Ausfallwahrscheinlichkeit zu einer Reparaturpriorität zusammenführt und wobei die Überwachungszentrale die Reparaturpriorität der Windenergieanlage zuordnet. It is also known from this an arrangement of a wind turbine, a monitoring center, a computing module, a logic module and a calculator, wherein the wind turbine has a sensor for receiving state data of the wind turbine, wherein the logic module for determining deviations between the state data and an associated comparison value is designed, wherein the calculator determined from the ratio of actually generated amount of electrical energy to potentially producible total amount related to the wind turbine availability value, the calculation model determined at a deviation detected by the logic module a probability of failure of the wind turbine, the Re Chen module merges the availability value and the probability of failure to a repair priority and wherein the monitoring center assigns the repair priority of the wind turbine.
Durch dieses Verfahren und diese Anordnung gemäß der DE 1 0 2009 004 385 B4 soll ein möglichst gleichmäßiger Betrieb von Windenergieanlagen erreicht werden. Es ist zudem angegeben , dass es erstrebenswert sei, die Wartung möglichst bei allen Windenergieanlagen der Windparks gleichzeitig fällig werden zu lassen . Dies führt allerdings zu unnötigen Ertragsverlusten . By this method and this arrangement according to DE 1 0 2009 004 385 B4 as even as possible operation of wind turbines should be achieved. It is also stated that it is desirable to have the maintenance due at the same time as possible for all wind turbines of the wind farms. However, this leads to unnecessary yield losses.
Es ist Aufgabe der vorliegenden Erfindung , notwendige Wartungsarbeiten in einem Windenergieanlagenpark so auszuführen, dass der Energieertrag des Windenergieanlagenparks optimiert ist. It is an object of the present invention to carry out necessary maintenance work in a wind energy plant park so that the energy yield of the wind energy plant park is optimized.
Gelöst wird diese Aufgabe durch ein Verfahren zum Betreiben eines Windenergieanlagenparks mit mehreren Windenergieanlagen , wobei bei wenigstens einer Anzahl von Windenergieanlagen Wartungsarbeiten auszuführen sind , mit den folgenden Verfahrensschritten: This object is achieved by a method for operating a wind energy plant with multiple wind turbines, wherein at least a number of wind turbines are to carry out maintenance work, with the following process steps:
Beschaffen oder zur Verfügung stellen einer Prognose von meteorologischen Bedingungen, Providing or providing a forecast of meteorological conditions,
Ermitteln von Ertragsverlusten der Windenergieanlagen aus der Anzahl von Windenergieanlagen, bei denen Wartungsarbeiten durchzuführen sind, in Abhängigkeit der Prognose von meteorologischen Bedingungen , Determining yield losses of the wind turbines from the number of wind turbines to be serviced, depending on the forecast of meteorological conditions,
Erstellen einer Reihenfolge durchzuführender Wartungsarbeiten,
Steuern des Betriebs der Anzahl von Windenergieanlagen, bei denen Wartungsarbeiten auszuführen sind in Abhängigkeit der erstellten Reihenfolge durchzuführender Wartungsarbeiten, um Wartungsarbeiten auszuführen oder ausführbar zu machen, wobei das Steuern des Betriebs der Anzahl von Windenergieanlagen ein zeitweises Stillsetzen der jeweiligen Windenergieanlage oder einen leistungsverminderten Betrieb der jeweiligen Windenergieanlage vorsieht, an der zu einer vorgegebenen Zeit Wartungsarbeiten auszuführen sind oder ausgeführt werden. Creating a sequence of maintenance work, Controlling the operation of the number of wind turbines to perform maintenance work in accordance with the established order of maintenance to perform maintenance or to make executable, wherein controlling the operation of the number of wind turbines is a temporary shutdown of the respective wind turbine or a power reduced operation of the respective Wind turbine provides, are carried out at a specified time maintenance or performed.
Durch das erfindungsgemäße Verfahren ist es möglich festzustellen, in welcher Reihenfolge Wartungsarbeiten auszuführen sind, um einen möglichst geringen Ertragsverlust des Windenergieanlagen- parks zu erzielen. So wird beispielsweise dafür gesorgt, dass Windenergieanlagen gewartet werden, die im Windschatten anderer Windenergieanlagen liegen. Es ist bevorzugt, diese Windenergieanlagen zu warten, solange eine entsprechende Windrichtung vorherrscht, da die im Windschatten liegenden Windenergieanlagen einen geringeren Energieertrag haben, als die freistehenden, in Windrichtung stromaufwärts angeordneten Windenergieanlagen. By means of the method according to the invention, it is possible to determine the sequence in which maintenance work is to be carried out in order to achieve the lowest possible yield loss of the wind energy plant park. For example, it ensures that wind turbines are maintained, which are in the slipstream of other wind turbines. It is preferable to maintain these wind turbines as long as a corresponding wind direction prevails, since the wind turbines lying in the slipstream have a lower energy yield than the freestanding wind turbines arranged upstream in the wind direction.
Mit einer entsprechenden Prognose von meteorologischen Bedingungen wie beispielsweise Windrichtung, Windstärke, Luftdichte, Windgradient bzw. Windturbulenzen, Temperatur, Niederschlag und/oder Eisbildungsgefahr kann entsprechend sehr gezielt eine Reihenfolge durchzuführender Wartungsarbeiten, insbesondere einer Reihenfolge an stillzusetzenden Windenergieanlagen bzw. Windenergieanlagen mit leistungsvermindertem Betrieb erstellt werden, um entsprechende Wartungsarbeiten durchzuführen. Mit dem Ermitteln von Ertragsverlusten ist insbesondere das Ermitteln von zu erwartenden Ertragsverlusten gemeint.
Ist beispielsweise bekannt, dass die meteorologischen Bedingungen in einer Woche von dem heutigen Zeitpunkt so aussehen, dass vermehrt Eisbildung ansteht, können bevorzugt Wartungsarbeiten ausgeführt werden, da aufgrund der Eisbildung der Energieertrag des Windenergieanlagenparks voraussichtlich vermindert sein wird. Zudem können beispielsweise in einigen Gebieten, bei denen ein leis- tungsverminderter Betrieb der Windenergieanlagen zu gewissen Zeitpunkten vorgeschrieben ist wie beispielsweise in Dämmerungszeiten, in denen vermehrt Fledermausflug zu befürchten ist, zu dieser Zeit Wartungsarbeiten zu einigen Windenergieanlagen des Parks festgelegt werden. Das Steuern des Betriebs umfasst hierbei bevorzugt die Ausführung, dass dem Service-Personal die Reihenfolge der durchzuführenden Wartungsarbeiten angezeigt wird und das Personal die Windenergieanlage oder Windenergieanlagen vor Ort manuell stillsetzt. With a corresponding prognosis of meteorological conditions such as wind direction, wind strength, air density, wind gradient or wind turbulence, temperature, precipitation and / or Eisbildungsgefahr can be created correspondingly very targeted a sequence of maintenance to be performed, in particular a sequence of immobilized wind turbines or wind turbines with reduced power operation to perform appropriate maintenance. In particular, the determination of loss of earnings means the determination of expected loss of earnings. For example, if it is known that the meteorological conditions in a week from today's time look like that more ice formation is pending, preferably maintenance work can be carried out because due to the formation of ice, the energy yield of the wind turbine park is likely to be reduced. In addition, for example, maintenance work on some of the park's wind turbines may be scheduled at that time in some areas where de-rated operation of the wind turbines is required at certain times, such as in twilight periods where bat flying is likely to increase. The control of the operation here preferably includes the execution that the service personnel the order of the maintenance to be performed is displayed and the staff manually shut down the wind turbine or wind turbines on site.
Bevorzugt geschieht das Ermitteln von Ertragsverlusten der Windenergieanlagen in Abhängigkeit der Prognose der meteorologischen Bedingung mittels einer gespeicherten Ertragsmatrix des Windenergieanlagenparks und/oder mittels rechnerischer Simulation anhand der Prognose der meteorologischen Daten. Es kann beispielsweise rechnerisch simuliert werden, wie hoch Ertragsverluste bei entsprechenden Windrichtungen, Windgeschwindigkeiten und einer entsprechenden Luftdichte für die verschiedenen Windenergieanlagen bzw. den Standorten der Windenergieanlagen eines Windenergieanlagenparks sind. Alternativ und genauer wird mittels einer gespeicherten Ertragsmatrix des Windenergieanlagenparks eine Prognose der Ertragsverluste in Abhängigkeit der meteorologischen Bedingungen vorgenommen. Eine Ertragsmatrix kann hierbei beispielsweise mittels eines Verfahrens durchgeführt werden, das in der DE 10 201 1 081 241 A1 beschrieben ist. Eine entsprechende Ertrags-
matrix kann auch erstellt werden mittels eines Verfahrens, das beispielsweise in der DE 1 0 201 1 003 799 B3 beschrieben ist. The determination of yield losses of the wind energy installations preferably takes place as a function of the forecast of the meteorological condition by means of a stored yield matrix of the wind energy plant park and / or by means of computational simulation on the basis of the forecast of the meteorological data. For example, it can be simulated by calculation how high yield losses are with corresponding wind directions, wind speeds and a corresponding air density for the various wind turbines or the locations of the wind turbines of a wind turbine park. Alternatively and more precisely, by means of a stored yield matrix of the wind energy plant park, a forecast of the yield losses is made as a function of the meteorological conditions. In this case, a yield matrix can be carried out, for example, by means of a method which is described in DE 10 201 1 081 241 A1. A corresponding income Matrix can also be created by means of a method which is described for example in DE 1 0 201 1 003 799 B3.
Vorzugsweise wird nach erfolgter Wartung einer Windenergieanlage oder mehrerer Windenergieanlagen , die parallel oder zeitnah zueinander gewartet wurden, das Verfahren anhand einer aktualisierten Prognose von meteorologischen Bedingungen erneut durchgeführt. Hierzu verringert sich der Ertragsverlust des Windenergieanlagen- parks aufgrund von Wartungsarbeiten erheblich. Preferably, after the maintenance of a wind turbine or several wind turbines, which have been serviced in parallel or in close proximity to each other, the method is carried out anew on the basis of an updated forecast of meteorological conditions. For this purpose, the yield loss of the wind energy plant due to maintenance work is reduced considerably.
Die Aufgabe wird erfindungsgemäß und besonders bevorzugt durch ein Verfahren zum Betreiben eines Windenergieanlagenparks mit mehreren Windenergieanlagen gelöst, wobei bei wenigstens einer Anzahl von Windenergieanlagen Wartungsarbeiten auszuführen sind , mit den folgenden Verfahrensschritten: The object is achieved according to the invention and particularly preferably by a method for operating a wind energy plant with multiple wind turbines, wherein at least a number of wind turbines are to carry out maintenance work, with the following method steps:
Beschaffen oder zur Verfügung stellen einer Prognose von meteorologischen Bedingungen , Providing or providing a forecast of meteorological conditions,
Ermitteln von Ertragsverlusten der Windenergieanlagen aus der Anzahl von Windenergieanlagen, bei denen Wartungsarbeiten durchzuführen sind , in Abhängigkeit der Prognose von meteorologischen Bedingungen, Determining yield losses of the wind turbines from the number of wind turbines to be serviced, depending on the forecast of meteorological conditions,
Erstellen einer Reihenfolge durchzuführender Wartungsarbeiten, Creating a sequence of maintenance work,
Steuern des Betriebs der Anzahl von Windenergieanlagen , bei denen Wartungsarbeiten auszuführen sind in Abhängigkeit der erstellten Reihenfolge durchzuführender Wartungsarbeiten, um Wartungsarbeiten auszuführen oder ausführbar zu machen,
wobei das Steuern des Betriebs der Anzahl von Windenergieanlagen ein zeitweises Stillsetzen der jeweiligen Windenergieanlage oder einen leistungsverminderten Betrieb der jeweiligen Windenergieanlage vorsieht, an der zu einer vorgegebenen Zeit Wartungsarbeiten auszuführen sind oder ausgeführt werden, wobei das Ermitteln von Ertragsverlusten der Windenergieanlagen in Abhängigkeit der Prognose der meteorologischen Bedingungen mittels einer gespeicherten Ertragsmatrix des Windenergieanlagenparks geschieht. Controlling the operation of the number of wind turbines to perform maintenance on, depending on the order of maintenance to be performed, to perform maintenance or to carry out, wherein controlling the operation of the number of wind turbines provides a temporary shutdown of the respective wind turbine or a reduced power operation of the respective wind turbine to be executed at a given time maintenance or carried out, wherein determining yield losses of the wind turbines depending on the forecast of the meteorological Conditions by means of a stored yield matrix of the wind turbine park happens.
Dieses erfindungsgemäße Verfahren führt zu einer sehr präzisen Analyse der Reihenfolge durchzuführender Wartungsarbeiten und damit zu einem optimierten Energieertrag des Windenergieanlagenparks. This method according to the invention leads to a very precise analysis of the sequence of maintenance operations to be performed and thus to an optimized energy yield of the wind energy plant park.
Die Aufgabe wird ferner erfindungsgemäß und besonders bevorzugt gelöst durch ein Verfahren zum Betreiben eines Windenergieanlagenparks mit mehreren Windenergieanlagen, wobei bei wenigstens einer Anzahl von Windenergieanlagen Wartungsarbeiten auszuführen sind, mit den folgenden Verfahrensschritten: The object is further achieved according to the invention and particularly preferably by a method for operating a wind energy plant park having a plurality of wind energy installations, wherein maintenance work is to be carried out in at least a number of wind energy installations, with the following method steps:
Beschaffen oder zur Verfügung stellen einer Prognose von meteorologischen Bedingungen, Providing or providing a forecast of meteorological conditions,
Ermitteln von Ertragsverlusten der Windenergieanlagen aus der Anzahl von Windenergieanlagen, bei denen Wartungsarbeiten durchzuführen sind, in Abhängigkeit der Prognose von meteorologischen Bedingungen, Determining yield losses of the wind turbines from the number of wind turbines to be serviced, depending on the forecast of meteorological conditions,
Erstellen einer Reihenfolge durchzuführender Wartungsarbeiten,
Steuern des Betriebs der Anzahl von Windenergieanlagen, bei denen Wartungsarbeiten auszuführen sind in Abhängigkeit der erstellten Reihenfolge durchzuführender Wartungsarbeiten, um Wartungsarbeiten auszuführen oder ausführbar zu machen, wobei das Steuern des Betriebs der Anzahl von Windenergieanlagen ein zeitweises Stillsetzen der jeweiligen Windenergieanlage oder einen leis- tungsverminderten Betrieb der jeweiligen Windenergieanlage vorsieht, an der zu einer vorgegebenen Zeit Wartungsarbeiten auszuführen sind oder ausgeführt werden, wobei das Ermitteln von Ertragsverlusten der Windenergieanlagen in Abhängigkeit der meteorologischen Bedingungen mittels rechnerischer Simulation anhand der Prognose der meteorologischen Daten geschieht, wobei nach erfolgter Wartung einer Windenergieanlage das Verfahren anhand einer aktualisierten Prognose von meteorologischen Bedingungen erneut durchgeführt wird. Dieses erfindungsgemäße Verfahren führt zu ständig aktualisierten Reihenfolgen von durchzuführenden Wartungsarbeiten und damit zu einer kontinuierlichen Optimierung des Energieertrags des Windenergie- anlagenparks. Creating a sequence of maintenance work, Controlling the operation of the number of wind turbines to perform maintenance on, depending on the order of maintenance to be performed to perform or perform maintenance, controlling the operation of the number of wind turbines temporarily stopping the respective wind turbine or power reduced operation the respective wind turbine provides, are carried out at the at a given time maintenance or executed, the determination of yield losses of wind turbines depending on the meteorological conditions by means of computational simulation based on the forecast of the meteorological data, after maintenance of a wind turbine, the method based an updated forecast of meteorological conditions is performed again. This method according to the invention leads to constantly updated sequences of maintenance work to be performed and thus to a continuous optimization of the energy yield of the wind power plant.
Vorzugsweise wird bei der Ermittlung der Ertragsdaten berücksichtigt, dass eine Windenergieanlage, die im Windschatten einer zu Wartungszwecken stillgesetzten Windenergieanlage angeordnet ist, einen höheren Ertrag erwirtschaftet im Vergleich zu dem Betrieb der im Windschatten angeordneten Windenergieanlage bei einer in Betrieb befindlichen den Windschatten erzeugenden Windenergieanlage. Dieser Verfahrensschritt macht sich die Erkenntnis zu eigen, dass der Ertragsverlust bzw. die Ertragsminderung einer im Windschatten einer anderen Windenergieanlage stehenden Windenergieanlage dann geringer ist, wenn die andere Windenergieanlage
selbst nicht in Betrieb ist, sondern stillgesetzt ist. Durch die Stillsetzung der in Windrichtung stromaufwärts angeordneten Windenergieanlage wird dem Wind im Wesentlichen keine Energie entnommen, weswegen die im Windschatten zu dieser Windenergieanlage stehende Windenergieanlage die volle Energie des Windes ausnutzen kann. In determining the yield data, it is preferably taken into account that a wind energy plant arranged in the slipstream of a wind turbine that has been shut down for maintenance generates a higher yield in comparison to the operation of the wind energy turbine in an operating windshield generating wind energy plant. This process step makes the knowledge that the loss of yield or the reduction in yield of a wind energy plant standing in the slipstream of another wind energy plant is lower when the other wind energy plant itself is not in operation, but is shut down. As a result of the shutdown of the wind energy installation arranged upstream in the wind direction, essentially no energy is taken from the wind, which is why the wind power plant standing in the slipstream to this wind energy installation can utilize the full energy of the wind.
Besonders bevorzugt ist es, wenn bei der Bestimmung der Reihenfolge der Wartungsarbeiten eine Wegezeit, Transportkosten, Ersatzteillogistik und/oder Gruppierungseffekte berücksichtigt werden. Insbesondere bei Offshore-Windenergieanlagen sollten bei der Wartung von Windenergieanlagen eines Windenergieanlagenparks die Wegezeit, um zu einer Windenergieanlage für Wartungsarbeiten zu gelangen, berücksichtigt werden, da sich hierdurch zum einen die Zeitdauer der Wartungsarbeiten verändert und bei Änderungen der meteorologischen Bedingungen diese eher eine Rolle spielen. Zudem kann es sinnvoll sein, eine nähergelegene Windenergieanlage als nächstes zu warten, auch wenn der Ertragsverlust bei dieser Windenergieanlage, die zu warten ist, größer ist als eine entfernter liegende Windenergieanlage, dessen Ertragsverlust bei den vorausgesagten meteorologischen Bedingungen geringer wäre. Hierbei wiegen sich somit die wirtschaftlichen Einbußen möglicherweise gegeneinander auf, so dass eine kürzere Wegezeit bevorzugt wäre. Entsprechendes gilt dann auch für die Transportkosten, insbesondere dann, wenn entsprechend schwere bzw. unhandliche Ersatzteile bei der Wartung verwendet werden sollen. Die Abhängigkeit von der Ersatzteillogistik ergibt sich insbesondere auch daraus, dass sinnvollerweise nur Wartungsarbeiten an Windenergieanlagen auszuführen sind, die effizient so ausgeführt werden, dass diese möglichst vollständig sind, was naturgemäß nur geschehen kann, wenn alle notwendigen Ersatzteile vorrätig bzw. vor Ort sind . Bei der Reihenfolge der durchzuführenden Wartungsarbeiten wird vorzugsweise
somit eine Transportlogistik zu berücksichtigen sein. It is particularly preferred if, in determining the order of the maintenance work, a travel time, transport costs, spare parts logistics and / or grouping effects are taken into account. In particular, in offshore wind turbines should be considered in the maintenance of wind turbines of a wind turbine park the travel time to get to a wind turbine for maintenance, as this changed on the one hand, the duration of maintenance and change in meteorological conditions these play a role. In addition, it may be useful to wait for a nearby wind turbine next, even if the yield loss in this wind turbine, which is to be maintained, is greater than a remote wind turbine, the yield loss would be lower in the predicted meteorological conditions. Thus, the economic losses may weigh against each other, so that a shorter travel time would be preferred. The same applies then also to the transport costs, especially if correspondingly heavy or unwieldy spare parts are to be used during maintenance. The dependency on the spare parts logistics results in particular from the fact that reasonably only maintenance of wind turbines are to be executed, which are executed efficiently so that they are as complete as possible, which naturally can only happen if all necessary spare parts are in stock or on site. In the order of maintenance to be performed is preferably Thus, a transport logistics to be considered.
Die Berücksichtigung von Gruppierungseffekten beinhaltet insbesondere die Berücksichtigung verschiedener Anlagentypen in einem Windenergieanlagenpark. Es kann beispielsweise sinnvoll sein, in einem ersten Wartungszyklus bei allen Windenergieanlagen mit einem hydraulischen Pitch-System bzw. Rotorblattwinkelverstellsys- tem das Hydrauliköl zu tauschen und in einem zweiten Wartungszyklus bei allen Windenergieanlagen mit einem elektrischen Pitch- System bzw. Rotorblattwinkelverstellsystem die Akkumulatoren dieser Systeme zu tauschen. The consideration of grouping effects includes in particular the consideration of different plant types in a wind turbine park. It may be useful, for example, in a first maintenance cycle in all wind turbines with a hydraulic pitch system or Rotorblattwinkelverstellsys- tem the hydraulic oil and in a second maintenance cycle in all wind turbines with an electric pitch system or Rotorblattwinkelverstellsystem the accumulators of these systems To deceive.
Ferner kann unter den Gruppierungseffekten verstanden werden, dass bei Retrofitmaßnahmen, insbesondere dem Einbau neuer Komponenten wie effizienterer Rotorblätter, einem neuen Generator oder ähnlichen größeren Umbauten nur einige der Windenergieanlagen überhaupt betroffen sind, so dass das Verfahren nur auf einen Teil der Windenergieanlagen des Windenergieanlagenparks angewendet wird und nur für diesen Teil der Windenergieanlagen des Windenergieanlagenparks eine Reihenfolge durchzuführender Wartungsarbeiten bestimmt wird. Furthermore, among the grouping effects can be understood that in retrofit measures, in particular the installation of new components such as more efficient rotor blades, a new generator or similar larger conversions, only some of the wind turbines are affected at all, so that the method is applied only to a part of the wind turbines of the wind turbine park and only for this part of the wind turbines of the wind turbine park a sequence of maintenance to be performed is determined.
Ferner treten Gruppierungseffekte dann auf, wenn beispielsweise elektrische Komponenten im Windenergieanlagenpark gewartet werden müssen. So sind einige Gruppierungen von Windenergieanlagen üblicherweise in Windenergieanlagenparks vorgesehen dergestalt, dass mehrere Windenergieanlagen an jeweils einem Leitungsstrang angeordnet sind, so dass eine Reihe bzw. Untergruppe der Windenergieanlagen des Windenergieanlagenparks gleichzeitig spannungsfrei geschaltet wird, wenn Wartungsarbeiten an den elektrischen Komponenten ausgeführt werden sollen. Ähnliche Gruppierungseffekte treten bei der Abschaltung von Transformator-
Stationen, Umspannwerken und so weiter auf, die mehr als nur eine Windenergieanlage betreffen. Derartige Wartungen sollten möglichst in prognostizierten Flautezeiten erfolgen. Es kann auch durch Bereitstellung von mehreren Serviceteams sichergestellt werden, dass während des wartungsbedingten Abschaltens eines Umspannwerks auch der Großteil der daran angeschlossenen Windenergieanlagen gewartet wird. Furthermore, grouping effects occur when, for example, electrical components in the wind energy plant park have to be maintained. Thus, some groups of wind turbines are usually provided in wind turbine parks in such a way that several wind turbines are arranged on a respective wiring harness, so that a number or subgroup of wind turbines of the wind turbine park is simultaneously de-energized when maintenance work on the electrical components to be performed. Similar grouping effects occur when switching off transformer Stations, substations and so on, which concern more than just a wind turbine. Such maintenance should be done in predicted periods of drought. It can also be ensured by providing several service teams that during the maintenance-related shutdown of a substation and the majority of the connected wind turbines is serviced.
Vorzugsweise geschieht die Ermittlung der Ertragsverluste in vorgebbaren Zeitintervallen. Die Prognose der Ertragsverluste bzw. das Ermitteln der Ertragsverluste wird vorzugsweise in entsprechend vorgebbaren Zeitintervallen durchgeführt. Hierzu sind insbesondere Zeitintervalle von einer Minute bis einer Stunde, insbesondere von fünf Minuten bis zwanzig Minuten und besonderes bevorzugt von zehn Minuten bis zwanzig Minuten vorgesehen. Preferably, the determination of the yield losses happens at predeterminable time intervals. The forecast of the yield losses or the determination of the yield losses is preferably carried out in correspondingly predeterminable time intervals. For this purpose, in particular time intervals of one minute to one hour, in particular from five minutes to twenty minutes and more preferably from ten minutes to twenty minutes are provided.
Vorzugsweise geschieht das Erstellen der Reihenfolge durchzuführender Wartungsarbeiten iterativ. Dieses beinhaltet insbesondere, dass nach dem Erstellen einer Reihenfolge von Wartungsarbeiten, wonach eine Windenergieanlage oder eine Gruppe von Windenergieanlagen in einem Zeitabschnitt als erstes zu warten ist, am Ende dieses Zeitabschnitts bzw. nach diesem Zeitabschnitt erneut eine Reihenfolge durchzuführender Wartungsarbeiten für die weiteren Windenergieanlagen erstellt wird. Preferably, the creation of the order of maintenance to be performed iteratively. This includes in particular that after the creation of a sequence of maintenance operations, according to which a wind turbine or a group of wind turbines is to be maintained first in a period of time, at the end of this period or after this period an order of maintenance to be carried out for the further wind turbines is created again ,
Insbesondere kann das iterative Erstellen der Reihenfolge durchzuführender Wartungsarbeiten auch beinhalten, dass iterativ simuliert oder iterativ berechnet wird, wie hoch der Ertragsverlust ist, wenn eine oder eine Gruppe der Windenergieanlagen ausgeschaltet bzw. stillgesetzt wird, um damit den Energieertrag des Windenergieanla- genparks zu ermitteln. Hierbei geschieht eine entsprechende Ermittlung des Energieertrags des Windenergieanlagenparks iterativ. Es
wird nacheinander berechnet, wie hoch der Ertragsverlust des Windenergieanlagenparks beim Stillsetzen verschiedener Windenergieanlagen bzw. verschiedener Gruppen von Windenergieanlagen ist, wobei hierbei berücksichtigt wird, dass durch das Stillsetzen von Windenergieanlagen oder einer Windenergieanlage ein geringerer Abschattungseffekt nachgeordneter Windenergieanlagen bzw. von Windenergieanlagen im Windschatten dieser Windenergieanlage stattfindet. So kann iterativ effizient ermittelt werden, bei welcher Windenergieanlage bei einer entsprechenden Prognose von meteorologischen Bedingungen insgesamt für den Windenergieanlagen- park der geringste Ertragsverlust bei einer Wartung dieser Windenergieanlage erzielt wird. In particular, the iterative creation of the order of maintenance to be performed may also involve iteratively simulating or iteratively calculating how high the loss of revenue is when one or a group of wind turbines is shut down to determine the energy yield of the wind turbine park. In this case, a corresponding determination of the energy yield of the wind energy plant is done iteratively. It is calculated successively, how high the yield loss of the wind turbine park when shutting down various wind turbines or different groups of wind turbines, taking into account that takes place by shutting down wind turbines or a wind turbine, a lower shading effect of downstream wind turbines or wind turbines in the lee of this wind turbine , Thus, it can be efficiently determined iteratively, with which wind energy plant with a corresponding forecast of meteorological conditions a total of the wind power plant park the lowest yield loss is achieved in a maintenance of this wind turbine.
Vorzugsweise umfasst die Prognose von meteorologischen Bedingungen eine Windgeschwindigkeit und eine Richtung. Preferably, the forecast of meteorological conditions includes a wind speed and a direction.
Ferner vorzugsweise werden zusätzlich vergangene meteorologische Bedingungen, insbesondere statistisch, berücksichtigt, wobei insbesondere Wartungsarbeiten, die zeitlich verschoben werden können, bei einer für die Wartungsarbeiten verbesserten zukünftigen statistischen Prognose für vorbestimmte meteorologische Bedingungen, das Stillsetzen oder der leistungsverminderte Betrieb der jeweiligen Windenergieanlage ausgesetzt wird . Bei dieser bevorzugten Ausführungsform des erfindungsgemäßen Verfahrens wird für gewisse Lagen berücksichtigt, dass in diesen Lagen bzw. Orten des Windenergieanlagenparks zu gewissen Jahreszeiten beispielsweise bestimmte Windrichtungen und Windgeschwindigkeiten mit einer hohen Wahrscheinlichkeit auftreten, so dass beispielsweise berücksichtigt werden kann, dass mit einer relativ hohen Wahrscheinlichkeit beispielsweise eine Flautezeit in einer zukünftigen Zeitperiode zu erwarten ist. Es wird dann mit den Wartungsarbeiten in Abhängigkeit der Wahrscheinlichkeit einer für die Wartungsarbei-
ten bevorzugten meteorologischen Bedingung abgewartet bzw. das Stillsetzen oder der leistungsverminderte Betrieb der jeweiligen Windenergieanlage ausgesetzt. Furthermore, preferably past meteorological conditions, in particular statistically, are taken into account, in particular maintenance work which can be postponed in time is suspended at a future statistical forecast for predetermined meteorological conditions, shutdown or reduced power operation of the respective wind turbine. In this preferred embodiment of the method according to the invention is taken into account for certain situations that occur at certain locations in certain locations seasons and wind speeds, for example, certain wind directions and wind speeds with a high probability, so that, for example, can be considered that with a relatively high probability, for example a lull time is to be expected in a future period of time. It is then carried out with the maintenance work depending on the probability of maintenance work. waited ten preferred meteorological condition or suspended or the reduced power operation of the respective wind turbine exposed.
Vorzugsweise wird als zu berücksichtigender Gruppierungseffekt berücksichtigt, dass mehrere Windenergieanlagen über einen elektrischen Strang angeschlossen sind oder eine gemeinsame Transformatorstation und/oder ein gemeinsames Umspannwerk für mehrere Windenergieanlagen im Windenergieanlagenpark vorgesehen sind. It is preferably taken into account as a grouping effect to be taken into account that a plurality of wind energy installations are connected via an electrical train or a common transformer station and / or a common substation are provided for a plurality of wind energy plants in the wind energy plant park.
Die Aufgabe wird erfindungsgemäß auch gelöst durch ein Verfahren zum Betreiben eines Windenergieanlagenparks mit mehreren Windenergieanlagen, wobei bei wenigstens einer Anzahl von Windenergieanlagen Wartungsarbeiten auszuführen sind, wobei die folgenden Verfahrensschritte ausgeführt werden: The object is also achieved by a method for operating a wind energy plant with multiple wind turbines, wherein at least a number of wind turbines are to carry out maintenance work, wherein the following method steps are carried out:
Es wird vorzugsweise eine Mehrzahl von geplanten Wartungen oder Serviceeinsätzen vorgegeben, A plurality of scheduled maintenance or service operations is preferably specified,
Beschaffen oder zur Verfügung stellen einer Prognose von meteorologischen Bedingungen, Providing or providing a forecast of meteorological conditions,
Ermitteln einer Reihenfolge durchzuführender Wartungsarbeiten, die zu geringstmöglichen Energieertragsverlusten unter Berücksichtigung zusätzlicher wirtschaftlicher Bedingungen führt, Determine a sequence of maintenance operations that result in the least possible energy yield loss taking into account additional economic conditions
Steuern des Betriebs der Anzahl von Windenergieanlagen gemäß der ermittelten Reihenfolge, um Wartungsarbeiten auszuführen oder ausführbar zu machen. Hierzu werden vorzugsweise die Windenergieanlagen, an denen Wartungsarbeiten aus-
zuführen sind, zeitweise stillgesetzt oder in einem leistungs- verminderten Betrieb geführt. Controlling the operation of the number of wind turbines according to the determined order to perform maintenance or to make executable. For this purpose, preferably the wind turbines, on which maintenance work be temporarily shut down or run in a low-power operation.
Alternativ oder ergänzend wird die Aufgabe durch ein Verfahren zum Betreiben eines Windenergieanlagenparks mit mehreren Windenergieanlagen gelöst, wobei bei wenigstens einer Anzahl von Windenergieanlagen Wartungsarbeiten auszuführen sind, wobei die folgenden Verfahrensschritte ausgeführt werden: Alternatively or additionally, the object is achieved by a method for operating a wind energy plant with multiple wind turbines, wherein at least a number of wind turbines are to perform maintenance work, wherein the following method steps are performed:
Vorzugsweise Vorgeben einer Mehrzahl von geplanten Wartungsarbeiten oder Serviceeinsätzen, Preferably predetermining a plurality of planned maintenance or service operations,
Beschaffen oder zur Verfügung stellen einer Prognose von meteorologischen Bedingungen, Providing or providing a forecast of meteorological conditions,
Ermitteln einer Reihenfolge durchzuführender Wartungsarbeiten, die zu geringstmöglichen Energieertragsverlusten führt, wobei die Energieertragsverluste basierend auf einer gespeicherten Datenbank ermittelt werden, in der Ertragsdaten in Abhängigkeit von meteorologischen Bedingungen der Vergangenheit aufgezeichnet sind, Determining an order of maintenance to be performed resulting in lowest possible energy yield losses, the energy yield losses being determined based on a stored database in which yield data is recorded in dependence on past meteorological conditions,
Steuern des Betriebs der Anzahl von Windenergieanlagen, bei denen Wartungsarbeiten auszuführen sind in Abhängigkeit der erstellten Reihenfolge der durchzuführenden Wartungsarbeiten, um Wartungsarbeiten auszuführen oder ausführbar zu machen. Controlling the operation of the number of wind turbines to perform maintenance on, depending on the established order of maintenance to be performed to perform maintenance or to make executable.
Hierbei wird insbesondere der Betrieb der Anzahl von Windenergieanlagen so gesteuert, dass die jeweilige Windenergieanlage, die gewartet wird bzw. gewartet werden soll, zeitweise stillgesetzt wird oder in einen leistungsverminderten Betrieb geführt wird. Die Da-
tenbank, in der die Ertragsdaten bei entsprechenden meteorologischen Bedingungen der Vergangenheit gespeichert sind, kann hierbei erstellt werden, wie in der DE 10 201 1 081 241 A1 , wobei die dort genannte Matrix der Datenbank entspricht. Alternativ kann eine entsprechende Datenbank Verwendung finden, die in der DE 10 201 1 003 799 B3 beschrieben ist. Here, in particular, the operation of the number of wind turbines is controlled so that the respective wind turbine, which is to be maintained or to be maintained, is temporarily shut down or led into a reduced-power operation. That one- In this case, the database in which the yield data are stored in the case of corresponding meteorological conditions of the past can be created, as in DE 10 201 1 081 241 A1, where the matrix named there corresponds to the database. Alternatively, a corresponding database can be used, which is described in DE 10 201 1 003 799 B3.
Die Datenbank weist erfindungsgemäß in deren Datenbankfeldern den Energieertrag des Windenergieanlagenparks und/oder einzelner Windenergieanlagen des Windenergieanlagenparks auf, die bei bestimmten meteorologischen Bedingungen vorherrschen. So kann beispielsweise einer Datenbankzelle, die einer bestimmten Windrichtung und einer bestimmten Windstärke zugeordnet ist, der Energieertrag einer einzelnen bestimmten Windenergieanlage und/oder der Energieertrag des gesamten Windenergieanlagenparks zugeordnet sein und entsprechend für jede Windenergieanlage der Energieertrag dieser Windstärke und Windrichtung zugeordnet sein. Da über einen gewissen längeren Zeitraum damit zu rechnen ist, dass eine entsprechende Windrichtung in einem vorgegebenen Windrichtungsraster und eine entsprechende Windstärke in einem vorgegebenen entsprechenden Windstärkenraster häufiger auftritt, kann auch ein Durchschnittswert für den Energieertrag in der Datenbank abgespeichert sein und die Anzahl des Vorkommens entsprechender Winddaten. According to the invention, the database has in its database fields the energy yield of the wind energy plant park and / or individual wind energy installations of the wind energy plant park, which prevail under certain meteorological conditions. Thus, for example, a database cell, which is assigned to a specific wind direction and a specific wind force, be assigned the energy output of a single specific wind turbine and / or the energy yield of the entire wind turbine park and be assigned accordingly for each wind turbine, the energy yield of wind force and wind direction. Since it is to be expected over a certain extended period of time that a corresponding wind direction occurs more frequently in a given wind direction grid and a corresponding wind force in a predefined corresponding wind force grid, an average value for the energy yield can also be stored in the database and the number of occurrences of corresponding wind data ,
Um entsprechende Wartungseinsätze bzw. Wartungsarbeiten bei möglichst geringem Energieverlust bzw. Ertragsverlust auszuführen, kann vorgesehen sein, aus einem Wettervorhersagemodell die Windgeschwindigkeit und die Windrichtung oder andere Wetterdaten einzugeben, dann zudem die Windenergieanlagen, die zu warten sind und die Zeitdauer der Wartung, als auch die Anzahl der möglichen parallelen Einsätze bzw. parallelen Wartungsarbeiten. Es kön-
nen dann aufgrund der Wettervorhersage bzw. Wetterprognose Ertragsverluste auf zeitliche Mittelwerte heruntergerechnet werden, wie beispielsweise auf zehn Minuten Mittelwerte. Die Ertragsverluste können so aufgrund der Wartungsarbeiten bestimmt werden und die Wartungsarbeiten entsprechend iterativ verschoben werden, um die entsprechenden meteorologischen Bedingungen einzuhalten. Es wird dann eine Wartungsarbeitszeitenreihenfolge ausgegeben, mittels der ein möglichst geringer Energieertragsverlust erzielbar ist. In order to carry out corresponding maintenance operations or maintenance work with the least possible energy loss or yield loss, it may be provided to input the wind speed and the wind direction or other weather data from a weather forecast model, then also the wind turbines to be maintained and the duration of the maintenance, as well as Number of possible parallel operations or parallel maintenance work. It can Then based on the weather forecast or weather forecast yield losses are downscaled to temporal means, such as ten minutes averages. The yield losses can thus be determined on the basis of the maintenance work and the maintenance work can be postponed accordingly iteratively in order to comply with the corresponding meteorological conditions. A maintenance working time sequence is then output, by means of which the lowest possible energy yield loss can be achieved.
Weitere Merkmale der Erfindung werden aus der Beschreibung erfindungsgemäßer Ausführungsformen zusammen mit den Ansprüchen und der beigefügten Zeichnung ersichtlich. Erfindungsgemäße Ausführungsformen können einzelne Merkmale oder eine Kombination mehrerer Merkmale erfüllen. Further features of the invention will become apparent from the description of embodiments according to the invention together with the claims and the accompanying drawings. Embodiments of the invention may satisfy individual features or a combination of several features.
Die Erfindung wird nachstehend ohne Beschränkung des allgemeinen Erfindungsgedankens anhand von Ausführungsbeispielen unter Bezugnahme auf die Zeichnung beschrieben, wobei bezüglich aller im Text nicht näher erläuterten erfindungsgemäßen Einzelheiten ausdrücklich auf die Zeichnung verwiesen wird. Es zeigt: The invention will be described below without limiting the general inventive concept using exemplary embodiments with reference to the drawing, reference being expressly made to the drawing with respect to all in the text unspecified details of the invention. It shows:
Fig. 1 schematisch eine Draufsicht auf einen Windenergieanla- genpark mit 48 Windenergieanlagen bei einem bestimmten Wind. Fig. 1 shows schematically a plan view of a wind energy plant park with 48 wind turbines at a given wind.
Fig. 1 zeigt eine schematische Draufsicht auf einen Windenergiean- lagenpark mit 48 Windenergieanlagen bei einem bestimmten Wind 50 mit einer Windrichtung und einer Windstärke. Der Windenergie- anlagenpark hat die Bezugsziffer 51 . Die Windenergieanlagen sind mit den Bezugsziffern 1 bis 48 gekennzeichnet. Bei einer Windrichtung gemäß dem Wind 50 haben die Windenergieanlagen 1 bis 5 eine optimale Anströmung und damit einen optimalen Energieertrag.
Zudem haben auch die Windenergieanlagen 7, 9, 1 1 und 13 einen optimalen Energieertrag, da diese unmittelbar dem Wind ausgesetzt sind. Alle im Windschatten dieser Windenergieanlagen stehenden Windenergieanlagen bekommen die Energieentnahme aus dem Wind der vorgelagerten Windenergieanlagen 1 bis 5, 7, 9, 1 1 und 13 zu spüren und entnehmen dem Wind weniger Energie und produzieren damit weniger Leistung. Wenn nun beispielsweise an den Windenergieanlagen 1 , 6, 20 und 36 Wartungsarbeiten auszuführen wären, würde bei einer entsprechenden Windrichtungsprognose gemäß dem Wind 50 bevorzugt zunächst die Windenergieanlage 36 und gegebenenfalls auch 20 gewartet werden, da so der Energieertragsverlust am geringsten ist. Es würde zudem versucht werden, die Wartung der Windenergieanlage 1 auf einen späteren Zeitpunkt zu verschieben, wenn der Wind beispielsweise aus der entgegengesetzten Richtung weht. Hierdurch kann der Ertragsverlust reduziert werden. 1 shows a schematic plan view of a wind energy plant park with 48 wind turbines for a specific wind 50 with a wind direction and a wind force. The wind energy plant park has the reference numeral 51. The wind turbines are marked with the reference numbers 1 to 48. In a wind direction according to the wind 50, the wind turbines 1 to 5 have an optimal flow and thus optimum energy yield. In addition, the wind turbines 7, 9, 1 1 and 13 have an optimal energy yield, since they are exposed directly to the wind. All in the slipstream of these wind turbines standing wind turbines get the energy from the wind of the upstream wind turbines 1 to 5, 7, 9, 1 1 and 13 to feel and take the wind less energy and thus produce less power. For example, if maintenance work were to be carried out on wind turbines 1, 6, 20 and 36, the wind power plant 36 and optionally also 20 would be serviced first, given a corresponding wind direction forecast according to the wind 50, since the energy yield loss is the lowest. It would also be attempted to postpone the maintenance of the wind turbine 1 to a later date, when the wind blows, for example, from the opposite direction. This can reduce the loss of revenue.
Sollen beispielsweise alle Windenergieanlagen des Windenergiean- lagenparks 51 auf eine bestimmte Art gewartet werden, könnten auch Windenergieanlagen parallel gewartet werden. So könnte es bevorzugt sein, zunächst die Windenergieanlagen 46 bis 48 zu warten, wenn die Prognose für die meteorologische Bedingung so ist, dass für den Zeitraum der Wartung die Windrichtung des Windes 50 vorherrscht. Ist allerdings abzusehen, dass nur für einen kurzen Bruchteil der Wartungszeit die Windrichtung so ist wie in Fig. 1 gezeigt, und später, und zwar für den wesentlichen Teil der Dauer der Wartungsarbeiten, ein Sturm in beispielsweise der entgegengesetzten Richtung zu erwarten ist, könnte es Sinn machen, zunächst Windenergieanlagen zu warten, die mitten im Windenergieanlagen- park angeordnet sind, wie beispielsweise die Windenergieanlagen 16, 23, 31 , 17, 24, 32 und 18, 25, 33.
Ebenso könnte es für das in Fig. 1 gezeigte Beispiel sinnvoll sein, bei der vorherrschenden Windrichtung 50 und geringer Windturbulenz zunächst die Wartung auf den Anlagen 15, 16, 17, 18 und 19, also der zweiten Reihe, durchzuführen. Aus Messungen ist bekannt, dass an turbulenzarmen Standorten bei gleichmäßigen Reihenabständen häufig die 2. Reihe den geringsten Energieertrag erzeugt, was auf die noch verhältnismäßig geringe Turbulenz im Nachlauf der ersten Windenergieanlagen-Reihe zurückgeführt wird. Weiter hinten im Windpark ist die Windturbulenz generell höher, was dazu führt, dass hinter einer hinteren Windenergieanlage im Betrieb die Luft auch schneller mit energiereicher Strömung durchmischt wird, so dass die Strömung sich von der Energieentnahme schneller„erholt". Bei Stillsetzung der Anlagen der 2. Reihe steigt der Energieertrag der Windenergieanlagen 21 , 23, 24, 25 und 27, da für diese Windenergieanlagen der Abstand zur nächsten im Betrieb befindlichen Windenergieanlage steigt und die Strömung somit mehr Zeit hat, zu beschleunigen. If, for example, all wind turbines of the wind energy park 51 are to be maintained in a certain way, wind turbines could also be maintained in parallel. Thus, it may be preferable to firstly wait for the wind turbines 46 to 48 if the forecast for the meteorological condition is such that the wind direction of the wind 50 prevails for the period of the maintenance. However, if it is foreseen that only for a short fraction of the maintenance time the wind direction is as shown in Fig. 1, and later, for the major part of the duration of the maintenance, a storm is to be expected in, for example, the opposite direction Make sense first to wait for wind turbines, which are located in the middle of the wind turbine park, such as the wind turbines 16, 23, 31, 17, 24, 32 and 18, 25, 33. Likewise, it might be useful for the example shown in FIG. 1 to first carry out the maintenance on the systems 15, 16, 17, 18 and 19, ie the second row, in the prevailing wind direction 50 and low wind turbulence. From measurements it is known that at turbulence-poor locations with uniform row spacings often the second row produces the lowest energy yield, which is attributed to the still relatively low turbulence in the wake of the first wind turbine series. Further down in the wind farm, wind turbulence is generally higher, which means that behind a rear wind turbine in operation, the air is also mixed faster with high-energy flow, so that the flow of the energy extraction "recovered" faster In the series, the energy yield of the wind turbines 21, 23, 24, 25 and 27 increases because for these wind turbines the distance to the next operating wind turbine increases and the flow thus has more time to accelerate.
Sofern die Abstände der Windenergieanlagen relativ groß sind, kann bei der Reihenfolge der Wartungsarbeiten berücksichtigt werden, dass die Zeit für das Wartungsteam, um beispielsweise von der Windenergieanlage 28 zur Windenergieanlage 1 zu gelangen, sehr groß ist, so dass alleine hierdurch wirtschaftliche Aspekte hinzukommen, die bevorzugt auch zu berücksichtigen sind. If the distances of the wind turbines are relatively large, can be taken into account in the order of maintenance that the time for the maintenance team, for example, to get from the wind turbine 28 to the wind turbine 1, is very large, so that this alone economic aspects are added preferably also to be considered.
Alle genannten Merkmale, auch die der Zeichnung allein zu entnehmenden sowie auch einzelne Merkmale, die in Kombination mit anderen Merkmalen offenbart sind, werden allein und in Kombination als erfindungswesentlich angesehen. Erfindungsgemäße Ausführungsformen können durch einzelne Merkmale oder eine Kombination mehrerer Merkmale erfüllt sein. Im Rahmen der Erfindung ist ein mit insbesondere abgegrenztes Merkmal vorzugsweise ein fakultati-
ves Merkmal.
All mentioned features, including those of the drawing alone to be taken as well as individual features that are disclosed in combination with other features are considered alone and in combination as essential to the invention. Embodiments of the invention may be accomplished by individual features or a combination of several features. In the context of the invention, a particularly delineated feature is preferably an optional feature. feature.
Bezuqszeichenliste LIST OF REFERENCES
1 - 48 Windenergieanlage 50 Wind 51 Windenergieanlage
1 - 48 Wind energy plant 50 Wind 51 Wind energy plant
Claims
1. Verfahren zum Betreiben eines Windenergieanlagenparks (51 ) mit mehreren Windenergieanlagen (1 - 48), wobei bei wenigstens einer Anzahl von Windenergieanlagen (1 - 48) Wartungsarbeiten auszuführen sind, mit den folgenden Verfahrensschritten: A method of operating a wind turbine park (51) having a plurality of wind turbines (1 - 48), wherein at least a number of wind turbines (1 - 48) are to be carried out maintenance, comprising the following method steps:
Beschaffen oder zur Verfügung stellen einer Prognose von meteorologischen Bedingungen, Providing or providing a forecast of meteorological conditions,
Ermitteln von Ertragsverlusten der Windenergieanlagen (1 - 48) aus der Anzahl von Windenergieanlagen (1 - 48), bei denen Wartungsarbeiten durchzuführen sind, in Abhängigkeit der Prognose von meteorologischen Bedingungen, Determining yield losses of wind turbines (1 - 48) from the number of wind turbines (1 - 48) at which maintenance work is to be carried out, depending on the prognosis of meteorological conditions,
Erstellen einer Reihenfolge durchzuführender Wartungsarbeiten,
Steuern des Betriebs der Anzahl von Windenergieanlagen (1 - 48), bei denen Wartungsarbeiten auszuführen sind in Abhängigkeit der erstellten Reihenfolge durchzuführender Wartungsarbeiten, um Wartungsarbeiten auszuführen oder ausführbar zu machen, wobei das Steuern des Betriebs der Anzahl von Windenergieanlagen (1 - 48) ein zeitweises Stillsetzen der jeweiligen Windenergieanlage (1 - 48) oder einen leistungsverminderten Betrieb der jeweiligen Windenergieanlage (1 - 48) vorsieht, an der zu einer vorgegebenen Zeit Wartungsarbeiten auszuführen sind oder ausgeführt werden. Creating a sequence of maintenance work, Controlling the operation of the number of wind turbines (1 - 48) at which maintenance is to be performed depending on the order of maintenance to be performed to perform or perform maintenance, wherein controlling the operation of the number of wind turbines (1 - 48) is a temporary one Stopping the respective wind turbine (1 - 48) or a reduced-power operation of the respective wind turbine (1 - 48) provides, are carried out at the at a given time maintenance or run.
Verfahren nach Anspruch 1 , dadurch gekennzeichnet, dass das Ermitteln von Ertragsverlusten der Windenergieanlagen (1 - 48) in Abhängigkeit der Prognose der meteorologischen Bedingungen mittels einer gespeicherten Ertragsmatrix des Windenergieanlagenparks (51 ) geschieht. A method according to claim 1, characterized in that the determination of yield losses of the wind turbines (1 - 48) depending on the forecast of the meteorological conditions by means of a stored yield matrix of the wind turbine park (51).
Verfahren nach Anspruch 1 oder 2, dadurch gekennzeichnet, dass das Ermitteln von Ertragsverlusten der Windenergieanlagen (1 - 48) in Abhängigkeit der meteorologischen Bedingungen mittels rechnerischer Simulation anhand der Prognose der meteorologischen Daten geschieht. A method according to claim 1 or 2, characterized in that the determination of yield losses of the wind turbines (1 - 48) depending on the meteorological conditions by means of computational simulation based on the forecast of the meteorological data.
Verfahren nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, dass nach erfolgter Wartung einer Windenergieanlage (1 - 48) das Verfahren anhand einer aktualisierten Prognose von meteorologischen Bedingungen erneut durchgeführt wird. Method according to one of claims 1 to 3, characterized in that after the maintenance of a wind turbine (1 - 48), the method is performed again using an updated forecast of meteorological conditions.
Verfahren nach einem der Ansprüche 1 bis 4, dadurch ge-
kennzeichnet, dass bei der Ermittlung der Ertragsdaten berücksichtigt wird, dass eine Windenergieanlage (1 - 48), die im Windschatten einer zu Wartungszwecken stillgesetzten Windenergieanlage (1 - 48) angeordnet ist, einen höheren Ertrag erwirtschaftet im Vergleich zu dem Betrieb der im Windschatten angeordneten Windenergieanlage (1 - 48) bei einer im Betrieb befindlichen den Windschatten erzeugenden Windenergieanlage (1 - 48). Method according to one of claims 1 to 4, characterized indicates that when determining the yield data is taken into account that a wind turbine (1 - 48), which is located in the lee of a shut down for maintenance wind turbine (1-48), generates a higher yield compared to the operation of arranged in the slipstream wind turbine (1 - 48) at a windshield producing wind turbine (1 - 48) in operation.
Verfahren nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, dass bei der Bestimmung der Reihenfolge der Wartungsarbeiten eine Wegezeit, Transportkosten, Ersatzteillogistik und/oder Gruppierungseffekte berücksichtigt werden. Method according to one of claims 1 to 5, characterized in that in the determination of the order of the maintenance work a travel time, transport costs, spare parts logistics and / or grouping effects are taken into account.
Verfahren nach einem der Ansprüche 1 bis 6, dadurch gekennzeichnet, dass die Ermittlung der Ertragsverluste in vorgebbaren Zeitintervallen geschieht. Method according to one of claims 1 to 6, characterized in that the determination of the yield losses happens at predeterminable time intervals.
Verfahren nach einem der Ansprüche 1 bis 7, dadurch gekennzeichnet, dass das Erstellen der Reihenfolge durchzuführender Wartungsarbeiten iterativ geschieht. Method according to one of claims 1 to 7, characterized in that the creation of the order of maintenance to be performed iteratively.
Verfahren nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, dass die Prognose von meteorologischen Bedingungen eine Prognose einer Windgeschwindigkeit (50) und einer Windrichtung (50) umfasst. Method according to one of claims 1 to 8, characterized in that the forecast of meteorological conditions includes a forecast of a wind speed (50) and a wind direction (50).
Verfahren nach einem der Ansprüche 1 bis 9, dadurch gekennzeichnet, dass zusätzlich vergangene meteorologische Bedingungen, insbesondere statistisch, berücksichtigt werden, wobei insbesondere Wartungsarbeiten, die zeitlich verschoben werden können, bei einer für die Wartungsarbeiten
verbesserten zukünftigen statistischen Prognose für vorbestimmte meteorologische Bedingungen, das Stillsetzen oder der leistungsverminderte Betrieb der jeweiligen Windenergieanlage (1 - 48) ausgesetzt wird . Method according to one of claims 1 to 9, characterized in that in addition past meteorological conditions, in particular statistically, are taken into account, in particular maintenance work that can be postponed in time, one for the maintenance work improved future statistical forecast for predetermined meteorological conditions, the shutdown or the reduced power operation of the respective wind turbine (1 - 48) is exposed.
Verfahren nach einem der Ansprüche 6 bis 1 0, dadurch gekennzeichnet, dass als zu berücksichtigender Gruppierungseffekt berücksichtigt wird , dass mehrere Windenergieanlagen (1 - 48) über einen elektrischen Strang angeschlossen sind oder eine gemeinsame Transformatorstation und/oder ein gemeinsames Umspannwerk für mehrere Windenergieanlagen (1 - 48) im Windenergieanlagenpark (51 ) vorgesehen sind .
Method according to one of claims 6 to 1 0, characterized in that is taken into account as grouping effect to be considered that several wind turbines (1 - 48) are connected via an electrical line or a common transformer station and / or a common substation for several wind turbines (1 - 48) in the wind turbine park (51) are provided.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102013210090.6 | 2013-05-29 | ||
DE102013210090.6A DE102013210090A1 (en) | 2013-05-29 | 2013-05-29 | Method for operating a wind energy plant park |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2014191067A1 true WO2014191067A1 (en) | 2014-12-04 |
Family
ID=50280344
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/EP2014/000598 WO2014191067A1 (en) | 2013-05-29 | 2014-03-10 | Method for operating a wind turbine park |
Country Status (2)
Country | Link |
---|---|
DE (1) | DE102013210090A1 (en) |
WO (1) | WO2014191067A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102018000088A1 (en) | 2018-01-09 | 2019-07-11 | Senvion Gmbh | Method for operating a wind power plant, in particular maintenance control |
EP3536950A1 (en) | 2018-03-06 | 2019-09-11 | Senvion GmbH | Method and system for performing maintenance on a wind turbine in a group of wind turbines |
CN111295600A (en) * | 2017-10-30 | 2020-06-16 | 福斯4X股份有限公司 | Method for forecasting the output of a wind farm in icing conditions |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102015015596A1 (en) * | 2015-12-04 | 2017-06-08 | Senvion Gmbh | Method for monitoring a wind turbine |
KR101704937B1 (en) * | 2015-12-07 | 2017-02-22 | 두산중공업 주식회사 | System and method for repairing wind generator based on weather's information |
EP3839253B1 (en) * | 2019-12-20 | 2022-05-11 | Wobben Properties GmbH | Method for determining the energy production of a wind turbine |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6975925B1 (en) * | 2002-03-19 | 2005-12-13 | Windlynx Systems, B.V. | Forecasting an energy output of a wind farm |
EP2148225A1 (en) * | 2008-07-22 | 2010-01-27 | Siemens Aktiengesellschaft | Method and arrangement for the forecast of wind-resources |
DE102009004385A1 (en) * | 2009-01-12 | 2010-07-15 | Repower Systems Ag | Method and device for monitoring a wind turbine |
WO2011095519A2 (en) * | 2010-02-05 | 2011-08-11 | Vestas Wind Systems A/S | Method of operating a wind power plant |
DE102011081241A1 (en) * | 2011-08-19 | 2013-02-21 | Repower Systems Se | Energy yield loss determination of a wind turbine |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6925385B2 (en) * | 2003-05-16 | 2005-08-02 | Seawest Holdings, Inc. | Wind power management system and method |
JP2006342766A (en) * | 2005-06-10 | 2006-12-21 | Mitsubishi Electric Corp | Monitoring system of wind power generating facility |
EP2267305B1 (en) * | 2009-06-24 | 2016-01-13 | Vestas Wind Systems A/S | A method and a system for controlling operation of a wind turbine |
US20100280872A1 (en) * | 2009-08-27 | 2010-11-04 | Scholte-Wassink Hartmut | Methods and systems for monitoring and scheduling operations and maintenance activities |
WO2011143531A2 (en) * | 2010-05-13 | 2011-11-17 | University Of Cincinnati | Turbine-to-turbine prognostics technique for wind farms |
DE102011003799C5 (en) | 2011-02-08 | 2017-10-26 | Wobben Properties Gmbh | Method for determining lost energy |
-
2013
- 2013-05-29 DE DE102013210090.6A patent/DE102013210090A1/en not_active Withdrawn
-
2014
- 2014-03-10 WO PCT/EP2014/000598 patent/WO2014191067A1/en active Application Filing
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6975925B1 (en) * | 2002-03-19 | 2005-12-13 | Windlynx Systems, B.V. | Forecasting an energy output of a wind farm |
EP2148225A1 (en) * | 2008-07-22 | 2010-01-27 | Siemens Aktiengesellschaft | Method and arrangement for the forecast of wind-resources |
DE102009004385A1 (en) * | 2009-01-12 | 2010-07-15 | Repower Systems Ag | Method and device for monitoring a wind turbine |
WO2011095519A2 (en) * | 2010-02-05 | 2011-08-11 | Vestas Wind Systems A/S | Method of operating a wind power plant |
DE102011081241A1 (en) * | 2011-08-19 | 2013-02-21 | Repower Systems Se | Energy yield loss determination of a wind turbine |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111295600A (en) * | 2017-10-30 | 2020-06-16 | 福斯4X股份有限公司 | Method for forecasting the output of a wind farm in icing conditions |
DE102018000088A1 (en) | 2018-01-09 | 2019-07-11 | Senvion Gmbh | Method for operating a wind power plant, in particular maintenance control |
EP3536950A1 (en) | 2018-03-06 | 2019-09-11 | Senvion GmbH | Method and system for performing maintenance on a wind turbine in a group of wind turbines |
DE102018001763A1 (en) | 2018-03-06 | 2019-09-12 | Senvion Gmbh | Method and system for servicing a wind turbine from a group of wind turbines |
CN110230575A (en) * | 2018-03-06 | 2019-09-13 | 森维安有限公司 | Safeguard the method and system of a wind power plant of one group of wind power plant |
US10711767B2 (en) | 2018-03-06 | 2020-07-14 | Senvion Gmbh | Method and system for the maintenance of a wind energy installation from a group of wind energy installations |
Also Published As
Publication number | Publication date |
---|---|
DE102013210090A1 (en) | 2014-12-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2659136B1 (en) | Wind farm and method for operating a wind farm | |
DE102009004385B4 (en) | Method and device for monitoring a wind turbine | |
WO2014191067A1 (en) | Method for operating a wind turbine park | |
EP1389682B1 (en) | Method for operating a wind park | |
EP3047554B1 (en) | Method for controlling a power consumption of a group of a plurality of wind turbines | |
DE19948196A1 (en) | Process for operating a wind farm | |
EP3536950B1 (en) | Method and system for performing maintenance on a wind turbine in a group of wind turbines | |
DE202008017271U1 (en) | System for the use of renewable energy sources | |
EP2672111A2 (en) | Target-value dependent control of a wind farm | |
DE102012215565A1 (en) | Method for controlling system pool of current generators, involves providing environmental data prediction, particularly of weather prediction, for determined period, and creating feed-in power prediction of systems pool | |
DE102018129810A1 (en) | Method and device for controlling a number of energy-feeding and / or energy-consuming units | |
EP3486479B1 (en) | Method for operation of a wind farm and wind farm | |
DE19926553B4 (en) | Sected | |
EP3598354A1 (en) | Offshore wind energy system | |
EP2834898B1 (en) | Method for determining measuring points in low-voltage networks, and network management subsystem for carrying out the method | |
EP2577829A1 (en) | Method and system for adapting a production flow schedule for a production process | |
DE102014222687A1 (en) | Control of a power network | |
DE102011100981A1 (en) | Operating procedure for a wind turbine | |
DE102019117985A1 (en) | Method for optimizing the technical management of individual wind turbines in a wind farm | |
DE102013002662A1 (en) | Method for operating wind energy plant of wind farm, involves determining target operation target to limit mechanical load at one of wind energy plants using first degree of wear and second degree of wear of wind energy plants | |
DE102019119909B4 (en) | Method for operating a wind turbine and computer program product | |
DE102018131188A1 (en) | Method for operating at least one wind turbine and device therefor | |
DE102014223762A1 (en) | Method and device for monitoring at least one wind turbine, ensprechende wind turbine and a wind farm | |
EP4421570A1 (en) | Method and device for regulating one or more operating means of an energy system | |
WO2021074002A1 (en) | Method for controlling a wind farm and device for controlling a wind farm |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 14710192 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 14710192 Country of ref document: EP Kind code of ref document: A1 |