WO2012169402A1 - 受信装置及び方法、情報配信装置及び方法、並びに情報配信システム - Google Patents

受信装置及び方法、情報配信装置及び方法、並びに情報配信システム Download PDF

Info

Publication number
WO2012169402A1
WO2012169402A1 PCT/JP2012/063910 JP2012063910W WO2012169402A1 WO 2012169402 A1 WO2012169402 A1 WO 2012169402A1 JP 2012063910 W JP2012063910 W JP 2012063910W WO 2012169402 A1 WO2012169402 A1 WO 2012169402A1
Authority
WO
WIPO (PCT)
Prior art keywords
distribution
information
power supply
content
unit
Prior art date
Application number
PCT/JP2012/063910
Other languages
English (en)
French (fr)
Inventor
山岸 靖明
Original Assignee
ソニー株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ソニー株式会社 filed Critical ソニー株式会社
Priority to EP12796031.8A priority Critical patent/EP2696509A4/en
Priority to BR112013030863A priority patent/BR112013030863A2/pt
Priority to US14/122,816 priority patent/US20140109164A1/en
Priority to RU2013153242/07A priority patent/RU2013153242A/ru
Priority to KR1020137031007A priority patent/KR20140036195A/ko
Priority to CN201280026357.6A priority patent/CN103563259A/zh
Publication of WO2012169402A1 publication Critical patent/WO2012169402A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04HBROADCAST COMMUNICATION
    • H04H20/00Arrangements for broadcast or for distribution combined with broadcast
    • H04H20/12Arrangements for observation, testing or troubleshooting
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04BTRANSMISSION
    • H04B1/00Details of transmission systems, not covered by a single one of groups H04B3/00 - H04B13/00; Details of transmission systems not characterised by the medium used for transmission
    • H04B1/06Receivers
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04NPICTORIAL COMMUNICATION, e.g. TELEVISION
    • H04N21/00Selective content distribution, e.g. interactive television or video on demand [VOD]
    • H04N21/40Client devices specifically adapted for the reception of or interaction with content, e.g. set-top-box [STB]; Operations thereof
    • H04N21/43Processing of content or additional data, e.g. demultiplexing additional data from a digital video stream; Elementary client operations, e.g. monitoring of home network or synchronising decoder's clock; Client middleware
    • H04N21/443OS processes, e.g. booting an STB, implementing a Java virtual machine in an STB or power management in an STB
    • H04N21/4436Power management, e.g. shutting down unused components of the receiver
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00002Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by monitoring
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00032Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
    • H02J13/00034Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/30State monitoring, e.g. fault, temperature monitoring, insulator monitoring, corona discharge

Definitions

  • the present technology relates to a receiving apparatus and method, an information distribution apparatus and method, and an information distribution system, and in particular, a receiving apparatus and method, an information distribution apparatus and method that can reduce a load on a power system during information distribution. And an information distribution system.
  • a technique called cognitive radio which enables effective use of frequencies by recognizing the radio environment and dynamically switching communication systems and frequencies used by terminal devices and base stations.
  • a frequency sharing type system that uses a frequency assigned to an existing radio system in another radio system is being put into practical use.
  • a frequency band that is allocated to an existing wireless system but is not used in the area or has a limited use time can be used in another wireless system.
  • practical use is being promoted as a technique for utilizing an empty TV broadcast channel, so-called TV white space (see, for example, Non-Patent Document 1).
  • Non-Patent Document 1 a database (white space database: WSDB (White Space Data Base)) that registers frequencies and time zones that can be used for each region is installed, and wireless devices (TVBD (TV Band Devices)) are installed. It describes a mechanism for inquiring whether or not the frequency can be used based on the current position.
  • WSDB White Space Data Base
  • TVBD TV Band Devices
  • broadcasting media represented by television broadcasting has a broadcast function as a distribution characteristic. To make the best use of this distribution characteristic, the broadcast data is received simultaneously. It is necessary to maximize the number of terminal devices.
  • This technology has been made in view of such a situation, and is intended to reduce the load on the power system during information distribution.
  • the receiving device receives the content based on the distribution information of the content distributed using the distribution frequency band in the distribution time zone, which is notified from the information distribution device that distributes the content.
  • a power supply information notifying unit for notifying a power supply information including information on a power supply amount and a power supply time at the time of reception to a monitoring control device that monitors and controls power supply of the power system, and the power supply by the monitoring control device
  • a control unit configured to control the content to be receivable based on the notified distribution information when the power supply in the distribution time period is ensured by evaluating whether power supply is possible based on the information;
  • a content receiving unit that receives the content distributed from the distribution device.
  • the power supply information notification unit is redistributed from the information distribution device when the power supply in the distribution time period cannot be secured by the evaluation of the power supply availability based on the power supply information by the monitoring control device. Based on the above, the power supply information is notified to the monitoring control device.
  • the control unit selects a desired content from the content distributed from the information distribution device based on the notified distribution information, and the power supply information notification unit relates to the selected content Notify power supply information.
  • control unit Based on the selected distribution information of the content, the control unit activates the receiving device to make the content receivable immediately before the content is distributed from the information distribution device. To do.
  • the distribution time zone and the distribution frequency band are determined based on frequency usage status information regarding the usage status of the frequency band for each time zone in each predetermined region.
  • the reception method according to the first aspect of the present technology is a reception method corresponding to the reception device according to the first aspect of the present technology described above.
  • the content is based on the distribution information of the content distributed using the distribution frequency band in the distribution time zone, which is notified from the information distribution device that distributes the content.
  • the power supply information including information on the power supply amount and the power supply time when receiving the power is notified to the monitoring control device that monitors and controls the power supply of the power system, and the power supply information based on the power supply information by the monitoring control device.
  • An information distribution apparatus includes a content acquisition unit that acquires content to be distributed, and frequency usage status information that acquires frequency usage status information regarding the usage status of a frequency band for each time zone in a predetermined region.
  • a distribution information notification unit for notifying a device of distribution information of the content distributed using the distribution frequency band in the distribution time zone, and a plurality of receiving devices in the region
  • a monitoring control device that monitors and controls the power supply of the power system, including power supply information including information on the power supply amount and the power supply time when receiving the content.
  • a power supply evaluation result receiving unit that receives evaluation results of whether or not power can be supplied to the plurality of receiving devices in the distribution time zone, and in the distribution time zone by evaluating whether or not power supply is possible.
  • the plurality of receiving devices that are capable of distributing the acquired content according to the distribution information using the distribution frequency band
  • the distribution information notifying unit when the power supply in the distribution time zone cannot be secured by evaluating whether or not the power supply is possible, or either of the distribution time zone and the distribution frequency band or The distribution information in which both are changed is notified to a plurality of receiving devices in the area.
  • An evaluation reference information acquisition unit that acquires evaluation reference information serving as a reference when evaluating the distribution time band and the distribution frequency band, and the distribution evaluation unit, based on the acquired evaluation reference information, The time zone and the distribution frequency band are evaluated.
  • the evaluation criterion information highly evaluates the cost of a time zone in which viewing of the content by a larger number of viewers is expected, and highly evaluates the cost of a frequency band in which the distribution bit rate of the content is expected to be higher. Is the standard.
  • the evaluation standard information is a standard for highly evaluating the cost of a time zone in which viewing of the content by more viewers is expected.
  • the evaluation criterion information is a criterion for highly evaluating the cost of the frequency band where the distribution bit rate of the content is expected to be higher.
  • the frequency usage status information acquisition unit acquires the frequency usage status information for each region from an information management device that manages the frequency usage status information for each region.
  • the information distribution device includes a distribution device and a management device, the distribution device includes the content acquisition unit and the content distribution unit, and the management device includes the frequency usage status information acquisition unit, The distribution evaluation unit, the distribution information notification unit, and the power supply evaluation result reception unit.
  • the information distribution method according to the second aspect of the present technology is an information distribution method corresponding to the information distribution apparatus according to the second aspect of the present technology described above.
  • the content to be distributed is acquired, the frequency usage status information regarding the usage status of the frequency band for each time zone in each predetermined region is acquired, and the acquired frequency usage Based on the situation information, the distribution time band for distributing the acquired content and the distribution frequency band used for the distribution are evaluated, and the distribution frequency band is used for the distribution time band for a plurality of receiving devices in the region.
  • the distribution information of the content to be distributed is notified, and the power supply information including information on the power supply amount and the power supply time when the plurality of receiving devices in the region receive the content based on the distribution information is An evaluation result of whether or not power can be supplied to a plurality of receiving devices in a distribution time period, which is evaluated by notifying a monitoring control device that monitors and controls power supply Is received and the power supply in the distribution time zone is secured by evaluating the availability of power supply.
  • the distribution time zone is reached, the acquired content is distributed according to the distribution information using the distribution frequency band.
  • Distribution information that is distributed to a plurality of receiving devices that are in a possible state, and when one or both of the distribution time band and the distribution frequency band is changed when the power supply in the distribution time band cannot be secured by evaluating whether or not the power supply is possible Is notified to a plurality of receiving devices in the area.
  • An information distribution system is an information distribution system including an information distribution apparatus, an information management apparatus, a plurality of reception apparatuses, and a monitoring control apparatus that monitors and controls power supply of an electric power system.
  • the distribution device includes: a content acquisition unit that acquires content to be distributed; and the frequency usage status information that manages frequency usage status information related to a frequency band usage status for each time zone in each predetermined region.
  • a frequency usage status information acquisition unit for acquiring the content, a distribution time zone for distributing the acquired content based on the acquired frequency usage status information, a distribution evaluation unit for evaluating a distribution frequency band used for the distribution, The content distributed to the plurality of receiving devices in the region using the distribution frequency band in the distribution time zone.
  • a power supply information notification unit configured to notify the power supply information including information related to a power supply time to the monitoring control device, wherein the monitoring control device is based on the power supply information notified from each of the plurality of receiving devices;
  • a power supply evaluation unit that evaluates whether or not power can be supplied to the plurality of receiving devices in the distribution time period; and a power supply result notification unit that notifies the information distribution device of the evaluated result of whether or not power supply is possible.
  • the information distribution device further includes: a power supply evaluation result receiving unit that receives a result of power supply availability notified from the monitoring control device; and power supply availability
  • a power supply evaluation result receiving unit that receives a result of power supply availability notified from the monitoring control device
  • power supply availability When power supply in the distribution time zone is ensured by the evaluation, when the distribution time zone is reached, the acquired content can be distributed according to the distribution information using the distribution frequency band.
  • the distribution information in which one or both of the bands are changed is notified to a plurality of receiving devices in the area, and each of the receiving devices further supplies power in the distribution time zone by evaluating whether or not power can be supplied.
  • a control unit that controls the content to be receivable based on the notified distribution information, and the information distribution device
  • a content receiving unit that receive
  • the information distribution device, the information management device, the plurality of receiving devices, and the monitoring control device may be independent devices, or may be internal blocks constituting one device.
  • the information distribution system is information in which content to be distributed is acquired by an information distribution device, and frequency usage status information regarding frequency band usage status in each predetermined time zone is managed.
  • Frequency usage information is acquired from the management device, and based on the acquired frequency usage status information, a distribution time zone for distributing the acquired content and a distribution frequency band used for the distribution are evaluated, The distribution information of the content distributed using the distribution frequency band in the distribution time zone is notified to the reception device, and the content is transmitted based on the distribution information notified from the information distribution device by a plurality of reception devices.
  • the power supply information including information on the power supply amount and the power supply time at the time of reception is notified to the monitoring control device, and the monitoring control device On the basis of the power supply information notified from each of the plurality of receiving devices, whether or not power can be supplied to the plurality of receiving devices in the distribution time period is evaluated, and the evaluated result of whether or not power supply is possible is notified to the information distributing device
  • the information distribution device receives the result of the power supply availability notified from the monitoring control device, and when the power supply in the distribution time zone is secured by the evaluation of the power supply availability, the distribution time zone is reached.
  • the acquired content is distributed to a plurality of receiving devices that can be distributed according to the distribution information, and the power supply in the distribution time period cannot be secured by evaluating whether or not the power can be supplied.
  • distribution information in which one or both of the distribution time band and the distribution frequency band is changed is notified to a plurality of receiving apparatuses in the region, and
  • each of the contents is controlled to be in a state where the content can be received based on the notified distribution information and distributed from the information distribution device. Content to be received.
  • FIG. 1 is a diagram illustrating a configuration of an embodiment of a content distribution system of the present technology.
  • the content distribution system 1 includes a broadcast server 11, a broadcast resource management server 12, WSDBs 21-1 to 21-N, and TVBDs 31-1 to 31-M.
  • the user homes 5-1 to 5-M in which the TVBDs 31-1 to 31-M are arranged are connected to the power network 6 through power lines, and further, the power network 6 includes a power plant 7, an office 8, A factory 9 and a power control server 41 are connected.
  • the broadcast server 11 is a dedicated server that distributes content.
  • the broadcast server 11 is arranged in the facility of the service provider 3.
  • the service provider 3 is a company that provides a distribution service for content such as television programs and movies.
  • the broadcast server 11 acquires the content to be distributed, and requests the broadcast resource management server 12 for the distribution schedule of the content.
  • the broadcast resource management server 12 is a dedicated server that manages content distribution.
  • the broadcast resource management server 12 is arranged in the facility of the service provider 3.
  • the broadcast server 11 and the broadcast resource management server 12 are arranged in the same facility, for example, and exchange various data by wired or wireless communication using a predetermined communication method.
  • the broadcast resource management server 12 inquires the WSDB 21-1 to 21-N about the usage status of the frequency band for each time zone via the transmission path 2.
  • WSDB 21-1 to 21-N (N: 1, 2,..., N) store information on frequency usage status for each time zone in each region (hereinafter referred to as frequency usage status information) in a white space database (WSDB: A dedicated server managed by White : Space Data Base).
  • the WSDBs 21-1 to 21-N are arranged in the network provider 4 facility.
  • the network provider 4 is an operator that provides frequency usage status information.
  • the WSDBs 21-1 to 21 -N notify the broadcast resource management server 12 of the frequency usage status information via the transmission path 2 in response to an inquiry from the broadcast resource management server 12.
  • the broadcast resource management server 12 determines a content distribution schedule based on the frequency usage status information notified from the WSDBs 21-1 to 21-N, and notifies the broadcast server 11 of the content distribution schedule. Also, the broadcast resource management server 12 notifies the TVBDs 31-1 to 31-M of the content distribution schedule via the transmission path 2.
  • the broadcast server 11 broadcasts content to the TVBDs 31-1 to 31-M via the transmission path 2 based on the delivery schedule notified from the broadcast resource management server 12.
  • the TVBDs 31-1 to 31-M are terminal devices that execute reproduction or storage of distributed content, called TV band devices (TVBD: TV Band Devices). (Receiving device).
  • TVBD TV Band Devices
  • the TVBDs 31-1 to 31-M are arranged and used in user homes 5-1 to 5-M, respectively.
  • the TVBDs 31-1 to 31-M are ready to receive content based on the distribution schedule notified from the broadcast resource management server 12, and are ready to receive the content.
  • the TVBDs 31-1 to 31-M receive the content and reproduce or store it.
  • the user homes 5-1 to 5-M are connected to the power network 6 via the power line, and the electronic devices such as TVBD in the user home are driven by the power from the power network 6.
  • the power grid 6 is equipped with a function to autonomously control power demand by arranging measuring devices equipped with artificial intelligence and communication functions, called Smart Grid, so that human power can be controlled.
  • This is a power supply system (power system) that can optimize power demand without intervention.
  • Smart grids aim to save energy, reduce costs, and improve reliability and transparency. In recent years, smart grids have gained widespread attention and are being put to practical use.
  • a substation and a transformer are connected to the power grid 6 through a power line.
  • the power generated by the power plant 7 is transmitted via the substation and the transformer.
  • And supply to power demand facilities such as user homes 5-1 to 5-M, office 8, factory 9 and the like.
  • the power control server 41 monitors the amount of power generated by the power plant 7 in the power grid 6 and the load of power demand equipment such as the user homes 5-1 to 5-M, and controls the power according to the monitoring result. A dedicated server to do.
  • the power control server 41 is arranged in the facility of the business operator 10 that provides the smart grid.
  • the power control server 41 is notified from the TVBDs 31-1 to 31-M via the transmission path 2 and information on the power supply amount and the power supply time necessary for receiving the content (hereinafter referred to as power supply information). Received). Based on the notified power supply information, the power control server 41 evaluates whether or not power can be supplied to the TVBDs 31-1 to 31-M, and sends the evaluation result of the power supply availability to the broadcast resource via the transmission path 2.
  • the management server 12 is notified.
  • the broadcast server 11, the broadcast resource management server 12, and the WSDB 21 are also connected to the power network 6 through the power line and are driven by the power from the power network 6.
  • the Therefore, communication performed between the power control server 41 and the TVBD 31 or the broadcast resource management server 12 is not only performed via the transmission path 2 but also via the power network 6 by so-called power line communication (PLC: Power Line Communications). It is also possible to do this.
  • PLC Power Line Communications
  • the content distribution system 1 shown in FIG. 1 is configured as described above.
  • WSDB 21-1 to 21-N will be referred to as WSDB 21 unless it is particularly necessary to distinguish them.
  • TVBD 31-1 to 31-M will be referred to as TVBD 31 when there is no need to distinguish between them
  • user homes 5-1 through 5-M will be referred to as user home 5 when there is no need to distinguish between them. .
  • FIG. 2 is a diagram illustrating a configuration example of the broadcast server 11 of FIG.
  • the broadcast server 11 includes a control unit 110, a content acquisition unit 111, a communication unit 112, and a content distribution unit 113.
  • the control unit 110 controls the operation of each unit of the broadcast server 11.
  • the content acquisition unit 111 acquires content to be broadcasted to the TVBD 31, and supplies the content to the control unit 110.
  • control unit 110 supplies a request for a distribution schedule for the content to the communication unit 112.
  • the communication unit 112 transmits a distribution schedule request supplied from the control unit 110 to the broadcast resource management server 12.
  • the communication unit 112 receives the distribution schedule transmitted from the broadcast resource management server 12 in response to the distribution schedule request, and supplies it to the control unit 110.
  • the control unit 110 executes distribution processing scheduling based on the distribution schedule supplied from the communication unit 112.
  • the control unit 110 supplies the content acquired by the content acquisition unit 111 to the content distribution unit 113 when it is time to distribute the content.
  • the content distribution unit 113 broadcasts the content supplied from the control unit 110 to the TVBDs 31-1 to 31-M via the transmission path 2 using a frequency band for distributing the content.
  • the broadcast server 11 is configured.
  • FIG. 3 is a diagram illustrating a configuration example of the broadcast resource management server 12 of FIG.
  • the broadcast resource management server 12 includes a control unit 120, a communication unit 121, a distribution evaluation unit 122, a WSDB inquiry unit 123, a frequency usage status information acquisition unit 124, an evaluation criterion information acquisition unit 125, a distribution schedule generation unit 126, and a distribution schedule notification unit. 127 and a power supply evaluation result receiving unit 128.
  • the control unit 120 controls the operation of each unit of the broadcast resource management server 12.
  • the communication unit 121 receives a distribution schedule request transmitted from the broadcast server 11 and supplies it to the distribution evaluation unit 122.
  • the delivery evaluation unit 122 instructs the WSDB query unit 123 to query the WSDB 21.
  • the WSDB inquiry unit 123 inquires of the WSDB 21-1 to 21-N about the frequency usage status information via the transmission path 2 in accordance with the instruction from the distribution evaluation unit 122. In response to the inquiry, the WSDB inquiry unit 123 supplies the frequency usage status information notified from each of the WSDBs 21-1 to 21-N to the frequency usage status information acquisition unit 124.
  • the frequency usage status information acquisition unit 124 acquires the frequency usage status information supplied from the WSDB inquiry unit 123 and supplies the frequency usage status information to the distribution evaluation unit 122.
  • the evaluation criterion information acquisition unit 125 acquires the evaluation criterion information and supplies it to the distribution evaluation unit 122.
  • the evaluation reference information is information that becomes a reference for evaluation when the distribution evaluation unit 122 executes the distribution evaluation process.
  • the evaluation reference information may be held by the broadcast resource management server 12 or may be acquired simultaneously with the content distributed by the broadcast server 11.
  • the distribution evaluation unit 122 is supplied with the frequency usage status information from the frequency usage status information acquisition unit 124 and the evaluation standard information from the evaluation standard information acquisition unit 125.
  • the distribution evaluation unit 122 is based on the frequency usage status information and the evaluation reference information, and distributes the content requested for the distribution schedule (hereinafter referred to as distribution time period) and the frequency band (hereinafter referred to as the frequency band) used for the distribution. , A distribution evaluation process for evaluating the distribution frequency band).
  • the distribution evaluation unit 122 supplies the result of distribution evaluation obtained by the distribution evaluation process to the WSDB inquiry unit 123 and the distribution schedule generation unit 126.
  • the WSDB inquiry unit 123 stores information for reserving the distribution time band and the distribution frequency band as reserved blocks via the transmission line 2 through the WSDB 21-1 to WSDB 21-1 21-N is notified. In addition, when the content distribution is completed, the WSDB inquiry unit 123 notifies the WSDB 21-1 to 21-N via the transmission path 2 of information for releasing the reserved block.
  • the distribution schedule generation unit 126 generates a distribution schedule based on the result of distribution evaluation supplied from the distribution evaluation unit 122 and supplies the distribution schedule to the communication unit 121 and the distribution schedule notification unit 127.
  • the communication unit 121 transmits the distribution schedule supplied from the distribution schedule generation unit 126 to the broadcast server 11.
  • the distribution schedule notification unit 127 notifies the TVBDs 31-1 to 31-M of the distribution schedule supplied from the distribution schedule generation unit 126 via the transmission path 2.
  • the power supply evaluation result receiving unit 128 receives the evaluation result of the power supply availability notified from the power control server 41 via the transmission path 2 and supplies it to the distribution schedule generating unit 126. Note that, when performing power line communication with the power control server 41, the evaluation result of the power supply availability notified through the power network 6 is received.
  • the distribution schedule generating unit 126 regenerates a distribution schedule in which one or both of the distribution time zone and the frequency band are changed based on the evaluation result of the power supply availability supplied from the power supply evaluation result receiving unit 128.
  • the communication unit 121 and the distribution schedule notification unit 127 are supplied.
  • the communication unit 121 transmits the distribution schedule regenerated by the distribution schedule generation unit 126 to the broadcast server 11. Also, the distribution schedule notification unit 127 notifies the TVBDs 31-1 to 31 -M via the transmission path 2 of the distribution schedule regenerated by the distribution schedule generation unit 126.
  • the broadcast resource management server 12 is configured.
  • FIG. 4 is a diagram illustrating a configuration example of the WSDB 21 of FIG.
  • the WSDB 21 includes a control unit 210, a communication unit 211, a DB management unit 212, and a WSDB 213.
  • the control unit 210 controls the operation of each unit of the WSDB 21.
  • the control unit 210 controls the communication unit 211 and the DB management unit 212 to collect information on frequencies and time zones that can be used in a predetermined area under management, and registers the information in a WSDB (White Space Data Base) 213 Let
  • the communication unit 211 receives an inquiry about the frequency usage status information notified from the broadcast resource management server 12 via the transmission path 2 and supplies it to the DB management unit 212.
  • the DB management unit 212 refers to the WSDB 213 in response to the inquiry supplied from the communication unit 211 and acquires the frequency usage status information.
  • the DB management unit 212 supplies the frequency usage status information to the communication unit 211.
  • the communication unit 211 notifies the broadcast resource management server 12 of the frequency usage status information supplied from the DB management unit 212 via the transmission path 2.
  • the communication unit 211 supplies the notification to the DB management unit 212.
  • the DB management unit 212 In response to the notification supplied from the communication unit 211, the DB management unit 212 refers to the WSDB 213 to register a reserved block or execute a process of releasing a reserved block.
  • the WSDB 21 is configured.
  • FIG. 5 is a diagram illustrating a configuration example of the TVBD 31 in FIG.
  • the TVBD 31 includes a control unit 310, a communication unit 311, a display unit 312, an input unit 313, a reproduction unit 314, a storage unit 315, a preference information acquisition unit 316, a power supply information notification unit 317, and a power supply unit 318.
  • the control unit 310 controls the operation of each unit of the TVBD 31.
  • the communication unit 311 receives the distribution schedule notified from the broadcast resource management server 12 via the transmission path 2 and supplies the distribution schedule to the control unit 310.
  • the control unit 310 executes scheduling of reception processing based on the distribution schedule supplied from the communication unit 311.
  • the control unit 310 displays the scheduling result on the display unit 312.
  • the control unit 310 selects a desired content from the content scheduled to be distributed based on the operation signal from the input unit 313. In addition, the control unit 310 selects desired content based on the preference information acquired by the preference information acquisition unit 316.
  • the preference information is, for example, a user's viewing history and the like, and may be held by the TVBD 31 itself, or may be acquired from an external device before a desired content selection process is executed. Good.
  • the control unit 310 activates the TVBD 31 to control the desired content so that it can be received immediately before the distribution time of the desired content.
  • the communication unit 311 receives content broadcast from the broadcast server 11 via the transmission path 2 and supplies the content to the control unit 310.
  • the control unit 310 When playing back the content supplied from the communication unit 311, the control unit 310 supplies the content to the playback unit 314. In this case, the playback unit 314 plays back the content supplied from the control unit 310 in real time and causes the display unit 312 to display the content. In addition, when storing the content supplied from the communication unit 311, the control unit 310 supplies the content to the storage unit 315 and stores it. In this case, the accumulated content is reproduced by the reproduction unit 314.
  • the power supply information notifying unit 317 generates power supply information that is information related to the power supply amount and the power supply time necessary for receiving the content selected by the scheduling of the reception process according to the control of the control unit 310,
  • the power control server 41 is notified via the transmission path 2.
  • power supply information is notified via the power network 6.
  • the power supply unit 318 is connected to the power network 6 through a power line, and supplies power from the power network 6 to each unit of the TVBD 31.
  • the TVBD 31 is configured.
  • FIG. 6 is a diagram illustrating a configuration example of the power control server 41 in FIG. 1.
  • the power control server 41 includes a connection unit 411, a power monitoring control unit 412, and a communication unit 413.
  • the power monitoring control unit 412 monitors the amount of power generated by the power plant 7 in the power network 6 and the load of power demand equipment such as the user home 5, the office 8, and the factory 9 through the connection unit 411. The power is controlled according to the monitoring result.
  • the communication unit 413 receives the power supply information notified from the TVBD 31 via the transmission path 2 and supplies it to the power monitoring control unit 412.
  • the power monitoring control unit 412 performs power supply scheduling based on the power supply information supplied from the communication unit 413.
  • the power monitoring control unit 412 evaluates whether or not power can be supplied to the TVBD 31 based on the result of scheduling of power supply, and supplies the result of whether power supply is possible to the communication unit 413.
  • the communication unit 413 notifies the broadcast resource management server 12 of the result of availability of power supply supplied from the power monitoring control unit 412 via the transmission path 2.
  • the power control server 41 is configured.
  • TVBDs 31-1 to 31-M exist in the areas under the control of WSDB 21-1 to 21-3, and the flowcharts of FIGS.
  • the TVBD 31-1 and TVBD 31-M will be described as representatives among the TVBDs 31-1 to 31-M.
  • the control unit 110 requests the broadcast resource management server 12 for a distribution schedule (step S12).
  • the content acquired by the content acquisition unit 111 is provided from a content production company, a broadcasting station, an individual or other content provider via a terminal device or a recording medium.
  • the WSDB inquiry unit 123 causes the free blocks in the time zone and the frequency band to be sent to the WSDBs 21-1 to 21-3 via the transmission path 2, respectively.
  • An inquiry is made (step S21).
  • the DB management unit 212 of the WSDB 21-1 refers to the WSDB 213, identifies an empty block from the usage status of the frequency band for each time zone in the area managed by the WSDB 21-1, and determines the frequency corresponding to the empty block.
  • the usage status information is notified to the broadcast resource management server 12.
  • an empty block for each region is specified, and the frequency usage status information is notified to the broadcast resource management server 12 (steps S41 and S51).
  • the frequency usage status information acquisition unit 124 acquires the frequency usage status information from the WSDBs 21-1 to 21-3 (step S22).
  • the distribution evaluation unit 122 executes a distribution evaluation process based on the frequency usage status information acquired by the frequency usage status information acquisition unit 124.
  • the distribution evaluation unit 122 acquires the frequency usage status information acquired by the frequency usage status information acquisition unit 124 and the evaluation standard information acquired by the evaluation standard information acquisition unit 125 (steps S101 and S102).
  • step S103 the distribution evaluation unit 122 generates a cost evaluation graph weighted by the evaluation reference information based on the acquired frequency use state information and evaluation reference information.
  • the distribution evaluation unit 122 evaluates the generated cost evaluation graph (step S104), and specifies a reservation block according to the result of the distribution evaluation (step S105).
  • each WSDB 21 has a different area composed of a time band and a frequency band specified by the empty block B. The reason is that, as described above, each WSDB 21 has a different region in which the usage status of the frequency band for each time zone is managed, so that the vacant time zone and frequency band are different for each region. .
  • the empty block B1 is an area where all the empty blocks B1 to B3 overlap.
  • four common empty blocks are obtained as shown in E of FIG.
  • These common empty blocks become frequency bands that can be used in common in a common time zone in all regions under the control of the WSDBs 21-1 to 21-3.
  • the broadcast server 11 can broadcast-distribute content by using the distribution frequency band corresponding to the distribution time zone in the distribution time zone within the common empty block area shown in E of FIG. . Then, the broadcast-distributed content is distributed to TVBDs 31-1 to 31-M existing in the area under the control of WSDB 21-1 to 21-3.
  • the evaluation can be executed after weighting the empty block area. For example, for areas where content is expected to be viewed by more viewers, such as 19: 00-22: 00 on Sundays, the cost of using free blocks is set higher while early morning and For areas that are expected to have fewer viewers, such as late-night hours, the use cost of empty blocks is set low.
  • a time-high cost area an area in which a large number of viewers are expected to view and the usage cost is high.
  • the evaluation standard information includes a cost parameter indicating which of the common free blocks belonging to the time high cost area or the time low cost area is prioritized.
  • a common free block in the low-cost area is selected as a reserved block as shown in E of FIG. 11E illustrates the case where the time-low cost area is prioritized, but when the cost parameter indicates the priority of the time-high cost area, a common free block in the time high-cost area is illustrated. Will be selected as the reserved block.
  • the use cost of the empty block may be set according to the bit rate of content delivery, that is, the frequency band cost.
  • a region where the bit rate is expected to be high and the usage cost is high (hereinafter referred to as a high frequency cost region) can be set.
  • the empty blocks B1 to B3 that are superimposed are shown.
  • a high frequency area is superimposed. That is, among the common free blocks, the common free blocks in the high frequency area of the frequency are expected to be high in cost, but the use cost outside the high cost area of the frequency is low (hereinafter referred to as the low frequency area of the frequency). Cost) is expected to be low.
  • the evaluation criterion information includes, as the cost parameter, a parameter indicating which of the above-described parameters related to the priority of the time cost area, common empty blocks belonging to the frequency high cost area or the frequency low cost area is prioritized.
  • a common free block in the low frequency area is selected as the reserved block.
  • the cost parameter indicates the priority of the low frequency frequency area
  • a common free block in the low frequency area is selected as the reserved block.
  • the cost parameter indicates the high cost area
  • the common free block in the high frequency area is used. Will be selected as the reserved block.
  • time cost shown in FIG. 11 and the frequency cost shown in FIG. 12 are combined, and a reserved block is selected from the common free blocks according to the combination of the time cost and the frequency cost. May be.
  • a case where such a combination is used is, for example, a case where it is desired to minimize the frequency cost but the time cost may be the maximum.
  • a time high cost region and a frequency high cost are set for a graph in which empty blocks B1 to B3 are respectively represented on the time and frequency planes. be able to.
  • the overlapping blocks B1 through B3 are shown superimposed. Furthermore, a time high cost region and a frequency high cost region are superimposed. That is, among the common free blocks, the common free block in the time high cost area or the frequency high cost area is expected to be high in cost, while the common free block in the time low cost area or the frequency low cost area is common. The cost is expected to be low.
  • the cost parameter indicates the priority in the time high cost region and the frequency low cost region
  • the cost parameter is in the time high cost region and in the frequency low cost region as shown in E of FIG. Is selected as a reserved block.
  • FIG. 13E illustrates the case where the high time cost area and the low frequency area are prioritized, but the cost parameter indicates the high time area priority and the high frequency area priority. If there is, a common empty block that is in the time high cost area and in the frequency high cost area is selected as the reserved block. In addition, when priority is given to the time low-cost area and frequency low-cost area, or when the time low-cost area and frequency high-cost area are preferred, the common free block in the priority area is reserved. Will be selected.
  • the distribution evaluation unit 122 priority is given to any of the common free blocks belonging to one or both of the time high cost region or the time low cost region and the frequency high cost region or the frequency low cost region. Evaluation is performed after weighting with a parameter indicating whether or not a reserved block is specified.
  • the cost parameter is set in advance by a content provider such as a content production company as evaluation standard information.
  • the content provider wants to allow more viewers to view its content distribution conditions (distribution time band and distribution frequency band), for example, considering its own budget, or It can be set from the viewpoint of wanting to deliver at a higher bit rate. As a result, the content provider can distribute the desired content under the best distribution conditions within its own budget.
  • step S105 when the process of step S105 ends, the process further returns to the flowchart of FIG. 7, and the processes after step S23 are executed.
  • step S24 the WSDB inquiry unit 123 notifies the reserved blocks identified by the distribution evaluation process to the WSDBs 21-1 to 21-3 via the transmission path 2, respectively.
  • step S32 the DB management unit 212 of the WSDB 21-1 registers the reserved block notified from the broadcast resource management server 12 in the WSDB 213. Similarly, in the WSDB 21-2 and WSDB 21-3, the notified reserved blocks are registered in the WSDB 213, respectively.
  • the time zone and frequency band corresponding to the reserved block are reserved for content distribution by the broadcast server 11, and cannot be used for distribution of other content.
  • the distribution schedule generation unit 126 generates a distribution schedule based on the reserved block specified by the distribution evaluation process (step S25).
  • This distribution schedule is distribution information of content distributed in the distribution time band and distribution frequency band assigned to the reservation block, and is composed of, for example, a file (manifest file) in which metadata is stored.
  • a file manufactured file
  • metadata information on the title, genre, outline, purchase price, and other contents of content scheduled to be distributed for each distribution time band and distribution frequency band is stored as metadata.
  • the generated distribution schedule is notified to the broadcast server 11 by the communication unit 121, and is also notified to the TVBDs 31-1 to 31-M via the transmission path 2 by the distribution schedule notification unit 127 (step S26). .
  • scheduling of distribution processing is executed by the control unit 110 (step S13).
  • this scheduling based on the notified distribution schedule, a schedule for broadcast distribution of content is made using the distribution frequency band when the distribution time zone comes.
  • the broadcast server 11 waits until the control unit 110 determines that the distribution time has come (“Yes” in step S14 in FIG. 8).
  • the control unit 310 executes scheduling of the reception process (step S61).
  • scheduling of the reception process a desired content delivered from the broadcast server 11 can be received using the delivery frequency band when the delivery time zone comes based on the notified delivery schedule. To make a plan.
  • the control unit 310 has information on the title, genre, overview, purchase price, and other content for each content scheduled to be distributed, as shown in FIG.
  • the distribution schedule displayed on the time and frequency plane is displayed on the display unit 312.
  • the user confirms the distribution schedule displayed on the display unit 312 and selects the desired content that the user wants to view from the contents scheduled to be distributed by operating the input unit 313.
  • the distribution schedule in FIG. 14 is an example of a screen display for allowing the user to select content to be distributed.
  • an electronic program table EPG: Electronic Program Guide
  • a display method such as a radio TV column of a newspaper may be used.
  • the control unit 310 infers content that matches the preference of the user using the TVBD 31-1 from the content scheduled to be distributed. Processing may be executed and the analogized content may be regarded as content that the user wants to view. In this case, the user does not need to select desired content. Further, as the preference information, the above-described user viewing history or the like is used, and a genre or title content corresponding to the viewing history is selected.
  • step S62 the power supply information notification unit 317 receives information on the power supply amount and the power supply time when receiving the content selected by the scheduling of the reception process. Is notified to the power control server 41 via the transmission path 2 or the power network 6.
  • the TVBD 31-1 waits until the control unit 310 determines that it is just before the distribution time slot (for example, several minutes before the distribution) (“Yes” in step S63 in FIG. 8).
  • the TVBDs 31-2 to 31-M when a delivery schedule is notified, scheduling of reception processing is executed. Due to this scheduling, when the distribution time zone is reached, a schedule for making it possible to receive the desired content distributed from the broadcast server 11 is made using the distribution frequency band (step S71). In addition, the power supply information according to the scheduling of the reception process is notified to the power control server 41 via the transmission path 2 or the power network 6 (step S72). Then, the TVBDs 31-2 to 31-M stand by until it is determined that it is immediately before the distribution time period (“Yes” in step S73 in FIG. 8).
  • the power supply information notified from the TVBDs 31-1 to 31-M via the transmission path 2 or the power network 6 is received by the communication unit 413 or the connection unit 411 of the power control server 41.
  • power supply scheduling based on the power supply information is executed by the power monitoring control unit 412 (step S81). By this scheduling, for example, the amount of power required in the distribution time zone for each content scheduled to be distributed is scheduled.
  • step S82 the power monitoring control unit 412 evaluates whether or not power can be supplied to the TVBDs 31-1 to 31-M in the distribution time period based on the result of scheduling of power supply.
  • the power monitoring control unit 412 since the expected value of the total power consumption of the TVBDs 31-1 to 31-M in the distribution time zone is obtained, the power monitoring control unit 412, for example, sets the total power consumption in advance. When the power amount is less than or equal to the power amount, it is evaluated that power can be supplied to the TVBDs 31-1 to 31-M. On the other hand, when the total power consumption exceeds a predetermined power amount, it is evaluated that power cannot be supplied to the TVBDs 31-1 to 31-M.
  • the power monitoring control unit 412 monitors the amount of power generated by the power plant 7 and the load of power demand equipment such as the user home 5 and the office 8, for example, according to the demand and supply of those powers. If there is a surplus in power supply, it may be evaluated that the power can be supplied even if the predicted value of the total power consumption of the TVBDs 31-1 to 31-M is large. Conversely, when there is no margin for power supply, it is evaluated that power supply is impossible even if the predicted value of the total power consumption of TVBDs 31-1 to 31-M is small.
  • the power monitoring control unit 412 evaluates whether or not power can be supplied to the TVBDs 31-1 to 31-M, and if it is determined that the power can be supplied, the TVBDs 31-1 to 31-M in the distribution time zone. Thus, power from the power network 6 is secured. On the other hand, when the power monitoring control unit 412 evaluates that power supply is impossible, it is impossible to secure power from the power network 6 for the TVBDs 31-1 to 31-M in the distribution time period.
  • FIG. 7 and FIG. 8 a case will be described in which power supply to the TVBDs 31-1 to 31-M in the distribution time period is ensured by evaluating whether power supply is possible.
  • the TVBDs 31-1 to 31 -M control each power supply unit according to the control of each control unit 310. It is activated based on the power from 318. Then, each of the TVBDs 31-1 to 31-M transitions from the standby state to a state where desired content can be received (steps S64 and S74). In other words, from the broadcast server 11 and broadcast resource management server 12 side, it can be said that the TVBDs 31-1 to 31-M are ready for distribution according to the distribution schedule.
  • step S14 when it is determined that the distribution time has come (“Yes” in step S14), the process proceeds to step S15.
  • the content distribution unit 113 broadcasts the content acquired by the content acquisition unit 111 to the TVBDs 31-1 to 31-M using the distribution frequency band.
  • the content distributed from the broadcast server 11 is received by the communication unit 311 (steps S65 and S75).
  • the received content is played back by the playback unit 314 and displayed on the display unit 312.
  • the content to be distributed does not need to be played back in real time.
  • the TVBD 31-M among the TVBDs 31-2 to 31-M stores the received content by the storage unit 315. Is done.
  • control unit 310 determines whether or not the distribution of the content by the broadcast server 11 has ended, and when it is determined that the distribution of the content has not ended (“No” in step S67, “No” in S77). ), The process returns to steps S65 and S75. Then, the process of receiving and reproducing or storing the content is executed until the distribution of the content is completed.
  • the control unit 310 changes the state of the TVBD 31 from the receivable state to the standby state. As a result, in the TVBDs 31-1 to 31-M, the process of receiving and playing back or storing the content ends.
  • step S27 the process proceeds to step S28.
  • step S28 the WSDB inquiry unit 123 notifies the WSDBs 21-1 to 21-3 of the release of the reservation block used for content distribution via the transmission path 2, respectively.
  • step S33 the DB management unit 212 of the WSDB 21-1 releases the reserved block notified by the broadcast resource management server 12 and registered in the WSDB 213. Similarly, the reserved blocks registered in the WSDB 213 are also released in the WSDB 21-2 and WSDB 21-3 (steps S43 and S53). Thereby, in each WSDB 21, the time zone and frequency band corresponding to the reserved block are released, and can be used for distribution of other contents.
  • the frequency usage status information managed in the WSDB 21 is acquired, and based on the frequency usage status information, the distribution time zone and distribution of the content to be distributed The frequency band is evaluated. If the distribution schedule is notified to the TVBDs 31-1 to 31-M in the area under the control of the WSDB 21, and further power supply to the TVBDs 31-1 to 31-M is secured, the distribution is performed. Content is broadcasted to TVBDs 31-1 to 31-M that are ready for reception according to the schedule.
  • the power to the TVBDs 31-1 to 31-M can be obtained only when there is a sufficient power demand such as when the total power consumption of the TVBDs 31-1 to 31-M is equal to or less than a predetermined power amount in the distribution time period. Since the supply is ensured and the TVBDs 31-1 to 31-M are ready to receive and the content is distributed, the load on the power system at the time of content distribution can be reduced.
  • the TVBD 31 of the user who wants to view the content is always activated, so that the simultaneous simultaneous reception performance described above can be improved.
  • the characteristics of broadcast distribution can be fully utilized, and the efficiency of information distribution such as contents can be improved.
  • the evaluation is performed after weighting according to the time band and frequency band, so it is commensurate with the cost to which the content provider is concerned.
  • Content can be distributed at the time and bit rate of distribution.
  • Step S24 of FIG. 7 is performed, and the reserved blocks are stored in the WSDBs 21-1 to 21-. 3 corresponds to the processing after the registration in 3.
  • step S221 as in step S25 of FIG. 7, the distribution schedule generation unit 126 generates a distribution schedule based on the reserved block specified by the distribution evaluation process.
  • the distribution schedule is notified to the broadcast server 11 by the communication unit 121 as in step S26 of FIG. 7, while the distribution schedule notification unit 127 also transmits to the TVBDs 31-1 to 31-M via the transmission path 2. Notification is made (step S222).
  • step S211 scheduling of distribution processing is executed by the control unit 110 as in step S13 of FIG. 7 (step S211). Then, the broadcast server 11 waits until the control unit 110 determines that the distribution time zone has come.
  • the control unit 310 executes the scheduling of the reception process in the same manner as steps S61 and S71 in FIG. 7 (steps S261 and S271). .
  • the scheduling of the reception process is completed, in the TVBDs 31-1 to 31-M, the power supply information corresponding to the scheduling of the reception process is transmitted via the transmission path 2 or the power network 6 as in steps S62 and S72 of FIG.
  • the control server 41 is notified (steps S262 and S272).
  • the power supply information notified from the TVBDs 31-1 to 31-M via the transmission path 2 or the power network 6 is received by the power control server 41.
  • the power control server 41 similarly to steps S81 and S82 in FIG. 7, scheduling of power supply is executed based on the power supply information, and the TVBDs 31-1 to 31- Whether or not power can be supplied to M is evaluated (steps S281 and S282).
  • step S283 the power monitoring control unit 412 determines whether or not power can be supplied to the TVBDs 31-1 to 31-M based on the evaluation result of whether power can be supplied.
  • step S283 If it is determined in step S283 that power cannot be supplied, the process proceeds to step S284.
  • the communication unit 413 notifies the broadcast resource management server 12 via the transmission path 2 or the power network 6 of the evaluation result of the availability of power supply according to the control of the power monitoring control unit 412.
  • the power supply evaluation result receiving unit 128 of the broadcast resource management server 12 receives the power supply availability evaluation result notified from the power control server 41 via the transmission path 2 or the power network 6. And the process of step S221 is performed again, and the delivery schedule production
  • the cost evaluation graph generated by the above-described distribution evaluation process (step S23 in FIG. 7) is evaluated again. That is, as described with reference to FIGS. 10 to 13, in the evaluation of the cost evaluation graph, a reserved block is selected from the common free blocks. Here, the reserved block is selected last time. A reserved block different from the reserved block is selected. And the delivery schedule production
  • the cost evaluation graph itself may be regenerated.
  • the distribution evaluation unit 122 regenerates the cost evaluation graph weighted by the evaluation reference information based on the frequency usage status information and the evaluation reference information, similarly to step S23 of FIG.
  • the regenerated cost evaluation graph is evaluated, and a reserved block different from the previously selected reserved block is selected.
  • generation part 126 regenerates a delivery schedule based on the newly specified reservation block.
  • the target value of the total power consumption of the TVBDs 31-1 to 31-M in the distribution time period is included in the evaluation result of the power supply availability notified from the power control server 41, for example.
  • a corresponding distribution schedule may be regenerated.
  • the distribution time zone is deviated from the previous distribution schedule, the number of content viewers decreases, and the number of TVBDs 31 to be activated decreases accordingly. Therefore, it is expected that the power demand in the distribution time zone will be satisfied.
  • the power demand in the distribution time zone may be satisfied, or if the distribution bit rate is low, for example, high-quality content May not be viewed by a viewer who expects
  • the regenerated distribution schedule is re-notified to the broadcast server 11 by the communication unit 121, and is also re-notified to the TVBDs 31-1 to 31-M via the transmission path 2 by the distribution schedule notification unit 127 ( Step S222).
  • the broadcast server 11 waits until the control unit 110 executes the scheduling of the distribution process again (step S211) and determines that the distribution time zone is reached. To do.
  • the distribution schedule is re-notified in the TVBDs 31-1 to 31-M
  • the reception processing is scheduled again in the TVBDs 31-1 to 31-M (steps S261 and S271).
  • the power supply information corresponding to the scheduling is re-notified to the power control server 41 (steps S262 and S272).
  • the power supply information re-notified from the TVBDs 31-1 to 31-M is received by the power control server 41. Then, the power monitoring control unit 412 again executes power supply scheduling based on the power supply information (step S281), and re-evaluates whether power can be supplied to the TVBDs 31-1 to 31-M in the distribution time period. (Step S282).
  • step S283 If it is determined that power cannot be supplied to the TVBDs 31-1 to 31-M by re-evaluation of whether or not power can be supplied (“Yes” in step S283), the process proceeds to step S284 again. That is, the above-described distribution schedule regeneration process is repeated until the power supply to the TVBDs 31-1 to 31-M is ensured in the distribution time period.
  • step S284 when the power supply in the distribution time zone for the TVBDs 31-1 to 31-M is secured by re-evaluation of the power supply availability ("No" in step S283), the process in step S284 is skipped. In this case, the broadcast resource management server 12 is not notified of the evaluation result of the availability of power supply, the distribution schedule is fixed, and the TVBDs 31-1 to 31-M are in the distribution time zone according to the scheduling of the reception process. It will wait until just before.
  • the distribution schedule is regenerated until the power supply to the TVBDs 31-1 to 31-M is secured, it is possible to reduce the load on the power system during content distribution and to reliably distribute the content. Is possible.
  • FIG. 16 is a diagram illustrating another configuration of the embodiment of the content distribution system according to the present technology.
  • the broadcast server 11 and the broadcast resource management server 12 have been described as independent devices, but these devices are regarded as one broadcast server 11 as illustrated in FIG. 16. You can also.
  • the broadcast server 11 in FIG. 16 includes a broadcast distribution unit 11A as one processing unit corresponding to the broadcast server 11 in FIG. 1 and a broadcast resource management unit 12A as one processing unit corresponding to the broadcast resource management server 12.
  • a broadcast distribution unit 11A as one processing unit corresponding to the broadcast server 11 in FIG. 1
  • a broadcast resource management unit 12A as one processing unit corresponding to the broadcast resource management server 12.
  • the broadcast server 11 in FIG. 16 is arranged in the facility of the service provider 3.
  • the broadcast distribution unit 11A includes the control unit 110 to the content distribution unit 113 in FIG.
  • the operations of the control unit 110 to the content distribution unit 113 in FIG. 2 are as described above.
  • the broadcast resource management unit 12A includes the control unit 120 or the power supply evaluation result receiving unit 128 in FIG.
  • the operations of the control unit 120 to the power supply evaluation result receiving unit 128 in FIG. 3 are as described above.
  • the content distribution system 1 in FIG. 16 is configured.
  • FIG. 17 is a diagram illustrating still another configuration of the content distribution system according to the embodiment of the present technology.
  • the broadcast server 11, the broadcast resource management server 12, and the WSDBs 21-1 to 21-N have been described as being independent devices. However, as shown in FIG. It can also be regarded as one broadcast server 11.
  • the broadcast server 11 in FIG. 17 is one apparatus including the above-described broadcast distribution unit 11A in FIG. 17 and the broadcast resource management unit 12A, and the WSDB 21A as one processing unit corresponding to the WSDB 21.
  • the broadcast server 11 in FIG. 17 is arranged in the facility of the service / network provider 3A.
  • the service / network provider 3A is a provider that provides both a content distribution service and frequency usage status information.
  • the WSDB 21A is configured from the control unit 210 to WSDB 213 in FIG.
  • the operations of the control unit 210 to WSDB 213 in FIG. 4 are as described above.
  • the content distribution system 1 of FIG. 17 is configured.
  • weighting is performed at the cost of two stages of “low” and “high” for both time and frequency as the evaluation criterion information is not limited to the two stages described above.
  • Weighting may be performed at a cost of three or more stages such as three stages of “medium” and “high” and four stages of “level 1”, “level 2”, “level 3”, and “level 4”.
  • the content distribution by the broadcast server 11 is not limited to broadcasting such as television broadcasting, but the content may be distributed by other communication methods such as the Internet.
  • the communication is not only wireless communication and wired communication, but also communication in which wireless communication and wired communication are mixed, that is, wireless communication is performed in a certain section, and wired communication is performed in another section. It may be a thing. Further, communication from one device to another device may be performed by wired communication, and communication from another device to one device may be performed by wireless communication.
  • the power supply information notified to the power control server 41 has been described as being notified by the TVBDs 31-1 to 31-M, but may be notified by the broadcast resource management server 12. .
  • the broadcast resource management server 12 notifies the power supply information based on the distribution schedule to the power control server 41 via the transmission path 2, so that the TVBD 31 does not need to notify the power supply information.
  • FIG. 18 shows a configuration example of an embodiment of a computer in which a program for executing the series of processes described above is installed.
  • the program can be recorded in advance in a recording unit 508 such as a hard disk or a ROM (Read Only Memory) 502 built in the computer 500.
  • a recording unit 508 such as a hard disk or a ROM (Read Only Memory) 502 built in the computer 500.
  • the program is temporarily or permanently stored on a removable medium 511 such as a flexible disk, a CD-ROM (Compact Disc Read Only Memory), an MO (Magneto Optical) disc, a DVD (Digital Versatile Disc), a magnetic disc, or a semiconductor memory.
  • a removable medium 511 can be provided as so-called package software.
  • the program is installed on the computer 500 from the removable medium 511 as described above, or transferred from the download site to the computer 500 via an artificial satellite for digital satellite broadcasting, or a local area network (LAN).
  • the program can be transferred to the computer 500 via a network such as the Internet, and the computer 500 can receive the program transferred in this manner and install it in the recording unit 508.
  • the computer 500 has a CPU (Central Processing Unit) 501 built-in.
  • An input / output interface 505 is connected to the CPU 501 via the bus 504, and the CPU 501 operates an input unit 506 configured by a user such as a keyboard, a mouse, and a microphone via the input / output interface 505.
  • the program stored in the ROM 502 is executed accordingly.
  • the CPU 501 can also transfer a program stored in the recording unit 508, a program transferred from a satellite or a network, received by the communication unit 509, and installed in the recording unit 508, or a removable medium 511 installed in the drive 510.
  • the program read from the program and installed in the recording unit 508 is loaded into a RAM (Random Access Memory) 503 and executed.
  • the CPU 501 performs processing according to the above-described flowchart or processing performed by the configuration of the above-described block diagram.
  • the CPU 501 outputs the processing result from the output unit 507 configured with an LCD (Liquid Crystal Display), a speaker, or the like via the input / output interface 505 or the communication unit 509 as necessary. Transmission is performed, and recording is performed by the recording unit 508.
  • processing steps for describing a program for causing a computer to perform various types of processing do not necessarily have to be processed in time series according to the order described in the flowchart, but in parallel or individually. This includes processing to be executed (for example, parallel processing or processing by an object).
  • the program may be processed by a single computer, or may be processed in a distributed manner by a plurality of computers. Furthermore, the program may be transferred to a remote computer and executed.
  • a system represents the whole apparatus comprised by a some apparatus.
  • the present technology can be configured as follows.
  • a power supply information notifying unit for notifying power supply information including information to a monitoring control device that monitors and controls power supply of the power system; When power supply in the distribution time period is secured by evaluating whether or not power supply is possible based on the power supply information by the monitoring control device, the content can be received based on the notified distribution information.
  • the power supply information notification unit is redistributed from the information distribution device when the power supply in the distribution time period cannot be secured by the evaluation of the power supply availability based on the power supply information by the monitoring control device.
  • the receiving device according to [1], wherein the power supply information is notified to the monitoring control device based on the following.
  • the control unit selects a desired content from the content distributed from the information distribution device based on the notified distribution information, The receiving device according to [1] or [2], wherein the power supply information notification unit notifies the power supply information related to the selected content.
  • the control unit Based on the selected distribution information of the content, the control unit activates the receiving device to make the content receivable immediately before the content is distributed from the information distribution device.
  • the receiving device according to any one of [1] to [3].
  • [5] The delivery according to any one of [1] to [4], wherein the delivery time zone and the delivery frequency band are determined based on frequency usage status information regarding a usage status of a frequency band for each time zone in each predetermined region. apparatus.
  • the receiving device The power supply amount and the power supply time when receiving the content based on the distribution information of the content distributed using the distribution frequency band in the distribution time zone notified from the information distribution device that distributes the content Notifying the power supply information including information to the monitoring control device that monitors and controls the power supply of the power system,
  • the content can be received based on the notified distribution information.
  • Control A receiving method including the step of receiving the content distributed from the information distribution apparatus.
  • a frequency usage status information acquisition unit for acquiring frequency usage status information regarding the usage status of the frequency band for each time zone in each predetermined region; Based on the acquired frequency usage status information, a distribution time zone for distributing the acquired content, a distribution evaluation unit for evaluating a distribution frequency band used for the distribution,
  • a distribution information notifying unit for notifying a plurality of receiving devices in the region of distribution information of the content distributed using the distribution frequency band in the distribution time zone;
  • a monitoring control device that monitors and controls power supply information including power supply amount and power supply time information when a plurality of receiving devices in the region receive the content based on the distribution information
  • a power supply evaluation result receiving unit that receives an evaluation result of whether or not power can be supplied to the plurality of receiving devices in the distribution time zone, When power supply in the distribution time zone is ensured by evaluating whether or not power supply is possible, when the distribution time zone is reached, the acquired frequency content is used according to the distribution information using the distribution frequency band.
  • a content distribution unit that distributes to a plurality of receiving devices that are ready for distribution, When the distribution information notifying unit cannot secure power supply in the distribution time zone by evaluating whether or not power supply is possible, the distribution information notification unit changes the one or both of the distribution time band and the distribution frequency band to the distribution information.
  • An information distribution device that notifies a plurality of receiving devices.
  • An evaluation reference information acquisition unit that acquires evaluation reference information that serves as a reference when evaluating the distribution time band and the distribution frequency band; The information distribution device according to [7], wherein the distribution evaluation unit evaluates the distribution time band and the distribution frequency band based on the acquired evaluation reference information.
  • the evaluation criterion information highly evaluates the cost of a time zone in which viewing of the content by a larger number of viewers is expected, and highly evaluates the cost of a frequency band in which the distribution bit rate of the content is expected to be higher.
  • the information distribution device according to [8], wherein [10]
  • the information distribution apparatus according to [8] or [9], wherein the evaluation criterion information is a criterion for highly evaluating a cost in a time zone in which viewing of the content by more viewers is expected.
  • the frequency usage status information acquisition unit acquires the frequency usage status information for each region from an information management device that manages the frequency usage status information for each region.
  • the information distribution device is composed of a distribution device and a management device, The distribution device includes the content acquisition unit and the content distribution unit, The said management apparatus is provided with the said frequency utilization condition information acquisition part, the said distribution evaluation part, the said distribution information notification part, and the said electric power supply evaluation result receiving part. Any one of [7] thru
  • Information distribution device Get the content to deliver, Obtain frequency usage status information on the usage status of frequency bands for each time zone in a given area, Based on the acquired frequency usage status information, evaluate the distribution time band for distributing the acquired content and the distribution frequency band used for the distribution, Notifying a plurality of receiving devices in the region of distribution information of the content distributed using the distribution frequency band in the distribution time zone, A monitoring control device that monitors and controls power supply information including power supply amount and power supply time information when a plurality of receiving devices in the region receive the content based on the distribution information Receiving the evaluation result of the propriety of power supply to the plurality of receiving devices in the distribution time zone, which is evaluated by notifying When power supply in the distribution time zone is ensured by evaluating whether or not power supply is possible, when the distribution time zone is reached, the acquired frequency content is used according to the distribution information using the distribution frequency band.
  • the distribution information obtained by changing either one or both of the distribution time zone and the distribution frequency band is sent to a plurality of receiving devices in the region.
  • An information distribution method including a step of notifying the user.
  • the information distribution apparatus includes: A content acquisition unit for acquiring content to be distributed; A frequency usage status information acquisition unit that acquires the frequency usage status information from the information management device that manages frequency usage status information regarding the usage status of the frequency band for each time zone in each predetermined region; Based on the acquired frequency usage status information, a distribution time zone for distributing the acquired content, a distribution evaluation unit for evaluating a distribution frequency band used for the distribution, A distribution information notification unit that notifies the plurality of receiving devices in the region of distribution information of the content distributed using the distribution frequency band in the distribution time zone; Each of the plurality of receiving devices is A power supply information notifying unit for notifying the monitoring control device of power supply information including information related to a power supply amount and a power supply time when receiving the content based on the distribution information notified from the information distribution device With
  • the monitoring and control device includes: A power supply evaluation unit that
  • a content distribution unit that distributes to a plurality of the receiving devices that are ready for distribution, When the distribution information notifying unit cannot secure power supply in the distribution time zone by evaluating whether or not power supply is possible, the distribution information notification unit changes the one or both of the distribution time band and the distribution frequency band to the distribution information.
  • Each of the receiving devices further includes A control unit that controls the content to be receivable based on the notified distribution information when power supply in the distribution time period is secured by evaluating whether or not power supply is possible;
  • An information distribution system comprising: a content receiving unit that receives the content distributed from the information distribution device.
  • 1 content distribution system 2 transmission lines, 6 power network, 11 broadcast server, 11A broadcast distribution unit, 12 broadcast resource management server, 12A broadcast resource management unit, 21, 21A, 21-1 to 21-N WSDB, 31, 31- 1 to 31-M TVBD, 41 power control server, 110 control unit, 111 content acquisition unit, 112 communication unit, 113 content distribution unit, 120 control unit, 121 communication unit, 122 distribution evaluation unit, 123 WSDB inquiry unit, 124 frequency Usage status information acquisition unit, 125 evaluation criteria information acquisition unit, 126 distribution schedule generation unit, 127 distribution schedule notification unit, 128 power supply evaluation result reception unit, 210 control unit 211 communication unit, 212 DB management unit, 213 WSDB, 310 control unit, 311 communication unit, 312 display unit, 313 input unit, 314 playback unit, 315 storage unit, 316 preference information acquisition unit, 317 power supply information notification unit, 318 Power supply unit, 412 Power monitoring control unit, 413 communication unit, 500 computers, 501 CPU

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • General Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Multimedia (AREA)
  • Power Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Two-Way Televisions, Distribution Of Moving Picture Or The Like (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Circuits Of Receivers In General (AREA)
  • Telephonic Communication Services (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本技術は、情報配信時の電力系統の負荷を軽減することができる受信装置及び方法、情報配信装置及び方法、並びに情報配信システムに関する。 電力供給情報通知部は、コンテンツを配信する情報配信装置から通知される、配信時間帯に配信周波数帯域を利用して配信されるコンテンツの配信情報に基づいて、コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知し、制御部は、監視制御装置による電力供給情報に基づいた電力供給の可否の評価によって配信時間帯における電力供給が確保される場合、通知された配信情報に基づいて、コンテンツを受信可能な状態に制御し、コンテンツ受信部は、情報配信装置から配信されるコンテンツを受信する。本技術は、例えば、コンテンツの配信を行うコンテンツ配信システムに適用できる。

Description

受信装置及び方法、情報配信装置及び方法、並びに情報配信システム
 本技術は、受信装置及び方法、情報配信装置及び方法、並びに情報配信システムに関し、特に、情報配信時の電力系統の負荷を軽減することができるようにした受信装置及び方法、情報配信装置及び方法、並びに情報配信システムに関する。
 近年、情報通信手段の発展により、各種の情報通信手段を利用してコンテンツなどの情報を配信するサービスが普及している。その影響により、データ通信のトラフィック量が増加の一途をたどっており、この急増するトラフィックに対処するための手段が求められている。
 その一つの手段として、コグニティブ無線と称される、端末装置や基地局が無線環境を認識し、利用する通信システムや周波数を動的に切り替えることで、周波数の有効利用を可能にする技術が提案されている。このコグニティブ無線では、既存の無線システムに割り当てられている周波数を別の無線システムで利用する周波数共用型のシステムの実用化が進められている。
 例えば、既存の無線システムに割り当てられているが、その地域では使用されていない、あるいは利用時間が限られている周波数帯域を、別の無線システムで使用できるようにするものである。特に、米国では、テレビジョン放送の空きチャンネル、いわゆるTVホワイトスペースを活用するための技術として実用化が進められている(例えば非特許文献1参照)。
 非特許文献1には、各地域ごとに利用できる周波数と時間帯とを登録したデータベース(ホワイトスペースデータベース:WSDB(White Space Data Base))を設置し、無線デバイス(TVBD(TV Band Devices))が現在位置に基づいて、その周波数が使用できるか否かを照会する仕組みについて記載されている。
藤井宏治、"電波利用のムダなくす、ホワイトスペース活用のコア技術"、[online]、ビジネスネットワーク.jp、[平成23年5月2日検索]、インターネット<URL:http://businessnetwork.jp/tabid/65/artid/110/page/2/Default.aspx>
 ところで、テレビジョン放送に代表される放送メディアは、一斉同報機能を配信特性として有しているが、この配信特性を最大限に生かすためには、一斉同報されるデータを同時に受信している端末装置の数を最大にする必要がある。
 この一斉同時受信性能を向上させるためには、同時に起動されている端末装置の数を最大にすればよいことになるが、同時に起動している端末装置の増加に伴い、電力需要が急増して、電力系統に過大な負荷を与える可能性がある。
 本技術はこのような状況に鑑みてなされたものであり、情報配信時の電力系統の負荷を軽減することができるようにするものである。
 本技術の第1の側面の受信装置は、コンテンツを配信する情報配信装置から通知される、配信時間帯に配信周波数帯域を利用して配信される前記コンテンツの配信情報に基づいて、前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知する電力供給情報通知部と、前記監視制御装置による前記電力供給情報に基づいた電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、通知された前記配信情報に基づいて、前記コンテンツを受信可能な状態に制御する制御部と、前記情報配信装置から配信される前記コンテンツを受信するコンテンツ受信部とを備える。
 前記電力供給情報通知部は、前記監視制御装置による前記電力供給情報に基づいた電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記情報配信装置から再通知される配信情報に基づいて、前記電力供給情報を前記監視制御装置に通知する。
 前記制御部は、通知された前記配信情報に基づいて、前記情報配信装置から配信される前記コンテンツの中から所望のコンテンツを選択し、前記電力供給情報通知部は、選択された前記コンテンツに関する前記電力供給情報を通知する。
 前記制御部は、選択された前記コンテンツの配信情報に基づいて、前記情報配信装置から前記コンテンツが配信される直前になったとき、前記受信装置を起動させて、前記コンテンツを受信可能な状態にする。
 前記配信時間帯と前記配信周波数帯域は、所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を基に決定される。
 本技術の第1の側面の受信方法は、前述した本技術の第1の側面の受信装置に対応する受信方法である。
 本技術の第1の側面の受信装置及び方法においては、コンテンツを配信する情報配信装置から通知される、配信時間帯に配信周波数帯域を利用して配信されるコンテンツの配信情報に基づいて、コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報が、電力系統の電力供給を監視制御する監視制御装置に通知され、監視制御装置による電力供給情報に基づいた電力供給の可否の評価によって配信時間帯における電力供給が確保される場合、通知された配信情報に基づいて、コンテンツが受信可能な状態に制御され、情報配信装置から配信されるコンテンツが受信される。
 本技術の第2の側面の情報配信装置は、配信するコンテンツを取得するコンテンツ取得部と、所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を取得する周波数利用状況情報取得部と、取得した前記周波数利用状況情報に基づいて、取得した前記コンテンツを配信する配信時間帯と、その配信に利用する配信周波数帯域を評価する配信評価部と、前記地域内の複数の受信装置に対して、前記配信時間帯に前記配信周波数帯域を利用して配信される前記コンテンツの配信情報を通知する配信情報通知部と、前記地域内の複数の受信装置が前記配信情報に基づいて前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知することで評価される、前記配信時間帯における複数の前記受信装置に対する電力供給の可否の評価結果を受信する電力供給評価結果受信部と、電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、前記配信時間帯になったとき、前記配信周波数帯域を利用して、取得した前記コンテンツを、前記配信情報に応じて配信可能な状態となった複数の前記受信装置に配信するコンテンツ配信部とを備え、前記配信情報通知部は、電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記配信時間帯及び前記配信周波数帯のいずれか一方又は双方を変更した前記配信情報を前記地域内の複数の受信装置に対して通知する。
 前記配信時間帯及び前記配信周波数帯域を評価するときの基準となる評価基準情報を取得する評価基準情報取得部をさらに備え、前記配信評価部は、取得した前記評価基準情報に基づいて、前記配信時間帯及び前記配信周波数帯域を評価する。
 前記評価基準情報は、より多くの視聴者による前記コンテンツの視聴が見込まれる時間帯のコストを高く評価し、かつ、前記コンテンツの配信ビットレートがより高く見込まれる周波数帯域のコストを高く評価するための基準である。
 前記評価基準情報は、より多くの視聴者による前記コンテンツの視聴が見込まれる時間帯のコストを高く評価するための基準である。
 前記評価基準情報は、前記コンテンツの配信ビットレートがより高く見込まれる周波数帯域のコストを高く評価するための基準である。
 前記周波数利用状況情報取得部は、各地域ごとの前記周波数利用状況情報を管理している情報管理装置から各地域ごとの前記周波数利用状況情報を取得する。
 前記情報配信装置は、配信装置と管理装置から構成されており、前記配信装置は、前記コンテンツ取得部と、前記コンテンツ配信部とを備え、前記管理装置は、前記周波数利用状況情報取得部と、前記配信評価部と、前記配信情報通知部と、前記電力供給評価結果受信部とを備える。
 本技術の第2の側面の情報配信方法は、前述した本技術の第2の側面の情報配信装置に対応する情報配信方法である。
 本技術の第2の側面の情報配信装置及び方法においては、配信するコンテンツが取得され、所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報が取得され、取得した周波数利用状況情報に基づいて、取得したコンテンツを配信する配信時間帯と、その配信に利用する配信周波数帯域が評価され、地域内の複数の受信装置に対して、配信時間帯に配信周波数帯域を利用して配信されるコンテンツの配信情報が通知され、地域内の複数の受信装置が配信情報に基づいてコンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知することで評価される、配信時間帯における複数の受信装置に対する電力供給の可否の評価結果が受信され、電力供給の可否の評価によって配信時間帯における電力供給が確保される場合、配信時間帯になったとき、配信周波数帯域を利用して、取得したコンテンツが、配信情報に応じて配信可能な状態となった複数の受信装置に配信され、電力供給の可否の評価によって配信時間帯における電力供給が確保できない場合、配信時間帯及び配信周波数帯のいずれか一方又は双方を変更した配信情報が地域内の複数の受信装置に対して通知される。
 本技術の第3の側面の情報配信システムは、情報配信装置、情報管理装置、複数の受信装置、及び電力系統の電力供給を監視制御する監視制御装置から構成される情報配信システムにおいて、前記情報配信装置は、配信するコンテンツを取得するコンテンツ取得部と、所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を管理している前記情報管理装置から、前記周波数利用状況情報を取得する周波数利用状況情報取得部と、取得した前記周波数利用状況情報に基づいて、取得した前記コンテンツを配信する配信時間帯と、その配信に利用する配信周波数帯域を評価する配信評価部と、前記地域内の複数の前記受信装置に対して、前記配信時間帯に前記配信周波数帯域を利用して配信される前記コンテンツの配信情報を通知する配信情報通知部とを備え、複数の前記受信装置のそれぞれは、前記情報配信装置から通知される、前記配信情報に基づいて、前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を前記監視制御装置に通知する電力供給情報通知部を備え、前記監視制御装置は、複数の前記受信装置のそれぞれから通知される前記電力供給情報に基づいて、前記配信時間帯における複数の前記受信装置に対する電力供給の可否を評価する電力供給評価部と、評価された電力供給の可否の結果を、前記情報配信装置に通知する電力供給結果通知部とを備え、前記情報配信装置は、さらに、前記監視制御装置から通知される電力供給の可否の結果を受信する電力供給評価結果受信部と、電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、前記配信時間帯になったとき、前記配信周波数帯域を利用して、取得した前記コンテンツを、前記配信情報に応じて配信可能な状態となった複数の前記受信装置に配信するコンテンツ配信部を備え、前記配信情報通知部は、電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記配信時間帯及び前記配信周波数帯のいずれか一方又は双方を変更した前記配信情報を前記地域内の複数の受信装置に対して通知し、前記受信装置のそれぞれは、さらに、電力供給の可否の評価によって配信時間帯における電力供給が確保される場合、通知された前記配信情報に基づいて、前記コンテンツを受信可能な状態に制御する制御部と、前記情報配信装置から配信される前記コンテンツを受信するコンテンツ受信部とを備える。
 情報配信装置、情報管理装置、複数の受信装置、監視制御装置は、独立した装置であってもよいし、1つの装置を構成している内部ブロックであってもよい。
 本技術の第3の側面の情報配信システムは、情報配信装置によって、配信するコンテンツが取得され、所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を管理している情報管理装置から、周波数利用状況情報が取得され、取得した周波数利用状況情報に基づいて、取得したコンテンツを配信する配信時間帯と、その配信に利用する配信周波数帯域が評価され、地域内の複数の受信装置に対して、配信時間帯に配信周波数帯域を利用して配信されるコンテンツの配信情報が通知され、複数の受信装置によって、情報配信装置から通知される、配信情報に基づいて、コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報が監視制御装置に通知され、監視制御装置によって、複数の受信装置のそれぞれから通知される電力供給情報に基づいて、配信時間帯における複数の受信装置に対する電力供給の可否が評価され、評価された電力供給の可否の結果が、情報配信装置に通知され、情報配信装置によって、監視制御装置から通知される電力供給の可否の結果が受信され、電力供給の可否の評価によって配信時間帯における電力供給が確保される場合、配信時間帯になったとき、配信周波数帯域を利用して、取得したコンテンツが、配信情報に応じて配信可能な状態となった複数の受信装置に配信され、電力供給の可否の評価によって配信時間帯における電力供給が確保できない場合、配信時間帯及び配信周波数帯のいずれか一方又は双方を変更した配信情報が地域内の複数の受信装置に対して通知され、受信装置のそれぞれは、さらに、電力供給の可否の評価によって配信時間帯における電力供給が確保される場合、通知された配信情報に基づいて、コンテンツが受信可能な状態に制御され、情報配信装置から配信されるコンテンツが受信される。
 本技術の第1の側面乃至第3の側面によれば、情報配信時の電力系統の負荷を軽減することができる。
本技術のコンテンツ配信システムの一実施の形態の構成を示す図である。 ブロードキャストサーバの構成例を示す図である。 ブロードキャストリソース管理サーバの構成例を示す図である。 WSDBの構成例を示す図である。 TVBDの構成例を示す図である。 電力制御サーバの構成例を示す図である。 コンテンツ配信処理を示すフローチャートである。 コンテンツ配信処理を示すフローチャートである。 配信評価処理の詳細を示すフローチャートである。 共通の空きブロックの特定方法を示す図である。 コスト評価グラフの評価方法(時間低コストを設定)を示す図である。 コスト評価グラフの評価方法(周波数低コストを設定)を示す図である。 コスト評価グラフの評価方法(時間高コスト、周波数低コストを設定)を示す図である。 コンテンツ選択の画面例を示す図である。 配信スケジュール再通知処理を示すフローチャートである。 本技術のコンテンツ配信システムの一実施の形態の他の構成を示す図である。 本技術のコンテンツ配信システムの一実施の形態のさらに他の構成を示す図である。 コンピュータの構成例を示す図である。
 以下、本技術の実施の形態について説明する。なお、説明は以下の順序で行う。
1.第1の実施の形態
2.第2の実施の形態
3.第3の実施の形態
4.変形例
<1.第1の実施の形態>
[コンテンツ配信システムの構成]
 図1は、本技術のコンテンツ配信システムの一実施の形態の構成を示す図である。
 コンテンツ配信システム1は、ブロードキャストサーバ11、ブロードキャストリソース管理サーバ12、WSDB21-1乃至21-N、及びTVBD31-1乃至31-Mから構成される。また、TVBD31-1乃至31-Mが配置されるユーザ宅5-1乃至5-Mは、電力線を介して電力網6に接続されており、さらに、電力網6には、発電所7、オフィス8、工場9、及び電力制御サーバ41が接続されている。
 ブロードキャストサーバ11は、コンテンツの配信を行う専用のサーバである。ブロードキャストサーバ11は、サービスプロバイダ3の施設内に配置される。サービスプロバイダ3は、テレビ番組や映画等のコンテンツの配信サービスを提供する事業者である。
 ブロードキャストサーバ11は、配信するコンテンツを取得し、そのコンテンツの配信スケジュールを、ブロードキャストリソース管理サーバ12に要求する。
 ブロードキャストリソース管理サーバ12は、コンテンツの配信を管理する専用のサーバである。ブロードキャストリソース管理サーバ12は、サービスプロバイダ3の施設内に配置される。ブロードキャストサーバ11とブロードキャストリソース管理サーバ12は、例えば、同一の施設内に配置され、所定の通信方式により有線又は無線通信することで、各種のデータをやり取りする。
 ブロードキャストリソース管理サーバ12は、ブロードキャストサーバ11からの要求に応じて、時間帯ごとの周波数帯域の利用状況を、伝送路2を介してWSDB21-1乃至21-Nに問い合わせる。
 WSDB21-1乃至21-N(N:1,2,・・・,N)は、各地域における時間帯ごとの周波数の利用状況に関する情報(以下、周波数利用状況情報という)を、ホワイトスペースデータベース(WSDB:White Space Data Base)により管理する専用のサーバである。WSDB21-1乃至21-Nは、ネットワークプロバイダ4の施設内に配置される。ネットワークプロバイダ4は、周波数利用状況情報を提供する事業者である。
 WSDB21-1乃至21-Nは、ブロードキャストリソース管理サーバ12からの問い合わせに応じて、周波数利用状況情報を、伝送路2を介してブロードキャストリソース管理サーバ12に通知する。
 ブロードキャストリソース管理サーバ12は、WSDB21-1乃至21-Nから通知された周波数利用状況情報に基づいて、コンテンツの配信スケジュールを決定し、ブロードキャストサーバ11に通知する。また、ブロードキャストリソース管理サーバ12は、コンテンツの配信スケジュールを、伝送路2を介してTVBD31-1乃至31-Mに通知する。
 ブロードキャストサーバ11は、ブロードキャストリソース管理サーバ12から通知された配信スケジュールに基づいて、伝送路2を介してTVBD31-1乃至31-Mに対して、コンテンツをブロードキャスト配信する。
 TVBD31-1乃至31-M(M:1,2,・・・,M)は、TVバンドデバイス(TVBD:TV Band Devices)と称される、配信されたコンテンツの再生又は蓄積を実行する端末装置(受信装置)である。TVBD31-1乃至31-Mは、それぞれユーザ宅5-1乃至5-Mに配置されて使用される。
 TVBD31-1乃至31-Mは、ブロードキャストリソース管理サーバ12から通知される配信スケジュールに基づいて、コンテンツの配信を受ける準備をして、コンテンツを受信可能な状態となる。TVBD31-1乃至31-Mは、ブロードキャストサーバ11からコンテンツが配信されてきた場合、そのコンテンツを受信して、再生又は蓄積する。
 また、ユーザ宅5-1乃至5-Mは、電力線を介して電力網6に接続されており、ユーザ宅内のTVBD等の電子機器は、電力網6からの電力により駆動する。
 電力網6は、スマートグリッド(Smart Grid)と称される、人工知能や通信機能を搭載した計測機器等を配置して、電力需要を自律的に制御する機能を持たせることにより、人の手を介さずに電力需要を最適化できるようにした電力供給システム(電力系統)である。スマートグリッドは、省エネルギーとコストの削減、さらには信頼性と透明性の向上を目指しており、近年、世界各国で広く注目され、実用化が進められている。
 電力網6には、発電所7のほか、変電所や変圧器(不図示)などが電力線を介して接続されており、発電所7により発電された電力を、変電所や変圧器を経由して、ユーザ宅5-1乃至5-Mやオフィス8、工場9等の電力需用設備に供給する。
 電力制御サーバ41は、電力網6における発電所7の発電電力量と、ユーザ宅5-1乃至5-Mなどの電力需用設備の負荷を監視し、その監視結果に応じて、電力の制御を行う専用のサーバである。電力制御サーバ41は、スマートグリッドを提供する事業者10の施設内に配置される。
 また、電力制御サーバ41は、TVBD31-1乃至31-Mから伝送路2を介して通知される、コンテンツを受信する際に必要となる電力供給量と電力供給時間に関する情報(以下、電力供給情報という)を受信する。電力制御サーバ41は、通知された電力供給情報に基づいて、TVBD31-1乃至31-Mに対する電力供給の可否を評価し、その電力供給の可否の評価結果を、伝送路2を介してブロードキャストリソース管理サーバ12に通知する。
 なお、説明の簡略化のため、図示はしていないが、ブロードキャストサーバ11、ブロードキャストリソース管理サーバ12、及びWSDB21についても電力線を介して電力網6に接続されており、電力網6からの電力により駆動される。そのため、電力制御サーバ41と、TVBD31又はブロードキャストリソース管理サーバ12との間で行われる通信は、伝送路2を介した通信だけでなく、いわゆる電力線通信(PLC:Power Line Communications)により電力網6を介して行うことも可能である。
 以上のようにして、図1のコンテンツ配信システム1は構成される。
 なお、以下の説明において、WSDB21-1乃至21-Nを、特に区別する必要がない場合、WSDB21と称して説明する。また、TVBD31-1乃至31-Mを、特に区別する必要がない場合、TVBD31と称し、ユーザ宅5-1乃至5-Mを、特に区別する必要がない場合、ユーザ宅5と称して説明する。
[各装置の構成]
 次に、図2乃至図6を参照して、図1のコンテンツ配信システム1を構成する、ブロードキャストサーバ11、ブロードキャストリソース管理サーバ12、WSDB21、TVBD31、及び電力制御サーバ41のそれぞれの詳細な構成について説明する。
[ブロードキャストサーバの構成]
 図2は、図1のブロードキャストサーバ11の構成例を示す図である。
 ブロードキャストサーバ11は、制御部110、コンテンツ取得部111、通信部112、及びコンテンツ配信部113から構成される。
 制御部110は、ブロードキャストサーバ11の各部の動作を制御する。
 コンテンツ取得部111は、TVBD31に対してブロードキャスト配信するコンテンツを取得し、制御部110に供給する。
 制御部110は、コンテンツ取得部111からコンテンツが供給された場合、そのコンテンツについての配信スケジュールの要求を、通信部112に供給する。
 通信部112は、制御部110から供給される配信スケジュールの要求を、ブロードキャストリソース管理サーバ12に送信する。通信部112は、配信スケジュールの要求に応じて、ブロードキャストリソース管理サーバ12から送信される配信スケジュールを受信し、制御部110に供給する。
 制御部110は、通信部112から供給される配信スケジュールに基づいて、配信処理のスケジューリングを実行する。制御部110は、コンテンツを配信する時間帯になったとき、コンテンツ取得部111により取得されたコンテンツを、コンテンツ配信部113に供給する。
 コンテンツ配信部113は、制御部110から供給されるコンテンツを、そのコンテンツを配信するための周波数帯域を使用して、TVBD31-1乃至31-Mに、伝送路2を介してブロードキャスト配信する。
 以上のように、ブロードキャストサーバ11は構成される。
[ブロードキャストリソース管理サーバの構成]
 図3は、図1のブロードキャストリソース管理サーバ12の構成例を示す図である。
 ブロードキャストリソース管理サーバ12は、制御部120、通信部121、配信評価部122、WSDB照会部123、周波数利用状況情報取得部124、評価基準情報取得部125、配信スケジュール生成部126、配信スケジュール通知部127、及び電力供給評価結果受信部128から構成される。
 制御部120は、ブロードキャストリソース管理サーバ12の各部の動作を制御する。
 通信部121は、ブロードキャストサーバ11から送信される配信スケジュールの要求を受信し、配信評価部122に供給する。
 配信評価部122は、通信部121から配信スケジュールの要求が供給された場合、WSDB照会部123に、WSDB21の照会を指示する。
 WSDB照会部123は、配信評価部122からの指示に応じて、周波数利用状況情報を、伝送路2を介してWSDB21-1乃至21-Nに問い合わせる。WSDB照会部123は、問い合わせに応じて、WSDB21-1乃至21-Nのそれぞれから通知される周波数利用状況情報を、周波数利用状況情報取得部124に供給する。
 周波数利用状況情報取得部124は、WSDB照会部123から供給される周波数利用状況情報を取得し、配信評価部122に供給する。
 評価基準情報取得部125は、評価基準情報を取得して、配信評価部122に供給する。
 評価基準情報は、配信評価部122が配信評価処理を実行する際に評価の基準となる情報であって、例えば、配信するコンテンツを提供する、コンテンツ制作会社、放送局、個人その他のコンテンツ提供者によりあらかじめ設定される。評価基準情報は、ブロードキャストリソース管理サーバ12が保持していてもよいし、あるいは、ブロードキャストサーバ11が配信するコンテンツと同時に取得するようにしてもよい。
 配信評価部122には、通信部121から供給される配信スケジュールの要求の他、周波数利用状況情報取得部124からの周波数利用状況情報と、評価基準情報取得部125からの評価基準情報が供給される。
 配信評価部122は、周波数利用状況情報及び評価基準情報に基づいて、配信スケジュールの要求がされたコンテンツを配信する時間帯(以下、配信時間帯という)と、その配信に利用する周波数帯域(以下、配信周波数帯域という)を評価する配信評価処理を実行する。配信評価部122は、配信評価処理により得られた配信評価の結果を、WSDB照会部123及び配信スケジュール生成部126に供給する。
 WSDB照会部123は、配信評価部122から供給される配信評価の結果に基づいて、配信時間帯と配信周波数帯域を予約ブロックとして予約するための情報を、伝送路2を介してWSDB21-1乃至21-Nに通知する。また、WSDB照会部123は、コンテンツの配信が終了した場合には、予約ブロックを開放させるための情報を、伝送路2を介してWSDB21-1乃至21-Nに通知する。
 配信スケジュール生成部126は、配信評価部122から供給される配信評価の結果に基づいて、配信スケジュールを生成し、通信部121及び配信スケジュール通知部127に供給する。
 通信部121は、配信スケジュール生成部126から供給される配信スケジュールを、ブロードキャストサーバ11に送信する。
 配信スケジュール通知部127は、配信スケジュール生成部126から供給される配信スケジュールを、伝送路2を介してTVBD31-1乃至31-Mに通知する。
 電力供給評価結果受信部128は、伝送路2を介して電力制御サーバ41から通知される電力供給の可否の評価結果を受信し、配信スケジュール生成部126に供給する。なお、電力制御サーバ41と電力線通信を行う場合には、電力網6を介して通知される電力供給の可否の評価結果が受信されることになる。
 配信スケジュール生成部126は、電力供給評価結果受信部128から供給される電力供給の可否の評価結果に基づいて、配信時間帯及び周波数帯域のいずれか一方又は双方を変更した配信スケジュールを再生成し、通信部121及び配信スケジュール通知部127に供給する。
 通信部121は、配信スケジュール生成部126により再生成された配信スケジュールを、ブロードキャストサーバ11に送信する。また、配信スケジュール通知部127は、配信スケジュール生成部126により再生成された配信スケジュールを、伝送路2を介してTVBD31-1乃至31-Mに通知する。
 以上のように、ブロードキャストリソース管理サーバ12は構成される。
[WSDBの構成]
 図4は、図1のWSDB21の構成例を示す図である。
 WSDB21は、制御部210、通信部211、DB管理部212、及びWSDB213から構成される。
 制御部210は、WSDB21の各部の動作を制御する。制御部210は、通信部211及びDB管理部212を制御して、管理下にある所定の地域において利用可能となる周波数と時間帯に関する情報を収集し、WSDB(White Space Data Base)213に登録させる。
 通信部211は、ブロードキャストリソース管理サーバ12から、伝送路2を介して通知される周波数利用状況情報の問い合わせを受信し、DB管理部212に供給する。
 DB管理部212は、通信部211から供給される問い合わせに応じて、WSDB213を参照して、周波数利用状況情報を取得する。DB管理部212は、周波数利用状況情報を通信部211に供給する。
 通信部211は、DB管理部212から供給される周波数利用状況情報を、伝送路2を介してブロードキャストリソース管理サーバ12に通知する。
 また、通信部211は、ブロードキャストリソース管理サーバ12から、伝送路2を介して予約ブロック又はその予約ブロックの開放が通知された場合、その通知をDB管理部212に供給する。
 DB管理部212は、通信部211から供給される通知に応じて、WSDB213を参照して、予約ブロックを登録するか、又は予約ブロックを開放する処理を実行する。
 以上のように、WSDB21は構成される。
[TVBDの構成]
 図5は、図1のTVBD31の構成例を示す図である。
 TVBD31は、制御部310、通信部311、表示部312、入力部313、再生部314、蓄積部315、嗜好情報取得部316、電力供給情報通知部317、及び電力供給部318から構成される。
 制御部310は、TVBD31の各部の動作を制御する。
 通信部311は、ブロードキャストリソース管理サーバ12から、伝送路2を介して通知される配信スケジュールを受信し、制御部310に供給する。
 制御部310は、通信部311から供給される配信スケジュールに基づいて、受信処理のスケジューリングを実行する。制御部310は、スケジューリングの結果を表示部312に表示する。
 制御部310は、入力部313からの操作信号に基づいて、配信が予定されるコンテンツの中から、所望のコンテンツを選択する。また、制御部310は、嗜好情報取得部316により取得される嗜好情報に基づいて、所望のコンテンツを選択する。
 嗜好情報は、例えば、ユーザの視聴履歴などであり、TVBD31自身が保持していてもよいし、あるいは、所望のコンテンツの選択処理が実行される前に、外部の装置から取得するようにしてもよい。
 制御部310は、所望のコンテンツの配信時間帯の直前になったとき、TVBD31を起動して、所望のコンテンツを受信可能な状態に制御する。
 通信部311は、ブロードキャストサーバ11から伝送路2を介してブロードキャスト配信されるコンテンツを受信し、制御部310に供給する。
 制御部310は、通信部311から供給されるコンテンツを再生する場合、コンテンツを再生部314に供給する。この場合、再生部314は、制御部310から供給されるコンテンツをリアルタイムで再生し、表示部312に表示させる。また、制御部310は、通信部311から供給されるコンテンツを蓄積する場合、コンテンツを蓄積部315に供給して、蓄積する。この場合、蓄積されたコンテンツが、再生部314により再生される。
 電力供給情報通知部317は、制御部310の制御に従い、受信処理のスケジューリングにより選択されたコンテンツを受信する際に必要となる電力供給量と電力供給時間に関する情報である電力供給情報を生成し、伝送路2を介して電力制御サーバ41に通知する。なお、電力制御サーバ41と電力線通信を行う場合には、電力供給情報が電力網6を介して通知されることになる。
 電力供給部318は、電力線を介して電力網6と接続されており、電力網6からの電力をTVBD31の各部に供給する。
 以上のように、TVBD31は構成される。
[電力制御サーバの構成]
 図6は、図1の電力制御サーバ41の構成例を示す図である。
 電力制御サーバ41は、接続部411、電力監視制御部412、及び通信部413から構成される。
 電力監視制御部412は、接続部411を介して、電力網6における発電所7の発電電力量と、ユーザ宅5、オフィス8、及び工場9などの電力需用設備の負荷を監視して、その監視結果に応じた電力の制御を行う。
 通信部413は、伝送路2を介してTVBD31から通知される電力供給情報を受信し、電力監視制御部412に供給する。
 電力監視制御部412は、通信部413から供給される電力供給情報に基づいて、電力供給のスケジューリングを行う。電力監視制御部412は、電力供給のスケジューリングの結果に基づいて、TVBD31に対する電力供給の可否を評価し、その電力供給の可否の結果を、通信部413に供給する。
 通信部413は、電力監視制御部412から供給される電力供給の可否の結果を、伝送路2を介してブロードキャストリソース管理サーバ12に通知する。
 なお、TVBD31やブロードキャストリソース管理サーバ12と電力線通信を行う場合には、電力供給情報や電力供給の可否の結果が、電力網6を介してやり取りされることになる。
 以上のように、電力制御サーバ41は構成される。
[コンテンツ配信処理]
 次に、図7及び図8のフローチャートを参照して、図1のコンテンツ配信システム1において実行されるコンテンツ配信処理について説明する。
 なお、ここでは、説明を簡略化するため、WSDB21-1乃至21-3の管理下にある地域内に、TVBD31-1乃至31-Mが存在しているものとし、図7及び図8のフローチャートでは、TVBD31-1乃至31-Mの中から、TVBD31-1と、TVBD31-Mを代表して説明する。
 ブロードキャストサーバ11において、コンテンツ取得部111によりコンテンツが取得されると(ステップS11)、制御部110は、配信スケジュールを、ブロードキャストリソース管理サーバ12に要求する(ステップS12)。
 なお、コンテンツ取得部111により取得されるコンテンツは、コンテンツ制作会社、放送局、個人その他のコンテンツ提供者から、端末装置又は記録媒体等を介して提供される。
 ブロードキャストリソース管理サーバ12において、ブロードキャストサーバ11から配信スケジュールが要求されると、WSDB照会部123によって、時間帯と周波数帯域の空きブロックが、伝送路2を介してWSDB21-1乃至21-3にそれぞれ問い合わせられる(ステップS21)。
 ステップS31において、WSDB21-1のDB管理部212は、WSDB213を参照して、自身の管理する地域における時間帯ごとの周波数帯域の利用状況から、空きブロックを特定し、その空きブロックに応じた周波数利用状況情報を、ブロードキャストリソース管理サーバ12に通知する。WSDB21-2及びWSDB21-3においても同様に、各地域ごとの空きブロックが特定され、その周波数利用状況情報が、ブロードキャストリソース管理サーバ12に通知される(ステップS41,S51)。
 ブロードキャストリソース管理サーバ12においては、周波数利用状況情報取得部124によって、WSDB21-1乃至21-3からの周波数利用状況情報が取得される(ステップS22)。そして、ステップS23において、配信評価部122は、周波数利用状況情報取得部124により取得された周波数利用状況情報に基づいて、配信評価処理を実行する。
 ここで、図9のフローチャートを参照して、図7のステップS23に対応する配信評価処理の詳細について説明する。
 配信評価部122は、周波数利用状況情報取得部124により取得された周波数利用状況情報と、評価基準情報取得部125により取得された評価基準情報を取得する(ステップS101,S102)。
 ステップS103において、配信評価部122は、取得された周波数利用状況情報及び評価基準情報に基づいて、評価基準情報により重み付けがされたコスト評価グラフを生成する。配信評価部122は、生成したコスト評価グラフを評価し(ステップS104)、その配信評価の結果に応じて、予約ブロックを特定する(ステップS105)。
 ここで、図10乃至図13を参照して、コスト評価グラフの評価方法の詳細について説明する。
 図10のA乃至図10のCに示すように、WSDB21-1乃至21-3から取得された周波数利用状況情報により通知される空きブロックB1乃至B3を、それぞれ時間と周波数の平面上に表すと、各WSDB21ごとに、空きブロックBにより特定される時間帯と周波数帯域からなる領域が異なっている。その理由は、前述したように、WSDB21ごとに、時間帯ごとの周波数帯域の利用状況を管理している地域が異なるために、その地域ごとに空いている時間帯や周波数帯域が異なるからである。
 そして、図10のA乃至図10のCに示した平面を1つの平面上に重畳的に表すと、図10のDに示すように、空きブロックB1乃至B3の全てが重なる領域、空きブロックB1とB2が重なる領域、空きブロックB1とB3が重なる領域、空きブロックB2とB3が重なる領域、空きブロックB1,B2,B3のみの領域のいずれの領域からなる。そして、空きブロックB1乃至B3の全てが重なる領域を抜き出すと、図10のEに示すように、4つの共通の空きブロックが得られる。これらの共通の空きブロックは、WSDB21-1乃至21-3の管理下にある全ての地域で、共通の時間帯において、共通に利用可能な周波数帯域となる。
 すなわち、ブロードキャストサーバ11は、図10のEに示した共通の空きブロックの領域内の配信時間帯に、その配信時間帯に対応する配信周波数帯域を利用して、コンテンツをブロードキャスト配信することができる。そして、このブロードキャスト配信されるコンテンツは、WSDB21-1乃至21-3の管理下にある地域内に存在するTVBD31-1乃至31-Mに配信されることになる。
 また、共通の空きブロックの領域内の時間帯と周波数帯域を評価するに際して、空きブロックの領域に対して重み付けをしてから、評価を実行することができる。例えば、日曜日の19:00~22:00の時間帯などのように、コンテンツがより多くの視聴者に視聴されると見込まれる領域については、空きブロックの利用コストを高く設定する一方、早朝や深夜の時間帯などのように視聴者が少なくなると見込まれる領域については、空きブロックの利用コストを低く設定する。
 例えば、図11のA乃至図11のCに示すように、図10のA乃至図10のCの空きブロックB1乃至B3を、それぞれ時間と周波数の平面上に表したグラフに対して、各WSDB21ごとに、より多くの視聴者による視聴が多く見込まれ、利用コストが高くなっている領域(以下、時間高コスト領域という)を設定することができる。
 そして、図11のA乃至図11のCに示した平面を1つの平面上に重畳的に表すと、図11のDに示すように、重畳的に表された空きブロックB1乃至B3に対して、さらに時間高コスト領域が重畳される。すなわち、共通の空きブロックの領域のうち、時間高コスト領域内の共通の空きブロックは、コストが高く見込まれる一方、時間高コスト領域外となる利用コストが低くなっている領域(以下、時間低コスト領域という)の共通の空きブロックは、コストが低く見込まれる。
 評価基準情報には、時間高コスト領域又は時間低コスト領域に属する共通の空きブロックのいずれを優先するかを示すコストパラメータが含まれている。
 例えば、コストパラメータが、時間低コスト領域の優先を示している場合、図11のEに示すように、時間低コスト領域内の共通の空きブロックが、予約ブロックとして選択される。なお、図11のEには時間低コスト領域が優先される場合について図示したが、コストパラメータが、時間高コスト領域の優先を示している場合には、時間高コスト領域内の共通の空きブロックが、予約ブロックとして選択されることになる。
 また、日時や時刻等の時間帯の他、コンテンツを配信するビットレートの高低、すなわち、周波数帯域のコストに応じて、空きブロックの利用コストを設定してもよい。
 例えば、図12のA乃至図12のCに示すように、空きブロックB1乃至B3を、それぞれ時間と周波数の平面上に表したグラフに対して、各WSDB21ごとに、コンテンツを配信するための配信ビットレートが高く見込まれ、利用コストが高くなっている領域(以下、周波数高コスト領域という)を設定することができる。
 そして、図12のA乃至図12のCに示した平面を1つの平面上に重畳的に表すと、図12のDに示すように、重畳的に表された空きブロックB1乃至B3に対して、さらに周波数高コスト領域が重畳される。すなわち、共通の空きブロックのうち、周波数高コスト領域内の共通の空きブロックは、コストが高く見込まれる一方、周波数高コスト領域外となる利用コストが低くなっている領域(以下、周波数低コスト領域という)の共通の空きブロックは、コストが低く見込まれる。
 評価基準情報には、コストパラメータとして、前述した時間コスト領域の優先度に関するパラメータの他、周波数高コスト領域又は周波数低コスト領域に属する共通の空きブロックのいずれを優先するか示すパラメータが含まれる。
 例えば、コストパラメータが、周波数低コスト領域の優先を示している場合、図12のEに示すように、周波数低コスト領域内の共通の空きブロックが、予約ブロックとして選択される。なお、図12のEには周波数低コスト領域が優先される場合について図示したが、コストパラメータが、周波数高コスト領域の優先を示している場合には、周波数高コスト領域内の共通の空きブロックが、予約ブロックとして選択されることになる。
 また、前述した図11に示した時間コストと、図12に示した周波数コストを組み合わせて、それらの時間コストと周波数コストの組み合わせに応じて、共通の空きブロックの中から、予約ブロックを選択してもよい。このような組み合わせが利用されるケースとしては、例えば、周波数コストを最小限に抑えたいが、時間コストは最大であってもよい、といった場合である。
 例えば、図13のA乃至図13のCに示すように、空きブロックB1乃至B3を、それぞれ時間と周波数の平面上に表したグラフに対して、時間高コスト領域と、周波数高コストを設定することができる。
 そして、図13のA乃至図13のCに示した平面を1つの平面上に重畳的に表すと、図13のDに示すように、重畳的に表された空きブロックB1乃至B3に対して、さらに時間高コスト領域と周波数高コスト領域が重畳される。すなわち、共通の空きブロックのうち、時間高コスト領域内又は周波数高コスト領域内の共通の空きブロックは、コストが高く見込まれる一方、時間低コスト領域内又は周波数低コスト領域内の共通の空きブロックは、コストが低く見込まれる。
 例えば、コストパラメータが、時間高コスト領域の優先、かつ、周波数低コスト領域の優先を示している場合、図13のEに示すように、時間高コスト領域内で、かつ、周波数低コスト領域内となる共通の空きブロックが、予約ブロックとして選択される。
 なお、図13のEには、時間高コスト領域と周波数低コスト領域が優先される場合について図示したが、コストパラメータが、時間高コスト領域の優先、かつ、周波数高コスト領域の優先を示している場合には、時間高コスト領域内で、かつ、周波数高コスト領域内となる共通の空きブロックが、予約ブロックとして選択される。また、時間低コスト領域と周波数低コスト領域が優先される場合や、時間低コスト領域と周波数高コスト領域が優先される場合についても、優先される領域内の共通の空きブロックが、予約ブロックとして選択されることになる。
 以上のように、配信評価部122においては、時間高コスト領域又は時間低コスト領域、及び周波数高コスト領域又は周波数低コスト領域のうちのいずれか一方又は双方に属する共通の空きブロックのいずれを優先するかを示すパラメータにより重み付けがされてから評価が行われ、予約ブロックが特定されることになる。
 なお、前述したように、コストパラメータは、評価基準情報として、コンテンツ制作会社等のコンテンツ提供者によりあらかじめ設定される。
 従って、コンテンツ提供者は、自身のコンテンツの配信条件(配信時間帯や配信周波数帯域)を、例えば、自身の予算を考慮しながら、より多くの視聴者に視聴されるようにしたいか、あるいは、より高ビットレートで配信されるようにしたいかなどの観点から設定することができる。その結果、コンテンツ提供者は、自身の予算内で、最もよい配信条件により、所望のコンテンツを配信させることができる。
 図9のフローチャートに戻り、ステップS105の処理が終了すると、処理は、さらに、図7のフローチャートに戻り、ステップS23以降の処理が実行される。
 ステップS24において、WSDB照会部123は、配信評価処理により特定された予約ブロックを、伝送路2を介して、WSDB21-1乃至21-3にそれぞれ通知する。
 ステップS32において、WSDB21-1のDB管理部212は、ブロードキャストリソース管理サーバ12から通知された予約ブロックを、WSDB213に登録する。WSDB21-2及びWSDB21-3においても同様に、通知された予約ブロックが、WSDB213にそれぞれ登録される。
 これにより、各WSDB21において、予約ブロックに対応する時間帯と周波数帯域が、ブロードキャストサーバ11によるコンテンツの配信用に確保され、他のコンテンツの配信には用いることができなくなる。
 一方、ブロードキャストリソース管理サーバ12においては、配信スケジュール生成部126によって、配信評価処理により特定された予約ブロックに基づいて、配信スケジュールが生成される(ステップS25)。
 この配信スケジュールは、予約ブロックに割り当てられた配信時間帯と配信周波数帯域により配信されるコンテンツの配信情報であって、例えば、メタデータが格納されたファイル(マニフェストファイル)からなる。例えば、配信スケジュール(配信情報)には、配信時間帯と配信周波数帯域ごとに配信される予定のコンテンツのタイトル、ジャンル、概要、購入価格、その他のコンテンツに関する情報がメタデータとして格納されている。
 生成された配信スケジュールは、通信部121によって、ブロードキャストサーバ11に通知される一方、配信スケジュール通知部127によって、伝送路2を介してTVBD31-1乃至31-Mにも通知される(ステップS26)。
 配信スケジュールが通知されると、ブロードキャストサーバ11においては、制御部110によって、配信処理のスケジューリングが実行される(ステップS13)。このスケジューリングでは、通知された配信スケジュールに基づいて、配信時間帯になったときに、配信周波数帯域を利用して、コンテンツをブロードキャスト配信するための予定が立てられる。
 そして、制御部110によって、配信時間帯となったと判定されるまで(図8のステップS14の「Yes」)、ブロードキャストサーバ11は待機する。
 一方、TVBD31-1においては、配信スケジュールが通知されると、制御部310によって、受信処理のスケジューリングが実行される(ステップS61)。この受信処理のスケジューリングでは、通知された配信スケジュールに基づいて、配信時間帯になったときに、配信周波数帯を利用して、ブロードキャストサーバ11から配信されてくる、所望のコンテンツを受信可能な状態にするための予定が立てられる。
 例えば、制御部310は、配信スケジュールに含まれるコンテンツのメタデータに基づいて、図14に示すように、配信が予定されるコンテンツごとのタイトル、ジャンル、概要、購入価格、その他のコンテンツに関する情報が時間と周波数の平面上に表された配信予定表を、表示部312に表示する。ユーザは、表示部312に表示された配信予定表を確認して、配信が予定されるコンテンツの中から、自身が視聴したい所望のコンテンツを、入力部313を操作して選択することになる。
 なお、図14の配信予定表は、ユーザに対して配信予定のコンテンツを選択させるための画面表示の一例であって、例えば、TVBD31において利用可能な電子番組表(EPG:Electronic Program Guide)や、新聞のラジオテレビ欄のような表示方法であってもよい。
 また、制御部310は、嗜好情報取得部316により取得されたユーザの嗜好情報に基づいて、配信予定のコンテンツの中から、TVBD31-1を使用しているユーザの嗜好に合ったコンテンツを類推する処理を実行し、類推されたコンテンツを、ユーザが視聴したいコンテンツとみなしてもよい。この場合、ユーザは、所望のコンテンツを選択する必要がない。また、嗜好情報としては、前述したユーザの視聴履歴などが用いられ、その視聴履歴に応じたジャンルやタイトルのコンテンツが選択される。
 受信処理のスケジューリングが終了すると、図7のフローチャートに戻り、ステップS62において、電力供給情報通知部317は、受信処理のスケジューリングにより選択されたコンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、伝送路2又は電力網6を介して電力制御サーバ41に通知する。
 そして、制御部310によって、配信時間帯の直前(例えば、配信の数分前)になったと判定されるまで(図8のステップS63の「Yes」)、TVBD31-1は待機する。
 同様に、TVBD31-2乃至31-Mにおいては、配信スケジュールが通知されると、受信処理のスケジューリングが実行される。このスケジューリングにより、配信時間帯になったときに、配信周波数帯を利用して、ブロードキャストサーバ11から配信されてくる、所望のコンテンツを受信可能にするための予定が立てられる(ステップS71)。また、受信処理のスケジューリングに応じた電力供給情報が伝送路2又は電力網6を介して電力制御サーバ41に通知される(ステップS72)。そして、配信時間帯の直前になったと判定されるまで(図8のステップS73の「Yes」)、TVBD31-2乃至31-Mは待機する。
 TVBD31-1乃至31-Mから伝送路2又は電力網6を介して通知される電力供給情報は、電力制御サーバ41の通信部413又は接続部411により受信される。電力制御サーバ41においては、電力監視制御部412によって、電力供給情報に基づいた電力供給のスケジューリングが実行される(ステップS81)。このスケジューリングにより、例えば、配信予定のコンテンツごとの配信時間帯において必要となる電力量の予定が立てられる。
 ステップS82において、電力監視制御部412は、電力供給のスケジューリングの結果に基づいて、配信時間帯におけるTVBD31-1乃至31-Mに対する電力供給の可否を評価する。
 すなわち、電力供給のスケジューリングでは、配信時間帯におけるTVBD31-1乃至31-Mの総消費電力量の予想値が求められるので、電力監視制御部412は、例えば、総消費電力量があらかじめ定められた電力量以下となる場合、TVBD31-1乃至31-Mに対して電力を供給できると評価する。一方、総消費電力量があらかじめ定められた電力量を超える場合には、TVBD31-1乃至31-Mに対して電力を供給できないと評価される。
 また、電力監視制御部412は、発電所7の発電電力量と、ユーザ宅5やオフィス8等の電力需要設備の負荷を監視しているため、例えば、それらの電力の需要と供給に応じて、電力供給に余裕がある場合には、TVBD31-1乃至31-Mの総消費電力量の予想値が大きくても、電力供給が可能であると評価してもよい。逆に、電力供給に余裕がない場合には、TVBD31-1乃至31-Mの総消費電力量の予想値が小さくても電力供給が不可能であると評価される。
 このように、電力監視制御部412によって、TVBD31-1乃至31-Mに対する電力供給の可否が評価され、電力供給が可能であると評価された場合、配信時間帯におけるTVBD31-1乃至31-Mに対する電力網6からの電力が確保されることになる。一方、電力監視制御部412によって、電力供給が不可能であると評価された場合、配信時間帯におけるTVBD31-1乃至31-Mに対する電力網6からの電力が確保できないことになる。以下、図7及び図8のコンテンツ配信処理では、電力供給の可否の評価によって、配信時間帯におけるTVBD31-1乃至31-Mに対する電力供給が確保された場合について説明する。
 その後、配信時間帯の直前になったと判定された場合(ステップS63の「Yes」、S73の「Yes」)、TVBD31-1乃至31-Mは、各制御部310の制御に従って、各電力供給部318からの電力に基づいて起動される。そして、TVBD31-1乃至31-Mは、それぞれ、待機状態から、所望のコンテンツを受信可能な状態に遷移する(ステップS64,S74)。すなわち、ブロードキャストサーバ11とブロードキャストリソース管理サーバ12側からすれば、TVBD31-1乃至31-Mが、配信スケジュールに応じて配信可能な状態になったとも言える。
 一方、ブロードキャストサーバ11においては、配信時間帯になったと判定された場合(ステップS14の「Yes」)、処理は、ステップS15に進む。そして、ステップS15において、コンテンツ配信部113は、配信周波数帯域を利用して、コンテンツ取得部111により取得されたコンテンツを、TVBD31-1乃至31-Mにブロードキャスト配信する。
 このとき、TVBD31-1乃至31-Mは、既に起動して受信可能な状態となっているため、通信部311によって、ブロードキャストサーバ11から配信されるコンテンツが受信される(ステップS65,S75)。
 TVBD31-1では、再生部314によって、受信されたコンテンツが再生され、表示部312に表示される。なお、前述したように、配信されるコンテンツは、リアルタイムで再生する必要はなく、例えば、TVBD31-2乃至31-Mのうちの、TVBD31-Mでは、蓄積部315によって、受信されたコンテンツが蓄積される。
 これにより、TVBD31-1乃至31-Mを使用するユーザは、所望のコンテンツを視聴するか、あるいは蓄積しておいて後から視聴することができる。
 その後、制御部310は、ブロードキャストサーバ11によるコンテンツの配信が終了したか否かを判定し、コンテンツの配信が終了していないと判定された場合(ステップS67の「No」,S77の「No」)、処理は、ステップS65,S75に戻る。そして、コンテンツの配信が終了するまで、コンテンツの受信及び再生又は蓄積の処理が実行される。
 一方、コンテンツの配信が終了したと判定された場合(ステップS67の「Yes」,S77の「Yes」)、制御部310は、TVBD31の状態を、受信可能状態からスタンバイ状態に遷移させる。これにより、TVBD31-1乃至31-Mでは、コンテンツの受信及び再生又は蓄積の処理が終了する。
 また、ブロードキャストリソース管理サーバ12においては、コンテンツの配信が終了すると(ステップS27の「Yes」)、処理は、ステップS28に進む。ステップS28において、WSDB照会部123は、コンテンツの配信に使用していた予約ブロックの開放を、伝送路2を介して、WSDB21-1乃至21-3にそれぞれ通知する。
 ステップS33において、WSDB21-1のDB管理部212は、WSDB213に登録されていた、ブロードキャストリソース管理サーバ12により通知された予約ブロックを開放する。WSDB21-2及びWSDB21-3においても同様に、WSDB213に登録されていた予約ブロックが開放される(ステップS43,S53)。これにより、各WSDB21において、予約ブロックに対応する時間帯と周波数帯域が開放され、他のコンテンツの配信に用いることが可能となる。
 以上のように、コンテンツ配信システム1においては、コンテンツを配信するに際して、WSDB21に管理されている周波数利用状況情報が取得され、その周波数利用状況情報に基づいて、配信するコンテンツの配信時間帯と配信周波数帯域が評価される。そして、WSDB21の管理下の地域内にある、TVBD31-1乃至31-Mに対して、配信スケジュールが通知され、さらにTVBD31-1乃至31-Mに対する電力供給が確保される場合には、その配信スケジュールにより受信可能な状態となったTVBD31-1乃至31-Mに対して、コンテンツがブロードキャスト配信される。
 これにより、例えば配信時間帯におけるTVBD31-1乃至31-Mの総消費電力量が所定の電力量以下となる場合等の電力需要に余裕がある場合にのみ、TVBD31-1乃至31-Mに対する電力供給が確保され、TVBD31-1乃至31-Mが受信可能な状態となって、コンテンツの配信が行われるので、コンテンツ配信時の電力系統の負荷を軽減することができる。
 また、所定のコンテンツをブロードキャスト配信するとき、そのコンテンツを視聴したいと思っているユーザのTVBD31は必ず起動していることになるため、前述した一斉同時受信性能を向上させることができる。その結果、ブロードキャスト配信の特性を十分に生かすことができ、コンテンツ等の情報配信の効率を向上させることができる。
 さらに、配信時間帯と配信周波数帯域を評価するに際しては、時間帯や周波数帯域に応じた重み付けがされてから評価が行われるので、コンテンツ提供者側からすれば、自身がかけられるコストに見合った配信の時間帯とビットレートで、コンテンツを配信できる。これにより、配信コストに応じて情報配信の効率を向上させることができるため、コンテンツ配信の費用対効果を高めることができる。
[配信スケジュール再通知処理]
 次に、図15のフローチャートを参照して、前述した電力監視制御部412による電力供給の可否の評価処理(図7のステップS82)によって、TVBD31-1乃至31-Mに対する電力供給が確保できない場合の配信スケジュール再通知処理について説明する。
 なお、図15のフローチャートに示された処理は、図7のフローチャートと重複している処理が一部省略されており、図7のステップS24が行われ、予約ブロックが、WSDB21-1乃至21-3にそれぞれ登録された以降の処理に対応している。
 すなわち、ステップS221においては、図7のステップS25と同様に、配信スケジュール生成部126によって、配信評価処理により特定された予約ブロックに基づいて、配信スケジュールが生成される。この配信スケジュールは、図7のステップS26と同様に、通信部121によって、ブロードキャストサーバ11に通知される一方、配信スケジュール通知部127によって、伝送路2を介してTVBD31-1乃至31-Mにも通知される(ステップS222)。
 配信スケジュールが通知されると、ブロードキャストサーバ11においては、図7のステップS13と同様に、制御部110によって、配信処理のスケジューリングが実行される(ステップS211)。そして、制御部110によって、配信時間帯となったと判定されるまで、ブロードキャストサーバ11は待機する。
 一方、TVBD31-1乃至31-Mにおいては、配信スケジュールが通知されると、制御部310によって、図7のステップS61,S71と同様に、受信処理のスケジューリングが実行される(ステップS261,S271)。受信処理のスケジューリングが終了すると、TVBD31-1乃至31-Mにおいては、図7のステップS62,S72と同様に、受信処理のスケジューリングに応じた電力供給情報が伝送路2又は電力網6を介して電力制御サーバ41に通知される(ステップS262,S272)。
 TVBD31-1乃至31-Mから伝送路2又は電力網6を介して通知される電力供給情報は、電力制御サーバ41により受信される。電力制御サーバ41においては、図7のステップS81,S82と同様に、電力供給情報に基づいた電力供給のスケジューリングが実行され、そのスケジューリングの結果に基づいて、配信時間帯におけるTVBD31-1乃至31-Mに対する電力供給の可否が評価される(ステップS281,S282)。
 ステップS283において、電力監視制御部412は、電力供給の可否の評価結果に基づいて、TVBD31-1乃至31-Mに対して電力を供給できるか否かを判定する。
 ステップS283において、電力を供給できないと判定された場合、処理は、ステップS284に進む。ステップS284において、通信部413は、電力監視制御部412の制御に従い、電力供給の可否の評価結果を、伝送路2又は電力網6を介してブロードキャストリソース管理サーバ12に通知する。
 電力制御サーバ41から伝送路2又は電力網6を介して通知される電力供給の可否の評価結果は、ブロードキャストリソース管理サーバ12の電力供給評価結果受信部128により受信される。そして、再度、ステップS221の処理が行われ、配信スケジュール生成部126によって、配信スケジュールが再生成される。
 この配信スケジュールの再生成の処理としては、例えば、前述した配信評価処理(図7のステップS23)により生成されたコスト評価グラフの評価が再度行われる。すなわち、図10乃至図13を参照して説明したように、コスト評価グラフの評価に際しては、共通の空きブロックの中から、予約ブロックが選択されることになるが、ここでは、前回選択された予約ブロックとは異なる予約ブロックが選択されることになる。そして、配信スケジュール生成部126は、新たに特定された予約ブロックに基づいて、配信スケジュールを再生成する。なお、この場合、WSDB21-1乃至21-3においては、前回登録された予約ブロックが開放され、今回新たに選択された予約ブロックがそれぞれ登録されることになる。
 また、例えば、コスト評価グラフ自体が再生成されるようにしてもよい。この場合、WSDB21-1乃至21-3の前回登録された予約ブロックを開放してから、図7のステップS21,S22と同様に、空きブロックがWSDB21-1乃至21-3にそれぞれ問い合わせられ、周波数利用状況情報が取得される。そして、配信評価部122によって、図7のステップS23と同様に、周波数利用状況情報及び評価基準情報に基づいた、評価基準情報により重み付けがされたコスト評価グラフが再生成される。これにより、再生成されたコスト評価グラフの評価が行われ、前回選択された予約ブロックとは異なる予約ブロックが選択されることになる。そして、配信スケジュール生成部126は、新たに特定された予約ブロックに基づいて、配信スケジュールを再生成する。
 なお、電力制御サーバ41から通知される電力供給の可否の評価結果に、例えば、配信時間帯におけるTVBD31-1乃至31-Mの総消費電力量の目標値を含ませることで、その目標値に応じた配信スケジュールが再生成されるようにしてもよい。
 このようにして、配信スケジュールが再生成されることにより、例えば、前回の配信スケジュールと比べて配信時間帯がずれてコンテンツの視聴者が減少し、その分起動するTVBD31の数が減少することになるので、配信時間帯における電力需要が満たされることが期待される。また、例えば、配信時間帯が電力需要の少ない時間帯にずれることでも、配信時間帯における電力需要が満たされる可能性があるし、あるいは、例えば、配信ビットレートが低くなれば、高画質のコンテンツを期待する視聴者が視聴しない可能性がある。
 再生成された配信スケジュールは、通信部121によって、ブロードキャストサーバ11に再通知される一方、配信スケジュール通知部127によって、伝送路2を介してTVBD31-1乃至31-Mにも再通知される(ステップS222)。
 配信スケジュールが再通知されると、ブロードキャストサーバ11においては、制御部110によって、再度、配信処理のスケジューリングが実行され(ステップS211)、配信時間帯となったと判定されるまで、ブロードキャストサーバ11は待機する。
 一方、TVBD31-1乃至31-Mにおいては、配信スケジュールが再通知されると、TVBD31-1乃至31-Mにおいては、再度、受信処理のスケジューリングが行われ(ステップS261,S271)、受信処理のスケジューリングに応じた電力供給情報が電力制御サーバ41に再通知される(ステップS262,S272)。
 TVBD31-1乃至31-Mから再通知される電力供給情報は、電力制御サーバ41により受信される。そして、電力監視制御部412によって、再度、電力供給情報に基づいた電力供給のスケジューリングが実行され(ステップS281)、配信時間帯におけるTVBD31-1乃至31-Mに対する電力供給の可否が再評価される(ステップS282)。
 そして、電力供給の可否の再評価によって、TVBD31-1乃至31-Mに対して電力を供給できないと判定された場合(ステップS283の「Yes」)、処理は、再度、ステップS284に進む。すなわち、TVBD31-1乃至31-Mに対する配信時間帯における電力供給が確保されるまで、前述した配信スケジュールの再生成処理が繰り返される。
 一方、電力供給の可否の再評価によって、TVBD31-1乃至31-Mに対する配信時間帯における電力供給が確保された場合(ステップS283の「No」)、ステップS284の処理はスキップされる。この場合、ブロードキャストリソース管理サーバ12には、電力供給の可否の評価結果が通知されず、配信スケジュールが確定し、TVBD31-1乃至31-Mは、受信処理のスケジューリングに応じて、配信時間帯の直前まで、待機することになる。
 それ以降の処理は、図8のフローチャートに対応しているため、その説明は省略するが、TVBD31-1乃至31-Mは配信時間帯の直前に起動して、ブロードキャストサーバ11からブロードキャスト配信されるコンテンツを受信することになる。
 以上のように、TVBD31-1乃至31-Mに対する電力供給が確保されるまで、配信スケジュールが再生成されるので、コンテンツ配信時の電力系統の負荷を軽減するとともに、確実にコンテンツを配信することが可能となる。
<2.第2の実施の形態>
[コンテンツ配信システムの他の構成]
 図16は、本技術のコンテンツ配信システムの一実施の形態の他の構成を示す図である。
 図1においては、ブロードキャストサーバ11と、ブロードキャストリソース管理サーバ12は、それぞれ独立した装置であるとして説明したが、それらの装置は、図16に示すように、1つのブロードキャストサーバ11であると捉えることもできる。
 すなわち、図16のブロードキャストサーバ11は、図1のブロードキャストサーバ11に対応する一処理部としてのブロードキャスト配信部11Aと、ブロードキャストリソース管理サーバ12に対応する一処理部としてのブロードキャストリソース管理部12Aからなる1つの装置である。図16のブロードキャストサーバ11は、サービスプロバイダ3の施設内に配置される。
 ブロードキャスト配信部11Aは、図2の制御部110乃至コンテンツ配信部113から構成される。図2の制御部110乃至コンテンツ配信部113の動作は前述したとおりである。
 ブロードキャストリソース管理部12Aは、図3の制御部120乃至電力供給評価結果受信部128から構成される。図3の制御部120乃至電力供給評価結果受信部128の動作は前述したとおりである。
 以上のように、図16のコンテンツ配信システム1は構成される。
<3.第3の実施の形態>
[コンテンツ配信システムの他の構成]
 図17は、本技術のコンテンツ配信システムの一実施の形態のさらに他の構成を示す図である。
 図1においては、ブロードキャストサーバ11と、ブロードキャストリソース管理サーバ12と、WSDB21-1乃至21-Nは、それぞれ独立した装置であるとして説明したが、それらの装置は、図17に示すように、1つのブロードキャストサーバ11であると捉えることもできる。
 すなわち、図17のブロードキャストサーバ11は、前述した図17のブロードキャスト配信部11Aと、ブロードキャストリソース管理部12Aの他、WSDB21に対応する一処理部としてのWSDB21Aからなる1つの装置である。図17のブロードキャストサーバ11は、サービス・ネットワークプロバイダ3Aの施設内に配置される。サービス・ネットワークプロバイダ3Aは、コンテンツ配信のサービスと、周波数利用状況情報の双方を提供する事業者である。
 WSDB21Aは、図4の制御部210乃至WSDB213から構成される。図4の制御部210乃至WSDB213の動作は前述したとおりである。
 以上のように、図17のコンテンツ配信システム1は構成される。
<4.変形例>
 前述した説明では、評価基準情報として、時間、周波数ともに「低」、「高」の2段階のコストで重み付けを行う例を説明したが、前述した2段階に限らず、例えば、「低」、「中」、「高」の3段階や、「レベル1」、「レベル2」、「レベル3」、「レベル4」の4段階など、3段階以上のコストで重み付けをしてもよい。
 また、ブロードキャストサーバ11によるコンテンツの配信であるが、テレビジョン放送等の放送は勿論、放送に限らず、例えばインターネット等、他の通信方式により、コンテンツを配信するようにしてもよい。なお、ここで、通信とは、無線通信及び有線通信は勿論、無線通信と有線通信とが混在した通信、すなわち、ある区間では無線通信が行われ、他の区間では有線通信が行われるようなものであってもよい。さらに、ある装置から他の装置への通信が有線通信で行われ、他の装置からある装置への通信が無線通信で行われるようなものであってもよい。
 また、前述した説明では、電力制御サーバ41に通知される電力供給情報は、TVBD31-1乃至31-Mにより通知されるとして説明したが、ブロードキャストリソース管理サーバ12により通知されるようにしてもよい。この場合、ブロードキャストリソース管理サーバ12は、配信スケジュールに基づいた電力供給情報を、伝送路2を介して電力制御サーバ41に通知するため、TVBD31は電力供給情報を通知する必要がない。
[本技術を適用したコンピュータの説明]
 前述した一連の処理は、ハードウェアにより行うこともできるし、ソフトウェアにより行うこともできる。一連の処理をソフトウェアによって行う場合には、そのソフトウェアを構成するプログラムが、汎用のコンピュータ等にインストールされる。
 そこで、図18は、前述した一連の処理を実行するプログラムがインストールされるコンピュータの一実施の形態の構成例を示している。
 プログラムは、コンピュータ500に内蔵されているハードディスク等の記録部508やROM(Read Only Memory)502に予め記録しておくことができる。
 あるいはまた、プログラムは、フレキシブルディスク、CD-ROM(Compact Disc Read Only Memory),MO(Magneto Optical)ディスク,DVD(Digital Versatile Disc)、磁気ディスク、半導体メモリなどのリムーバブルメディア511に、一時的あるいは永続的に格納(記録)しておくことができる。このようなリムーバブルメディア511は、いわゆるパッケージソフトウエアとして提供することができる。
 なお、プログラムは、前述したようなリムーバブルメディア511からコンピュータ500にインストールする他、ダウンロードサイトから、デジタル衛星放送用の人工衛星を介して、コンピュータ500に無線で転送したり、LAN(Local Area Network)、インターネットといったネットワークを介して、コンピュータ500に有線で転送し、コンピュータ500では、そのようにして転送されてくるプログラムを、通信部509で受信し、記録部508にインストールすることができる。
 コンピュータ500は、CPU(Central Processing Unit)501を内蔵している。CPU501には、バス504を介して、入出力インタフェース505が接続されており、CPU501は、入出力インタフェース505を介して、ユーザによって、キーボードや、マウス、マイク等で構成される入力部506が操作等されることにより指令が入力されると、それに従って、ROM502に格納されているプログラムを実行する。あるいは、また、CPU501は、記録部508に格納されているプログラム、衛星若しくはネットワークから転送され、通信部509で受信されて記録部508にインストールされたプログラム、またはドライブ510に装着されたリムーバブルメディア511から読み出されて記録部508にインストールされたプログラムを、RAM(Random Access Memory)503にロードして実行する。これにより、CPU501は、前述したフローチャートにしたがった処理、あるいは前述したブロック図の構成により行われる処理を行う。そして、CPU501は、その処理結果を、必要に応じて、例えば、入出力インタフェース505を介して、LCD(Liquid Crystal Display)やスピーカ等で構成される出力部507から出力、あるいは、通信部509から送信、さらには、記録部508に記録等させる。
 ここで、本明細書において、コンピュータに各種の処理を行わせるためのプログラムを記述する処理ステップは、必ずしもフローチャートとして記載された順序に沿って時系列に処理する必要はなく、並列的あるいは個別に実行される処理(例えば、並列処理あるいはオブジェクトによる処理)も含むものである。
 また、プログラムは、1のコンピュータにより処理されるものであってもよいし、複数のコンピュータによって分散処理されるものであってもよい。さらに、プログラムは、遠方のコンピュータに転送されて実行されるものであってもよい。
 なお、本明細書において、システムとは、複数の装置により構成される装置全体を表すものである。
 また、本技術の実施の形態は、前述した実施の形態に限定されるものではなく、本技術の要旨を逸脱しない範囲において種々の変更が可能である。
 さらに、本技術は、以下の構成とすることも可能である。
[1]
 コンテンツを配信する情報配信装置から通知される、配信時間帯に配信周波数帯域を利用して配信される前記コンテンツの配信情報に基づいて、前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知する電力供給情報通知部と、
 前記監視制御装置による前記電力供給情報に基づいた電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、通知された前記配信情報に基づいて、前記コンテンツを受信可能な状態に制御する制御部と、
 前記情報配信装置から配信される前記コンテンツを受信するコンテンツ受信部と
 を備える受信装置。
[2]
 前記電力供給情報通知部は、前記監視制御装置による前記電力供給情報に基づいた電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記情報配信装置から再通知される配信情報に基づいて、前記電力供給情報を前記監視制御装置に通知する
 [1]に記載の受信装置。
[3]
 前記制御部は、通知された前記配信情報に基づいて、前記情報配信装置から配信される前記コンテンツの中から所望のコンテンツを選択し、
 前記電力供給情報通知部は、選択された前記コンテンツに関する前記電力供給情報を通知する
 [1]又は[2]に記載の受信装置。
[4]
 前記制御部は、選択された前記コンテンツの配信情報に基づいて、前記情報配信装置から前記コンテンツが配信される直前になったとき、前記受信装置を起動させて、前記コンテンツを受信可能な状態にする
 [1]乃至[3]のいずれかに記載の受信装置。
[5]
 前記配信時間帯と前記配信周波数帯域は、所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を基に決定される
 [1]乃至[4]のいずれかに記載の受信装置。
[6]
 受信装置が、
 コンテンツを配信する情報配信装置から通知される、配信時間帯に配信周波数帯域を利用して配信される前記コンテンツの配信情報に基づいて、前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知し、
 前記監視制御装置による前記電力供給情報に基づいた電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、通知された前記配信情報に基づいて、前記コンテンツを受信可能な状態に制御し、
 前記情報配信装置から配信される前記コンテンツを受信する
 ステップを含む受信方法。
[7]
 配信するコンテンツを取得するコンテンツ取得部と、
 所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を取得する周波数利用状況情報取得部と、
 取得した前記周波数利用状況情報に基づいて、取得した前記コンテンツを配信する配信時間帯と、その配信に利用する配信周波数帯域を評価する配信評価部と、
 前記地域内の複数の受信装置に対して、前記配信時間帯に前記配信周波数帯域を利用して配信される前記コンテンツの配信情報を通知する配信情報通知部と、
 前記地域内の複数の受信装置が前記配信情報に基づいて前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知することで評価される、前記配信時間帯における複数の前記受信装置に対する電力供給の可否の評価結果を受信する電力供給評価結果受信部と、
 電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、前記配信時間帯になったとき、前記配信周波数帯域を利用して、取得した前記コンテンツを、前記配信情報に応じて配信可能な状態となった複数の前記受信装置に配信するコンテンツ配信部と
 を備え、
 前記配信情報通知部は、電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記配信時間帯及び前記配信周波数帯のいずれか一方又は双方を変更した前記配信情報を前記地域内の複数の受信装置に対して通知する
 情報配信装置。
[8]
 前記配信時間帯及び前記配信周波数帯域を評価するときの基準となる評価基準情報を取得する評価基準情報取得部をさらに備え、
 前記配信評価部は、取得した前記評価基準情報に基づいて、前記配信時間帯及び前記配信周波数帯域を評価する
 [7]に記載の情報配信装置。
[9]
 前記評価基準情報は、より多くの視聴者による前記コンテンツの視聴が見込まれる時間帯のコストを高く評価し、かつ、前記コンテンツの配信ビットレートがより高く見込まれる周波数帯域のコストを高く評価するための基準である
 [8]に記載の情報配信装置。
[10]
 前記評価基準情報は、より多くの視聴者による前記コンテンツの視聴が見込まれる時間帯のコストを高く評価するための基準である
 [8]又は[9]に記載の情報配信装置。
[11]
 前記評価基準情報は、前記コンテンツの配信ビットレートがより高く見込まれる周波数帯域のコストを高く評価するための基準である
 [8]乃至[10]のいずれかに記載の情報配信装置。
[12]
 前記周波数利用状況情報取得部は、各地域ごとの前記周波数利用状況情報を管理している情報管理装置から各地域ごとの前記周波数利用状況情報を取得する
 [7]乃至[11]のいずれかに記載の情報配信装置。
[13]
 前記情報配信装置は、配信装置と管理装置から構成されており、
 前記配信装置は、前記コンテンツ取得部と、前記コンテンツ配信部とを備え、
 前記管理装置は、前記周波数利用状況情報取得部と、前記配信評価部と、前記配信情報通知部と、前記電力供給評価結果受信部とを備える
 [7]乃至[12]のいずれかに記載の情報配信装置。
[14]
 情報配信装置が、
 配信するコンテンツを取得し、
 所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を取得し、
 取得した前記周波数利用状況情報に基づいて、取得した前記コンテンツを配信する配信時間帯と、その配信に利用する配信周波数帯域を評価し、
 前記地域内の複数の受信装置に対して、前記配信時間帯に前記配信周波数帯域を利用して配信される前記コンテンツの配信情報を通知し、
 前記地域内の複数の受信装置が前記配信情報に基づいて前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知することで評価される、前記配信時間帯における複数の前記受信装置に対する電力供給の可否の評価結果を受信し、
 電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、前記配信時間帯になったとき、前記配信周波数帯域を利用して、取得した前記コンテンツを、前記配信情報に応じて配信可能な状態となった複数の前記受信装置に配信し、
 電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記配信時間帯及び前記配信周波数帯のいずれか一方又は双方を変更した前記配信情報を前記地域内の複数の受信装置に対して通知する
 ステップを含む情報配信方法。
[15]
 情報配信装置、情報管理装置、複数の受信装置、及び電力系統の電力供給を監視制御する監視制御装置から構成される情報配信システムにおいて、
 前記情報配信装置は、
  配信するコンテンツを取得するコンテンツ取得部と、
  所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を管理している前記情報管理装置から、前記周波数利用状況情報を取得する周波数利用状況情報取得部と、
  取得した前記周波数利用状況情報に基づいて、取得した前記コンテンツを配信する配信時間帯と、その配信に利用する配信周波数帯域を評価する配信評価部と、
  前記地域内の複数の前記受信装置に対して、前記配信時間帯に前記配信周波数帯域を利用して配信される前記コンテンツの配信情報を通知する配信情報通知部と
 を備え、
 複数の前記受信装置のそれぞれは、
  前記情報配信装置から通知される、前記配信情報に基づいて、前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を前記監視制御装置に通知する電力供給情報通知部を備え、
 前記監視制御装置は、
  複数の前記受信装置のそれぞれから通知される前記電力供給情報に基づいて、前記配信時間帯における複数の前記受信装置に対する電力供給の可否を評価する電力供給評価部と、
  評価された電力供給の可否の結果を、前記情報配信装置に通知する電力供給結果通知部と
 を備え、
 前記情報配信装置は、さらに、
  前記監視制御装置から通知される電力供給の可否の結果を受信する電力供給評価結果受信部と、
  電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、前記配信時間帯になったとき、前記配信周波数帯域を利用して、取得した前記コンテンツを、前記配信情報に応じて配信可能な状態となった複数の前記受信装置に配信するコンテンツ配信部を備え、
 前記配信情報通知部は、電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記配信時間帯及び前記配信周波数帯のいずれか一方又は双方を変更した前記配信情報を前記地域内の複数の受信装置に対して通知し、
 前記受信装置のそれぞれは、さらに、
  電力供給の可否の評価によって配信時間帯における電力供給が確保される場合、通知された前記配信情報に基づいて、前記コンテンツを受信可能な状態に制御する制御部と、
  前記情報配信装置から配信される前記コンテンツを受信するコンテンツ受信部と
 を備える情報配信システム。
 1 コンテンツ配信システム, 2 伝送路, 6 電力網, 11 ブロードキャストサーバ, 11A ブロードキャスト配信部, 12 ブロードキャストリソース管理サーバ, 12A ブロードキャストリソース管理部, 21,21A,21-1乃至21-N WSDB, 31,31-1乃至31-M TVBD, 41 電力制御サーバ, 110 制御部, 111 コンテンツ取得部, 112 通信部, 113 コンテンツ配信部, 120 制御部, 121 通信部, 122 配信評価部, 123 WSDB照会部, 124 周波数利用状況情報取得部, 125 評価基準情報取得部, 126 配信スケジュール生成部, 127 配信スケジュール通知部, 128 電力供給評価結果受信部, 210 制御部, 211 通信部, 212 DB管理部, 213 WSDB, 310 制御部, 311 通信部, 312 表示部, 313 入力部, 314 再生部, 315 蓄積部, 316 嗜好情報取得部, 317 電力供給情報通知部, 318 電力供給部, 412 電力監視制御部, 413 通信部, 500 コンピュータ, 501 CPU

Claims (15)

  1.  コンテンツを配信する情報配信装置から通知される、配信時間帯に配信周波数帯域を利用して配信される前記コンテンツの配信情報に基づいて、前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知する電力供給情報通知部と、
     前記監視制御装置による前記電力供給情報に基づいた電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、通知された前記配信情報に基づいて、前記コンテンツを受信可能な状態に制御する制御部と、
     前記情報配信装置から配信される前記コンテンツを受信するコンテンツ受信部と
     を備える受信装置。
  2.  前記電力供給情報通知部は、前記監視制御装置による前記電力供給情報に基づいた電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記情報配信装置から再通知される配信情報に基づいて、前記電力供給情報を前記監視制御装置に通知する
     請求項1に記載の受信装置。
  3.  前記制御部は、通知された前記配信情報に基づいて、前記情報配信装置から配信される前記コンテンツの中から所望のコンテンツを選択し、
     前記電力供給情報通知部は、選択された前記コンテンツに関する前記電力供給情報を通知する
     請求項1に記載の受信装置。
  4.  前記制御部は、選択された前記コンテンツの配信情報に基づいて、前記情報配信装置から前記コンテンツが配信される直前になったとき、前記受信装置を起動させて、前記コンテンツを受信可能な状態にする
     請求項3に記載の受信装置。
  5.  前記配信時間帯と前記配信周波数帯域は、所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を基に決定される
     請求項4に記載の受信装置。
  6.  受信装置が、
     コンテンツを配信する情報配信装置から通知される、配信時間帯に配信周波数帯域を利用して配信される前記コンテンツの配信情報に基づいて、前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知し、
     前記監視制御装置による前記電力供給情報に基づいた電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、通知された前記配信情報に基づいて、前記コンテンツを受信可能な状態に制御し、
     前記情報配信装置から配信される前記コンテンツを受信する
     ステップを含む受信方法。
  7.  配信するコンテンツを取得するコンテンツ取得部と、
     所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を取得する周波数利用状況情報取得部と、
     取得した前記周波数利用状況情報に基づいて、取得した前記コンテンツを配信する配信時間帯と、その配信に利用する配信周波数帯域を評価する配信評価部と、
     前記地域内の複数の受信装置に対して、前記配信時間帯に前記配信周波数帯域を利用して配信される前記コンテンツの配信情報を通知する配信情報通知部と、
     前記地域内の複数の受信装置が前記配信情報に基づいて前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知することで評価される、前記配信時間帯における複数の前記受信装置に対する電力供給の可否の評価結果を受信する電力供給評価結果受信部と、
     電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、前記配信時間帯になったとき、前記配信周波数帯域を利用して、取得した前記コンテンツを、前記配信情報に応じて配信可能な状態となった複数の前記受信装置に配信するコンテンツ配信部と
     を備え、
     前記配信情報通知部は、電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記配信時間帯及び前記配信周波数帯のいずれか一方又は双方を変更した前記配信情報を前記地域内の複数の受信装置に対して通知する
     情報配信装置。
  8.  前記配信時間帯及び前記配信周波数帯域を評価するときの基準となる評価基準情報を取得する評価基準情報取得部をさらに備え、
     前記配信評価部は、取得した前記評価基準情報に基づいて、前記配信時間帯及び前記配信周波数帯域を評価する
     請求項7に記載の情報配信装置。
  9.  前記評価基準情報は、より多くの視聴者による前記コンテンツの視聴が見込まれる時間帯のコストを高く評価し、かつ、前記コンテンツの配信ビットレートがより高く見込まれる周波数帯域のコストを高く評価するための基準である
     請求項8に記載の情報配信装置。
  10.  前記評価基準情報は、より多くの視聴者による前記コンテンツの視聴が見込まれる時間帯のコストを高く評価するための基準である
     請求項8に記載の情報配信装置。
  11.  前記評価基準情報は、前記コンテンツの配信ビットレートがより高く見込まれる周波数帯域のコストを高く評価するための基準である
     請求項8に記載の情報配信装置。
  12.  前記周波数利用状況情報取得部は、各地域ごとの前記周波数利用状況情報を管理している情報管理装置から各地域ごとの前記周波数利用状況情報を取得する
     請求項7に記載の情報配信装置。
  13.  前記情報配信装置は、配信装置と管理装置から構成されており、
     前記配信装置は、前記コンテンツ取得部と、前記コンテンツ配信部とを備え、
     前記管理装置は、前記周波数利用状況情報取得部と、前記配信評価部と、前記配信情報通知部と、前記電力供給評価結果受信部とを備える
     請求項7に記載の情報配信装置。
  14.  情報配信装置が、
     配信するコンテンツを取得し、
     所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を取得し、
     取得した前記周波数利用状況情報に基づいて、取得した前記コンテンツを配信する配信時間帯と、その配信に利用する配信周波数帯域を評価し、
     前記地域内の複数の受信装置に対して、前記配信時間帯に前記配信周波数帯域を利用して配信される前記コンテンツの配信情報を通知し、
     前記地域内の複数の受信装置が前記配信情報に基づいて前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を、電力系統の電力供給を監視制御する監視制御装置に通知することで評価される、前記配信時間帯における複数の前記受信装置に対する電力供給の可否の評価結果を受信し、
     電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、前記配信時間帯になったとき、前記配信周波数帯域を利用して、取得した前記コンテンツを、前記配信情報に応じて配信可能な状態となった複数の前記受信装置に配信し、
     電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記配信時間帯及び前記配信周波数帯のいずれか一方又は双方を変更した前記配信情報を前記地域内の複数の受信装置に対して通知する
     ステップを含む情報配信方法。
  15.  情報配信装置、情報管理装置、複数の受信装置、及び電力系統の電力供給を監視制御する監視制御装置から構成される情報配信システムにおいて、
     前記情報配信装置は、
      配信するコンテンツを取得するコンテンツ取得部と、
      所定の各地域における時間帯ごとの周波数帯域の利用状況に関する周波数利用状況情報を管理している前記情報管理装置から、前記周波数利用状況情報を取得する周波数利用状況情報取得部と、
      取得した前記周波数利用状況情報に基づいて、取得した前記コンテンツを配信する配信時間帯と、その配信に利用する配信周波数帯域を評価する配信評価部と、
      前記地域内の複数の前記受信装置に対して、前記配信時間帯に前記配信周波数帯域を利用して配信される前記コンテンツの配信情報を通知する配信情報通知部と
     を備え、
     複数の前記受信装置のそれぞれは、
      前記情報配信装置から通知される、前記配信情報に基づいて、前記コンテンツを受信する際の電力供給量と電力供給時間に関する情報を含む電力供給情報を前記監視制御装置に通知する電力供給情報通知部を備え、
     前記監視制御装置は、
      複数の前記受信装置のそれぞれから通知される前記電力供給情報に基づいて、前記配信時間帯における複数の前記受信装置に対する電力供給の可否を評価する電力供給評価部と、
      評価された電力供給の可否の結果を、前記情報配信装置に通知する電力供給結果通知部と
     を備え、
     前記情報配信装置は、さらに、
      前記監視制御装置から通知される電力供給の可否の結果を受信する電力供給評価結果受信部と、
      電力供給の可否の評価によって前記配信時間帯における電力供給が確保される場合、前記配信時間帯になったとき、前記配信周波数帯域を利用して、取得した前記コンテンツを、前記配信情報に応じて配信可能な状態となった複数の前記受信装置に配信するコンテンツ配信部を備え、
     前記配信情報通知部は、電力供給の可否の評価によって前記配信時間帯における電力供給が確保できない場合、前記配信時間帯及び前記配信周波数帯のいずれか一方又は双方を変更した前記配信情報を前記地域内の複数の受信装置に対して通知し、
     前記受信装置のそれぞれは、さらに、
      電力供給の可否の評価によって配信時間帯における電力供給が確保される場合、通知された前記配信情報に基づいて、前記コンテンツを受信可能な状態に制御する制御部と、
      前記情報配信装置から配信される前記コンテンツを受信するコンテンツ受信部と
     を備える情報配信システム。
PCT/JP2012/063910 2011-06-06 2012-05-30 受信装置及び方法、情報配信装置及び方法、並びに情報配信システム WO2012169402A1 (ja)

Priority Applications (6)

Application Number Priority Date Filing Date Title
EP12796031.8A EP2696509A4 (en) 2011-06-06 2012-05-30 RECEIVING DEVICE AND METHOD, INFORMATION DISTRIBUTION DEVICE AND METHOD AND INFORMATION DISTRIBUTION SYSTEM
BR112013030863A BR112013030863A2 (pt) 2011-06-06 2012-05-30 aparelho de recepção, método de recepção, aparelho de entrega de informação, método de entrega de informação, e , sistema de entrega de informação
US14/122,816 US20140109164A1 (en) 2011-06-06 2012-05-30 Reception apparatus and method, information delivery apparatus and method, and information delivery system
RU2013153242/07A RU2013153242A (ru) 2011-06-06 2012-05-30 Устройство приема и способ, устройство доставки информации и способ и система доставки информации
KR1020137031007A KR20140036195A (ko) 2011-06-06 2012-05-30 수신 장치 및 방법, 정보 배신 장치 및 방법, 및 정보 배신 시스템
CN201280026357.6A CN103563259A (zh) 2011-06-06 2012-05-30 接收设备和方法、信息分发设备和方法,以及信息分发系统

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2011-126026 2011-06-06
JP2011126026A JP5626129B2 (ja) 2011-06-06 2011-06-06 受信装置及び方法、情報配信装置及び方法、並びに情報配信システム

Publications (1)

Publication Number Publication Date
WO2012169402A1 true WO2012169402A1 (ja) 2012-12-13

Family

ID=47295968

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2012/063910 WO2012169402A1 (ja) 2011-06-06 2012-05-30 受信装置及び方法、情報配信装置及び方法、並びに情報配信システム

Country Status (8)

Country Link
US (1) US20140109164A1 (ja)
EP (1) EP2696509A4 (ja)
JP (1) JP5626129B2 (ja)
KR (1) KR20140036195A (ja)
CN (1) CN103563259A (ja)
BR (1) BR112013030863A2 (ja)
RU (1) RU2013153242A (ja)
WO (1) WO2012169402A1 (ja)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140297869A1 (en) * 2012-10-11 2014-10-02 Uplynk, LLC Adaptive streaming cost management
WO2014063026A1 (en) 2012-10-18 2014-04-24 Interdigital Patent Holdings, Inc. Decoding complexity for mobile multimedia streaming
CN103986239B (zh) * 2014-05-28 2016-05-25 国电南瑞科技股份有限公司 一种适应分布式电源接入的智能分布式fa控制方法
CN104377829A (zh) * 2014-11-21 2015-02-25 烟台科大正信电气有限公司 基于Cortex-M3内核的新型DTU、FTU配电终端硬件平台
US11396388B2 (en) 2018-12-20 2022-07-26 The Boeing Company Optimized power balanced variable thrust transfer orbits to minimize an electric orbit raising duration
US11401053B2 (en) * 2018-12-20 2022-08-02 The Boeing Company Autonomous control of electric power supplied to a thruster during electric orbit raising
US11753188B2 (en) 2018-12-20 2023-09-12 The Boeing Company Optimized power balanced low thrust transfer orbits utilizing split thruster execution
US11270418B1 (en) 2020-11-19 2022-03-08 VPIX Medical Incorporation Method and system for correcting phase of image reconstruction signal

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011030045A (ja) * 2009-07-28 2011-02-10 Nec Corp 放送システム、放送局、端末、放送方法およびプログラム

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101335454B (zh) * 2001-11-30 2012-03-28 英科电子有限公司 用于远程控制局部站点的能量分配的系统
CN100530888C (zh) * 2004-04-28 2009-08-19 夏普株式会社 发电设备管理系统
JP2009284723A (ja) * 2008-05-26 2009-12-03 Toshiba Corp 電力需給制御装置および電力需給制御方法
JP5742233B2 (ja) * 2011-01-17 2015-07-01 ソニー株式会社 情報配信装置及び方法、並びに情報配信システム
JP5472146B2 (ja) * 2011-02-07 2014-04-16 ソニー株式会社 情報処理装置、情報処理方法、コンピュータプログラム、および電力供給システム

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011030045A (ja) * 2009-07-28 2011-02-10 Nec Corp 放送システム、放送局、端末、放送方法およびプログラム

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
FUJII, K., CORE TECHNOLOGY USING WHITE SPACE FOR ELIMINATING RADIO WAVE UTILIZATION LOSS, 2 May 2011 (2011-05-02), Retrieved from the Internet <URL:http://businessnetwork.jp/tabid/65/artid/110/page/2/Default.aspx>>
See also references of EP2696509A4

Also Published As

Publication number Publication date
EP2696509A4 (en) 2015-02-18
US20140109164A1 (en) 2014-04-17
CN103563259A (zh) 2014-02-05
JP2012253642A (ja) 2012-12-20
JP5626129B2 (ja) 2014-11-19
KR20140036195A (ko) 2014-03-25
RU2013153242A (ru) 2015-06-10
BR112013030863A2 (pt) 2017-03-21
EP2696509A1 (en) 2014-02-12

Similar Documents

Publication Publication Date Title
JP5626129B2 (ja) 受信装置及び方法、情報配信装置及び方法、並びに情報配信システム
US10432296B2 (en) Inter-residence computing resource sharing
US10764344B2 (en) Apparatus, systems and methods for providing edge cached media content to media devices based on user history
JP5167153B2 (ja) ピアのネットワークでリソースを共有する装置及び方法
CN101849415B (zh) 电视分发系统的负载控制
US7840120B2 (en) Communication system, recording apparatus and method, recording medium, and program
EP1901475A2 (en) Systems and methods for channel reuse in a cable system
KR20110076831A (ko) 분산 네트워크 pvr 시스템 및 그 서비스 방법
CN102474594A (zh) 用于实时地管理内容的系统和方法
JP5742233B2 (ja) 情報配信装置及び方法、並びに情報配信システム
US9563717B2 (en) Intelligent caching of content items
US8988614B2 (en) Peak time power saving
CN202143177U (zh) 一种实现网络电视终端多媒体数据共享的系统
CA2880925A1 (en) Systems, methods and computer-readable media for local content storage within a media network
CN103118055A (zh) 一种多媒体接入的方法和设备
US20130268989A1 (en) Method and system for dynamically alocating popular content
Yu Improvement of the client-centric approach for broadcasting popular videos
US20240015357A1 (en) Episode Season Selectable DVR recordings
JP2006065516A (ja) 配信負荷分散装置、配信サーバ、コンテンツ配信システム、配信負荷分散方法、配信負荷分散プログラム、およびコンピュータ読み取り可能な記録媒体
JP2004282502A (ja) 同報サービスのための情報信号送信方法及び情報信号視聴方法、並びに、受信機及びそのプログラム
JP2008269514A (ja) 受信装置、送信装置、配信方法及び配信システム

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 12796031

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2012796031

Country of ref document: EP

ENP Entry into the national phase

Ref document number: 20137031007

Country of ref document: KR

Kind code of ref document: A

WWE Wipo information: entry into national phase

Ref document number: 14122816

Country of ref document: US

ENP Entry into the national phase

Ref document number: 2013153242

Country of ref document: RU

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

REG Reference to national code

Ref country code: BR

Ref legal event code: B01A

Ref document number: 112013030863

Country of ref document: BR

ENP Entry into the national phase

Ref document number: 112013030863

Country of ref document: BR