[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

WO2012054808A1 - Leg ice shields for ice worthy jack-up drilling unit - Google Patents

Leg ice shields for ice worthy jack-up drilling unit Download PDF

Info

Publication number
WO2012054808A1
WO2012054808A1 PCT/US2011/057228 US2011057228W WO2012054808A1 WO 2012054808 A1 WO2012054808 A1 WO 2012054808A1 US 2011057228 W US2011057228 W US 2011057228W WO 2012054808 A1 WO2012054808 A1 WO 2012054808A1
Authority
WO
WIPO (PCT)
Prior art keywords
ice
hull
rig
water
legs
Prior art date
Application number
PCT/US2011/057228
Other languages
French (fr)
Inventor
Peter G. Noble
Randall S. Shafer
Dominique P. Berta
Michael B. Winfree
Original Assignee
Conocophillips Company
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US13/277,791 external-priority patent/US20120128426A1/en
Application filed by Conocophillips Company filed Critical Conocophillips Company
Priority to US13/278,480 priority Critical patent/US20120128427A1/en
Priority to RU2013123039/13A priority patent/RU2013123039A/en
Priority to PCT/US2011/057228 priority patent/WO2012054808A1/en
Priority to CA2804898A priority patent/CA2804898A1/en
Publication of WO2012054808A1 publication Critical patent/WO2012054808A1/en
Priority to NO20130547A priority patent/NO20130547A1/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/0017Means for protecting offshore constructions
    • E02B17/0021Means for protecting offshore constructions against ice-loads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/02Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto
    • E02B17/021Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor placed by lowering the supporting construction to the bottom, e.g. with subsequent fixing thereto with relative movement between supporting construction and platform
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B35/00Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
    • B63B35/08Ice-breakers or other vessels or floating structures for operation in ice-infested waters; Ice-breakers, or other vessels or floating structures having equipment specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0039Methods for placing the offshore structure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/006Platforms with supporting legs with lattice style supporting legs
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B2017/0056Platforms with supporting legs
    • E02B2017/0073Details of sea bottom engaging footing
    • E02B2017/0082Spudcans, skirts or extended feet

Definitions

  • This invention relates to mobile offshore drilling units, often called “jack-up” drilling units or rigs that are used in shallow water, typically less than 400 feet, for drilling for hydrocarbons.
  • a jack-up or mobile offshore drilling unit can be used for about 45-90 days in the short, open-water summer season. Predicting when the drilling season starts and ends is a game of chance and many efforts are undertaken to determine when the jack-up may be safely towed to the drilling location and drilling may be started. Once started, there is considerable urgency to complete the well to avoid having to disconnect and retreat in the event of ice incursion before the well is complete. Even during the few weeks of open water, ice floes present a significant hazard to jack-up drilling rigs where the drilling rig is on location and legs of the jack-up drilling rig are exposed and quite vulnerable to damage.
  • Jack-up rigs are mobile, self-elevating, offshore drilling and workover platforms equipped with legs that are arranged to be lowered to the sea floor and then to lift the hull out of the water.
  • Jack-up rigs typically include the drilling and/or workover equipment, leg-jacking system, crew quarters, loading and unloading facilities, storage areas for bulk and liquid materials, helicopter landing deck and other related facilities and equipment.
  • a jack-up rig is designed to be towed to the drilling site and jacked-up out of the water so that the wave action of the sea only impacts the legs which have a fairly small cross section and thus allows the wave action to pass by without imparting significant movement to the jack-up rig.
  • the legs of a jack-up provide little defense against ice floe collisions and an ice floe of any notable size is capable of causing structural damage to one or more legs and/or pushing the rig off location. If this type of event were to happen before the drilling operations were suspended and suitable secure and abandon had been completed, a hydrocarbon leak would possibly occur. Even a small risk of such a leak is completely unacceptable in the oil and gas industry, to the regulators and to the public.
  • the invention more-particularly relates to an ice worthy jack up rig for drilling for hydrocarbons in potential ice conditions in offshore areas including a flotation hull having a relatively flat deck at the upper portion thereof.
  • the flotation hull further includes an ice bending shape along the lower portion thereof and extending around the periphery of the hull where the ice bending shape extends from an area of the hull near the level of the deck and extends downwardly near the bottom of the hull along with an ice deflecting portion extending around the perimeter of the bottom of the hull to direct ice around the hull and not under the hull.
  • the rig includes at least three truss form legs that are positioned within the perimeter of the bottom of the hull wherein the legs are arranged to be lifted up off the seafloor so that the rig may be towed through shallow water and also extend to the sea floor and extend further to lift the hull partially or fully out of the water.
  • a jack up device is associated with each leg to both lift the leg from the sea bottom so that the ice worthy jack up rig may float by the buoyancy of the hull and push the legs down to the seafloor and push the hull partially up and out of the water when ice floes threaten the rig and fully out of the water when ice is not present.
  • Leg ice shields are arranged to protect the truss form legs from ice.
  • the invention further relates to a method for drilling wells in ice prone waters.
  • the method includes providing a flotation hull having a relatively flat deck at the upper portion thereof and an ice bending shape along the lower portion thereof where the ice bending shape extends from an area of the hull near the level of the deck and extends downwardly near the bottom of the hull and an ice deflecting portion extending around the perimeter of the bottom of the hull to direct ice around the hull and not under the hull.
  • At least three truss form legs are positioned within the perimeter of the bottom of the hull where each leg comprises a plurality of vertically oriented posts connected by cross members and ice shields are arranged between the posts to protect the cross members from ice.
  • Each leg is jacked down in a manner that feet on the bottom of the legs engages the sea floor and lifts the hull up and fully out of the water when ice is not threatening the rig while the rig is drilling a well on a drill site.
  • the hull is further lowered into the water into an ice defensive configuration so that the ice bending shape extends above and below the sea surface to bend ice that comes against the rig to cause the ice to submerge under the water and endure bending forces that break the ice where the ice flows past the rig.
  • Figure 1 is an elevation view of a first embodiment of the present invention where the drilling rig is floating in the water and available to be towed to a well drilling site;
  • Figure 2 is an elevation view of the first embodiment of the present invention where the drilling rig is jacked up out of the water for open water drilling through a moon pool;
  • Figure 3 is a second elevation view of the first embodiment of the present invention where the drilling rig is partially lowered into the ice/water interface, but still supported by its legs, in a defensive configuration for drilling during potential ice conditions;
  • Figure 4 is an enlarged fragmentary elevation view showing one end of the first embodiment of the present invention in the Figure 3 configuration with ice moving against the rig;
  • Figure 5 is a top view of a leg of the drilling rig with a first embodiment of the leg ice shields in place;
  • Figure 6 is a top view of a leg of the drilling rig with a second embodiment of the leg ice shields in place;
  • Figure 7 is an elevation view of the drilling rig with the first embodiment leg ice shields in place.
  • Figure 8 is an elevation view of the drilling rig with the second embodiment leg ice shields in place.
  • an ice worthy jack-up rig is generally indicated by the arrow 10.
  • jack-up rig 10 is shown with its hull 20 floating in the sea and legs 25 in a lifted arrangement where much of the length of the legs 25 extend above the deck 21 of the hull 20.
  • the legs 25 are constructed of long posts with cross members connecting the posts in a truss arrangement.
  • derrick 30 On the deck 21 is derrick 30 which is used to drill wells.
  • the jack-up rig 10 may be towed from one prospect field to another and to and from shore bases for maintenance and other shore service.
  • the legs 25 are lowered through the openings 27 in hull 20 until the feet 26 at the bottom ends of the legs 25 engage the seafloor 15 as shown in Figure 2.
  • the feet 26 are connected to spud cans 28 to secure the rig 10 to the seafloor.
  • jacking rigs within openings 27 push the legs 25 down and therefore, the hull 20 is lifted out of the water. With the hull 20 fully jacked-up and out of the water, any wave action and heavy seas more easily break past the legs 25 as compared to the effect of waves against a large buoyant object like the hull 20.
  • well drilling operations may commence in the ordinary course while there is no ice in the area.
  • the risk of an ice floe contacting and damaging the legs 25 or simply bulldozing the jack-up rig 10 off the drilling site becomes a significant concern for conventional jack-up rigs and such rigs are typically removed from drill sites by the end of the open water season.
  • the ice-worthy jack-up drilling rig 10 is designed to resist ice floes by assuming an ice defensive, hull-in- water configuration as shown in Figure 3.
  • ice tends to dampen waves and rough seas, so the sea surface 12 appears less threatening, however, the hazards of the marine environment have only altered, and not lessened.
  • the hull 20 is lowered into the water to contact same, but not to the extent that the hull 20 would begin to float.
  • a significant portion of the weight of the rig 10 preferably remains on the legs 25 to hold the position of the rig 10 on the drill site against any pressure an ice flow might bring.
  • the rig 10 is lowered so that inwardly sloped, ice-bending surface 41 bridges the sea surface 12 or ice/water interface to engage any floating ice that may come upon the rig 10.
  • the sloped ice-bending surface 41 runs from shoulder 42, which is at the edge of the deck 26, down to neckline 44. Ice deflector 45 extends downward from neckline 44.
  • the ice-bending surface 41 causes the leading edge of the ice floe 51 to submerge under the sea surface 12 and apply a significant bending force that breaks large ice floes into smaller, less damaging, less hazardous bits of ice. For example, it is conceivable that an ice floe being hundreds of feet and maybe miles across could come toward the rig 10. If the ice floe is broken into bits that are less than twenty feet in the longest dimension, such bits are able to pass around the rig 10 with much less concern.
  • Ice has substantial compressive strength being in the range of 4 to 12 MPa, but is much weaker against bending with typical flexure strength in the range of 0.3 to 0.5 MPa.
  • the force of the ice floe 51 moving along the sea surface 12 causes the leading edge to slide under the sea surface 12 and caused section 52 to break off.
  • the ice floe 51 broken into smaller floes, such as section 52 and bit 53 the smaller sections tend to float past and around the rig 10 without applying the impacts or forces of a large floe.
  • ice not be forced under the flat of bottom of the hull 20 and the ice deflector 45 turns ice to flow around the side of the hull 20.
  • the ice deflector 45 is arranged to extend downwardly at a steeper angle than ice-bending surface 41 and will increase the bending forces on the ice floe.
  • an ice deflector is positioned to extend down from the flat of bottom of the hull 20.
  • the turn of the bilge is the flat of bottom at the bottom end of the ice deflector 45.
  • the feet 26 of the legs may be arranged to connect to cans 28 set in the sea floor so that when an ice floe comes against the ice-bending surface 41, the legs 25 actually hold the hull 20 down and force the bending of the ice floe and resist the lifting force of the ice floe which, in an extreme case, may lift the near side of the rig 10 and push the rig over on its side by using the feet 26 on the opposite side of the rig 10 as the fulcrum or pivot.
  • the cans in the sea floor are known for other applications and the feet 26 would include appropriate connections to attach and release from the cans, as desired.
  • the ice- worthy jack-up drill rig 10 is designed to operate like a conventional jack-up rig in open water, but is also designed to settle to the water in an ice defensive position and then re-acquire the conventional stance or configuration when wave action becomes a concern. It is the shape of the hull 20 (as well as its strength) that provides ice bending and breaking capabilities.
  • leg ice shields 32 are attached between vertical posts 31 of the legs.
  • the leg ice shields 32 are bowed to provide a rounded shape to steer any ice around the legs.
  • the leg ice shields 33 are relatively flat.
  • the leg ice shields 32 and 33 are preferably positioned on the legs to extend above, below and across the waterline 12 but not necessarily cover the entire vertical length of each leg 25.
  • leg ice shields provide some ice protection from the legs
  • the legs 25 and the openings 27 through which they are connected to the hull 20 are within the perimeter of the ice deflector 45 so that the ice floes are less likely to contact the legs 25 while the rig 10 is in its defensive ice condition configuration as shown in Figure 3 and sometimes called hull-in-water configuration.
  • the rig 10 does not have to handle every ice floe threat to significantly add value to oil and gas companies. If rig 10 can extend the drilling season by as little as a month, that would be a fifty percent improvement in some ice prone areas and therefore provide a very real cost saving benefit to the industry.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to an ice worthy jack up rig that may extend the drilling season in shallow water off shore Arctic or ice prone locations. The inventive rig would work like a conventional jack up rig while in open water with the hull jacked up out of the water. However, in the event of ice conditions, the legs are held in place by cans embedded in the sea floor to resist lateral movement of the rig and the hull is lowered into the water into an ice defensive configuration. The hull is specifically shaped with an ice bending surface to bend and break up ice that comes in contact with the hull while in the ice defensive configuration.

Description

LEG ICE SHIELDS FOR ICE WORTHY JACK-UP DRILLING UNIT
FIELD OF THE INVENTION
[0001] This invention relates to mobile offshore drilling units, often called "jack-up" drilling units or rigs that are used in shallow water, typically less than 400 feet, for drilling for hydrocarbons.
BACKGROUND OF THE INVENTION
[0002] In the never-ending search for hydrocarbons, many oil and gas reservoirs have been discovered over the last one hundred and fifty years. Many technologies have been developed to find new reservoirs and resources and most areas of the world have been scoured looking for new discoveries. Few expect that any large, undiscovered resources remain to be found near populated areas and in places that would be easily accessed. Instead, new large reserves are being found in more challenging and difficult to reach areas.
[0003] One promising area is in the offshore Arctic. However, the Arctic is remote and cold where ice on the water creates considerable challenges for prospecting for and producing hydrocarbons. Over the years, it has generally been regarded that six unprofitable wells must be drilled for every profitable well. If this is actually true, one must hope that the unprofitable wells will not be expensive to drill. However, in the Arctic, little, if anything, is inexpensive.
[0004] Currently, in the shallow waters of cold weather places like the Arctic, a jack-up or mobile offshore drilling unit (MODU) can be used for about 45-90 days in the short, open-water summer season. Predicting when the drilling season starts and ends is a game of chance and many efforts are undertaken to determine when the jack-up may be safely towed to the drilling location and drilling may be started. Once started, there is considerable urgency to complete the well to avoid having to disconnect and retreat in the event of ice incursion before the well is complete. Even during the few weeks of open water, ice floes present a significant hazard to jack-up drilling rigs where the drilling rig is on location and legs of the jack-up drilling rig are exposed and quite vulnerable to damage. [0005] Jack-up rigs are mobile, self-elevating, offshore drilling and workover platforms equipped with legs that are arranged to be lowered to the sea floor and then to lift the hull out of the water. Jack-up rigs typically include the drilling and/or workover equipment, leg-jacking system, crew quarters, loading and unloading facilities, storage areas for bulk and liquid materials, helicopter landing deck and other related facilities and equipment.
[0006] A jack-up rig is designed to be towed to the drilling site and jacked-up out of the water so that the wave action of the sea only impacts the legs which have a fairly small cross section and thus allows the wave action to pass by without imparting significant movement to the jack-up rig. However, the legs of a jack-up provide little defense against ice floe collisions and an ice floe of any notable size is capable of causing structural damage to one or more legs and/or pushing the rig off location. If this type of event were to happen before the drilling operations were suspended and suitable secure and abandon had been completed, a hydrocarbon leak would possibly occur. Even a small risk of such a leak is completely unacceptable in the oil and gas industry, to the regulators and to the public.
[0007] Thus, once it is determined that a potentially profitable well has been drilled during this short season, a very large, gravity based production system, or similar structure may be brought in and set on the sea floor for the long process of drilling and producing the hydrocarbons. These gravity based structures are very large and very expensive, but are built to withstand the ice forces year around.
BRIEF SUMMARY OF THE DISCLOSURE
[0008] The invention more-particularly relates to an ice worthy jack up rig for drilling for hydrocarbons in potential ice conditions in offshore areas including a flotation hull having a relatively flat deck at the upper portion thereof. The flotation hull further includes an ice bending shape along the lower portion thereof and extending around the periphery of the hull where the ice bending shape extends from an area of the hull near the level of the deck and extends downwardly near the bottom of the hull along with an ice deflecting portion extending around the perimeter of the bottom of the hull to direct ice around the hull and not under the hull. The rig includes at least three truss form legs that are positioned within the perimeter of the bottom of the hull wherein the legs are arranged to be lifted up off the seafloor so that the rig may be towed through shallow water and also extend to the sea floor and extend further to lift the hull partially or fully out of the water. A jack up device is associated with each leg to both lift the leg from the sea bottom so that the ice worthy jack up rig may float by the buoyancy of the hull and push the legs down to the seafloor and push the hull partially up and out of the water when ice floes threaten the rig and fully out of the water when ice is not present. Leg ice shields are arranged to protect the truss form legs from ice.
[0009] The invention further relates to a method for drilling wells in ice prone waters. The method includes providing a flotation hull having a relatively flat deck at the upper portion thereof and an ice bending shape along the lower portion thereof where the ice bending shape extends from an area of the hull near the level of the deck and extends downwardly near the bottom of the hull and an ice deflecting portion extending around the perimeter of the bottom of the hull to direct ice around the hull and not under the hull. At least three truss form legs are positioned within the perimeter of the bottom of the hull where each leg comprises a plurality of vertically oriented posts connected by cross members and ice shields are arranged between the posts to protect the cross members from ice. Each leg is jacked down in a manner that feet on the bottom of the legs engages the sea floor and lifts the hull up and fully out of the water when ice is not threatening the rig while the rig is drilling a well on a drill site. The hull is further lowered into the water into an ice defensive configuration so that the ice bending shape extends above and below the sea surface to bend ice that comes against the rig to cause the ice to submerge under the water and endure bending forces that break the ice where the ice flows past the rig.
BRIEF DESCRIPTION OF THE DRAWINGS
[0010] A more complete understanding of the present invention and benefits thereof may be acquired by referring to the follow description taken in conjunction with the accompanying drawings in which:
[0011] Figure 1 is an elevation view of a first embodiment of the present invention where the drilling rig is floating in the water and available to be towed to a well drilling site; [0012] Figure 2 is an elevation view of the first embodiment of the present invention where the drilling rig is jacked up out of the water for open water drilling through a moon pool;
[0013] Figure 3 is a second elevation view of the first embodiment of the present invention where the drilling rig is partially lowered into the ice/water interface, but still supported by its legs, in a defensive configuration for drilling during potential ice conditions;
[0014] Figure 4 is an enlarged fragmentary elevation view showing one end of the first embodiment of the present invention in the Figure 3 configuration with ice moving against the rig;
[0015] Figure 5 is a top view of a leg of the drilling rig with a first embodiment of the leg ice shields in place;
[0016] Figure 6 is a top view of a leg of the drilling rig with a second embodiment of the leg ice shields in place;
[0017] Figure 7 is an elevation view of the drilling rig with the first embodiment leg ice shields in place; and
[0018] Figure 8 is an elevation view of the drilling rig with the second embodiment leg ice shields in place.
DETAILED DESCRIPTION
[0019] Turning now to the detailed description of the preferred arrangement or arrangements of the present invention, it should be understood that the inventive features and concepts may be manifested in other arrangements and that the scope of the invention is not limited to the embodiments described or illustrated. The scope of the invention is intended only to be limited by the scope of the claims that follow.
[0020] As shown in Figure 1, an ice worthy jack-up rig is generally indicated by the arrow 10. In Figure 1, jack-up rig 10 is shown with its hull 20 floating in the sea and legs 25 in a lifted arrangement where much of the length of the legs 25 extend above the deck 21 of the hull 20. The legs 25 are constructed of long posts with cross members connecting the posts in a truss arrangement. On the deck 21 is derrick 30 which is used to drill wells. In the configuration shown in Figure 1, the jack-up rig 10 may be towed from one prospect field to another and to and from shore bases for maintenance and other shore service.
[0021] When the jack-up rig 10 is towed to a drilling site in generally shallow water, the legs 25 are lowered through the openings 27 in hull 20 until the feet 26 at the bottom ends of the legs 25 engage the seafloor 15 as shown in Figure 2. In a preferred embodiment, the feet 26 are connected to spud cans 28 to secure the rig 10 to the seafloor. Once the feet 26 engage the seafloor 15, jacking rigs within openings 27 push the legs 25 down and therefore, the hull 20 is lifted out of the water. With the hull 20 fully jacked-up and out of the water, any wave action and heavy seas more easily break past the legs 25 as compared to the effect of waves against a large buoyant object like the hull 20. As shown in Figure 2, well drilling operations may commence in the ordinary course while there is no ice in the area. However, when ice begins to form on the sea surface 12, the risk of an ice floe contacting and damaging the legs 25 or simply bulldozing the jack-up rig 10 off the drilling site becomes a significant concern for conventional jack-up rigs and such rigs are typically removed from drill sites by the end of the open water season. The ice-worthy jack-up drilling rig 10 is designed to resist ice floes by assuming an ice defensive, hull-in- water configuration as shown in Figure 3. In Figure 3, ice tends to dampen waves and rough seas, so the sea surface 12 appears less threatening, however, the hazards of the marine environment have only altered, and not lessened.
[0022] When the ice- worthy jack-up rig 10 assumes its ice defensive, hull -in- water configuration, the hull 20 is lowered into the water to contact same, but not to the extent that the hull 20 would begin to float. A significant portion of the weight of the rig 10 preferably remains on the legs 25 to hold the position of the rig 10 on the drill site against any pressure an ice flow might bring. The rig 10 is lowered so that inwardly sloped, ice-bending surface 41 bridges the sea surface 12 or ice/water interface to engage any floating ice that may come upon the rig 10.
[0023] The sloped ice-bending surface 41 runs from shoulder 42, which is at the edge of the deck 26, down to neckline 44. Ice deflector 45 extends downward from neckline 44. Thus, when an ice floe, such as shown at 51 comes to the rig 10, the ice-bending surface 41 causes the leading edge of the ice floe 51 to submerge under the sea surface 12 and apply a significant bending force that breaks large ice floes into smaller, less damaging, less hazardous bits of ice. For example, it is conceivable that an ice floe being hundreds of feet and maybe miles across could come toward the rig 10. If the ice floe is broken into bits that are less than twenty feet in the longest dimension, such bits are able to pass around the rig 10 with much less concern.
[0024] Ice has substantial compressive strength being in the range of 4 to 12 MPa, but is much weaker against bending with typical flexure strength in the range of 0.3 to 0.5 MPa. As shown, the force of the ice floe 51 moving along the sea surface 12 causes the leading edge to slide under the sea surface 12 and caused section 52 to break off. With the ice floe 51 broken into smaller floes, such as section 52 and bit 53, the smaller sections tend to float past and around the rig 10 without applying the impacts or forces of a large floe. It is preferred that ice not be forced under the flat of bottom of the hull 20 and the ice deflector 45 turns ice to flow around the side of the hull 20. If the ice is really thick, the ice deflector 45 is arranged to extend downwardly at a steeper angle than ice-bending surface 41 and will increase the bending forces on the ice floe. At the ice deflector 45, an ice deflector is positioned to extend down from the flat of bottom of the hull 20. In an optional arrangement, the turn of the bilge is the flat of bottom at the bottom end of the ice deflector 45.
[0025] To additionally resist the forces that an ice floe may impose on the rig 10, the feet 26 of the legs may be arranged to connect to cans 28 set in the sea floor so that when an ice floe comes against the ice-bending surface 41, the legs 25 actually hold the hull 20 down and force the bending of the ice floe and resist the lifting force of the ice floe which, in an extreme case, may lift the near side of the rig 10 and push the rig over on its side by using the feet 26 on the opposite side of the rig 10 as the fulcrum or pivot. The cans in the sea floor are known for other applications and the feet 26 would include appropriate connections to attach and release from the cans, as desired.
[0026] It should probably be noted that shifting from a conventional open water drilling configuration as shown in Figure 2 to a hull-in-water, ice defensive configuration shown in Figure 3 may require considerable planning and accommodation depending on what aspect of drilling is ongoing at the time. While some equipment can accommodate shifting of the height of the deck 21, other equipment may require disconnections or reconfiguration to adapt to a new height off the sea floor 15.
[0027] The ice- worthy jack-up drill rig 10 is designed to operate like a conventional jack-up rig in open water, but is also designed to settle to the water in an ice defensive position and then re-acquire the conventional stance or configuration when wave action becomes a concern. It is the shape of the hull 20 (as well as its strength) that provides ice bending and breaking capabilities.
[0028] One of the concerns for operating a jack-up drilling rig in potentially ice conditions is the exposed legs 25. To help protect the legs 25 from ice, leg ice shields 32 are attached between vertical posts 31 of the legs. In Figure 5, the leg ice shields 32 are bowed to provide a rounded shape to steer any ice around the legs. In Figure 6, the leg ice shields 33 are relatively flat. As shown in Figures 7 and 8, the leg ice shields 32 and 33 are preferably positioned on the legs to extend above, below and across the waterline 12 but not necessarily cover the entire vertical length of each leg 25.
[0029] While the leg ice shields provide some ice protection from the legs, it should be noted that the legs 25 and the openings 27 through which they are connected to the hull 20 are within the perimeter of the ice deflector 45 so that the ice floes are less likely to contact the legs 25 while the rig 10 is in its defensive ice condition configuration as shown in Figure 3 and sometimes called hull-in-water configuration. Moreover, the rig 10 does not have to handle every ice floe threat to significantly add value to oil and gas companies. If rig 10 can extend the drilling season by as little as a month, that would be a fifty percent improvement in some ice prone areas and therefore provide a very real cost saving benefit to the industry.
[0030] In closing, it should be noted that the discussion of any reference is not an admission that it is prior art to the present invention, especially any reference that may have a publication date after the priority date of this application. At the same time, each and every claim below is hereby incorporated into this detailed description or specification as an additional embodiment of the present invention.
[0031] Although the systems and processes described herein have been described in detail, it should be understood that various changes, substitutions, and alterations can be made without departing from the spirit and scope of the invention as defined by the following claims. Those skilled in the art may be able to study the preferred embodiments and identify other ways to practice the invention that are not exactly as described herein. It is the intent of the inventors that variations and equivalents of the invention are within the scope of the claims, while the description, abstract and drawings are not to be used to limit the scope of the invention. The invention is specifically intended to be as broad as the claims below and their equivalents.

Claims

1. An ice-worthy jack-up rig for drilling for hydrocarbons in potential ice conditions in offshore areas comprising:
a flotation hull having a relatively flat deck at the upper portion thereof and an ice-bending shape along the lower portion thereof and extending downwardly and inwardly around the periphery of the hull where the ice-bending shape extends from an area of the hull near the level of the deck and extends downwardly near the bottom of the hull; an ice deflecting portion extending around the perimeter of the bottom of the hull to direct ice around the hull and not under the hull;
at least three truss form legs that are positioned within the perimeter of the bottom of the flotation hull wherein the legs are arranged to be lifted up off the seafloor so that the rig may be towed through shallow water and also extend to the sea floor and extend further to lift the hull partially or fully out of the water;
a jack-up device associated with each leg to both lift the leg from the sea bottom so that the ice worthy jack-up rig may float by the buoyancy of the hull and push the legs down to the seafloor and push the hull partially up and out of the water when ice floes threaten the rig and fully out of the water when ice is not present; and
leg ice shields arranged to protect the truss form legs from ice.
2. The ice worthy jack-up rig according to claim 1, further including an anchoring mechanism associated with a foot of each leg to provide additional resistance to the forces an ice floe may impose on the rig.
3. The ice worthy jack-up rig according to claim 1 or claim 2, wherein the ice bending surface is slanted upwardly and outwardly from a smaller dimension neckline to a larger dimension shoulder.
4. The ice worthy jack-up rig according to any preceding claim, wherein the ice bending surface extends vertically at least 8 to 10 or more meters.
5. The ice worthy jack-up rig according to Claim 4, wherein the angle of the ice-bending surface is in the range of 30 to 60 degrees from the vertical.
6. The ice worthy jack-up rig according to any preceding claim, wherein the ice-bending surface comprises a plurality of relatively flat, sloped, segments extending around the periphery of the rig.
7. The ice worthy jack-up rig according to any preceding claim, wherein the truss form legs include long posts connected by cross members and the leg ice shields are arranged to span between the long posts and protect the cross members of the legs.
8. The ice worthy jack-up rig according to any preceding claim, wherein the leg ice shields extend along the leg from below the waterline to above the water line when the jack-up rig is positioned for drilling less than the vertical length of the legs along the vertical length are arranged to span between the long posts and protect the cross members of the legs.
9. A method for exploratory drilling in ice prone waters where an exploratory well is drilled to determine the existence and economic viability of hydrocarbon reserves in an under sea reservoir, the method comprising:
providing a rig having a flotation hull having a relatively flat deck at the upper portion thereof and an ice-bending shape along the lower portion thereof where the ice-bending shape extends from an area of the hull near the level of the deck and extends downwardly near the bottom of the hull and an ice deflecting portion extending around the perimeter of the bottom of the hull to direct ice around the hull and not under the hull; providing at least three truss form legs that are positioned within the perimeter of the bottom of the hull where each leg comprises a plurality of vertically oriented posts connected by cross members and ice shields are arranged between the posts to protect the cross members from ice;
jacking down each leg in a manner that feet on the bottom of the legs engages the sea floor and lifts the hull up and fully out of the water when ice is not threatening the rig while the rig is drilling a well on a drill site; and lowering the hull into the water into an ice defensive configuration so that the ice-bending shape extends above and below the sea surface to bend ice that comes against the rig to cause the ice to submerge under the water and endure bending forces that break the ice where the ice flows past the rig.
10. The method according to claim 9 further including the step of anchoring the legs to the seafloor to further resist the force of ice floes.
11. The method according to claim 9 or claim 10 wherein the ice-bending surface extends from a shoulder to a neckline and the step of lowering the hull into the water more particularly comprises lowering the hull into the water so that the neckline is at least 4 meters below the sea surface and the shoulder is at least 7 meters above the sea surface.
12. The method according to any of claims 9 to 11 further including the step of raising the hull up out of the water when the threat of ice floes are reduced.
13. A method for drilling a well in ice prone waters comprising the use of a rig as claimed in any of claims 1 to 8.
PCT/US2011/057228 2010-10-21 2011-10-21 Leg ice shields for ice worthy jack-up drilling unit WO2012054808A1 (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
US13/278,480 US20120128427A1 (en) 2010-10-21 2011-10-21 Leg ice shields for ice worthy jack-up drilling unit
RU2013123039/13A RU2013123039A (en) 2010-10-21 2011-10-21 ICE SCREEN SUPPORTS FOR SELF-LIFTING DRILLING MARINE BASIS OF ICE CLASS
PCT/US2011/057228 WO2012054808A1 (en) 2010-10-21 2011-10-21 Leg ice shields for ice worthy jack-up drilling unit
CA2804898A CA2804898A1 (en) 2010-10-21 2011-10-21 Leg ice shields for ice worthy jack-up drilling unit
NO20130547A NO20130547A1 (en) 2010-10-21 2013-04-19 ICE PROTECTION FOR BONE ON ADJUSTABLE DRILL UNIT

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
US40549710P 2010-10-21 2010-10-21
US61/405,497 2010-10-21
US13/277,791 US20120128426A1 (en) 2010-10-21 2011-10-20 Ice worthy jack-up drilling unit
US13/277,791 2011-10-20
PCT/US2011/057228 WO2012054808A1 (en) 2010-10-21 2011-10-21 Leg ice shields for ice worthy jack-up drilling unit

Publications (1)

Publication Number Publication Date
WO2012054808A1 true WO2012054808A1 (en) 2012-04-26

Family

ID=46332610

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/US2011/057228 WO2012054808A1 (en) 2010-10-21 2011-10-21 Leg ice shields for ice worthy jack-up drilling unit

Country Status (5)

Country Link
US (1) US20120128427A1 (en)
CA (1) CA2804898A1 (en)
NO (1) NO20130547A1 (en)
RU (1) RU2013123039A (en)
WO (1) WO2012054808A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014046625A1 (en) * 2012-09-24 2014-03-27 Keppel Offshore & Marine Technology Centre Pte Ltd Ice resistant jackup leg

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3669052A (en) * 1970-06-15 1972-06-13 Air Logistics Corp Method and apparatus for preventing ice damage to marine structures
US4102144A (en) * 1977-05-31 1978-07-25 Global Marine, Inc. Method and apparatus for protecting offshore structures against forces from moving ice sheets
NL7705518A (en) * 1977-05-18 1978-11-21 Rijn Schelde Verolme Maschf En Deicing equipment for vulnerable components on offshore installations - comprises automatically inflatable and deflatable flexible bodies secured detachably
GB2079826A (en) * 1980-07-09 1982-01-27 Coyne & Bellier Underwater support structures for platform-carrying tower or towers
FR2528465A1 (en) * 1982-06-15 1983-12-16 Waertsilae Oy Ab METHOD FOR USING A SEA DRILLING PLATFORM IN ICE PRESENCE CONDITIONS, AND EQUIPPED PLATFORM WITH MEANS FOR APPLYING SAID METHOD
US4434741A (en) * 1982-03-22 1984-03-06 Gulf Canada Limited Arctic barge drilling unit
SU1661050A1 (en) * 1986-12-15 1991-07-07 Предприятие П/Я Р-6109 Floating drilling rig
GB2302355A (en) * 1995-06-16 1997-01-15 Marine Structure Comsultants Bottom supporting construction for a leg end of a displaceable jack-up platform

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3628336A (en) * 1969-04-28 1971-12-21 Offshore Co Drilling platform
US3696624A (en) * 1970-10-02 1972-10-10 Sun Oil Co Delaware Bucket wheel ice cutter
US3972199A (en) * 1972-06-26 1976-08-03 Chevron Research Company Low adhesional arctic offshore platform
US3807179A (en) * 1972-10-02 1974-04-30 Gulf Oil Corp Deicing systems
US4063428A (en) * 1975-08-26 1977-12-20 Heinrich Waas Method of deflecting ice at upright columns submerged in water of stationary or floating structures in marine areas in which the occurence of ice may be expected, and ice deflector assembly therefor
US4048943A (en) * 1976-05-27 1977-09-20 Exxon Production Research Company Arctic caisson
US4511288A (en) * 1981-11-30 1985-04-16 Global Marine Inc. Modular island drilling system
FI82112C (en) * 1982-06-15 1991-01-10 Masa Yards Oy Protection procedure and device
JPH0739756Y2 (en) * 1987-08-21 1995-09-13 石川島播磨重工業株式会社 Floating structure
SG120186A1 (en) * 2004-09-07 2006-03-28 Offshore Technology Dev Pte Lt Improved jackup oil rig and similar platforms
US20080237173A1 (en) * 2007-03-30 2008-10-02 Remedial (Cyprus) Pcl Arm assembly and methods of passing a pipe from a first vessel to a second vessel using the arm assembly

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3669052A (en) * 1970-06-15 1972-06-13 Air Logistics Corp Method and apparatus for preventing ice damage to marine structures
NL7705518A (en) * 1977-05-18 1978-11-21 Rijn Schelde Verolme Maschf En Deicing equipment for vulnerable components on offshore installations - comprises automatically inflatable and deflatable flexible bodies secured detachably
US4102144A (en) * 1977-05-31 1978-07-25 Global Marine, Inc. Method and apparatus for protecting offshore structures against forces from moving ice sheets
GB2079826A (en) * 1980-07-09 1982-01-27 Coyne & Bellier Underwater support structures for platform-carrying tower or towers
US4434741A (en) * 1982-03-22 1984-03-06 Gulf Canada Limited Arctic barge drilling unit
FR2528465A1 (en) * 1982-06-15 1983-12-16 Waertsilae Oy Ab METHOD FOR USING A SEA DRILLING PLATFORM IN ICE PRESENCE CONDITIONS, AND EQUIPPED PLATFORM WITH MEANS FOR APPLYING SAID METHOD
SU1661050A1 (en) * 1986-12-15 1991-07-07 Предприятие П/Я Р-6109 Floating drilling rig
GB2302355A (en) * 1995-06-16 1997-01-15 Marine Structure Comsultants Bottom supporting construction for a leg end of a displaceable jack-up platform

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
DATABASE WPI Week 199214, Derwent World Patents Index; AN 1992-112958, XP002667157 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014046625A1 (en) * 2012-09-24 2014-03-27 Keppel Offshore & Marine Technology Centre Pte Ltd Ice resistant jackup leg
US9121155B2 (en) 2012-09-24 2015-09-01 Keppel Offshore & Marine Technology Centre Pte Ltd Ice resistant jackup leg
RU2618107C2 (en) * 2012-09-24 2017-05-02 Кеппел Офшор Энд Марин Текнолоджи Сенте Пте Лтд Ice-resistant supports for self-elevating offshore platforms

Also Published As

Publication number Publication date
NO20130547A1 (en) 2013-04-19
RU2013123039A (en) 2014-11-27
CA2804898A1 (en) 2012-04-26
US20120128427A1 (en) 2012-05-24

Similar Documents

Publication Publication Date Title
CA2813426C (en) Ice worthy jack-up drilling unit with pre-loading tension system
US20120125688A1 (en) Ice worthy jack-up drilling unit secured to the seafloor
US20120128432A1 (en) Ice worthy jack-up drilling unit with moon pool for protected drilling in ice
US20120128434A1 (en) Ice worthy jack-up drilling unit with conical piled monopod
CA2812596C (en) Ice worthy jack-up drilling unit with gas agitation and leg ice shields
US20120125690A1 (en) Ice worthy jack-up drilling unit with telescoping riser
US20120128426A1 (en) Ice worthy jack-up drilling unit
CA2811938C (en) Ice worthy jack-up drilling unit with gas agitated ice prevention
US8801333B2 (en) Ice worthy jack-up drilling unit with gas agitation and leg ice shields
US20120128427A1 (en) Leg ice shields for ice worthy jack-up drilling unit
CA2810902A1 (en) Ice worthy jack-up drilling unit secured to the seafloor
US20120128428A1 (en) Reinforced legs for ice worthy jack-up drilling unit
CA2804900A1 (en) Reinforced legs for ice worthy jack-up drilling unit
CA2812597A1 (en) Ice worthy jack-up drilling unit with conical piled monopod

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 11779039

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2804898

Country of ref document: CA

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2013123039

Country of ref document: RU

Kind code of ref document: A

122 Ep: pct application non-entry in european phase

Ref document number: 11779039

Country of ref document: EP

Kind code of ref document: A1