[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

WO2009010360A2 - Feedthrough for cables or busbars of a power distribution unit - Google Patents

Feedthrough for cables or busbars of a power distribution unit Download PDF

Info

Publication number
WO2009010360A2
WO2009010360A2 PCT/EP2008/057651 EP2008057651W WO2009010360A2 WO 2009010360 A2 WO2009010360 A2 WO 2009010360A2 EP 2008057651 W EP2008057651 W EP 2008057651W WO 2009010360 A2 WO2009010360 A2 WO 2009010360A2
Authority
WO
WIPO (PCT)
Prior art keywords
wall sections
water
bushing
protection
cables
Prior art date
Application number
PCT/EP2008/057651
Other languages
German (de)
French (fr)
Other versions
WO2009010360A3 (en
Inventor
Marcella Günther
Original Assignee
Siemens Aktiengesellschaft
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Aktiengesellschaft filed Critical Siemens Aktiengesellschaft
Publication of WO2009010360A2 publication Critical patent/WO2009010360A2/en
Publication of WO2009010360A3 publication Critical patent/WO2009010360A3/en

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02BBOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
    • H02B1/00Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
    • H02B1/26Casings; Parts thereof or accessories therefor
    • H02B1/30Cabinet-type casings; Parts thereof or accessories therefor
    • H02B1/305Cable entries

Definitions

  • the invention relates to a bushing for cable or busbars of a power distribution unit.
  • a predetermined scope of protection when passing the cable or busbars through the enclosure, a predetermined scope of protection must be maintained, which is predetermined for the power distribution unit by a protection ⁇ type .
  • the scope of protection includes the protection of persons against touching live parts and the protection of electrical equipment against the ingress of solids and water in housings and enclosures (DIN VDE 0470-1).
  • a foreign body protection cladding part to be fastened to the frame of the power distribution unit, which is provided with a first opening for the passage of the cables or bus bars,
  • a connecting shaft formed by wall sections, which connects the first passage opening with the second passage opening.
  • a first protection component in the form of the first foreign body protection enclosure part for degree of protection IP20-IP40 (maximum 12.5 mm to at least 1 mm foreign body protection)
  • a second protection component in the form of the water protection enclosure part for protection class IPX1-IPX2 (dripping water in the angle of incidence perpendicular to 15 °)
  • a third protection component in the form of Ver ⁇ binding shaft is built on the framework.
  • connection shaft which is below the second protection component, in the protection ⁇ type IP20-IP40 (maximum 12.5 mm to at least 1 mm Fremdkör ⁇ perschutz) - ie in the same degree of protection as the first protection component - executed , Since the feedthrough openings for different applications must have different sizes (different widths and different depths), the connection shaft must be provided in these different sizes accordingly.
  • this object is achieved in that the first of the wall sections of the connection shaft, as inte ⁇ graler part of the water-protective enclosure part or as an integral part of the foreign body protection-wrapping part are formed. It is therefore intended to integrate the third protection component in the form of the connection shaft as far as possible into one of the two other protection components. This makes it possible to further complete the connection chess in that second wall sections of
  • connection shaft of connecting parts are formed, which connect the first wall sections and which are formed separately to the covering parts as equal parts.
  • the connection shaft can be cuboid, with its sides are formed by the first wall sections and its corners of the second wall sections.
  • the required connecting parts can in particular also un ⁇ depending on the dimension of the passage openings all always be the same.
  • the first wall sections of the connection shaft are formed by bent first partial surfaces of the water-protective enclosure part, wherein advantageously the connecting shaft support surfaces may be provided for supporting on the foreign body protection-wrapping part, which are formed as bent second faces of the water-protective wrapping part.
  • first wall sections can also be formed as bent first partial surfaces of the foreign-body protection enclosure part, wherein support surfaces for supporting on the water-protection enclosure part can then advantageously be provided on the connection shaft, which are formed as bent second partial surfaces of the foreign-body protection enclosure part are.
  • the function of the connecting shaft is almost completely formed from the lost material of the lead-through opening of the water-protecting covering part or the foreign-body protecting covering part.
  • the part of the connection shaft which is formed by the connecting parts only has a small share of the total material expenditure.
  • the Materialauf ⁇ wall for manufacturing the implementation is thereby significantly reduced.
  • a further preferred embodiment of the new implementation is provided to provide bending of the faces material-reducing bending zones, which reduce the forming force to manual force.
  • These bending zones may be predetermined bending line, which are formed for example by perforations, in particular ⁇ special in the form of mutually offset slots arranged.
  • the new bushing is very well suited for the passage of cables or busbars through the roof or the bottom of the power distribution unit, because of the partial integration the connection shaft in the water-protective enclosure part or the foreign-body protection-Umhüllungs presses the scope of the power distribution unit in a simple way not only ⁇ held but even improved.
  • Figure 1 shows a detail of a power distribution unit in the form of a low-voltage switch panel, with frame and enclosure, wherein the roof of the power distribution unit forming part of the enclosure is formed by a known from practice implementation of cables or busbars and
  • FIGS. 2 to 4 are sections of a further power distribution unit in the form of a low-voltage
  • the switch panel has a framework (frame) 2 formed from profiles and a sheathing 3 for the framework.
  • enclosure 3 Of the enclosure 3 are two vertically extending so thatn ⁇ de 4 and 5 in the form of Beplankungsblechen and a the roof see the power distribution unit forming implementation 6 for not shown cables or busbars.
  • the passage 6 consists of a fixed to the frame 2 of the power distribution unit foreign body protection enclosure part 7, a water protection enclosure part 8 and a connection ⁇ bay 9th
  • the foreign body protection cladding part 7 is provided with a first passage opening 10 for performing not shown cables or busbars
  • the water protection cladding part 8 has a second implementation ⁇ opening 11 for the passage of the cables or busbars and is at a predetermined distance 12 on the foreign body protection-wrapping part 7 is arranged.
  • the connecting shaft according to the invention which is shown in FIGS. 2 to 4 and described below, is essentially integrated in the water-protection casing part.
  • connection shaft is not integrated into the water protection enclosure part but-in otherwise the same way-into the foreign body protection enclosure part.
  • FIGS 2 to 4 show a power distribution unit 101 in the form of a control panel of a switchgear. Again, points the panel on a scaffold (frame) 102 formed from profiles and a sheathing 103 for the framework on.
  • a scaffold frame 102 formed from profiles and a sheathing 103 for the framework on.
  • the bushing 106 consists of a foreign body protection wrapping part 107 attached to the frame 102 of the power distribution unit, a water protection casing part 108 and a connection shaft 109.
  • the foreign body protection wrapping part 107 is provided with a first feedthrough opening 110 and the water protection wrapping part 108 is provided with a second feedthrough opening 111, which serve to carry out cables or busbars which are not shown in any more detail.
  • the connection shaft 109 which is formed by wall sections, connects the first passage opening 110 with the second passage opening 111.
  • the connection shaft is cuboidal. So he has a square cross-section.
  • the foreign body protection sheath part 107 serves the contactless rungs- and foreign body protection according to the degree of protection IP20 IP40 and the water protective covering member 108 which is at ⁇ orderly at a predetermined distance 112 above the foreign body protection sheath part 107, serves to water protection according to the degree of protection IPX1- IPX2.
  • first partial surfaces 117, 118, 119 and 120 are in the direction of the foreign-body protection-covering part 107 bent, the first of the wall sections - namely the side surfaces - form the connection shaft.
  • second partial surfaces 125, 126, 127 and 128 are bent out of the lost material of the second through opening 111 along second bending zones 121, 122, 123 and 124.
  • These second part surfaces form support surfaces for supporting the connection shaft 109 on the side facing away from the water protection enclosure 8 Sei ⁇ te of the foreign body protection-Umheilungsteils 107.
  • the bending zones 113, 114, 115 and 116 and 121, 122, 123 and 124 are perforations, which are formed by mutually offset slots.
  • connection shaft Corner edges of the connection shaft are formed by four separate, formed as equal parts connecting parts 130. These four connecting portions are overlap the manner of tongs over bent tabs, the inner edge of the first through opening 110, ge ⁇ clamped to the foreign body protection sheath part 107 and first screw (shown only through openings 131 for receiving connecting screws) to the foreign body protection sheath part 107 buildin ⁇ Untitled , So that the connecting parts 130 complete the connection shaft 109 by way of second fferverbin ⁇ applications (again, only through holes 133, 134 shown for receiving connecting screws) with the space formed by the first partial surfaces 117, 118, 119 and 120 side walls are connected.
  • four support components 135 are additionally provided, which are also formed as equal parts and third
  • Screw (again see only through openings 136 for receiving connecting screws) with the foreign body protection sheath part 107 and the frame 102 are ver ⁇ prevented.
  • the second leadthrough opening 111 of the water-proof cover part 108 is closed from above with a cover 137.
  • the cover 137 is fixed to the water-protection covering part 108 by way of fourth screw connections (again, only through-openings 138, 139 for receiving connecting screws are visible).

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Installation Of Indoor Wiring (AREA)
  • Connector Housings Or Holding Contact Members (AREA)

Abstract

The invention relates to a feedthrough (106) for cables or busbars of a power distribution unit (101), comprising a cladding part (107) preventing foreign-object damage, to be fastened to the rack (102) of the power distribution unit, said cladding part having a first feedthrough opening (110) for feeding through the cables or busbars, a cladding part (108) providing safety from water and being arranged at a defined distance (112) above the cladding part (107) preventing foreign-object damage, the cladding part providing safety from water having a second feedthrough opening (111) for feeding through the cables or busbars, and a connecting duct (109) configured in one of the wall sections, which connects the first feedthrough opening (110) to the second feedthrough opening (111). In order to reduce the number of variants and the complexity of the feedthrough, the first of the wall sections of the connecting duct (109) is configured as an integral part of the cladding part (108) providing safety from water or as an integral part of the cladding part (107) preventing foreign-object damage.

Description

Beschreibungdescription
Durchführung für Kabel- oder Stromschienen einer StromverteilereinheitFeedthrough for cable or busbars of a power distribution unit
Die Erfindung betrifft eine Durchführung für Kabel- oder Stromschienen einer Stromverteilereinheit.The invention relates to a bushing for cable or busbars of a power distribution unit.
Bei Stromverteilereinheiten insbesondere in Form von Nie- derspannungs-Schaltfeidern oder Niederspannungs-In power distribution units, in particular in the form of low-voltage breakers or low-voltage
Schaltschränken ist es erforderlich, im Dach- oder Bodenbereich Kabel oder Stromschienen durch eine den Anlagenraum begrenzende Umhüllung (Verkleidung) zu führen.Cabinets, it is necessary to lead in the roof or floor area cables or busbars by a plant space limiting enclosure (cladding).
Dabei muss beim Durchführen der Kabel- oder Stromschienen durch die Umhüllung ein vorgegebener Schutzumfang eingehalten werden, der für die Stromverteilereinheit durch eine Schutz¬ art vorgegeben ist. In bekannter Weise beinhaltet der Schutzumfang den Schutz von Personen gegen das Berühren unter Span- nung stehender Teile und den Schutz elektrischen Betriebsmittel gegen das Eindringen von festen Körpern und von Wasser bei Gehäusen und Kapselungen (DIN VDE 0470-1). Die Schutzart wird international durch eine Kombination von Buchstaben (IP = international protection) und Kennziffern ausgedrückt. Ei- ner erste der Kennziffern definiert dabei den Berührungs- und Fremdkörperschutz und eine zweite der Kennziffern definiert den Wasserschutz.In this case, when passing the cable or busbars through the enclosure, a predetermined scope of protection must be maintained, which is predetermined for the power distribution unit by a protection ¬ type . In a known manner, the scope of protection includes the protection of persons against touching live parts and the protection of electrical equipment against the ingress of solids and water in housings and enclosures (DIN VDE 0470-1). The type of protection is expressed internationally by a combination of letters (IP = international protection) and reference numbers. One of the indices defines contact and foreign body protection, and a second of the indices defines the water protection.
Daher sind bei Stromverteilereinheiten für die Durchführung von Kabeln oder Stromschienen üblicherweise zwei Umhüllungs¬ komponenten notwendig. Eine belüftete erste Komponente dient dem Fremdkörperschutz und eine zweite Komponente dient dem Wasserschutz, insbesondere dem Tropfwasserschutz. Diese beiden Komponenten sind üblicherweise übereinander aufgebaut. Die benötigten Kabel oder Stromschienen sind durch die beiden genannten Komponenten zu führen und dabei ist die jeweilige Schutzart einzuhalten.Therefore, in power distribution units for the implementation of cables or busbars usually two coating ¬ components necessary. A ventilated first component is used for foreign body protection and a second component is used for water protection, especially the drip water protection. These two components are usually built on top of each other. The required cables or busbars are to be routed through the two components mentioned and the respective degree of protection must be observed.
Aus der Praxis ist eine Durchführung für Kabel oder Stromschienen in Stromverteilereinheiten gemäß der Figur 1 bekannt. Diese bekannte Durchführung besteht ausFrom practice a passage for cables or busbars in power distribution units according to the figure 1 is known. This known implementation consists of
- einem am Gerüst der Stromverteilereinheit zu befestigenden Fremdkörperschutz-Umhüllungsteil, das mit einer ersten Durch¬ führungsöffnung zur Durchführung der Kabel oder Stromschienen versehen ist,a foreign body protection cladding part to be fastened to the frame of the power distribution unit, which is provided with a first opening for the passage of the cables or bus bars,
- einem in vorgegebenem Abstand über dem Fremdkörperschutz- Umhüllungsteil angeordneten Wasserschutz-Umhüllungsteil, das mit einer zweiten Durchführungsöffnung zur Durchführung der Kabel oder Stromschienen versehen ist und- A arranged at a predetermined distance above the Fremdkörperschutz- wrapping part water-protective enclosure part, which is provided with a second passage opening for the implementation of the cable or busbars and
- einem durch Wandabschnitte gebildeten Verbindungsschacht, der die erste Durchführungsöffnung mit der zweiten Durchführungsöffnung verbindet.- A connecting shaft formed by wall sections, which connects the first passage opening with the second passage opening.
Bei dieser bekannten Durchführung werden drei separate Schutz-Komponenten auf das Gerüst aufgebaut. Eine erste Schutz-Komponente in Form des ersten Fremdkörperschutz- Umhüllungsteils für die Schutzart IP20-IP40 (maximal 12,5 mm bis mindestens 1 mm Fremdkörperschutz), eine zweite Schutz- Komponente in Form des Wasserschutz-Umhüllungsteils für die Schutzart IPX1-IPX2 (Tropfwasser im Einfaltswinkel senkrecht bis 15°) und eine dritte Schutz-Komponente in Form des Ver¬ bindungsschachtes. Dabei ist der Verbindungsschacht, welcher unterhalb der zweiten Schutz-Komponente liegt, in der Schutz¬ art IP20-IP40 (maximal 12,5 mm bis mindestens 1 mm Fremdkör¬ perschutz) - also in der gleichen Schutzart wie die erste Schutz-Komponente - ausgeführt. Da die Durchführungsöffnungen für verschiedene Anwendungen verschiedene Größen (verschiedene Breiten und verschiedenen Tiefen) haben müssen, muss dementsprechend auch der Verbindungsschacht in diesen verschiedenen Größen bereitgestellt werden.In this known implementation, three separate protection components are built on the framework. A first protection component in the form of the first foreign body protection enclosure part for degree of protection IP20-IP40 (maximum 12.5 mm to at least 1 mm foreign body protection), a second protection component in the form of the water protection enclosure part for protection class IPX1-IPX2 (dripping water in the angle of incidence perpendicular to 15 °) and a third protection component in the form of Ver ¬ binding shaft. In this case, the connection shaft, which is below the second protection component, in the protection ¬ type IP20-IP40 (maximum 12.5 mm to at least 1 mm Fremdkör ¬ perschutz) - ie in the same degree of protection as the first protection component - executed , Since the feedthrough openings for different applications must have different sizes (different widths and different depths), the connection shaft must be provided in these different sizes accordingly.
Ausgehend von einer Durchführung mit den Merkmalen des Oberbegriffes des Patentanspruches 1 (Figur 1) liegt der Erfin¬ dung die Aufgabe zu Grunde, die Varianten bzw. Teilevielfalt der Durchführung zu verringern.Based on an implementation with the features of the preamble of claim 1 (Figure 1) of the inven ¬ tion is the object of the invention, the variants or parts variety of implementation to reduce.
Gemäß der Erfindung wird diese Aufgabe dadurch gelöst, dass erste der Wandabschnitte des Verbindungsschachtes, als inte¬ graler Bestandteil des Wasserschutz-Umhüllungsteils oder als integraler Bestandteil des Fremdkörperschutz-Umhüllungsteils ausgebildet sind. - Es ist also vorgesehen, die dritte Schutz-Komponente in Form des Verbindungsschachtes weitestge- hend in eine der beiden anderen Schutz-Komponenten zu integrieren. Dies ermöglicht es im Weiteren den Verbindungsschach dadurch zu vervollständigen, dass zweite Wandabschnitte desAccording to the invention, this object is achieved in that the first of the wall sections of the connection shaft, as inte ¬ graler part of the water-protective enclosure part or as an integral part of the foreign body protection-wrapping part are formed. It is therefore intended to integrate the third protection component in the form of the connection shaft as far as possible into one of the two other protection components. This makes it possible to further complete the connection chess in that second wall sections of
Verbindungsschachtes von Verbindungsteilen gebildet sind, die die ersten Wandabschnitte verbinden und die separat zu den Umhüllungsteilen als Gleichteile ausgebildet sind. - Dabei kann der Verbindungsschacht quaderförmig sein, wobei seine Seiten von den ersten Wandabschnitten und seine Ecken von den zweiten Wandabschnitten gebildet werden.Connecting shaft of connecting parts are formed, which connect the first wall sections and which are formed separately to the covering parts as equal parts. - In this case, the connection shaft can be cuboid, with its sides are formed by the first wall sections and its corners of the second wall sections.
Die benötigten Verbindungsteile können insbesondere auch un¬ abhängig von der Dimension der Durchführungsöffnungen alle immer gleich ausgebildet sein.The required connecting parts can in particular also un ¬ depending on the dimension of the passage openings all always be the same.
Bei einer bevorzugter Ausgestaltung der neuen Durchführung sind die ersten Wandabschnitte des Verbindungsschachtes von abgebogenen ersten Teilflächen des Wasserschutz- Umhüllungsteils ausgebildet, wobei in vorteilhafter Weise an dem Verbindungsschacht Stützflächen zum Abstützen an dem Fremdkörperschutz-Umhüllungsteil vorgesehen sein können, die als abgebogene zweite Teilflächen des Wasserschutz- Umhüllungsteils ausgebildet sind.In a preferred embodiment of the new implementation, the first wall sections of the connection shaft are formed by bent first partial surfaces of the water-protective enclosure part, wherein advantageously the connecting shaft support surfaces may be provided for supporting on the foreign body protection-wrapping part, which are formed as bent second faces of the water-protective wrapping part.
In gleicher Weise können die ersten Wandabschnitte aber auch als abgebogene erste Teilflächen des Fremdkörperschutz- Umhüllungsteils ausgebildet sein, wobei dann in vorteilhafter Weise an dem Verbindungsschacht Stützflächen zum Abstützen an dem Wasserschutz-Umhüllungsteil vorgesehen sein können, die als abgebogene zweite Teilflächen des Fremdkörperschutz- Umhüllungsteils ausgebildet sind.In the same way, however, the first wall sections can also be formed as bent first partial surfaces of the foreign-body protection enclosure part, wherein support surfaces for supporting on the water-protection enclosure part can then advantageously be provided on the connection shaft, which are formed as bent second partial surfaces of the foreign-body protection enclosure part are.
Bei diesen bevorzugten Ausgestaltungen wird demnach aus dem verlorenen Material der Durchführungsöffnung des Wasserschutz-Umhüllungsteils oder des Fremdkörperschutz- Umhüllungsteils die Funktion des Verbindungsschachtes nahezu vollständig ausgebildet. Der Teil des Verbindungsschachtes, der von den Verbindungsteilen gebildet ist hat nur einen ge- ringen Anteil am gesamten Materialaufwand. Der Materialauf¬ wand zur Fertigung der Durchführung wird dadurch erheblich gesenkt .Accordingly, in these preferred embodiments, the function of the connecting shaft is almost completely formed from the lost material of the lead-through opening of the water-protecting covering part or the foreign-body protecting covering part. The part of the connection shaft which is formed by the connecting parts only has a small share of the total material expenditure. The Materialauf ¬ wall for manufacturing the implementation is thereby significantly reduced.
In weiterer bevorzugter Ausgestaltung der neuen Durchführung ist vorgesehen, zum Abbiegen der Teilflächen materialreduzierende Biegezonen vorzusehen, welche die Umformkraft bis auf Handkraft reduzieren. - Diese Biegezonen können vorbestimmte Biegelinie sein, die beispielsweise von Perforationen, insbe¬ sondere in Form zueinander versetzt angeordneter Langlöcher gebildet sind.In a further preferred embodiment of the new implementation is provided to provide bending of the faces material-reducing bending zones, which reduce the forming force to manual force. - These bending zones may be predetermined bending line, which are formed for example by perforations, in particular ¬ special in the form of mutually offset slots arranged.
Die neue Durchführung ist zum Durchführung von Kabeln oder Stromschienen durch das Dach- oder den Boden von Stromverteilereinheit sehr gut geeignet, da durch die Teilintegration des Verbindungsschachtes in das Wasserschutz-Umhüllungsteil bzw. das Fremdkörperschutz-Umhüllungsteiles der Schutzumfang der Stromverteilereinheit auf einfache Weise nicht nur ein¬ gehalten sondern sogar verbessert werden kann.The new bushing is very well suited for the passage of cables or busbars through the roof or the bottom of the power distribution unit, because of the partial integration the connection shaft in the water-protective enclosure part or the foreign-body protection-Umhüllungsteiles the scope of the power distribution unit in a simple way not only ¬ held but even improved.
Die Erfindung soll nachfolgend zum besseren Verständnis an¬ hand eines in der Zeichnung dargestellten, den Schutzumfang der Erfindung nicht einschränkenden Ausführungsbeispiels nä¬ her erläutert werden. Dabei zeigen:The invention will be explained nä ¬ forth her for better understanding of ¬ hand illustrated in the drawing, the scope of the invention not limiting embodiment. Showing:
Figur 1 einen Ausschnitt einer Stromverteilereinheit in Form eines Niederspannungs- Schaltfeldes, mit Rahmen und Umhüllung, bei der der das Dach der Stromverteiler- einheit bildende Teil der Umhüllung durch eine aus der Praxis bekannten Durchführung für Kabel oder Stromschienen gebildet ist undFigure 1 shows a detail of a power distribution unit in the form of a low-voltage switch panel, with frame and enclosure, wherein the roof of the power distribution unit forming part of the enclosure is formed by a known from practice implementation of cables or busbars and
Figuren 2 bis 4 Ausschnitte einer weiteren Stromvertei- lereinheit in Form eines Niederspannungs-FIGS. 2 to 4 are sections of a further power distribution unit in the form of a low-voltage
Schaltfeldes bei der der das Dach bilden¬ de Teil der Umhüllung durch eine erfindungsgemäße Durchführung für Kabel oder Stromschienen gebildet ist,Switching field in which the roof forming the roof ¬ de part of the enclosure is formed by an inventive implementation for cables or busbars,
Die Figur 1 zeigt eine aus der Praxis bekannte Stromvertei¬ lereinheit 1 in Form eines Schaltfeldes einer in der Strom¬ verteilertechnik auch als Punktverteiler bekannten Schaltanlage. Das Schaltfeld weist ein aus Profilen gebildetes Gerüst (Rahmen) 2 und eine Umhüllung 3 für das Gerüst auf.1 shows a well-known from practice Stromvertei ¬ lereinheit 1 in the form of a panel of a known also as a point distribution in the power distribution technology ¬ switchgear. The switch panel has a framework (frame) 2 formed from profiles and a sheathing 3 for the framework.
Von der Umhüllung 3 sind zwei vertikal verlaufende Seitenwän¬ de 4 und 5 in Form von Beplankungsblechen und eine das Dach der Stromverteilereinheit bildende Durchführung 6 für nicht weiter dargestellte Kabel oder Stromschienen zu sehen.Of the enclosure 3 are two vertically extending Seitenwän ¬ de 4 and 5 in the form of Beplankungsblechen and a the roof see the power distribution unit forming implementation 6 for not shown cables or busbars.
Die Durchführung 6 besteht aus einem am Gerüst 2 der Strom- Verteilereinheit befestigten Fremdkörperschutz-Umhüllungsteil 7, einem Wasserschutz-Umhüllungsteil 8 und einem Verbindungs¬ schacht 9.The passage 6 consists of a fixed to the frame 2 of the power distribution unit foreign body protection enclosure part 7, a water protection enclosure part 8 and a connection ¬ bay 9th
Dabei ist das Fremdkörperschutz-Umhüllungsteil 7 mit einer ersten Durchführungsöffnung 10 zur Durchführung nicht weiter dargestellter Kabel oder Stromschienen versehen, und das Wasserschutz-Umhüllungsteil 8 weist eine zweite Durchführungs¬ öffnung 11 zur Durchführung der Kabeln oder der Stromschienen auf und ist in vorgegebenem Abstand 12 über dem Fremdkörper- schutz-Umhüllungsteil 7 angeordnet. Der Verbindungsschacht 9, der durch Wandabschnitte gebildet ist, verbindet die erste Durchführungsöffnung 10 mit der zweiten Durchführungsöffnung 11.In this case, the foreign body protection cladding part 7 is provided with a first passage opening 10 for performing not shown cables or busbars, and the water protection cladding part 8 has a second implementation ¬ opening 11 for the passage of the cables or busbars and is at a predetermined distance 12 on the foreign body protection-wrapping part 7 is arranged. The connection shaft 9, which is formed by wall sections, connects the first passage opening 10 to the second passage opening 11.
Im Gegensatz zu dieser bekannten Durchführung 6 ist bei der in den Figuren 2 bis 4 dargestellten und im Weiteren beschriebenen Ausführungsform der erfindungsgemäßen Durchführung der Verbindungsschacht im Wesentlichen in das Wasserschutz-Umhüllungsteil integriert .In contrast to this known bushing 6, the connecting shaft according to the invention, which is shown in FIGS. 2 to 4 and described below, is essentially integrated in the water-protection casing part.
Figürlich nicht dargestellt ist eine andere Ausführungsform der neuen Durchführung, bei der der Verbindungsschacht nicht in das Wasserschutz-Umhüllungsteil, sondern - in ansonsten gleicher Weise - in das Fremdkörperschutz-Umhüllungsteil in- tegriert ist.Not shown in the figure is another embodiment of the new implementation, in which the connection shaft is not integrated into the water protection enclosure part but-in otherwise the same way-into the foreign body protection enclosure part.
Die Figuren 2 bis 4 zeigen eine Stromverteilereinheit 101 in Form eines Schaltfeldes einer Schaltanlage. Auch hier weist das Schaltfeld ein aus Profilen gebildetes Gerüst (Rahmen) 102 und eine Umhüllung 103 für das Gerüst auf.Figures 2 to 4 show a power distribution unit 101 in the form of a control panel of a switchgear. Again, points the panel on a scaffold (frame) 102 formed from profiles and a sheathing 103 for the framework on.
Von der Umhüllung 103 ist nur eine das Dach der Stromvertei- lereinheit bildende Durchführung 106 für Kabel oder Strom¬ schienen zu sehen.Of the sheath 103, only one of the roof of Stromvertei- ller unit forming bushing 106 for cables or Strom ¬ rails to see.
Die Durchführung 106 besteht aus einem am Gerüst 102 der Stromverteilereinheit befestigten Fremdkörperschutz- Umhüllungsteil 107, einem Wasserschutz-Umhüllungsteil 108 und einem Verbindungsschacht 109.The bushing 106 consists of a foreign body protection wrapping part 107 attached to the frame 102 of the power distribution unit, a water protection casing part 108 and a connection shaft 109.
Auch hier sind das Fremdkörperschutz-Umhüllungsteil 107 mit einer ersten Durchführungsöffnung 110 und das Wasserschutz- Umhüllungsteil 108 mit einer zweiten Durchführungsöffnung 111 versehen, die der Durchführung nicht weiter dargestellter Kabel oder Stromschienen dienen. Der Verbindungsschacht 109, der durch Wandabschnitte gebildet ist, verbindet die erste Durchführungsöffnung 110 mit der zweiten Durchführungsöffnung 111. Dabei ist der Verbindungsschacht quaderförmig. Er weist also einen quadratischen Querschnitt auf.Here, too, the foreign body protection wrapping part 107 is provided with a first feedthrough opening 110 and the water protection wrapping part 108 is provided with a second feedthrough opening 111, which serve to carry out cables or busbars which are not shown in any more detail. The connection shaft 109, which is formed by wall sections, connects the first passage opening 110 with the second passage opening 111. In this case, the connection shaft is cuboidal. So he has a square cross-section.
Das Fremdkörperschutz-Umhüllungsteil 107 dient dem Berüh- rungs- und Fremdkörperschutz gemäß der Schutzart IP20-IP40 und das Wasserschutz-Umhüllungsteil 108, das in vorgegebenem Abstand 112 über dem Fremdkörperschutz-Umhüllungsteil 107 an¬ geordneten ist, dient dem Wasserschutz gemäß der Schutzart IPX1-IPX2.The foreign body protection sheath part 107 serves the contactless rungs- and foreign body protection according to the degree of protection IP20 IP40 and the water protective covering member 108 which is at ¬ orderly at a predetermined distance 112 above the foreign body protection sheath part 107, serves to water protection according to the degree of protection IPX1- IPX2.
Aus dem verlorenen Material der zweiten Durchführungsöffnung 111 des Wasserschutz-Umhüllungsteils 8 sind entlang erster Biegezonen 113, 114, 115 und 116 erste Teilflächen 117, 118, 119 und 120 in Richtung des Fremdkörperschutz-Umhüllungsteils 107 abgebogen, die erste der Wandabschnitte - und zwar die Seitenflächen - des Verbindungsschachtes bilden.From the lost material of the second lead-through opening 111 of the water-protection covering part 8, along first bending zones 113, 114, 115 and 116, first partial surfaces 117, 118, 119 and 120 are in the direction of the foreign-body protection-covering part 107 bent, the first of the wall sections - namely the side surfaces - form the connection shaft.
Jeweils an den Enden der ersten Teilflächen, die dem Fremd- körperschutz-Umhüllungsteils 107 zugewandt sind, sind entlang zweiter Biegezonen 121, 122, 123 und 124 zweite Teilfläche 125, 126, 127 und 128 aus dem verlorenen Material der zweiten Durchführungsöffnung 111 abgebogen. Diese zweiten Teilflächen bilden Stützflächen zum Abstützen des Verbindungsschachtes 109 an der dem Wasserschutz-Umhüllungsteil 8 abgewandten Sei¬ te des Fremdkörperschutz-Umhüllungsteils 107. Dadurch, dass die zweiten Teilflächen (Stützflächen) des Wasserschutz- Umhüllungsteils 8 das Fremdkörperschutz-Umhüllungsteils 107 hintergreifen, ist das Wasserschutz-Umhüllungsteil 8 sicher an das Fremdkörperschutz-Umhüllungsteil 107 geklemmt.Respectively at the ends of the first partial surfaces which face the foreign body protection wrapping part 107, second partial surfaces 125, 126, 127 and 128 are bent out of the lost material of the second through opening 111 along second bending zones 121, 122, 123 and 124. These second part surfaces form support surfaces for supporting the connection shaft 109 on the side facing away from the water protection enclosure 8 Sei ¬ te of the foreign body protection-Umheilungsteils 107. The fact that the second partial surfaces (support surfaces) of the water-protective enclosure part 8 engage behind the foreign body protection-wrapping part 107, that is Water protection wrapping part 8 securely clamped to the foreign body protection wrapping part 107.
Die Biegezonen 113, 114, 115 und 116 sowie 121, 122, 123 und 124 sind Perforationen, die von zueinander versetzt angeordneter Langlöcher gebildet sind.The bending zones 113, 114, 115 and 116 and 121, 122, 123 and 124 are perforations, which are formed by mutually offset slots.
Eckkanten des Verbindungsschachtes sind durch vier separate, als Gleichteile ausgebildete Verbindungsteile 130 gebildet. Diese vier Verbindungsteile sind über abgebogene Laschen, die Innenkante der ersten Durchführungsöffnung 110 zangenartig übergreifen, an das Fremdkörperschutz-Umhüllungsteil 107 ge¬ klemmt und über erste Schraubverbindungen (dargestellt sind nur Durchgangsöffnungen 131 zur Aufnahme von Verbindungsschrauben) an dem Fremdkörperschutz-Umhüllungsteil 107 befes¬ tigt. Die Verbindungsteile 130 vervollständigen damit den Verbindungsschacht 109, indem Sie über zweite Schraubverbin¬ dungen (auch hier sind nur Durchgangsöffnungen 133, 134 zur Aufnahme von Verbindungsschrauben dargestellt) mit den durch die ersten Teilflächen 117, 118, 119 und 120 gebildeten Seitenwänden verbunden sind. Zum weiteren Abstützen der Ecken des Wasserschutz- Umhüllungsteil 108 an dem Fremdkörperschutz-Umhüllungsteil 107 sind zusätzlich vier Stützkomponenten 135 vorgesehen, die ebenfalls als Gleichteile ausgebildete und über dritteCorner edges of the connection shaft are formed by four separate, formed as equal parts connecting parts 130. These four connecting portions are overlap the manner of tongs over bent tabs, the inner edge of the first through opening 110, ge ¬ clamped to the foreign body protection sheath part 107 and first screw (shown only through openings 131 for receiving connecting screws) to the foreign body protection sheath part 107 buildin ¬ Untitled , So that the connecting parts 130 complete the connection shaft 109 by way of second Schraubverbin ¬ applications (again, only through holes 133, 134 shown for receiving connecting screws) with the space formed by the first partial surfaces 117, 118, 119 and 120 side walls are connected. To further support the corners of the water-resistant wrapping part 108 to the foreign-body protection-wrapping part 107, four support components 135 are additionally provided, which are also formed as equal parts and third
Schraubverbindungen (zu sehen sind wiederum nur Durchgangsöffnungen 136 zur Aufnahme von Verbindungsschrauben) mit dem Fremdkörperschutz-Umhüllungsteil 107 und dem Gerüst 102 ver¬ bunden sind.Screw (again see only through openings 136 for receiving connecting screws) with the foreign body protection sheath part 107 and the frame 102 are ver ¬ prevented.
Sofern keine Kabel oder Stromschienen durch die neue Durchführung 106 geführt werden, wird die zweite Durchführungsöff¬ nung 111 des Wasserschutz-Umhüllungsteils 108 von oben mit einem Deckel 137 verschlossen. Dabei wird der Deckel 137 über vierte Schraubverbindungen (zu sehen sind wiederum nur Durchgangsöffnungen 138, 139 zur Aufnahme von Verbindungsschrau¬ ben) an dem Wasserschutz-Umhüllungsteil 108 fixiert. If no cables or bus bars are guided through the new leadthrough 106, the second leadthrough opening 111 of the water-proof cover part 108 is closed from above with a cover 137. In this case, the cover 137 is fixed to the water-protection covering part 108 by way of fourth screw connections (again, only through-openings 138, 139 for receiving connecting screws are visible).

Claims

Patentansprüche claims
1. Durchführung (106) für Kabel oder Stromschienen einer Stromverteilereinheit (101) - mit einem am Gerüst (102) der Stromverteilereinheit zu befestigenden Fremdkörperschutz-Umhüllungsteil (107), das mit einer ersten Durchführungsöffnung (110) zur Durchführung der Kabel oder Stromschienen versehen ist, - mit einem in vorgegebenem Abstand (112) über dem Fremdkörperschutz-Umhüllungsteil (107) angeordneten Wasserschutz-Umhüllungsteil (108), das mit einer zwei¬ ten Durchführungsöffnung (111) zur Durchführung der Kabel oder Stromschienen versehen ist und - mit einem durch Wandabschnitte gebildeten Verbindungsschacht (109), der die erste Durchführungsöffnung (110) mit der zweiten Durchführungsöffnung (111) verbindet, d a d u r c h g e k e n n z e i c h n e t, d a s s erste der Wandabschnitte des VerbindungsschachtesA lead-through (106) for cables or bus bars of a power distribution unit (101) - having a foreign body protective covering part (107) to be fastened to the frame (102) of the power distribution unit, which is provided with a first lead-through opening (110) for passing the cables or bus bars , - with a at a predetermined distance (112) above the foreign body protection-wrapping part (107) arranged water-protective enclosure part (108) which is provided with a two ¬ th implementation opening (111) for carrying the cable or busbars and - with a through wall sections formed connecting shaft (109) which connects the first passage opening (110) with the second passage opening (111), characterized in that first of the wall sections of the connecting shaft
(109), als integraler Bestandteil des Wasserschutz- Umhüllungsteils (108) oder als integraler Bestandteil des Fremdkörperschutz-Umhüllungsteils (107) ausgebildet sind.(109), are formed as an integral part of the water-resistant wrapping part (108) or as an integral part of the foreign-body-protecting wrapping part (107).
2. Durchführung (106) nach Ansprüche 1, d a d u r c h g e k e n n z e i c h n e t, d a s s zweite Wandabschnitte des Verbindungsschachtes (109) von Verbindungsteilen (130) gebildet sind, die die ers- ten Wandabschnitte verbinden und die separat zu den Um¬ hüllungsteilen (107, 108) als Gleichteile ausgebildet sind.2. bushing (106) according to claims 1, characterized in that second wall sections of the connecting shaft (109) of connecting parts (130) are formed, which connect the first wall sections and the separately ¬ to Umhüllungsteilen (107, 108) as equal parts are formed.
3. Durchführung (106) nach Anspruch 2, d a d u r c h g e k e n n z e i c h n e t, dass der Verbindungsschacht (109) quaderförmig ist und dass seine Seiten von den ersten Wandabschnitten und seine Ecken von den zweiten Wandabschnitten gebildet sind.3. bushing (106) according to claim 2, characterized in that the connection shaft (109) is cuboid and that its sides are formed by the first wall sections and its corners by the second wall sections.
4. Durchführung (106) nach einem der Ansprüche 1 bis 3, d a d u r c h g e k e n n z e i c h n e t, d a s s die ersten Wandabschnitte als abgebogene erste Teilflä- chen (117, 118, 119, 120) des Wasserschutz- Umhüllungsteils (108) ausgebildet sind.4. The bushing (106) according to claim 1, wherein the first wall sections are configured as bent first partial surfaces (117, 118, 119, 120) of the water-proof covering part (108).
5. Durchführung (106) nach Anspruch 4 d a d u r c h g e k e n n z e i c h n e t, d a s s an dem Verbindungsschacht (109) Stützflächen zum Ab¬ stützen an dem Fremdkörperschutz-Umhüllungsteil (107) vorgesehen sind, wobei die Stützflächen als abgebogene zweite Teilflä¬ chen (125, 126, 127, 128) des Wasserschutz- Umhüllungsteils (108) ausgebildet sind.5. bushing (106) according to claim 4, characterized in that on the connection shaft (109) support surfaces for supporting ¬ on the foreign body protection-wrapping part (107) are provided, wherein the support surfaces as bent second Teilflä ¬ chen (125, 126, 127, 128) of the water-shielding part (108) are formed.
6. Durchführung (106) nach einem der Ansprüche 1 bis 3, d a d u r c h g e k e n n z e i c h n e t, d a s s die ersten Wandabschnitte des Verbindungsschachtes von abgebogenen ersten Teilflächen des Fremdkörperschutz- Umhüllungsteils gebildet sind.6. The bushing (106) according to claim 1, wherein the first wall sections of the connection shaft are formed by bent first partial surfaces of the foreign-body protection-covering part.
7. Durchführung (106) nach Anspruch 6 d a d u r c h g e k e n n z e i c h n e t d a s s, an dem Verbindungsschacht Stützflächen zum Abstützen an dem Wasserschutz-Umhüllungsteil vorgesehen sind, wobei die Stützflächen als abgebogene zweite Teilflä¬ chen des Fremdkörperschutz-Umhüllungsteils ausgebildet sind. 7. bushing (106) according to claim 6 characterized in that, provided on the connection shaft support surfaces for supporting on the water-protective enclosure part, wherein the support surfaces are formed as bent second Teilflä ¬ surfaces of the foreign body protection-wrapping part.
8. Durchführung (106) nach einem der Ansprüche 1 bis 7 d a d u r c h g e k e n n z e i c h n e t d a s s, zum Abbiegen der Teilflächen Biegezonen (113, 114, 115, 116; 121, 122, 123, 124) vorgesehen sind.8. bushing (106) according to one of claims 1 to 7 d a d u r c h e c e n e c e s e s d e s s, for bending the partial surfaces bending zones (113, 114, 115, 116, 121, 122, 123, 124) are provided.
9. Durchführung (106) nach Ansprüche 9 d a d u r c h g e k e n n z e i c h n e t d a s s, das die Biegezonen (113, 114, 115, 116; 121, 122, 123, 124) von Perforationen, insbesondere in Form zueinander versetzt angeordneter Langlöcher gebildet sind.9. Bushing (106) according to claim 9, which forms the bending zones (113, 114, 115, 116, 121, 122, 123, 124) of perforations, in particular in the form of elongated holes arranged offset from each other.
10. Stromverteilereinheit (101) mit einer Durchführung (106) für Kabel oder Stromschienen, d a d u r c h g e k e n n z e i c h n e t d a s s, die Durchführung (106) nach einem der Ansprüche 1 bis 9 ausgebildet ist. 10. Power distributor unit (101) with a leadthrough (106) for cables or busbars, d a d c h e c e n e c e s t a s, the leadthrough (106) according to one of Claims 1 to 9.
PCT/EP2008/057651 2007-07-19 2008-06-18 Feedthrough for cables or busbars of a power distribution unit WO2009010360A2 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102007034269.3 2007-07-19
DE200710034269 DE102007034269A1 (en) 2007-07-19 2007-07-19 Feedthrough for cable or busbars of a power distribution unit

Publications (2)

Publication Number Publication Date
WO2009010360A2 true WO2009010360A2 (en) 2009-01-22
WO2009010360A3 WO2009010360A3 (en) 2009-06-11

Family

ID=40122000

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2008/057651 WO2009010360A2 (en) 2007-07-19 2008-06-18 Feedthrough for cables or busbars of a power distribution unit

Country Status (2)

Country Link
DE (1) DE102007034269A1 (en)
WO (1) WO2009010360A2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0116705A2 (en) * 1982-12-24 1984-08-29 TEHALIT Kunststoffwerk GmbH Cable-branch cover
DE29723533U1 (en) * 1997-07-16 1998-09-24 Rittal-Werk Rudolf Loh GmbH & Co. KG, 35745 Herborn Frame for a control cabinet
EP1150404A1 (en) * 2000-04-27 2001-10-31 Schneider Electric Industries SA Housing for electrical devices having a cable feedthrough
US6565166B1 (en) * 2000-05-17 2003-05-20 Thomas Bulk Cabinet assembly

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1640734C3 (en) * 1967-10-25 1974-08-22 Hermann J. 8405 Donaustauf Kerl Flush-mounted distributor with fully insulated equipment compartment and sheet steel frame
DE8431888U1 (en) * 1984-10-31 1985-02-14 Christian Geyer GmbH & Co, 8500 Nürnberg Protective housing
US6126458A (en) * 1999-07-13 2000-10-03 Yazaki North America, Inc. Bussed electrical center assembly with connector pre-set
DE19959476B4 (en) * 1999-12-10 2004-04-08 Festo Ag & Co. control device
DE20305734U1 (en) * 2003-04-03 2003-06-12 FESTO AG & Co., 73734 Esslingen Adaptor to connect cables of different types to standard base for control unit of pneumatic valve set

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0116705A2 (en) * 1982-12-24 1984-08-29 TEHALIT Kunststoffwerk GmbH Cable-branch cover
DE29723533U1 (en) * 1997-07-16 1998-09-24 Rittal-Werk Rudolf Loh GmbH & Co. KG, 35745 Herborn Frame for a control cabinet
EP1150404A1 (en) * 2000-04-27 2001-10-31 Schneider Electric Industries SA Housing for electrical devices having a cable feedthrough
US6565166B1 (en) * 2000-05-17 2003-05-20 Thomas Bulk Cabinet assembly

Also Published As

Publication number Publication date
DE102007034269A1 (en) 2009-01-22
WO2009010360A3 (en) 2009-06-11

Similar Documents

Publication Publication Date Title
EP2461440B1 (en) Plug-in system
DE202006016545U1 (en) Electrical connection arrangement for switchboard, has plug part connected with shielding sheet metal having cable connection tongue that is bent or runs opposite to middle longitudinal axis and/or plane of mounting plate in inclined manner
EP2720325B1 (en) Switchable socket
DE3418582A1 (en) CONNECTING OR BRANCHING DEVICE FOR SHIELDED MESSAGE LINES
DE102008062250A1 (en) Installation switching device with a Isollierstoffgehäuse
EP3139454A1 (en) Electrical appliance for installation within a switching cabinet
EP1376795B1 (en) Device for installing energy conductors
DE102016119665B3 (en) Device with a contact-protected arrangement of electrical connection elements
DE19928400C2 (en) Touch-proof electrical high-voltage supply
DE3806478A1 (en) Plug socket for installation in buildings
WO2009010360A2 (en) Feedthrough for cables or busbars of a power distribution unit
EP2561580B1 (en) Power switch with spring terminals
EP1052737B1 (en) Plug connector housing
EP3164919B1 (en) Cable termination for connecting a switchgear assembly to a high-voltage cable
DE102005024644A1 (en) Electrical connection and connection box
DE102007052943B4 (en) In a mounting wall permanently installed control and / or communication device
EP1463173A1 (en) Metal-clad gas-insulated switchgear
EP1277259B1 (en) Switchpanel for circuit breakers, with a device compartment and a cable terminal compartment
WO2014161923A1 (en) Switch cabinet arrangement having connected protection areas
EP3731247A1 (en) Kit for a feedthrough assembly for electrically connecting a transformer system
DE202014003281U1 (en) Kit for cable terminations for connecting a switchgear to a high voltage cable
EP2656366B1 (en) Star-delta wiring, especially for a protection circuit on a mounting plate
DE29602715U1 (en) power strip
DE10231850B4 (en) Clamping device for mounting a shielded cable
WO1994024745A1 (en) Metal-enclosed medium voltage switchgear panel with switching compartment, bus bar compartment and cable connecting compartment

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 08761131

Country of ref document: EP

Kind code of ref document: A2

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 08761131

Country of ref document: EP

Kind code of ref document: A2