WO2008142196A1 - Modular burial system - Google Patents
Modular burial system Download PDFInfo
- Publication number
- WO2008142196A1 WO2008142196A1 PCT/ES2008/070098 ES2008070098W WO2008142196A1 WO 2008142196 A1 WO2008142196 A1 WO 2008142196A1 ES 2008070098 W ES2008070098 W ES 2008070098W WO 2008142196 A1 WO2008142196 A1 WO 2008142196A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- blocks
- walls
- modular
- burial
- burial system
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H13/00—Monuments; Tombs; Burial vaults; Columbaria
Definitions
- the present invention relates to a burial system based on the use of large stackable concrete blocks that have cavities inside that are used as niches for burial.
- pantheons thus made will have a minimum cost per grave and will have sufficient dimensions to contain hundreds of thousands or millions of niches, so that they will last in time due to their grandeur.
- the object of the invention is to solve the aforementioned problem, by means of a burial system according to independent claim 1, which achieves: Minimum cost of construction and maintenance of niches
- the proposal represents a total innovation compared to existing burial systems, since:
- the individual or family tomb is exchanged for pantheons with countless niches.
- the possibility of stacking blocks in height allows moving from horizontal burials to one in height with high density of niches per m 2 of land.
- the cemetery is made up of one or several funerary monuments with capacity for millions of niches that endure over time due to their grandeur.
- the initially planned blocks are made of slightly reinforced concrete, approximate dimensions of one meter wide by one meter high and two meters long, with two niches inside to house the remains of the deceased. With these blocks walls are made that preferably have their two faces accessible.
- the funerary monuments to be carried out have as their basic objective their permanence over time. For this it is necessary that the conservation costs are minimal and that they awaken some kind of social interest so that they are not abandoned, forgotten and finally destroyed.
- Multi-level maze built with the proposed wall system.
- the design must be such that it allows its growth over time and that it is a challenge to get out of it without using the evacuation routes that it must have on its sides to be used by those who leave or those who are going to visit a specific niche .
- Figure 1 is a section% of one of the type blocks (l), showing the cavity (5) destined to contain the remains of the deceased, the closing covers (2) with the identification data of each niche, and the grooves (3) for coupling between blocks.
- Figure 2 shows the lower and upper face of two blocks to show the highlights
- Figure 4 shows an example of a funerary monument made with the proposed modular burial: a pyramid.
- a pyramid In the upper part there is a vertical section and in the lower one the plants of two consecutive levels.
- the set shows the arrangement of the walls (6) and the general corridors of the plant (7) as well as auxiliary corridors (8) transverse to those of the plant and that facilitate quick access to all niches.
- a central hole is left that serves for the construction forklift and lift of the visitors.
- Figure 5 shows the system of phases to follow (9, 10 and 11) so that the assembly has an attractive profile throughout the entire construction.
- the blocks will preferably be of lightly reinforced concrete, and their manufacture will be in molds according to conventional method, incorporating additives to accelerate the setting, facilitate the decoupling, etc.
- the blocks will have a system of recesses in their upper face and projections in the lower one (or inversely), so that they fix their position and avoid horizontal displacements when they overlap to form the walls.
- the union between blocks is carried out by means of a small amount of mortar for leveling and filling of gaps, so that the joints are sealed to transmit vertical forces well and the filled gaps prevent horizontal slips in case of seismic movements.
- the pyramid of the previous example would constitute (alone or together with others) a cemetery model in which the proposed modular burial system can be used.
- a preferred mode for its execution is analyzed below and serves as an example for any other model.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Residential Or Office Buildings (AREA)
Abstract
The invention relates to a modular burial system based on the use of large stackable concrete blocks containing cavities serving as burial chambers. The blocks are used to construct large vaults and all of the walls of said vaults are filled with tombs. Individual vaults or groups of vaults form a cemetery. The shape and dimensions of the blocks allows tall funerary monuments to be built, such as pyramids, containing networks comprising numerous walls and passages and having sufficient dimensions to house millions of chambers. The grandeur of these monuments ensures that they will endure over time.
Description
SISTEMA DE ENTERRAMIENTO MODULAR MODULAR BURIAL SYSTEM
La presente invención se refiere a un sistema de enterramiento basado en la utilización de grandes bloques de hormigón apilables que disponen en su interior de unas cavidades que se usan como nichos para realizar enterramientos.The present invention relates to a burial system based on the use of large stackable concrete blocks that have cavities inside that are used as niches for burial.
Con los bloques se realiza una construcción ciclópea de monumentos funerarios, que tienen la superficie de sus muros disponibles para los nichos.With the blocks a cyclopean construction of funerary monuments is made, which have the surface of their walls available for niches.
Los panteones así realizados tendrán un coste mínimo por tumba y tendrán dimensiones suficientes para contener cientos de miles o millones de nichos, de forma que perduren en el tiempo por su grandiosidad .The pantheons thus made will have a minimum cost per grave and will have sufficient dimensions to contain hundreds of thousands or millions of niches, so that they will last in time due to their grandeur.
ANTECEDENTES DE LA INVENCIÓNBACKGROUND OF THE INVENTION
Existen dos aspectos fundamentales que condicionan los modelos de cementerios actuales: Los costes, tanto del suelo como de la construcción y conservación, y la permanencia a lo largo del tiempo.There are two fundamental aspects that condition the models of current cemeteries: The costs, both of the land and of the construction and conservation, and the permanence over time.
Para reducir en lo posible los costes se han ideado varios sistemas modulares, como son los correspondientes a las siguientes patentes:To reduce costs as much as possible, several modular systems have been devised, such as those corresponding to the following patents:
30423/92 Burial System (Australia)30423/92 Burial System (Australia)
3878656 Modular mausoleum crypt system (Estados Unidos) 5381591 Multi-tier burial system (Estados Unidos)3878656 Modular mausoleum crypt system (United States) 5381591 Multi-tier burial system (United States)
2225993 Caveau funéraire (Francia)2225993 Caveau funéraire (France)
La permanencia a lo largo del tiempo no queda resuelta por ninguno de ellos y siguiéndose en los cementerios actuales el modelo de nichos en alquiler, al cabo de pocas décadas se desalojan las tumbas y terminan los restos en un osario o fosa común.The permanence over time is not resolved by any of them and following the current cemeteries the model of niches for rent, after a few decades the graves are evicted and the remains are finished in an ossuary or mass grave.
EXPOSICIÓN DE LA INVENCIÓNEXHIBITION OF THE INVENTION
El objeto de la invención es resolver la problemática anteriormente expuesta, mediante un sistema de enterramiento según reivindicación independiente 1, con el que se consigue:
Coste mínimo de la construcción y mantenimiento de los nichosThe object of the invention is to solve the aforementioned problem, by means of a burial system according to independent claim 1, which achieves: Minimum cost of construction and maintenance of niches
- Permanencia de la construcción a lo largo del tiempo, por su grandiosidad e información que en la misma se puede almacenar.- Permanence of the construction over time, due to its grandeur and information that can be stored in it.
El presente sistema modular se caracteriza por:The present modular system is characterized by:
Utilizar grandes bloques resistentes que son apilables a gran altura, los cuales disponen en su interior de los nichos en los que se depositan los restos de los difuntos junto con otros objetos o información que se desee. - Formación de muros ciclópeos con dichos bloques, los cuales forman parte de la construcción de monumentos funerarios de grandes dimensiones.Use large resistant blocks that are stackable at high altitude, which have inside the niches in which the remains of the deceased are deposited along with other objects or information that is desired. - Formation of cyclopean walls with these blocks, which are part of the construction of large funerary monuments.
La propuesta representa una innovación total frente a los sistemas de enterramiento existentes, ya que:The proposal represents a total innovation compared to existing burial systems, since:
Se cambia la tumba individual o familiar por panteones con infinidad de nichos. La posibilidad de apilar bloques en altura permite pasar de los enterramientos horizontales a uno en altura con gran densidad de nichos por m2 de terreno. El cementerio lo constituye uno o varios monumentos funerarios con capacidad para millones de nichos que perduran en el tiempo por su grandiosidad.The individual or family tomb is exchanged for pantheons with countless niches. The possibility of stacking blocks in height allows moving from horizontal burials to one in height with high density of niches per m 2 of land. The cemetery is made up of one or several funerary monuments with capacity for millions of niches that endure over time due to their grandeur.
Los bloques previstos inicialmente son de hormigón ligeramente armado, dimensiones aproximadas de un metro de ancho por un metro de alto y dos metros de longitud, con dos nichos en su interior para alojar los restos de los difuntos. Con estos bloques se realizan muros que de forma preferente tienen sus dos caras accesibles.The initially planned blocks are made of slightly reinforced concrete, approximate dimensions of one meter wide by one meter high and two meters long, with two niches inside to house the remains of the deceased. With these blocks walls are made that preferably have their two faces accessible.
Inicialmente solo se prevén bloques para contener cenizas, restos óseos o cuerpos momificados, junto con objetos personales como diarios, videos, fotos, y en general cualquier información (en sistema analógico o digital) que se quiera dar al "futuro".Initially only blocks are provided to contain ashes, bone remains or mummified bodies, along with personal items such as diaries, videos, photos, and in general any information (in analog or digital system) that you want to give to the "future".
Los monumentos funerarios a realizar tienen como objetivo básico su permanencia a lo largo del tiempo. Para ello es necesario que los gastos de conservación sean mínimos y que despierten algún tipo de interés social para que no sean abandonados, olvidados y finalmente destruidos.
Algunos monumentos que cumplirían este objetivo son:The funerary monuments to be carried out have as their basic objective their permanence over time. For this it is necessary that the conservation costs are minimal and that they awaken some kind of social interest so that they are not abandoned, forgotten and finally destroyed. Some monuments that would fulfill this objective are:
Laberinto de múltiples niveles construido con el sistema de muros propuesto. El diseño ha de ser tal que permita su crecimiento con el tiempo y que suponga un reto salir del mismo sin utilizar las vías de evacuación que debe tener en sus laterales para ser utilizadas por los que abandonan o los que van a visitar un nicho en concreto.Multi-level maze built with the proposed wall system. The design must be such that it allows its growth over time and that it is a challenge to get out of it without using the evacuation routes that it must have on its sides to be used by those who leave or those who are going to visit a specific niche .
Red de muros y pasillos a distintos niveles, en forma de catacumbas, que se cubrirían posteriormente con tierras para crear unos jardines o un pequeño bosque.Network of walls and corridors at different levels, in the form of catacombs, which would later be covered with lands to create gardens or a small forest.
- Pirámide con red de pasillos que posibilita la visita de todos los nichos.- Pyramid with network of corridors that allows the visit of all niches.
Las ventajas de un cementerio con este sistema de enterramiento son las siguientes:The advantages of a cemetery with this burial system are the following:
- Coste mínimo de los enterramientos, que lo hace accesible a la gran mayoría. Gran concentración de nichos en espacios pequeños.- Minimum cost of burials, which makes it accessible to the vast majority. Great concentration of niches in small spaces.
- Permanencia en el tiempo de forma indefinida, cubriendo la necesidad de respeto y no destrucción de sus restos que en general tienen las personas - Fuente de datos para el futuro, manteniendo un registro de todos los elementos depositados en los nichos, que en caso necesario se podrían abrir.- Permanence in time indefinitely, covering the need for respect and not destruction of their remains that people generally have - Data source for the future, keeping a record of all the elements deposited in the niches, which if necessary They could open.
BREVE DESCRIPCIÓN DE LOS DIBUJOSBRIEF DESCRIPTION OF THE DRAWINGS
La figura 1 es una sección % de uno de los bloques tipo(l) , mostrando la cavidad (5) destinada a contener los restos de los difuntos, las tapas de cierre (2) con los datos de identificación de cada nicho, y las hendiduras (3) para el acoplamiento entre bloques.Figure 1 is a section% of one of the type blocks (l), showing the cavity (5) destined to contain the remains of the deceased, the closing covers (2) with the identification data of each niche, and the grooves (3) for coupling between blocks.
En la figura 2 se ve la cara inferior y superior de dos bloques para mostrar los resaltesFigure 2 shows the lower and upper face of two blocks to show the highlights
(4) y hendiduras (3) de acoplamiento entre los mismos, los cuales sirven para fijar su posición y evitar desplazamientos horizontales. Con la distribución indicada en la figura permiten el acoplamiento entre bloques en posición paralela o perpendicular, con solapes entre ellos del 25, 50, 75 y 100%.
En la parte superior de la figura 3 aparecen los tres tipos de bloques utilizados (A, B y C) para la realización de muros y en la parte inferior se muestra un muro realizado con dichos bloques y en el que se puede apreciar como se acoplan y sujetan entre sí los bloques en todas direcciones.(4) and grooves (3) of coupling between them, which serve to fix their position and avoid horizontal displacements. With the distribution indicated in the figure they allow the coupling between blocks in parallel or perpendicular position, with overlaps between them of 25, 50, 75 and 100%. In the upper part of figure 3 the three types of blocks used (A, B and C) appear for the realization of walls and in the lower part a wall made with said blocks is shown and in which it can be seen how they are coupled and hold the blocks in all directions.
En la figura 4 se muestra un ejemplo de monumento funerario realizado con el enterramiento modular propuesto: una pirámide. En la parte superior se tiene una sección vertical y en la inferior las plantas de dos niveles consecutivos. El conjunto muestra la disposición de los muros (6) y los pasillos generales de la planta (7) así como pasillos auxiliares (8) transversales a los de planta y que facilitan el rápido acceso a todos los nichos. Se deja un hueco central que sirve para el montacargas de la construcción y ascensor de los visitantes.Figure 4 shows an example of a funerary monument made with the proposed modular burial: a pyramid. In the upper part there is a vertical section and in the lower one the plants of two consecutive levels. The set shows the arrangement of the walls (6) and the general corridors of the plant (7) as well as auxiliary corridors (8) transverse to those of the plant and that facilitate quick access to all niches. A central hole is left that serves for the construction forklift and lift of the visitors.
La figura 5 muestra el sistema de fases a seguir (9, 10 y 11) de forma que el conjunto tenga un perfil atractivo a lo largo de toda la construcción.Figure 5 shows the system of phases to follow (9, 10 and 11) so that the assembly has an attractive profile throughout the entire construction.
El sistema de fases no se puede realizar solo con el montacargas central, por lo que en la figura 6 se propone un sistema de ascensión de bloques sobre raíles (12) que se van prolongando a los distintos niveles, realizando los muros (14) con la ayuda de una grúa motorizada (13)The phase system cannot be carried out only with the central forklift, so in Figure 6 a system of ascending blocks on rails (12) is proposed that are extended to the different levels, making the walls (14) with the help of a motorized crane (13)
EXPOSICIÓN DETALLADA DE UN MODO DE REALIZACIÓNDETAILED EXHIBITION OF AN EMBODIMENT
Los bloques serán preferentemente de hormigón ligeramente armado, y su fabricación será en moldes según método convencional, incorporando aditivos para acelerar el fraguado, facilitar el desencofrado, etc.The blocks will preferably be of lightly reinforced concrete, and their manufacture will be in molds according to conventional method, incorporating additives to accelerate the setting, facilitate the decoupling, etc.
Los bloques dispondrán de un sistema de entrantes en su cara superior y salientes en la inferior ( o de forma inversa), de manera que fijan su posición y evitan desplazamientos horizontales cuando se superponen para formar los muros.
La unión entre bloques se realiza mediante una pequeña cantidad de mortero para nivelación y relleno de huecos, de forma que las juntas queden selladas para transmitir bien los esfuerzos verticales y los huecos rellenos eviten los deslizamientos horizontales en caso de movimientos sísmicos.The blocks will have a system of recesses in their upper face and projections in the lower one (or inversely), so that they fix their position and avoid horizontal displacements when they overlap to form the walls. The union between blocks is carried out by means of a small amount of mortar for leveling and filling of gaps, so that the joints are sealed to transmit vertical forces well and the filled gaps prevent horizontal slips in case of seismic movements.
La pirámide del ejemplo anterior constituiría (sola o junto a otras) un modelo de cementerio en el que se puede utilizar el sistema de enterramiento modular que se propone. Se analiza a continuación un modo preferente para su ejecución y que sirve de ejemplo para cualquier otro modelo.The pyramid of the previous example would constitute (alone or together with others) a cemetery model in which the proposed modular burial system can be used. A preferred mode for its execution is analyzed below and serves as an example for any other model.
Se partirá de un núcleo central realizado en una fase inicial. Su forma será de pirámide completa y tendrá una altura de unos 20 m, contando con ya con el ascensor central para las visitas o utilizado como montacargas para subir los bloques. Sobre las cuatro caras de este núcleo se van añadiendo sucesivas capas de bloques, de manera que en su crecimiento se mantengan formas armoniosas. La construcción final tendría una base de unos trescientos metros de lado y altura entorno a los doscientos metros.It will start from a central core made in an initial phase. Its shape will be full pyramid and will have a height of about 20 m, with the central elevator for visitors or used as forklifts to climb the blocks. Successive block layers are added to the four faces of this core, so that harmonious shapes are maintained in their growth. The final construction would have a base of about three hundred meters of side and height around two hundred meters.
Para esta construcción se utilizaran tres filas de bloques en cada planta , con al menos 2,80 m de altura libre en los pasillos. Para cada nicho se necesita un volumen de 1 m3 y ocupando los bloques el doble que los pasillos se tendrá una capacidad de unos 3,5 millones de nichos para una pirámide de las dimensiones dadas.For this construction three rows of blocks will be used on each floor, with at least 2.80 m of free height in the corridors. For each niche a volume of 1 m3 is needed and occupying the blocks twice as long as the aisles will have a capacity of about 3.5 million niches for a pyramid of the given dimensions.
Para cubrir los huecos que se forman en los pasillos por el cruce de los muros de plantas correlativas, se utilizarán placas de hormigón de unos 20 cm de espesor que cuentan en su cara inferior del mismo sistema de anclaje de los bloques y se colocan igual que estos.
To cover the gaps that are formed in the corridors by crossing the walls of correlative plants, concrete plates of about 20 cm thick will be used that have on their lower face the same anchoring system of the blocks and are placed the same as these.
Claims
REIVINDICACIONES
1,- Sistema de enterramiento modular que se caracteriza por utilizar grandes bloques de hormigón u otros materiales resistentes (1) (figuras 1 y 2), los cuales disponen de unas cavidades (5) donde se guardan los restos de los difuntos junto con los datos, documentos u objetos que se deseen, y que cuentan con tapas de cierre (2) en las que figuran los datos identificación necesarios. Los bloques son apilables y con ellos se realiza la construcción de grandes monumentos funerarios, por ejemplo una pirámide (figura 4), los cuales por su grandiosidad, poco espacio requerido y gran cantidad de datos almacenados cabe esperar que perduren en el tiempo de forma indefinida.1, - Modular burial system that is characterized by using large concrete blocks or other resistant materials (1) (figures 1 and 2), which have cavities (5) where the remains of the deceased are stored along with the data, documents or objects that are desired, and that have closing covers (2) in which the necessary identification data are included. The blocks are stackable and with them the construction of large funerary monuments is carried out, for example a pyramid (figure 4), which due to its grandeur, little space required and large amount of stored data can be expected to last indefinitely in time .
2,- Sistema de enterramiento modular según reivindicación 1, que se caracteriza porque los bloques están provistos de resaltes (4) y hendiduras (3) en sus caras, de forma que se tienen posiciones fijas de acoplamiento entre ellos y mediante la adición de una pequeña capa de relleno, se impida el desplazamiento horizontal de los bloques en caso de movimientos sísmicos.2, - Modular burial system according to claim 1, characterized in that the blocks are provided with projections (4) and grooves (3) on their faces, so that they have fixed coupling positions between them and by adding a Small filling layer, horizontal displacement of the blocks is prevented in case of seismic movements.
3,- Sistema de enterramiento modular según reivindicaciones 1 y 2, que se caracteriza por utilizar bloques de distinto formato (IA, IB y IC) que permiten formar muros ciclópeos con sus dos caras accesibles (figura 3) y en los cuales todos los bloques quedan sujetos por al menos otros dos, tanto en su cara superior como en la inferior.3, - Modular burial system according to claims 1 and 2, characterized by using blocks of different format (IA, IB and IC) that allow cyclopean walls to be formed with their two accessible faces (figure 3) and in which all the blocks they are held by at least two others, both on their upper and lower faces.
4,- Sistema de enterramiento modular según reivindicación 3, que se caracteriza por utilizar múltiples muros ciclópeos (figura 3) en disposición paralela y dejando pasillos entre ellos, de forma que al superponer sucesivas capas con los muros perpendiculares entre ellas , se forme un enterramiento en altura muy compacto y estable, por ejemplo una pirámide (figura 4).
4, - Modular burial system according to claim 3, characterized by using multiple cyclopean walls (figure 3) in parallel arrangement and leaving corridors between them, so that when overlapping successive layers with the perpendicular walls between them, a burial is formed in height very compact and stable, for example a pyramid (figure 4).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
ESU200701085 | 2007-05-23 | ||
ES200701085U ES1066422Y (en) | 2007-05-23 | 2007-05-23 | CEMETERY WITH MODULAR BURIAL |
Publications (2)
Publication Number | Publication Date |
---|---|
WO2008142196A1 true WO2008142196A1 (en) | 2008-11-27 |
WO2008142196A4 WO2008142196A4 (en) | 2009-01-22 |
Family
ID=38961599
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/ES2008/070098 WO2008142196A1 (en) | 2007-05-23 | 2008-05-20 | Modular burial system |
Country Status (2)
Country | Link |
---|---|
ES (1) | ES1066422Y (en) |
WO (1) | WO2008142196A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10688005B2 (en) | 2017-01-13 | 2020-06-23 | Scott S. Conrad | Cremation storage device and system, methods of forming cremation storage device and system, and methods of operation of cremation storage device and system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4031678A (en) * | 1975-11-20 | 1977-06-28 | Schuring James A | Interlocking building block construction |
US5287603A (en) * | 1992-03-17 | 1994-02-22 | Schorman David C | Storage container for human remains and method therefor |
WO1999057395A1 (en) * | 1998-05-01 | 1999-11-11 | Dudek Daniel T | Burial structure for the non-retrievable interment of human remains and significant memorabilia |
US6161268A (en) * | 1999-06-07 | 2000-12-19 | Joseph; Charles | Modular niche construction |
-
2007
- 2007-05-23 ES ES200701085U patent/ES1066422Y/en not_active Expired - Fee Related
-
2008
- 2008-05-20 WO PCT/ES2008/070098 patent/WO2008142196A1/en active Application Filing
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4031678A (en) * | 1975-11-20 | 1977-06-28 | Schuring James A | Interlocking building block construction |
US5287603A (en) * | 1992-03-17 | 1994-02-22 | Schorman David C | Storage container for human remains and method therefor |
WO1999057395A1 (en) * | 1998-05-01 | 1999-11-11 | Dudek Daniel T | Burial structure for the non-retrievable interment of human remains and significant memorabilia |
US6161268A (en) * | 1999-06-07 | 2000-12-19 | Joseph; Charles | Modular niche construction |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10688005B2 (en) | 2017-01-13 | 2020-06-23 | Scott S. Conrad | Cremation storage device and system, methods of forming cremation storage device and system, and methods of operation of cremation storage device and system |
US11285067B2 (en) | 2017-01-13 | 2022-03-29 | Scott S. Conrad | Cremation storage device and system, methods of forming cremation storage device and system, and methods of operation of cremation storage device and system |
Also Published As
Publication number | Publication date |
---|---|
WO2008142196A4 (en) | 2009-01-22 |
ES1066422U (en) | 2008-02-01 |
ES1066422Y (en) | 2008-05-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10927560B2 (en) | Modular crypt | |
CA2330748C (en) | Burial structure for the non-retrievable interment of human remains and significant memorabilia | |
US5381591A (en) | Multi-tier burial system | |
RU96155U1 (en) | DEVELOPMENT OF MULTI-LEVEL CEMETERY | |
WO2008142196A1 (en) | Modular burial system | |
US4780994A (en) | Honeycomb type of structure for interment of human remains | |
US20050126086A1 (en) | Burial structure for interment of human remains and significant memorabilia | |
CN102704737B (en) | Ecological underground cemetery | |
JP3184381U (en) | Tumulus-type cemetery and underground cemetery | |
CN202007568U (en) | Cemetery building | |
CN203846845U (en) | Three-dimensional tomb chamber | |
ES1069831U (en) | Advanced model of cemetery with modular burning (Machine-translation by Google Translate, not legally binding) | |
RU77318U1 (en) | FAMILY CEMETERY | |
CN107327205A (en) | A kind of novel solid is buried | |
KR102381751B1 (en) | Tower for laying ashes | |
JP7330410B1 (en) | tombstone | |
CN219387430U (en) | Green ecological underground public cemetery | |
Shi | The hidden level in space and time: the vertical shaft in the royal tombs of the zhongshan kingdom in late eastern zhou (475–221 bce) china | |
CN103195289A (en) | Three-dimensional garden public cemetery | |
JP3008650U (en) | United tomb | |
CN113982362A (en) | Burying method and cemetery based on same | |
CN102619378A (en) | Multi-story high-rise storage building for cinerary caskets | |
JP3013366U (en) | Three-dimensional shrine | |
Sposito | La influencia de Wright en Nápoles | |
JPH0318590Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 08775437 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 08775437 Country of ref document: EP Kind code of ref document: A1 |