[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

WO1991019851A1 - Defibering of fibre material - Google Patents

Defibering of fibre material Download PDF

Info

Publication number
WO1991019851A1
WO1991019851A1 PCT/SE1991/000320 SE9100320W WO9119851A1 WO 1991019851 A1 WO1991019851 A1 WO 1991019851A1 SE 9100320 W SE9100320 W SE 9100320W WO 9119851 A1 WO9119851 A1 WO 9119851A1
Authority
WO
WIPO (PCT)
Prior art keywords
fibre material
preheater
worm
defibration
water
Prior art date
Application number
PCT/SE1991/000320
Other languages
French (fr)
Inventor
Baltsar Lundgren
Inge Larsson
Original Assignee
Sunds Defibrator Industries Aktiebolag
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sunds Defibrator Industries Aktiebolag filed Critical Sunds Defibrator Industries Aktiebolag
Publication of WO1991019851A1 publication Critical patent/WO1991019851A1/en

Links

Classifications

    • DTEXTILES; PAPER
    • D21PAPER-MAKING; PRODUCTION OF CELLULOSE
    • D21BFIBROUS RAW MATERIALS OR THEIR MECHANICAL TREATMENT
    • D21B1/00Fibrous raw materials or their mechanical treatment
    • D21B1/04Fibrous raw materials or their mechanical treatment by dividing raw materials into small particles, e.g. fibres
    • D21B1/12Fibrous raw materials or their mechanical treatment by dividing raw materials into small particles, e.g. fibres by wet methods, by the use of steam

Definitions

  • This invention relates to the defibration of lignocellul- ose-containing fibre material, such as wood chips, bagasse or the like, which is intended to be formed to fibreboard by forming and pressing.
  • fibre material is fed to an infeed bin, in which a certain preheating with steam of atmospheric pressure takes place.
  • the fibre material can be moist chips, which normally have been washed in a chip washer.
  • a feeding screw which brings about an air-tight plug, then feeds the chips to a pressurized preheater where the chips are heated with steam of a predetermined pressure for a cert ⁇ ain period of time, whereafter the chips are fed further via some type of worm conveyor to a refiner where defibr ⁇ ation is carried out between two refiner discs.
  • the def- ibered fibre material normally is mixed with resin during its tr port in a blow line and blown by steam to a fibre drier where the fibres are dried to a moisture ratio of ca. 0.1, then are transported to a fibre bin *and thereafter formed to a fibre mat, which is pressed in a hot press to a complete board.
  • the fibres can be mixed with resin in a mixer after the drying.
  • the drying can be carried out in a fibre drier of one- or two-step type.
  • the complete boards can be manufactured as boards of one or several layers. The latter type requires several production lines accord ⁇ ing to above arranged in parallel.
  • the preheated material normally is transferred from the preheater to the defibrator by a straight worm conveyor, which advances the material without compressing it.
  • Modern defibrators are fed laterally, i.e they comprise a worm feeder, which compresses the material slightly and feeds it to a worm belt, which in its turn feeds the chips into the beating zone between the refiner discs.
  • a slight compression was chosen, because the steam, which is produced at the refining and flows rearward against the chips via a by-pass pipe connected to the preheater top, is desired to be returned to the pre ⁇ heater for being used in the preheating.
  • the moist fibres shall be dried to the moisture ratio mentioned above.
  • the moisture ratio of ingoing chips can vary conside.ably, from 0.2 to 2.0 when no chip washer is used, but after chip washing normally is about 1.3.
  • additional moisture is supplied via the steam. Part of this moisture is pressed out in the worm feeder to the preheater, and an additional amount is allowed to evaporate during the energy-intensive refin ⁇ ing, whereafter moisture is added with the size introd ⁇ uced in the blow line. Remaining moisture minus the res ⁇ idue moisture 0.1, however, must be evaporated in the drier.
  • the drier used at the manufacture of fibreboard is of tubular type, where ingoing air temperature is about 160°C and outgoing air temperature is about 60°C, and where the efficiency degree is correspondingly low.
  • the drying therefore, requires a relatively high energy input per ton of evaporated moisture.
  • the energy consumption is reduced due to the fact, that the fibre material at the transfer from the preheater to the defibration is com ⁇ pressed at a compression rate of 1.5-3, preferably 2-3, and dewatered so that the material after defibration has a moisture ratio as low as possible.
  • the energy demand at the subsequent drying can hereby be reduced substant ⁇ ially.
  • the invention implies, that the total energy con ⁇ sumption at fibreboard manufacture can be reduced.
  • Chips are fed from an infeed bin 1 by a worm feeder 2, which produces an air-tight plug, into a preheater 3, where the chips are heated by steam via a conduit 4 to 140°C - 190°C, preferably 160°C - 180°C.
  • a certain dewatering takes place in the worm 2 .
  • a compressing worm 5 is located, which has a compression ratio of 1.5-3, preferably 2-3, i.e. the ratio between the free area of the worm at the inlet and the correspond ⁇ ing area at the outlet.
  • the casing 6 of the worm is prov ⁇ ided with a great number of apertures or slits, so that an effective dewatering can be achieved.
  • the water pressed out is collected in an air-tight casing 7 and discharged through a conduit 8 to a cleaning plant or returned to the infeed bin 1 for heating the chips.
  • the chips then can be fed from the worm 5 directly to the deflbrator 9 or to the refining zone of the defibrator via an angled worm belt, which breaks up the chip plug and ensures uniform infeed to the refining zone of the defibrator.
  • the defibered mat ⁇ erial is transported in a blow line 10, into which resin is introduced through a conduit 10. Thereafter drying takes place in a tubular drier 12, whereafter the fibres are transferred to a forming station where fibreboard is formed in a manner known per se.
  • the moisture ratio of the material fed into the defibrator 9 is lowered to 0.7-1.1, suitably 0.7-0.9, preferably about 0.8 , and of fibre admixed with resin after the blow line to 0.4-0.5.
  • the heat demand in the drier can hereby be almost halved. For a new plant, therefore, only slightly more than half the drier size is required. This implies for a plant producing 50 000 tons of board per annum a red ⁇ uction in drying energy at certain prerequisite conditi ⁇ ons counted in oil equivalents about 2150 - oil/year, in addition to the lower investment costs for the drier. To this.
  • the invention implies that the inlet temperature in the drier can be lowered substanti ⁇ ally, which results in lower drying costs. Besides, in cases when the drier was limiting the production, the prod ⁇ uction can be increased. An additional saving probably can be made in the amount of resin, because the resin consumpt ⁇ ion can be expected to decrease due to the lower"".drying temperature. All together, even in this case the saving will be substantial.
  • a drier fibre material also has a lower weight and is thereby easier to transport in the blow line, thereby red ⁇ ucing the demand for additional steam required for the transport.
  • the hot water collected from the com ⁇ pressing worm 5 is recovered and returned through the conduit 8 to the'infeed bin 1 for heating ingoing cold chips.
  • a considerable saving in steam to the preheater 3 is hereby obtained.
  • the hot water preferably can be returned via the conduit 8 for use in the chip washer.
  • the hot water returned through the conduit 8 is mixed with the cold chips in the infeed bin 1, so that temperature equilibrium is obtained. Tests have shown, that such a state can be achieved within a few minutes. By this heating, at certain prerequisite conditions, a saving of 30-35% in the steam demand for the preheater 3 can be made.
  • the waste flow from the worm 2 before the preheater 3 increases from 0.2 to 0.55 m /ton dry substance, which is an amount capable to be handled even when for environmental reasons water purification would be required. It is to be observed that the amount of water -soluble substance in this flow is smaller than that in the hot water from the compressing worm 5 after the prehea er 3., because part of the hot water is re-circulated.
  • Another alternative is to flash off by pressure drop the hot water pressed out and to utilize the steam for pre- -steaming the chips in the infeed bin 1 at the same time as the hot water is returned to the chip washer.
  • the invention is not restricted to the embodiments describ ed, but can be varied within the scope of the invention idea.

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Mechanical Engineering (AREA)
  • Dry Formation Of Fiberboard And The Like (AREA)
  • Paper (AREA)

Abstract

A method for the defibration of lignocellulose-containing fibre material; such as wood chips, bagasse or the like, comprising preheating the fibre material with steam under pressure at a temperature of 140-190 °C in a preheater (3) and subsequent defibration under pressure in a defibrator (9). The fibre material is transferred from the preheater (3) to the defibrator (9) and simultaneously compressed and dewatered in a compressing worm (5) with a compression ratio of 1.5-3, preferably 2-3, for lowering the moisture ratio of the fibre material.

Description

Defibering of fibre material
This invention relates to the defibration of lignocellul- ose-containing fibre material, such as wood chips, bagasse or the like, which is intended to be formed to fibreboard by forming and pressing.
At the manufacture of fibreboard according to the dry method, fibre material is fed to an infeed bin, in which a certain preheating with steam of atmospheric pressure takes place. The fibre material can be moist chips, which normally have been washed in a chip washer. A feeding screw, which brings about an air-tight plug, then feeds the chips to a pressurized preheater where the chips are heated with steam of a predetermined pressure for a cert¬ ain period of time, whereafter the chips are fed further via some type of worm conveyor to a refiner where defibr¬ ation is carried out between two refiner discs. The def- ibered fibre material normally is mixed with resin during its tr port in a blow line and blown by steam to a fibre drier where the fibres are dried to a moisture ratio of ca. 0.1, then are transported to a fibre bin *and thereafter formed to a fibre mat, which is pressed in a hot press to a complete board.
The fibres, alternatively, can be mixed with resin in a mixer after the drying. The drying can be carried out in a fibre drier of one- or two-step type. The complete boards can be manufactured as boards of one or several layers. The latter type requires several production lines accord¬ ing to above arranged in parallel.
The preheated material normally is transferred from the preheater to the defibrator by a straight worm conveyor, which advances the material without compressing it. Modern defibrators are fed laterally, i.e they comprise a worm feeder, which compresses the material slightly and feeds it to a worm belt, which in its turn feeds the chips into the beating zone between the refiner discs. A slight compression was chosen, because the steam, which is produced at the refining and flows rearward against the chips via a by-pass pipe connected to the preheater top, is desired to be returned to the pre¬ heater for being used in the preheating.
At a method of re-using the produced steam under press¬ ure, as disclosed in the patent SE-8200943-2 , a compress¬ ing worm feeder of straight-feed design is used. Further examples of compressing worm feeders of straight- -feed design are shown in the patents SE-7603464-4 and 8302014-9.
These patents refer to applications at the manufacture of papermaking pulp, where the pressure in the preheater is kept lower than in the refiner housing in order to achieve a pulp of highest ISO-brightness. At the manufact¬ ure of papermaking pulp, defibration and treatment take place in the refiner. This requires high energy input and at the same time produces much steam. As mentioned above, the worm feeder there is intended to prevent the steam from flowing rearward. The compressing worm feeder in thes cases, thus, has the object to adjust the pressure differ¬ ence between preheater and refiner housing. The degree of compression is low. The prerequisite conditions of in¬ terest at these applications, therefore, have been differ¬ ent from those at the defibering of fibre material for the manufacture of fibreboard according to the dry method.
At the manufacture of fibreboard according to the dry method, the moist fibres shall be dried to the moisture ratio mentioned above. The moisture ratio of ingoing chips can vary conside.ably, from 0.2 to 2.0 when no chip washer is used, but after chip washing normally is about 1.3. During the heating of the chips in the feeder bin and preheater, additional moisture is supplied via the steam. Part of this moisture is pressed out in the worm feeder to the preheater, and an additional amount is allowed to evaporate during the energy-intensive refin¬ ing, whereafter moisture is added with the size introd¬ uced in the blow line. Remaining moisture minus the res¬ idue moisture 0.1, however, must be evaporated in the drier. The drier used at the manufacture of fibreboard is of tubular type, where ingoing air temperature is about 160°C and outgoing air temperature is about 60°C, and where the efficiency degree is correspondingly low. The drying, therefore, requires a relatively high energy input per ton of evaporated moisture.
According to the invention, the energy consumption is reduced due to the fact, that the fibre material at the transfer from the preheater to the defibration is com¬ pressed at a compression rate of 1.5-3, preferably 2-3, and dewatered so that the material after defibration has a moisture ratio as low as possible. The energy demand at the subsequent drying can hereby be reduced substant¬ ially. The invention implies, that the total energy con¬ sumption at fibreboard manufacture can be reduced. The characterizing features of the invention are apparent from the attached claims.
The invention is described in greater detail in the foll¬ owing, with reference to the accompanying Figure, which schematically shows an embodiment of a plant for the manuf¬ acture of defibered fibre material according to the in¬ vention.
Chips are fed from an infeed bin 1 by a worm feeder 2, which produces an air-tight plug, into a preheater 3, where the chips are heated by steam via a conduit 4 to 140°C - 190°C, preferably 160°C - 180°C. In the worm 2 a certain dewatering takes place. After the preheater 3 a compressing worm 5 is located, which has a compression ratio of 1.5-3, preferably 2-3, i.e. the ratio between the free area of the worm at the inlet and the correspond¬ ing area at the outlet. The casing 6 of the worm is prov¬ ided with a great number of apertures or slits, so that an effective dewatering can be achieved. The water pressed out is collected in an air-tight casing 7 and discharged through a conduit 8 to a cleaning plant or returned to the infeed bin 1 for heating the chips. The chips then can be fed from the worm 5 directly to the deflbrator 9 or to the refining zone of the defibrator via an angled worm belt, which breaks up the chip plug and ensures uniform infeed to the refining zone of the defibrator. The defibered mat¬ erial is transported in a blow line 10, into which resin is introduced through a conduit 10. Thereafter drying takes place in a tubular drier 12, whereafter the fibres are transferred to a forming station where fibreboard is formed in a manner known per se.
Due to the compression and dewatering of the fibre material in the worm 5, the moisture ratio of the material fed into the defibrator 9 is lowered to 0.7-1.1, suitably 0.7-0.9, preferably about 0.8 , and of fibre admixed with resin after the blow line to 0.4-0.5. The heat demand in the drier can hereby be almost halved. For a new plant, therefore, only slightly more than half the drier size is required. This implies for a plant producing 50 000 tons of board per annum a red¬ uction in drying energy at certain prerequisite conditi¬ ons counted in oil equivalents about 2150 - oil/year, in addition to the lower investment costs for the drier. To this. are further to be added reduced costs for almost halved fan energy for the drier as well as almost halved emissions of impurities in the drier exhaust gases, altern¬ atively reduced size of required cleaning equipmen.t. In certain cases the installation of any cleaning equipment can be abandoned.
For an existing plant, the invention implies that the inlet temperature in the drier can be lowered substanti¬ ally, which results in lower drying costs. Besides, in cases when the drier was limiting the production, the prod¬ uction can be increased. An additional saving probably can be made in the amount of resin, because the resin consumpt¬ ion can be expected to decrease due to the lower"".drying temperature. All together, even in this case the saving will be substantial.
By increasing the compression ratio and dewatering in the infeed worm 2, the moisture content of the chips fed into the defibrator 9 and drier 12 can be lowered further An increase in the compression ratio from 1.8 to 2.8 yields a decrease in drying energy by about 10%. A drier fibre material also has a lower weight and is thereby easier to transport in the blow line, thereby red¬ ucing the demand for additional steam required for the transport.
As mentioned above, the hot water collected from the com¬ pressing worm 5 is recovered and returned through the conduit 8 to the'infeed bin 1 for heating ingoing cold chips. A considerable saving in steam to the preheater 3 is hereby obtained. Several different designs can be imagined in this respect, depending on whether or not the plant has a chip washer, and whether the chips are pre- -steamed in the infeed bin 1. When the plant comprises chip washing, the hot water preferably can be returned via the conduit 8 for use in the chip washer. At a simple application, the hot water returned through the conduit 8 is mixed with the cold chips in the infeed bin 1, so that temperature equilibrium is obtained. Tests have shown, that such a state can be achieved within a few minutes. By this heating, at certain prerequisite conditions, a saving of 30-35% in the steam demand for the preheater 3 can be made.
Still more energy can be saved when the water pressed out from the worm 2 before the preheater 3 is passed to a chip washer. At an annual production of 50 000 tons of board, about 800 m^ oil, counted in oil equivalents, can be saved. In a new plant, besides, the size of the steam boiler system can be reduced, thereby lowering the invest¬ ment costs and very probably well compensating for the excess cost of the compressing worm 5 after the preheat¬ er 3.
Compared with conventional defibering, at given prerequis¬ ite conditions, the waste flow from the worm 2 before the preheater 3 increases from 0.2 to 0.55 m /ton dry substance, which is an amount capable to be handled even when for environmental reasons water purification would be required. It is to be observed that the amount of water -soluble substance in this flow is smaller than that in the hot water from the compressing worm 5 after the prehea er 3., because part of the hot water is re-circulated. Another alternative is to flash off by pressure drop the hot water pressed out and to utilize the steam for pre- -steaming the chips in the infeed bin 1 at the same time as the hot water is returned to the chip washer. The invention is not restricted to the embodiments describ ed, but can be varied within the scope of the invention idea.

Claims

Claims
1. A method for manufacturing fibreboard according to the dry method by defibration of lignocellulose-containing fibre material, comprising preheating of the fibre material with steam under pressure at a temperature of 140-190°C in a preheater (3) and subsequent defibering under pressure in a defibrator (9) , admixing resin in the fibre material in a blow line after defibration, drying the fibre material to a moisture ratio of about 0.1 and forming the fibre material to fibreboard, c h a r a c t e r i z e d i n that the fibre material is fed by a worm feeder (2) air-tight from an infeed bin (1) to the preheater (3) and simultaneously dewatered with a compression ratio of 2-3, that the transfer of the fibre material from the preheating to the defibration takes place while the material simultaneously is compressed and dewatered in a compression worm (5) with a compression ratio of 1.5-3, preferably 2-3, for lowering the moisture ratio of the fibre material to 0.7-1.1, preferably to 0.7-0.9, and further lowering the moisture ratio of the fibre material by defibration so that the moisture ratio after defibration and admixing of resin is 0.4-0.5.
2. A method as defined in claim 1, c h a r a c t ¬ e r i z e d i n that the water separated from the compressing worm (5) is re-circulated for heating the fibre material before the preheater (3) .
3. A method as defined in claim 2, c h a r a c t ¬ e r i z e d i n that the water is re-circulated to the infeed bin (1) before the preheater (3) .
4. A method as defined in claim 2, c h a r a c t ¬ e r i z e d i n that the water is re-circulated to a washer, from which the fibre material via the infeed bin (1) is fed into the preheater (3) .
5. A method as defined in claim 1, c h a r a c t ¬ e r i z e d i n that the water separated from the compressing worm (5) is allowed to expand, that the steam going off is utilized for pre-steaming the fibre material in the infeed bin (1) before the preheater (3) , and that the water is used at the washing of the fibre material in a washer before the infeed bin (1) .
6. A method as defined in claim 1, c h a r a c t - erized i n that the water separated from the worm feeder (2) is re-circulated to be used at the washing of the fibre material before the infeed bin (1) .
PCT/SE1991/000320 1990-06-20 1991-05-06 Defibering of fibre material WO1991019851A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
SE9002197A SE468016B (en) 1990-06-20 1990-06-20 SET FOR FIBERBOARD MANUFACTURING ACCORDING TO THE DRY METHOD INCLUDING DEFIBRATION OF LIGNOCELLULOS containing FIBER MATERIAL
SE9002197-3 1990-06-20

Publications (1)

Publication Number Publication Date
WO1991019851A1 true WO1991019851A1 (en) 1991-12-26

Family

ID=20379822

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/SE1991/000320 WO1991019851A1 (en) 1990-06-20 1991-05-06 Defibering of fibre material

Country Status (4)

Country Link
AU (1) AU7996991A (en)
NZ (1) NZ238142A (en)
SE (1) SE468016B (en)
WO (1) WO1991019851A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2401069A (en) * 2003-03-10 2004-11-03 Andritz Ag Maschf Processing lignocellulose materials
US6899791B2 (en) 1997-08-08 2005-05-31 Andritz Inc. Method of pretreating lignocellulose fiber-containing material in a pulp refining process

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE376267B (en) * 1973-12-28 1975-05-12 S D Selander
SE413784B (en) * 1976-08-06 1980-06-23 Isel Sa SET AND DEVICE TO USE IN DEFIBRATION ZONE DEVELOPED HEAT TO MINIMIZE CONSUMPTION WHEN PREPARING MASS FOR FIBER DISC

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE376267B (en) * 1973-12-28 1975-05-12 S D Selander
SE413784B (en) * 1976-08-06 1980-06-23 Isel Sa SET AND DEVICE TO USE IN DEFIBRATION ZONE DEVELOPED HEAT TO MINIMIZE CONSUMPTION WHEN PREPARING MASS FOR FIBER DISC

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6899791B2 (en) 1997-08-08 2005-05-31 Andritz Inc. Method of pretreating lignocellulose fiber-containing material in a pulp refining process
GB2401069A (en) * 2003-03-10 2004-11-03 Andritz Ag Maschf Processing lignocellulose materials
AT412787B (en) * 2003-03-10 2005-07-25 Andritz Ag Maschf METHOD AND DEVICE FOR TRANSFERRING LIGNOCELLULOUS RAW MATERIAL FROM A COOKER AND PROMOTING THE RAW MATERIAL TO A REFINER
GB2401069B (en) * 2003-03-10 2006-01-04 Andritz Ag Maschf Process and device for discharging wood chips from a digester and conveying the raw material to a refiner
DE102004010196B4 (en) * 2003-03-10 2008-11-13 Andritz Ag Apparatus for discharging lignocellulosic raw material from a digester and for conveying the raw material to a refiner

Also Published As

Publication number Publication date
SE9002197D0 (en) 1990-06-20
AU7996991A (en) 1992-01-07
NZ238142A (en) 1992-11-25
SE468016B (en) 1992-10-19
SE9002197L (en) 1991-12-21

Similar Documents

Publication Publication Date Title
US4136831A (en) Method and apparatus for minimizing steam consumption in the production of pulp for fiberboard and the like
US4012279A (en) Process of producing pulp, for manufacture of fiberboard, in a closed backwater system
US2323194A (en) Apparatus for the production of pulp from cellulosic material
US4537655A (en) Process for producing and flash drying high yield mechanical cellulose pulp with steam and condensate recycle
CA1132822A (en) Method and apparatus in defibration
PL208597B1 (en) Method and appliance designed to take lignocellulose raw material and particularly chips, sawdust, annual plants or wood wastes out of the boiling pot and to feed this raw material to the refining mill
EP1728917B1 (en) Method and system for energy savings in TMP by high temperature LC/MC refining of pulp
FI62149B (en) FOERFARANDE FOER FRAMSTAELLNING AV VARMSLIPMASSA
WO1993025358A1 (en) Manufacture of board
JP3372607B2 (en) Fiberboard manufacturing
US5663221A (en) Method for the production of MDF boards based on sunflower seed husks
WO1991019851A1 (en) Defibering of fibre material
US2889242A (en) Manufacturing of wallboard
US6113821A (en) Process for producing wood fibres
EP0199481B1 (en) A process for the manufacture of cellulose pulps
US3801434A (en) Method in the manufacture of lignocellulosic fibreboard
KR20200118083A (en) Method for producing microcrystalline cellulose
FI66449C (en) SAETT ATT PAOLAEGGA ETT ELLER FLERA YTMASSASKIKT PAO GRUNDMASSABANAN VID FRAMSTAELLNING AV FIBERSKIVOR PAO VAOTA VAEGEN
US2977274A (en) Digestion of pulp
CA1140382A (en) Process for producing fiberboard wherein dissolved wood matter is separated from the process water
CN115190924A (en) Method and processing system for reducing volatile organic compounds in wood chips
SE420224B (en) Process and device for heating fibrous materials in the preparation of pulp obtained by defibrating wood chips
SU1285091A1 (en) Installation for producing fibrous wood mass
PL144780B1 (en) Method of obtaining a fibrous composition of cellulose containing solid particles in particular for use in manufacture of fibreboards
FI74056B (en) FOERFARANDE FOER FRAMSTAELLNING AV TRAEFLIS.

Legal Events

Date Code Title Description
AK Designated states

Kind code of ref document: A1

Designated state(s): AU CA FI JP US

AL Designated countries for regional patents

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB GR IT LU NL SE

NENP Non-entry into the national phase

Ref country code: CA