[go: up one dir, main page]
More Web Proxy on the site http://driver.im/

US9303908B2 - Air conditioner - Google Patents

Air conditioner Download PDF

Info

Publication number
US9303908B2
US9303908B2 US12/096,806 US9680606A US9303908B2 US 9303908 B2 US9303908 B2 US 9303908B2 US 9680606 A US9680606 A US 9680606A US 9303908 B2 US9303908 B2 US 9303908B2
Authority
US
United States
Prior art keywords
refrigerant
heat exchanger
utilization
side heat
heat source
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active, expires
Application number
US12/096,806
Other versions
US20090151374A1 (en
Inventor
Shinichi Kasahara
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daikin Industries Ltd
Original Assignee
Daikin Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daikin Industries Ltd filed Critical Daikin Industries Ltd
Assigned to DAIKIN INDUSTRIES, LTD. reassignment DAIKIN INDUSTRIES, LTD. ASSIGNMENT OF ASSIGNORS INTEREST (SEE DOCUMENT FOR DETAILS). Assignors: KASAHARA, SHINICHI
Publication of US20090151374A1 publication Critical patent/US20090151374A1/en
Application granted granted Critical
Publication of US9303908B2 publication Critical patent/US9303908B2/en
Active legal-status Critical Current
Adjusted expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/005Arrangement or mounting of control or safety devices of safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/023Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
    • F25B2313/0233Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units in parallel arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02741Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using one four-way valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/029Control issues
    • F25B2313/0293Control issues related to the indoor fan, e.g. controlling speed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2400/00General features or devices for refrigeration machines, plants or systems, combined heating and refrigeration systems or heat-pump systems, i.e. not limited to a particular subgroup of F25B
    • F25B2400/13Economisers

Definitions

  • the present invention relates to a function to judge the adequacy of the refrigerant quantity in a refrigerant circuit of an air conditioner. More specifically, the present invention relates to a function to judge the adequacy of the refrigerant quantity in a refrigerant circuit of an air conditioner configured by the interconnection of a heat source unit and a utilization unit.
  • An object of the present invention is to reduce the labor of inputting information on a utilization unit before operating a separate type air conditioner, and at the same time, to enable a highly accurate judgment of the adequacy of the refrigerant quantity in a refrigerant circuit.
  • An air conditioner includes a refrigerant circuit, a transmission line, an information obtaining means or section, an operation controlling means or section, a refrigerant quantity judging means or section, and a condition setting means or section.
  • the refrigerant circuit is configured by the interconnection of a heat source unit and a utilization unit.
  • the transmission line exchanges a signal between the heat source unit and the utilization unit.
  • the information obtaining means obtains information on the utilization unit connected to the heat source unit via the transmission line.
  • the operation controlling means can perform a refrigerant quantity judging operation.
  • the refrigerant quantity judging means judges the adequacy of the refrigerant quantity in the refrigerant circuit by using an operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit in the refrigerant quantity judging operation.
  • the condition setting means sets a condition for the refrigerant quantity judging operation according to the information on the utilization unit obtained by the information obtaining means.
  • the refrigerant quantity judging operation and judgment of the adequacy of the refrigerant quantity in the refrigerant circuit can be appropriately performed according to the connection condition for the utilization unit. In this way, in this air conditioner, it is possible to judge the adequacy of the refrigerant quantity in the refrigerant circuit with high accuracy while reducing the labor of inputting information on the utilization unit.
  • the term “information on the utilization unit” refers to information on the model, capacity, and the like of the utilization unit.
  • condition for the refrigerant quantity judging operation refers to a target control value of constituent equipment for the refrigerant quantity judging operation, a relational expression that is used when judging the adequacy of the refrigerant quantity, and the like.
  • An air conditioner according to a second aspect of the present invention is the air conditioner according to the first aspect of the present invention, further including a refrigerant quantity calculating means or section to calculate the refrigerant quantity in the refrigerant circuit from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit in the refrigerant quantity judging operation, by using a relational expression between the refrigerant quantity in the refrigerant circuit and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit.
  • the refrigerant quantity judging means judges the adequacy of the refrigerant quantity in the refrigerant circuit by using the refrigerant quantity in the refrigerant circuit calculated by the refrigerant quantity calculating means.
  • the condition setting means sets the relational expression as the condition for the refrigerant quantity judging operation, according to the model of the utilization unit obtained by the infolination obtaining means.
  • the refrigerant quantity in the refrigerant circuit is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit in the refrigerant quantity judging operation by using the relational expression between the refrigerant quantity in the refrigerant circuit and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit, and the adequacy of the refrigerant quantity in the refrigerant circuit is judged by using the refrigerant quantity calculated.
  • this air conditioner because it is premised that various types of utilization units are connected to the heat source unit, in the case where it is wished to enable a high accurate judgment of the adequacy of the refrigerant quantity when judging the adequacy of the refrigerant quantity in the refrigerant circuit by this approach, it is desirable to set the relational expression according to the model of each utilization unit. Therefore, this air conditioner is configured such that the relational expression can be set according to the information on the utilization units.
  • An air conditioner according to a third aspect of the present invention is the air conditioner according to the second aspect of the present invention, wherein the relational expressions are provided separately for the utilization units and the portions other than the utilization units.
  • the condition setting means sets the relational expressions provided for the refrigerant quantity in the utilization units according to the models of the utilization units obtained by the information obtaining means.
  • the relational expressions are prepared separately for the utilization units and the portions other than the utilization units.
  • the relational expressions for the refrigerant quantity in the entire refrigerant circuit according to the models of the utilization units, only the relational expressions for the refrigerant quantity in the utilization units need to be changed.
  • the relational expressions for the refrigerant quantity in the entire refrigerant circuit can be used for a diversity of models of the utilization units, and thus a calculation process can be smoothly performed.
  • An air conditioner according to a fourth aspect of the present invention is the air conditioner according to any one of the first through third aspects of the present invention, wherein the condition setting means sets a target control value of constituent equipment in the refrigerant quantity judging operation as a condition for the refrigerant quantity judging operation, according to the capacity of the utilization unit.
  • this air conditioner it is premised that various types of utilization units are connected to the heat source unit. Consequently, in the case where it is wished to enable a highly accurate judgment of the adequacy of the refrigerant quantity when judging the adequacy of the refrigerant quantity in the refrigerant circuit, it is desirable to set the target control value of constituent equipment for the refrigerant quantity judging operation according to the capacities of the utilization units connected to the heat source unit. Therefore, in this air conditioner, the target control value of constituent equipment for the refrigerant quantity judging operation can be set according to the information on the capacities of the utilization units. In this way, in this air conditioner, it is possible to perform the refrigerant quantity judging operation by using the appropriate target control value according to the capacities of the utilization units connected to the utilization unit.
  • An air conditioner according to a fifth aspect of the present invention is the air conditioner according to the fourth aspect of the present invention, wherein the heat source unit includes a compressor and a heat source side heat exchanger.
  • the utilization unit includes an expansion mechanism and a utilization side heat exchanger.
  • the refrigerant circuit is configured by the interconnection of the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger.
  • the operation controlling means causes the utilization side heat exchanger to function as an evaporator for the refrigerant, and also controls constituent equipment such that the pressure of the refrigerant sent from the utilization side heat exchanger to the compressor or the operation state quantity equivalent to the aforementioned pressure becomes constant at a target low pressure as the target control value.
  • the target low pressure for the refrigerant quantity judging operation can be set according to the information on the capacities of the utilization units. In this way, in this air conditioner, it is possible to perform the refrigerant quantity judging operation by using an appropriate target low pressure according to the capacities of the utilization units connected to the heat source unit.
  • An air conditioner according to a sixth aspect of the present invention is the air conditioner according to the fourth aspect of the present invention, wherein the heat source unit includes a compressor and a heat source side heat exchanger.
  • the utilization unit includes an expansion mechanism and a utilization side heat exchanger.
  • the refrigerant circuit is configured by the interconnection of the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger.
  • the operation controlling means causes the utilization side heat exchanger to function as an evaporator for the refrigerant, and also controls constituent equipment such that the superheat degree of the refrigerant sent from the utilization side heat exchanger to the compressor becomes constant at a target superheat degree as the target control value.
  • the target superheat degree for the refrigerant quantity judging operation can set according to the information on the capacities of the utilization units. In this way, in this air conditioner, it is possible to perform the refrigerant quantity judging operation by using an appropriate target superheat degree according to the capacities of the utilization units connected to the heat source unit.
  • An air conditioner according to a seventh aspect of the present invention is the air conditioner according to the fourth aspect of the present invention, wherein the heat source unit includes a compressor and a heat source side heat exchanger.
  • the utilization unit includes an expansion mechanism, a utilization side heat exchanger, and a ventilation fan that supplies air to the utilization side heat exchanger.
  • the refrigerant circuit is configured by the interconnection of the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger.
  • the operation controlling means causes the utilization side heat exchanger to function as an evaporator for the refrigerant, and also performs control such that the air flow rate of the ventilation fan becomes constant at a target air flow rate.
  • the target air flow rate in the refrigerant quantity judging operation can be set according to the information on the capacity of the utilization units. In this way, in this air conditioner, it is possible to perform the refrigerant quantity judging operation by using an appropriate target air flow rate according to the capacities of the utilization units connected to the heat source unit.
  • FIG. 1 is a schematic configuration view of an air conditioner according to an embodiment of the present invention.
  • FIG. 2 is a control block diagram of the air conditioner.
  • FIG. 3 is a flowchart of a test operation mode.
  • FIG. 4 is a flowchart of an automatic refrigerant charging operation.
  • FIG. 5 is a schematic diagram to show a state of refrigerant flowing in a refrigerant circuit in a refrigerant quantity judging operation (illustrations of a four-way switching valve and the like are omitted).
  • FIG. 6 is a flowchart to show an information obtaining process and a condition setting process in the refrigerant quantity judging operation.
  • FIG. 7 is a flowchart to show the information obtaining process and the condition setting process in calculation of the refrigerant quantity.
  • FIG. 8 is a flowchart of a pipe volume judging operation.
  • FIG. 9 is a Mollier diagram to show a refrigerating cycle of the air conditioner in the pipe volume judging operation for a liquid refrigerant communication pipe.
  • FIG. 10 is a Mollier diagram to show a refrigerating cycle of the air conditioner in the pipe volume judging operation for a gas refrigerant communication pipe.
  • FIG. 11 is a flowchart of an initial refrigerant quantity judging operation.
  • FIG. 12 is a flowchart of a refrigerant leak detection operation mode.
  • FIG. 1 is a schematic configuration view of an air conditioner 1 according to an embodiment of the present invention.
  • the air conditioner 1 is a device that is used to cool and heat a room in a building and the like by performing a vapor compression-type refrigeration cycle operation.
  • the air conditioner 1 mainly includes one outdoor unit 2 as a heat source unit, indoor units 4 and 5 as a plurality (two in the present embodiment) of utilization units connected in parallel thereto, and a liquid refrigerant communication pipe 6 and a gas refrigerant communication pipe 7 as refrigerant communication pipes which interconnect the outdoor unit 2 and the indoor units 4 and 5 .
  • the vapor compression-type refrigerant circuit 10 of the air conditioner 1 in the present embodiment is configured by the interconnection of the outdoor unit 2 , the indoor units 4 and 5 , and the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 .
  • the indoor units 4 and 5 are installed by being embedded in or hung from a ceiling of a room in a building and the like or by being mounted or the like on a wall surface of a room.
  • the indoor units 4 and 5 are connected to the outdoor unit 2 via the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 , and configure a part of the refrigerant circuit 10 .
  • the indoor unit 4 mainly includes an indoor side refrigerant circuit 10 a (an indoor side refrigerant circuit 10 b in the case of the indoor unit 5 ) that configures a part of the refrigerant circuit 10 .
  • the indoor side refrigerant circuit 10 a mainly includes an indoor expansion valve 41 as an expansion mechanism and an indoor heat exchanger 42 as a utilization side heat exchanger.
  • the indoor expansion valve 41 is an electrically powered expansion valve connected to a liquid side of the indoor heat exchanger 42 in order to adjust the flow rate or the like of the refrigerant flowing in the indoor side refrigerant circuit 10 a.
  • the indoor heat exchanger 42 is a cross fin-type fin-and-tube type heat exchanger configured by a heat transfer tube and numerous fins, and is a heat exchanger that functions as an evaporator for the refrigerant during a cooling operation to cool the room air and functions as a condenser for the refrigerant during a heating operation to heat the room air.
  • the indoor unit 4 includes an indoor fan 43 as a ventilation fan for taking in room air into the unit, causing the air to heat exchange with the refrigerant in the indoor heat exchanger 42 , and then supplying the air to the room as supply air.
  • the indoor fan 43 is a fan capable of varying an air flow rate Wr of the air which is supplied to the indoor heat exchanger 42 , and in the present embodiment, is a centrifugal fan, multi-blade fan, or the like, which is driven by a motor 43 a comprising a DC fan motor.
  • a liquid side temperature sensor 44 that detects the temperature of the refrigerant (i.e., the refrigerant temperature corresponding to a condensation temperature Tc during the heating operation or an evaporation temperature Te during the cooling operation) is disposed at the liquid side of the indoor heat exchanger 42 .
  • a gas side temperature sensor 45 that detects a temperature Teo of the refrigerant is disposed at a gas side of the indoor heat exchanger 42 .
  • a room temperature sensor 46 that detects the temperature of the room air that flows into the unit i.e., a room temperature Tr
  • a room air intake side of the indoor unit 4 disposed at a room air intake side of the indoor unit 4 .
  • the liquid side temperature sensor 44 , the gas side temperature sensor 45 , and the room temperature sensor 46 comprise thermistors.
  • the indoor unit 4 includes an indoor side controller 47 that controls the operation of each portion constituting the indoor unit 4 .
  • the indoor side controller 47 includes a microcomputer and a memory and the like disposed in order to control the indoor unit 4 , and is configured such that it can exchange control signals and the like with a remote controller (not shown) for individually operating the indoor unit 4 and can exchange control signals and the like with the outdoor unit 2 via a transmission line 8 a.
  • the outdoor unit 2 is installed outside of a building and the like, is connected to the indoor units 4 and 5 via the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 , and configures the refrigerant circuit 10 with the indoor units 4 and 5 .
  • the outdoor unit 2 mainly includes an outdoor side refrigerant circuit 10 c that configures a part of the refrigerant circuit 10 .
  • This outdoor side refrigerant circuit 10 c mainly includes a compressor 21 , a four-way switching valve 22 , an outdoor heat exchanger 23 as a heat source side heat exchanger, an outdoor expansion valve 38 as an expansion mechanism, an accumulator 24 , a subcooler 25 as a temperature adjustment mechanism, a liquid side stop valve 26 , and a gas side stop valve 27 .
  • the compressor 21 is a compressor whose operation capacity can be varied, and in the present embodiment, is a positive displacement-type compressor driven by a motor 21 a whose rotation frequency Rm is controlled by an inverter. In the present embodiment, only one compressor 21 is provided, but it is not limited thereto, and two or more compressors may be connected in parallel according to the number of connected units of indoor units and the like.
  • the four-way switching valve 22 is a valve for switching the direction of the flow of the refrigerant such that, during the cooling operation, the four-way switching valve 22 is capable of connecting a discharge side of the compressor 21 and a gas side of the outdoor heat exchanger 23 and connecting a suction side of the compressor 21 (specifically, the accumulator 24 ) and the gas refrigerant communication pipe 7 (see the solid lines of the four-way switching valve 22 in FIG.
  • the four-way switching valve 22 is capable of connecting the discharge side of the compressor 21 and the gas refrigerant communication pipe 7 and connecting the suction side of the compressor 21 and the gas side of the outdoor heat exchanger 23 (see the dotted lines of the four-way switching valve 22 in FIG.
  • the outdoor heat exchanger 23 is a cross-fin type fin-and-tube type heat exchanger configured by a heat transfer tube and numerous fins, and is a heat exchanger that functions as a condenser for the refrigerant during the cooling operation and as an evaporator for the refrigerant during the heating operation.
  • the gas side of the outdoor heat exchanger 23 is connected to the four-way switching valve 22 , and the liquid side thereof is connected to the liquid refrigerant communication pipe 6 .
  • the outdoor expansion valve 38 is an electrically powered expansion valve connected to a liquid side of the outdoor heat exchanger 23 in order to adjust the pressure, flow rate, or the like of the refrigerant flowing in the outdoor side refrigerant circuit 10 c.
  • the outdoor unit 2 includes an outdoor fan 28 as a ventilation fan for taking in outdoor air into the unit, causing the air to exchange heat with the refrigerant in the outdoor heat exchanger 23 , and then exhausting the air to the outside.
  • the outdoor fan 28 is a fan capable of varying an air flow rate Wo of the air which is supplied to the outdoor heat exchanger 23 , and in the present embodiment, is a propeller fan or the like driven by a motor 28 a comprising a DC fan motor.
  • the accumulator 24 is connected between the four-way switching valve 22 and the compressor 21 , and is a container capable of accumulating excess refrigerant generated in the refrigerant circuit 10 in accordance with the change in the operation load of the indoor units 4 and 5 and the like.
  • the subcooler 25 is a double tube heat exchanger, and is disposed to cool the refrigerant sent to the indoor expansion valves 41 and 51 after the refrigerant is condensed in the outdoor heat exchanger 23 .
  • the subcooler 25 is connected between the outdoor expansion valve 38 and the liquid side stop valve 26 .
  • a bypass refrigerant circuit 61 as a cooling source of the subcooler 25 is disposed. Note that, in the description below, a portion corresponding to the refrigerant circuit 10 excluding the bypass refrigerant circuit 61 is referred to as a main refrigerant circuit for convenience sake.
  • the bypass refrigerant circuit 61 is connected to the main refrigerant circuit so as to cause a portion of the refrigerant sent from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 to branch from the main refrigerant circuit and return to the suction side of the compressor 21 .
  • the bypass refrigerant circuit 61 includes a branch circuit 61 a connected so as to branch a portion of the refrigerant sent from the outdoor expansion valve 38 to the indoor expansion valves 41 and 51 at a position between the outdoor heat exchanger 23 and the subcooler 25 , and a merging circuit 61 b connected to the suction side of the compressor 21 so as to return a portion of refrigerant from an outlet on a bypass refrigerant circuit side of the subcooler 25 to the suction side of the compressor 21 .
  • the branch circuit 61 a is disposed with a bypass expansion valve 62 for adjusting the flow rate of the refrigerant flowing in the bypass refrigerant circuit 61 .
  • the bypass expansion valve 62 comprises an electrically operated expansion valve.
  • the refrigerant sent from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 is cooled in the subcooler 25 by the refrigerant flowing in the bypass refrigerant circuit 61 which has been depressurized by the bypass expansion valve 62 .
  • performance of the subcooler 25 is controlled by adjusting the opening degree of the bypass expansion valve 62 .
  • the liquid side stop valve 26 and the gas side stop valve 27 are valves disposed at ports connected to external equipment and pipes (specifically, the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 ).
  • the liquid side stop valve 26 is connected to the outdoor heat exchanger 23 .
  • the gas side stop valve 27 is connected to the four-way switching valve 22 .
  • various sensors are disposed in the outdoor unit 2 .
  • disposed in the outdoor unit 2 are an suction pressure sensor 29 that detects a suction pressure Ps of the compressor 21 , a discharge pressure sensor 30 that detects a discharge pressure Pd of the compressor 21 , a suction temperature sensor 31 that detects a suction temperature Ts of the compressor 21 , and a discharge temperature sensor 32 that detects a discharge temperature Td of the compressor 21 .
  • the suction temperature sensor 31 is disposed at a position between the accumulator 24 and the compressor 21 .
  • a heat exchanger temperature sensor 33 that detects the temperature of the refrigerant flowing through the outdoor heat exchanger 23 (i.e., the refrigerant temperature corresponding to the condensation temperature Tc during the cooling operation or the evaporation temperature Te during the heating operation) is disposed in the outdoor heat exchanger 23 .
  • a liquid side temperature sensor 34 that detects a refrigerant temperature Tco is disposed at the liquid side of the outdoor heat exchanger 23 .
  • a liquid pipe temperature sensor 35 that detects the temperature of the refrigerant i.e., a liquid pipe temperature Tlp
  • Tlp liquid pipe temperature
  • the merging circuit 61 b of the bypass refrigerant circuit 61 is disposed with a bypass temperature sensor 63 for detecting the temperature of the refrigerant flowing through the outlet on the bypass refrigerant circuit side of the subcooler 25 .
  • An outdoor temperature sensor 36 that detects the temperature of the outdoor air that flows into the unit (i.e., an outdoor temperature Ta) is disposed at an outdoor air intake side of the outdoor unit 2 .
  • the suction temperature sensor 31 , the discharge temperature sensor 32 , the heat exchanger temperature sensor 33 , the liquid side temperature sensor 34 , the liquid pipe temperature sensor 35 , the outdoor temperature sensor 36 , and the bypass temperature sensor 63 comprise thermistors.
  • the outdoor unit 2 includes an outdoor side controller 37 that controls the operation of each portion constituting the outdoor unit 2 .
  • the outdoor side controller 37 includes a microcomputer and a memory disposed in order to control the outdoor unit 2 , an inverter circuit that controls the motor 21 a , and the like, and is configured such that it can exchange control signals and the like with the indoor side controllers 47 and 57 of the indoor units 4 and 5 via the transmission line 8 a .
  • a controller 8 that performs the operation control of the entire air conditioner 1 is configured by the indoor side controllers 47 and 57 , the outdoor side controller 37 , and the transmission line 8 a that interconnects the controllers 37 , 47 , and 57 .
  • the controller 8 is connected so as to be able to receive detection signals of sensors 29 to 36 , 44 to 46 , 54 to 56 , and 63 and also to be able to control various equipment and valves 21 , 22 , 24 , 28 a , 38 , 41 , 43 a , 51 , 53 a , and 62 based on these detection signals and the like.
  • a warning display 9 comprising LEDs and the like, which is configured to indicate that a refrigerant leak is detected in the below described refrigerant leak detection operation, is connected to the controller 8 .
  • FIG. 2 is a control block diagram of the air conditioner 1 .
  • the refrigerant communication pipes 6 and 7 are refrigerant pipes that are arranged on site when installing the air conditioner 1 at an installation location such as a building.
  • the refrigerant communication pipes 6 and 7 pipes having various lengths and pipe diameters are used according to the installation conditions such as an installation location, combination of an outdoor unit and an indoor unit, and the like. Accordingly, for example, when installing a new air conditioner, in order to calculate the charging quantity of the refrigerant, it is necessary to obtain accurate information regarding the lengths and pipe diameters and the like of the refrigerant communication pipes 6 and 7 . However, management of such information and the calculation itself of the refrigerant quantity are difficult. In addition, when utilizing an existing pipe to renew an indoor unit and an outdoor unit, information regarding the lengths and pipe diameters and the like of the refrigerant communication pipes 6 and 7 may have been lost in some cases.
  • the refrigerant circuit 10 of the air conditioner 1 is configured by the interconnection of the indoor side refrigerant circuits 10 a and 10 b , the outdoor side refrigerant circuit 10 c , and the refrigerant communication pipes 6 and 7 .
  • this refrigerant circuit 10 is configured by the bypass refrigerant circuit 61 and the main refrigerant circuit excluding the bypass refrigerant circuit 61 .
  • controller 8 constituted by the indoor side controllers 47 and 57 and the outdoor side controller 37 allows the air conditioner 1 in the present embodiment to switch and operate between the cooling operation and the heating operation by the four-way switching valve 22 and to control each equipment of the outdoor unit 2 and the indoor units 4 and 5 according to the operation load of each of the indoor units 4 and 5 .
  • the operation modes of the air conditioner 1 in the present embodiment include: a normal operation mode where control of constituent equipment of the outdoor unit 2 and the indoor units 4 and 5 is performed according to the operation load of each of the indoor units 4 and 5 ; a test operation mode where a test operation to be performed after installation of constituent equipment of the air conditioner 1 is performed (specifically, it is not limited to after the first installation of equipment: it also includes, for example, after modification by adding or removing constituent equipment such as an indoor unit, after repair of damaged equipment); and a refrigerant leak detection operation mode where, after the test operation is finished and the normal operation has started, whether or not there is a refrigerant leak from the refrigerant circuit 10 is judged.
  • the normal operation mode mainly includes the cooling operation for cooling the room and the heating operation for heating the room.
  • the test operation mode mainly includes an automatic refrigerant charging operation to charge refrigerant into the refrigerant circuit 10 ; a pipe volume judging operation to detect the volumes of the refrigerant communication pipes 6 and 7 ; and an initial refrigerant quantity detection operation to detect the initial refrigerant quantity after installing constituent equipment or after charging refrigerant into the refrigerant circuit.
  • the four-way switching valve 22 is in the state represented by the solid lines in FIG. 1 , i.e., a state where the discharge side of the compressor 21 is connected to the gas side of the outdoor heat exchanger 23 and also the suction side of the compressor 21 is connected to the gas sides of the indoor heat exchangers 42 and 52 via the gas side stop valve 27 and the gas refrigerant communication pipe 7 .
  • the outdoor expansion valve 38 is in a fully opened state.
  • the liquid side stop valve 26 and the gas side stop valve 27 are in an opened state.
  • the opening degree of each of the indoor expansion valves 41 and 51 is adjusted such that a superheat degree SHr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 (i.e., the gas sides of the indoor heat exchangers 42 and 52 ) becomes constant at a target superheat degree SHrs.
  • the superheat degree SHr of the refrigerant at the outlet of each of the indoor heat exchangers 42 and 52 is detected by subtracting the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors 44 and 54 from the refrigerant temperature detected by the gas side temperature sensors 45 and 55 , or is detected by converting the suction pressure Ps of the compressor 21 detected by the suction pressure sensor 29 to saturated temperature corresponding to the evaporation temperature Te, and subtracting this saturated temperature of the refrigerant from the refrigerant temperature detected by the gas side temperature sensors 45 and 55 .
  • a temperature sensor that detects the temperature of the refrigerant flowing through each of the indoor heat exchangers 42 and 52 may be disposed such that the superheat degree SHr of the refrigerant at the outlet of each of the indoor heat exchangers 42 and 52 is detected by subtracting the refrigerant temperature corresponding to the evaporation temperature Te which is detected by this temperature sensor from the refrigerant temperature detected by the gas side temperature sensors 45 and 55 .
  • the opening degree of the bypass expansion valve 62 is adjusted such that a superheat degree SHb of the refrigerant at the outlet on the bypass refrigerant circuit side of the subcooler 25 becomes a target superheat degree SHbs.
  • the superheat degree SHb of the refrigerant at the outlet on the bypass refrigerant circuit side of the subcooler 25 is detected by converting the suction pressure Ps of the compressor 21 detected by the suction pressure sensor 29 to saturated temperature corresponding to the evaporation temperature Te, and subtracting this saturated temperature of the refrigerant from the refrigerant temperature detected by the bypass temperature sensor 63 .
  • a temperature sensor may be disposed at an inlet on the bypass refrigerant circuit side of the subcooler 25 such that the superheat degree SHb of the refrigerant at the outlet on the bypass refrigerant circuit side of the subcooler 25 is detected by subtracting the refrigerant temperature detected by this temperature sensor from the refrigerant temperature detected by the bypass temperature sensor 63 .
  • the refrigerant flowing from the outlet of the bypass expansion valve 62 of the bypass refrigerant circuit 61 toward the suction side of the compressor 21 passes through the subcooler 25 and exchanges heat with high-pressure liquid refrigerant sent from the outdoor heat exchanger 23 on the main refrigerant circuit side to the indoor units 4 and 5 .
  • the high-pressure liquid refrigerant that has become subcooled is sent to the indoor units 4 and 5 via the liquid side stop valve 26 and the liquid refrigerant communication pipe 6 .
  • the high-pressure liquid refrigerant sent to the indoor units 4 and 5 is depressurized close to the suction pressure Ps of the compressor 21 by the indoor expansion valves 41 and 51 , becomes refrigerant in a low-pressure gas-liquid two-phase state, is sent to the indoor heat exchangers 42 and 52 , exchanges heat with the room air in the indoor heat exchangers 42 and 52 , and is evaporated into low-pressure gas refrigerant.
  • This low-pressure gas refrigerant is sent to the outdoor unit 2 via the gas refrigerant communication pipe 7 , and flows into the accumulator 24 via the gas side stop valve 27 and the four-way switching valve 22 . Then, the low-pressure gas refrigerant that flowed into the accumulator 24 is again sucked into the compressor 21 .
  • the four-way switching valve 22 is in a state represented by the dotted lines in FIG. 1 , i.e., a state where the discharge side of the compressor 21 is connected to the gas sides of the indoor heat exchangers 42 and 52 via the gas side stop valve 27 and the gas refrigerant communication pipe 7 and also the suction side of the compressor 21 is connected to the gas side of the outdoor heat exchanger 23 .
  • the opening degree of the outdoor expansion valve 38 is adjusted so as to be able to depressurize the refrigerant that flows into the outdoor heat exchanger 23 to a pressure where the refrigerant can evaporate (i.e., evaporation pressure Pe) in the outdoor heat exchanger 23 .
  • the liquid side stop valve 26 and the gas side stop valve 27 are in an opened state.
  • the opening degree of the indoor expansion valves 41 and 51 is adjusted such that a subcooling degree SCr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 becomes constant at the target subcooling degree SCrs.
  • a subcooling degree SCr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 is detected by converting the discharge pressure Pd of the compressor 21 detected by the discharge pressure sensor 30 to saturated temperature corresponding to the condensation temperature Tc, and subtracting the refrigerant temperature detected by the liquid side temperature sensors 44 and 54 from this saturated temperature of the refrigerant.
  • a temperature sensor that detects the temperature of the refrigerant flowing through each of the indoor heat exchangers 42 and 52 may be disposed such that the subcooling degree SCr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 is detected by subtracting the refrigerant temperature corresponding to the condensation temperature Tc which is detected by this temperature sensor from the refrigerant temperature detected by the liquid side temperature sensors 44 and 54 .
  • the bypass expansion valve 62 is closed.
  • the high-pressure gas refrigerant sent to the indoor units 4 and 5 exchanges heat with the room air in the indoor heat exchangers 42 and 52 and is condensed into high-pressure liquid refrigerant. Subsequently, it is depressurized according to the opening degree of the indoor expansion valves 41 and 51 when passing through the indoor expansion valves 41 and 51 .
  • the refrigerant that passed through the indoor expansion valves 41 and 51 is sent to the outdoor unit 2 via the liquid refrigerant communication pipe 6 , is further depressurized via the liquid side stop valve 26 , the subcooler 25 , and the outdoor expansion valve 38 , and then flows into the outdoor heat exchanger 23 . Then, the refrigerant in a low-pressure gas-liquid two-phase state that flowed into the outdoor heat exchanger 23 exchanges heat with the outdoor air supplied by the outdoor fan 28 , is evaporated into low-pressure gas refrigerant, and flows into the accumulator 24 via the four-way switching valve 22 . Then, the low-pressure gas refrigerant that flowed into the accumulator 24 is again sucked into the compressor 21 .
  • Such operation control as described above in the normal operation mode is performed by the controller 8 (more specifically, the indoor side controllers 47 and 57 , the outdoor side controller 37 , and the transmission line 8 a that connects between the controllers 37 , 47 and 57 ) that functions as a normal operation controlling means or section to perform the normal operation that includes the cooling operation and the heating operation.
  • the controller 8 more specifically, the indoor side controllers 47 and 57 , the outdoor side controller 37 , and the transmission line 8 a that connects between the controllers 37 , 47 and 57 ) that functions as a normal operation controlling means or section to perform the normal operation that includes the cooling operation and the heating operation.
  • FIG. 3 is a flowchart of the test operation mode.
  • the test operation mode first, the automatic refrigerant charging operation in Step S 1 is performed. Subsequently, the pipe volume judging operation in Step S 2 is performed, and then the initial refrigerant quantity detection operation in Step S 3 is performed.
  • the outdoor unit 2 in which the refrigerant is charged in advance and the indoor units 4 and 5 are installed at an installation location such as a building, and the outdoor unit 2 , the indoor units 4 , 5 are interconnected via the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 to configure the refrigerant circuit 10 , and subsequently additional refrigerant is charged into the refrigerant circuit 10 whose refrigerant quantity is insufficient according to the volumes of the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 .
  • Step S 1 Automatic Refrigerant Charging Operation
  • the liquid side stop valve 26 and the gas side stop valve 27 of the outdoor unit 2 are opened and the refrigerant circuit 10 is filled with the refrigerant that is charged in the outdoor unit 2 in advance.
  • FIG. 4 is a flowchart of the automatic refrigerant charging operation.
  • Step S 11 Refrigerant Quantity Judging Operation
  • the refrigerant circuit 10 When a command to start the automatic refrigerant charging operation is issued, the refrigerant circuit 10 , with the four-way switching valve 22 of the outdoor unit 2 in the state represented by the solid lines in FIG. 1 , becomes a state where the indoor expansion valves 41 and 51 of the indoor units 4 and 5 and the outdoor expansion valve 38 are opened. Then, the compressor 21 , the outdoor fan 28 , and the indoor fans 43 and 53 are started, and the cooling operation is forcibly performed in all of the indoor units 4 and 5 (hereinafter referred to as “all indoor unit operation”).
  • the high-pressure gas refrigerant compressed and discharged in the compressor 21 flows along a flow path from the compressor 21 to the outdoor heat exchanger 23 that functions as a condenser (see the portion from the compressor 21 to the outdoor heat exchanger 23 in the hatching area indicated by the diagonal line in FIG. 5 ); the high-pressure refrigerant that undergoes phase-change from a gas state to a liquid state by heat exchange with the outdoor air flows in the outdoor heat exchanger 23 that functions as a condenser (see the portion corresponding to the outdoor heat exchanger 23 in the hatching area indicated by the diagonal line and the black-lacquered hatching area in FIG.
  • the high-pressure liquid refrigerant flows along a flow path from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 including the outdoor expansion valve 38 , the portion corresponding to the main refrigerant circuit side of the subcooler 25 and the liquid refrigerant communication pipe 6 , and a flow path from the outdoor heat exchanger 23 to the bypass expansion valve 62 (see the portions from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 and to the bypass expansion valve 62 in the area indicated by the black hatching in FIG.
  • the low-pressure refrigerant that undergoes phase-change from a gas-liquid two-phase state to a gas state by heat exchange with the room air flows in the portions corresponding to the indoor heat exchangers 42 and 52 that function as evaporators and the portion corresponding to the bypass refrigerant circuit side of the subcooler 25 (see the portions corresponding to the indoor heat exchangers 42 and 52 and the portion corresponding to the subcooler 25 in the area indicated by the lattice hatching and the hatching indicated by the diagonal line in FIG.
  • FIG. 5 is a schematic diagram to show a state of the refrigerant flowing in the refrigerant circuit 10 in a refrigerant quantity judging operation (illustrations of the four-way switching valve 22 and the like are omitted).
  • the indoor expansion valves 41 and 51 are controlled such that the superheat degree SHr of the indoor heat exchangers 42 and 52 that function as evaporators becomes constant (hereinafter referred to as “super heat degree control”); the operation capacity of the compressor 21 is controlled such that an evaporation pressure Pe becomes constant (hereinafter referred to as “evaporation pressure control”); the air flow rate Wo of outdoor air supplied to the outdoor heat exchanger 23 by the outdoor fan 28 is controlled such that a condensation pressure Pc of the refrigerant in the outdoor heat exchanger 23 becomes constant (hereinafter referred to as “condensation pressure control”); the operation capacity of the subcooler 25 is controlled such that the temperature of the refrigerant sent from the subcooler 25 to the indoor expansion valves 41 and 51 becomes constant (hereinafter referred to as “liquid pipe temperature control”); and the air flow rate Wr of room air supplied
  • the reason to perform the evaporation pressure control is that the evaporation pressure Pe of the refrigerant in the indoor heat exchangers 42 and 52 that function as evaporators is greatly affected by the refrigerant quantity in the indoor heat exchangers 42 and 52 where low-pressure refrigerant flows while undergoing a phase change from a gas-liquid two-phase state to a gas state as a result of heat exchange with the room air (see the portions corresponding to the indoor heat exchangers 42 and 52 in the area indicated by the lattice hatching and hatching indicated by the diagonal line in FIG. 5 , which is hereinafter referred to as “evaporator portion C”).
  • the control of the evaporation pressure Pe by the compressor 21 in the present embodiment is achieved in the following manner: the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors 44 and 54 of the indoor heat exchangers 42 and 52 is converted to saturation pressure; the operation capacity of the compressor 21 is controlled such that the saturation pressure becomes constant at a target low pressure Pes (in other words, the control to change the rotation frequency Rm of the motor 21 a is performed); and then a refrigerant circulation flow rate Wc flowing in the refrigerant circuit 10 is increased or decreased.
  • the refrigerant temperature which corresponds to the evaporation temperature Te
  • the operation capacity of the compressor 21 is controlled such that the saturation pressure becomes constant at a target low pressure Pes (in other words, the control to change the rotation frequency Rm of the motor 21 a is performed)
  • a refrigerant circulation flow rate Wc flowing in the refrigerant circuit 10 is increased or decreased.
  • the operation capacity of the compressor 21 may be controlled such that the suction pressure Ps of the compressor 21 detected by the suction pressure sensor 29 , which is the operation state quantity equivalent to the pressure of the refrigerant at the evaporation pressure Pe of the refrigerant in the indoor heat exchangers 42 and 52 , becomes constant at the target low pressure Pes, or the saturation temperature (which corresponds to the evaporation temperature Te) corresponding to the suction pressure Ps becomes constant at a target low pressure Tes.
  • the operation capacity of the compressor 21 may be controlled such that the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors 44 and 54 of the indoor heat exchangers 42 and 52 becomes constant at the target low pressure Tes.
  • gas refrigerant distribution portion D the state of the refrigerant flowing in the refrigerant pipes from the indoor heat exchangers 42 and 52 to the compressor 21 including the gas refrigerant communication pipe 7 and the accumulator 24 (see the portion from the indoor heat exchangers 42 and 52 to the compressor 21 in the hatching area indicated by the diagonal line in FIG. 5 , which is hereinafter referred to as “gas refrigerant distribution portion D”) becomes stabilized, creating a state where the refrigerant quantity in the gas refrigerant distribution portion D changes mainly by the evaporation pressure Pe (i.e., the suction pressure Ps), which is the operation state quantity equivalent to the pressure of the refrigerant in the gas refrigerant distribution portion D.
  • the evaporation pressure Pe i.e., the suction pressure Ps
  • the reason to perform the condensation pressure control is that the condensation pressure Pc of the refrigerant is greatly affected by the refrigerant quantity in the outdoor heat exchanger 23 where high-pressure refrigerant flows while undergoing a phase change from a gas state to a liquid state as a result of heat exchange with the outdoor air (see the portions corresponding to the outdoor heat exchanger 23 in the area indicated by the diagonal line hatching and the black hatching in FIG. 5 , which is hereinafter referred to as “condenser portion A”).
  • the condensation pressure Pc of the refrigerant in the condenser portion A greatly changes due to the effect of the outdoor temperature Ta.
  • the air flow rate Wo of the room air supplied from the outdoor fan 28 to the outdoor heat exchanger 23 is controlled by the motor 28 a , and thereby the condensation pressure Pc of the refrigerant in the outdoor heat exchanger 23 is maintained constant and the state of the refrigerant flowing in the condenser portion A is stabilized, creating a state where the refrigerant quantity in condenser portion A changes mainly by a subcooling degree SCo at the liquid side of the outdoor heat exchanger 23 (hereinafter regarded as the outlet of the outdoor heat exchanger 23 in the description regarding the refrigerant quantity judging operation).
  • the discharge pressure Pd of the compressor 21 detected by the discharge pressure sensor 30 which is the operation state quantity equivalent to the condensation pressure Pc of the refrigerant in the outdoor heat exchanger 23 , or the temperature of the refrigerant flowing through the outdoor heat exchanger 23 (i.e., the condensation temperature Tc) detected by the heat exchanger temperature sensor 33 is used.
  • the high-pressure liquid refrigerant flows along a flow path from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 including the outdoor expansion valve 38 , the portion on the main refrigerant circuit side of the subcooler 25 , and the liquid refrigerant communication pipe 6 and a flow path from the outdoor heat exchanger 23 to the bypass expansion valve 62 of the bypass refrigerant circuit 61 ; the pressure of the refrigerant in the portions from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 and to the bypass expansion valve 62 (see the area indicated by the black hatching in FIG. 5 , which is hereinafter referred to as “liquid refrigerant distribution portion B”) also becomes stabilized; and the liquid refrigerant distribution portion B is sealed by the liquid refrigerant, thereby becoming a stable state.
  • the reason to perform the liquid pipe temperature control is to prevent a change in the density of the refrigerant in the refrigerant pipes from the subcooler 25 to the indoor expansion valves 41 and 51 including the liquid refrigerant communication pipe 6 (see the portion from the subcooler 25 to the indoor expansion valves 41 and 51 in the liquid refrigerant distribution portion B shown in FIG. 5 ).
  • Performance of the subcooler 25 is controlled by increasing or decreasing the flow rate of the refrigerant flowing in the bypass refrigerant circuit 61 such that the refrigerant temperature Tlp detected by the liquid pipe temperature sensor 35 disposed at the outlet on the main refrigerant circuit side of the subcooler 25 becomes constant at a target liquid pipe temperature Tlps, and by adjusting the quantity of heat exchange between the refrigerant flowing through the main refrigerant circuit side and the refrigerant flowing through the bypass refrigerant circuit side of the subcooler 25 .
  • the flow rate of the refrigerant flowing in the bypass refrigerant circuit 61 is increased or decreased by adjustment of the opening degree of the bypass expansion valve 62 . In this way, the liquid pipe temperature control is achieved in which the refrigerant temperature in the refrigerant pipes from the subcooler 25 to the indoor expansion valves 41 and 51 including the liquid refrigerant communication pipe 6 becomes constant.
  • the reason to perform the superheat degree control is because the refrigerant quantity in the evaporator portion C greatly affects the quality of wet vapor of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 .
  • the superheat degree SHr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 is controlled such that the superheat degree SHr of the refrigerant at the gas sides of the indoor heat exchangers 42 and 52 (hereinafter regarded as the outlets of the indoor heat exchangers 42 and 52 in the description regarding the refrigerant quantity judging operation) becomes constant at the target superheat degree SHrs (in other words, the gas refrigerant at the outlets of the indoor heat exchangers 42 and 52 is in a superheat state) by controlling the opening degree of the indoor expansion valves 41 and 51 , and thereby the state of the refrigerant flowing in the evaporator portion C is stabilized.
  • Step S 11 the above described various target control values are set to the most appropriate values according to the information on the indoor units 4 and 5 connected to the outdoor unit 2 (Steps S 14 to S 16 ).
  • Step S 14 the controller 8 that functions as an information obtaining means or section (more specifically, the outdoor side controller 37 ) obtains information on the capacities of the indoor units 4 and 5 from the indoor units 4 and 5 via the transmission line 8 a.
  • Step S 15 the controller 8 that functions as a condition setting means or section calculates the total capacity of the indoor units 4 and 5 by adding the capacity of the indoor unit 4 and the capacity of the indoor unit 5 , and sets various target control values (specifically, the target low pressure Pes, the target superheat degree SHrs, or a target air flow rate Wrs) according to the total capacity.
  • target control values specifically, the target low pressure Pes, the target superheat degree SHrs, or a target air flow rate Wrs
  • the target low pressure Pes is set such that its value becomes higher as the total capacity of the indoor units 4 and 5 is larger so as to follow the tendency.
  • Step S 16 equipment control is performed which includes the condensation pressure control, liquid pipe temperature control, superheat degree control in which the target superheat degree SHrs set in Step S 15 is used, evaporation pressure control in which the target low pressure Pes set in Step S 15 is used, and air flow rate Wr control of the indoor fans 43 and 53 in which the target air flow rate Wrs set in Step S 15 is used.
  • refrigerant quantity judging operation when refrigerant starts to be charged into the refrigerant circuit 10 by additional refrigerant charging, which is subsequently performed, it is possible to create a state where a change in the refrigerant quantity in the refrigerant circuit 10 mainly appears as a change of the refrigerant quantity in the outdoor heat exchanger 23 (hereinafter this operation is referred to as “refrigerant quantity judging operation”).
  • Step S 11 Such control as described above is performed as the process in Step S 11 by the controller 8 (more specifically, by the indoor side controllers 47 and 57 , the outdoor side controller 37 , and the transmission line 8 a that connects between the controllers 37 , 47 and 57 ) that functions as a refrigerant quantity judging operation controlling means or section for performing the refrigerant quantity judging operation.
  • the controller 8 that functions as the information obtaining means and the condition setting means obtains information on the indoor units 4 and 5 from the indoor units 4 and 5 via the transmission line 8 a .
  • the process in Steps S 14 and S 15 is performed in which the target control values are set as the conditions for refrigerant quantity judging operation.
  • Step S 11 when refrigerant is not charged in advance in the outdoor unit 2 , it is necessary prior to Step S 11 to charge refrigerant until the refrigerant quantity reaches a level where constituent equipment will not abnormally stop during the above described refrigerant quantity judging operation.
  • Step S 12 Refrigerant Quantity Calculation
  • the controller 8 that functions as a refrigerant quantity calculating means or section calculates the refrigerant quantity in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 during additional refrigerant charging in Step S 12 .
  • the refrigerant quantity calculating means divides the refrigerant circuit 10 into a plurality of portions, calculates the refrigerant quantity for each divided portion, and thereby calculates the refrigerant quantity in the refrigerant circuit 10 . More specifically, a relational expression between the refrigerant quantity in each portion and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is set for each divided portion, and the refrigerant quantity in each portion can be calculated by using these relational expressions.
  • the four-way switching valve 22 is represented by the solid lines in FIG.
  • the refrigerant circuit 10 is divided into the following portions and a relational expression is set for each portion: a portion corresponding to the compressor 21 and a portion from the compressor 21 to the outdoor heat exchanger 23 including the four-way switching valve 22 (not shown in FIG.
  • high-pressure gas pipe portion E a portion corresponding to the outdoor heat exchanger 23 (i.e., the condenser portion A); a portion from the outdoor heat exchanger 23 to the subcooler 25 and an inlet side half of the portion corresponding to the main refrigerant circuit side of the subcooler 25 in the liquid refrigerant distribution portion B (hereinafter referred to as “high temperature side liquid pipe portion B 1 ”); an outlet side half of a portion corresponding to the main refrigerant circuit side of the subcooler 25 and a portion from the subcooler 25 to the liquid side stop valve 26 (not shown in FIG.
  • liquid refrigerant communication pipe portion B 3 a portion from the liquid refrigerant communication pipe 6 in the liquid refrigerant distribution portion B to the gas refrigerant communication pipe 7 in the gas refrigerant distribution portion D including portions corresponding to the indoor expansion valves 41 and 51 and the indoor heat exchangers 42 and 52 (i.e., the evaporator portion C) (hereinafter referred to as “indoor unit portion F”); a portion corresponding to the gas refrigerant communication pipe 7 in the gas refrigerant distribution portion D (hereinafter referred to as “gas refrigerant communication pipe portion G”); a portion from the gas side stop valve 27 (not shown in FIG.
  • low-pressure gas pipe portion H a portion from the high temperature side liquid pipe portion B 1 in the liquid refrigerant distribution portion B to the low-pressure gas pipe portion H including the bypass expansion valve 62 and a portion corresponding to the bypass refrigerant circuit side of the subcooler 25 (hereinafter referred to as “bypass circuit portion I”).
  • the volume Vog 1 of the high-pressure gas pipe portion E is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8 .
  • a density pd of the refrigerant in the high-pressure gas pipe portion E is obtained by converting the discharge temperature Td and the discharge pressure Pd.
  • the compressor discharge superheat degree SHm is a superheat degree of the refrigerant at the discharge side of the compressor, and is obtained by converting the discharge pressure Pd to refrigerant saturation temperature and subtracting this refrigerant saturation temperature from the discharge temperature Td.
  • a saturated liquid density ⁇ c of the refrigerant is obtained by converting the condensation temperature Tc.
  • a density ⁇ co of the refrigerant at the outlet of the outdoor heat exchanger 23 is obtained by converting the condensation pressure Pc which is obtained by converting the condensation temperature Tc and the refrigerant temperature Tco.
  • the volume Vol 1 of the high-pressure liquid pipe portion B 1 is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8 .
  • the volume Vol 2 of the low temperature liquid pipe portion B 2 is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8 .
  • the density ⁇ lp of the refrigerant in the low temperature liquid pipe portion B 2 is the density of the refrigerant at the outlet of the subcooler 25 , and is obtained by converting the condensation pressure Pc and the refrigerant temperature Tlp at the outlet of the subcooler 25 .
  • the volume Vlp of the liquid refrigerant communication pipe 6 because the liquid refrigerant communication pipe 6 is a refrigerant pipe arranged on site when installing the air conditioner 1 at an installation location such as a building, a value calculated on site from the information regarding the length, pipe diameter and the like is input, or information regarding the length, pipe diameter and the like is input on site and the controller 8 calculates the volume Vlp from the input information of the liquid refrigerant communication pipe 6 . Or, as described below, the volume Vlp is calculated by using the operation results of the pipe volume judging operation.
  • the parameters kr 1 to kr 5 in the above described relational expression are derived from a regression analysis of results of tests and detailed simulations and are stored in advance in the memory of the controller 8 .
  • the above described relational expressions for the refrigerant quantity Mr in the indoor unit portion F is set to the most appropriate relational expression in Step S 12 according to the information on the indoor units 4 and 5 connected to the outdoor unit 2 (Steps S 17 to S 19 ).
  • Step S 17 the controller 8 that functions as the information obtaining means obtains information on the models of the indoor units 4 and 5 from the indoor units 4 and 5 via the transmission line 8 a connected to the outdoor unit 2 .
  • Step S 18 the controller 8 that functions as the condition setting means sets the above described relational expression for the refrigerant quantity Mr according to the model of each of the indoor units 4 and 5 .
  • the values of the parameters kr 1 to kr 5 in the relational expression for the refrigerant quantity Mr in the indoor unit portion F are provided by being stored in advance in the memory of the outdoor side controller 37 that configures the controller 8 in a manner such that these values are collected for each model of the indoor unit, and are set in Step S 18 by being selected according to the model of each of the indoor units 4 and 5 .
  • Steps S 17 and S 18 may be simultaneously performed with the process in Steps S 14 and S 15 for setting various target control values in the above described refrigerant quantity judging operation.
  • the volume Vgp of the gas refrigerant communication pipe 7 is a refrigerant pipe arranged on site when installing the air conditioner 1 at an installation location such as a building, a value calculated on site from the information regarding the length, pipe diameter and the like is input, or information regarding the length, pipe diameter and the like is input on site and the controller 8 calculates the volume Vgp from the input information of the gas refrigerant communication pipe 7 .
  • the volume Vgp is calculated by using the operation results of the pipe volume judging operation.
  • the density ⁇ gp of the refrigerant in the gas refrigerant communication pipe portion G is an average value between a density ⁇ s of the refrigerant at the suction side of the compressor 21 and a density ⁇ eo of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 (i.e., the inlet of the gas refrigerant communication pipe 7 ).
  • the density ⁇ s of the refrigerant is obtained by converting the suction pressure Ps and the suction temperature Ts
  • a density ⁇ eo of the refrigerant is obtained by converting the evaporation pressure Pe, which is a converted value of the evaporation temperature Te, and an outlet temperature Teo of the indoor heat exchangers 42 and 52 .
  • the volume Vog 2 of the low-pressure gas pipe portion H is a value that is known prior to shipment to the installation location and is stored in advance in the memory of the controller 8 .
  • the volume Vob of the bypass circuit portion I is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8 .
  • the saturated liquid density ⁇ e at the portion corresponding to the bypass circuit side of the subcooler 25 is obtained by converting the suction pressure Ps or the evaporation temperature Te.
  • one outdoor unit 2 is provided.
  • the refrigerant quantity in the outdoor unit such as Mog 1 , Mc, Mol 1 , Mol 2 , Mog 2 , and Mob
  • the relational expression for the refrigerant quantity in each portion is set for each of the plurality of outdoor units, and the entire refrigerant quantity in the outdoor units is calculated by adding the refrigerant quantity in each portion of the plurality of the outdoor units.
  • relational expressions for the refrigerant quantity in each portion having parameters with different values will be used when a plurality of outdoor units with different models and capacities are connected.
  • the refrigerant quantity in each portion is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant quantity judging operation, and thereby the refrigerant quantity in the refrigerant circuit 10 can be calculated.
  • the refrigerant quantity Mr in the indoor unit portion F is calculated in Step S 19 by using the relational expression set according to the model of each of the indoor units 4 and 5 .
  • Step S 12 is repeated until the condition for judging the adequacy of the refrigerant quantity in the below described Step S 13 is satisfied. Therefore, in the period from the start to the completion of additional refrigerant charging, the refrigerant quantity in each portion is calculated from the operation state quantity during refrigerant charging by using the relational expressions for each portion in the refrigerant circuit 10 .
  • a refrigerant quantity Mo in the outdoor unit 2 and the refrigerant quantity Mr in each of the indoor units 4 and 5 i.e., the refrigerant quantity in each portion in the refrigerant circuit 10 excluding the refrigerant communication pipes 6 and 7 ) necessary for judgment of the adequacy of the refrigerant quantity in the below described Step S 13 are calculated.
  • the refrigerant quantity Mo in the outdoor unit 2 is calculated by adding Mog 1 , Mc, Mol 1 , Mol 2 , Mog 2 , and Mob described above, each of which is the refrigerant quantity in each portion in the outdoor unit 2 .
  • Step S 12 the process in Step S 12 is performed by the controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity in each portion in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the automatic refrigerant charging operation.
  • the controller 8 that functions as the information obtaining means and condition setting means obtains information on the indoor units 4 and 5 from the indoor units 4 and 5 via the transmission line 8 a .
  • the process in Steps S 17 and S 18 is performed in which the relational expression as the condition for the refrigerant quantity judging operation is set.
  • Step S 13 Judgment of the Adequacy of the Refrigerant Quantity
  • the refrigerant quantity in the refrigerant circuit 10 gradually increases.
  • the refrigerant quantity that should be charged into the refrigerant circuit 10 after additional refrigerant charging cannot be prescribed as the refrigerant quantity in the entire refrigerant circuit 10 .
  • the focus is placed only on the outdoor unit 2 and the indoor units 4 and 5 (i.e., the refrigerant circuit 10 excluding the refrigerant communication pipes 6 and 7 ), it is possible to know in advance the optimal refrigerant quantity in the outdoor unit 2 in the normal operation mode by tests and detailed simulations.
  • additional refrigerant can be charged by the following manner: a value of this refrigerant quantity is stored in advance in the memory of the controller 8 as a target charging value Ms; the refrigerant quantity Mo in the outdoor unit 2 and a refrigerant quantity Mr in the indoor units 4 and 5 are calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the automatic refrigerant charging operation by using the above described relational expressions; and additional refrigerant is charged until a value of the refrigerant quantity obtained by adding the refrigerant quantity Mo and the refrigerant quantity Mr reaches the target charging value Ms.
  • Step S 13 is a process to judge the adequacy of the refrigerant quantity charged into the refrigerant circuit 10 by additional refrigerant charging by judging whether or not the refrigerant quantity, which is obtained by adding the refrigerant quantity Mo in the outdoor unit 2 and the refrigerant quantity Mr in the indoor units 4 and 5 in the automatic refrigerant charging operation, has reached the target charging value Ms.
  • Step S 13 when a value of the refrigerant quantity obtained by adding the refrigerant quantity Mo in the outdoor unit 2 and the refrigerant quantity Mr in the indoor units 4 and 5 is smaller than the target charging value Ms and additional refrigerant charging has not been completed, the process in Step S 13 is repeated until the target charging value Ms is reached. In addition, when a value of the refrigerant quantity obtained by adding the refrigerant quantity Mo in the outdoor unit 2 and the refrigerant quantity Mr in the indoor units 4 and 5 reaches the target charging value Ms, additional refrigerant charging is completed, and Step S 1 as the automatic refrigerant charging operation process is completed.
  • the target charging value Ms may be set as a value corresponding to only the refrigerant quantity Mo in the outdoor unit 2 but not the outdoor unit 2 and the indoor units 4 and 5 , or may be set as a value corresponding to the refrigerant quantity Mc in the outdoor heat exchanger 23 , and additional refrigerant may be charged until the target charging value Ms is reached.
  • Step S 13 the process in Step S 13 is performed by the controller 8 that functions as the refrigerant quantity judging means for judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 in the refrigerant quantity judging operation of the automatic refrigerant charging operation (i.e., for judging whether or not the refrigerant quantity has reached the target charging value Ms).
  • Step S 2 Pipe Volume Judging Operation
  • Step S 2 the process proceeds to the pipe volume judging operation in Step S 2 .
  • the process from Step S 21 to Step S 25 as shown in FIG. 8 is performed by the controller 8 .
  • FIG. 8 is a flowchart of the pipe volume judging operation.
  • Steps S 21 , S 22 Pipe Volume Judging Operation for Liquid Refrigerant Communication Pipe and Volume Calculation
  • Step S 21 as is the case with the above described refrigerant quantity judging operation in Step S 11 of the automatic refrigerant charging operation, the pipe volume judging operation for the liquid refrigerant communication pipe 6 , including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control, is performed.
  • the target liquid pipe temperature Tlps of the temperature Tlp of the refrigerant at the outlet on the main refrigerant circuit side of the subcooler 25 under the liquid pipe temperature control is regarded as a first target value Tlps 1
  • the state where the refrigerant quantity judging operation is stable at this first target value Tlps 1 is regarded as a first state (see the refrigerating cycle indicated by the lines including the dotted lines in FIG. 9 ).
  • FIG. 9 is a Mollier diagram to show the refrigerating cycle of the air conditioner 1 in the pipe volume judging operation for the liquid refrigerant communication pipe.
  • the first state where the temperature Tlp of the refrigerant at the outlet on the main refrigerant circuit side of the subcooler 25 in liquid pipe temperature control is stable at the first target value Tlps 1 is switched to a second state (see the refrigerating cycle indicated by the solid lines in FIG. 9 ) where the target liquid pipe temperature Tlps is changed to a second target value Tlps 2 different from the first target value Tlps 1 and stabilized without changing the conditions for other equipment controls, i.e., the conditions for the condensation pressure control, superheat degree control, and evaporation pressure control (i.e., without changing the target superheat degree SHrs and the target low pressure Tes).
  • the second target value Tlps 2 is a temperature higher than the first target value Tlps 1 .
  • the conditions for other equipment controls other than the liquid pipe temperature control are not changed, and therefore the refrigerant quantity Mog 1 in the high-pressure gas pipe portion E, the refrigerant quantity Mog 2 in the low-pressure gas pipe portion H, and the refrigerant quantity Mgp in the gas refrigerant communication pipe portion G are maintained substantially constant, and the refrigerant whose quantity has decreased in the liquid refrigerant communication pipe portion B 3 will move to the condenser portion A, the high temperature liquid pipe portion B 1 , the low temperature liquid pipe portion B 2 , the indoor unit portion F, and the bypass circuit portion I.
  • the refrigerant quantity Mc in the condenser portion A, the refrigerant quantity Mol 1 in the high temperature liquid pipe portion B 1 , the refrigerant quantity Mol 2 in the low temperature liquid pipe portion B 2 , the refrigerant quantity Mr in the indoor unit portion F, and the refrigerant quantity Mob in the bypass circuit portion I will increase by the quantity of the refrigerant that has decreased in the liquid refrigerant communication pipe portion B 3 .
  • Such control as described above is performed as the process in Step S 21 by the controller 8 (more specifically, by the indoor side controllers 47 and 57 , the outdoor side controller 37 , and the transmission line 8 a that connects between the controllers 37 , 47 and 57 ) that functions as pipe volume judging operation controlling means for performing the pipe volume judging operation to calculate the refrigerant quantity Mlp of the liquid refrigerant communication pipe 6 .
  • Step S 22 the volume Vlp of the liquid refrigerant communication pipe 6 is calculated by utilizing a phenomenon that the refrigerant quantity in the liquid refrigerant communication pipe portion B 3 decreases and the refrigerant whose quantity has decreased moves to other portions in the refrigerant circuit 10 because of the change from the first state to the second state.
  • this ⁇ Mlp value is divided by a density change quantity ⁇ lp of the refrigerant between the first state and the second state in the liquid refrigerant communication pipe 6 , and thereby the volume Vlp of the liquid refrigerant communication pipe 6 can be calculated.
  • the refrigerant quantity Mog 1 and the refrigerant quantity Mog 2 may be included in the above described function expression.
  • Vlp ⁇ Mlp/ ⁇ lp
  • ⁇ Mc, ⁇ Mol 1 , ⁇ Mol 2 , ⁇ Mr, and ⁇ Mob can be obtained by calculating the refrigerant quantity in the first state and the refrigerant quantity in the second state by using the above described relational expression for each portion in the refrigerant circuit 10 and further by subtracting the refrigerant quantity in the first state from the refrigerant quantity in the second state.
  • the density change quantity ⁇ lp can be obtained by calculating the density of the refrigerant at the outlet of the subcooler 25 in the first state and the density of the refrigerant at the outlet of the subcooler 25 in the second state and further by subtracting the density of the refrigerant in the first state from the density of the refrigerant in the second state.
  • the volume Vlp of the liquid refrigerant communication pipe 6 can be calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the first and second states.
  • the refrigerant quantity Mr in each of the indoor units 4 and 5 is calculated.
  • the process in Step S 17 in which information on the indoor units 4 and 5 is obtained and the process in Step S 18 in which the relational expression for the refrigerant quantity is set are performed, as is the case with the calculation of the refrigerant quantity in Step S 12 of the automatic refrigerant charging operation.
  • the state is changed such that the second target value Tlps 2 in the second state becomes a temperature higher than the first target value Tlps 1 in the first state and therefore the refrigerant in the liquid refrigerant communication pipe portion B 3 is moved to other portions in order to increase the refrigerant quantity in the other portions; thereby the volume Vlp in the liquid refrigerant communication pipe 6 is calculated from the increased quantity.
  • the state may be changed such that the second target value Tlps 2 in the second state becomes a temperature lower than the first target value Tlps 1 in the first state and therefore the refrigerant is moved from other portions to the liquid refrigerant communication pipe portion B 3 in order to decrease the refrigerant quantity in the other portions; thereby the volume Vlp in the liquid refrigerant communication pipe 6 is calculated from the decreased quantity.
  • Step S 22 is performed by the controller 8 that functions as the pipe volume calculating means for the liquid refrigerant communication pipe, which calculates the volume Vlp of the liquid refrigerant communication pipe 6 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the pipe volume judging operation for the liquid refrigerant communication pipe 6 .
  • Steps S 23 , S 24 Pipe Volume Judging Operation and Volume Calculation for the Gas Refrigerant Communication Pipe
  • Step S 23 the pipe volume judging operation for the gas refrigerant communication pipe 7 , including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control, is performed in Step S 23 .
  • the target low pressure Pes of the suction pressure Ps of the compressor 21 under the evaporation pressure control is regarded as a first target value Pes 1
  • the state where the refrigerant quantity judging operation is stable at this first target value Pes 1 is regarded as a first state (see the refrigerating cycle indicated by the lines including the dotted lines in FIG. 10 ).
  • FIG. 10 is a Mollier diagram to show the refrigerating cycle of the air conditioner 1 in the pipe volume judging operation for the gas refrigerant communication pipe.
  • the first state where the target low pressure Pes of the suction pressure Ps in the compressor 21 under evaporation pressure control is stable at the first target value Pes 1 is switched to a second state (see the refrigerating cycle indicated by only the solid lines in FIG. 10 ) where the target low pressure Pes is changed to a second target value Pes 2 different from the first target value Pes 1 and stabilized without changing the conditions for other equipment controls, i.e., without changing the conditions for the liquid pipe temperature control, the condensation pressure control, and the superheat degree control (i.e., without changing target liquid pipe temperature Tlps and target superheat degree SHrs).
  • the second target value Pes 2 is a pressure lower than the first target value Pes 1 .
  • the density of the refrigerant in the gas refrigerant communication pipe 7 decreases, and therefore the refrigerant quantity Mgp in the gas refrigerant communication pipe portion G in the second state decreases compared to the refrigerant quantity in the first state. Then, the refrigerant whose quantity has decreased in the gas refrigerant communication pipe portion G will move to other portions in the refrigerant circuit 10 .
  • the conditions for other equipment controls other than the evaporation pressure control are not changed, and therefore the refrigerant quantity Mog 1 in the high pressure gas pipe portion E, the refrigerant quantity Mol 1 in the high-temperature liquid pipe portion B 1 , the refrigerant quantity Mol 2 in the low temperature liquid pipe portion B 2 , and the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B 3 are maintained substantially constant, and the refrigerant whose quantity has decreased in the gas refrigerant communication pipe portion G will move to the low-pressure gas pipe portion H, the condenser portion A, the indoor unit portion F, and the bypass circuit portion I.
  • the refrigerant quantity Mog 2 in the low-pressure gas pipe portion H, the refrigerant quantity Mc in the condenser portion A, the refrigerant quantity Mr in the indoor unit portion F; and the refrigerant quantity Mob in the bypass circuit portion I will increase by the quantity of the refrigerant that has decreased in the gas refrigerant communication pipe portion G.
  • Such control as described above is performed as the process in Step S 23 by the controller 8 (more specifically, by the indoor side controllers 47 and 57 , the outdoor side controller 37 , and the transmission line 8 a that connects between the controllers 37 and 47 , and 57 ) that functions as the pipe volume judging operation controlling means for performing the pipe volume judging operation to calculate the volume Vgp of the gas refrigerant communication pipe 7 .
  • Step S 24 the volume Vgp of the gas refrigerant communication pipe 7 is calculated by utilizing a phenomenon that the refrigerant quantity in the gas refrigerant communication pipe portion G decreases and the refrigerant whose quantity has decreased moves to other portions in the refrigerant circuit 10 because of the change from the first state to the second state.
  • this ⁇ Mgp value is divided by a density change quantity ⁇ gp of the refrigerant between the first state and the second state in the gas refrigerant communication pipe 7 , and thereby the volume Vgp of the gas refrigerant communication pipe 7 can be calculated.
  • the refrigerant quantity Mog 1 , the refrigerant quantity Mol 1 , and the refrigerant quantity Mol 2 may be included in the above described function expression.
  • Vgp ⁇ Mgp/ ⁇ gp
  • ⁇ Mc, ⁇ Mog 2 , ⁇ Mr and ⁇ Mob can be obtained by calculating the refrigerant quantity in the first state and the refrigerant quantity in the second state by using the above described relational expression for each portion in the refrigerant circuit 10 and further by subtracting the refrigerant quantity in the first state from the refrigerant quantity in the second state.
  • the density change quantity ⁇ gp can be obtained by calculating an average density between the density ⁇ s of the refrigerant at the suction side of the compressor 21 in the first state and the density ⁇ eo of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 in the first state and by subtracting the average density in the first state from the average density in the second state.
  • the volume Vgp of the gas refrigerant communication pipe 7 can be calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the first and second states.
  • the refrigerant increase/decrease quantity ⁇ Mr the refrigerant quantity Mr in each of the indoor units 4 and 5 is calculated.
  • the process in Step S 17 in which information on the indoor units 4 and 5 is obtained and the process in Step S 18 in which the relational expression for the refrigerant quantity is set are performed, as is the case with the calculation of the refrigerant quantity in Step S 12 of the automatic refrigerant charging operation.
  • the state is changed such that the second target value Pes 2 in the second state becomes a pressure lower than the first target value Pes 1 in the first state and therefore the refrigerant in the gas refrigerant communication pipe portion G is moved to other portions in order to increase the refrigerant quantity in the other portions; thereby the volume Vlp of the gas refrigerant communication pipe 7 is calculated from the increased quantity.
  • the state may be changed such that the second target value Pes 2 in the second state becomes a pressure higher than the first target value Pes 1 in the first state and therefore the refrigerant is moved from other portions to the gas refrigerant communication pipe portion G in order to decrease the refrigerant quantity in the other portions; thereby the volume Vlp in the gas refrigerant communication pipe 7 is calculated from the decreased quantity.
  • Step S 24 is performed by the controller 8 that functions as the pipe volume calculating means for the gas refrigerant communication pipe, which calculates the volume Vgp of the gas refrigerant communication pipe 7 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the pipe volume judging operation for the gas refrigerant communication pipe 7 .
  • Step S 25 Adequacy Judgment of the Pipe Volume Judging Operation Result
  • Step S 25 is performed to judge whether or not a result of the pipe volume judging operation is adequate, in other words, whether or not the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 calculated by the pipe volume calculating means are adequate.
  • ⁇ 1 and ⁇ 2 are values that are changed based on the minimum value and the maximum value of the pipe volume ratio in feasible combinations of the heat source unit and the utilization units.
  • Step S 2 of the pipe volume judging operation is completed.
  • the process for the pipe volume judging operation and volume calculation in Step S 21 to Step S 24 is performed again.
  • Step S 25 is performed by the controller 8 that functions as the adequacy judging means for judging whether or not a result of the above described pipe volume judging operation is adequate, in other words, whether or not the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 calculated by the pipe volume calculating means are adequate.
  • the pipe volume judging operation (Steps S 21 , S 22 ) for the liquid refrigerant communication pipe 6 is first performed and then the pipe volume judging operation for the gas refrigerant communication pipe 7 (Steps S 23 , S 24 ) is performed.
  • the pipe volume judging operation for the gas refrigerant communication pipe 7 may be performed first.
  • Step S 25 when a result of the pipe volume judging operation in Steps S 21 to S 24 is judged to be inadequate for a plurality of times, or when it is desired to more simply judge the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 , although it is not shown in FIG.
  • Step S 25 after a result of the pipe volume judging operation in Steps S 21 to S 24 is judged to be inadequate, it is possible to proceed to the process for estimating the lengths of the refrigerant communication pipes 6 and 7 from the pressure loss in the refrigerant communication pipes 6 and 7 and calculating the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 from the estimated pipe lengths and an average volume ratio, thereby obtaining the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 .
  • the pipe volume judging operation is performed to calculate the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 is described on the premise that there is no information regarding the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7 and the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 are unknown.
  • the pipe volume calculating means has a function to calculate the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 by inputting information regarding the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7 , such function may be used together.
  • the above described adequacy judging means may be used to judge whether or not the input information regarding the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7 is adequate.
  • Step S 3 Initial Refrigerant Quantity Detection Operation
  • Step S 3 the process in Step S 31 and Step S 32 shown in FIG. 11 is performed by the controller 8 .
  • FIG. 11 is a flowchart of the initial refrigerant quantity detection operation.
  • Step S 31 Refrigerant Quantity Judging Operation
  • Step S 31 as is the case with the above described refrigerant quantity judging operation in Step S 11 of the automatic refrigerant charging operation, the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control, is performed.
  • the refrigerant quantity judging operation including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control.
  • values that are the same as the target values in the refrigerant quantity judging operation in Step S 11 of the automatic refrigerant charging operation are used for the target liquid pipe temperature Tlps in the liquid pipe temperature control, the target superheat degree SHrs in the superheat degree control, and the target low pressure Pes in the evaporation pressure control.
  • Step S 14 the process in Step S 14 in which information on the indoor units 4 and 5 is obtained and the process in Step S 15 in which various target control values are set are performed.
  • Step S 31 the process in Step S 31 is performed by the controller 8 that functions as the refrigerant quantity judging operation controlling means for performing the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control.
  • Step S 32 Refrigerant Quantity Calculation
  • the refrigerant quantity in the refrigerant circuit 10 is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the initial refrigerant quantity judging operation in Step S 32 by the controller 8 that functions as the refrigerant quantity calculating means while performing the above described refrigerant quantity judging operation.
  • Calculation of the refrigerant quantity in the refrigerant circuit 10 is performed by using the above described relational expressions between the refrigerant quantity in each portion in the refrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 .
  • the volumes Vlp and Vgp of the refrigerant communication pipes 6 and 7 which were unknown at the time of after installation of constituent equipment of the air conditioner 1 , have been calculated and the values thereof are known by the above described pipe volume judging operation.
  • the refrigerant quantities Mlp, Mgp in the refrigerant communication pipes 6 and 7 can be calculated, and further by adding the refrigerant quantity in the other each portion, the initial refrigerant quantity in the entire refrigerant circuit 10 can be detected.
  • the refrigerant quantity Mr in each of the indoor units 4 and 5 is calculated. Also at this time, the process in Step S 17 in which information on the indoor units 4 and 5 is obtained and the process in Step S 18 in which the relational expressions for the refrigerant quantity is set are performed, as is the case with the calculation of the refrigerant quantity in Step S 12 of the automatic refrigerant charging operation.
  • This initial refrigerant quantity is used as a reference refrigerant quantity Mi of the entire refrigerant circuit 10 , which serves as the reference for judging whether or not there is a refrigerant leak from the refrigerant circuit 10 in the below described refrigerant leak detection operation. Therefore, it is stored as a value of the operation state quantity in the memory of the controller 8 as state quantity storing means.
  • Step S 32 is performed by the controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity in each portion in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the initial refrigerant quantity detecting operation.
  • FIG. 12 is a flowchart of the refrigerant leak detection operation mode.
  • Step S 41 Refrigerant Quantity Judging Operation
  • the normal operation mode when operation in the normal operation mode such as the above described cooling operation and heating operation has gone on for a certain period of time (for example, half a year to a year), the normal operation mode is automatically or manually switched to the refrigerant leak detection operation mode, and as is the case with the refrigerant quantity judging operation of the initial refrigerant quantity detection operation, the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control, is performed.
  • values that are the same as the target values in Step S 31 of the refrigerant quantity judging operation of the initial refrigerant quantity detection operation are used for the target liquid pipe temperature Tlps in the liquid pipe temperature control, the target superheat degree SHrs in the superheat degree control, and the target low pressure Pes in the evaporation pressure control.
  • the refrigerant quantity judging operation in Step S 11 of the automatic refrigerant charging operation the process in Step S 14 in which information on the indoor units 4 and 5 is obtained and the process in Step S 15 in which various target control values are set are performed.
  • this refrigerant quantity judging operation is performed for each time the refrigerant leak detection operation is performed. Even when the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 23 fluctuates due to the different operating conditions, for example, such as when the condensation pressure Pc is different or when there is a refrigerant leak, the refrigerant temperature Tlp in the liquid refrigerant communication pipe 6 is maintained constant at the same target liquid pipe temperature Tlps by the liquid pipe temperature control.
  • Step S 41 the process in Step S 41 is performed by the controller 8 that functions as the refrigerant quantity judging operation controlling means for performing the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control.
  • Step S 42 Refrigerant Quantity Calculation
  • the refrigerant quantity in the refrigerant circuit 10 is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant leak detection operation in Step S 42 by the controller 8 that functions as the refrigerant quantity calculating means while performing the above described refrigerant quantity judging operation.
  • Calculation of the refrigerant quantity in the refrigerant circuit 10 is performed by using the above described relational expression between the refrigerant quantity in each portion in the refrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 .
  • the volumes Vlp and Vgp of the refrigerant communication pipes 6 and 7 which were unknown at the time of after installation of constituent equipment of the air conditioner 1 , have been calculated and the values thereof are known by the above described pipe volume judging operation.
  • the refrigerant quantities Mlp, Mgp in the refrigerant communication pipes 6 and 7 can be calculated, and further by adding the refrigerant quantity in the other each portion, the refrigerant quantity M in the entire refrigerant circuit 10 can be calculated.
  • the refrigerant quantity Mr in each of the indoor units 4 and 5 is calculated. Also at this time, the process in Step S 17 in which information on the indoor units 4 and 5 is obtained and the process in Step S 18 in which the relational expression for the refrigerant quantity is set are performed, as is the case with the calculation of the refrigerant quantity in Step S 12 of the automatic refrigerant charging operation.
  • the refrigerant temperature Tlp in the liquid refrigerant communication pipe 6 is maintained constant at the target liquid pipe temperature Tlps by the liquid pipe temperature control. Therefore, regardless the difference in the operating conditions for the refrigerant leak detection operation, the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B 3 will be maintained constant even when the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 23 changes.
  • Step S 42 is performed by the controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity at each portion in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant leak detection operation.
  • Steps S 43 , S 44 Adequacy Judgment of the Refrigerant Quantity, Warning Display
  • the refrigerant quantity in the refrigerant circuit 10 decreases. Then, when the refrigerant quantity in the refrigerant circuit 10 decreases, mainly, a tendency of a decrease in the subcooling degree SC o at the outlet of the outdoor heat exchanger 23 appears. Along with this, the refrigerant quantity Mc in the outdoor heat exchanger 23 decreases, and the refrigerant quantities in other portions tend to be maintained substantially constant.
  • the refrigerant quantity M of the entire refrigerant circuit 10 calculated in the above described Step S 42 is smaller than the reference refrigerant quantity Mi detected in the initial refrigerant quantity detection operation when there is a refrigerant leak from the refrigerant circuit 10 ; whereas when there is no refrigerant leak from the refrigerant circuit 10 , the refrigerant quantity M is substantially the same as the reference refrigerant quantity Mi.
  • Step S 43 whether or not there is a refrigerant leak is judged in Step S 43 .
  • Step S 43 that there is no refrigerant leak from the refrigerant circuit 10 , the refrigerant leak detection operation mode is finished.
  • Step S 43 when it is judged in Step S 43 that there is a refrigerant leak from the refrigerant circuit 10 , the process proceeds to Step S 44 , and a warning indicating that a refrigerant leak is detected is displayed on the warning display 9 . Subsequently, the refrigerant leak detection operation mode is finished.
  • Steps S 42 to S 44 the process from Steps S 42 to S 44 is performed by the controller 8 that functions as the refrigerant leak detection means, which is one of the refrigerant quantity judging means, and which detects whether or not there is a refrigerant leak by judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 while performing the refrigerant quantity judging operation in the refrigerant leak detection operation mode.
  • the controller 8 that functions as the refrigerant leak detection means, which is one of the refrigerant quantity judging means, and which detects whether or not there is a refrigerant leak by judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 while performing the refrigerant quantity judging operation in the refrigerant leak detection operation mode.
  • the controller 8 functions as the refrigerant quantity judging operation means, the refrigerant quantity calculating means, the refrigerant quantity judging means, the pipe volume judging operation means, the pipe volume calculating means, the adequacy judging means, information obtaining means, the condition setting means, and the state quantity storing means, and thereby configures the refrigerant quantity judging system for judging the adequacy of the refrigerant quantity charged into the refrigerant circuit 10 .
  • the air conditioner 1 in the present embodiment has the following characteristics.
  • the information on the indoor units 4 and 5 as the utilization units connected to the outdoor unit 2 as the heat source unit via the transmission line 8 a is obtained, and the condition for the refrigerant quantity judging operation is set according to the information on the indoor units 4 and 5 .
  • the refrigerant quantity judging operation and judgment of the adequacy of the refrigerant quantity in the refrigerant circuit can be appropriately performed according to the connection condition for the indoor units 4 and 5 . In this way, in this air conditioner 1 , it is possible to judge the adequacy of the refrigerant quantity in the refrigerant circuit 10 with high accuracy while reducing the labor of inputting information on the indoor units 4 and 5 .
  • the refrigerant quantity in the refrigerant circuit 10 is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant quantity judging operation by using the relational expressions between the refrigerant quantity in the refrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 ; and the adequacy of the refrigerant quantity in the refrigerant circuit 10 is judged by using the refrigerant quantity calculated.
  • this air conditioner 1 because it is premised that various types of indoor units 4 and 5 are connected to the outdoor unit 2 , in the case where it is wished to enable a highly accurate judgment of the adequacy of the refrigerant quantity when judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 by this approach, it is desirable to set the relational expressions according to the models of the indoor units 4 and 5 . Therefore, this air conditioner 1 is configured such that the relational expression (specifically, the relational expression for the refrigerant quantity Mr in the indoor unit portion F) can be set according to the models of the indoor units 4 and 5 .
  • the relational expression specifically, the relational expression for the refrigerant quantity Mr in the indoor unit portion F
  • this air conditioner 1 it is possible to judge the adequacy of the refrigerant quantity in the refrigerant circuit 10 by using the appropriate relational expressions between the refrigerant quantity in the refrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 , according to the models of the indoor units 4 and 5 connected to the outdoor unit 2 .
  • the relational expressions to calculate the refrigerant quantity are provided separately for the indoor units 4 and 5 and the portions other than the indoor units 4 and 5 .
  • the relational expressions for the refrigerant quantity in the entire refrigerant circuit 10 can be used for a diversity of models of the indoor units 4 and 5 , and thus a calculation process can be smoothly performed.
  • the air conditioner 1 in the present embodiment it is premised that various types of indoor units 4 and 5 are connected to the outdoor unit 2 . Consequently, in the case where it is wished to enable a highly accurate judgment of the adequacy of the refrigerant quantity when judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 , it is desirable to set the target control values of constituent equipment in the refrigerant quantity judging operation (specifically, the refrigerant quantity judging operation in the automatic refrigerant charging operation, the initial refrigerant quantity detection operation, and the refrigerant leak detection operation) according to the total capacity of the indoor units 4 and 5 connected to the outdoor unit 2 .
  • the target control values of constituent equipment in the refrigerant quantity judging operation specifically, the refrigerant quantity judging operation in the automatic refrigerant charging operation, the initial refrigerant quantity detection operation, and the refrigerant leak detection operation
  • the target control values (specifically, the target low pressure Pes, the target superheat degree SHrs, and the target air flow rate Wrs) of constituent equipment in the refrigerant quantity judging operation can be set according to the information on the capacities of the indoor units 4 and 5 . In this way, in this air conditioner 1 , it is possible to perform the refrigerant quantity judging operation by using appropriate target control values according to the capacities of the indoor units 4 and 5 connected to the outdoor unit 2 .
  • the refrigerant circuit 10 is divided into a plurality of portions, and the relational expression between the refrigerant quantity and the operation state quantity is set for each portion. Consequently, compared to the conventional case where a simulation of characteristics of a refrigerating cycle is performed, the calculation load can be reduced, and the operation state quantity that is important for calculation of the refrigerant quantity in each portion can be selectively incorporated as a variable of the relational expression, thus improving the calculation accuracy of the refrigerant quantity in each portion. As a result, the adequacy of the refrigerant quantity in the refrigerant circuit 10 can be judged with high accuracy.
  • the controller 8 as the refrigerant quantity calculating means can quickly calculate the refrigerant quantity in each portion from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the automatic refrigerant charging operation in which the refrigerant is charged into the refrigerant circuit 10 .
  • the controller 8 as the refrigerant quantity judging means can judge with high accuracy whether or not the refrigerant quantity in the refrigerant circuit 10 (specifically, a value obtained by adding the refrigerant quantity Mo in the outdoor unit 2 and the refrigerant quantity Mr in the indoor units 4 and 5 ) has reached the target charging value Ms.
  • the controller 8 can quickly calculate the initial refrigerant quantity as the reference refrigerant quantity Mi by calculating the refrigerant quantity in each portion from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the initial refrigerant quantity detection operation in which the initial refrigerant quantity after constituent equipment is installed or after the refrigerant is charged into the refrigerant circuit 10 is detected. Moreover, it is possible to detect the initial refrigerant quantity with high accuracy.
  • the controller 8 can quickly calculate the refrigerant quantity in each portion from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant leak detection operation in which whether or not there is a refrigerant leak from the refrigerant circuit 10 is judged. Moreover, the controller 8 can judge with high accuracy whether or not the refrigerant is leaking from the refrigerant circuit 10 by comparison between the calculated refrigerant quantity in each portion and the reference refrigerant quantity Mi that serves as a reference for judging whether or not the refrigerant is leaking.
  • the subcooler 25 is disposed as the temperature adjustment mechanism capable of adjusting the temperature of the refrigerant sent from the outdoor heat exchanger 23 as a condenser to the indoor expansion valves 41 and 51 as expansion mechanisms. Performance of the subcooler 25 is controlled such that the temperature Tlp of the refrigerant sent from the subcooler 25 to the indoor expansion valves 41 and 51 as expansion mechanisms is maintained constant during the refrigerant quantity judging operation, thereby preventing a change in the density ⁇ lp of the refrigerant in the refrigerant pipes from the subcooler 25 to the indoor expansion valves 41 and 51 .
  • the effect of the temperature difference of the refrigerant as described above will remain only within the refrigerant pipes from the outlet of the outdoor heat exchanger 23 to the subcooler 25 , and the error in judgment due to the difference in the temperature Tco of the refrigerant at the outlet of the outdoor heat exchanger 23 (i.e., the difference in the density of the refrigerant) can be reduced when judging the refrigerant quantity.
  • the outdoor unit 2 as a heat source unit and the indoor units 4 and 5 as utilization units are interconnected via the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 , the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7 that connect between the outdoor unit 2 and the indoor units 4 and 5 are different depending on conditions such as installation location.
  • the difference in the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 23 will be the difference in the temperature of the refrigerant in the liquid refrigerant communication pipe 6 that configures a large portion of the refrigerant pipes from the outlet of the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 and thus the error in judgment tends to increase.
  • performance of the subcooler 25 is controlled such that the temperature Tlp of the refrigerant in the liquid refrigerant communication pipe 6 is constant during the refrigerant quantity judging operation, thereby preventing a change in the density ⁇ lp of the refrigerant in the refrigerant pipes from the subcooler 25 to the indoor expansion valves 41 and 51 .
  • the error in judgment due to the difference in the temperature Tco of the refrigerant at the outlet of the outdoor heat exchanger 23 i.e., the difference in the density of the refrigerant
  • the difference in the density of the refrigerant can be reduced when judging the refrigerant quantity.
  • the initial refrigerant quantity detection operation in which the initial refrigerant quantity after constituent equipment is installed or after the refrigerant is charged into the refrigerant circuit 10 is detected, the initial refrigerant quantity can be detected with high accuracy.
  • the refrigerant leak detection operation in which whether or not there is a refrigerant leak from the refrigerant circuit 10 is judged, whether or not there is a refrigerant leak from the refrigerant circuit 10 can be judged with high accuracy.
  • a change in the density ⁇ gp of the refrigerant sent from the indoor heat exchangers 42 and 52 to the compressor 21 is prevented by controlling constituent equipment such that the pressure (for example, the suction pressure Ps and the evaporation pressure Pe) of the refrigerant sent from the indoor heat exchangers 42 and 52 as evaporators to the compressor 21 or the operation state quantity (for example, the evaporation temperature Te) equivalent to the aforementioned pressure becomes constant during the refrigerant quantity judging operation.
  • the pressure for example, the suction pressure Ps and the evaporation pressure Pe
  • the error in judgment due to the difference i.e., the difference in the density of the refrigerant
  • the difference in the density of the refrigerant in the pressure of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 or the operation state quantity equivalent to the aforementioned pressure can be reduced when judging the refrigerant quantity.
  • the pipe volume judging operation is performed in which two states are created where the density of the refrigerant flowing in the refrigerant communication pipes 6 and 7 is different between the two states. Then, the increase/decrease quantity of the refrigerant between these two states is calculated from the refrigerant quantity in the portions other than the refrigerant communication pipes 6 and 7 , and the increase/decrease quantity of the refrigerant is divided by the density change quantity of the refrigerant in the refrigerant communication pipes 6 and 7 between the first state and the second state, thereby the volumes of the refrigerant communication pipes 6 and 7 are calculated.
  • the volumes of the refrigerant communication pipes 6 and 7 can be detected. Accordingly, the volumes of the refrigerant communication pipes 6 and 7 can be obtained while reducing the labor of inputting information of the refrigerant communication pipes 6 and 7 .
  • the adequacy of the refrigerant quantity in the refrigerant circuit 10 can be judged by using the volumes of the refrigerant communication pipes 6 and 7 calculated by the pipe volume calculating means and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 . Therefore, even when the volumes of the refrigerant communication pipes 6 and 7 are unknown at the time of after installation of constituent equipment, the adequacy of the refrigerant quantity in the refrigerant circuit 10 can be judged with high accuracy.
  • the refrigerant quantity in the refrigerant circuit 10 in the initial refrigerant quantity judging operation can be calculated by using the volumes of the refrigerant communication pipes 6 and 7 calculated by the pipe volume calculating means.
  • the refrigerant quantity in the refrigerant circuit 10 in the refrigerant leak detection operation can be calculated by using the volumes of the refrigerant communication pipes 6 and 7 calculated by the pipe volume calculating means.
  • the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7 are calculated from the information regarding the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 (for example, operation results of the pipe volume judging operation and information regarding the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7 , which is input by the operator and the like).
  • the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7 can be accurately obtained; whereas when it is judged to be inadequate, it is possible to handle the situation by, for example, re-inputting appropriate information regarding the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 , re-performing the pipe volume judging operation, and the like.
  • such judgment method is not to judge the adequacy by individually checking the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7 obtained by the calculation, but to judge the adequacy by checking whether or not the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7 satisfy a predetermined relation. Therefore, an appropriate judgment can be made which also takes into consideration a relative relation between the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7 .
  • the present invention is applied to an air conditioner capable of switching and performing the cooling operation and heating operation.
  • the present invention may be applied to different types of air conditioners such as a cooling only air conditioner and the like.
  • an example in which the present invention is applied to an air conditioner including a single outdoor unit is described.
  • the present invention may be applied to an air conditioner including a plurality of outdoor units.
  • the present invention When the present invention is used, the labor of inputting information on the utilization unit before operating a separate type air conditioner is reduced, and at the same time, the adequacy of the refrigerant quantity in the refrigerant circuit can be judged with high accuracy.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Conditioning Control Device (AREA)

Abstract

An air conditioner includes a refrigerant circuit configured to interconnect a heat source unit and a utilization unit, a transmission line that exchanges a signal between the heat source unit and the utilization unit, an information obtaining section, an operation controlling section capable of performing a refrigerant quantity judging operation, a refrigerant quantity judging section, and a condition setting section. The information obtaining section obtains information on the utilization unit connected to the heat source unit via the transmission line. The refrigerant quantity judging section judges the adequacy of the refrigerant quantity in the refrigerant circuit by using the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit in the refrigerant quantity judging operation. The condition setting section sets a condition for the refrigerant quantity judging operation according to the information on the utilization unit obtained by the information obtaining section.

Description

CROSS-REFERENCE TO RELATED APPLICATIONS
This U.S. National stage application claims priority under 35 U.S.C. §119(a) to Japanese Patent Application No. 2005-363736, filed in Japan on Dec. 16, 2005, the entire contents of which are hereby incorporated herein by reference.
TECHNICAL FIELD
The present invention relates to a function to judge the adequacy of the refrigerant quantity in a refrigerant circuit of an air conditioner. More specifically, the present invention relates to a function to judge the adequacy of the refrigerant quantity in a refrigerant circuit of an air conditioner configured by the interconnection of a heat source unit and a utilization unit.
BACKGROUND ART
Conventionally, there has been provided a separate type air conditioner configured by the interconnection of a heat source unit and a utilization unit in which information on the capacity and the like of the utilization unit is input in order to accurately judge the excess or deficiency of the refrigerant quantity in a refrigerant circuit (for example, see JP-A Publication No. H8-200905).
SUMMARY OF THE INVENTION
However, the above described work to input information on the utilization unit is extremely laborious work. In addition, there is a problem that an input error easily occurs.
An object of the present invention is to reduce the labor of inputting information on a utilization unit before operating a separate type air conditioner, and at the same time, to enable a highly accurate judgment of the adequacy of the refrigerant quantity in a refrigerant circuit.
An air conditioner according to a first aspect of the present invention includes a refrigerant circuit, a transmission line, an information obtaining means or section, an operation controlling means or section, a refrigerant quantity judging means or section, and a condition setting means or section. The refrigerant circuit is configured by the interconnection of a heat source unit and a utilization unit. The transmission line exchanges a signal between the heat source unit and the utilization unit. The information obtaining means obtains information on the utilization unit connected to the heat source unit via the transmission line. The operation controlling means can perform a refrigerant quantity judging operation. The refrigerant quantity judging means judges the adequacy of the refrigerant quantity in the refrigerant circuit by using an operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit in the refrigerant quantity judging operation. The condition setting means sets a condition for the refrigerant quantity judging operation according to the information on the utilization unit obtained by the information obtaining means.
In this air conditioner, information on the utilization unit connected to the heat source unit via the transmission line is obtained, and the condition for the refrigerant quantity judging operation is set according to this information on the utilization unit. Thus, the refrigerant quantity judging operation and judgment of the adequacy of the refrigerant quantity in the refrigerant circuit can be appropriately performed according to the connection condition for the utilization unit. In this way, in this air conditioner, it is possible to judge the adequacy of the refrigerant quantity in the refrigerant circuit with high accuracy while reducing the labor of inputting information on the utilization unit. Here, the term “information on the utilization unit” refers to information on the model, capacity, and the like of the utilization unit. In addition, the term “condition for the refrigerant quantity judging operation” refers to a target control value of constituent equipment for the refrigerant quantity judging operation, a relational expression that is used when judging the adequacy of the refrigerant quantity, and the like.
An air conditioner according to a second aspect of the present invention is the air conditioner according to the first aspect of the present invention, further including a refrigerant quantity calculating means or section to calculate the refrigerant quantity in the refrigerant circuit from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit in the refrigerant quantity judging operation, by using a relational expression between the refrigerant quantity in the refrigerant circuit and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit. The refrigerant quantity judging means judges the adequacy of the refrigerant quantity in the refrigerant circuit by using the refrigerant quantity in the refrigerant circuit calculated by the refrigerant quantity calculating means. The condition setting means sets the relational expression as the condition for the refrigerant quantity judging operation, according to the model of the utilization unit obtained by the infolination obtaining means.
In this air conditioner, an approach is employed in which the refrigerant quantity in the refrigerant circuit is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit in the refrigerant quantity judging operation by using the relational expression between the refrigerant quantity in the refrigerant circuit and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit, and the adequacy of the refrigerant quantity in the refrigerant circuit is judged by using the refrigerant quantity calculated. However, in this air conditioner, because it is premised that various types of utilization units are connected to the heat source unit, in the case where it is wished to enable a high accurate judgment of the adequacy of the refrigerant quantity when judging the adequacy of the refrigerant quantity in the refrigerant circuit by this approach, it is desirable to set the relational expression according to the model of each utilization unit. Therefore, this air conditioner is configured such that the relational expression can be set according to the information on the utilization units. In this way, in this air conditioner, it is possible to judge the adequacy of the refrigerant quantity in the refrigerant circuit by using an appropriate relational expression between the refrigerant quantity in the refrigerant circuit and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit, according to the model of each of the utilization units connected to the heat source unit.
An air conditioner according to a third aspect of the present invention is the air conditioner according to the second aspect of the present invention, wherein the relational expressions are provided separately for the utilization units and the portions other than the utilization units. The condition setting means sets the relational expressions provided for the refrigerant quantity in the utilization units according to the models of the utilization units obtained by the information obtaining means.
In this air conditioner, the relational expressions are prepared separately for the utilization units and the portions other than the utilization units. Thus, when setting the relational expressions for the refrigerant quantity in the entire refrigerant circuit according to the models of the utilization units, only the relational expressions for the refrigerant quantity in the utilization units need to be changed. In this way, the relational expressions for the refrigerant quantity in the entire refrigerant circuit can be used for a diversity of models of the utilization units, and thus a calculation process can be smoothly performed.
An air conditioner according to a fourth aspect of the present invention is the air conditioner according to any one of the first through third aspects of the present invention, wherein the condition setting means sets a target control value of constituent equipment in the refrigerant quantity judging operation as a condition for the refrigerant quantity judging operation, according to the capacity of the utilization unit.
In this air conditioner, it is premised that various types of utilization units are connected to the heat source unit. Consequently, in the case where it is wished to enable a highly accurate judgment of the adequacy of the refrigerant quantity when judging the adequacy of the refrigerant quantity in the refrigerant circuit, it is desirable to set the target control value of constituent equipment for the refrigerant quantity judging operation according to the capacities of the utilization units connected to the heat source unit. Therefore, in this air conditioner, the target control value of constituent equipment for the refrigerant quantity judging operation can be set according to the information on the capacities of the utilization units. In this way, in this air conditioner, it is possible to perform the refrigerant quantity judging operation by using the appropriate target control value according to the capacities of the utilization units connected to the utilization unit.
An air conditioner according to a fifth aspect of the present invention is the air conditioner according to the fourth aspect of the present invention, wherein the heat source unit includes a compressor and a heat source side heat exchanger. The utilization unit includes an expansion mechanism and a utilization side heat exchanger. The refrigerant circuit is configured by the interconnection of the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger. In the refrigerant quantity judging operation, the operation controlling means causes the utilization side heat exchanger to function as an evaporator for the refrigerant, and also controls constituent equipment such that the pressure of the refrigerant sent from the utilization side heat exchanger to the compressor or the operation state quantity equivalent to the aforementioned pressure becomes constant at a target low pressure as the target control value.
In this air conditioner, the target low pressure for the refrigerant quantity judging operation can be set according to the information on the capacities of the utilization units. In this way, in this air conditioner, it is possible to perform the refrigerant quantity judging operation by using an appropriate target low pressure according to the capacities of the utilization units connected to the heat source unit.
An air conditioner according to a sixth aspect of the present invention is the air conditioner according to the fourth aspect of the present invention, wherein the heat source unit includes a compressor and a heat source side heat exchanger. The utilization unit includes an expansion mechanism and a utilization side heat exchanger. The refrigerant circuit is configured by the interconnection of the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger. In the refrigerant quantity judging operation, the operation controlling means causes the utilization side heat exchanger to function as an evaporator for the refrigerant, and also controls constituent equipment such that the superheat degree of the refrigerant sent from the utilization side heat exchanger to the compressor becomes constant at a target superheat degree as the target control value.
In this air conditioner, the target superheat degree for the refrigerant quantity judging operation can set according to the information on the capacities of the utilization units. In this way, in this air conditioner, it is possible to perform the refrigerant quantity judging operation by using an appropriate target superheat degree according to the capacities of the utilization units connected to the heat source unit.
An air conditioner according to a seventh aspect of the present invention is the air conditioner according to the fourth aspect of the present invention, wherein the heat source unit includes a compressor and a heat source side heat exchanger. The utilization unit includes an expansion mechanism, a utilization side heat exchanger, and a ventilation fan that supplies air to the utilization side heat exchanger. The refrigerant circuit is configured by the interconnection of the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger. In the refrigerant quantity judging operation, the operation controlling means causes the utilization side heat exchanger to function as an evaporator for the refrigerant, and also performs control such that the air flow rate of the ventilation fan becomes constant at a target air flow rate.
In this air conditioner, the target air flow rate in the refrigerant quantity judging operation can be set according to the information on the capacity of the utilization units. In this way, in this air conditioner, it is possible to perform the refrigerant quantity judging operation by using an appropriate target air flow rate according to the capacities of the utilization units connected to the heat source unit.
BRIEF DESCRIPTION OF THE DRAWINGS
FIG. 1 is a schematic configuration view of an air conditioner according to an embodiment of the present invention.
FIG. 2 is a control block diagram of the air conditioner.
FIG. 3 is a flowchart of a test operation mode.
FIG. 4 is a flowchart of an automatic refrigerant charging operation.
FIG. 5 is a schematic diagram to show a state of refrigerant flowing in a refrigerant circuit in a refrigerant quantity judging operation (illustrations of a four-way switching valve and the like are omitted).
FIG. 6 is a flowchart to show an information obtaining process and a condition setting process in the refrigerant quantity judging operation.
FIG. 7 is a flowchart to show the information obtaining process and the condition setting process in calculation of the refrigerant quantity.
FIG. 8 is a flowchart of a pipe volume judging operation.
FIG. 9 is a Mollier diagram to show a refrigerating cycle of the air conditioner in the pipe volume judging operation for a liquid refrigerant communication pipe.
FIG. 10 is a Mollier diagram to show a refrigerating cycle of the air conditioner in the pipe volume judging operation for a gas refrigerant communication pipe.
FIG. 11 is a flowchart of an initial refrigerant quantity judging operation.
FIG. 12 is a flowchart of a refrigerant leak detection operation mode.
DETAILED DESCRIPTION OF THE INVENTION
In the following, an embodiment of an air conditioner according to the present invention is described based on the drawings.
(1) Configuration of the Air Conditioner
FIG. 1 is a schematic configuration view of an air conditioner 1 according to an embodiment of the present invention. The air conditioner 1 is a device that is used to cool and heat a room in a building and the like by performing a vapor compression-type refrigeration cycle operation. The air conditioner 1 mainly includes one outdoor unit 2 as a heat source unit, indoor units 4 and 5 as a plurality (two in the present embodiment) of utilization units connected in parallel thereto, and a liquid refrigerant communication pipe 6 and a gas refrigerant communication pipe 7 as refrigerant communication pipes which interconnect the outdoor unit 2 and the indoor units 4 and 5. In other words, the vapor compression-type refrigerant circuit 10 of the air conditioner 1 in the present embodiment is configured by the interconnection of the outdoor unit 2, the indoor units 4 and 5, and the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7.
<Indoor Unit>
The indoor units 4 and 5 are installed by being embedded in or hung from a ceiling of a room in a building and the like or by being mounted or the like on a wall surface of a room. The indoor units 4 and 5 are connected to the outdoor unit 2 via the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7, and configure a part of the refrigerant circuit 10.
Next, the configurations of the indoor units 4 and 5 are described. Note that, because the indoor units 4 and 5 have the same configuration, only the configuration of the indoor unit 4 is described here, and in regard to the configuration of the indoor unit 5, reference numerals in the 50s are used instead of reference numerals in the 40s representing the respective portions of the indoor unit 4, and descriptions of those respective portions are omitted.
The indoor unit 4 mainly includes an indoor side refrigerant circuit 10 a (an indoor side refrigerant circuit 10 b in the case of the indoor unit 5) that configures a part of the refrigerant circuit 10. The indoor side refrigerant circuit 10 a mainly includes an indoor expansion valve 41 as an expansion mechanism and an indoor heat exchanger 42 as a utilization side heat exchanger.
In the present embodiment, the indoor expansion valve 41 is an electrically powered expansion valve connected to a liquid side of the indoor heat exchanger 42 in order to adjust the flow rate or the like of the refrigerant flowing in the indoor side refrigerant circuit 10 a.
In the present embodiment, the indoor heat exchanger 42 is a cross fin-type fin-and-tube type heat exchanger configured by a heat transfer tube and numerous fins, and is a heat exchanger that functions as an evaporator for the refrigerant during a cooling operation to cool the room air and functions as a condenser for the refrigerant during a heating operation to heat the room air.
In the present embodiment, the indoor unit 4 includes an indoor fan 43 as a ventilation fan for taking in room air into the unit, causing the air to heat exchange with the refrigerant in the indoor heat exchanger 42, and then supplying the air to the room as supply air. The indoor fan 43 is a fan capable of varying an air flow rate Wr of the air which is supplied to the indoor heat exchanger 42, and in the present embodiment, is a centrifugal fan, multi-blade fan, or the like, which is driven by a motor 43 a comprising a DC fan motor.
In addition, various types of sensors are disposed in the indoor unit 4. A liquid side temperature sensor 44 that detects the temperature of the refrigerant (i.e., the refrigerant temperature corresponding to a condensation temperature Tc during the heating operation or an evaporation temperature Te during the cooling operation) is disposed at the liquid side of the indoor heat exchanger 42. A gas side temperature sensor 45 that detects a temperature Teo of the refrigerant is disposed at a gas side of the indoor heat exchanger 42. A room temperature sensor 46 that detects the temperature of the room air that flows into the unit (i.e., a room temperature Tr) is disposed at a room air intake side of the indoor unit 4. In the present embodiment, the liquid side temperature sensor 44, the gas side temperature sensor 45, and the room temperature sensor 46 comprise thermistors. In addition, the indoor unit 4 includes an indoor side controller 47 that controls the operation of each portion constituting the indoor unit 4. Additionally, the indoor side controller 47 includes a microcomputer and a memory and the like disposed in order to control the indoor unit 4, and is configured such that it can exchange control signals and the like with a remote controller (not shown) for individually operating the indoor unit 4 and can exchange control signals and the like with the outdoor unit 2 via a transmission line 8 a.
<Outdoor Unit>
The outdoor unit 2 is installed outside of a building and the like, is connected to the indoor units 4 and 5 via the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7, and configures the refrigerant circuit 10 with the indoor units 4 and 5.
Next, the configuration of the outdoor unit 2 is described. The outdoor unit 2 mainly includes an outdoor side refrigerant circuit 10 c that configures a part of the refrigerant circuit 10. This outdoor side refrigerant circuit 10 c mainly includes a compressor 21, a four-way switching valve 22, an outdoor heat exchanger 23 as a heat source side heat exchanger, an outdoor expansion valve 38 as an expansion mechanism, an accumulator 24, a subcooler 25 as a temperature adjustment mechanism, a liquid side stop valve 26, and a gas side stop valve 27.
The compressor 21 is a compressor whose operation capacity can be varied, and in the present embodiment, is a positive displacement-type compressor driven by a motor 21 a whose rotation frequency Rm is controlled by an inverter. In the present embodiment, only one compressor 21 is provided, but it is not limited thereto, and two or more compressors may be connected in parallel according to the number of connected units of indoor units and the like.
The four-way switching valve 22 is a valve for switching the direction of the flow of the refrigerant such that, during the cooling operation, the four-way switching valve 22 is capable of connecting a discharge side of the compressor 21 and a gas side of the outdoor heat exchanger 23 and connecting a suction side of the compressor 21 (specifically, the accumulator 24) and the gas refrigerant communication pipe 7 (see the solid lines of the four-way switching valve 22 in FIG. 1) to cause the outdoor heat exchanger 23 to function as a condenser for the refrigerant compressed in the compressor 21 and to cause the indoor heat exchangers 42 and 52 to function as evaporators for the refrigerant condensed in the outdoor heat exchanger 23; and such that, during the heating operation, the four-way switching valve 22 is capable of connecting the discharge side of the compressor 21 and the gas refrigerant communication pipe 7 and connecting the suction side of the compressor 21 and the gas side of the outdoor heat exchanger 23 (see the dotted lines of the four-way switching valve 22 in FIG. 1) to cause the indoor heat exchangers 42 and 52 to function as condensers for the refrigerant compressed in the compressor 21 and to cause the outdoor heat exchanger 23 to function as an evaporator for the refrigerant condensed in the indoor heat exchangers 42 and 52.
In the present embodiment, the outdoor heat exchanger 23 is a cross-fin type fin-and-tube type heat exchanger configured by a heat transfer tube and numerous fins, and is a heat exchanger that functions as a condenser for the refrigerant during the cooling operation and as an evaporator for the refrigerant during the heating operation. The gas side of the outdoor heat exchanger 23 is connected to the four-way switching valve 22, and the liquid side thereof is connected to the liquid refrigerant communication pipe 6.
In the present embodiment, the outdoor expansion valve 38 is an electrically powered expansion valve connected to a liquid side of the outdoor heat exchanger 23 in order to adjust the pressure, flow rate, or the like of the refrigerant flowing in the outdoor side refrigerant circuit 10 c.
In the present embodiment, the outdoor unit 2 includes an outdoor fan 28 as a ventilation fan for taking in outdoor air into the unit, causing the air to exchange heat with the refrigerant in the outdoor heat exchanger 23, and then exhausting the air to the outside. The outdoor fan 28 is a fan capable of varying an air flow rate Wo of the air which is supplied to the outdoor heat exchanger 23, and in the present embodiment, is a propeller fan or the like driven by a motor 28 a comprising a DC fan motor.
The accumulator 24 is connected between the four-way switching valve 22 and the compressor 21, and is a container capable of accumulating excess refrigerant generated in the refrigerant circuit 10 in accordance with the change in the operation load of the indoor units 4 and 5 and the like.
In the present embodiment, the subcooler 25 is a double tube heat exchanger, and is disposed to cool the refrigerant sent to the indoor expansion valves 41 and 51 after the refrigerant is condensed in the outdoor heat exchanger 23. In the present embodiment, the subcooler 25 is connected between the outdoor expansion valve 38 and the liquid side stop valve 26.
In the present embodiment, a bypass refrigerant circuit 61 as a cooling source of the subcooler 25 is disposed. Note that, in the description below, a portion corresponding to the refrigerant circuit 10 excluding the bypass refrigerant circuit 61 is referred to as a main refrigerant circuit for convenience sake.
The bypass refrigerant circuit 61 is connected to the main refrigerant circuit so as to cause a portion of the refrigerant sent from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 to branch from the main refrigerant circuit and return to the suction side of the compressor 21. Specifically, the bypass refrigerant circuit 61 includes a branch circuit 61 a connected so as to branch a portion of the refrigerant sent from the outdoor expansion valve 38 to the indoor expansion valves 41 and 51 at a position between the outdoor heat exchanger 23 and the subcooler 25, and a merging circuit 61 b connected to the suction side of the compressor 21 so as to return a portion of refrigerant from an outlet on a bypass refrigerant circuit side of the subcooler 25 to the suction side of the compressor 21. Further, the branch circuit 61 a is disposed with a bypass expansion valve 62 for adjusting the flow rate of the refrigerant flowing in the bypass refrigerant circuit 61. Here, the bypass expansion valve 62 comprises an electrically operated expansion valve. In this way, the refrigerant sent from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 is cooled in the subcooler 25 by the refrigerant flowing in the bypass refrigerant circuit 61 which has been depressurized by the bypass expansion valve 62. In other words, performance of the subcooler 25 is controlled by adjusting the opening degree of the bypass expansion valve 62.
The liquid side stop valve 26 and the gas side stop valve 27 are valves disposed at ports connected to external equipment and pipes (specifically, the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7). The liquid side stop valve 26 is connected to the outdoor heat exchanger 23. The gas side stop valve 27 is connected to the four-way switching valve 22.
In addition, various sensors are disposed in the outdoor unit 2. Specifically, disposed in the outdoor unit 2 are an suction pressure sensor 29 that detects a suction pressure Ps of the compressor 21, a discharge pressure sensor 30 that detects a discharge pressure Pd of the compressor 21, a suction temperature sensor 31 that detects a suction temperature Ts of the compressor 21, and a discharge temperature sensor 32 that detects a discharge temperature Td of the compressor 21. The suction temperature sensor 31 is disposed at a position between the accumulator 24 and the compressor 21. A heat exchanger temperature sensor 33 that detects the temperature of the refrigerant flowing through the outdoor heat exchanger 23 (i.e., the refrigerant temperature corresponding to the condensation temperature Tc during the cooling operation or the evaporation temperature Te during the heating operation) is disposed in the outdoor heat exchanger 23. A liquid side temperature sensor 34 that detects a refrigerant temperature Tco is disposed at the liquid side of the outdoor heat exchanger 23. A liquid pipe temperature sensor 35 that detects the temperature of the refrigerant (i.e., a liquid pipe temperature Tlp) is disposed at the outlet on the main refrigerant circuit side of the subcooler 25. The merging circuit 61 b of the bypass refrigerant circuit 61 is disposed with a bypass temperature sensor 63 for detecting the temperature of the refrigerant flowing through the outlet on the bypass refrigerant circuit side of the subcooler 25. An outdoor temperature sensor 36 that detects the temperature of the outdoor air that flows into the unit (i.e., an outdoor temperature Ta) is disposed at an outdoor air intake side of the outdoor unit 2. In the present embodiment, the suction temperature sensor 31, the discharge temperature sensor 32, the heat exchanger temperature sensor 33, the liquid side temperature sensor 34, the liquid pipe temperature sensor 35, the outdoor temperature sensor 36, and the bypass temperature sensor 63 comprise thermistors. In addition, the outdoor unit 2 includes an outdoor side controller 37 that controls the operation of each portion constituting the outdoor unit 2. Additionally, the outdoor side controller 37 includes a microcomputer and a memory disposed in order to control the outdoor unit 2, an inverter circuit that controls the motor 21 a, and the like, and is configured such that it can exchange control signals and the like with the indoor side controllers 47 and 57 of the indoor units 4 and 5 via the transmission line 8 a. In other words, a controller 8 that performs the operation control of the entire air conditioner 1 is configured by the indoor side controllers 47 and 57, the outdoor side controller 37, and the transmission line 8 a that interconnects the controllers 37, 47, and 57.
As shown in FIG. 2, the controller 8 is connected so as to be able to receive detection signals of sensors 29 to 36, 44 to 46, 54 to 56, and 63 and also to be able to control various equipment and valves 21, 22, 24, 28 a, 38, 41, 43 a, 51, 53 a, and 62 based on these detection signals and the like. In addition, a warning display 9 comprising LEDs and the like, which is configured to indicate that a refrigerant leak is detected in the below described refrigerant leak detection operation, is connected to the controller 8. Here, FIG. 2 is a control block diagram of the air conditioner 1.
<Refrigerant Communication Pipe>
The refrigerant communication pipes 6 and 7 are refrigerant pipes that are arranged on site when installing the air conditioner 1 at an installation location such as a building. As the refrigerant communication pipes 6 and 7, pipes having various lengths and pipe diameters are used according to the installation conditions such as an installation location, combination of an outdoor unit and an indoor unit, and the like. Accordingly, for example, when installing a new air conditioner, in order to calculate the charging quantity of the refrigerant, it is necessary to obtain accurate information regarding the lengths and pipe diameters and the like of the refrigerant communication pipes 6 and 7. However, management of such information and the calculation itself of the refrigerant quantity are difficult. In addition, when utilizing an existing pipe to renew an indoor unit and an outdoor unit, information regarding the lengths and pipe diameters and the like of the refrigerant communication pipes 6 and 7 may have been lost in some cases.
As described above, the refrigerant circuit 10 of the air conditioner 1 is configured by the interconnection of the indoor side refrigerant circuits 10 a and 10 b, the outdoor side refrigerant circuit 10 c, and the refrigerant communication pipes 6 and 7. In addition, it can also be said that this refrigerant circuit 10 is configured by the bypass refrigerant circuit 61 and the main refrigerant circuit excluding the bypass refrigerant circuit 61. Additionally, the controller 8 constituted by the indoor side controllers 47 and 57 and the outdoor side controller 37 allows the air conditioner 1 in the present embodiment to switch and operate between the cooling operation and the heating operation by the four-way switching valve 22 and to control each equipment of the outdoor unit 2 and the indoor units 4 and 5 according to the operation load of each of the indoor units 4 and 5.
(2) Operation of the Air Conditioner
Next, the operation of the air conditioner 1 in the present embodiment is described.
The operation modes of the air conditioner 1 in the present embodiment include: a normal operation mode where control of constituent equipment of the outdoor unit 2 and the indoor units 4 and 5 is performed according to the operation load of each of the indoor units 4 and 5; a test operation mode where a test operation to be performed after installation of constituent equipment of the air conditioner 1 is performed (specifically, it is not limited to after the first installation of equipment: it also includes, for example, after modification by adding or removing constituent equipment such as an indoor unit, after repair of damaged equipment); and a refrigerant leak detection operation mode where, after the test operation is finished and the normal operation has started, whether or not there is a refrigerant leak from the refrigerant circuit 10 is judged. The normal operation mode mainly includes the cooling operation for cooling the room and the heating operation for heating the room. In addition, the test operation mode mainly includes an automatic refrigerant charging operation to charge refrigerant into the refrigerant circuit 10; a pipe volume judging operation to detect the volumes of the refrigerant communication pipes 6 and 7; and an initial refrigerant quantity detection operation to detect the initial refrigerant quantity after installing constituent equipment or after charging refrigerant into the refrigerant circuit.
Operation in each operation mode of the air conditioner 1 is described below.
<Normal Operation Mode>
(Cooling Operation)
First, the cooling operation in the normal operation mode is described with reference to FIGS. 1 and 2.
During the cooling operation, the four-way switching valve 22 is in the state represented by the solid lines in FIG. 1, i.e., a state where the discharge side of the compressor 21 is connected to the gas side of the outdoor heat exchanger 23 and also the suction side of the compressor 21 is connected to the gas sides of the indoor heat exchangers 42 and 52 via the gas side stop valve 27 and the gas refrigerant communication pipe 7. The outdoor expansion valve 38 is in a fully opened state. The liquid side stop valve 26 and the gas side stop valve 27 are in an opened state. The opening degree of each of the indoor expansion valves 41 and 51 is adjusted such that a superheat degree SHr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 (i.e., the gas sides of the indoor heat exchangers 42 and 52) becomes constant at a target superheat degree SHrs. In the present embodiment, the superheat degree SHr of the refrigerant at the outlet of each of the indoor heat exchangers 42 and 52 is detected by subtracting the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors 44 and 54 from the refrigerant temperature detected by the gas side temperature sensors 45 and 55, or is detected by converting the suction pressure Ps of the compressor 21 detected by the suction pressure sensor 29 to saturated temperature corresponding to the evaporation temperature Te, and subtracting this saturated temperature of the refrigerant from the refrigerant temperature detected by the gas side temperature sensors 45 and 55. Note that, although it is not employed in the present embodiment, a temperature sensor that detects the temperature of the refrigerant flowing through each of the indoor heat exchangers 42 and 52 may be disposed such that the superheat degree SHr of the refrigerant at the outlet of each of the indoor heat exchangers 42 and 52 is detected by subtracting the refrigerant temperature corresponding to the evaporation temperature Te which is detected by this temperature sensor from the refrigerant temperature detected by the gas side temperature sensors 45 and 55. In addition, the opening degree of the bypass expansion valve 62 is adjusted such that a superheat degree SHb of the refrigerant at the outlet on the bypass refrigerant circuit side of the subcooler 25 becomes a target superheat degree SHbs. In the present embodiment, the superheat degree SHb of the refrigerant at the outlet on the bypass refrigerant circuit side of the subcooler 25 is detected by converting the suction pressure Ps of the compressor 21 detected by the suction pressure sensor 29 to saturated temperature corresponding to the evaporation temperature Te, and subtracting this saturated temperature of the refrigerant from the refrigerant temperature detected by the bypass temperature sensor 63. Note that, although it is not employed in the present embodiment, a temperature sensor may be disposed at an inlet on the bypass refrigerant circuit side of the subcooler 25 such that the superheat degree SHb of the refrigerant at the outlet on the bypass refrigerant circuit side of the subcooler 25 is detected by subtracting the refrigerant temperature detected by this temperature sensor from the refrigerant temperature detected by the bypass temperature sensor 63.
When the compressor 21, the outdoor fan 28, the indoor fans 43 and 53 are started in this state of the refrigerant circuit 10, low-pressure gas refrigerant is sucked into the compressor 21 and compressed into high-pressure gas refrigerant. Subsequently, the high-pressure gas refrigerant is sent to the outdoor heat exchanger 23 via the four-way switching valve 22, exchanges heat with the outdoor air supplied by the outdoor fan 28, and becomes condensed into high-pressure liquid refrigerant. Then, this high-pressure liquid refrigerant passes through the outdoor expansion valve 38, flows into the subcooler 25, exchanges heat with the refrigerant flowing in the bypass refrigerant circuit 61, is further cooled, and becomes subcooled. At this time, a portion of the high-pressure liquid refrigerant condensed in the outdoor heat exchanger 23 is branched into the bypass refrigerant circuit 61 and is depressurized by the bypass expansion valve 62. Subsequently, it is returned to the suction side of the compressor 21. Here, the refrigerant that passes through the bypass expansion valve 62 is depressurized close to the suction pressure Ps of the compressor 21 and thereby a portion of the refrigerant evaporates. Then, the refrigerant flowing from the outlet of the bypass expansion valve 62 of the bypass refrigerant circuit 61 toward the suction side of the compressor 21 passes through the subcooler 25 and exchanges heat with high-pressure liquid refrigerant sent from the outdoor heat exchanger 23 on the main refrigerant circuit side to the indoor units 4 and 5.
Then, the high-pressure liquid refrigerant that has become subcooled is sent to the indoor units 4 and 5 via the liquid side stop valve 26 and the liquid refrigerant communication pipe 6. The high-pressure liquid refrigerant sent to the indoor units 4 and 5 is depressurized close to the suction pressure Ps of the compressor 21 by the indoor expansion valves 41 and 51, becomes refrigerant in a low-pressure gas-liquid two-phase state, is sent to the indoor heat exchangers 42 and 52, exchanges heat with the room air in the indoor heat exchangers 42 and 52, and is evaporated into low-pressure gas refrigerant.
This low-pressure gas refrigerant is sent to the outdoor unit 2 via the gas refrigerant communication pipe 7, and flows into the accumulator 24 via the gas side stop valve 27 and the four-way switching valve 22. Then, the low-pressure gas refrigerant that flowed into the accumulator 24 is again sucked into the compressor 21.
(Heating Operation)
Next, the heating operation in the normal operation mode is described.
During the heating operation, the four-way switching valve 22 is in a state represented by the dotted lines in FIG. 1, i.e., a state where the discharge side of the compressor 21 is connected to the gas sides of the indoor heat exchangers 42 and 52 via the gas side stop valve 27 and the gas refrigerant communication pipe 7 and also the suction side of the compressor 21 is connected to the gas side of the outdoor heat exchanger 23. The opening degree of the outdoor expansion valve 38 is adjusted so as to be able to depressurize the refrigerant that flows into the outdoor heat exchanger 23 to a pressure where the refrigerant can evaporate (i.e., evaporation pressure Pe) in the outdoor heat exchanger 23. In addition, the liquid side stop valve 26 and the gas side stop valve 27 are in an opened state. The opening degree of the indoor expansion valves 41 and 51 is adjusted such that a subcooling degree SCr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 becomes constant at the target subcooling degree SCrs. In the present embodiment, a subcooling degree SCr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 is detected by converting the discharge pressure Pd of the compressor 21 detected by the discharge pressure sensor 30 to saturated temperature corresponding to the condensation temperature Tc, and subtracting the refrigerant temperature detected by the liquid side temperature sensors 44 and 54 from this saturated temperature of the refrigerant. Note that, although it is not employed in the present embodiment, a temperature sensor that detects the temperature of the refrigerant flowing through each of the indoor heat exchangers 42 and 52 may be disposed such that the subcooling degree SCr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 is detected by subtracting the refrigerant temperature corresponding to the condensation temperature Tc which is detected by this temperature sensor from the refrigerant temperature detected by the liquid side temperature sensors 44 and 54. In addition, the bypass expansion valve 62 is closed.
When the compressor 21, the outdoor fan 28, the indoor fans 43 and 53 are started in this state of the refrigerant circuit 10, low-pressure gas refrigerant is sucked into the compressor 21, compressed into high-pressure gas refrigerant, and sent to the indoor units 4 and 5 via the four-way switching valve 22, the gas side stop valve 27, and the gas refrigerant communication pipe 7.
Then, the high-pressure gas refrigerant sent to the indoor units 4 and 5 exchanges heat with the room air in the indoor heat exchangers 42 and 52 and is condensed into high-pressure liquid refrigerant. Subsequently, it is depressurized according to the opening degree of the indoor expansion valves 41 and 51 when passing through the indoor expansion valves 41 and 51.
The refrigerant that passed through the indoor expansion valves 41 and 51 is sent to the outdoor unit 2 via the liquid refrigerant communication pipe 6, is further depressurized via the liquid side stop valve 26, the subcooler 25, and the outdoor expansion valve 38, and then flows into the outdoor heat exchanger 23. Then, the refrigerant in a low-pressure gas-liquid two-phase state that flowed into the outdoor heat exchanger 23 exchanges heat with the outdoor air supplied by the outdoor fan 28, is evaporated into low-pressure gas refrigerant, and flows into the accumulator 24 via the four-way switching valve 22. Then, the low-pressure gas refrigerant that flowed into the accumulator 24 is again sucked into the compressor 21.
Such operation control as described above in the normal operation mode is performed by the controller 8 (more specifically, the indoor side controllers 47 and 57, the outdoor side controller 37, and the transmission line 8a that connects between the controllers 37, 47 and 57) that functions as a normal operation controlling means or section to perform the normal operation that includes the cooling operation and the heating operation.
<Test Operation Mode>
Next, the test operation mode is described with reference to FIGS. 1 to 3. Here, FIG. 3 is a flowchart of the test operation mode. In the present embodiment, in the test operation mode, first, the automatic refrigerant charging operation in Step S1 is performed. Subsequently, the pipe volume judging operation in Step S2 is performed, and then the initial refrigerant quantity detection operation in Step S3 is performed.
In the present embodiment, an example of a case is described where, the outdoor unit 2 in which the refrigerant is charged in advance and the indoor units 4 and 5 are installed at an installation location such as a building, and the outdoor unit 2, the indoor units 4, 5 are interconnected via the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 to configure the refrigerant circuit 10, and subsequently additional refrigerant is charged into the refrigerant circuit 10 whose refrigerant quantity is insufficient according to the volumes of the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7.
(Step S1: Automatic Refrigerant Charging Operation)
First, the liquid side stop valve 26 and the gas side stop valve 27 of the outdoor unit 2 are opened and the refrigerant circuit 10 is filled with the refrigerant that is charged in the outdoor unit 2 in advance.
Next, when a worker performing the test operation connects a refrigerant cylinder for additional charging to a service port (not shown) of the refrigerant circuit 10 and issues a command to start the test operation directly to the controller 8 or remotely by a remote controller (not shown) and the like, the controller 8 starts the process from Step S11 to Step S13 shown in FIG. 4. Here, FIG. 4 is a flowchart of the automatic refrigerant charging operation.
(Step S11: Refrigerant Quantity Judging Operation)
When a command to start the automatic refrigerant charging operation is issued, the refrigerant circuit 10, with the four-way switching valve 22 of the outdoor unit 2 in the state represented by the solid lines in FIG. 1, becomes a state where the indoor expansion valves 41 and 51 of the indoor units 4 and 5 and the outdoor expansion valve 38 are opened. Then, the compressor 21, the outdoor fan 28, and the indoor fans 43 and 53 are started, and the cooling operation is forcibly performed in all of the indoor units 4 and 5 (hereinafter referred to as “all indoor unit operation”).
Consequently, as shown in FIG. 5, in the refrigerant circuit 10, the high-pressure gas refrigerant compressed and discharged in the compressor 21 flows along a flow path from the compressor 21 to the outdoor heat exchanger 23 that functions as a condenser (see the portion from the compressor 21 to the outdoor heat exchanger 23 in the hatching area indicated by the diagonal line in FIG. 5); the high-pressure refrigerant that undergoes phase-change from a gas state to a liquid state by heat exchange with the outdoor air flows in the outdoor heat exchanger 23 that functions as a condenser (see the portion corresponding to the outdoor heat exchanger 23 in the hatching area indicated by the diagonal line and the black-lacquered hatching area in FIG. 5); the high-pressure liquid refrigerant flows along a flow path from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 including the outdoor expansion valve 38, the portion corresponding to the main refrigerant circuit side of the subcooler 25 and the liquid refrigerant communication pipe 6, and a flow path from the outdoor heat exchanger 23 to the bypass expansion valve 62 (see the portions from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 and to the bypass expansion valve 62 in the area indicated by the black hatching in FIG. 5); the low-pressure refrigerant that undergoes phase-change from a gas-liquid two-phase state to a gas state by heat exchange with the room air flows in the portions corresponding to the indoor heat exchangers 42 and 52 that function as evaporators and the portion corresponding to the bypass refrigerant circuit side of the subcooler 25 (see the portions corresponding to the indoor heat exchangers 42 and 52 and the portion corresponding to the subcooler 25 in the area indicated by the lattice hatching and the hatching indicated by the diagonal line in FIG. 5); and the low-pressure gas refrigerant flows along a flow path from the indoor heat exchangers 42 and 52 to the compressor 21 including the gas refrigerant communication pipe 7 and the accumulator 24 and a flow path from the portion corresponding to the bypass refrigerant circuit side of the subcooler 25 to the compressor 21 (see the portion from the indoor heat exchangers 42 and 52 to the compressor 21 and the portion from the portion corresponding to the bypass refrigerant circuit side of the subcooler 25 to the compressor 21 in the hatching area indicated by the diagonal line in FIG. 5). FIG. 5 is a schematic diagram to show a state of the refrigerant flowing in the refrigerant circuit 10 in a refrigerant quantity judging operation (illustrations of the four-way switching valve 22 and the like are omitted).
Next, equipment control as described below is performed to proceed to operation to stabilize the state of the refrigerant circulating in the refrigerant circuit 10. Specifically, the indoor expansion valves 41 and 51 are controlled such that the superheat degree SHr of the indoor heat exchangers 42 and 52 that function as evaporators becomes constant (hereinafter referred to as “super heat degree control”); the operation capacity of the compressor 21 is controlled such that an evaporation pressure Pe becomes constant (hereinafter referred to as “evaporation pressure control”); the air flow rate Wo of outdoor air supplied to the outdoor heat exchanger 23 by the outdoor fan 28 is controlled such that a condensation pressure Pc of the refrigerant in the outdoor heat exchanger 23 becomes constant (hereinafter referred to as “condensation pressure control”); the operation capacity of the subcooler 25 is controlled such that the temperature of the refrigerant sent from the subcooler 25 to the indoor expansion valves 41 and 51 becomes constant (hereinafter referred to as “liquid pipe temperature control”); and the air flow rate Wr of room air supplied to the indoor heat exchangers 42 and 52 by the indoor fans 43 and 53 is maintained constant such that the evaporation pressure Pe of the refrigerant is stably controlled by the above described evaporation pressure control.
Here, the reason to perform the evaporation pressure control is that the evaporation pressure Pe of the refrigerant in the indoor heat exchangers 42 and 52 that function as evaporators is greatly affected by the refrigerant quantity in the indoor heat exchangers 42 and 52 where low-pressure refrigerant flows while undergoing a phase change from a gas-liquid two-phase state to a gas state as a result of heat exchange with the room air (see the portions corresponding to the indoor heat exchangers 42 and 52 in the area indicated by the lattice hatching and hatching indicated by the diagonal line in FIG. 5, which is hereinafter referred to as “evaporator portion C”). Consequently, here, a state is created in which the refrigerant quantity in the evaporator portion C changes mainly by the evaporation pressure Pe by causing the evaporation pressure Pe of the refrigerant in the indoor heat exchangers 42 and 52 to become constant and by stabilizing the state of the refrigerant flowing in the evaporator portion C as a result of controlling the operation capacity of the compressor 21 by the motor 21 a whose rotation frequency Rm is controlled by an inverter. Note that, the control of the evaporation pressure Pe by the compressor 21 in the present embodiment is achieved in the following manner: the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors 44 and 54 of the indoor heat exchangers 42 and 52 is converted to saturation pressure; the operation capacity of the compressor 21 is controlled such that the saturation pressure becomes constant at a target low pressure Pes (in other words, the control to change the rotation frequency Rm of the motor 21 a is performed); and then a refrigerant circulation flow rate Wc flowing in the refrigerant circuit 10 is increased or decreased. Note that, although it is not employed in the present embodiment, the operation capacity of the compressor 21 may be controlled such that the suction pressure Ps of the compressor 21 detected by the suction pressure sensor 29, which is the operation state quantity equivalent to the pressure of the refrigerant at the evaporation pressure Pe of the refrigerant in the indoor heat exchangers 42 and 52, becomes constant at the target low pressure Pes, or the saturation temperature (which corresponds to the evaporation temperature Te) corresponding to the suction pressure Ps becomes constant at a target low pressure Tes. Also, the operation capacity of the compressor 21 may be controlled such that the refrigerant temperature (which corresponds to the evaporation temperature Te) detected by the liquid side temperature sensors 44 and 54 of the indoor heat exchangers 42 and 52 becomes constant at the target low pressure Tes.
Then, by performing such evaporation pressure control, the state of the refrigerant flowing in the refrigerant pipes from the indoor heat exchangers 42 and 52 to the compressor 21 including the gas refrigerant communication pipe 7 and the accumulator 24 (see the portion from the indoor heat exchangers 42 and 52 to the compressor 21 in the hatching area indicated by the diagonal line in FIG. 5, which is hereinafter referred to as “gas refrigerant distribution portion D”) becomes stabilized, creating a state where the refrigerant quantity in the gas refrigerant distribution portion D changes mainly by the evaporation pressure Pe (i.e., the suction pressure Ps), which is the operation state quantity equivalent to the pressure of the refrigerant in the gas refrigerant distribution portion D.
In addition, the reason to perform the condensation pressure control is that the condensation pressure Pc of the refrigerant is greatly affected by the refrigerant quantity in the outdoor heat exchanger 23 where high-pressure refrigerant flows while undergoing a phase change from a gas state to a liquid state as a result of heat exchange with the outdoor air (see the portions corresponding to the outdoor heat exchanger 23 in the area indicated by the diagonal line hatching and the black hatching in FIG. 5, which is hereinafter referred to as “condenser portion A”). The condensation pressure Pc of the refrigerant in the condenser portion A greatly changes due to the effect of the outdoor temperature Ta. Therefore, the air flow rate Wo of the room air supplied from the outdoor fan 28 to the outdoor heat exchanger 23 is controlled by the motor 28 a, and thereby the condensation pressure Pc of the refrigerant in the outdoor heat exchanger 23 is maintained constant and the state of the refrigerant flowing in the condenser portion A is stabilized, creating a state where the refrigerant quantity in condenser portion A changes mainly by a subcooling degree SCo at the liquid side of the outdoor heat exchanger 23 (hereinafter regarded as the outlet of the outdoor heat exchanger 23 in the description regarding the refrigerant quantity judging operation). Note that, for the control of the condensation pressure Pc by the outdoor fan 28 in the present embodiment, the discharge pressure Pd of the compressor 21 detected by the discharge pressure sensor 30, which is the operation state quantity equivalent to the condensation pressure Pc of the refrigerant in the outdoor heat exchanger 23, or the temperature of the refrigerant flowing through the outdoor heat exchanger 23 (i.e., the condensation temperature Tc) detected by the heat exchanger temperature sensor 33 is used.
Then, by performing such condensation pressure control, the high-pressure liquid refrigerant flows along a flow path from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 including the outdoor expansion valve 38, the portion on the main refrigerant circuit side of the subcooler 25, and the liquid refrigerant communication pipe 6 and a flow path from the outdoor heat exchanger 23 to the bypass expansion valve 62 of the bypass refrigerant circuit 61; the pressure of the refrigerant in the portions from the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 and to the bypass expansion valve 62 (see the area indicated by the black hatching in FIG. 5, which is hereinafter referred to as “liquid refrigerant distribution portion B”) also becomes stabilized; and the liquid refrigerant distribution portion B is sealed by the liquid refrigerant, thereby becoming a stable state.
In addition, the reason to perform the liquid pipe temperature control is to prevent a change in the density of the refrigerant in the refrigerant pipes from the subcooler 25 to the indoor expansion valves 41 and 51 including the liquid refrigerant communication pipe 6 (see the portion from the subcooler 25 to the indoor expansion valves 41 and 51 in the liquid refrigerant distribution portion B shown in FIG. 5). Performance of the subcooler 25 is controlled by increasing or decreasing the flow rate of the refrigerant flowing in the bypass refrigerant circuit 61 such that the refrigerant temperature Tlp detected by the liquid pipe temperature sensor 35 disposed at the outlet on the main refrigerant circuit side of the subcooler 25 becomes constant at a target liquid pipe temperature Tlps, and by adjusting the quantity of heat exchange between the refrigerant flowing through the main refrigerant circuit side and the refrigerant flowing through the bypass refrigerant circuit side of the subcooler 25. Note that, the flow rate of the refrigerant flowing in the bypass refrigerant circuit 61 is increased or decreased by adjustment of the opening degree of the bypass expansion valve 62. In this way, the liquid pipe temperature control is achieved in which the refrigerant temperature in the refrigerant pipes from the subcooler 25 to the indoor expansion valves 41 and 51 including the liquid refrigerant communication pipe 6 becomes constant.
Then, by performing such liquid pipe temperature constant control, even when the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 23 (i.e., the subcooling degree SCo of the refrigerant at the outlet of the outdoor heat exchanger 23) changes along with a gradual increase in the refrigerant quantity in the refrigerant circuit 10 by charging refrigerant into the refrigerant circuit 10, the effect of a change in the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 23 will remain only within the refrigerant pipes from the outlet of the outdoor heat exchanger 23 to the subcooler 25, and the effect will not extend to the refrigerant pipes from the subcooler 25 to the indoor expansion valves 41 and 51 including the liquid refrigerant communication pipe 6 in the liquid refrigerant distribution portion B.
Further, the reason to perform the superheat degree control is because the refrigerant quantity in the evaporator portion C greatly affects the quality of wet vapor of the refrigerant at the outlets of the indoor heat exchangers 42 and 52. The superheat degree SHr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 is controlled such that the superheat degree SHr of the refrigerant at the gas sides of the indoor heat exchangers 42 and 52 (hereinafter regarded as the outlets of the indoor heat exchangers 42 and 52 in the description regarding the refrigerant quantity judging operation) becomes constant at the target superheat degree SHrs (in other words, the gas refrigerant at the outlets of the indoor heat exchangers 42 and 52 is in a superheat state) by controlling the opening degree of the indoor expansion valves 41 and 51, and thereby the state of the refrigerant flowing in the evaporator portion C is stabilized.
Consequently, by performing such superheat degree control, a state is created in which the gas refrigerant reliably flows into the gas refrigerant communication portion D.
Here, as shown in FIG. 6, in Step S11, the above described various target control values are set to the most appropriate values according to the information on the indoor units 4 and 5 connected to the outdoor unit 2 (Steps S14 to S16).
Specifically, first, in Step S14, the controller 8 that functions as an information obtaining means or section (more specifically, the outdoor side controller 37) obtains information on the capacities of the indoor units 4 and 5 from the indoor units 4 and 5 via the transmission line 8 a.
Next in Step S15, the controller 8 that functions as a condition setting means or section calculates the total capacity of the indoor units 4 and 5 by adding the capacity of the indoor unit 4 and the capacity of the indoor unit 5, and sets various target control values (specifically, the target low pressure Pes, the target superheat degree SHrs, or a target air flow rate Wrs) according to the total capacity. Here, because there is a tendency that the evaporation pressure Pe and the suction pressure Ps can be made higher as the total capacity of the indoor units 4 and 5 is larger, the target low pressure Pes is set such that its value becomes higher as the total capacity of the indoor units 4 and 5 is larger so as to follow the tendency. However, when the difference between the target low pressure Pes in case of the total capacity of the indoor units 4 and 5 being small and the target low pressure Pes in case of the total capacity of the indoor units 4 and 5 being large becomes large, an error in the refrigerant quantity determined by the below described calculation of the refrigerant quantity may increase. Therefore, by setting such that the target superheat degree SHrs becomes larger and the target air flow rate Wrs becomes smaller as the total capacity of the indoor units 4 and 5 becomes larger, a rise in the target low pressure Pes along with an increase in the total capacity of the indoor units 4 and 5 is suppressed, thereby preventing an increase the difference of the target low pressure Pes by the difference of the total capacity of the indoor units 4 and 5. In addition, in the present embodiment, various target control values are provided by being stored in advance in the memory of the outdoor side controller 37 that configures the controller 8, and are set in Step S15 by being selected according to the total capacity of the indoor units 4 and 5.
Next, in Step S16, equipment control is performed which includes the condensation pressure control, liquid pipe temperature control, superheat degree control in which the target superheat degree SHrs set in Step S15 is used, evaporation pressure control in which the target low pressure Pes set in Step S15 is used, and air flow rate Wr control of the indoor fans 43 and 53 in which the target air flow rate Wrs set in Step S15 is used.
Consequently, by various control described above, the state of the refrigerant circulating in the refrigerant circuit 10 becomes stabilized, and the distribution of the refrigerant quantity in the refrigerant circuit 10 becomes constant. Therefore, when refrigerant starts to be charged into the refrigerant circuit 10 by additional refrigerant charging, which is subsequently performed, it is possible to create a state where a change in the refrigerant quantity in the refrigerant circuit 10 mainly appears as a change of the refrigerant quantity in the outdoor heat exchanger 23 (hereinafter this operation is referred to as “refrigerant quantity judging operation”).
Such control as described above is performed as the process in Step S11 by the controller 8 (more specifically, by the indoor side controllers 47 and 57, the outdoor side controller 37, and the transmission line 8 a that connects between the controllers 37, 47 and 57) that functions as a refrigerant quantity judging operation controlling means or section for performing the refrigerant quantity judging operation. In this Step S11, the controller 8 that functions as the information obtaining means and the condition setting means obtains information on the indoor units 4 and 5 from the indoor units 4 and 5 via the transmission line 8 a. Then, according to the information, the process in Steps S14 and S15 is performed in which the target control values are set as the conditions for refrigerant quantity judging operation.
Note that, unlike the present embodiment, when refrigerant is not charged in advance in the outdoor unit 2, it is necessary prior to Step S11 to charge refrigerant until the refrigerant quantity reaches a level where constituent equipment will not abnormally stop during the above described refrigerant quantity judging operation.
(Step S12: Refrigerant Quantity Calculation)
Next, additional refrigerant is charged into the refrigerant circuit 10 while performing the above described refrigerant quantity judging operation. At this time, the controller 8 that functions as a refrigerant quantity calculating means or section calculates the refrigerant quantity in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 during additional refrigerant charging in Step S12.
First, the refrigerant quantity calculating means in the present embodiment is described. The refrigerant quantity calculating means divides the refrigerant circuit 10 into a plurality of portions, calculates the refrigerant quantity for each divided portion, and thereby calculates the refrigerant quantity in the refrigerant circuit 10. More specifically, a relational expression between the refrigerant quantity in each portion and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is set for each divided portion, and the refrigerant quantity in each portion can be calculated by using these relational expressions. In the present embodiment, in a state where the four-way switching valve 22 is represented by the solid lines in FIG. 1, i.e., a state where the discharge side of the compressor 21 is connected to the gas side of the outdoor heat exchanger 23 and where the suction side of the compressor 21 is connected to the outlets of the indoor heat exchangers 42 and 52 via the gas side stop valve 27 and the gas refrigerant communication pipe 7, the refrigerant circuit 10 is divided into the following portions and a relational expression is set for each portion: a portion corresponding to the compressor 21 and a portion from the compressor 21 to the outdoor heat exchanger 23 including the four-way switching valve 22 (not shown in FIG. 5) (hereinafter referred to as “high-pressure gas pipe portion E”); a portion corresponding to the outdoor heat exchanger 23 (i.e., the condenser portion A); a portion from the outdoor heat exchanger 23 to the subcooler 25 and an inlet side half of the portion corresponding to the main refrigerant circuit side of the subcooler 25 in the liquid refrigerant distribution portion B (hereinafter referred to as “high temperature side liquid pipe portion B1”); an outlet side half of a portion corresponding to the main refrigerant circuit side of the subcooler 25 and a portion from the subcooler 25 to the liquid side stop valve 26 (not shown in FIG. 5) in the liquid refrigerant distribution portion B (hereinafter referred to as “low temperature side liquid pipe portion B2”); a portion corresponding to the liquid refrigerant communication pipe 6 in the liquid refrigerant distribution portion B (hereinafter referred to as “liquid refrigerant communication pipe portion B3”); a portion from the liquid refrigerant communication pipe 6 in the liquid refrigerant distribution portion B to the gas refrigerant communication pipe 7 in the gas refrigerant distribution portion D including portions corresponding to the indoor expansion valves 41 and 51 and the indoor heat exchangers 42 and 52 (i.e., the evaporator portion C) (hereinafter referred to as “indoor unit portion F”); a portion corresponding to the gas refrigerant communication pipe 7 in the gas refrigerant distribution portion D (hereinafter referred to as “gas refrigerant communication pipe portion G”); a portion from the gas side stop valve 27 (not shown in FIG. 5) in the gas refrigerant distribution portion D to the compressor 21 including the four-way switching valve 22 and the accumulator 24 (hereinafter referred to as “low-pressure gas pipe portion H”); and a portion from the high temperature side liquid pipe portion B1 in the liquid refrigerant distribution portion B to the low-pressure gas pipe portion H including the bypass expansion valve 62 and a portion corresponding to the bypass refrigerant circuit side of the subcooler 25 (hereinafter referred to as “bypass circuit portion I”). Next, the relational expressions set for each portion described above are described.
In the present embodiment, a relational expression between a refrigerant quantity Mog1 in the high-pressure gas pipe portion E and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is, for example, expressed by
Mog1=Vog1×ρd,
which is a function expression in which a volume Vog1 of the high-pressure gas pipe portion E in the outdoor unit 2 is multiplied by the density ρd of the refrigerant in high-pressure gas pipe portion E. Note that, the volume Vog1 of the high-pressure gas pipe portion E is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8. In addition, a density pd of the refrigerant in the high-pressure gas pipe portion E is obtained by converting the discharge temperature Td and the discharge pressure Pd.
A relational expression between a refrigerant quantity Mc in the condenser portion A and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is, for example, expressed by
Mc=kcTa+kcTc+kcSHm+kcWc+kcρc+kcρco+kc7,
which is a function expression of the outdoor temperature Ta, the condensation temperature Tc, a compressor discharge superheat degree SHm, the refrigerant circulation flow rate Wc, the saturated liquid density ρc of the refrigerant in the outdoor heat exchanger 23, and the density ρco of the refrigerant at the outlet of the outdoor heat exchanger 23. Note that, the parameters kc1 to kc7 in the above described relational expression are derived from a regression analysis of results of tests and detailed simulations and are stored in advance in the memory of the controller 8. In addition, the compressor discharge superheat degree SHm is a superheat degree of the refrigerant at the discharge side of the compressor, and is obtained by converting the discharge pressure Pd to refrigerant saturation temperature and subtracting this refrigerant saturation temperature from the discharge temperature Td. The refrigerant circulation flow rate Wc is expressed as a function of the evaporation temperature Te and the condensation temperature Tc (i.e., Wc=f(Te, Tc)). A saturated liquid density ρc of the refrigerant is obtained by converting the condensation temperature Tc. A density ρco of the refrigerant at the outlet of the outdoor heat exchanger 23 is obtained by converting the condensation pressure Pc which is obtained by converting the condensation temperature Tc and the refrigerant temperature Tco.
A relational expression between a refrigerant quantity Mol1 in the high temperature liquid pipe portion B1 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is, for example, expressed by
Mol1=Vol1×ρco,
which is a function expression in which a volume Vol1 of the high temperature liquid pipe portion B1 in the outdoor unit 2 is multiplied by the density ρco of the refrigerant in the high temperature liquid pipe portion B1 (i.e., the above described density of the refrigerant at the outlet of the outdoor heat exchanger 23). Note that, the volume Vol1 of the high-pressure liquid pipe portion B1 is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8.
A relational expression between a refrigerant quantity Mol2 in the low temperature liquid pipe portion B2 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is, for example, expressed by
Mol2=Vol2×ρlp,
which is a function expression in which a volume Vol2 of the low temperature liquid pipe portion B2 in the outdoor unit 2 is multiplied by a density ρlp of the refrigerant in the low temperature liquid pipe portion B2. Note that, the volume Vol2 of the low temperature liquid pipe portion B2 is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8. In addition, the density ρlp of the refrigerant in the low temperature liquid pipe portion B2 is the density of the refrigerant at the outlet of the subcooler 25, and is obtained by converting the condensation pressure Pc and the refrigerant temperature Tlp at the outlet of the subcooler 25.
A relational expression between a refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B3 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is, for example, expressed by
Mlp=Vlp×ρlp,
which is a function expression in which a volume Vlp of the liquid refrigerant communication pipe 6 is multiplied by the density ρlp of the refrigerant in the liquid refrigerant communication pipe portion B3 (i.e., the density of the refrigerant at the outlet of the subcooler 25). Note that, as for the volume Vlp of the liquid refrigerant communication pipe 6, because the liquid refrigerant communication pipe 6 is a refrigerant pipe arranged on site when installing the air conditioner 1 at an installation location such as a building, a value calculated on site from the information regarding the length, pipe diameter and the like is input, or information regarding the length, pipe diameter and the like is input on site and the controller 8 calculates the volume Vlp from the input information of the liquid refrigerant communication pipe 6. Or, as described below, the volume Vlp is calculated by using the operation results of the pipe volume judging operation.
A relational expression between a refrigerant quantity Mr in the indoor unit portion F and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is, for example, expressed by
Mr=krTlp+kr2×ΔT+krSHr+krWr+kr5,
which is a function expression of the refrigerant temperature Tlp at the outlet of the subcooler 25, a temperature difference ΔT in which the evaporation temperature Te is subtracted from the room temperature Tr, the superheat degree SHr of the refrigerant at the outlets of the indoor heat exchangers 42 and 52, and the air flow rate Wr of the indoor fans 43 and 53. Note that, the parameters kr1 to kr5 in the above described relational expression are derived from a regression analysis of results of tests and detailed simulations and are stored in advance in the memory of the controller 8.
Here, as shown in FIG. 7, the above described relational expressions for the refrigerant quantity Mr in the indoor unit portion F is set to the most appropriate relational expression in Step S12 according to the information on the indoor units 4 and 5 connected to the outdoor unit 2 (Steps S17 to S19).
Specifically, first, in Step S17, the controller 8 that functions as the information obtaining means obtains information on the models of the indoor units 4 and 5 from the indoor units 4 and 5 via the transmission line 8 a connected to the outdoor unit 2.
Next, in Step S18, the controller 8 that functions as the condition setting means sets the above described relational expression for the refrigerant quantity Mr according to the model of each of the indoor units 4 and 5. In the present embodiment, the values of the parameters kr1 to kr5 in the relational expression for the refrigerant quantity Mr in the indoor unit portion F are provided by being stored in advance in the memory of the outdoor side controller 37 that configures the controller 8 in a manner such that these values are collected for each model of the indoor unit, and are set in Step S18 by being selected according to the model of each of the indoor units 4 and 5.
Note that, the process in Steps S17 and S18 may be simultaneously performed with the process in Steps S14 and S15 for setting various target control values in the above described refrigerant quantity judging operation.
A relational expression between a refrigerant quantity Mgp in the gas refrigerant communication pipe portion G and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is, for example, expressed by
Mgp=Vgp×ρgp,
which is a function expression in which a volume Vgp of the gas refrigerant communication pipe 7 is multiplied by a density ρgp of the refrigerant in the gas refrigerant communication pipe portion H. Note that, as for the volume Vgp of the gas refrigerant communication pipe 7, as is the case with the liquid refrigerant communication pipe 6, because the gas refrigerant communication pipe 7 is a refrigerant pipe arranged on site when installing the air conditioner 1 at an installation location such as a building, a value calculated on site from the information regarding the length, pipe diameter and the like is input, or information regarding the length, pipe diameter and the like is input on site and the controller 8 calculates the volume Vgp from the input information of the gas refrigerant communication pipe 7. Or, as described below, the volume Vgp is calculated by using the operation results of the pipe volume judging operation. In addition, the density ρgp of the refrigerant in the gas refrigerant communication pipe portion G is an average value between a density ρs of the refrigerant at the suction side of the compressor 21 and a density ρeo of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 (i.e., the inlet of the gas refrigerant communication pipe 7). The density ρs of the refrigerant is obtained by converting the suction pressure Ps and the suction temperature Ts, and a density ρeo of the refrigerant is obtained by converting the evaporation pressure Pe, which is a converted value of the evaporation temperature Te, and an outlet temperature Teo of the indoor heat exchangers 42 and 52.
A relational expression between a refrigerant quantity Mog2 in the low-pressure gas pipe portion H and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is, for example, expressed by
Mog2=Vog2×ρs,
which is a function expression in which a volume Vog2 of the low-pressure gas pipe portion H in the outdoor unit 2 is multiplied by the density ρs of the refrigerant in the low-pressure gas pipe portion H. Note that, the volume Vog2 of the low-pressure gas pipe portion H is a value that is known prior to shipment to the installation location and is stored in advance in the memory of the controller 8.
A relational expression between a refrigerant quantity Mob in the bypass circuit portion I and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 is, for example, expressed by
Mob=kob1×ρco+kob2×ρs+kobPe+kob4,
which is a function expression of a density ρco of the refrigerant at the outlet of the outdoor heat exchanger 23, and the density ρs and evaporation pressure Pe of the refrigerant at the outlet on the bypass circuit side of the subcooler 25. Note that, the parameters kob1 to kob3 in the above described relational expression are derived from a regression analysis of results of tests and detailed simulations and are stored in advance in the memory of the controller 8. In addition, the refrigerant quantity Mob of the bypass circuit portion I may be calculated using a simpler relational expression because the refrigerant quantity there is smaller compared to the other portions. For example, it is expressed as follows:
Mob=Vob×ρe×kob5,
which is a function expression in which a volume Vob of the bypass circuit portion I is multiplied by the saturated liquid density ρe at the portion corresponding to the bypass circuit side of the subcooler 25 and a correct coefficient kob 5. Note that, the volume Vob of the bypass circuit portion I is a value that is known prior to installation of the outdoor unit 2 at the installation location and is stored in advance in the memory of the controller 8. In addition, the saturated liquid density ρe at the portion corresponding to the bypass circuit side of the subcooler 25 is obtained by converting the suction pressure Ps or the evaporation temperature Te.
Note that, in the present embodiment, one outdoor unit 2 is provided. However, when a plurality of outdoor units are connected, as for the refrigerant quantity in the outdoor unit such as Mog1, Mc, Mol1, Mol2, Mog2, and Mob, the relational expression for the refrigerant quantity in each portion is set for each of the plurality of outdoor units, and the entire refrigerant quantity in the outdoor units is calculated by adding the refrigerant quantity in each portion of the plurality of the outdoor units. Note that, relational expressions for the refrigerant quantity in each portion having parameters with different values will be used when a plurality of outdoor units with different models and capacities are connected.
As described above, in the present embodiment, by using the relational expressions for each portion in the refrigerant circuit 10, the refrigerant quantity in each portion is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant quantity judging operation, and thereby the refrigerant quantity in the refrigerant circuit 10 can be calculated. At this time, the refrigerant quantity Mr in the indoor unit portion F is calculated in Step S19 by using the relational expression set according to the model of each of the indoor units 4 and 5.
Further, this Step S12 is repeated until the condition for judging the adequacy of the refrigerant quantity in the below described Step S13 is satisfied. Therefore, in the period from the start to the completion of additional refrigerant charging, the refrigerant quantity in each portion is calculated from the operation state quantity during refrigerant charging by using the relational expressions for each portion in the refrigerant circuit 10. More specifically, a refrigerant quantity Mo in the outdoor unit 2 and the refrigerant quantity Mr in each of the indoor units 4 and 5 (i.e., the refrigerant quantity in each portion in the refrigerant circuit 10 excluding the refrigerant communication pipes 6 and 7) necessary for judgment of the adequacy of the refrigerant quantity in the below described Step S13 are calculated. Here, the refrigerant quantity Mo in the outdoor unit 2 is calculated by adding Mog1, Mc, Mol1, Mol2, Mog2, and Mob described above, each of which is the refrigerant quantity in each portion in the outdoor unit 2.
In this way, the process in Step S12 is performed by the controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity in each portion in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the automatic refrigerant charging operation. In this Step S12, the controller 8 that functions as the information obtaining means and condition setting means obtains information on the indoor units 4 and 5 from the indoor units 4 and 5 via the transmission line 8 a. Then, according to the information, the process in Steps S17 and S18 is performed in which the relational expression as the condition for the refrigerant quantity judging operation is set.
(Step S13: Judgment of the Adequacy of the Refrigerant Quantity)
As described above, when additional refrigerant charging into the refrigerant circuit 10 starts, the refrigerant quantity in the refrigerant circuit 10 gradually increases. Here, when the volumes of the refrigerant communication pipes 6 and 7 are unknown, the refrigerant quantity that should be charged into the refrigerant circuit 10 after additional refrigerant charging cannot be prescribed as the refrigerant quantity in the entire refrigerant circuit 10. However, when the focus is placed only on the outdoor unit 2 and the indoor units 4 and 5 (i.e., the refrigerant circuit 10 excluding the refrigerant communication pipes 6 and 7), it is possible to know in advance the optimal refrigerant quantity in the outdoor unit 2 in the normal operation mode by tests and detailed simulations. Therefore, additional refrigerant can be charged by the following manner: a value of this refrigerant quantity is stored in advance in the memory of the controller 8 as a target charging value Ms; the refrigerant quantity Mo in the outdoor unit 2 and a refrigerant quantity Mr in the indoor units 4 and 5 are calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the automatic refrigerant charging operation by using the above described relational expressions; and additional refrigerant is charged until a value of the refrigerant quantity obtained by adding the refrigerant quantity Mo and the refrigerant quantity Mr reaches the target charging value Ms. In other words, Step S13 is a process to judge the adequacy of the refrigerant quantity charged into the refrigerant circuit 10 by additional refrigerant charging by judging whether or not the refrigerant quantity, which is obtained by adding the refrigerant quantity Mo in the outdoor unit 2 and the refrigerant quantity Mr in the indoor units 4 and 5 in the automatic refrigerant charging operation, has reached the target charging value Ms.
Further, in Step S13, when a value of the refrigerant quantity obtained by adding the refrigerant quantity Mo in the outdoor unit 2 and the refrigerant quantity Mr in the indoor units 4 and 5 is smaller than the target charging value Ms and additional refrigerant charging has not been completed, the process in Step S13 is repeated until the target charging value Ms is reached. In addition, when a value of the refrigerant quantity obtained by adding the refrigerant quantity Mo in the outdoor unit 2 and the refrigerant quantity Mr in the indoor units 4 and 5 reaches the target charging value Ms, additional refrigerant charging is completed, and Step S1 as the automatic refrigerant charging operation process is completed.
Note that, in the above described refrigerant quantity judging operation, as the amount of additional refrigerant charged into the refrigerant circuit 10 increases, a tendency of an increase in the subcooling degree SCo at the outlet of the outdoor heat exchanger 23 appears, causing the refrigerant quantity Mc in the outdoor heat exchanger 23 to increase, and the refrigerant quantity in the other portions tends to be maintained substantially constant. Therefore, the target charging value Ms may be set as a value corresponding to only the refrigerant quantity Mo in the outdoor unit 2 but not the outdoor unit 2 and the indoor units 4 and 5, or may be set as a value corresponding to the refrigerant quantity Mc in the outdoor heat exchanger 23, and additional refrigerant may be charged until the target charging value Ms is reached.
In this way, the process in Step S13 is performed by the controller 8 that functions as the refrigerant quantity judging means for judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 in the refrigerant quantity judging operation of the automatic refrigerant charging operation (i.e., for judging whether or not the refrigerant quantity has reached the target charging value Ms).
(Step S2: Pipe Volume Judging Operation)
When the above described automatic refrigerant charging operation in Step S1 is completed, the process proceeds to the pipe volume judging operation in Step S2. In the pipe volume judging operation, the process from Step S21 to Step S25 as shown in FIG. 8 is performed by the controller 8. Here, FIG. 8 is a flowchart of the pipe volume judging operation.
(Steps S21, S22: Pipe Volume Judging Operation for Liquid Refrigerant Communication Pipe and Volume Calculation)
In Step S21, as is the case with the above described refrigerant quantity judging operation in Step S11 of the automatic refrigerant charging operation, the pipe volume judging operation for the liquid refrigerant communication pipe 6, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control, is performed. Here, the target liquid pipe temperature Tlps of the temperature Tlp of the refrigerant at the outlet on the main refrigerant circuit side of the subcooler 25 under the liquid pipe temperature control is regarded as a first target value Tlps1, and the state where the refrigerant quantity judging operation is stable at this first target value Tlps1 is regarded as a first state (see the refrigerating cycle indicated by the lines including the dotted lines in FIG. 9). Note that, FIG. 9 is a Mollier diagram to show the refrigerating cycle of the air conditioner 1 in the pipe volume judging operation for the liquid refrigerant communication pipe.
Next, the first state where the temperature Tlp of the refrigerant at the outlet on the main refrigerant circuit side of the subcooler 25 in liquid pipe temperature control is stable at the first target value Tlps1 is switched to a second state (see the refrigerating cycle indicated by the solid lines in FIG. 9) where the target liquid pipe temperature Tlps is changed to a second target value Tlps2 different from the first target value Tlps1 and stabilized without changing the conditions for other equipment controls, i.e., the conditions for the condensation pressure control, superheat degree control, and evaporation pressure control (i.e., without changing the target superheat degree SHrs and the target low pressure Tes). In the present embodiment, the second target value Tlps2 is a temperature higher than the first target value Tlps1.
In this way, by changing from the stable state at the first state to the second state, the density of the refrigerant in the liquid refrigerant communication pipe 6 decreases, and therefore a refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B3 in the second state decreases compared to the refrigerant quantity in the first state. Then, the refrigerant whose quantity has decreased in the liquid refrigerant communication pipe portion B3 moves to other portions in the refrigerant circuit 10. More specifically, as described above, the conditions for other equipment controls other than the liquid pipe temperature control are not changed, and therefore the refrigerant quantity Mog1 in the high-pressure gas pipe portion E, the refrigerant quantity Mog2 in the low-pressure gas pipe portion H, and the refrigerant quantity Mgp in the gas refrigerant communication pipe portion G are maintained substantially constant, and the refrigerant whose quantity has decreased in the liquid refrigerant communication pipe portion B3 will move to the condenser portion A, the high temperature liquid pipe portion B1, the low temperature liquid pipe portion B2, the indoor unit portion F, and the bypass circuit portion I. In other words, the refrigerant quantity Mc in the condenser portion A, the refrigerant quantity Mol1 in the high temperature liquid pipe portion B1, the refrigerant quantity Mol2 in the low temperature liquid pipe portion B2, the refrigerant quantity Mr in the indoor unit portion F, and the refrigerant quantity Mob in the bypass circuit portion I will increase by the quantity of the refrigerant that has decreased in the liquid refrigerant communication pipe portion B3.
Such control as described above is performed as the process in Step S21 by the controller 8 (more specifically, by the indoor side controllers 47 and 57, the outdoor side controller 37, and the transmission line 8 a that connects between the controllers 37, 47 and 57) that functions as pipe volume judging operation controlling means for performing the pipe volume judging operation to calculate the refrigerant quantity Mlp of the liquid refrigerant communication pipe 6.
Next in Step S22, the volume Vlp of the liquid refrigerant communication pipe 6 is calculated by utilizing a phenomenon that the refrigerant quantity in the liquid refrigerant communication pipe portion B3 decreases and the refrigerant whose quantity has decreased moves to other portions in the refrigerant circuit 10 because of the change from the first state to the second state.
First, a calculation formula used in order to calculate the volume Vlp of the liquid refrigerant communication pipe 6 is described. Provided that the quantity of the refrigerant that has decreased in the liquid refrigerant communication pipe portion B3 and moved to the other portions in the refrigerant circuit 10 by the above described pipe volume judging operation is a refrigerant increase/decrease quantity ΔMlp, and that the increase/decrease quantity of the refrigerant in each portion between the first state and the second state is ΔMc, ΔMol1, ΔMol2, ΔMr, and ΔMob (here, the refrigerant quantity Mog1, the refrigerant quantity Mog2, and the refrigerant quantity Mgp are omitted because they are maintained substantially constant), the refrigerant increase/decrease quantity ΔMlp can be, for example, calculated by the following function expression:
ΔMlp=−(ΔMc+ΔMol1+ΔMol2+ΔMr+ΔMob)
Then, this ΔMlp value is divided by a density change quantity Δρlp of the refrigerant between the first state and the second state in the liquid refrigerant communication pipe 6, and thereby the volume Vlp of the liquid refrigerant communication pipe 6 can be calculated. Note that, although there is little effect on a calculation result of the refrigerant increase/decrease quantity ΔMlp, the refrigerant quantity Mog1 and the refrigerant quantity Mog2 may be included in the above described function expression.
Vlp=ΔMlp/Δρlp
Note that, ΔMc, ΔMol1, ΔMol2, ΔMr, and ΔMob can be obtained by calculating the refrigerant quantity in the first state and the refrigerant quantity in the second state by using the above described relational expression for each portion in the refrigerant circuit 10 and further by subtracting the refrigerant quantity in the first state from the refrigerant quantity in the second state. In addition, the density change quantity Δρlp can be obtained by calculating the density of the refrigerant at the outlet of the subcooler 25 in the first state and the density of the refrigerant at the outlet of the subcooler 25 in the second state and further by subtracting the density of the refrigerant in the first state from the density of the refrigerant in the second state.
By using the calculation formula as described above, the volume Vlp of the liquid refrigerant communication pipe 6 can be calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the first and second states. Here, when calculating a refrigerant increase/decrease quantity ΔMr, the refrigerant quantity Mr in each of the indoor units 4 and 5 is calculated. Also at this time, the process in Step S17 in which information on the indoor units 4 and 5 is obtained and the process in Step S18 in which the relational expression for the refrigerant quantity is set are performed, as is the case with the calculation of the refrigerant quantity in Step S12 of the automatic refrigerant charging operation.
Note that, in the present embodiment, the state is changed such that the second target value Tlps2 in the second state becomes a temperature higher than the first target value Tlps1 in the first state and therefore the refrigerant in the liquid refrigerant communication pipe portion B3 is moved to other portions in order to increase the refrigerant quantity in the other portions; thereby the volume Vlp in the liquid refrigerant communication pipe 6 is calculated from the increased quantity. However, the state may be changed such that the second target value Tlps2 in the second state becomes a temperature lower than the first target value Tlps1 in the first state and therefore the refrigerant is moved from other portions to the liquid refrigerant communication pipe portion B3 in order to decrease the refrigerant quantity in the other portions; thereby the volume Vlp in the liquid refrigerant communication pipe 6 is calculated from the decreased quantity.
In this way, the process in Step S22 is performed by the controller 8 that functions as the pipe volume calculating means for the liquid refrigerant communication pipe, which calculates the volume Vlp of the liquid refrigerant communication pipe 6 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the pipe volume judging operation for the liquid refrigerant communication pipe 6.
(Steps S23, S24: Pipe Volume Judging Operation and Volume Calculation for the Gas Refrigerant Communication Pipe)
After the above described Step S21 and Step S22 are completed, the pipe volume judging operation for the gas refrigerant communication pipe 7, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control, is performed in Step S23. Here, the target low pressure Pes of the suction pressure Ps of the compressor 21 under the evaporation pressure control is regarded as a first target value Pes1, and the state where the refrigerant quantity judging operation is stable at this first target value Pes1 is regarded as a first state (see the refrigerating cycle indicated by the lines including the dotted lines in FIG. 10). Note that FIG. 10 is a Mollier diagram to show the refrigerating cycle of the air conditioner 1 in the pipe volume judging operation for the gas refrigerant communication pipe.
Next, the first state where the target low pressure Pes of the suction pressure Ps in the compressor 21 under evaporation pressure control is stable at the first target value Pes1 is switched to a second state (see the refrigerating cycle indicated by only the solid lines in FIG. 10) where the target low pressure Pes is changed to a second target value Pes2 different from the first target value Pes1 and stabilized without changing the conditions for other equipment controls, i.e., without changing the conditions for the liquid pipe temperature control, the condensation pressure control, and the superheat degree control (i.e., without changing target liquid pipe temperature Tlps and target superheat degree SHrs). In the present embodiment, the second target value Pes2 is a pressure lower than the first target value Pes1.
In this way, by changing the target value Pes from the stable state at the first state to the second state, the density of the refrigerant in the gas refrigerant communication pipe 7 decreases, and therefore the refrigerant quantity Mgp in the gas refrigerant communication pipe portion G in the second state decreases compared to the refrigerant quantity in the first state. Then, the refrigerant whose quantity has decreased in the gas refrigerant communication pipe portion G will move to other portions in the refrigerant circuit 10. More specifically, as described above, the conditions for other equipment controls other than the evaporation pressure control are not changed, and therefore the refrigerant quantity Mog1 in the high pressure gas pipe portion E, the refrigerant quantity Mol1 in the high-temperature liquid pipe portion B1, the refrigerant quantity Mol2 in the low temperature liquid pipe portion B2, and the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B3 are maintained substantially constant, and the refrigerant whose quantity has decreased in the gas refrigerant communication pipe portion G will move to the low-pressure gas pipe portion H, the condenser portion A, the indoor unit portion F, and the bypass circuit portion I. In other words, the refrigerant quantity Mog2 in the low-pressure gas pipe portion H, the refrigerant quantity Mc in the condenser portion A, the refrigerant quantity Mr in the indoor unit portion F; and the refrigerant quantity Mob in the bypass circuit portion I will increase by the quantity of the refrigerant that has decreased in the gas refrigerant communication pipe portion G.
Such control as described above is performed as the process in Step S23 by the controller 8 (more specifically, by the indoor side controllers 47 and 57, the outdoor side controller 37, and the transmission line 8 a that connects between the controllers 37 and 47, and 57) that functions as the pipe volume judging operation controlling means for performing the pipe volume judging operation to calculate the volume Vgp of the gas refrigerant communication pipe 7.
Next in Step S24, the volume Vgp of the gas refrigerant communication pipe 7 is calculated by utilizing a phenomenon that the refrigerant quantity in the gas refrigerant communication pipe portion G decreases and the refrigerant whose quantity has decreased moves to other portions in the refrigerant circuit 10 because of the change from the first state to the second state.
First, a calculation formula used in order to calculate the volume Vgp of the gas refrigerant communication pipe 7 is described. Provided that the quantity of the refrigerant that has decreased in the gas refrigerant communication pipe portion G and moved to the other portions in the refrigerant circuit 10 by the above described pipe volume judging operation is a refrigerant increase/decrease quantity ΔMgp, and that increase/decrease quantities of the refrigerant in respective portion between the first state and the second state are ΔMc, ΔMog2, ΔMr, and ΔMob (here, the refrigerant quantity Mog1, the refrigerant quantity Mol1, the refrigerant quantity Mol2, and the refrigerant quantity Mlp are omitted because they are maintained substantially constant), the refrigerant increase/decrease quantity ΔMgp can be, for example, calculated by the following function expression:
ΔMgp=−(ΔMc+ΔMog2+ΔMr+ΔMob).
Then, this ΔMgp value is divided by a density change quantity Δρgp of the refrigerant between the first state and the second state in the gas refrigerant communication pipe 7, and thereby the volume Vgp of the gas refrigerant communication pipe 7 can be calculated. Note that, although there is little effect on a calculation result of the refrigerant increase/decrease quantity ΔMgp, the refrigerant quantity Mog1, the refrigerant quantity Mol1, and the refrigerant quantity Mol2 may be included in the above described function expression.
Vgp=ΔMgp/Δρgp
Note that, ΔMc, ΔMog2, ΔMr and ΔMob can be obtained by calculating the refrigerant quantity in the first state and the refrigerant quantity in the second state by using the above described relational expression for each portion in the refrigerant circuit 10 and further by subtracting the refrigerant quantity in the first state from the refrigerant quantity in the second state. In addition, the density change quantity Δρgp can be obtained by calculating an average density between the density ρs of the refrigerant at the suction side of the compressor 21 in the first state and the density ρeo of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 in the first state and by subtracting the average density in the first state from the average density in the second state.
By using such calculation formula as described above, the volume Vgp of the gas refrigerant communication pipe 7 can be calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the first and second states. Here, when calculating the refrigerant increase/decrease quantity ΔMr, the refrigerant quantity Mr in each of the indoor units 4 and 5 is calculated. Also at this time, the process in Step S17 in which information on the indoor units 4 and 5 is obtained and the process in Step S18 in which the relational expression for the refrigerant quantity is set are performed, as is the case with the calculation of the refrigerant quantity in Step S12 of the automatic refrigerant charging operation.
Note that, in the present embodiment, the state is changed such that the second target value Pes2 in the second state becomes a pressure lower than the first target value Pes1 in the first state and therefore the refrigerant in the gas refrigerant communication pipe portion G is moved to other portions in order to increase the refrigerant quantity in the other portions; thereby the volume Vlp of the gas refrigerant communication pipe 7 is calculated from the increased quantity. However, the state may be changed such that the second target value Pes2 in the second state becomes a pressure higher than the first target value Pes1 in the first state and therefore the refrigerant is moved from other portions to the gas refrigerant communication pipe portion G in order to decrease the refrigerant quantity in the other portions; thereby the volume Vlp in the gas refrigerant communication pipe 7 is calculated from the decreased quantity.
In this way, the process in Step S24 is performed by the controller 8 that functions as the pipe volume calculating means for the gas refrigerant communication pipe, which calculates the volume Vgp of the gas refrigerant communication pipe 7 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the pipe volume judging operation for the gas refrigerant communication pipe 7.
(Step S25: Adequacy Judgment of the Pipe Volume Judging Operation Result)
After the above described Step S21 to Step S24 are completed, Step S25 is performed to judge whether or not a result of the pipe volume judging operation is adequate, in other words, whether or not the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 calculated by the pipe volume calculating means are adequate.
Specifically, as shown in an inequality expression below, judgment is made based on whether or not the ratio of the volume Vlp of the liquid refrigerant communication pipe 6 to the volume Vgp of the gas refrigerant communication pipe 7 obtained by the calculations is in a predetermined numerical value range.
ε1<Vlp/Vgp<ε2
Here, ε1 and ε2 are values that are changed based on the minimum value and the maximum value of the pipe volume ratio in feasible combinations of the heat source unit and the utilization units.
Then, when the volume ratio Vlp/Vgp satisfies the above described numerical value range, the process in Step S2 of the pipe volume judging operation is completed. When the volume ratio Vlp/Vgp does not satisfy the above described numerical value range, the process for the pipe volume judging operation and volume calculation in Step S21 to Step S24 is performed again.
In this way, the process in Step S25 is performed by the controller 8 that functions as the adequacy judging means for judging whether or not a result of the above described pipe volume judging operation is adequate, in other words, whether or not the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 calculated by the pipe volume calculating means are adequate.
Note that, in the present embodiment, the pipe volume judging operation (Steps S21, S22) for the liquid refrigerant communication pipe 6 is first performed and then the pipe volume judging operation for the gas refrigerant communication pipe 7 (Steps S23, S24) is performed. However, the pipe volume judging operation for the gas refrigerant communication pipe 7 may be performed first.
In addition, in the above described Step S25, when a result of the pipe volume judging operation in Steps S21 to S24 is judged to be inadequate for a plurality of times, or when it is desired to more simply judge the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7, although it is not shown in FIG. 8, for example, in Step S25, after a result of the pipe volume judging operation in Steps S21 to S24 is judged to be inadequate, it is possible to proceed to the process for estimating the lengths of the refrigerant communication pipes 6 and 7 from the pressure loss in the refrigerant communication pipes 6 and 7 and calculating the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 from the estimated pipe lengths and an average volume ratio, thereby obtaining the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7.
In addition, in the present embodiment, the case where the pipe volume judging operation is performed to calculate the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 is described on the premise that there is no information regarding the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7 and the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 are unknown. However, when the pipe volume calculating means has a function to calculate the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 by inputting information regarding the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7, such function may be used together.
Further, when the above described function to calculate the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 by using the pipe volume judging operation and the operation results thereof is not used but only the function to calculate the volumes Vlp, Vgp of the refrigerant communication pipes 6 and 7 by inputting information regarding the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7 is used, the above described adequacy judging means (Step 25) may be used to judge whether or not the input information regarding the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7 is adequate.
(Step S3: Initial Refrigerant Quantity Detection Operation)
When the above described pipe volume judging operation in Step S2 is completed, the process proceeds to an initial refrigerant quantity judging operation in Step S3. In the initial refrigerant quantity detection operation, the process in Step S31 and Step S32 shown in FIG. 11 is performed by the controller 8. Here, FIG. 11 is a flowchart of the initial refrigerant quantity detection operation.
(Step S31: Refrigerant Quantity Judging Operation)
In Step S31, as is the case with the above described refrigerant quantity judging operation in Step S11 of the automatic refrigerant charging operation, the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control, is performed. Here, as a rule, values that are the same as the target values in the refrigerant quantity judging operation in Step S11 of the automatic refrigerant charging operation are used for the target liquid pipe temperature Tlps in the liquid pipe temperature control, the target superheat degree SHrs in the superheat degree control, and the target low pressure Pes in the evaporation pressure control. In addition, as is the case with the refrigerant quantity judging operation in Step S11 of the automatic refrigerant charging operation, the process in Step S14 in which information on the indoor units 4 and 5 is obtained and the process in Step S15 in which various target control values are set are performed.
In this way, the process in Step S31 is performed by the controller 8 that functions as the refrigerant quantity judging operation controlling means for performing the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control.
(Step S32: Refrigerant Quantity Calculation)
Next, the refrigerant quantity in the refrigerant circuit 10 is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the initial refrigerant quantity judging operation in Step S32 by the controller 8 that functions as the refrigerant quantity calculating means while performing the above described refrigerant quantity judging operation. Calculation of the refrigerant quantity in the refrigerant circuit 10 is performed by using the above described relational expressions between the refrigerant quantity in each portion in the refrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10. However, at this time, the volumes Vlp and Vgp of the refrigerant communication pipes 6 and 7, which were unknown at the time of after installation of constituent equipment of the air conditioner 1, have been calculated and the values thereof are known by the above described pipe volume judging operation. Thus, by multiplying the volumes Vlp and Vgp of the refrigerant communication pipes 6 and 7 by the density of the refrigerant, the refrigerant quantities Mlp, Mgp in the refrigerant communication pipes 6 and 7 can be calculated, and further by adding the refrigerant quantity in the other each portion, the initial refrigerant quantity in the entire refrigerant circuit 10 can be detected. Here, when calculating the initial refrigerant quantity, the refrigerant quantity Mr in each of the indoor units 4 and 5 is calculated. Also at this time, the process in Step S17 in which information on the indoor units 4 and 5 is obtained and the process in Step S18 in which the relational expressions for the refrigerant quantity is set are performed, as is the case with the calculation of the refrigerant quantity in Step S12 of the automatic refrigerant charging operation. This initial refrigerant quantity is used as a reference refrigerant quantity Mi of the entire refrigerant circuit 10, which serves as the reference for judging whether or not there is a refrigerant leak from the refrigerant circuit 10 in the below described refrigerant leak detection operation. Therefore, it is stored as a value of the operation state quantity in the memory of the controller 8 as state quantity storing means.
In this way, the process in Step S32 is performed by the controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity in each portion in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the initial refrigerant quantity detecting operation.
<Refrigerant Leak Detection Operation Mode>
Next, the refrigerant leak detection operation mode is described with reference to FIGS. 1, 2, 5, and 12. Here, FIG. 12 is a flowchart of the refrigerant leak detection operation mode.
In the present embodiment, an example of a case is described where, whether or not the refrigerant in the refrigerant circuit 10 is leaking to the outside due to an unforeseen factor is detected periodically (for example, during a period of time such as on a holiday or in the middle of the night when air conditioning is not needed).
(Step S41: Refrigerant Quantity Judging Operation)
First, when operation in the normal operation mode such as the above described cooling operation and heating operation has gone on for a certain period of time (for example, half a year to a year), the normal operation mode is automatically or manually switched to the refrigerant leak detection operation mode, and as is the case with the refrigerant quantity judging operation of the initial refrigerant quantity detection operation, the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control, is performed. Here, as a rule, values that are the same as the target values in Step S31 of the refrigerant quantity judging operation of the initial refrigerant quantity detection operation are used for the target liquid pipe temperature Tlps in the liquid pipe temperature control, the target superheat degree SHrs in the superheat degree control, and the target low pressure Pes in the evaporation pressure control. In addition, as is the case with the refrigerant quantity judging operation in Step S11 of the automatic refrigerant charging operation, the process in Step S14 in which information on the indoor units 4 and 5 is obtained and the process in Step S15 in which various target control values are set are performed.
Note that, this refrigerant quantity judging operation is performed for each time the refrigerant leak detection operation is performed. Even when the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 23 fluctuates due to the different operating conditions, for example, such as when the condensation pressure Pc is different or when there is a refrigerant leak, the refrigerant temperature Tlp in the liquid refrigerant communication pipe 6 is maintained constant at the same target liquid pipe temperature Tlps by the liquid pipe temperature control.
In this way, the process in Step S41 is performed by the controller 8 that functions as the refrigerant quantity judging operation controlling means for performing the refrigerant quantity judging operation, including the all indoor unit operation, condensation pressure control, liquid pipe temperature control, superheat degree control, and evaporation pressure control.
(Step S42: Refrigerant Quantity Calculation)
Next, the refrigerant quantity in the refrigerant circuit 10 is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant leak detection operation in Step S42 by the controller 8 that functions as the refrigerant quantity calculating means while performing the above described refrigerant quantity judging operation. Calculation of the refrigerant quantity in the refrigerant circuit 10 is performed by using the above described relational expression between the refrigerant quantity in each portion in the refrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10. However, at this time, as is the case with the initial refrigerant quantity judging operation, the volumes Vlp and Vgp of the refrigerant communication pipes 6 and 7, which were unknown at the time of after installation of constituent equipment of the air conditioner 1, have been calculated and the values thereof are known by the above described pipe volume judging operation. Thus, by multiplying the volumes Vlp and Vgp of the refrigerant communication pipes 6 and 7 by the density of the refrigerant, the refrigerant quantities Mlp, Mgp in the refrigerant communication pipes 6 and 7 can be calculated, and further by adding the refrigerant quantity in the other each portion, the refrigerant quantity M in the entire refrigerant circuit 10 can be calculated. Here, when calculating the initial refrigerant quantity, the refrigerant quantity Mr in each of the indoor units 4 and 5 is calculated. Also at this time, the process in Step S17 in which information on the indoor units 4 and 5 is obtained and the process in Step S18 in which the relational expression for the refrigerant quantity is set are performed, as is the case with the calculation of the refrigerant quantity in Step S12 of the automatic refrigerant charging operation.
Here, as described above, the refrigerant temperature Tlp in the liquid refrigerant communication pipe 6 is maintained constant at the target liquid pipe temperature Tlps by the liquid pipe temperature control. Therefore, regardless the difference in the operating conditions for the refrigerant leak detection operation, the refrigerant quantity Mlp in the liquid refrigerant communication pipe portion B3 will be maintained constant even when the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 23 changes.
In this way, the process in Step S42 is performed by the controller 8 that functions as the refrigerant quantity calculating means for calculating the refrigerant quantity at each portion in the refrigerant circuit 10 from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant leak detection operation.
(Steps S43, S44: Adequacy Judgment of the Refrigerant Quantity, Warning Display)
When refrigerant leaks from the refrigerant circuit 10, the refrigerant quantity in the refrigerant circuit 10 decreases. Then, when the refrigerant quantity in the refrigerant circuit 10 decreases, mainly, a tendency of a decrease in the subcooling degree SCo at the outlet of the outdoor heat exchanger 23 appears. Along with this, the refrigerant quantity Mc in the outdoor heat exchanger 23 decreases, and the refrigerant quantities in other portions tend to be maintained substantially constant. Consequently, the refrigerant quantity M of the entire refrigerant circuit 10 calculated in the above described Step S42 is smaller than the reference refrigerant quantity Mi detected in the initial refrigerant quantity detection operation when there is a refrigerant leak from the refrigerant circuit 10; whereas when there is no refrigerant leak from the refrigerant circuit 10, the refrigerant quantity M is substantially the same as the reference refrigerant quantity Mi.
By utilizing the above-described characteristics, whether or not there is a refrigerant leak is judged in Step S43. When it is judged in Step S43 that there is no refrigerant leak from the refrigerant circuit 10, the refrigerant leak detection operation mode is finished.
On the other hand, when it is judged in Step S43 that there is a refrigerant leak from the refrigerant circuit 10, the process proceeds to Step S44, and a warning indicating that a refrigerant leak is detected is displayed on the warning display 9. Subsequently, the refrigerant leak detection operation mode is finished.
In this way, the process from Steps S42 to S44 is performed by the controller 8 that functions as the refrigerant leak detection means, which is one of the refrigerant quantity judging means, and which detects whether or not there is a refrigerant leak by judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 while performing the refrigerant quantity judging operation in the refrigerant leak detection operation mode.
As described above, in the air conditioner 1 in the present embodiment, the controller 8 functions as the refrigerant quantity judging operation means, the refrigerant quantity calculating means, the refrigerant quantity judging means, the pipe volume judging operation means, the pipe volume calculating means, the adequacy judging means, information obtaining means, the condition setting means, and the state quantity storing means, and thereby configures the refrigerant quantity judging system for judging the adequacy of the refrigerant quantity charged into the refrigerant circuit 10.
(3) Characteristics of the Air Conditioner
The air conditioner 1 in the present embodiment has the following characteristics.
(A)
In the air conditioner 1 in the present embodiment, the information on the indoor units 4 and 5 as the utilization units connected to the outdoor unit 2 as the heat source unit via the transmission line 8 a is obtained, and the condition for the refrigerant quantity judging operation is set according to the information on the indoor units 4 and 5. Thus, the refrigerant quantity judging operation and judgment of the adequacy of the refrigerant quantity in the refrigerant circuit can be appropriately performed according to the connection condition for the indoor units 4 and 5. In this way, in this air conditioner 1, it is possible to judge the adequacy of the refrigerant quantity in the refrigerant circuit 10 with high accuracy while reducing the labor of inputting information on the indoor units 4 and 5.
(B)
In the air conditioner 1 in the present embodiment, an approach is employed in which the refrigerant quantity in the refrigerant circuit 10 is calculated from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant quantity judging operation by using the relational expressions between the refrigerant quantity in the refrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10; and the adequacy of the refrigerant quantity in the refrigerant circuit 10 is judged by using the refrigerant quantity calculated. However, in the air conditioner 1, because it is premised that various types of indoor units 4 and 5 are connected to the outdoor unit 2, in the case where it is wished to enable a highly accurate judgment of the adequacy of the refrigerant quantity when judging the adequacy of the refrigerant quantity in the refrigerant circuit 10 by this approach, it is desirable to set the relational expressions according to the models of the indoor units 4 and 5. Therefore, this air conditioner 1 is configured such that the relational expression (specifically, the relational expression for the refrigerant quantity Mr in the indoor unit portion F) can be set according to the models of the indoor units 4 and 5. In this way, in this air conditioner 1, it is possible to judge the adequacy of the refrigerant quantity in the refrigerant circuit 10 by using the appropriate relational expressions between the refrigerant quantity in the refrigerant circuit 10 and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10, according to the models of the indoor units 4 and 5 connected to the outdoor unit 2.
Further, in the present embodiment, the relational expressions to calculate the refrigerant quantity are provided separately for the indoor units 4 and 5 and the portions other than the indoor units 4 and 5. Thus, when setting relational expressions for the refrigerant quantity in the entire refrigerant circuit 10 according to the models of the indoor units 4 and 5, only the relational expressions for the refrigerant quantity in the indoor units 4 and 5 need to be changed. In this way, the relational expressions for the refrigerant quantity in the entire refrigerant circuit 10 can be used for a diversity of models of the indoor units 4 and 5, and thus a calculation process can be smoothly performed.
(C)
In the air conditioner 1 in the present embodiment, it is premised that various types of indoor units 4 and 5 are connected to the outdoor unit 2. Consequently, in the case where it is wished to enable a highly accurate judgment of the adequacy of the refrigerant quantity when judging the adequacy of the refrigerant quantity in the refrigerant circuit 10, it is desirable to set the target control values of constituent equipment in the refrigerant quantity judging operation (specifically, the refrigerant quantity judging operation in the automatic refrigerant charging operation, the initial refrigerant quantity detection operation, and the refrigerant leak detection operation) according to the total capacity of the indoor units 4 and 5 connected to the outdoor unit 2. Therefore, in this air conditioner 1, the target control values (specifically, the target low pressure Pes, the target superheat degree SHrs, and the target air flow rate Wrs) of constituent equipment in the refrigerant quantity judging operation can be set according to the information on the capacities of the indoor units 4 and 5. In this way, in this air conditioner 1, it is possible to perform the refrigerant quantity judging operation by using appropriate target control values according to the capacities of the indoor units 4 and 5 connected to the outdoor unit 2.
(D)
In the air conditioner 1 in the present embodiment, the refrigerant circuit 10 is divided into a plurality of portions, and the relational expression between the refrigerant quantity and the operation state quantity is set for each portion. Consequently, compared to the conventional case where a simulation of characteristics of a refrigerating cycle is performed, the calculation load can be reduced, and the operation state quantity that is important for calculation of the refrigerant quantity in each portion can be selectively incorporated as a variable of the relational expression, thus improving the calculation accuracy of the refrigerant quantity in each portion. As a result, the adequacy of the refrigerant quantity in the refrigerant circuit 10 can be judged with high accuracy.
For example, by using the relational expressions, the controller 8 as the refrigerant quantity calculating means can quickly calculate the refrigerant quantity in each portion from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the automatic refrigerant charging operation in which the refrigerant is charged into the refrigerant circuit 10. Moreover, by using the calculated refrigerant quantity in each portion, the controller 8 as the refrigerant quantity judging means can judge with high accuracy whether or not the refrigerant quantity in the refrigerant circuit 10 (specifically, a value obtained by adding the refrigerant quantity Mo in the outdoor unit 2 and the refrigerant quantity Mr in the indoor units 4 and 5) has reached the target charging value Ms.
In addition, by using the relational expressions, the controller 8 can quickly calculate the initial refrigerant quantity as the reference refrigerant quantity Mi by calculating the refrigerant quantity in each portion from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the initial refrigerant quantity detection operation in which the initial refrigerant quantity after constituent equipment is installed or after the refrigerant is charged into the refrigerant circuit 10 is detected. Moreover, it is possible to detect the initial refrigerant quantity with high accuracy.
Further, by using the relational expressions, the controller 8 can quickly calculate the refrigerant quantity in each portion from the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10 in the refrigerant leak detection operation in which whether or not there is a refrigerant leak from the refrigerant circuit 10 is judged. Moreover, the controller 8 can judge with high accuracy whether or not the refrigerant is leaking from the refrigerant circuit 10 by comparison between the calculated refrigerant quantity in each portion and the reference refrigerant quantity Mi that serves as a reference for judging whether or not the refrigerant is leaking.
(E)
In the air conditioner 1 in the present embodiment, the subcooler 25 is disposed as the temperature adjustment mechanism capable of adjusting the temperature of the refrigerant sent from the outdoor heat exchanger 23 as a condenser to the indoor expansion valves 41 and 51 as expansion mechanisms. Performance of the subcooler 25 is controlled such that the temperature Tlp of the refrigerant sent from the subcooler 25 to the indoor expansion valves 41 and 51 as expansion mechanisms is maintained constant during the refrigerant quantity judging operation, thereby preventing a change in the density ρlp of the refrigerant in the refrigerant pipes from the subcooler 25 to the indoor expansion valves 41 and 51. Therefore, even when the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 23 as a condenser is different each time the refrigerant quantity judging operation is performed, the effect of the temperature difference of the refrigerant as described above will remain only within the refrigerant pipes from the outlet of the outdoor heat exchanger 23 to the subcooler 25, and the error in judgment due to the difference in the temperature Tco of the refrigerant at the outlet of the outdoor heat exchanger 23 (i.e., the difference in the density of the refrigerant) can be reduced when judging the refrigerant quantity.
In particular, as is the case with the present embodiment where the outdoor unit 2 as a heat source unit and the indoor units 4 and 5 as utilization units are interconnected via the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7, the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7 that connect between the outdoor unit 2 and the indoor units 4 and 5 are different depending on conditions such as installation location. Therefore, when the volumes of the refrigerant communication pipes 6 and 7 are large, the difference in the refrigerant temperature Tco at the outlet of the outdoor heat exchanger 23 will be the difference in the temperature of the refrigerant in the liquid refrigerant communication pipe 6 that configures a large portion of the refrigerant pipes from the outlet of the outdoor heat exchanger 23 to the indoor expansion valves 41 and 51 and thus the error in judgment tends to increase. However, as described above, along with the disposition of the subcooler 25, performance of the subcooler 25 is controlled such that the temperature Tlp of the refrigerant in the liquid refrigerant communication pipe 6 is constant during the refrigerant quantity judging operation, thereby preventing a change in the density ρlp of the refrigerant in the refrigerant pipes from the subcooler 25 to the indoor expansion valves 41 and 51. As a result, the error in judgment due to the difference in the temperature Tco of the refrigerant at the outlet of the outdoor heat exchanger 23 (i.e., the difference in the density of the refrigerant) can be reduced when judging the refrigerant quantity.
For example, during the automatic refrigerant charging operation in which the refrigerant is charged into the refrigerant circuit 10, it is possible to judge with high accuracy whether or not the refrigerant quantity in the refrigerant circuit 10 has reached the target charging value Mi. In addition, during the initial refrigerant quantity detection operation in which the initial refrigerant quantity after constituent equipment is installed or after the refrigerant is charged into the refrigerant circuit 10 is detected, the initial refrigerant quantity can be detected with high accuracy. In addition, during the refrigerant leak detection operation in which whether or not there is a refrigerant leak from the refrigerant circuit 10 is judged, whether or not there is a refrigerant leak from the refrigerant circuit 10 can be judged with high accuracy.
In addition, in the air conditioner 1 in the present embodiment, a change in the density ρgp of the refrigerant sent from the indoor heat exchangers 42 and 52 to the compressor 21 is prevented by controlling constituent equipment such that the pressure (for example, the suction pressure Ps and the evaporation pressure Pe) of the refrigerant sent from the indoor heat exchangers 42 and 52 as evaporators to the compressor 21 or the operation state quantity (for example, the evaporation temperature Te) equivalent to the aforementioned pressure becomes constant during the refrigerant quantity judging operation. As a result, the error in judgment due to the difference (i.e., the difference in the density of the refrigerant) in the pressure of the refrigerant at the outlets of the indoor heat exchangers 42 and 52 or the operation state quantity equivalent to the aforementioned pressure can be reduced when judging the refrigerant quantity.
(F)
In the air conditioner 1 in the present embodiment, the pipe volume judging operation is performed in which two states are created where the density of the refrigerant flowing in the refrigerant communication pipes 6 and 7 is different between the two states. Then, the increase/decrease quantity of the refrigerant between these two states is calculated from the refrigerant quantity in the portions other than the refrigerant communication pipes 6 and 7, and the increase/decrease quantity of the refrigerant is divided by the density change quantity of the refrigerant in the refrigerant communication pipes 6 and 7 between the first state and the second state, thereby the volumes of the refrigerant communication pipes 6 and 7 are calculated. Therefore, for example, even when the volumes of the refrigerant communication pipes 6 and 7 are unknown at the time of after installation of constituent equipment, the volumes of the refrigerant communication pipes 6 and 7 can be detected. Accordingly, the volumes of the refrigerant communication pipes 6 and 7 can be obtained while reducing the labor of inputting information of the refrigerant communication pipes 6 and 7.
Also, in the air conditioner 1, the adequacy of the refrigerant quantity in the refrigerant circuit 10 can be judged by using the volumes of the refrigerant communication pipes 6 and 7 calculated by the pipe volume calculating means and the operation state quantity of constituent equipment or refrigerant flowing in the refrigerant circuit 10. Therefore, even when the volumes of the refrigerant communication pipes 6 and 7 are unknown at the time of after installation of constituent equipment, the adequacy of the refrigerant quantity in the refrigerant circuit 10 can be judged with high accuracy.
For example, even when the volumes of the refrigerant communication pipes 6 and 7 are unknown at the time of after installation of constituent equipment, the refrigerant quantity in the refrigerant circuit 10 in the initial refrigerant quantity judging operation can be calculated by using the volumes of the refrigerant communication pipes 6 and 7 calculated by the pipe volume calculating means. In addition, even when the volumes of the refrigerant communication pipes 6 and 7 are unknown at the time of after installation of constituent equipment, the refrigerant quantity in the refrigerant circuit 10 in the refrigerant leak detection operation can be calculated by using the volumes of the refrigerant communication pipes 6 and 7 calculated by the pipe volume calculating means. Accordingly, it is possible to detect the initial refrigerant quantity necessary for detecting a refrigerant leak from the refrigerant circuit 10 and judge with high accuracy whether or not the refrigerant is leaking from the refrigerant circuit 10 while reducing the labor of inputting information of the refrigerant communication pipes.
(G)
In the air conditioner 1 in the present embodiment, the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7 are calculated from the information regarding the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 (for example, operation results of the pipe volume judging operation and information regarding the lengths, pipe diameters and the like of the refrigerant communication pipes 6 and 7, which is input by the operator and the like). Then, based on the results obtained by calculating the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7, whether or not the information regarding the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7 used for the calculation is adequate is judged. Therefore, when it is judged to be adequate, the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7 can be accurately obtained; whereas when it is judged to be inadequate, it is possible to handle the situation by, for example, re-inputting appropriate information regarding the liquid refrigerant communication pipe 6 and the gas refrigerant communication pipe 7, re-performing the pipe volume judging operation, and the like. Moreover, such judgment method is not to judge the adequacy by individually checking the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7 obtained by the calculation, but to judge the adequacy by checking whether or not the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7 satisfy a predetermined relation. Therefore, an appropriate judgment can be made which also takes into consideration a relative relation between the volume Vlp of the liquid refrigerant communication pipe 6 and the volume Vgp of the gas refrigerant communication pipe 7.
(4) Other Embodiment
While a preferred embodiment of the present invention has been described with reference to the figures, the scope of the present invention is not limited to the above embodiment, and the various changes and modifications may be made without departing from the scope of the present invention.
For example, in the above described embodiment, an example in which the present invention is applied to an air conditioner capable of switching and performing the cooling operation and heating operation is described. However, it is not limited thereto, and the present invention may be applied to different types of air conditioners such as a cooling only air conditioner and the like. In addition, in the above described embodiment, an example in which the present invention is applied to an air conditioner including a single outdoor unit is described. However, it is not limited thereto, and the present invention may be applied to an air conditioner including a plurality of outdoor units.
Industrial Applicability
When the present invention is used, the labor of inputting information on the utilization unit before operating a separate type air conditioner is reduced, and at the same time, the adequacy of the refrigerant quantity in the refrigerant circuit can be judged with high accuracy.

Claims (15)

What is claimed is:
1. An air conditioner comprising:
a refrigerant circuit configured to interconnect a heat source unit and a utilization unit;
a transmission line configured to exchange a signal between the heat source unit and the utilization unit;
an information obtaining section configured to obtain information on the utilization unit connected to the heat source unit via the transmission line;
an operation controlling section configured to perform a refrigerant quantity judging operation;
a refrigerant quantity judging section configured to judge adequacy of a refrigerant quantity in the refrigerant circuit by using
an operation state quantity of constituent equipment of the heat source unit and the utilization unit, or
an operation state quantity of refrigerant flowing in the refrigerant circuit in the refrigerant quantity judging operation;
a condition setting section configured to set a condition for the refrigerant quantity judging operation according to the information on the utilization unit obtained by the information obtaining section, the condition setting section setting at least one relational expression between the refrigerant quantity in the refrigerant circuit and the operation state quantity as the condition for the refrigerant quantity judging operation, according to a model of the utilization unit obtained by the information obtaining section; and
a refrigerant quantity calculating section configured to calculate the refrigerant quantity in the refrigerant circuit from the operation state quantity in the refrigerant quantity judging operation by using the at least one relational expression, and
the refrigerant quantity judging section judging the adequacy of the refrigerant quantity in the refrigerant circuit by using the refrigerant quantity in the refrigerant circuit calculated by the refrigerant quantity calculating section.
2. The air conditioner according to claim 1, wherein
relational expressions are provided separately for the utilization unit and portions of the air conditioner other than the utilization unit, and
the condition setting section sets the relational expressions provided for the refrigerant quantity in the utilization unit according to the model of the utilization unit obtained by the information obtaining section.
3. The air conditioner according claim 2, wherein
the condition setting section sets a target control value of the constituent equipment of the heat source unit and the utilization unit in the refrigerant quantity judging operation as the condition for the refrigerant quantity judging operation according to the capacity of the utilization unit.
4. The air conditioner according to claim 3, wherein
the heat source unit includes a compressor and a heat source side heat exchanger,
the utilization unit includes an expansion mechanism and a utilization side heat exchanger,
the refrigerant circuit is configured to interconnect the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger, and
the operation controlling section causes the utilization side heat exchanger to function as an evaporator for the refrigerant and also controls the constituent equipment of the heat source unit and the utilization unit such that a pressure of the refrigerant sent from the utilization side heat exchanger to the compressor or an operation state quantity equivalent to said pressure becomes constant at a target low pressure used as the target control value in the refrigerant quantity judging operation.
5. The air conditioner according to claim 3, wherein
the heat source unit includes a compressor and a heat source side heat exchanger,
the utilization unit includes an expansion mechanism and a utilization side heat exchanger,
the refrigerant circuit is configured to interconnect the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger, and
the operation controlling section causes the utilization side heat exchanger to function as an evaporator for the refrigerant and also controls the constituent equipment of the heat source unit and the utilization unit such that a superheat degree of the refrigerant sent from the utilization side heat exchanger to the compressor becomes constant at a target superheat degree used as the target control value in the refrigerant quantity judging operation.
6. The air conditioner according to claim 3, wherein
the heat source unit includes a compressor and a heat source side heat exchanger,
the utilization unit includes an expansion mechanism, a utilization side heat exchanger, and a ventilation fan that supplies air to the utilization side heat exchanger,
the refrigerant circuit is configured to interconnect the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger, and
the operation controlling section causes the utilization side heat exchanger to function as an evaporator for the refrigerant and also performs control such that an air flow rate of the ventilation fan becomes constant at a target air flow rate used as the target control value in the refrigerant quantity judging operation.
7. The air conditioner according claim 1, wherein
the condition setting section sets a target control value of the constituent equipment of the heat source unit and the utilization unit in the refrigerant quantity judging operation as the condition for the refrigerant quantity judging operation according to the capacity of the utilization unit.
8. The air conditioner according to claim 7, wherein
the heat source unit includes a compressor and a heat source side heat exchanger,
the utilization unit includes an expansion mechanism and a utilization side heat exchanger,
the refrigerant circuit is configured to interconnect the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger, and
the operation controlling section causes the utilization side heat exchanger to function as an evaporator for the refrigerant and also controls the constituent equipment of the heat source unit and the utilization unit such that a pressure of the refrigerant sent from the utilization side heat exchanger to the compressor or an operation state quantity equivalent to said pressure becomes constant at a target low pressure used as the target control value in the refrigerant quantity judging operation.
9. The air conditioner according to claim 7, wherein
the heat source unit includes a compressor and a heat source side heat exchanger,
the utilization unit includes an expansion mechanism and a utilization side heat exchanger,
the refrigerant circuit is configured to interconnect the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger, and
the operation controlling section causes the utilization side heat exchanger to function as an evaporator for the refrigerant and also controls the constituent equipment of the heat source unit and the utilization unit such that a superheat degree of the refrigerant sent from the utilization side heat exchanger to the compressor becomes constant at a target superheat degree used as the target control value in the refrigerant quantity judging operation.
10. The air conditioner according to claim 7, wherein
the heat source unit includes a compressor and a heat source side heat exchanger,
the utilization unit includes an expansion mechanism, a utilization side heat exchanger, and a ventilation fan that supplies air to the utilization side heat exchanger,
the refrigerant circuit is configured to interconnect the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger, and
the operation controlling section causes the utilization side heat exchanger to function as an evaporator for the refrigerant and also performs control such that an air flow rate of the ventilation fan becomes constant at a target air flow rate used as the target control value in the refrigerant quantity judging operation.
11. An air conditioner comprising:
a refrigerant circuit configured to interconnect a heat source unit and a utilization unit;
a transmission line configured to exchange a signal between the heat source unit and the utilization unit;
an information obtaining section configured to obtain information on the utilization unit connected to the heat source unit via the transmission line;
an operation controlling section configured to perform a refrigerant quantity judging operation;
a refrigerant quantity judging section configured to judge adequacy of a refrigerant quantity in the refrigerant circuit by using
an operation state quantity of constituent equipment of the heat source unit and the utilization unit, or
an operation state quantity of refrigerant flowing in the refrigerant circuit in the refrigerant quantity judging operation; and
a condition setting section configured to set a condition for the refrigerant quantity judging operation according to the information on the utilization unit obtained by the information obtaining section;
the condition setting section setting a target control value of the constituent equipment of the heat source unit and the utilization unit in the refrigerant quantity judging operation as the condition for the refrigerant quantity judging operation according to a capacity of the utilization unit.
12. The air conditioner according to claim 11, wherein
the heat source unit includes a compressor and a heat source side heat exchanger,
the utilization unit includes an expansion mechanism and a utilization side heat exchanger,
the refrigerant circuit is configured to interconnect the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger, and
the operation controlling section causes the utilization side heat exchanger to function as an evaporator for the refrigerant and also controls the constituent equipment of the heat source unit and the utilization unit such that a pressure of the refrigerant sent from the utilization side heat exchanger to the compressor or an operation state quantity equivalent to said pressure becomes constant at a target low pressure used as the target control value in the refrigerant quantity judging operation.
13. The air conditioner according to claim 11, wherein
the heat source unit includes a compressor and a heat source side heat exchanger,
the utilization unit includes an expansion mechanism and a utilization side heat exchanger,
the refrigerant circuit is configured to interconnect the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger, and
the operation controlling section causes the utilization side heat exchanger to function as an evaporator for the refrigerant and also controls the constituent equipment of the heat source unit and the utilization unit such that a superheat degree of the refrigerant sent from the utilization side heat exchanger to the compressor becomes constant at a target superheat degree used as the target control value in the refrigerant quantity judging operation.
14. The air conditioner according to claim 11, wherein
the heat source unit includes a compressor and a heat source side heat exchanger,
the utilization unit includes an expansion mechanism, a utilization side heat exchanger, and a ventilation fan that supplies air to the utilization side heat exchanger,
the refrigerant circuit is configured to interconnect the compressor, the heat source side heat exchanger, the expansion mechanism, and the utilization side heat exchanger, and
the operation controlling section causes the utilization side heat exchanger to function as an evaporator for the refrigerant and also performs control such that an air flow rate of the ventilation fan becomes constant at a target air flow rate used as the target control value in the refrigerant quantity judging operation.
15. The air conditioner according to claim 11, wherein
the utilization unit includes multiple utilization units and the refrigerant circuit is configured to interconnect the multiple utilization units,
the condition setting section sets the target control value of the constituent equipment of the heat source unit and the multiple utilization units in the refrigerant quantity judging operation as the condition for the refrigerant quantity judging operation according to a total capacity of the multiple utilization units.
US12/096,806 2005-12-16 2006-12-12 Air conditioner Active 2033-02-17 US9303908B2 (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2005-363736 2005-12-16
JP2005363736A JP4120676B2 (en) 2005-12-16 2005-12-16 Air conditioner
PCT/JP2006/324727 WO2007069587A1 (en) 2005-12-16 2006-12-12 Air conditioner

Publications (2)

Publication Number Publication Date
US20090151374A1 US20090151374A1 (en) 2009-06-18
US9303908B2 true US9303908B2 (en) 2016-04-05

Family

ID=38162895

Family Applications (1)

Application Number Title Priority Date Filing Date
US12/096,806 Active 2033-02-17 US9303908B2 (en) 2005-12-16 2006-12-12 Air conditioner

Country Status (8)

Country Link
US (1) US9303908B2 (en)
EP (1) EP1970655B1 (en)
JP (1) JP4120676B2 (en)
KR (1) KR20080081946A (en)
CN (1) CN101331370B (en)
AU (1) AU2006324602B2 (en)
ES (1) ES2734899T3 (en)
WO (1) WO2007069587A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11927377B2 (en) 2014-09-26 2024-03-12 Waterfurnace International, Inc. Air conditioning system with vapor injection compressor
US11953239B2 (en) 2018-08-29 2024-04-09 Waterfurnace International, Inc. Integrated demand water heating using a capacity modulated heat pump with desuperheater

Families Citing this family (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7412842B2 (en) 2004-04-27 2008-08-19 Emerson Climate Technologies, Inc. Compressor diagnostic and protection system
US7275377B2 (en) 2004-08-11 2007-10-02 Lawrence Kates Method and apparatus for monitoring refrigerant-cycle systems
US8590325B2 (en) 2006-07-19 2013-11-26 Emerson Climate Technologies, Inc. Protection and diagnostic module for a refrigeration system
US20080216494A1 (en) 2006-09-07 2008-09-11 Pham Hung M Compressor data module
US20090037142A1 (en) 2007-07-30 2009-02-05 Lawrence Kates Portable method and apparatus for monitoring refrigerant-cycle systems
US9140728B2 (en) 2007-11-02 2015-09-22 Emerson Climate Technologies, Inc. Compressor sensor module
JP5130910B2 (en) * 2007-12-28 2013-01-30 ダイキン工業株式会社 Air conditioner and refrigerant quantity determination method
US20110005254A1 (en) * 2009-07-10 2011-01-13 Lin Guang Shun Environmental Protection and Energy Saving Heater
JP5116739B2 (en) * 2009-09-09 2013-01-09 三菱電機株式会社 Air conditioner and air conditioner remote controller
CN103597292B (en) 2011-02-28 2016-05-18 艾默生电气公司 For the heating of building, surveillance and the supervision method of heating ventilation and air-conditioning HVAC system
JP5594267B2 (en) * 2011-09-12 2014-09-24 ダイキン工業株式会社 Refrigeration equipment
US8964338B2 (en) 2012-01-11 2015-02-24 Emerson Climate Technologies, Inc. System and method for compressor motor protection
JP5940378B2 (en) * 2012-06-01 2016-06-29 株式会社東芝 MRI apparatus unit cooling apparatus and MRI apparatus
US9310439B2 (en) 2012-09-25 2016-04-12 Emerson Climate Technologies, Inc. Compressor having a control and diagnostic module
CN103912968B (en) * 2013-01-04 2016-06-08 广东美的制冷设备有限公司 A kind of conditioner permanent wind amount output control method and device
US9803902B2 (en) 2013-03-15 2017-10-31 Emerson Climate Technologies, Inc. System for refrigerant charge verification using two condenser coil temperatures
US9551504B2 (en) 2013-03-15 2017-01-24 Emerson Electric Co. HVAC system remote monitoring and diagnosis
US9638436B2 (en) 2013-03-15 2017-05-02 Emerson Electric Co. HVAC system remote monitoring and diagnosis
EP2981772B1 (en) 2013-04-05 2022-01-12 Emerson Climate Technologies, Inc. Heat-pump system with refrigerant charge diagnostics
JP2014213609A (en) * 2013-04-22 2014-11-17 株式会社デンソー Vehicle heat management apparatus
KR102242777B1 (en) * 2014-03-20 2021-04-20 엘지전자 주식회사 Air Conditioner
CN105333638B (en) * 2014-05-26 2018-09-21 大金工业株式会社 Air-conditioning device and its control method
JP6443177B2 (en) * 2015-03-30 2018-12-26 ダイキン工業株式会社 Air conditioner
JP6723077B2 (en) 2016-06-02 2020-07-15 サンデン・オートモーティブクライメイトシステム株式会社 Vehicle air conditioner
JP2019011899A (en) * 2017-06-30 2019-01-24 株式会社富士通ゼネラル Air conditioning device
CN108224644A (en) * 2018-02-12 2018-06-29 深圳市亿凌捷科技有限公司 All weather refrigeration system and its control method
KR102110915B1 (en) * 2018-04-26 2020-05-14 히타치 존슨 컨트롤즈 쿠쵸 가부시키가이샤 Air conditioner
JP6911883B2 (en) * 2019-03-29 2021-07-28 ダイキン工業株式会社 Performance deterioration diagnosis system for refrigeration cycle equipment
JP7037087B2 (en) * 2020-03-27 2022-03-16 ダイキン工業株式会社 Refrigeration cycle device

Citations (25)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62158966A (en) 1986-01-08 1987-07-14 株式会社日立製作所 Air conditioner with detector for quantity of refrigerant
US5035119A (en) * 1984-08-08 1991-07-30 Alsenz Richard H Apparatus for monitoring solenoid expansion valve flow rates
JPH03186170A (en) 1989-12-13 1991-08-14 Hitachi Ltd Refrigerating machine and refrigerant amount indicating method in refrigerating machine
JPH04148170A (en) 1990-10-12 1992-05-21 Mitsubishi Electric Corp Refrigerant sealing amount operating device
US5241833A (en) * 1991-06-28 1993-09-07 Kabushiki Kaisha Toshiba Air conditioning apparatus
US5271238A (en) * 1990-09-14 1993-12-21 Nartron Corporation Environmental control system
JPH06174289A (en) 1992-12-07 1994-06-24 Matsushita Seiko Co Ltd Separation type air-conditioning machine
JPH08200905A (en) 1995-01-20 1996-08-09 Hitachi Ltd Indicator for amount of refrigerant
US5630324A (en) * 1993-09-20 1997-05-20 Hitachi Ltd. Multiple type air conditioner system and address setting method thereof
US5860286A (en) * 1997-06-06 1999-01-19 Carrier Corporation System monitoring refrigeration charge
JPH1163745A (en) 1997-08-08 1999-03-05 Hitachi Ltd Refrigerant feeding amount indicating device for air conditioner and monitoring device
JPH11211292A (en) 1998-01-26 1999-08-06 Matsushita Electric Ind Co Ltd Refrigerant leakage detector and refrigerant leakage detection method for freezer
JP2000283521A (en) 1999-03-31 2000-10-13 Fujitsu General Ltd Air conditioner
JP2001027461A (en) 1999-07-15 2001-01-30 Zexel Valeo Climate Control Corp Method for detecting quantity of refrigerant in vapor compression refrigeration cycle
JP2001317790A (en) 2000-05-11 2001-11-16 Matsushita Refrig Co Ltd Diagnostic unit for air conditioner
US6318097B1 (en) 1999-07-27 2001-11-20 Daimlerchrysler Ag Method for monitoring the refrigerant level in an air conditioner
JP2002039649A (en) 2000-07-24 2002-02-06 Funai Electric Co Ltd Operation alarm device of air conditioner
US20020139128A1 (en) * 2001-04-03 2002-10-03 Takahisa Suzuki Vapor compression type refrigeration apparatus including leak detection and method for detecting refrigerant leaks
US20030019221A1 (en) * 2001-05-11 2003-01-30 Rossi Todd M. Estimating operating parameters of vapor compression cycle equipment
JP2005098642A (en) 2003-09-26 2005-04-14 Hitachi Ltd Refrigeration air conditioner and refrigeration air conditioning system
US20060086111A1 (en) * 2004-10-25 2006-04-27 Carrier Corporation Method for estimating inlet and outlet air conditions of an HVAC system
JP2006129282A (en) * 2004-10-29 2006-05-18 Fujitsu General Ltd Gateway device
US20060243815A1 (en) * 2005-04-28 2006-11-02 Lg Electronics Inc. Air conditioning system and method for controlling the same
US20070089440A1 (en) * 2005-10-21 2007-04-26 Abtar Singh Monitoring compressor performance in a refrigeration system
US20070204635A1 (en) * 2005-02-24 2007-09-06 Mitsubishi Denki Kabushiki Kaisha Air Conditioning Apparatus

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002267232A (en) * 2001-03-12 2002-09-18 Hitachi Ltd Service system and service-providing device for air conditioner
JP2002350014A (en) * 2001-05-22 2002-12-04 Daikin Ind Ltd Refrigerating equipment

Patent Citations (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5035119A (en) * 1984-08-08 1991-07-30 Alsenz Richard H Apparatus for monitoring solenoid expansion valve flow rates
JPS62158966A (en) 1986-01-08 1987-07-14 株式会社日立製作所 Air conditioner with detector for quantity of refrigerant
JPH03186170A (en) 1989-12-13 1991-08-14 Hitachi Ltd Refrigerating machine and refrigerant amount indicating method in refrigerating machine
US5214918A (en) 1989-12-13 1993-06-01 Hitachi, Ltd. Refrigerator and method for indicating refrigerant amount
US5271238A (en) * 1990-09-14 1993-12-21 Nartron Corporation Environmental control system
JPH04148170A (en) 1990-10-12 1992-05-21 Mitsubishi Electric Corp Refrigerant sealing amount operating device
US5241833A (en) * 1991-06-28 1993-09-07 Kabushiki Kaisha Toshiba Air conditioning apparatus
JPH06174289A (en) 1992-12-07 1994-06-24 Matsushita Seiko Co Ltd Separation type air-conditioning machine
US5630324A (en) * 1993-09-20 1997-05-20 Hitachi Ltd. Multiple type air conditioner system and address setting method thereof
JPH08200905A (en) 1995-01-20 1996-08-09 Hitachi Ltd Indicator for amount of refrigerant
US5860286A (en) * 1997-06-06 1999-01-19 Carrier Corporation System monitoring refrigeration charge
JPH1163745A (en) 1997-08-08 1999-03-05 Hitachi Ltd Refrigerant feeding amount indicating device for air conditioner and monitoring device
JPH11211292A (en) 1998-01-26 1999-08-06 Matsushita Electric Ind Co Ltd Refrigerant leakage detector and refrigerant leakage detection method for freezer
JP2000283521A (en) 1999-03-31 2000-10-13 Fujitsu General Ltd Air conditioner
JP2001027461A (en) 1999-07-15 2001-01-30 Zexel Valeo Climate Control Corp Method for detecting quantity of refrigerant in vapor compression refrigeration cycle
US6318097B1 (en) 1999-07-27 2001-11-20 Daimlerchrysler Ag Method for monitoring the refrigerant level in an air conditioner
JP2001317790A (en) 2000-05-11 2001-11-16 Matsushita Refrig Co Ltd Diagnostic unit for air conditioner
JP2002039649A (en) 2000-07-24 2002-02-06 Funai Electric Co Ltd Operation alarm device of air conditioner
US20020139128A1 (en) * 2001-04-03 2002-10-03 Takahisa Suzuki Vapor compression type refrigeration apparatus including leak detection and method for detecting refrigerant leaks
US20030019221A1 (en) * 2001-05-11 2003-01-30 Rossi Todd M. Estimating operating parameters of vapor compression cycle equipment
JP2005098642A (en) 2003-09-26 2005-04-14 Hitachi Ltd Refrigeration air conditioner and refrigeration air conditioning system
US20060086111A1 (en) * 2004-10-25 2006-04-27 Carrier Corporation Method for estimating inlet and outlet air conditions of an HVAC system
JP2006129282A (en) * 2004-10-29 2006-05-18 Fujitsu General Ltd Gateway device
US20070204635A1 (en) * 2005-02-24 2007-09-06 Mitsubishi Denki Kabushiki Kaisha Air Conditioning Apparatus
US20060243815A1 (en) * 2005-04-28 2006-11-02 Lg Electronics Inc. Air conditioning system and method for controlling the same
US20070089440A1 (en) * 2005-10-21 2007-04-26 Abtar Singh Monitoring compressor performance in a refrigeration system

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
ANSI/ARI Standard 540-1999; Positive Displacement Refrigerant Compressors and Compressor Units; Virginia; 1999.
European Search Report of corresponding EP Application No. 06 83 4482.9 dated Jun. 25, 2014.
Kenichi Hashizume; Flow pattern and void ratio of refrigerant; Transactions of the Japan Society of Mechanical Engineers; Series B, vol. 49, No. 437, pp. 189-196; Japan;1983.
Korean Office Action of the corresponding Korean Application No. 10-2008-7016046 dated Jun. 17, 2010.
Minoru Shiotani et al.; Multivariate statistical analysis theory; Kyoritsu Shuppan; Series A, 5-3; Japan; 1967.

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11927377B2 (en) 2014-09-26 2024-03-12 Waterfurnace International, Inc. Air conditioning system with vapor injection compressor
US11953239B2 (en) 2018-08-29 2024-04-09 Waterfurnace International, Inc. Integrated demand water heating using a capacity modulated heat pump with desuperheater

Also Published As

Publication number Publication date
CN101331370A (en) 2008-12-24
ES2734899T3 (en) 2019-12-12
EP1970655A4 (en) 2014-07-23
EP1970655B1 (en) 2019-04-24
WO2007069587A1 (en) 2007-06-21
KR20080081946A (en) 2008-09-10
US20090151374A1 (en) 2009-06-18
AU2006324602A1 (en) 2007-06-21
CN101331370B (en) 2010-11-03
EP1970655A1 (en) 2008-09-17
JP4120676B2 (en) 2008-07-16
AU2006324602B2 (en) 2009-11-19
JP2007163103A (en) 2007-06-28

Similar Documents

Publication Publication Date Title
US9303908B2 (en) Air conditioner
US7946121B2 (en) Air conditioner
AU2006324596B2 (en) Air conditioner
US7980086B2 (en) Air conditioner
US7954333B2 (en) Air conditioner
AU2007264431B2 (en) Air conditioner
US7997093B2 (en) Air conditioner
AU2007244357B2 (en) Air conditioner
US8069682B2 (en) Air conditioner that corrects refrigerant quantity determination based on refrigerant temperature
US8033123B2 (en) Air conditioner
US20090031739A1 (en) Air conditioner
US7878010B2 (en) Air conditioner
JP2007163102A (en) Air conditioning system

Legal Events

Date Code Title Description
AS Assignment

Owner name: DAIKIN INDUSTRIES, LTD., JAPAN

Free format text: ASSIGNMENT OF ASSIGNORS INTEREST;ASSIGNOR:KASAHARA, SHINICHI;REEL/FRAME:021070/0267

Effective date: 20070111

STCF Information on status: patent grant

Free format text: PATENTED CASE

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 4TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1551); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 4

MAFP Maintenance fee payment

Free format text: PAYMENT OF MAINTENANCE FEE, 8TH YEAR, LARGE ENTITY (ORIGINAL EVENT CODE: M1552); ENTITY STATUS OF PATENT OWNER: LARGE ENTITY

Year of fee payment: 8